Demand response management system

The demand response management system addresses the inefficiencies in heating device control during tight power supply and demand by using air conditioner and floor heating alternatives, ensuring user comfort and economic efficiency through user-consent-based floor heating adjustments.

JP2024147918APending Publication Date: 2024-10-17OSAKA GAS CO LTD

Patent Information

Application Number
JP2023060661
Authority / Receiving Office
JP · JP
Patent Type
Applications
Current Assignee / Owner
Filing Date
2023-04-04
Publication Date
2024-10-17

AI Technical Summary

Technical Problem

Existing power supply and demand control systems fail to manage heating devices effectively during periods of tight electricity supply and demand, leading to unnecessary usage and user discomfort or economic inefficiency, without considering alternative heating options.

Method used

A demand response management system that includes air conditioner and floor heating control mechanisms, calculates alternative heating outputs, and user consent-based floor heating directives to maintain comfort and economy during tight power supply and demand periods.

Benefits of technology

The system ensures comfortable and economical heating by replacing air conditioner heating with floor heating based on user consent, maintaining home heating status and adjusting operations according to user preferences and power demand fluctuations.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 2024147918000001_ABST
    Figure 2024147918000001_ABST
Patent Text Reader

Abstract

To provide a management system for preventing heating conditions of user's home from deteriorating more than necessary in the case of issuing demand response information to cope with tight power supply and demand.SOLUTION: A demand response management system includes an air conditioner command part 45b for giving an air conditioner control command to an air conditioning heating control part 70 for controlling the drive of air conditioning and heating, a floor heating command part 45c for giving a floor heating control command to a floor heating control part 80 for controlling the drive of floor heating, a replacement heating output calculation part 43 for calculating an output of floor heating for replacing the air condition and heating, a demand response information acquisition part 41 for acquiring demand response information showing a tight power supply and demand period, a notification information generation part 42 for generating notification information for notifying a user of the demand response information, and a replacement heating control part 45a for executing air conditioning heating replacement floor heating control for replacing the air conditioning heating with floor heating on the basis of an air conditioning heating replacement heating command.SELECTED DRAWING: Figure 1
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to a demand response management system that manages heating control in a user's home based on demand response information that requests adjustment of power supply and demand.

[0002] In the electricity supply and demand control service system disclosed in Patent Document 1, operation status request information is transmitted to the power generation equipment based on demand response information, and the center server transmits schedule change request information to an administrator terminal device based on the demand response information and the operation status information received from the power generation equipment. A user who manages the power generation equipment transmits availability information including the operation parameters of the power generation equipment to the center server using the administrator terminal device. When the center server transmits operation control information including the operation parameters included in the availability information to the power generation equipment, the power generation equipment generates power based on the operation parameters included in the operation control information. [Prior art documents] [Patent documents]

[0003] [Patent Document 1] JP 2017-108576 A Summary of the Invention [Problem to be solved by the invention]

[0004] In the power supply and demand control service system according to Patent Document 1, when demand response information is issued, the demand response information is notified to users, and power generation adjustment is performed on the user side, but the usage status of terminal power consumption devices such as heating devices in the user's home is not managed. For this reason, even if the operation rate of heating devices, etc. is reduced, a problem occurs in that they are used at the same operation rate as when the power supply and demand was tight even after the power supply and demand was tight. In addition, even if the operation rate of heating devices, etc. is automatically reduced, the power adjustment may be contrary to the user's intention, and there may be a problem of impairing the comfort and economy of the user's home. In particular, since no consideration is given to alternative heating when the operation rate of heating devices powered by electricity is zero or reduced, there is a possibility that the user may be inconvenienced.

[0005] In view of the above circumstances, an object of the present invention is to provide a management system that does not unnecessarily worsen the heating conditions in users' homes when demand response information is issued to deal with a tight power supply and demand situation. [Means for solving the problem]

[0006] The demand response management system according to the present invention comprises an air conditioner command unit that gives an air conditioner control command to an air conditioner heating control unit that controls the operation of the air conditioner heating, a floor heating command unit that gives a floor heating control command to a floor heating control unit that controls the operation of the floor heating, an alternative heating output calculation unit that calculates the output of the floor heating that replaces the air conditioner heating, a demand response information acquisition unit that acquires demand response information that indicates a period of tight electricity supply and demand, a notification information generation unit that generates notification information to notify a user of the demand response information, and an alternative heating control unit that executes air conditioner heating alternative floor heating control that replaces the air conditioner heating with the floor heating based on an air conditioner heating alternative floor heating command.

