Construction structure and construction method of stone wall

The stone wall construction method uses slings with pull-out resistance to suspend and tighten building stones without tools, ensuring secure installation and earthquake resistance.

JP2024151282AInactive Publication Date: 2024-10-24YUTOKU CONCRETE +1
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
JP2023123324
Authority / Receiving Office
JP · JP
Patent Type
Applications
Current Assignee / Owner
Priority Date
2023-04-11
Filing Date
2023-07-28
Publication Date
2024-10-24
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

Conventional stone wall construction methods require the use of tightening tools to wrap belts around building stones, which is time-consuming and inefficient, and do not effectively secure the stones during earthquakes.

Method used

The method involves using first and second slings with pull-out resistance, passed through annular portions of building stones, to suspend and tighten them without tools, ensuring secure fixation and resistance to earthquake vibrations.

Benefits of technology

This method allows for rapid installation of stones without tools, secures them against loosening and collapse during earthquakes, and reduces construction complexity and cost.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 2024151282000001_ABST
    Figure 2024151282000001_ABST
Patent Text Reader

Abstract

To provide a construction structure and a construction method for a stone wall that allow stones to be installed in desired locations without using fasteners and without the need for conventional labor.SOLUTION: In a first sling 6, a first end part 6a of one end provided with an annular part is positioned on one lateral side 3b1 of a reserve part 3b of a stone 3. A second end 6b of the other end is provided with pulling resistance force from a resistance material provided in banking 2. In a second sling 7, the first sling 6 is passed through an annular part provided at a third end 7a on one end, covering a part of the surroundings of the reserve part 3b from the one lateral side 3b1, on the other lateral side 3b2 of the reserve part 3b opposite to the one lateral side 3b1. In addition, a fourth end part 7b of the other end is passed through the annular part of the first end part 6a positioned on the one lateral side 3b1, covering the rest of the surroundings of the reserve part 3b from the other lateral side 3b2. The fourth end part 7b is provided with the pulling resistance force from the resistance material provided in the banking 2.SELECTED DRAWING: Figure 2
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to a construction structure and a construction method for stone walls used in castles and the like. [Background technology]

[0002] Conventionally, a construction structure and a construction method for this type of stone wall are disclosed in, for example, Patent Document 1.

[0003] In the structure and method disclosed in Patent Document 1, a belt is wrapped around the retaining portions of the masonry stones that make up a stone wall. The belt has a fastening device with a load-tightening function. The fastening device adjusts the length of the belt and keeps it at the adjusted length. Chestnut stones are piled on the back side of the area where the masonry stones will be placed, and a reinforcing net is placed inside the chestnut stones. The belt wrapped around the masonry stones is connected to the reinforcing net via a connecting member. [Prior art documents] [Patent documents]

[0004] [Patent Document 1] Patent No. 7153609 Summary of the Invention [Problem to be solved by the invention]

[0005] In the conventional stone wall construction structure and construction method disclosed in Patent Document 1, a fastener is used to wrap a belt around the stone, and the belt is wrapped around the stone by the load-binding function of the fastener. Therefore, in the conventional stone wall construction structure and construction method, when constructing a stone wall, a fastener is required to wrap the belt around the stone, and it is also time-consuming to wrap the belt around the stone with the fastener. [Means for solving the problem]

[0006] The present invention has been made to solve such problems, a first sling having a first end portion at one end provided with a loop portion, which is positioned on one side of a retaining portion of the masonry, and a pull-out resistance force is applied to a second end portion at the other end from a resistance material provided in the embankment or ground behind the retaining portion; a first sling is passed from one side to a loop provided at a third end at one end on the other side of the bracing part facing the one side, covering a part of the periphery of the bracing part from the one side, and a fourth end at the other end is passed from the other side to the loop provided at the first end on the one side, covering the remainder of the periphery, so that a pull-out resistance is applied to the fourth end from a resistance material provided in the embankment or natural ground, A first sling on the terminal side of the first end tightens a portion of the perimeter, and a second sling on the terminal side of the third end tightens the remainder of the perimeter, forming a stone wall construction.

[0007] The present invention also provides a method for producing a method for manufacturing a semiconductor device comprising the steps of: a first sling that is attached to one side of a masonry bracing portion, has a second end at one end passed through a loop provided at a first end at one end while covering the entire periphery of the bracing portion, and a pull-out resistance force is applied to the second end from a resistance material provided in the embankment or ground present behind the bracing portion; and a second sling, which covers the entire periphery of the bracing part on the other side surface of the bracing part facing the one side surface, has a fourth end portion at the other end passed through a loop portion provided at a third end portion at one end, and a pull-out resistance force is applied to the fourth end portion from a resistance material provided in the embankment or the natural ground, The first sling on the terminal side of the first end and the second sling on the terminal side of the third end each tightened around the entire periphery of the retaining portion to form the stone wall construction.

