Support structure for hoisting climbing crane

The support gantry system for climbing cranes addresses weight and assembly challenges by minimizing bending loads and parts, enabling efficient dam construction without schedule interference.

JP2024147950APending Publication Date: 2024-10-17IHI TRANSPORT MASCH CO LTD
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
JP2023060719
Authority / Receiving Office
JP · JP
Patent Type
Applications
Current Assignee / Owner
Filing Date
2023-04-04
Publication Date
2024-10-17

AI Technical Summary

Technical Problem

Existing climbing cranes for high-rise structures and dams face issues with increased weight and assembly time due to horizontal members bearing large bending loads and numerous parts, affecting efficiency and schedule compatibility with concrete pouring.

Method used

A support gantry system with a cross base, guide mast, and truss structures that minimize bending loads on horizontal members, reducing the number of parts and simplifying assembly and disassembly processes.

Benefits of technology

The system reduces weight, minimizes assembly and disassembly time, and allows independent task completion without embedding support materials in the dam, enhancing construction efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 2024147950000001_ABST
    Figure 2024147950000001_ABST
Patent Text Reader

Abstract

To provide a support structure for hoisting a climbing crane, which can reduce a weight by minimizing a bending load acting on horizontal members and the number of components so as to reduce an amount of work and the number of days required for assembly and disassembly.SOLUTION: A support structure for hoisting a climbing crane 1, comprising a cross base 3 on which a mast 2 is erected, and a guide mast 4 that can be raised and lowered along the mast 2, includes a base support structure base 5 having a leg 7 constructed by arranging a mountain-shaped truss structure 6 so as to surround the mast 2 from all sides and connecting adjacent lower ends, a rectangular base horizontal frame 8 whose four corners are horizontally supported by tops of the truss structures 6 and which supports four tip ends 3a of the cross base 3 at the four corners during climbing, and a base support frame 9 which is erected at the four corners of the base horizontal frame 8 so as to straddle the tip ends 3a of the cross base 3, and can connect protruding pieces 4a protruding from the guide mast 4 to upper side surfaces to support them.SELECTED DRAWING: Figure 1
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to a lifting support platform for a climbing crane. [Background technology]

[0002] Generally, in the case of climbing cranes used in the construction of high-rise buildings, dams, etc., the mast can support itself up to a certain height, but once the mast is extended and exceeds a certain height, the mast must be connected to a support material extending from the building structure.

[0003] In particular, when the structure is a dam, it is necessary to embed supports into the dam, but there was a problem in that the assembly work of the climbing crane was affected by the schedule for pouring concrete for the dam.

[0004] Incidentally, while the operating frequency of a typical climbing crane is 20 to 30 minutes per cycle, the operating frequency of a climbing crane for dams is 3 to 4 minutes per cycle. Other characteristics of climbing cranes for dams include a faster hoisting speed and a structure with less deflection compared to typical climbing cranes.

[0005] On the other hand, Patent Document 1 discloses a crane in which an outer mast is installed around an inner mast that supports the crane body from vertically below, and the inner mast is raised and lowered while being supported by the outer mast.

[0006] If the system disclosed in Patent Document 1 is used in the construction of a dam, there is no need to embed supports into the dam, so the assembly work of the climbing crane is not affected by the dam's concrete pouring construction schedule, and each task can be carried out separately. [Prior art documents] [Patent documents]

[0007] [Patent Document 1] JP 2019-81629 A Summary of the Invention [Problem to be solved by the invention]

[0008] However, the outer mast disclosed in Patent Document 1 has a structure in which four columns are connected by horizontal members and diagonal members, but since a large bending load acts on the horizontal members to support the weight of the climbing crane, the horizontal members must have a cross-sectional size that satisfies the bending strength, which leads to an increase in weight. In addition, there is also the issue that the amount of work and number of days required for assembly and disassembly increases due to the increased number of parts.

[0009] The present invention has been made in consideration of the above-mentioned circumstances, and has as its object to provide a support platform for lifting and lowering a climbing crane that minimizes the bending load acting on the horizontal members, thereby reducing weight and the number of parts, thereby reducing the amount of work and number of days required for assembly and disassembly. [Means for solving the problem]

[0010] The present invention provides a support platform for ascent and descent of a climbing crane, comprising a cross base on which a mast is erected and a guide mast that can be raised and lowered along the mast, The base support gantry has four truss structures forming an upward mountain shape, which are arranged around the mast on all four sides and are constructed by connecting the adjacent lower ends of each truss structure, a rectangular base horizontal frame portion whose four corners are horizontally supported by the tops of each truss structure and which supports the four tips of the cross base at the four corners during climbing, and a base support frame which is erected at the four corners of the base horizontal frame portion so as to straddle the tip of the cross base during climbing and which can support protrusions extending from the guide mast by connecting them to the upper side surfaces.