[0007] According to this configuration, notification information is generated to notify the user of the acquired demand response information, and air conditioner heating substitution floor heating control, in which air conditioner heating is substituted with floor heating, is executed based on an air conditioner heating substitution floor heating command. In other words, when demand response information is issued, the user can know through the notification information, and by substituting floor heating for air conditioner heating, the tight supply and demand of electricity is addressed and the resulting deterioration of the heating situation in the user's home is prevented. The air conditioner heating substitution floor heating control here includes stopping air conditioner heating and limiting the output of air conditioner heating (such as adjusting the operating rate and adjusting the maximum room temperature).

[0008] In a preferred embodiment of the present invention, the alternative heating output calculation unit calculates the compensation output of the floor heating to compensate for the drop in room temperature caused by the reduction or stop of the air conditioner heating, based on the heating power consumption read from a heating power consumption recording unit that records the heating power consumption over time by the air conditioner heating. In this configuration, the heating state of the user's home by the air conditioner heating is grasped based on the power consumed by the air conditioner heating in the past, and the compensation output of the floor heating is calculated so that the heating state is maintained by the floor heating that substitutes for (including compensation for) the air conditioner heating. This makes it possible to provide a comfortable heating situation in the user's home while dealing with the tight supply and demand of electricity.

[0009] Even if the demand response information is notified, if the air conditioner heating alternative floor heating is forcibly performed, it may go against the user's wishes and cause a loss of comfort and economy for the user. For this reason, in a preferred embodiment of the present invention, the demand response information includes a period and time period when the power supply and demand are tight, and the notification information includes an inquiry as to whether the user will allow the air conditioner heating alternative floor heating during the period and time period. The user can know from the notification information the period and time period during which the air conditioner heating alternative floor heating is desired, and can therefore check whether the user will approve this request and allow the air conditioner heating alternative floor heating.

[0010] Furthermore, in a preferred embodiment of the present invention, the air conditioner heating alternative floor heating command is issued based on the user's permission for the air conditioner heating alternative floor heating. In other words, if the user permits the air conditioner heating alternative floor heating, an air conditioner heating alternative floor heating command is issued, and if the user does not permit the air conditioner heating alternative floor heating, an air conditioner heating alternative floor heating command is not issued and the air conditioner heating alternative floor heating is not performed. This allows the heating situation in the user's home to be in line with the user's wishes.

[0011] Even if the tightness of the power supply and demand is resolved and the air conditioner heating alternative floor heating is no longer necessary, the user will not notice this. Furthermore, if there is no built-in control for automatically stopping the air conditioner heating alternative floor heating when the end of the demand response information is announced, the air conditioner heating alternative floor heating will continue even after the demand response information is resolved. In order to resolve this problem, in a preferred embodiment of the present invention, under the execution of the air conditioner heating alternative floor heating control, at the end of the power tightness period or immediately before the end of the power tightness period, the notification information generation unit generates inquiry information that asks the user whether or not to continue the air conditioner heating alternative floor heating control after the end of the power tightness period. Based on this inquiry information, the user can decide whether or not to continue the air conditioner heating alternative floor heating even after the tightness of the power supply and demand is resolved.

[0012] If the user does not want floor heating as an alternative to air conditioner heating after the tight power supply and demand is resolved, it is convenient that the heating situation in the user's home is automatically restored (initialized) to the state before the demand response information was issued, eliminating the need for the user to perform a return operation. For this reason, in a preferred embodiment of the present invention, if the user denies the continuation of the air conditioner heating alternative floor heating control, the air conditioner command unit gives an initialization command to the air conditioner heating control unit to return the air conditioner heating to the state before the air conditioner heating alternative floor heating control was started, and the floor heating command unit gives an initialization command to the floor heating control unit to return the floor heating to the state before the air conditioner heating alternative floor heating control was started.

