Ground determination support method, ground determination support system, and ground determination support program

The ground judgment support method addresses the challenge of accurately determining ground hardness by identifying threshold values through excavation measurements, enhancing the precision of soil firmness assessment.

JP2024148783APending Publication Date: 2024-10-18OHBAYASHI GUMI LTD
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
JP2023062225
Authority / Receiving Office
JP · JP
Patent Type
Applications
Current Assignee / Owner
Filing Date
2023-04-06
Publication Date
2024-10-18

AI Technical Summary

Technical Problem

Existing methods struggle to accurately determine the threshold value for determining whether the ground is solid or not, making it difficult to assess the hardness of the ground accurately using converted shear wave velocity.

Method used

A ground judgment support method that identifies a threshold value for determining ground hardness based on excavation measurements, using the N value of depth and soil quality, and calculates a verification index including hit rate, capture rate, and false positive rate to determine the threshold value for construction indices.

Benefits of technology

This method allows for accurate determination of ground hardness using specified threshold values, ensuring precise evaluation of soil firmness.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 2024148783000001_ABST
    Figure 2024148783000001_ABST
Patent Text Reader

Abstract

To provide a ground determination support method, a ground determination support system, and a ground determination support program for precisely determining whether or not the ground is hard using a specific threshold.SOLUTION: A ground hardness determination system 30 is provided with a construction index value storage unit 33 for storing a construction index value based on an excavation measured value acquired when excavating a hole in the ground, and a control unit 31. The control unit 31 identifies a first identifier determining whether or not the ground is hard based on a N value of depth and a soil property. The control unit 31 identifies threshold candidates on objective construction indexes used for determination of ground hardness, compares each value of the objective construction indexes with the threshold candidates, so as to identify a second identifier determining whether or not the ground is hard at the depth at which each value of the objective construction indexes is acquired. The control unit 31 calculates, while changing the threshold candidates, a capturing rate and an error detection rate using the number of data of the objective construction indexes categorized based on the first identifier and the second identifier, and uses them to determine the threshold value on the objective construction index.SELECTED DRAWING: Figure 2
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present disclosure relates to a ground determination support method, a ground determination support system, and a ground determination support program for identifying a threshold value for determining whether the ground is firm or not. [Background technology]

[0002] Conventionally, in order to support piles supporting buildings on solid ground, pile holes for forming piles are excavated down to the supporting layer of solid ground. Usually, the N value is used as the hardness of the ground, but even if the N value is the same, the hardness varies depending on the soil type. Therefore, in order to evaluate the hardness of the ground regardless of the soil type, the shear wave velocity is sometimes used. Since it is difficult to measure the shear wave velocity, the hardness is determined using a converted shear wave velocity using the depth, N value, age coefficient according to the soil classification, and soil coefficient (for example, see Patent Document 1). The control unit of the ground hardness estimation system described in this document acquires values ​​measured by a drilling depth measuring instrument, a flow measuring instrument, a current measuring instrument, and a vibration measuring instrument, and acquires multiple measurement values ​​from these values. The control unit calculates a multiple regression equation by performing a multivariate analysis using the acquired measurement values ​​and the hardness index value as explanatory variables and objective variables, and records the multiple regression equation in the multiple regression equation storage unit. When the control unit acquires measurement values ​​regarding the excavation conditions of the hole to be evaluated, the control unit uses these measurement values ​​and a multiple regression equation to estimate a hardness index value of the ground in which the hole to be evaluated is excavated. [Prior art documents] [Patent documents]

[0003] [Patent Document 1] Patent Publication No. 2021-080737 Summary of the Invention [Problem to be solved by the invention]

[0004] However, when using values ​​such as reduced shear wave velocity, it was not possible to evaluate whether the threshold value for determining whether the ground is solid or not was appropriate. For this reason, it was difficult to accurately determine the solidity of the ground using the threshold value. [Means for solving the problem]

[0005] The ground assessment support method that solves the above problem is a ground assessment support method that identifies a threshold value for determining whether the ground is solid or not for a construction indicator based on an excavation measurement value obtained when drilling a hole in the ground, and identifies a first identifier that has determined whether the ground is solid or not based on the N value of the depth and the soil type, identifies a threshold candidate for a target construction indicator to be used for determining the solidity of the ground, and identifies a second identifier that has determined whether the ground is solid or not at the depth at which each value of the target construction indicator was obtained by comparing each value of the target construction indicator with the threshold candidate. While changing the threshold candidate, a verification index including at least one of a hit rate, a capture rate, and a false positive rate is calculated using the number of data points of the target construction indicator classified based on the first identifier and the second identifier, and the threshold value for the target construction indicator is determined using the verification index. Effect of the Invention

