Photo management ledger creation system, photo management ledger creation method, and program for controlling photo management ledger creation system

The photo management ledger creation system efficiently organizes and manages large volumes of construction photographs by using a terminal and server to associate and rearrange data based on construction plan information, enhancing pipeline construction efficiency.

JP2024150311AActive Publication Date: 2024-10-23KUBOTA CORP
View PDF 8 Cites 0 Cited by

Patent Information

Application Number
JP2023063666
Authority / Receiving Office
JP · JP
Patent Type
Applications
Current Assignee / Owner
Filing Date
2023-04-10
Publication Date
2024-10-23
Estimated Expiration
2043-04-10

AI Technical Summary

Technical Problem

The management of large volumes of photographs taken during pipeline construction is complicated due to the need for manual organization and arrangement in a predetermined order, which is inefficient and labor-intensive.

Method used

A photo management ledger creation system that includes a performance acquisition terminal and a management server, capable of acquiring and organizing photographic data based on construction plan information, generating and rearranging photo management information according to management items such as measurement point positions, work items, and work times, and generating track record photo information for efficient data management.

Benefits of technology

The system automates the organization and management of photographic data, improving the efficiency of pipeline construction by reducing manual labor and ensuring data is organized in a manner that aligns with the progress and requirements of the construction process.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 2024150311000001_ABST
    Figure 2024150311000001_ABST
Patent Text Reader

Abstract

To realize a photo management ledger creation system that can efficiently manage photo data for recording status of pipeline construction work.SOLUTION: A photograph management ledger creation system 1 includes a result acquisition terminal 10 and a management server 20, and creates a photograph management ledger related to pipeline construction. The management server 20 includes: a construction plan information acquisition unit 31 that acquires construction plan information, which is information related to a construction plan for a pipeline that is a target of the pipeline construction; a photo management information creation unit 32 that links the construction plan information acquired by the construction plan information acquiring unit 31 to a management item and creates photo management information D1 for managing photo data P1 related to the pipeline construction; and a photo management information editing unit 33 that rearranges, on the basis of the management items, the photo management information D1 created by the photo management information creation unit 32.SELECTED DRAWING: Figure 1
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to a photo management ledger creation system that creates a photo management ledger related to pipeline construction work, a photo management ledger creation method, and a program for controlling the photo management ledger creation system. [Background technology]

[0002] In general, in pipeline construction work, records of construction results are required according to the progress of the work. The records of construction results include photographs to record the construction status. Since such photographs are necessary according to the progress of the work, they are managed by management ledgers, etc.

[0003] The management of the above-mentioned photographs is often performed manually. For this reason, there is a demand for improving the efficiency of the work of managing photographs. For example, Patent Document 1 discloses an automatic construction management ledger creation system that can improve the efficiency of the work of photographing the construction status at a construction site and the work of creating a construction management ledger that includes a construction status image with a blackboard.

[0004] In the construction management ledger automatic creation system of Patent Document 1, a worker at a construction site acquires a construction status image with an electronic whiteboard using a portable communication terminal, and this construction status image with an electronic whiteboard and the character data written on the electronic whiteboard are sent to a Web server in association with the identification data of each construction project. The Web server records these data in a database. A construction management ledger creation terminal in an office receives the corresponding construction status image with an electronic whiteboard and the character data written on the electronic whiteboard from the Web server, and automatically creates a construction management ledger including a construction status image with an electronic whiteboard. [Prior art documents] [Patent documents]

[0005] [Patent Document 1] JP 2008-225862 A Summary of the Invention [Problem to be solved by the invention]

[0006] In pipeline construction, a large number of photographs such as those described above are taken depending on the contents of the construction and the progress of the construction. In addition, for example, multiple photographs may be taken in the same process. Therefore, the number of photographs to be posted in the management ledger as described above is quite large, making photo management cumbersome. In addition, the photographs must be posted in a predetermined order in the management ledger. Therefore, the task of posting a large number of photographs in the management ledger in the predetermined order requires a great deal of effort.

[0007] The automatic construction management ledger creation system of Patent Document 1 can automatically create a management ledger using construction status images with an electronic whiteboard and text data written on the electronic whiteboard, but it is difficult to post a large number of photos in the management ledger in the specified order or to rearrange the photos on the management ledger.

[0008] Therefore, in pipeline construction, there is a demand for a device that can efficiently manage photographic data for recording the construction status.

[0009] An object of the present invention is to realize a photo management ledger creation system that can efficiently manage photo data for recording the status of pipeline construction work. [Means for solving the problem]

[0010] A photo management ledger creation system according to one embodiment of the present invention includes a performance acquisition terminal and a management server, and creates a photo management ledger related to pipeline construction. The management server includes a construction plan information acquisition unit that acquires construction plan information, which is information related to a construction plan for a pipeline that is the subject of the pipeline construction, a photo management information generation unit that links the construction plan information acquired by the construction plan information acquisition unit to management items and generates photo management information for managing photo data related to the pipeline construction, and a photo management information editing unit that rearranges the photo management information generated by the photo management information generation unit based on the management items (first configuration).

[0011] This allows construction plan information to be linked to management items, photo management information for managing photo data related to pipeline construction to be generated, and the photo management information to be rearranged based on the management items. This makes it possible to easily organize and manage large amounts of photo data using the photo management information. This means that the system can automatically organize photos, which was previously done manually by workers, thereby improving the efficiency of pipeline construction work.

[0012] In the first configuration, the result acquisition terminal has a photo management information acquisition unit that acquires the photo management information from the management server, a photo data acquisition unit that acquires the photo data corresponding to the photo management information acquired by the photo management information acquisition unit, and a data output unit that outputs the photo data acquired by the photo data acquisition unit together with the photo management information to the management server. The management server has an achievement photo information generation unit that generates achievement photo information using the photo data and the photo management information output from the result acquisition terminal (second configuration).

[0013] This allows the management server to link the photograph data acquired by the performance acquisition terminal to the photograph management information to generate performance photograph information. This allows a large amount of photograph data to be organized and managed by linking it to the photograph management information. This allows for improved efficiency in pipe construction work.

[0014] In the second configuration, the management server further includes a record photo information editing unit that rearranges the multiple pieces of record photo information generated by the record photo information generating unit based on the management items (third configuration).

[0015] This allows the user to sort the multiple pieces of actual photo information based on the management items when multiple pieces of photo data are acquired in, for example, one process of pipeline construction, and multiple pieces of actual photo information are generated. This allows the user to easily organize and manage a large amount of photo data, thereby improving the efficiency of pipeline construction work.

[0016] In the third configuration, the management items include at least one of a measurement point position, a work item, a type of work, and a work time (fourth configuration).

[0017] This allows the photograph management information or the actual photograph information to be sorted and managed by at least one of the measurement point position, the work item, the type of work, and the work time, thereby improving the efficiency of the pipe construction work.

[0018] In the fourth configuration, the actual photo information editing unit rearranges the multiple actual photo information generated by the actual photo information generation unit in the order of the measurement point location, the work item, the type of work, and the work time (fifth configuration).

[0019] This allows multiple pieces of actual photo information to be sorted first by measurement point location, then by work item, and then by work type and work time. This makes it possible to easily organize and manage the multiple pieces of actual photo information. This makes it possible to achieve improved work efficiency in pipeline construction. Moreover, by sorting the multiple pieces of actual photo information as described above, it is possible to manage the information in accordance with the actual work of pipeline construction.

[0020] In the third configuration, the record photo information editing unit rearranges multiple record photo information items all having the same management items according to the time the photo data was acquired by the photo data acquisition unit (sixth configuration).