[0013] Other features, operations, and advantages of the present invention will become apparent from the following description of the invention using the accompanying drawings. [Brief description of the drawings]

[0014] [Figure 1] FIG. 1 is a functional block diagram illustrating an example of a demand response management system. [Diagram 2] 1 is a graph showing changes in power consumption of an air conditioner over time. [Diagram 3] 13 is a graph showing an example of a relationship between floor heating operation rate and heat dissipation amount per unit area for each hot water temperature. [Figure 4] 13 is an example of a display screen showing an inquiry as to whether or not to accept cooperation in saving electricity. [Diagram 5] 13 is an example of a display screen diagram of inquiry information for asking a user whether or not to continue air conditioner heating alternative floor heating control. [Figure 6] 1 is a flow diagram showing an example of an information flow in a demand response management system. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0015] One embodiment of a demand response management system according to the present invention will be described with reference to Fig. 1. As an example, this demand response management system requests households equipped with floor heating equipment to cooperate in saving electricity during times of tight electricity demand, such as winter, and encourages them to actively use floor heating (heating that mainly consumes gas) instead of air conditioning heating (heating that mainly consumes electricity).

[0016] Based on tight power supply and demand information, which is a request for adjusting the supply and demand of power usage, transmitted from a power company 1 (including a power exchange, etc.), a demand response management server 2 transmits demand response information indicating the period and time period of tight power supply and demand to a user's home 3 that is the target of this demand response. The power company 1, the demand response management server 2, and the user's home 3 are connected to each other via an information and communication network such as the Internet or a public line network so that they can exchange data.

[0017] The electric power company 1 is equipped with a power tightness information transmission unit 10 that transmits power tightness information generated internally to a demand response management server 2, and the demand response management server 2 is equipped with a demand response information transmission unit 20 that transmits demand response information created based on the received power tightness information to a user's home 3.

[0018] The user's home 3 is equipped with an air conditioner 7 (including an electric heater, etc.), a gas-type floor heating device 8, and a computer unit 4 that manages the air conditioner 7 and the floor heating device 8. The air conditioner 7 is equipped with an air conditioner heating control unit 70 that controls the operation of the air conditioner heating based on a control command from the computer unit 4. The floor heating device 8 is equipped with a floor heating control unit 80 that controls the operation of the floor heating based on a control command from the computer unit 4.

[0019] The computer unit 4 is equipped with a first data input / output unit 4a and a second data input / output unit 4b for inputting and outputting data. The first data input / output unit 4a accesses an information communication network to input and output data. The second data input / output unit 4b is connected by wire or wirelessly to the operation unit 6, the air conditioner 7, and the floor heating device 8 connected to the computer unit 4 so as to be able to exchange data with these devices.

[0020] The operation unit 6 includes a display 61 such as a liquid crystal display, and an operation panel 62 including buttons, switches, etc. The display 61 and the operation panel 62 can be replaced with a touch panel. The operation unit 6 can be used to operate either or both of the air conditioner 7 and the floor heating device 8.

[0021] The computer unit 4 has functional units constructed by software (computer programs) and / or hardware. The functional units that are particularly related to the present invention are a demand response information acquisition unit 41, a notification information generation unit 42, an alternative heating output calculation unit 43, a heating power consumption recording unit 44, and an alternative heating management unit 45.

[0022] The demand response information acquisition unit 41 acquires the demand response information indicating the period and time period of tight power supply and demand through the first data input / output unit 4a. The notification information generation unit 42 generates notification information for notifying the user of the power saving cooperation by the demand response information. The notification information includes the content, period, and time period of the power saving cooperation. Furthermore, the notification information also includes inquiry information inquiring the user whether or not to accept the power saving cooperation. The notification information is provided to the operation unit 6 through the second data output unit 4b. The operation unit 6 displays the content of the notification information on the display 61. FIG. 4 shows an example of a display screen displaying an inquiry whether or not to accept the power saving cooperation. The user's response to such an inquiry whether or not to accept the power saving cooperation is input through the operation panel 62, and the input data is provided to the function unit of the computer unit 4 as a user command. In this embodiment, the power saving cooperation of the user is to use floor heating instead of air conditioner heating.

[0023] The heating power over time when the air conditioner 7 is in the air conditioning heating mode is sent from the air conditioner heating control unit 70 to the computer unit 4 and recorded in the heating power consumption recording unit 44. Since the heating power consumption recording unit 44 records the control history of the air conditioner heating mode, it is possible to know the amount of power consumed by the air conditioner heating mode in a specified period and in a specified time zone in the past from this control history.