[0006] According to the present invention, it is possible to accurately determine whether the ground is solid or not by using the specified threshold value. [Brief description of the drawings]

[0007] [Figure 1] FIG. 2 is a schematic front view of a drilling device for drilling a pile hole in the embodiment. [Diagram 2] 1 is a configuration diagram showing the configuration of a ground determination support system for determining the hardness of the ground in an embodiment. [Diagram 3] FIG. 2 is an explanatory diagram of a hardware configuration of the embodiment. [Figure 4] 1A and 1B are diagrams illustrating the data configuration of a storage unit of a ground assessment support system according to an embodiment, in which FIG. 1A illustrates a geological survey information storage unit, and FIG. [Diagram 5]11 is a flowchart illustrating a processing procedure of a threshold value determination process for determining the hardness of the ground in the embodiment. [Figure 6] 11 is a table showing a relationship between the results of a geological survey and an actual solidity identifier in the embodiment. [Figure 7] 10 is an explanatory diagram for explaining a process of calculating a predicted stiffness from a reduced shear wave velocity and a threshold candidate in an embodiment. FIG. [Figure 8] 11 is an explanatory diagram for explaining a process of identifying a predicted actual situation identifier from a predicted firmness and an actual situation firmness identifier in an embodiment. FIG. [Figure 9] FIG. 11 is an explanatory diagram illustrating a predicted actual situation identifier in the embodiment. [Figure 10] 11 is an explanatory diagram illustrating a capture rate and a false detection rate when a threshold candidate is 500 in an embodiment. FIG. [Figure 11] FIG. 11 is an explanatory diagram for explaining a curve of false detection rate-capture rate in reduced shear wave velocity and determination of a threshold value in an embodiment. [Figure 12] Graphs showing the firmness of the ground corresponding to depth in a modified example, where (a) is a graph showing that the ground is actually firm at position "3" on the horizontal axis depending on the depth, (b) is a graph in which the firmness of the ground is determined using two types of construction indicators, and (c) and (d) are graphs in which the firmness of the ground is determined using one of the construction indicators in (b). DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0008] Hereinafter, an embodiment of the ground judgment support method, the ground judgment support system, and the ground judgment support program will be described with reference to Fig. 1 to Fig. 11. In this embodiment, a threshold value is specified for determining whether the ground in which a pile hole is excavated is firm or not, in terms of the reduced shear wave velocity, which is a construction index.

[0009] 1 shows an excavator 10 as an excavation device for excavating a pile hole h0. The excavator 10 includes a base machine 11, a mast 14, and an auger machine 16. The base machine 11 includes a lower traveling body including a crawler 12, and an upper rotating body including an operation room 13.

[0010] The mast 14 is erected on the base machine 11. Wires for measuring depth and speed are provided inside the mast 14. An auger machine 16 is attached to the mast 14 so that it can be raised and lowered. The auger machine 16 is equipped with a drive motor housed in a box and a drilling rod 17 that is driven and rotated by the drive motor. A drilling head 18 is attached to the tip (lower end) of the drilling rod 17. The drilling head 18 has a pair (two) of swinging drilling arms with drilling blades formed at the tips thereof. The elevation and lowering of the drilling head 18 is controlled by an operator in the operation room 13.

[0011] In addition, a drilling water supply device (not shown) that supplies drilling water to the drilling head 18 is connected to the drilling machine 10. The amount of this drilling water is adjusted by the operator in the operation room 13 depending on the drilling conditions.

[0012] As shown in Fig. 2, the measuring instruments (21-24) that measure the excavation status of the excavator 10 are connected to a ground firmness determination system 30 as a ground determination support system. In this embodiment, they are connected to a drilling depth measuring instrument 21, a flow rate measuring instrument 22, a current measuring instrument 23, and a vibration measuring instrument 24. The measuring instruments (21-24) constantly perform measurements and transmit the measured values ​​to the ground firmness determination system 30.

[0013] The drilling depth measuring instrument 21 measures the amount of wire paid out in the mast 14, and measures the drilling depth (depth) according to the position of the drilling head 18. In this case, the drilling depth measuring instrument 21 measures the drilling depth in relation to time.

[0014] The flow rate meter 22 measures the injection flow rate (injected water amount) of drilling water supplied from the drilling water supply device. In this case, the flow rate meter 22 measures the injected water amount in relation to time. The current meter 23 measures the load current of the drive motor of the auger machine 16. In this case, the current meter 23 measures the current value in relation to time.