[0021] This allows multiple pieces of actual photo information, all of which have the same management items, to be sorted according to the time the photo data was acquired. This makes it easy to organize and manage the multiple pieces of actual photo information. This makes it possible to improve the efficiency of pipe construction work.

[0022] In the third configuration, the experience photo information editing section can change the order of the plurality of experience photo information generated by the experience photo information generating section in an arbitrary order (seventh configuration).

[0023] This allows the order of the multiple pieces of actual photo information to be changed to any order. Therefore, the order of the multiple pieces of actual photo information can be changed according to the progress of the pipeline construction work, etc. Therefore, the efficiency of the pipeline construction work can be improved.

[0024] In the third configuration, the actual photo information editing unit generates actual photo information separately from the multiple pieces of actual photo information generated by the actual photo information generation unit, and is capable of replacing part of the multiple pieces of actual photo information with the generated actual photo information or inserting the generated actual photo information into the multiple pieces of actual photo information in a predetermined order (eighth configuration).

[0025] In this way, after the multiple pieces of actual photo information are generated by the actual photo information generating unit, new actual photo information can be generated and used to replace a part of the multiple pieces of actual photo information, or inserted into the multiple pieces of actual photo information in a predetermined order. Therefore, actual photo information can be added according to the progress of the pipeline construction work, etc. Therefore, the efficiency of the pipeline construction work can be improved.

[0026] In the third configuration, the management server further includes an actual photo information output unit that outputs actual photo information selected from the plurality of actual photo information rearranged by the actual photo information editing unit (ninth configuration).

[0027] This makes it possible to output the selected piece of actual photo information from among the pieces of actual photo information rearranged by the photo management information editing unit, thereby improving the efficiency of pipe construction work.

[0028] A photo management ledger creation method according to one embodiment of the present invention is a method for creating a photo management ledger related to pipeline construction work using a photo management ledger creation system having a track record acquisition terminal and a management server. The photo management ledger creation method includes a construction plan information acquisition step in which the management server acquires construction plan information, which is information related to a construction plan for a pipeline that is the subject of the pipeline construction work, a photo management information generation step in which the management server generates photo management information for managing photo data related to the pipeline construction work by linking the construction plan information acquired in the construction plan information acquisition step to management items, and a photo management information editing step in which the management server rearranges the photo management information generated in the photo management information generation step based on the management items (first method).

[0029] This allows the construction plan information to be linked to the management items to generate photo management information for managing the photo data related to the pipeline construction work, and the photo management information can be rearranged based on the management items. Therefore, the large amount of photo data can be easily organized and managed using the photo management information. Therefore, the work of organizing photos, which was previously done manually by workers, can be done automatically, thereby improving the efficiency of the pipeline construction work.

[0030] In the first method, the photo management ledger creation method includes a photo management information acquisition step in which the performance acquisition terminal acquires the photo management information from the management server, a photo data acquisition step in which the performance acquisition terminal acquires the photo data corresponding to the photo management information acquired in the photo management information acquisition step, a photo data output step in which the performance acquisition terminal outputs the photo data acquired in the photo data acquisition step together with the photo management information to the management server, and an actual photo information generation step in which the management server generates actual photo information using the photo data and the photo management information output from the performance acquisition terminal (second method).

[0031] This allows the management server to link the photograph data acquired by the performance acquisition terminal with the photograph management information to generate performance photograph information. This allows a large amount of photograph data to be organized and managed by linking it with the photograph management information. This allows for improved efficiency in pipe construction work.

[0032] In the second method, the photo management ledger creation method further includes an actual photo information editing step of rearranging the multiple pieces of actual photo information generated in the actual photo information generation step based on the management items (third method).

[0033] This allows the user to sort the multiple pieces of actual photo information based on the management items when multiple pieces of photo data are acquired in, for example, one process of pipeline construction, and multiple pieces of actual photo information are generated. This allows the user to easily organize and manage a large amount of photo data, thereby improving the efficiency of pipeline construction work.

[0034] In the third method, the management items include at least one of a measurement point position, a work item, a type of work, and a work time (fourth method).

[0035] This allows the photo management information or actual photo information to be sorted and managed by at least one of the measurement point location, work item, work type, and work time. This makes it possible to improve the efficiency of pipeline construction work. Moreover, by sorting the photo management information or actual photo information as described above, management can be performed in accordance with the actual work of pipeline construction.

[0036] A program for controlling a photo management ledger creation system according to one embodiment of the present invention is a program for controlling a photo management ledger creation system that has a performance acquisition terminal and a management server and creates a photo management ledger related to pipeline construction work. The program for controlling the photo management ledger creation system causes the management server to acquire construction plan information, which is information related to the construction plan of the pipeline that is the subject of the pipeline construction work, link the acquired construction plan information to management items, generate photo management information for managing photo data related to the pipeline construction work, and rearrange the generated photo management information based on the management items (first program).

[0037] This allows the system to generate photo management information for managing photo data related to pipeline construction by linking construction plan information to management items, and sort the data based on the management items. This allows the system to easily organize and manage a large amount of photo data. This allows the system to automatically organize photos, which was previously done manually by workers, and improves the efficiency of pipeline construction work.

[0038] In the first program, a program for controlling the photo management ledger creation system causes the performance acquisition terminal to acquire the photo management information from the management server, acquire the photo data corresponding to the acquired photo management information, output the acquired photo data together with the photo management information to the management server, and cause the management server to generate performance photo information using the photo data and the photo management information output from the performance acquisition terminal (second program).

[0039] This allows the management server to link the photograph data acquired by the performance acquisition terminal to the photograph management information to generate performance photograph information. This allows a large amount of photograph data to be organized and managed by linking it to the photograph management information. This allows for improved efficiency in pipe construction work.

[0040] In the second program, a program for controlling a photo management ledger creation system causes the management server to rearrange the generated pieces of actual photo information based on the management items (third program).

[0041] This allows the user to sort the multiple pieces of actual photo information based on the management items when multiple pieces of photo data are acquired in, for example, one process of pipeline construction, and multiple pieces of actual photo information are generated. This allows the user to easily organize and manage a large amount of photo data, thereby improving the efficiency of pipeline construction work.

[0042] In the third program, the management items include at least one of a measurement point position, a work item, a type of work, and a work time (fourth program).

[0043] This allows the photo management information or actual photo information to be sorted and managed by at least one of the measurement point location, work item, work type, and work time. This makes it possible to improve the efficiency of pipeline construction work. Moreover, by sorting the photo management information or actual photo information as described above, management can be performed in accordance with the actual work of pipeline construction. Effect of the Invention

[0044] A photo management ledger creation system according to an embodiment of the present invention includes a performance acquisition terminal and a management server. The management server includes a construction plan information acquisition unit that acquires construction plan information, which is information related to a construction plan for a pipeline that is the target of the pipeline construction, a photo management information generation unit that generates photo management information for managing photo data related to the pipeline construction by linking the construction plan information acquired by the construction plan information acquisition unit to management items, and a photo management information editing unit that rearranges the photo management information generated by the photo management information generation unit based on the management items.