[0024] The alternative heating output calculation unit 43 calculates the amount of energy for air conditioner heating based on the heating power consumption read from the heating power consumption recording unit 44, and from that amount of energy calculates the compensation output of floor heating that must be compensated for by the floor heating when air conditioner heating is stopped (the output value of floor heating that compensates for the drop in room temperature due to the stoppage of air conditioner heating).

[0025] For example, when determining the output of floor heating to replace air conditioner heating, the power consumption of the air conditioner 7 is multiplied by a predetermined coefficient to calculate the air conditioner heating output. As shown in FIG. 2, the power consumption of the air conditioner 7 changes over time, so the air conditioner heating output is calculated on an integrated basis. In floor heating, heating is performed by repeatedly flowing hot water at 40°C to 70°C for a certain period of time during a steady state. An example of a relational expression between the floor heating operation rate and the heat dissipation amount per unit area at a specific hot water temperature is shown in FIG. 3. In FIG. 3, a graph of hot water flowing at 40°C is shown by a solid line, a graph of hot water flowing at 60°C is shown by a dotted line, and a graph of hot water flowing at 75°C is shown by a dashed line. Using such a relational expression, the compensation output of floor heating (floor heating control amount) that the floor heating must compensate for when the air conditioner heating is stopped is calculated. An example of the calculation is shown below. First, the heating output is calculated by multiplying the power consumption of the air conditioner 7 by a specified coefficient (defined in COP3.6, etc.), so that the air conditioner power consumption is approximately 200 W and the air conditioner heating output is 720 W. Next, the floor heating output is calculated to replace the air conditioner heating output. In the case of floor heating, hot water is passed through at 40°C / 60°C during steady state, and a fixed hot water passing time is repeated for a fixed cycle time. If the thermal valve opening rate is defined as hot water passing time / cycle time, the amount of heat dissipated by the floor heating varies depending on the hot water passing temperature, as shown in Figure 3. If the heat dissipation area of ​​the floor heating is 13 m2, 2 If this is set, the amount of heat dissipated by the floor heating will be approximately 55 W / m 2 From the graph in Figure 3, the thermal valve opening rate is calculated to be 20% when the hot water is 60°C, so this floor heating output can be used as the floor heating output when the air conditioner is not operating.

[0026] In this embodiment, if the user responds affirmatively to the inquiry about whether to accept cooperation in power saving, this is treated as an air conditioner heating alternative floor heating command (a type of user command), and air conditioner heating alternative floor heating is executed by the alternative heating management unit 45.

[0027] The alternative heating management unit 45 includes an alternative heating control unit 45a that controls air conditioner alternative heating, which provides floor heating instead of air conditioner heating, an air conditioner command unit 45b that gives air conditioner control commands to the air conditioner heating control unit 70, and a floor heating command unit 45c that gives floor heating control commands to the floor heating control unit 80.

[0028] The alternative heating control unit 45a gives an air conditioner control command (e.g., an air conditioner heating stop command) to the air conditioner heating control unit 70 to execute air conditioner heating alternative floor heating based on the alternative heating output (compensatory output for floor heating) calculated by the alternative heating output calculation unit 43, and gives a floor heating control command (e.g., a floor heating command to realize the compensatory output) to the floor heating control unit 80.

[0029] When demand response information is acquired that indicates that the tight power supply and demand has been resolved while the air conditioner heating alternative floor heating control is being executed, the notification information generating unit 42 generates inquiry information (a type of notification information) that asks the user whether or not to continue the air conditioner heating alternative floor heating control after the end of the power tight period, and provides it to the operation unit 6. FIG. 5 shows an example of a display screen diagram of inquiry information that asks the user whether or not to continue the air conditioner heating alternative floor heating control. When the user sees this notification information and provides a user command to the alternative heating management unit 45 requesting the continuation of the air conditioner heating alternative floor heating control, the air conditioner heating alternative floor heating control is continued. When the user provides a user command to the alternative heating management unit 45 that denies the continuation of the air conditioner heating alternative floor heating control, the alternative heating control unit 45a provides an air conditioner heating alternative floor heating stop command to the air conditioner command unit 45b and the floor heating command unit 45c.