[0015] The vibration measuring instrument 24 measures vibration at the installation location. In this embodiment, the vibration measuring instrument 24 is installed in the operation room 13 or the like, and measures vibration characteristics in three directions, namely, the front-rear direction, the left-right direction, and the up-down direction of the base machine 11. In this case, the vibration measuring instrument 24 measures the vibration characteristics in relation to time.

[0016] (Hardware configuration) 3, a hardware configuration of an information processing device H10 constituting the ground firmness determination system 30 will be described. The information processing device H10 includes a communication device H11, an input device H12, a display device H13, a storage device H14, and a processor H15. Note that this hardware configuration is an example, and it is also possible to realize the system using other hardware.

[0017] The communication device H11 is an interface that establishes a communication path with another device and transmits and receives data, and is, for example, a network interface or a wireless interface.

[0018] The input device H12 is a device that receives input from a worker or the like who specifies the ground firmness, and is, for example, a mouse, a keyboard, or the like. The display device H13 is a display or the like that displays various information. The storage device H14 is a storage device that stores data and various programs for executing various functions of the ground firmness determination system 30. Examples of the storage device H14 include a ROM, a RAM, and a hard disk.

[0019] The processor H15 uses the programs and data stored in the storage device H14 to control each process in the ground firmness determination system 30. Examples of the processor H15 include a CPU and an MPU. The processor H15 loads a program stored in a ROM or the like into a RAM and executes various processes for estimating ground firmness.

[0020] The processor H15 is not limited to a processor that performs software processing for all the processes it executes. For example, the processor H15 may be equipped with a dedicated hardware circuit (e.g., an application specific integrated circuit: ASIC) that performs hardware processing for at least a part of the processes it executes. That is, the processor H15 may be configured as a circuit including: [1] one or more processors that operate according to a computer program (software); [2] one or more dedicated hardware circuits that execute at least a part of various processes; or [3] a combination thereof. The processor includes a CPU and memory such as RAM and ROM, and the memory stores program code or instructions that are configured to cause the CPU to execute processes. The memory, i.e., computer-readable medium, includes any available medium that can be accessed by a general-purpose or dedicated computer.

[0021] (Ground Hardness Assessment System 30) 2 is a computer system that determines the firmness of the ground using a construction index value. The ground firmness determination system 30 includes a control unit 31, a geological survey information storage unit 32, a construction index value storage unit 33, and a threshold value storage unit .

[0022] The control unit 31 performs processes (processing of a measurement value management stage, a threshold value specification stage, a firmness determination stage, etc.) described later. To this end, the control unit 31 functions as a measurement value management unit 311, a threshold value specification unit 312, and a firmness determination unit 313 by executing a ground firmness determination program.

[0023] The measurement value management unit 311 records the geological survey results acquired in the boring survey in the geological survey information storage unit 32. In this embodiment, the measurement value management unit 311 stores a table for identifying a soil identifier that is identified from the type of soil and the age of the soil.

[0024] Furthermore, the measurement value management unit 311 accumulates the measurement values ​​acquired from each measuring device (21 to 24) for each time in the memory, and records the measurement values ​​for each depth in the construction index value storage unit 33. Specifically, the measurement value management unit 311 acquires the drilling depth, the amount of water injected, and the current value during the time period during which the drilling actually proceeded (drilling time period). In a hard stratum, the drilling head 18 may be withdrawn once just before drilling. For this reason, the actual drilling depth of the drilling head 18 does not necessarily increase monotonically with the elapsed time. Therefore, the measurement value management unit 311 deletes the period during which the drilling head 18 is withdrawn or stopped from the total work time, and identifies the measurement value of the drilling time period that is actually used for drilling. The measurement value management unit 311 identifies the depth (start depth, end depth) and the drilling speed, water injection amount, and integral current value associated with this depth by associating the measurement values ​​during the identified drilling time period.

[0025] Furthermore, the measurement value management unit 311 identifies the magnitude of vibration (amplitude value) for each analysis frequency by performing frequency analysis on the vibration characteristics in three directions measured by the vibration measuring instrument 24. In this embodiment, 20 intervals of frequencies (1 Hz to 80 Hz) of 1 / 3 octave band analysis are used as the analysis frequencies.

[0026] Furthermore, the measurement value management unit 311 stores a formula for calculating the reduced shear wave velocity. As the reduced shear wave velocity calculation formula, a multiple regression formula is used that uses the reduced shear wave velocity described in Cited Document 1 as a response variable and calculates the regression coefficient of each explanatory variable. Here, the logarithm of the integrated current value, the end depth, the excavation speed, the amount of water injected, and the vibration are used as explanatory variables.