[0008] In these configurations, when the masonry is placed in a desired location, the first sling and the second sling are wrapped around the masonry in the above-mentioned respective predetermined manners, and the second end of the first sling and the fourth end of the second sling are lifted up. By temporarily suspending the masonry in the air in this manner, the first sling on the terminal side of the first end fastens a part of the circumference of the masonry's bracing part, and the second sling on the terminal side of the third end fastens the remaining part of the circumference. Alternatively, the first sling on the terminal side of the first end and the second sling on the terminal side of the third end fasten the entire circumference of the masonry's bracing part.

[0009] As a result, it is possible to wrap a first sling and a second sling such as a belt around the masonry by simply lifting the masonry once, without using the fastening device that was previously required to wrap a belt around the masonry, and without the previously required effort of wrapping a belt around the masonry using a fastening device.

[0010] At the same time, it is easy to check whether the wrapped first sling and second sling do not come out of the masonry. In addition, it is possible to reliably wrap the first sling and second sling around masonry of various shapes and sizes in the same manner without requiring special tools or labor. In addition, by providing at least one each of such first sling and second sling, and increasing the number of pairs of first slings and second slings wrapped around the masonry as necessary, or by changing the circumferential position of the first end of the first sling through which the second end is passed, and the circumferential position of the third end of the second sling through which the fourth end is passed, the direction of each pull-out resistance force applied to the masonry from each resistance material can be adjusted, so that the masonry can be installed in a desired position even for masonry of irregular shapes.

[0011] The present invention also provides a method for producing a method for manufacturing a semiconductor device comprising the steps of: a first fastening member that fastens the loop portion provided at the third end portion and the first sling at a location where the first sling passes through the loop portion provided at the third end portion, thereby maintaining a state in which the first sling on the terminal side of the first end portion fastens a part of the periphery of the stay portion; a second fastening member fastening the loop portion provided at the first end portion and the second sling at a location where the second sling passes through the loop portion provided at the first end portion, thereby maintaining a state in which the second sling on the terminal side of the third end portion fastens the remaining portion of the periphery; The present invention is characterized by comprising:

[0012] According to this configuration, the first sling is fastened to the loop provided at the third end by the first fastening material, so that the first sling at the terminal side of the first end fastens a part of the periphery of the retaining part of the masonry. The second sling is fastened to the loop provided at the first end by the second fastening material, so that the second sling at the terminal side of the third end fastens the remaining part of the periphery. This reliably prevents the fastening of the first sling and the second sling to the masonry from loosening during the masonry installation process. Furthermore, even if the masonry is subjected to earthquake motion and vibrates, the fastening force of the first sling and the second sling to the masonry does not decrease.

[0013] The present invention also provides a method for producing a method for manufacturing a semiconductor device comprising the steps of: a first fastening member that fastens the loop portion provided at the first end portion and the first sling at a location where the first sling passes through the loop portion provided at the first end portion, thereby maintaining a state in which the first sling on the terminal side of the first end portion fastens the entire periphery of the stay portion; a second fastening member that fastens the loop portion provided at the third end and the second sling at a location where the second sling passes through the loop portion provided at the third end, thereby maintaining a state in which the second sling on the terminal side of the third end fastens the entire periphery of the stay portion; The present invention is characterized by comprising:

[0014] According to this configuration, the first sling on the terminal side of the first end is fastened to the loop portion on the first end, thereby maintaining a state in which the first sling on the terminal side of the first end fastens the entire circumference of the bracing portion. Furthermore, the second sling on the terminal side of the third end is fastened to the loop portion on the third end, thereby maintaining a state in which the second sling on the terminal side of the third end fastens the entire circumference of the bracing portion. Therefore, this configuration also reliably prevents the fastening of the first sling and the second sling to the masonry from loosening during the masonry installation construction process. Furthermore, even if seismic motion acts on the masonry and causes it to vibrate, the fastening force of the first sling and the second sling to the masonry does not decrease.

[0015] In addition, the present invention is characterized in that the second end and the fourth end are each provided with an annular portion.

[0016] According to this configuration, since a ring portion is provided at each of the second end and the fourth end, the first sling and the second sling can be connected to the resistance material provided in the embankment or ground easily, reliably, and at low cost without the need for special connecting tools.

[0017] The present invention is also characterized in that it provides binding materials that cover the retaining portions between adjacent building stones, or that are pulled into the embankment side or the natural ground side to connect adjacent first slings, second slings, or a first sling and a second sling.