[0030] The air conditioner command unit 45b, which has received the air conditioner heating substitute floor heating stop command, provides an initialization command to the air conditioner heating control unit 70 to return the air conditioner heating to the state before the air conditioner heating substitute floor heating control was started. The floor heating command unit 45c, which has received the air conditioner heating substitute floor heating stop command, provides an initialization command to the floor heating control unit 80 to return the floor heating to the state before the air conditioner heating substitute floor heating control was started.

[0031] Next, an example of a procedure for processing air conditioner heating alternative floor heating in the above-mentioned demand response management system will be described with reference to FIG.

[0032] The electric power company 1 transmits information on the tightness of power supply and demand to the demand response management server 2 (#01). The demand response management server 2 creates demand response information based on the received tightness of power supply and demand information, and transmits it to the computer unit 4 of the registered user's home 3 (#02). The computer unit 4 checks whether the received demand response information is a notification of a request for alternative heating due to the tightness of power supply and demand, or a notification that the tightness of power supply and demand has been resolved and alternative heating can be canceled (#03).

[0033] If the demand response information is a notification requesting alternative heating (#03, request branch), the user is notified that alternative heating is being requested via a notification screen such as that shown in Fig. 4 (#11). If the user accepts the request (#12, Yes branch), an alternative heating execution command is sent to the alternative heating output calculation unit 43 (#13). If the user does not accept this request (#12, No branch), the system waits until the next demand response information is received.

[0034] The alternative heating output calculation unit 43, which has received the alternative heating execution command, calculates the heating power consumption in the most recent specified period (#14), and calculates the floor heating output required for alternative heating (here, alternative heating output data or compensation output data) by referring to the heating power consumption (#15). The calculated alternative heating output data is provided to the alternative heating management unit 45 (#16).

[0035] The alternative heating management unit 45, which receives the alternative heating output, generates an air conditioner heating control command (here, stopping air conditioner heating) (#21) and sends it to the air conditioner 7 (#22). This causes the air conditioner 7 to stop. The air conditioner heating control state (such as the target temperature over time) before the air conditioner 7 was stopped is stored. In addition, the alternative heating management unit 45 generates a floor heating control command (here, starting or increasing floor heating) (#23) and sends it to the floor heating equipment 8 (#24). This causes the floor heating equipment 8 to start floor heating or increase floor heating (temperature increase).

[0036] If the demand response information notifies that the alternative heating can be cancelled (#03 Cancel branch), a check is made as to whether or not the alternative heating is currently being performed (#31). If the alternative heating is not being performed (#31 No branch), the process waits until the next demand response information is received. If the alternative heating is being performed (#31 Yes branch), the end of the alternative heating is notified through a notification screen such as that shown in FIG. 5 (#32). The notification screen indicates that the alternative heating can be terminated, but asks the user whether or not to continue the alternative heating (#33 Yes branch). If the user wishes to continue the alternative heating (#33 Yes branch), the alternative heating continues, and the process waits until the next demand response information is received. The user can also terminate the alternative heating through an operation on the operation unit 6, and in that case, the process after step #33 No branch described below is carried out.

[0037] If the user does not want to continue the alternative heating (No branch in #33), an alternative heating end command is given to the alternative heating management unit 45 (#34). The alternative heating management unit 45, which has received the alternative heating end command, reads out the stored air conditioner heating control state before the start of alternative heating, generates an air conditioner heating initialization command (e.g., return to the control state before alternative heating) (#35), and sends this to the air conditioner 7 (#36). This causes the air conditioner 7 to return to the control state before alternative heating. Furthermore, the alternative heating management unit 45 reads out the stored floor heating control state before the start of alternative heating, generates a floor heating initialization command (#37), and sends this to the floor heating equipment 8 (#38). This causes the floor heating equipment 8 to return to the control state before alternative heating, for example, floor heating is stopped or reduced.

[0038] [Another embodiment] (1) In the above-described embodiment, it was assumed that in the air conditioner heating alternative floor heating, the air conditioner heating is stopped and the floor heating operation is increased to compensate for the drop in room temperature caused by the air conditioner heating being stopped. However, an air conditioner heating alternative floor heating (partial air conditioner heating alternative floor heating) may be performed in which the output ratio between the air conditioner heating and the floor heating is adjusted.