[0027] The threshold specifying unit 312 executes a process (threshold specifying process) for specifying a threshold for determining whether the ground is solid or not. In this case, the threshold specifying unit 312 sets a threshold candidate, and calculates a capture rate and a false positive rate using the number of data points of the determination result of whether the ground is solid or not using the set threshold candidate. Then, the threshold specifying unit 312 specifies a threshold candidate that satisfies a determination condition that the capture rate is large and the false positive rate is small as the threshold. Specifically, the threshold specifying unit 312 uses, as the threshold, the threshold candidate at the point that is the shortest distance from the coordinates (1,0) when the false positive rate is plotted on the horizontal axis and the capture rate on the vertical axis. The firmness determination unit 313 estimates the firmness of the excavated ground from the measurement values ​​acquired when a new pile hole is excavated, using the thresholds stored in the threshold storage unit 34.

[0028] As shown in Fig. 4(a), geological survey information acquired by boring survey results is recorded in the geological survey information storage unit 32. The geological survey information includes data on a site identifier, a boring identifier, survey position coordinates, an N value associated with a depth, a soil identifier, and an actual hardness identifier.

[0029] The site identifier data area records data regarding an identifier for identifying the site where the drilling survey was conducted. The survey location coordinate data area records data relating to the coordinates of the location where the boring survey was conducted at this site.

[0030] In the depth data area, data on the depth that specifies the N value and soil type at this boring survey position is recorded. In this embodiment, for example, data is recorded in units of 0.1 m, and the depth range (end depth and start depth) is recorded.

[0031] In the N value data area, data on the N value measured at this depth is recorded. The soil type identifier data area records data related to an identifier for identifying the classification of the soil type at this depth. This soil type identifier is an identifier that is identified based on the soil type (clay, sand, etc.) and the age (new or old) of the soil.

[0032] In the actual firmness identifier data area, an identifier (first identifier) ​​for identifying whether the ground at this depth is firm or not based on the N value and the soil type identifier is recorded. This actual firmness identifier is calculated and recorded during the determination and identification process.

[0033] As shown in FIG. 4(b), the construction index value storage unit 33 records the construction index value in association with the site identifier, pile number, pile coordinates, and depth. Here, the construction index value is an index value used to judge the hardness of the ground. This construction index value includes an excavation measurement value and a value calculated using this excavation measurement value (e.g., reduced shear wave velocity, etc.). The excavation measurement value is a measurement value that can be obtained when a pile hole is excavated. In this embodiment, values ​​related to an integrated current value, an excavation speed, an injection amount, and vibration are used as the excavation measurement value.

[0034] The site identifier data area records data relating to an identifier for identifying the site where the pile hole was excavated. The pile number data area and the pile coordinate data area store data on the number for identifying the excavated pile and the position coordinates of the pile. Using the pile coordinates and the survey position coordinates in the geological survey information storage unit 32, the construction index value can be associated with the geological survey information of the closest position where the boring survey was performed.

[0035] In the depth data area, data on the depth of the measured value obtained in the hole is recorded. In this embodiment, for example, the data is recorded in units of 0.1 m, and the depth range (end depth and start depth) is recorded.

[0036] The integrated current value data area, drilling speed data area, and water injection amount data area each record data regarding the integrated current value (integrated current value) calculated from the measured current value, the speed of the drilling head 18 when drilling (drilling speed), and the injection amount of drilling water supplied (water injection amount).

[0037] The vibration data area records data on the vibration direction (three directions: front-back, left-right, and up-down) and the amplitude at the center frequency of each of 20 intervals. The reduced shear wave velocity data area records data regarding the reduced shear wave velocity at this depth.

[0038] 2, data on the threshold value for a construction index is recorded in association with the type of the construction index. In this embodiment, a threshold value for the converted shear wave velocity as the construction index is recorded.

[0039] (Threshold identification process) Next, a threshold value specification process for specifying a threshold value used to determine whether the ground is firm using the above-described ground firmness determination system 30 will be described with reference to Figs.

[0040] Before performing this threshold value identification process, the measurement value management unit 311 of the control unit 31 acquires, via the input device H12, a site identifier that identifies the site and the survey location coordinates where a boring survey was conducted at the site, and records these in the geological survey information storage unit 32. Furthermore, the measurement value management unit 311 acquires an N value corresponding to the depth in this boring survey, as well as information on the soil type and the age of the soil. The measurement value management unit 311 identifies a soil identifier from the acquired soil type and age information, and records this in the geological survey information storage unit 32 together with the depth and the N value corresponding to this depth.