[0045] This makes it possible to easily organize and manage a large amount of photo data using the photo management information. Therefore, the work of organizing photos, which was previously done manually by workers, can now be done automatically by the system, improving the efficiency of pipeline construction work. [Brief description of the drawings]

[0046] [Figure 1] FIG. 1 is a functional block diagram showing a schematic configuration of a photo management ledger creating system according to a first embodiment of the present invention. [Diagram 2] FIG. 2 is a diagram showing an example of measurement point positions in a management construction project. [Diagram 3] FIG. 3 is a diagram showing an example of photo management information. [Figure 4] FIG. 4 is a diagram showing an example of a state in which a plurality of pieces of photo management information are rearranged. [Diagram 5] FIG. 5 is a diagram showing an example of a state in which a plurality of pieces of photo management information are rearranged. [Figure 6] FIG. 6 is a diagram showing an example of the performance photo information. [Figure 7] FIG. 7 is a flow diagram showing a photo management ledger creating method performed by the photo management ledger creating system according to the first embodiment. [Figure 8] FIG. 8 is a functional block diagram showing a schematic configuration of a photo management ledger creating system according to the second embodiment. [Figure 9]FIG. 9 is a flow diagram showing a photo management ledger creating method performed by the photo management ledger creating system according to the second embodiment. [Figure 10] FIG. 10 is a diagram showing an example in which at least a part of the photo management information is displayed on the screen when photo data is acquired. [Figure 11] FIG. 11 is a functional block diagram showing a schematic configuration of a photo management ledger creating system having an operation terminal that causes a control unit of a management server to generate and edit photo management information and to generate record photo information. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0047] Each embodiment will be described below with reference to the drawings. In each drawing, the same parts are given the same reference numerals, and the description of the same parts will not be repeated. Note that the dimensions of the components in each drawing do not faithfully represent the actual dimensions of the components and the dimensional ratios of each component.

[0048] [Embodiment 1] (Photo management ledger creation system) FIG. 1 is a functional block diagram showing a schematic configuration of a photo management ledger creation system 1 according to a first embodiment of the present invention. The photo management ledger creation system 1 is a system that automatically creates a photo management ledger that manages photo data P1 related to pipeline construction such as water pipes. The pipeline construction refers to construction to bury pipes, etc. underground. The pipeline construction includes not only construction to bury new pipes, etc. underground, but also construction to renew pipes, etc. buried underground. The pipes, etc. include not only pipes but also parts necessary to configure a pipeline, such as valves.

[0049] The photo management ledger creation system 1 has a result acquisition terminal 10 and a management server 20. The result acquisition terminal 10 and the management server 20 are capable of transmitting and receiving data. The result acquisition terminal 10 acquires photo data P1 and transmits it to the management server 20. The management server 20 generates and manages result photo information D2 based on the photo data P1 and photo management information D1. The photo management information D1 is generated by the management server 20 from construction plan information. The construction plan information includes process information and measurement point position information of the managed construction. The result photo information D2 is data that constitutes the above-mentioned photo management ledger.

[0050] (Result acquisition device) The result acquisition terminal 10 has a configuration capable of transmitting and receiving data to and from the management server 20 and capable of acquiring photographic data related to pipeline construction. The result acquisition terminal 10 may be, for example, a mobile terminal such as a mobile phone, smartphone, or tablet, an imaging device such as a camera, or a processing device such as a computer. In other words, the result acquisition terminal 10 may have any configuration as long as it is capable of transmitting and receiving data to and from the management server 20 and capable of acquiring photographic data related to pipeline construction.

[0051] The result acquisition terminal 10 may be a work terminal owned by a construction company of a pipeline construction, or may be a terminal owned by a water utility. The result acquisition terminal 10 can access the management server 20 by an ID owned by the construction company or the water utility.

[0052] The result acquisition terminal 10 has a terminal side communication unit 11, a photo data acquisition unit 12, and a control unit 13. The result acquisition terminal 10 may have a storage unit capable of storing the photo data P1 acquired by the photo data acquisition unit 12.

[0053] The terminal-side communication unit 11 has a configuration capable of transmitting and receiving data to and from the management server 20. The terminal-side communication unit 11 may be, for example, a wireless communication device having an antenna, or a wired communication device to which a communication cable can be connected. The terminal-side communication unit 11 outputs data received from the management server 20 to the control unit 13, and transmits data output from the control unit 13 to the management server 20.

[0054] The photographic data acquisition unit 12 acquires photographic data P1 related to the pipeline construction. The photographic data acquisition unit 12 may acquire the photographic data P1 from an imaging device such as a camera, or may be an imaging unit such as a camera unit integrated into the result acquisition terminal 10. In other words, the photographic data acquisition unit 12 may have any configuration as long as it is capable of acquiring the photographic data P1.

[0055] The photo data acquisition unit 12 acquires photo data P1 corresponding to photo management information D1 acquired by a photo management information acquisition unit 14 (described later) of the control unit 13. That is, the photo data P1 acquired by the photo data acquisition unit 12 is determined by the photo management information D1. Note that acquisition of the photo data P1 of the pipeline construction by the photo data acquisition unit 12 may be performed, for example, by an operation of a worker, or may be performed automatically by the control unit 13 or the like.

[0056] The control unit 13 acquires photo management information D1 from the management server 20, causes the photo data acquisition unit 12 to acquire photo data P1 corresponding to the photo management information D1, and outputs the acquired photo data P1 to the management server 20. Specifically, the control unit 13 has a photo management information acquisition unit 14 and a data output unit 15. The control unit 13 may instruct the control unit 30 of the management server 20 to edit the photo management information D1 in response to an input operation on an input operation unit (not shown).

[0057] The photo management information acquisition unit 14 acquires photo management information D1 from the management server 20 via the terminal side communication unit 11. The photo management information D1 is information generated by the management server 20 based on the construction plan information in order to manage the photo data P1, as will be described in detail later. The photo management information D1 includes information related to the construction plan, such as the measurement point position, item, and type of work. The photo management information D1 also includes information on the photo data linked to the photo management information D1 (for example, the timing of acquiring the photo data, the content of the image, etc.).

[0058] Control unit 13 causes photo data acquisition unit 12 to acquire photo data P1 corresponding to photo management information D1 acquired by photo management information acquisition unit 14. That is, control unit 13 generates a photo data acquisition signal and outputs it to photo data acquisition unit 12.

[0059] The data output unit 15 outputs the photo data P1 acquired by the photo data acquisition unit 12 together with the corresponding photo management information D1 to the management server 20 via the terminal side communication unit 11. As a result, the photo data P1 is transmitted to the management server 20 together with the photo management information D1.

[0060] The data output unit 15 may output the photo data P1 acquired by the photo data acquisition unit 12 to the management server 20 one by one, or may output a plurality of photo data P1 to the management server 20 collectively.

[0061] (Management Server) The management server 20 manages the photo data P1 and photo management information D1. In detail, the management server 20 generates the photo management information D1 based on the construction plan information, and rearranges the photo management information D1 based on the management items. In addition, the management server 20 uses the photo management information D1 and the photo data P1 transmitted from the result acquisition terminal 10 to generate and output the performance photo information D2.

[0062] Specifically, the management server 20 includes a server side communication unit 21, a control unit 30, and a storage unit 40.

[0063] The server-side communication unit 21 has a configuration capable of transmitting and receiving data to and from the result acquisition terminal 10. The server-side communication unit 21 may be, for example, a wireless communication device having an antenna, or a wired communication device to which a communication cable can be connected. The server-side communication unit 21 outputs data received from the result acquisition terminal 10 to the control unit 30, and transmits data output from the control unit 30 to the result acquisition terminal 10.

[0064] The control unit 30 performs arithmetic processing for managing the photo data P1 and the photo management information D1. The control unit 30 may be realized by an arithmetic processing device such as a CPU (Central Processing Unit) or an MPU (Micro Processing Unit). The storage unit 40 stores programs required for the arithmetic processing of the control unit 30, and stores data obtained by the arithmetic processing of the control unit 30. The storage unit 40 may be realized by a storage device such as a volatile or non-volatile RAM (Read Only Memory) or ROM (Random Access Memory). The storage unit 40 may be realized by, for example, an internal or external storage device or a removable medium. Specifically, the storage unit 40 may be a cache memory and a main storage device. Specifically, the storage unit 40 may be an auxiliary storage device such as an SSD (Solid State Drive) or an HDD (Hard Disk).