[0011] In addition, it is preferable that the support platform for lifting and lowering of the climbing crane is equipped with an extension support platform that is stacked on the base support platform and has: a vertical column section that stands upright with its lower end connected directly above the upper part of each base support frame of the base support platform; an inclined column section that extends diagonally downward from the upper ends of a pair of vertical column sections diagonally facing each other in the base horizontal frame section of the base support platform and is connected to the vicinity of the lower part of the base support frame directly below the adjacent vertical column section; a rectangular extension horizontal frame section whose four corners are horizontally supported by the upper ends of the vertical column sections and that supports the four tips of the cross base at the four corners during further climbing; and an extension support frame that is erected at the four corners of the extension horizontal frame section so as to straddle the tip of the cross base during climbing and can connect to the upper side surfaces to support the protrusions extending from the guide masts.

[0012] Furthermore, in the support platform for lifting and lowering of the climbing crane, multiple tiers of extension support platforms of the same structure are stacked on a base support platform, and the lower ends of each vertical column portion of the upper extension support platform are connected directly above the upper parts of each extension support frame of the lower extension support platform, and the lower ends of each diagonal column portion of the upper extension support platform are connected near the lower parts of a set of extension support frames diagonally opposite the extension horizontal frame portion of the lower extension support platform.

[0013] In addition, in the support platform for lifting and lowering of the climbing crane, it is preferable that the base horizontal frame portion is provided with a base horizontal beam that is hung between the corners to which the lower ends of the inclined column portions are connected, and the extension horizontal frame portion is provided with an extension horizontal beam that is hung between the corners to which the lower ends of the inclined column portions of the extension support platform of the same structure are connected.

[0014] Furthermore, in the support platform for lifting and lowering a climbing crane, the climbing crane may be used in the construction of a dam. Effect of the Invention

[0015] The support platform for lifting and lowering a climbing crane of the present invention has the excellent effect of minimizing the bending load acting on the horizontal members, thereby reducing weight, and reducing the number of parts, thereby reducing the amount of work and the number of days required for assembly and disassembly. [Brief description of the drawings]

[0016] [Figure 1] FIG. 1 is a side view showing a first embodiment of the present invention. [Diagram 2] FIG. 2 is a plan view of the cross base of FIG. [Diagram 3] FIG. 3 is a side view of the cross base of FIG. [Figure 4] FIG. 2 is a perspective view of the base support gantry of FIG. [Diagram 5] 2 is a side view showing the state in which the tips of the cross base are fixed to the four corners of the horizontal frame part of the base in FIG. 1. [Figure 6] 2 is a front view showing details of the base support frame of FIG. 1. [Figure 7] FIG. 7 is a side view of the base support frame of FIG. 6. [Figure 8] 2 is a side view showing a state in which each protrusion of the guide mast in FIG. 1 is supported by an upper portion of the base support frame. [Figure 9] FIG. 6 is a side view showing the climbing crane of FIG. 5 in a climbing state. [Figure 10] FIG. 11 is a perspective view showing a second embodiment of the present invention. [Figure 11] A front view showing details of the base support frame or extension support frame in the second embodiment of the present invention. [Figure 12] FIG. 11 is a front view of the base support gantry and the extension support gantry of FIG. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0017] Hereinafter, an embodiment of the present invention will be described with reference to the accompanying drawings.

[0018] Figures 1 to 9 show a first embodiment of the lifting support gantry for a climbing crane 1 of the present invention. As shown in Figure 1, in this first embodiment, the climbing crane 1 is equipped with a cross base 3 on which a mast 2 is erected, and a guide mast 4 that can be raised and lowered along the mast 2, and a lifting support gantry consisting of a base support gantry 5 is constructed around the mast 2.

[0019] As shown in the plan view of Figure 2 and the side view of Figure 3, the cross base 3 is shaped like a cross with tips 3a extending out on all four sides, and each tip 3a extending out on all four sides is designed to be detachable so as not to interfere with the base support gantry 5 during climbing, which will be described later.