[0041] Furthermore, the measurement value management unit 311 acquires the measurement values ​​measured by each measuring device (21-24) when the pile hole is excavated, and stores them in the memory. In this case, the measurement value management unit 311 specifies the time period (drilling time period) when the drilling is actually performed for the drilling depth for each hour, and specifies the drilling depth, the amount of water injected, the current value, and the vibration characteristics for this time period. Then, the measurement value management unit 311 specifies the amount of water injected according to the specified drilling depth (depth), and records the amount of water injected in the construction index value storage unit 33 in association with the depth. In addition, the measurement value management unit 311 calculates the drilling speed and the integral current value based on the specified drilling depth in association with the drilling depth (depth), and records them in the construction index value storage unit 33. Furthermore, the measurement value management unit 311 specifies the vibration direction and the amplitude value at the analysis frequency by performing vibration analysis on the vibration based on the specified drilling depth, and records them in the construction index value storage unit 33 in association with the drilling depth (depth).

[0042] In the threshold value identification process, first, the control unit 31 of the ground firmness assessment system 30 executes a calculation process of firmness in a boring survey (step S11). Specifically, first, the threshold value identification unit 312 of the control unit 31 identifies the data of the boring survey closest to the pile hole from which the construction index (target construction index) used in this process was obtained. Here, the threshold value identification unit 312 identifies the geological survey information having the survey position coordinates closest to the pile coordinates in the construction index value storage unit 33 from the geological survey information storage unit 32, and obtains the N value and soil type identifier according to the depth of this construction index.

[0043] Then, as shown in Fig. 6, the control unit 31 displays the acquired N value and soil type identifier on the display device H13. Then, the control unit 31 acquires an actual firmness identifier indicating whether the ground was firm or not via the input device H12, and records it in the geological survey information storage unit 32. In Fig. 6, if the ground is firm, "3" is recorded as the actual firmness identifier, and if the ground is not firm, "-1" is recorded as the actual firmness identifier.

[0044] Next, the control unit 31 of the ground solidity determination system 30 executes a calculation process of the converted shear wave velocity (step S12). Specifically, the measurement value management unit 311 of the control unit 31 calculates the converted shear wave velocity Vs by substituting the construction index value recorded in the construction index value storage unit 33 into the stored converted shear wave velocity calculation formula shown in Patent Document 1.

[0045] Next, the control unit 31 of the ground firmness determination system 30 executes a process of setting the range and interval of the threshold candidate (step S13). Specifically, the measurement value management unit 311 of the control unit 31 acquires the change range and change amount of the threshold candidate for the reduced shear wave velocity Vs specified by the input device H12. Within this change range, the threshold candidate is changed sequentially by the change amount in the reduced shear wave velocity Vs, and an iterative calculation is performed to calculate the capture rate and the false detection rate for each threshold candidate. Here, the change range of the threshold candidate for the reduced shear wave velocity Vs is set to "100 to 500", and the change amount is set to "1".

[0046] Next, the control unit 31 of the ground firmness determination system 30 repeatedly executes the following process for each threshold candidate. First, the control unit 31 executes a process of identifying threshold candidates (step S14). Specifically, the threshold identifying unit 312 of the control unit 31 identifies the maximum value in the change range as a threshold candidate. Then, each time the process of step S14 is repeatedly executed, a value obtained by subtracting the amount of change "1" from the threshold candidate used in the previous calculation is identified as the threshold candidate T1 to be used in the current calculation.

[0047] Next, the control unit 31 executes a process of specifying a prediction firmness identifier based on this threshold candidate (step S15). Specifically, as shown in Fig. 7, the measurement value management unit 311 of the control unit 31 compares each value (construction index value) of the converted shear wave velocity associated with the depth with the candidate threshold value T1. If the converted shear wave velocity is equal to or greater than the candidate threshold value T1 as a result of the comparison, the measurement value management unit 311 assigns a predicted stiffness identifier (second identifier) ​​of "3" to the converted shear wave velocity, and if the converted shear wave velocity is less than the candidate threshold value T1, the measurement value management unit 311 assigns a predicted stiffness identifier (second identifier) ​​of "-1" to the converted shear wave velocity, and stores the identifier in memory.

[0048] Next, the control unit 31 executes a process of counting the true or false (step S16). Specifically, as shown in FIG. 8, the measurement value management unit 311 of the control unit 31 specifies the predicted actual situation identifier by using the predicted firmness identifier and the actual situation firmness identifier.