[0065] The control unit 30 has a construction plan information acquisition unit 31, a photo management information generation unit 32, a photo management information editing unit 33, and an actual photo information generation unit .

[0066] The construction plan information acquisition unit 31 acquires construction plan information from a management device (not shown) that creates and manages construction plan information. The construction plan information includes at least one of information on a work schedule, work instructions, work instruction slips, quantity calculations of materials such as water pipes used in construction, estimates and delivery plans for the materials, and inventory management and procurement plans for the materials. The construction plan is created according to conditions such as design information, type of construction, specifications and number of heavy machinery to be used, transportation time, work time, workers, and construction environment. The construction environment refers to the environment of the location where water pipe construction work is to be performed, such as the time period during which construction is possible, road traffic volume, types of nearby buildings (commercial, residential, etc.), weather, season, etc.

[0067] The photo management information generating unit 32 generates the photo management information D1 based on the construction plan information acquired by the construction plan information acquiring unit 31. As described above, the photo management information D1 includes information related to the construction plan, such as the measurement point, the item, and the type of work. The photo management information D1 also includes information on the photo data P1 linked to the photo management information D1 (for example, the timing of acquiring the photo data, the content of the image, etc.). FIG. 3 is a diagram showing an example of the photo management information D1. As shown in FIG. 3, the photo management information D1 includes construction information d1a including information on a portion of the construction plan information, and linking information d1b for linking the corresponding photo data P1. The construction information d1a and the linking information d1b may be arranged in any manner.

[0068] The photo management information generating unit 32 generates a plurality of pieces of photo management information D1 classified by measurement point position, work item, type of work, etc., based on the construction plan information. Each of the plurality of pieces of photo management information D1 has information that can be linked to the corresponding photo data P1. This information is information that allows photo data to be linked according to measurement point position, work item, type of work, etc. The photo management information D1 includes not only information such as measurement point position, work item, type of work, etc., but also design information obtained from the construction plan information.

[0069] The photo management information D1 generated by the photo management information generator 32 is output from the controller 30 and stored in the memory 40.

[0070] Fig. 2 is a diagram showing an example of measurement point positions in management construction. The construction plan information also includes information on measurement point positions as shown in Fig. 2. The measurement point positions are the same as the management positions in the construction plan information. The management positions are set at a predetermined interval M from the start point L1 in the range from the start point L1 to the end point L2 of the construction section TP in the pipeline PL. In Fig. 2, the management positions are indicated by A0 (start point L1) to A9 (end point L2).

[0071] The work items include items for which photographs are taken, such as before construction begins, after completion, construction status, safety management, materials used, quality control, and completed form management.

[0072] The type of work includes types of work in pipeline construction, such as pipe installation, valve and plug installation, temporary construction, quality control, temporary equipment, material inspection, safety facilities, and water supply pipe switching work.

[0073] The photo management information editing unit 33 edits the multiple pieces of photo management information D1 stored in the memory unit 40. The photo management information editing unit 33 rearranges the multiple pieces of photo management information D1 based on the management items. The management items include at least one of the measurement point location, work item, type of work (hereinafter also referred to as the type of work), and work time. The photo management information editing unit 33 rearranges the multiple pieces of photo management information D1 by each item in the order of the measurement point location, work item, type of work, and work time. By rearranging the photo management information D1 in this manner, photo management can be performed in accordance with the actual work of pipeline construction. The photo management information editing unit 33 may rearrange all of the photo management information D1 as described above, or may rearrange a selected portion of the photo management information D1 as described above.

[0074] 4 and 5 are diagrams showing an example of a state in which a plurality of pieces of photo management information D1 are rearranged. In FIG. 4 and FIG. 5, an example of the construction status at the same measurement point position is shown arranged in the order of the work type. In this way, the photo management information editing unit 33 arranges a plurality of pieces of photo management information D1 in order. In the example shown in FIG. 4, the photo management information editing unit 33 arranges a plurality of pieces of photo management information D1 in the order of upper left, lower left, upper right, and lower right in correspondence with the order of the work type. In the example shown in FIG. 5, the photo management information editing unit 33 arranges a plurality of pieces of photo management information D1 in the order of upper left, upper right, lower left, and lower right in correspondence with the order of the work type so that the photo management information D1 before the start of construction and after completion are arranged on the left and right. In addition, the photo management information D1 before the start of construction and after completion may be configured so that two pieces of photo management information D1 on the left and right are one set.

[0075] The photo management information editing unit 33 may be capable of deleting some of the multiple photo management information D1, and may be capable of adding other photo management information D1 to the multiple photo management information D1. When photo management information D1 is added later, it is preferable to attach a flag to the added photo management information D1 so that it can be distinguished from photo management information D1 created based on the construction plan information. This makes it possible to check the contents of the added photo management information D1 more reliably. Note that even when deleting or adding photo management information D1, the photo management information editing unit 33 rearranges the multiple photo management information D1 based on the management items.

[0076] Photo management information editing unit 33 may be able to change the order of the multiple pieces of photo management information D1 generated by photo management information generation unit 32 in any order.

[0077] The achievement photo information generating unit 34 generates achievement photo information D2 by associating the plurality of pieces of photo management information D1 stored in the storage unit 40 with the photo data P1 acquired from the achievement acquisition terminal 10. The achievement photo information D2 generated by the achievement photo information generating unit 34 is stored in the storage unit 40. The achievement photo information generating unit 34 may generate achievement photo information D2 based on the photo management information D1 and the photo data P1 acquired from the achievement acquisition terminal 10, respectively.

[0078] Fig. 6 is a diagram showing an example of the performance photo information D2. As shown in Fig. 6, the performance photo information D2 includes the construction information d1a of the photo management information D1 and the photo data P1 linked to the linking information d1b. If there is no photo data, the performance photo information D2 is information in which the photo data portion is blank (no photo).

[0079] As described above, the photo management ledger creation system 1 is a system that has a track record acquisition terminal 10 and a management server 20, and creates a photo management ledger related to pipeline construction work. The management server 20 has a construction plan information acquisition unit 31 that acquires construction plan information, which is information related to the construction plan of the pipeline PL that is the target of the pipeline construction work, a photo management information generation unit 32 that links the construction plan information acquired by the construction plan information acquisition unit 31 to management items and generates photo management information D1 for managing photo data P1 related to the pipeline construction work, and a photo management information editing unit 33 that rearranges the photo management information D1 generated by the photo management information generation unit 32 based on the management items.

[0080] This allows construction plan information to be linked to management items, photo management information D1 for managing photo data P1 related to pipeline construction to be generated, and the photo management information D1 to be rearranged based on the management items. Thus, a large amount of photo data P1 can be easily organized and managed using the photo management information D1. Therefore, the work of organizing photos, which was previously done manually by workers, can be automatically performed by the system, improving the efficiency of pipeline construction work.

[0081] Furthermore, the result acquisition terminal 10 has a photo management information acquisition unit 14 that acquires photo management information D1 from the management server 20, a photo data acquisition unit 12 that acquires photo data P1 corresponding to the photo management information D1 acquired by the photo management information acquisition unit 14, and a data output unit 15 that outputs the photo data P1 acquired by the photo data acquisition unit 12 together with the photo management information D1 to the management server 20. The management server 20 has an achievement photo information generation unit 34 that generates achievement photo information D2 using the photo data P1 and photo management information D1 output from the result acquisition terminal 10.