[0020] Figure 4 shows the schematic structure of the base support gantry 5, which is equipped with four truss structures 6 forming an upward mountain shape that are arranged to surround the mast 2 on all sides and are constructed by connecting the adjacent lower ends of each truss structure 6 to form legs 7, and a rectangular base horizontal frame portion 8 whose four corners are horizontally supported by the tops of each truss structure 6 and which supports the four tips 3a of the cross base 3 at the four corners when climbing.

[0021] That is, as shown in Figure 5, the four corners of the base horizontal frame portion 8 are designed to allow the tip 3a of the cross base 3 to be fixed when the climbing crane 1 is climbing, while a base support frame 9 is erected so as to straddle the tip 3a of the cross base 3 which is fixed during climbing, and furthermore, the upper side of this base support frame 9 is designed to be connected to and supported by the protrusion 4a extending from the guide mast 4 of the climbing crane 1.

[0022] More specifically, as shown in the front view of Figure 6, the lower part of the base support frame 9 is formed in a gate shape with a through hole 10 through which the tip 3a of the cross base 3 passes, and is erected so that the lower part of this gate shape can straddle the tip 3a of the cross base 3, and as shown in the side view of Figure 7, a connecting portion 11 is provided on the inner side of the upper part of the base support frame 9 for connecting the protrusion 4a protruding from the guide mast 4.

[0023] Here, various methods can be adopted for fixing the tip 3a of the cross base 3 when the climbing crane 1 is climbing, and for connecting the protrusion 4a extending from the guide mast 4 to the connecting part 11 of the base support frame 9. For example, for the tip 3a of the cross base 3, a clamp 12 can be placed across the upper surface of the tip 3a in the width direction and both ends of the clamp 12 can be fastened to the four corners of the base horizontal frame part 8 by long bolts 13. For the protrusion 4a extending from the guide mast 4, the protrusion 4a can be overlapped with the connecting part 11 on the upper side of the base support frame 9 and connected by bolts or pins.

[0024] In the case of the first embodiment, after the climbing crane 1 is lowered from the state shown in FIG. 1 to the state shown in FIG. 8 and the protruding pieces 4a protruding from the guide mast 4 are connected to the connecting parts on the upper side of the base support frame 9, as shown in FIG. 5, each tip 3a of the cross base 3 is removed and each removed tip 3a is moved to the four corners of the base horizontal frame 8, or new tips 3a are installed in the four corners of the base horizontal frame 8 and the cross base 3 is lifted up and reattached to each tip 3a, thereby fixing the cross base 3 to the four corners of the base horizontal frame 8, and then the protruding pieces 4a of the guide mast 4 are separated from the connecting parts on the upper side of the base support frames 9. As shown in FIG. 9, the support position of the mast 2 is raised by the height of the base support gantry 5, and the climbing crane 1 can climb without supports up to a height where it would be difficult for the mast 2 to stand on its own.

[0025] In this case, the load point of the guide mast 4 and the load point of the cross base 3 are arranged on the same axis that passes vertically through the four corners of the base horizontal frame 8, and in either case, the load of the climbing crane 1 enters the tops of the truss structures 6 of the base support gantry 5 from the four corners of the base horizontal frame 8, and all of them act directly as axial forces on the truss structures 6. Since no large bending load acts on the base horizontal frame 8 as a horizontal member, it is no longer necessary to make the base horizontal frame 8 a cross-sectional size that satisfies the strength against a large bending load, and weight can be reduced. In addition, since the number of parts is small, an increase in the amount of work and number of days required for assembly and disassembly can be avoided.

[0026] Therefore, according to the above first embodiment, the bending load acting on the horizontal members can be minimized to reduce weight, and the number of parts can be reduced to reduce the amount of work and the number of days required for assembly and disassembly. In particular, when such a climbing crane 1 is used for building a dam, since there is no need to embed the support materials in the dam, the assembly work of the climbing crane 1 is not affected by the concrete pouring construction schedule for the dam, and each task can be performed separately.

[0027] Furthermore, Figures 10 to 12 show a second embodiment of the lifting support gantry for the climbing crane 1 of the present invention. In this second embodiment, an extension support gantry 14 is added which can be stacked on the base support gantry 5 described above, and a lifting support gantry is constructed by the base support gantry 5 and the extension support gantry 14 described in the first embodiment. This allows the support position of the mast 2 to be further raised by the amount that the extension support gantry 14 is stacked.