[0049] 9, when the actual situation firmness identifier is firm ("3") and the predicted firmness identifier is also firm ("3"), the predicted actual situation identifier is assigned a value of "1." When the actual situation firmness identifier is firm ("3") and the predicted firmness identifier is not firm ("-1"), the predicted actual situation identifier is assigned a value of "3."

[0050] In addition, when the actual situation firmness identifier is not firm ("-1") and the predicted firmness identifier is firm ("3"), the predicted actual situation identifier is assigned a value of "2." When the actual situation firmness identifier is not firm ("-1") and the predicted firmness identifier is also not firm ("-1"), the predicted actual situation identifier is assigned a value of "4."

[0051] Next, the control unit 31 executes a calculation process of the capture rate and the false positive rate (step S17). Specifically, the measurement value management unit 311 of the control unit 31 calculates the number of data for each predicted actual situation identifier. Next, the measurement value management unit 311 calculates the capture rate by dividing the number of data for the predicted actual situation identifier "1" that is determined to be both actually solid and predicted by the number of data for the predicted actual situation identifiers "1" and "3" that indicate that the actual situation is solid. Furthermore, the measurement value management unit 311 calculates the false positive rate by dividing the number of data for the predicted actual situation identifier "2" that is determined to be not actually solid but predicted by the number of data for the predicted actual situation identifiers "2" and "4" that indicate that the actual situation is not solid.

[0052] For example, assume that the number of data items to which "1" is assigned as the predicted actual situation identifier is "3," the number of data items to which "2" is assigned is "0," the number of data items to which "3" is assigned is "4672," and the number of data items to which "4" is assigned is "7137" as shown in Fig. 10. In this case, the capture rate is 0.00064, and the false positive rate is 0.

[0053] The above process is repeated at set intervals within the range of threshold candidates set in step S13. As a result, the threshold specification unit 312 of the control unit 31 calculates the capture rate and the false detection rate for each of the threshold candidates specified at set intervals within the set range.

[0054] Next, the control unit 31 executes a process of creating an ROC curve (step S18). Specifically, the threshold specification unit 312 of the control unit 31 plots positions corresponding to the capture rate and false positive rate of each threshold candidate in a two-dimensional coordinate graph with the horizontal axis representing the false positive rate and the vertical axis representing the capture rate. Then, a receiver operating characteristic curve (ROC curve) is generated by connecting the plotted positions with a curve. This ROC curve can evaluate the classification performance when classifying using the threshold candidates. The closer the shape of this ROC curve is to the upper left (1,0), the higher the classification performance. FIG. 11 shows an ROC curve C1 when the threshold candidate for the reduced shear wave velocity is changed in increments of "1" within the range of "500 to 100."

[0055] Next, the control unit 31 executes a process of determining a threshold value (step S19). 11, the threshold specifying unit 312 of the control unit 31 specifies, as a threshold, a threshold candidate corresponding to a point P1 where the distance R1 from the coordinates (1, 0) is the shortest in the generated ROC curve. The threshold corresponding to this point P1 is "233". Then, the threshold specifying unit 312 records the specified threshold in the threshold storage unit 34.

[0056] (Determining the hardness of the ground using the determined threshold) Thereafter, in the excavation process when drilling a pile hole, the threshold value recorded in the threshold value storage unit 34 is used to determine whether the ground where the pile hole arrives is firm or not. Specifically, the control unit 31 of the ground firmness determination system 30 executes an acquisition process of excavation measurement values. Specifically, the measurement value management unit 311 of the control unit 31 acquires the excavation measurement values ​​(water injection amount, drilling speed, integral current value, vibration direction, and amplitude value at analysis frequency) measured when a new pile hole is excavated using the excavator 10. Then, the firmness determination unit 313 records the excavation measurement values ​​according to the drilling depth during the time period when the excavation actually proceeded in the construction index value storage unit 33 in association with the drilling depth (depth). Furthermore, the measurement value management unit 311 calculates the reduced shear wave velocity by substituting the excavation measurement value into the stored formula for calculating the reduced shear wave velocity.

[0057] Then, the firmness determination unit 313 of the control unit 31 compares the calculated converted shear wave velocity Vs with the threshold value stored in the threshold value storage unit 34. If the comparison result shows that the converted shear wave velocity Vs is equal to or greater than the threshold value, the firmness determination unit 313 determines that the ground is firm. In this case, the firmness determination unit 313 displays the depth and a message indicating that the ground is firm on the display device H13.

[0058] (action) The capture rate and the false positive rate are calculated using the number of data for each predicted actual condition identifier, which is identified by comparing the converted shear wave velocity Vs calculated from the construction index value with a threshold candidate, and the actual condition identifier based on the N value and soil quality of the ground. Then, a threshold with a high capture rate and a high false positive rate is identified.