[0082] This allows the management server 20 to link the photo data P1 acquired by the result acquisition terminal 10 to the photo management information D1 to generate result photo information D2. This allows a large amount of photo data P1 to be organized and managed by linking it to the photo management information D1. This allows for improved efficiency in pipe construction work.

[0083] (How to create a photo management ledger) 7 is a flow diagram showing a photo management ledger creating method performed by the photo management ledger creating system 1 having the above-described configuration. The photo management ledger creating method will be described below with reference to FIG.

[0084] 7, in this embodiment, when the flow starts (START), the construction plan information acquisition unit 31 of the management server 20 of the photo management ledger creation system 1 acquires construction plan information from a management device (not shown) (step SA1). Next, the photo management information generation unit 32 of the management server 20 generates photo management information D1 based on the acquired construction plan information (step SA2).

[0085] The photo management information editing unit 33 of the management server 20 edits the multiple pieces of photo management information D1 generated by the photo management information generation unit 32 (step SA3). Specifically, the photo management information editing unit 33 rearranges the multiple pieces of photo management information D1 based on management items. The management items include at least one of measurement point location, work item, type of work (hereinafter also referred to as type of work), and work time. The photo management information editing unit 33 rearranges the multiple pieces of photo management information D1 by each item in the order of measurement point location, work item, type of work, and work time.

[0086] The photo management information acquisition unit 14 of the result acquisition terminal 10 acquires the photo management information D1 corresponding to the work content of the pipeline construction from the management server 20 via the terminal side communication unit 11 (step SA4). Next, the photo data acquisition unit 12 of the result acquisition terminal 10 acquires the photo data P1 corresponding to the photo management information D1 (step SA5).

[0087] The data output unit 15 of the result acquisition terminal 10 outputs the acquired photo data P1 together with the corresponding photo management information D1 to the management server 20 via the terminal side communication unit 11 (step SA6). The result photo information generation unit 34 of the management server 20 generates result photo information D2 by associating the photo data P1 acquired from the result acquisition terminal 10 with the corresponding photo management information D1 (step SA7). Then, this flow ends (END).

[0088] Here, step SA1 corresponds to the construction plan information acquisition step, step SA2 corresponds to the photo management information generation step, step SA3 corresponds to the photo management information editing step, step SA4 corresponds to the photo management information acquisition step, step SA5 corresponds to the photo data acquisition step, step SA6 corresponds to the photo data output step, and step SA7 corresponds to the actual oblique view information generation step.

[0089] This allows the management server 20 to edit the multiple pieces of photo management information D1 that have been generated. Moreover, the management server 20 can generate record photo information D2 using the photo management information D1 and the photo data P1 acquired by the record acquisition terminal 10.

[0090] As described above, the photo management ledger creation method is a method of creating a photo management ledger related to pipeline construction work using a photo management ledger creation system 1 having a track record acquisition terminal 10 and a management server 20. The photo management ledger creation method includes a construction plan information acquisition step SA1 in which the management server 20 acquires construction plan information, which is information related to the construction plan of the pipeline PL that is the target of the pipeline construction work, a photo management information generation step SA2 in which the management server 20 links the construction plan information acquired in the construction plan information acquisition step SA1 to management items and generates photo management information D1 for managing photo data P1 related to the pipeline construction work, and a photo management information editing step SA3 in which the management server 20 rearranges the photo management information D1 generated in the photo management information generation step SA2 based on the management items.

[0091] This allows construction plan information to be linked to management items, photo management information D1 for managing photo data P1 related to pipeline construction to be generated, and the photo management information D1 to be rearranged based on the management items. Thus, a large amount of photo data P1 can be easily organized and managed using the photo management information D1. Therefore, the work of organizing photos, which was previously done manually by workers, can be done automatically, improving the efficiency of pipeline construction work.

[0092] The photo management ledger creation method also includes a photo management information acquisition step SA4 in which the track record acquisition terminal 10 acquires photo management information D1 from the management server 20, a photo data acquisition step SA5 in which the track record acquisition terminal 10 acquires photo data P1 corresponding to the photo management information D1 acquired in the photo management information acquisition step SA4, a photo data output step SA6 in which the track record acquisition terminal 10 outputs the photo data P1 acquired in the photo data acquisition step SA5 to the management server 20 together with the photo management information D1, and an actual photo information generation step SA7 in which the management server 20 generates actual photo information D2 using the photo data P1 and photo management information D1 output from the track record acquisition terminal 10.

[0093] This allows the management server 20 to link the photo data P1 acquired by the result acquisition terminal 10 to the photo management information D1 to generate result photo information D2. This allows a large amount of photo data P1 to be organized and managed by linking it to the photo management information D1. This allows for improved efficiency in pipe construction work.

[0094] (Photo management ledger creation system control program) The program in this embodiment (program for controlling the photo management ledger creation system) may be a program that causes the result acquisition terminal 10 and management server 20 constituting the photo management ledger creation system 1 to execute steps SA1 to SA4 shown in FIG. 7. The photo management ledger creation system 1 and the photo management ledger creation method in this embodiment can be realized by executing this program by the result acquisition terminal 10 and management server 20. In this case, the result acquisition terminal 10 and management server 20 may be a general-purpose computer or a dedicated computer. The computer is equipped with, for example, a CPU, and performs calculations using the CPU (Central Processing Unit).

[0095] As described above, the photo management ledger creation system control program is a program for controlling the photo management ledger creation system 1, which has a track record acquisition terminal 10 and a management server 20, and creates a photo management ledger related to pipeline construction work. The photo management ledger creation system control program causes the management server 20 to acquire construction plan information, which is information related to the construction plan of the pipeline PL that is the target of the pipeline construction work, link the acquired construction plan information to management items, generate photo management information D1 for managing photo data P1 related to the pipeline construction work, and rearrange the generated photo management information D1 based on the management items.

[0096] This allows construction plan information to be linked to management items, photo management information D1 for managing photo data P1 related to pipeline construction to be generated, and the photo management information D1 to be rearranged based on the management items. Thus, a large amount of photo data P1 can be easily organized and managed using the photo management information D1. Therefore, the work of organizing photos, which was previously done manually by workers, can be automatically performed by the system, improving the efficiency of pipeline construction work.

[0097] The photo management ledger creation system control program may be a program that causes the result acquisition terminal 10 and management server 20 constituting the photo management ledger creation system 1 to execute steps SA5 to SA7 shown in FIG.

[0098] In other words, the program for controlling the photo management ledger creation system causes the performance acquisition terminal 10 to acquire photo management information D1 from the management server 20, acquire photo data P1 corresponding to the acquired photo management information D1, output the acquired photo data P1 together with the photo management information D1 to the management server 20, and cause the management server 20 to generate performance photo information D2 using the photo data P1 and photo management information D1 output from the performance acquisition terminal 10.

[0099] This allows the management server 20 to link the photo data P1 acquired by the result acquisition terminal 10 to the photo management information D1 to generate result photo information D2. This allows a large amount of photo data P1 to be organized and managed by linking it to the photo management information D1. This allows for improved efficiency in pipe construction work.

[0100] [Embodiment 2] 8 is a functional block diagram showing a schematic configuration of a photo management ledger creation system 100 according to embodiment 2. The photo management ledger creation system 100 of this embodiment differs from the photo management ledger creation system 1 of embodiment 1 in that it has an actual photo information editing unit 135 and an actual photo information output unit 136. Below, only the points that differ from embodiment 1 will be described using reference symbols, and the same parts as embodiment 1 will not be described.