[0039] (2) The functional block diagram shown in Fig. 1 is an example, and each functional unit may be integrated with other functional units or divided into multiple functional units. In addition, the demand response management server 2 may be installed in the electric power company 1. Furthermore, the computer unit 4 and the operation unit 6 may be incorporated in the operation panel of the floor heating device 8 or the air conditioner 7.

[0040] (3) In the above-described embodiment, the air conditioner heating alternative floor heating command is issued based on the user's permission for the air conditioner heating alternative floor heating, but the alternative heating management unit 45 may automatically issue an air conditioner heating alternative floor heating command without the user's consent. However, it is preferable that the permission for such automatic issuance of an air conditioner heating alternative floor heating command is set in advance by the user as an item of user settings.

[0041] In addition, the configurations disclosed in the above embodiments (including other embodiments, the same applies below) can be applied in combination with configurations disclosed in other embodiments, provided no contradiction arises. Furthermore, the embodiments disclosed in this specification are illustrative, and the embodiments of the present invention are not limited thereto, and can be appropriately modified within the scope that does not deviate from the purpose of the present invention. [Industrial Applicability]

[0042] The present invention can be applied to homes and facilities equipped with air conditioners and floor heating devices. [Explanation of symbols]

[0043] 1: Electric power company 2: Demand response management server 3: User's home 4: Computer unit 4a: First data input / output unit 4b: Second data output section 6: Operation unit 7: Air conditioner 8: Floor heating equipment 10: Information transmission unit 20: Demand response information transmission unit 41: Demand response information acquisition unit 42: Notification information generating unit 43: Alternative heating output calculation section 44: Heating power consumption recorder 45: Alternative Heating Management Department 45a: Alternative heating control unit 45b: Air conditioner control unit 45c: Floor heating control unit 61: Display 62: Operation panel 70: Air conditioner heating control unit 80: Floor heating control unit

Claims

1. an air conditioner command unit that gives an air conditioner control command to an air conditioner heating control unit that controls the driving of the air conditioner heating; A floor heating command unit that gives a floor heating control command to a floor heating control unit that controls the operation of the floor heating; An alternative heating output calculation unit that calculates the output of the floor heating that substitutes for the air conditioner heating; a demand response information acquisition unit that acquires demand response information indicating a period of tight power supply and demand; a notification information generating unit that generates notification information for notifying a user of the demand response information; An alternative heating control unit that executes an air conditioner heating alternative floor heating control that substitutes the air conditioner heating with the floor heating based on an air conditioner heating alternative floor heating command; A demand response management system comprising:

2. The demand response management system of claim 1, wherein the alternative heating output calculation unit calculates the compensatory output of the floor heating to compensate for the drop in room temperature caused by a reduction or stopping of the air conditioner heating based on the heating power consumption read out from a heating power consumption recording unit that records the heating power consumption over time by the air conditioner heating.

3. 2. The demand response management system of claim 1, wherein the demand response information includes a period and time period during which power supply and demand are tight, and the notification information includes an inquiry as to whether the user should allow floor heating as an alternative to air conditioning heating during the period and time period.

4. The demand response management system according to claim 3 , wherein the air conditioner heating alternative floor heating command is issued based on permission of the air conditioner heating alternative floor heating by the user.

5. The demand response management system of claim 1, wherein, during execution of the air conditioner heating alternative floor heating control, at the end or immediately before the end of the power tight period, the notification information generating unit generates inquiry information to ask the user whether or not to continue the air conditioner heating alternative floor heating control after the end of the power tight period.

6. A demand response management system as described in claim 5, wherein if the user denies the continuation of the air conditioner heating alternative floor heating control, the air conditioner command unit gives an initialization command to the air conditioner heating control unit to return the air conditioner heating to the state before the air conditioner heating alternative floor heating control was started, and the floor heating command unit gives an initialization command to the floor heating control unit to return the floor heating to the state before the air conditioner heating alternative floor heating control was started.

Citation Information

Patent Citations

  • Management device and management system of equipment, program and recording medium

    JP2014120030A

  • Control unit, hot water supply and heating system, control method, and program

    JP2017048991A

  • Peak cut control device, peak cut control system, peak cut control method, and peak cut control program

    JP2017175857A

  • Energy management control device

    JP2020165549A

  • Power supply and demand control service system

    JP2017108576A

Cited By

  • Floor heating system and building

    JP7952501B1