[0028] More specifically, the extension support gantry 14 which is stacked on the base support gantry 5 comprises vertical column sections 15 which stand upright with their lower ends connected directly above the upper parts of each base support frame 9 of the base support gantry 5, an inclined column section 16 which extends diagonally downward from the upper ends of a pair of vertical column sections 15 which face diagonally opposite the base horizontal frame section 8 of the base support gantry 5 and is connected to the vicinity of the lower part of the base support frame 9 directly below the adjacent vertical column section 15, a rectangular frame-shaped extension horizontal frame section 17 whose four corners are horizontally supported by the upper ends of the vertical column sections 15 and which supports the four tips 3a of the cross base 3 at the four corners during further climbing, and an extension support frame 18 which is erected at the four corners of the extension horizontal frame section 17 so as to straddle the tips 3a of the cross base 3 during climbing and which can connect to the upper side surfaces and support the protrusions 4a protruding from the guide mast 4.

[0029] Here, the extension support frame 18 in the extension support gantry 14 is configured in the same manner as the base support frame 9 in the base support gantry 5, and since there is no significant difference in structure between the two, we will omit a detailed explanation of the extension support frame 18 and instead refer to the contents previously explained using Figures 6 and 7.

[0030] As shown as an example in Figures 10 and 12, it is possible to stack multiple tiers of extension support gantry 14 of the same structure on the base support gantry 5. In this case, the lower ends of each vertical column section 15 of the upper extension support gantry 14 are connected directly above the upper parts of each extension support frame 18 of the lower extension support gantry 14, while the lower ends of each diagonal column section 16 of the upper extension support gantry 14 are connected near the lower parts of a set of extension support frames 18 diagonally opposite the extension horizontal frame section 17 of the lower extension support gantry 14.

[0031] Furthermore, when connecting each inclined column section 16 of the extension support gantry 14 to the vicinity of the lower part of the base support frame 9 of the base support gantry 5, or to the vicinity of the lower part of the extension support frame 18 of the lower extension support gantry 14, it is preferable to previously arrange brackets 19 on both lower sides of the base support frame 9 or extension support frame 18 to which the inclined column section 16 will be connected, as shown in Figure 11. Although this is omitted in the first embodiment for convenience of explanation, it is of course preferable to also provide brackets 19 on both lower sides of the necessary base support frame 9 of the base support gantry 5 in the first embodiment, in anticipation of the possibility of extending the extension support gantry 14.

[0032] In addition, in this second embodiment, the base horizontal frame portion 8 is provided with a base horizontal beam 20 that is hung between the corners where the lower ends of the inclined column portions 16 of the extension support gantry 14 directly above are connected, while the extension horizontal frame portion 17 of the lower extension support gantry 14 is provided with an extension horizontal beam 21 that is hung between the corners where the lower ends of the inclined column portions 16 of the upper extension support gantry 14 are connected, and these base horizontal beams 20 and extension horizontal beams 21 are capable of bearing the horizontal force when the extension support gantry 14 is extended (see Figure 10).

[0033] In the second embodiment, the climbing crane 1 is lowered in the same manner as in the first embodiment, and after the protruding pieces 4a protruding from the guide mast 4 are connected to the connecting parts on the upper side of the extension support frame 18, each tip 3a of the cross base 3 is removed and each removed tip 3a is moved to the four corners of the extension horizontal frame part 17, or new tips 3a are installed in the four corners of the extension horizontal frame part 17 and the cross base 3 is lifted up and reattached to the each tip 3a, thereby fixing the cross base 3 to the four corners of the extension horizontal frame part 17. After that, by separating each protruding piece 4a of the guide mast 4 from the connecting parts on the upper side of the extension support frame 18, the support position of the mast 2 is further raised by the height of the extension support gantry 14, and it becomes possible to climb the climbing crane 1 without supports to a further height where the mast 2 cannot stand by itself.