[0059] According to this embodiment, the following effects can be obtained. (1) In this embodiment, the control unit 31 of the ground firmness determination system 30 compares the converted shear wave velocity Vs calculated from the construction index value with a threshold candidate to identify a predicted firmness identifier. The control unit 31 calculates a capture rate and a false positive rate using the number of data for each predicted actual condition identifier identified by the predicted firmness identifier and the actual firmness identifier based on the N value and soil quality of the ground. Then, the control unit 31 identifies a threshold candidate that has a large calculated capture rate and a small false positive rate as a threshold. This makes it possible to accurately set a threshold used to determine the firmness of the ground using two parameters, the capture rate and the false positive rate.

[0060] (2) In this embodiment, in the ROC curve creation process (step S18), the control unit 31 of the ground firmness assessment system 30 plots positions corresponding to the capture rate and false positive rate of each threshold candidate in a two-dimensional coordinate graph with the horizontal axis representing the false positive rate and the vertical axis representing the capture rate. Then, the ROC curve is generated by connecting the plotted positions with a curve. Then, the control unit 31 identifies a threshold candidate corresponding to point P1 where the distance R1 from the coordinate (1,0) is the shortest in the generated ROC curve. This makes it possible to efficiently identify a threshold where the calculated capture rate is large and the false positive rate is small.

[0061] (3) In this embodiment, the control unit 31 of the ground firmness determination system 30 determines the firmness of the ground using the converted shear wave velocity calculated based on the excavation measurement values. This makes it possible to evaluate the firmness of the ground from the excavation measurement values.

[0062] This embodiment can be modified as follows: This embodiment and the following modifications can be combined with each other to the extent that there is no technical contradiction. In the above embodiment, the control unit 31 of the ground firmness determination system 30 determined the threshold value of the converted shear wave velocity (step S19). The threshold value used to determine the ground firmness is not limited to the converted shear wave velocity, and may be another construction index, or multiple construction indexes may be used. When multiple construction indexes are used, the threshold value specification unit 312 of the control unit 31 executes the process of steps S13 to S19 for each construction index (target construction index) used for the determination. Then, the threshold value specification unit 312 records the determined threshold value in association with the construction index in the threshold value storage unit 34. In this case, the construction index may be not only an excavation measurement value (integral current value, end depth, excavation speed, water injection amount, vibration, etc.) that can be measured when forming a hole, but also a value calculated from them. For example, a start depth, an instantaneous current value, an excavation acceleration, etc. may be used.

[0063] For example, FIG. 12(a) shows that the ground is actually firm at the position of "3" on the horizontal axis according to the depth. Furthermore, FIG. 12(c) and (d) show construction indexes 1 and 2 in which the ground is identified as firm using the threshold value identified by the threshold value identification process of the above embodiment. Here, construction index 1 shows the change in the converted shear wave velocity, and construction index 2 shows the change in the excavation speed. FIG. 12(b) shows a portion determined to be firm because the value of construction index 1 (construction index value 1) is equal to or greater than "threshold 1" and the value of construction index 2 (construction index value 2) is equal to or less than "threshold 2". As is clear from FIG. 12(b), at a depth of about 25 m, the ground can be determined to be firm at a depth closer to the actual ground firmness shown in FIG. 12(a) than the threshold values ​​for each construction index in FIG. 12(c) and (d).

[0064] In the above embodiment, the control unit 31 of the ground firmness determination system 30 uses the candidate threshold at the minimum distance from the coordinate (0,1) in the created ROC curve as the threshold. The condition for determining the threshold is not limited to the minimum distance from the coordinate (0,1). For example, the threshold may be a candidate threshold at which the capture rate is a predetermined value (e.g., a candidate threshold corresponding to a point that is 75% or more and has the minimum false positive rate).

[0065] In the above embodiment, the threshold is determined using the capture rate and the false positive rate. The verification index for identifying the threshold from the threshold candidate may be either the capture rate or the false positive rate, or the threshold may be determined using the hit rate. This hit rate is calculated by dividing the total number of data of the predicted actual situation identifier "1" that is determined to be actually solid and the prediction is also solid, and the total number of data of the predicted actual situation identifier "4" that is determined to be not actually solid and the prediction is not solid, by the total number of data. Here, the threshold candidate with the highest hit rate may be used as the threshold. Furthermore, the threshold candidate with the highest hit rate among the threshold candidates with a high capture rate and a low false positive rate may be used as the threshold.