[0018] Stone walls that are not firmly fixed with concrete or the like will move significantly in all directions and may deform or collapse when subjected to large earthquake motions. However, with this configuration, adjacent first slings, second slings, or first and second slings that cover the retaining parts between adjacent stones, or that are pulled into the embankment or natural ground, are connected with ties. As a result, adjacent stones are flexibly connected by ties and will not move significantly even when subjected to large earthquake motions, improving the earthquake resistance of the stone wall that is constructed.

[0019] The present invention is also characterized in that the resistance material provided in the embankment is constructed by burying a first sling on the second end side and a second sling on the fourth end side in the embankment for a predetermined length each.

[0020] According to this configuration, the first sling itself on the second end side and the second sling itself on the fourth end side, which are buried in the embankment for a predetermined length, become resistance materials that generate friction resistance with the embankment with the minimum number of components. Therefore, the first sling on the second end side and the second sling on the fourth end side are fixed to the embankment by their own pull-out resistance force. Therefore, even if a force acts on the masonry to pull out toward the front side of the stone wall due to earth pressure from the back of the masonry or vibration of the masonry due to earthquake motion, the masonry with the first and second slings wrapped around it is pulled by the first and second slings, whose second end side and fourth end side are fixed to the embankment behind them, by the pull-out resistance force of the first and second slings themselves, and remains at the front of the stone wall, preventing the collapse of the stone wall.

[0021] In addition, according to this configuration, there is no restriction on the fixing position of the first sling and the second sling to the embankment. Therefore, even if the size of the stones is not uniform, the first sling and the second sling can be easily fixed to the embankment at a laying height that matches the size of each stone. Therefore, this configuration can be easily applied even when the size of the stones is not uniform.

[0022] The present invention is also characterized in that the resistance material installed in the embankment is composed of a strip-shaped resistance material, a mesh-shaped resistance material, or an anchor resistance material, with either or both of the second end and the fourth end connected.

[0023] According to this configuration, the strip resistance material or mesh resistance material is fixed to the embankment by the pull-out resistance force due to frictional resistance with the embankment. Also, the anchor resistance material is fixed to the embankment by the pull-out resistance force due to bearing resistance with the embankment. Therefore, even if a force acts on the stone to pull out toward the front side of the stone wall due to earth pressure from the back side of the stone or vibration of the stone due to earthquake motion, the stone with the first sling and the second sling wrapped around it is pulled to the front side of the stone wall by the pull-out resistance of each strip resistance material, mesh resistance material, or anchor resistance material to which either or both of the first sling and the second sling are connected, and the stone wall is prevented from collapsing.

[0024] Furthermore, according to this configuration, when the strip-shaped resistance material, net-shaped resistance material, or anchor resistance material is connected to both the second end and the fourth end, the number of strip-shaped resistance materials, net-shaped resistance materials, or anchor resistance materials used can be reduced. This reduces the complexity and construction costs during stone wall construction work. When the size of the stones is small, the number of stones piled up to the same height of the stone wall increases, so the effect of reducing the number of strip-shaped resistance materials, net-shaped resistance materials, or anchor resistance materials used is particularly high.

[0025] In addition, the strip resistance material and the anchor resistance material do not impose any restrictions on the fixing positions of the first sling and the second sling in the embankment. Therefore, even if the sizes of the stones are not uniform, the first sling and the second sling can be easily fixed in the embankment at a laying height that matches the size of each stone. Therefore, this configuration can be easily applied even when the sizes of the stones are not uniform.

[0026] In addition, since the connection positions between the second end of the first sling and the fourth end of the second sling are limited to the ends of the mesh resistance material, it is applicable when the sizes of the masonry stones are relatively uniform.

[0027] The present invention is also characterized in that connecting materials of a length corresponding to the distance between the second end and the fourth end and the end of the strip-shaped resistance material or the mesh-shaped resistance material or the anchor resistance material on the masonry side are provided.

[0028] The distance between the second end and the fourth end and the masonry side end of the strip-shaped resistance material, net-shaped resistance material, or anchor resistance material varies depending on the size of the masonry, because the length of the first sling and the second sling wrapped around the masonry varies. According to this configuration, the second end and the fourth end and the masonry side end of the strip-shaped resistance material, net-shaped resistance material, or anchor resistance material are connected by a connecting material of a length according to the distance between them. Therefore, the second end and the fourth end and the masonry side end of the strip-shaped resistance material, net-shaped resistance material, or anchor resistance material can be connected without adjusting the length of the first sling and the second sling, and the effort of cutting and connecting the first sling and the second sling according to the distance between the masonry side end of the strip-shaped resistance material, net-shaped resistance material, or anchor resistance material is not required.