[0101] The photo management ledger creation system 100 has a performance acquisition terminal 10 and a management server 120. The management server 120 has a control unit 130 and a memory unit 40. The control unit 130 has a construction plan information acquisition unit 31, a photo management information generation unit 32, a photo management information editing unit 33, a performance photo information generation unit 34, a performance photo information editing unit 135, and a performance photo information output unit 136.

[0102] The actual photo information editing unit 135 edits the actual photo information D2 generated by the actual photo information generating unit 34 and stored in the memory unit 40. The actual photo information editing unit 135 rearranges the multiple actual photo information D2 based on the management items. The management items include at least one of the measurement point position, work item, type of work (hereinafter also referred to as the type of work), and work time. The actual photo information editing unit 135 rearranges the multiple actual photo information D2 by each item in the order of the measurement point position, work item, type of work, and work time. By rearranging the actual photo information D2 in this manner, photo management can be performed in accordance with the actual work of pipeline construction. The actual photo information editing unit 135 may rearrange all the actual photo information D2 as described above, or may rearrange a selected part of the actual photo information D2 as described above.

[0103] The performance photo information editing unit 135 may rearrange multiple pieces of performance photo information D2, all of which have the same items in the management items, according to the time when the photo data P1 was acquired by the photo data acquisition unit 12 of the performance acquisition terminal 10. This allows multiple pieces of performance photo information D2, all of which have the same items in the management items, to be rearranged according to the time when the photo data P1 was acquired. Therefore, multiple pieces of performance photo information D2 can be easily organized and managed. This makes it possible to improve the efficiency of pipe construction work.

[0104] The actual photo information editing unit 135 may be able to change the order of the multiple pieces of actual photo information D2 generated by the actual photo information generating unit 34 to an arbitrary order. This allows the multiple pieces of actual photo information D2 to be changed to an arbitrary order. Therefore, the order of the multiple pieces of actual photo information D2 can be changed according to the progress of the pipeline construction work, etc. This makes it possible to improve the efficiency of the pipeline construction work.

[0105] The actual photo information editing unit 135 may generate actual photo information D2 separately from the multiple pieces of actual photo information D2 generated by the actual photo information generation unit 34, and may be capable of replacing the generated actual photo information D2 with part of the multiple pieces of actual photo information D2 or inserting the generated actual photo information D2 into the multiple pieces of actual photo information D2 in a predetermined order.

[0106] As a result, after the multiple pieces of performance photo information D2 are generated by the performance photo information generating unit 34, new performance photo information D2 can be generated and the generated performance photo information D2 can be replaced with part of the multiple pieces of performance photo information D2, or the generated performance photo information D2 can be inserted into the multiple pieces of performance photo information D2 in a predetermined order. Therefore, the performance photo information D2 can be replaced or added according to the progress of the pipeline construction work, etc. Therefore, the efficiency of the pipeline construction work can be improved.

[0107] The actual photo information output unit 136 outputs at least a part of the multiple pieces of actual photo information D2 edited by the actual photo information editing unit 135. The actual photo information output unit 136 may output, for example, the actual photo information D2 selected from the multiple pieces of actual photo information D2 rearranged by the actual photo information editing unit 135. This makes it possible to output the actual photo information D2 selected from the multiple pieces of actual photo information D2 rearranged by the actual photo information editing unit 135. This makes it possible to improve the efficiency of pipe construction work.

[0108] The achievement photo information D2 output from the achievement photo information output unit 136 may have a predetermined file format constituting a part of a photo management ledger. Furthermore, the achievement photo information D2 output from the achievement photo information output unit 136 may be displayed on a display device (not shown), may be printed on a print medium such as paper by a printing device (not shown), or may be transmitted to the achievement acquisition terminal 10 via the server-side communication unit 21 and displayed on a display unit of the achievement acquisition terminal 10.

[0109] The control unit 13 of the performance acquisition terminal 10 may instruct the control unit 30 of the management server 20 to edit the photo management information D1 and performance photo information D2, or may instruct the control unit 30 to output the performance photo information D2, in response to an input operation on an input operation unit not shown.

[0110] (How to create a photo management ledger) 9 is a flow diagram showing a photo management ledger creating method performed by the photo management ledger creating system 100 having the above-mentioned configuration. The photo management ledger creating method of this embodiment will be described below with reference to FIG.

[0111] As shown in Fig. 9, when the flow starts (START), the photo management ledger creation system 100 performs steps SA1 to SA7 in the same manner as the photo management ledger creation system 1 of embodiment 1. Note that steps SA1 to SA7 in Fig. 9 are the same as the photo management ledger creation method performed by the photo management ledger creation system 1 of embodiment 1. Therefore, a description of steps SA1 to SA7 in Fig. 9 will be omitted.

[0112] In step SB8, which is performed after the record photo information generating unit 34 of the management server 20 generates the record photo information D2 in step SA7, the record photo information editing unit 135 edits the generated record photo information D2. The record photo information editing unit 135 rearranges the multiple record photo information D2 based on the management items, for example.

[0113] The achievement photo information editing unit 135 may rearrange the multiple pieces of achievement photo information D2 having the same items of management items according to the time when the photo data P1 was acquired by the photo data acquisition unit 12 of the achievement acquisition terminal 10. The achievement photo information editing unit 135 may change the order of the multiple pieces of achievement photo information D2 generated by the achievement photo information generation unit 34 to an arbitrary order. The achievement photo information editing unit 135 may generate achievement photo information D2 separately from the multiple pieces of achievement photo information D2 generated by the achievement photo information generation unit 34, and replace part of the multiple pieces of achievement photo information D2 with the generated achievement photo information D2, or may insert the generated achievement photo information D2 into the multiple pieces of achievement photo information D2 in a predetermined order.

[0114] The achievement photo information output unit 136 outputs at least a part of the multiple pieces of achievement photo information D2 edited by the achievement photo information editing unit 135 (step SB9). The achievement photo information D2 output from the achievement photo information output unit 136 may have a predetermined file format constituting a part of a photo management ledger. Furthermore, the achievement photo information D2 output from the achievement photo information output unit 136 may be displayed on a display device, may be printed on a print medium such as paper by a printing device, or may be transmitted to the achievement acquisition terminal 10 via the server side communication unit 21 and displayed on the display unit of the achievement acquisition terminal 10. Then, this flow ends (END).

[0115] Here, Step SB8 corresponds to the step of editing the actual photograph information.

[0116] The photo management ledger creating method of this embodiment further includes a record photo information editing step SB8 for rearranging the multiple pieces of record photo information D2 generated in record photo information generating step SA7 of the first embodiment based on management items.

[0117] This allows, for example, when multiple pieces of photographic data P1 are acquired in one process of pipeline construction and multiple pieces of actual photographic information D2 are generated, the multiple pieces of actual photographic information D2 can be rearranged based on the management items. This makes it possible to easily organize and manage a large amount of photographic data P1. This allows for improved work efficiency in pipeline construction.

[0118] (Photo management ledger creation system control program) The program in this embodiment (program for controlling the photo management ledger creation system) may be a program that causes the result acquisition terminal 10 and management server 120 constituting the photo management ledger creation system 100 to execute steps SA1 to SA7, SB8, and SB9 shown in FIG. 9. The photo management ledger creation system 100 and the photo management ledger creation method in this embodiment can be realized by executing this program by the result acquisition terminal 10 and management server 120. In this case, the result acquisition terminal 10 and management server 120 may be a general-purpose computer or a dedicated computer. The computer is equipped with, for example, a CPU, and performs arithmetic processing using the CPU (Central Processing Unit).