[0066] Next, the technical ideas that can be understood from the above embodiment and other examples will be described below. (a) The ground judgment support method described in claim 3, characterized in that the control unit determines as the threshold the threshold candidate that is located at the position where the horizontal axis value is "0" and the distance from the coordinate where the horizontal axis value is "1" is the shortest in a graph with the false detection rate on the horizontal axis and the capture rate on the vertical axis. [Explanation of symbols]

[0067] C1...ROC curve, h0...pile hole, P1...point, R1...distance, T1...threshold candidate, Vs...reduced shear wave velocity, 10...drilling machine, 11...base machine, 12...crawler, 13...operation room, 14...mast, 16...auger machine, 17...drilling rod, 18...drilling head, 21...drilling depth meter, 22...flow meter, 23...current meter, 24...vibration meter, 30...ground hardness judgment system as ground judgment support system, 31...control unit, 32...geological survey information memory unit, 33...construction index value memory unit, 34...threshold memory unit, 311...measurement value management unit, 312...threshold identification unit, 313...hardness judgment unit.

Claims

1. A ground judgment support method for identifying a threshold value for determining whether the ground is solid or not for a construction index based on an excavation measurement value acquired when drilling a hole in the ground, Identifying a first identifier that determines whether the ground is solid or not based on the N value of the depth and the soil type; Identifying threshold candidates for a target construction index used to determine the hardness of the ground; A second identifier is identified based on a result of comparing each value of the target construction index with the threshold candidate, the second identifier being used to determine whether or not the ground is solid at the depth at which each value of the target construction index is obtained; While changing the threshold candidate, a verification index including at least one of a hit rate, a capture rate, and a false positive rate is calculated using the number of data of the target construction index classified based on the first identifier and the second identifier, A ground judgment support method, characterized in that the threshold value for the target construction index is determined using the verification index.

2. Calculating the capture rate by dividing the number of data items of the target construction indexes indicated as being firm by the number of data items of the target construction indexes indicated as being firm by the first identifier, Calculating a false positive rate by dividing the number of data items of the target construction indexes indicated by the first identifier as not being firm and the second identifier as being firm by the number of data items of the target construction indexes indicated by the first identifier as not being firm; Repeating the calculation of the capture rate and the false positive rate while sequentially changing the threshold candidate within a predetermined range; The ground judgment support method according to claim 1, characterized in that the threshold candidate for the capture rate and the false detection rate corresponding to the threshold determination condition is determined as the threshold for the target construction index.

3. A process of plotting the calculated capture rate and false positive rate on a graph having the capture rate and the false positive rate as axes of a two-dimensional coordinate system to create a curve; 3. The method for supporting ground determination according to claim 2, further comprising using the curve to determine the threshold candidate having a large capture rate and a small false positive rate as the threshold.

4. A ground judgment support system including a construction index value storage unit that stores each value of a construction index based on an excavation measurement value acquired when drilling a hole in the ground, and a control unit that specifies a threshold value for determining whether the ground is solid or not, The control unit is Identifying a first identifier that determines whether the ground is solid or not based on the N value of the depth and the soil type; Identifying threshold candidates for a target construction index used to determine the hardness of the ground; A second identifier is identified by comparing each value of the target construction index stored in the construction index value storage unit with the threshold candidate, and determining whether or not the ground is solid at the depth at which each value of the target construction index is acquired; While changing the threshold candidate, a verification index including at least one of a hit rate, a capture rate, and a false positive rate is calculated using the number of data of the target construction index classified based on the first identifier and the second identifier, A ground judgment support system characterized by using the verification index to determine the threshold value for the target construction index.

5. A ground judgment support program for identifying a threshold value for determining whether the ground is solid or not, using a ground judgment support system including a construction index value storage unit that stores values ​​of construction indexes based on excavation measurement values ​​acquired when drilling a hole in the ground, and a control unit, The control unit, Identifying a first identifier that determines whether the ground is solid or not based on the N value of the depth and the soil type; Identifying threshold candidates for a target construction index used to determine the hardness of the ground; A second identifier is identified by comparing each value of the target construction index stored in the construction index value storage unit with the threshold candidate, and determining whether or not the ground is solid at the depth at which each value of the target construction index is acquired; While changing the threshold candidate, a verification index including at least one of a hit rate, a capture rate, and a false positive rate is calculated using the number of data of the target construction index classified based on the first identifier and the second identifier, A ground assessment support program characterized by using the verification index to determine the threshold value for the target construction index.

Citation Information

Patent Citations

  • Ground hardness estimation system and ground hardness estimation method

    JP2021080737A