[0034] In this case, the load point of the guide mast 4 and the load point of the cross base 3 are arranged on the same axis that passes vertically through the four corners of the base horizontal frame portion 8 and the extension horizontal frame portion 17. When supporting either of them, the load of the climbing crane 1 acts directly as an axial force on each of the vertical column portions 15 and each of the diagonal column portions 16 from the four corners of the uppermost extension horizontal frame portion 17, and is transmitted in the same manner to the four corners of the extension horizontal frame portion 17 on the lower level, entering the top of each truss structure 6 in the base support gantry 5, and also acting directly as an axial force on each truss structure 6. Therefore, no large bending load is applied to the base horizontal frame portion 8 or the extension horizontal frame portion 17 of each level as a horizontal member, and it is no longer necessary to make the base horizontal frame portion 8 or the extension horizontal frame portion 17 of each level have a cross-sectional size that satisfies the strength against a large bending load, making it possible to reduce weight. In addition, since the number of parts is small, an increase in the amount of work and the number of days required for assembly and disassembly can be avoided.

[0035] Therefore, with the above-mentioned second embodiment, the bending load acting on the horizontal members can be minimized to reduce weight, and the number of parts can be reduced to reduce the amount of work and the number of days required for assembly and disassembly. In particular, when such a climbing crane 1 is used for building a dam, since there is no need to embed the support materials in the dam, the assembly work of the climbing crane 1 is not affected by the concrete pouring construction schedule for the dam, and each task can be performed separately.

[0036] Incidentally, the lifting support platform for the climbing crane of the present invention is not limited to the above-described embodiment, and it goes without saying that various modifications can be made within the scope of the gist of the present invention. [Explanation of symbols]

[0037] 1. Climbing crane 2 Mast 3. Cross Stand 3a tip 4 Guide Mast 4a Projection 5 Base support platform 6 Truss structure 7 Legs 8 Base horizontal frame 9 Base Support Frame 14 Joint support gantry 15 Vertical column 16 Diagonal column 17 Horizontal frame extension 18 Extension support frame 20 Base horizontal beam 21 Joint horizontal beam

Claims

1. A support platform for lifting and lowering a climbing crane, comprising a cross base on which a mast is erected and a guide mast that can be raised and lowered along the mast, A support platform for lifting and lowering a climbing crane equipped with a base support platform having four truss structures forming an upward mountain shape arranged around the mast on all four sides and constructed by connecting the adjacent lower ends of each truss structure, a rectangular base horizontal frame portion whose four corners are horizontally supported by the tops of each truss structure and which supports the four tips of the cross base at the four corners during climbing, and a base support frame that is erected at the four corners of the base horizontal frame portion so as to straddle the tip of the cross base during climbing and can support the protrusions extending from the guide mast by connecting them to the upper side surfaces.

2. 2. The support platform for lifting and lowering a climbing crane as described in claim 1, further comprising: a vertical column section that stands upright with its lower end connected directly above the upper part of each base support frame of the base support platform; an inclined column section that extends diagonally downward from the upper ends of a pair of vertical column sections diagonally facing each other in the base horizontal frame section of the base support platform and is connected to the vicinity of the lower part of the base support frame directly below the adjacent vertical column section; a rectangular extension horizontal frame section whose four corners are horizontally supported by the upper ends of the vertical column sections and that supports the four tips of the cross base at the four corners during further climbing; and an extension support frame that is erected at the four corners of the extension horizontal frame section so as to straddle the tips of the cross base during climbing and that can be connected to the upper side surfaces to support the protrusions extending from the guide masts.

3. A support platform for lifting and lowering a climbing crane as described in claim 2, in which multiple extension support platforms of the same structure are stacked on a base support platform, the lower ends of each vertical column portion of the upper extension support platform are connected directly above the upper parts of each extension support frame of the lower extension support platform, and the lower ends of each diagonal column portion of the upper extension support platform are connected near the lower parts of a set of extension support frames diagonally opposite the extension horizontal frame portion of the lower extension support platform.

4. A support platform for lifting and lowering a climbing crane as described in claim 2 or 3, wherein the base horizontal frame portion is provided with a base horizontal beam that is hung between the corners where the lower ends of the diagonal column portions are connected, and the extension horizontal frame portion is provided with an extension horizontal beam that is hung between the corners where the lower ends of the diagonal column portions of an extension support platform of the same structure are connected.

5. 5. The support platform for raising and lowering a climbing crane according to claim 1, 2, 3 or 4, wherein the climbing crane is used in the construction of a dam.

Citation Information

Patent Citations

  • Fitting mount, climbing crane, and crane body raising method

    JP2019081629A