[0119] As described above, the photo management ledger creation system control program causes the management server 120 to rearrange the multiple pieces of actual photo information D2 that have been generated based on the management items. This makes it possible to rearrange the multiple pieces of actual photo information D2 based on the management items when multiple pieces of photo data P1 are acquired in, for example, one process of pipeline construction and multiple pieces of actual photo information D2 are generated. This makes it possible to easily organize and manage large amounts of photo data P1. This makes it possible to improve the efficiency of pipeline construction work.

[0120] [Other embodiments] Although the embodiment of the present invention has been described above, the above-mentioned embodiment is merely an example for carrying out the present invention. Therefore, the present invention is not limited to the above-mentioned embodiment, and it is possible to carry out the above-mentioned embodiment by appropriately modifying it within the scope of the gist of the present invention.

[0121] In each of the above-described embodiments, the photo management ledger creation system 1,100 automatically creates a photo management ledger that manages photographic data related to pipeline construction such as water pipes. However, the photo management ledger creation system may automatically create a photo management ledger that manages photographic data related to construction of piping including sewer pipes, gas pipes, underground buried pipes, agricultural water, etc. The photo management ledger creation system may automatically create a photo management ledger that manages photographic data related to polyethylene pipe construction as well as iron pipes.

[0122] Although not specifically described in each of the above embodiments, the management server 20 may be realized by one or more computer devices.

[0123] In each of the above-mentioned embodiments, the photo management ledger creation system 1,100 has a management server 20 and one track record acquisition terminal 10 capable of communicating with the management server 20. However, the photo management ledger creation system may have multiple track record acquisition terminals capable of communicating with the management server. In this case, each track record acquisition terminal has the functions described in each of the above-mentioned embodiments. Note that when one of the multiple track record acquisition terminals instructs the management server to edit the photo management information or track record photo information, the operation of the other track record acquisition terminals is restricted so that the other track record acquisition terminals cannot instruct the management server to edit the photo management information or track record photo information. Even in this case, the other track record acquisition terminals can view the photo management information and track record photo information in the management server.

[0124] In each of the above-described embodiments, the management server 20 generates the actual result photo information using the photo data P1 acquired by the result acquisition terminal 10. However, the management server may generate photo data in which electronic whiteboard information is embedded. The electronic whiteboard information is generated based on, for example, construction plan information. The electronic whiteboard information includes information such as the measurement point position, information on the photographed object, design information, work items, work type, and work date and time.

[0125] The management server may generate the performance photo information using photo data acquired by a device other than the performance acquisition terminal. Furthermore, the management server may generate the performance photo information using photo data stored in the storage unit 40.

[0126] In each of the above-described embodiments, when the photo data is acquired by the photo data acquisition unit 12, the control unit 13 of the result acquisition terminal 10 may display at least a part of the photo management information D1, for example, on the screen of the result acquisition terminal 10 or the imaging device. FIG. 10 shows an example in which at least a part of the photo management information D1 is displayed on the screen. This allows the worker to properly acquire the photo data corresponding to the photo management information D1 when performing an operation to acquire the photo data by the photo data acquisition unit 12. Note that the photo management information D1 may or may not be embedded in the photo data acquired by the photo data acquisition unit 12.

[0127] In each of the above-described embodiments, the management items used to sort the photo management information or the actual photo information include at least one of the measurement point location, the work item, the work type, and the work time. However, the management items may include items other than the measurement point location, the work item, the work type, and the work time.

[0128] In each of the above-described embodiments, the management server 20, 120 rearranges the photo management information or the past photo information by each item in the order of measurement point location, task item, task type, and task time. However, the management server may rearrange the photo management information or the past photo information by prioritizing one of measurement point location, task item, task type, and task time, or may rearrange the items in an order different from the above-described order.

[0129] In each of the above-described embodiments, when all of the management items in the photo management information or the record photo information are the same, the management server 20, 120 rearranges the photo management information or the record photo information according to the time when the photo data P1 was acquired by the photo data acquisition unit 12. However, the management server may rearrange the photo management information or the record photo information according to an item other than the time.

[0130] In the first embodiment, the control unit 30 of the management server 20 of the photo management ledger creation system 1 has a construction plan information acquisition unit 31, a photo management information generation unit 32, a photo management information editing unit 33, and an actual photo information generation unit 34. However, the control unit of the management server does not have to have the actual photo information generation unit.

[0131] In the first embodiment, the control unit 30 of the management server 20 generates and edits the photo management information D1, and also generates the actual photo information D2. In the second embodiment, the control unit 130 of the management server 120 generates and edits the photo management information D1, and also generates and edits the actual photo information D2. The control unit of the management server may be caused to generate and edit the photo management information and the actual photo information by operating an operation terminal.

[0132] FIG. 11 is a functional block diagram showing the schematic configuration of a photo management ledger creation system 200 having an operation terminal 210 that causes the control unit 30 of the management server 20 to generate and edit photo management information D1 and to generate actual photo information D2.

[0133] The operation terminal 210 has a terminal-side communication unit 211, an input operation unit 212, and a control unit 213. The operation terminal 210 may be, for example, an arithmetic processing device such as a computer, or a mobile terminal such as a mobile phone, a smartphone, or a tablet. The operation terminal 210 may have any configuration as long as it is possible to input operations to cause the control unit 30 of the management server 20 to generate and edit the photo management information D1 and to generate the actual photo information D2.

[0134] The terminal-side communication unit 211 has a configuration capable of transmitting and receiving data to and from the management server 20. The terminal-side communication unit 211 may be, for example, a wireless communication device having an antenna, or may be a wired communication device to which a communication cable can be connected. The terminal-side communication unit 211 outputs data received from the management server 20 to the control unit 213, and transmits data output from the control unit 213 to the management server 20.

[0135] The input operation unit 212 is configured to be able to input operations to the control unit 30 of the management server 20. The input operation unit 212 may be, for example, an input device such as a keyboard or a mouse, a screen input device such as a touch panel provided on a display screen, or a voice input device. The input operation unit 212 may have any configuration as long as it is configured to be able to input operations to the control unit 30 of the management server 20.

[0136] The control unit 213 generates an operation signal for operating the control unit 30 of the management server 20 based on an input operation on the input operation unit 212, and causes the terminal side communication unit 211 to transmit the operation signal to the management server 20. The control unit 213 has an operation signal generation unit 214. The operation signal generation unit 214 generates the operation signal based on an input operation on the input operation unit 212, and outputs the operation signal to the terminal side communication unit 211.

[0137] The result acquisition terminal 10 may have the functions of the operation terminal 210 as described above. As a result, by operating the result acquisition terminal 10, the control unit 30 of the management server 20 can generate and edit the photo management information D1 and generate the result photo information D2.

[0138] Although not shown in the figure, the operation terminal 210 may be configured to be able to import photographic data. In this case, the control unit 213 of the operation terminal 210 can transmit the imported photographic data to the control unit 30 of the management server 20 via the terminal side communication unit 211.

[0139] Furthermore, although not shown, the control unit 130 in the second embodiment may edit and output the actual photograph information D2 by operating the operation terminal 210.

[0140] The photo management ledger creation system 200 may have multiple operation terminals 210. In this case, when one of the multiple operation terminals is instructing the management server to edit photo management information or actual photo information, the operation of the other operation terminals is restricted so that the other operation terminals cannot instruct the management server to edit the photo management information or actual photo information. Even in this case, the other operation terminals and the actual acquisition terminal can view the photo management information and actual photo information in the management server.

[0141] In the second embodiment, the control unit 130 of the management server 120 of the photo management ledger creation system 100 has a construction plan information acquisition unit 31, a photo management information generation unit 32, a photo management information editing unit 33, an actual photo information generation unit 34, an actual photo information editing unit 135, and an actual photo information output unit 136. However, the control unit of the management server does not have to have the actual photo information output unit.

[0142] In the second embodiment, the achievement photo information editing unit 135 can change the order of the multiple pieces of achievement photo information D2 generated by the achievement photo information generating unit 34 to an arbitrary order. However, the achievement photo information editing unit does not have to be able to change the order of the multiple pieces of achievement photo information to an arbitrary order. In this case, the achievement photo information editing unit rearranges the multiple pieces of achievement photo information according to a predetermined rule (for example, arranging according to the management item).

[0143] In the second embodiment, the actual photo information editing unit 135 generates actual photo information D2 separately from the multiple pieces of actual photo information D2 generated by the actual photo information generating unit 34, and can replace a part of the multiple pieces of actual photo information D2 with the generated actual photo information D2 or can insert the generated actual photo information D2 into the multiple pieces of actual photo information D2 in a predetermined order. However, the actual photo information editing unit does not have to have such a function. [Industrial Applicability]

[0144] The present invention can be used in a photo management ledger creation system that creates a photo management ledger related to pipeline construction work. [Explanation of symbols]

[0145] 1, 100, 200 Photo management ledger creation system 10. Achievement acquisition terminal 11 Terminal communication unit 12 Photo data acquisition section 13 Control section 14 Photo management information acquisition unit 15 Data output section 20, 120 Management Server 21 Server side communication section 30, 130 Control unit 31 Construction Planning Information Acquisition Department 32 Photo management information generation unit 33 Photo Management Information Editorial Department 34. Actual photo information generation unit 135 Photographic Information Editorial Department 136 Actual photo information output section 40 Storage section 210 Operation terminal 211 Terminal communication unit 212 Input operation section 213 Control Unit 214 Operation signal generation section D1 Photo Management Information d1a construction information d1b Linking information D2 Photo information P1 Photo data PL conduit

Claims

1. A track record acquisition terminal; A management server; having A photo management ledger creation system for creating a photo management ledger for pipeline construction, The management server includes: A construction plan information acquisition unit that acquires construction plan information, which is information regarding a construction plan for a pipeline that is a target of the pipeline construction; a photo management information generating unit that generates photo management information for managing photo data related to the pipeline construction by linking the construction plan information acquired by the construction plan information acquiring unit to a management item; a photo management information editing unit that rearranges the photo management information generated by the photo management information generating unit based on the management items; having Photo management ledger creation system.

2. 2. The photo management ledger creation system according to claim 1, The result acquisition terminal includes: a photo management information acquisition unit that acquires the photo management information from the management server; a photo data acquisition unit that acquires the photo data corresponding to the photo management information acquired by the photo management information acquisition unit; a data output unit that outputs the photo data acquired by the photo data acquisition unit to the management server together with the photo management information; having The management server includes: a record photo information generating unit that generates record photo information using the photo data and the photo management information output from the record acquisition terminal; Photo management ledger creation system.

3. 3. The photo management ledger creation system according to claim 2, The management server includes: a record photo information editing unit that rearranges the plurality of record photo information generated by the record photo information generating unit based on the management items; Photo management ledger creation system.

4. 4. The photo management ledger creation system according to claim 3, The management items include at least one of a measurement point position, a work item, a work type, and a work time. Photo management ledger creation system.

5. 5. The photo management ledger creation system according to claim 4, the performance photo information editing unit rearranges the plurality of performance photo information generated by the performance photo information generating unit in the order of the measurement point location, the work item, the type of work, and the work time; Photo management ledger creation system.

6. 4. The photo management ledger creation system according to claim 3, the record photo information editing unit rearranges a plurality of record photo information items each having the same management item according to a time when the photo data was acquired by the photo data acquisition unit; Photo management ledger creation system.

7. 4. The photo management ledger creation system according to claim 3, The performance photo information editing unit is capable of changing the order of the plurality of performance photo information generated by the performance photo information generating unit. Photo management ledger creation system.

8. 4. The photo management ledger creation system according to claim 3, the performance photo information editing unit generates performance photo information separately from the plurality of performance photo information generated by the performance photo information generating unit, and is capable of replacing a portion of the plurality of performance photo information with the generated performance photo information or inserting the generated performance photo information into the plurality of performance photo information in a predetermined order; Photo management ledger creation system.

9. 4. The photo management ledger creation system according to claim 3, The management server includes: a performance photo information output unit that outputs performance photo information selected from the plurality of performance photo information rearranged by the performance photo information editing unit; Photo management ledger creation system.

10. A photo management ledger creation method for creating a photo management ledger for pipeline construction using a photo management ledger creation system having a performance acquisition terminal and a management server, comprising: A construction plan information acquisition step in which the management server acquires construction plan information which is information regarding a construction plan for a pipeline that is a target of the pipeline construction; A photo management information generation step in which the management server links the construction plan information acquired in the construction plan information acquisition step to a management item and generates photo management information for managing photo data related to the pipeline construction; a photo management information editing step in which the management server rearranges the photo management information generated in the photo management information generating step based on the management items; having How to create a photo management ledger.

11. 11. The photo management ledger creating method according to claim 10, a photo management information acquisition step in which the result acquisition terminal acquires the photo management information from the management server; a photo data acquisition step in which the result acquisition terminal acquires the photo data corresponding to the photo management information acquired in the photo management information acquisition step; a photo data output step in which the result acquisition terminal outputs the photo data acquired in the photo data acquisition step to the management server together with the photo management information; a record photo information generating step in which the management server generates record photo information using the photo data and the photo management information output from the record acquisition terminal; having How to create a photo management ledger.

12. 12. The photo management ledger creating method according to claim 11, a record photo information editing step of rearranging the plurality of record photo information generated in the record photo information generating step based on the management items; How to create a photo management ledger.

13. 13. The photo management ledger creating method according to claim 12, The management items include at least one of a measurement point position, a work item, a work type, and a work time. How to create a photo management ledger.

14. A program for controlling a photo management ledger creation system that has a performance acquisition terminal and a management server and creates a photo management ledger related to pipeline construction, comprising: The management server includes: acquiring construction plan information which is information regarding a construction plan for a pipeline that is a target of the pipeline construction; linking the acquired construction plan information to a management item to generate photo management information for managing photo data related to the pipeline construction; rearrange the generated photo management information based on the management items; A program for controlling the photo management ledger creation system.

15. 15. The photo management ledger creation system control program according to claim 14, The result acquisition terminal, acquiring the photo management information from the management server; acquiring the photo data corresponding to the acquired photo management information; outputting the acquired photograph data together with the photograph management information to the management server; The management server includes: generating record photo information using the photo data and the photo management information output from the record acquisition terminal; A program for controlling the photo management ledger creation system.

16. 16. The photo management ledger creation system control program according to claim 15, The management server includes: rearrange the generated plurality of pieces of actual photograph information based on the management items; A program for controlling the photo management ledger creation system.

17. 17. The photo management ledger creation system control program according to claim 16, The management items include at least one of a measurement point position, a work item, a work type, and a work time. A program for controlling the photo management ledger creation system.

Citation Information

Patent Citations

  • Image management system and device, and construction picture album preparation system and device

    JP2003296346A

  • Construction support system for infrastructure

    JP2004295628A

  • Blackboard display system for construction

    JP2006235835A

  • Picture imaging device, picture management device, and picture management system

    JP2016058767A

  • Image acquisition device, photo folder creation system, photo folder creation method

    JP2018147215A