[0029] In addition, the present invention is characterized in that the resistance material composed of anchor resistance material has a rod-shaped member having a male threaded portion at the end opposite the building stone, and a resistor fixed at any position of the male threaded portion by a nut that screws into the male threaded portion.

[0030] Since the length at which the first and second slings are wound around the masonry varies depending on the size of the masonry, the anchor resistance member connected to the first and second slings needs to have its fixed position in the embankment adjusted by its bearing resistance. With this configuration, the fixed position of the anchor resistance member can be changed by fixing the resistor to any position on the male thread of the rod-shaped member. Therefore, the fixed position of the anchor resistance member due to the bearing resistance can be adjusted without adjusting the length of the first and second slings, and there is no need to cut and connect the first and second slings according to the length at which they are wound around the masonry.

[0031] In addition, the present invention is characterized in that when the resistance material made of anchor resistance material has both the second end and the fourth end connected, the second end and the fourth end are wound in opposite directions to each other.

[0032] According to this configuration, the second end of the first sling and the fourth end of the second sling can be easily connected to the same anchor resistance member by simply wrapping the second end and the fourth end around the same anchor resistance member in opposite directions, thereby balancing the forces applied from each sling to the anchor resistance member, without the need to specially tie each sling to the anchor resistance member.

[0033] The present invention is also characterized in that the resistance material installed in the ground comprises a core material which is inserted into a hole drilled in the ground with one end exposed to the surface of the ground, an adhesive which is filled into the hole into which the core material is inserted, a plate which is fixed to the end of the core material and fixed to the surface of the ground, and a hook which is exposed on the surface of the ground and fixed to the plate with either or both of the second end and the fourth end connected thereto.

[0034] According to this configuration, the resistance material installed in the ground is fixed to the ground by the pull-out resistance force generated by the frictional resistance between the fixing agent filled around the core material and the ground. In addition, either one or both of the second end of the first sling and the fourth end of the second sling are connected to the hooks fixed to the end of the core material via plates. Therefore, even if a force acts on the stone to pull out toward the front side of the stone wall due to earth pressure from the back of the stone or vibration of the stone due to earthquake motion, the stone wrapped around the first sling and the second sling is pulled by the first sling and the second sling due to the pull-out resistance of each resistance material to which either one or both of the first sling and the second sling are connected, and remains at the front of the stone wall, preventing the stone wall from collapsing.

[0035] The present invention is also characterized in that when both the second end and the fourth end of the first sling and the second sling are connected to one resistance material, the angle they form at the connection point with the resistance material is set to 90 degrees or less.

[0036] According to this configuration, the angle between the first sling and the second sling at the connection part with the resistance material is set to 90 degrees or less and does not exceed 90 degrees, so that the magnitude of the tension acting on the first sling and the second sling can be suppressed. Also, because the angle between the first sling and the second sling does not exceed 90 degrees, it is possible to suppress an excessive load burden that tends to expand the connecting material, such as a shackle, at the connection point with the first sling and the second sling, which is applied from the first sling and the second sling in the angle direction between them.

[0037] The present invention also provides a method for producing a method for manufacturing a semiconductor device comprising the steps of: The embankment is constructed as a reinforced earth structure in which the front side of the masonry side is covered with wall work and embankment reinforcement material is laid in the embankment, or as a reinforced earth structure in which the embankment material is restrained and reinforced, The present invention is characterized in that a resistance material that provides pull-out resistance to either or both of the second end and the fourth end is fixed to the reinforced soil structure.

[0038] According to this configuration, the large earth pressure from the back of the masonry can be resisted by the reinforced earth structure constructed on the back side of the masonry, thereby reducing the earth pressure acting on the back of the masonry. Therefore, even when the masonry is piled up high and a large earth pressure is applied from the back of the masonry, the resistance material fixed to the reinforced earth structure can keep the masonry at the piled location, and the earthquake resistance of the stone wall can be improved. Furthermore, because the earth pressure acting on the back of the masonry can be reduced, the length of the resistance material fixed to the reinforced earth structure can be shortened. Therefore, by ensuring that the length of the resistance material fixed to the reinforced earth structure is longer than necessary in advance, there is no need to adjust the length of the resistance material, and the workability of the stone wall is improved.

[0039] The present invention also provides a method for producing a method for manufacturing a semiconductor device comprising the steps of: The loose soil on the surface side is reinforced by the reinforcing material, the ends of which are exposed on the surface of the ground, The resistance member that provides a pull-out resistance to the second end portion and the resistance member that provides a pull-out resistance to the fourth end portion are formed of a reinforcing material; The present invention is characterized in that either or both of the second end and the fourth end are connected to the respective end portions of the reinforcing material that are exposed to the ground.

[0040] According to this configuration, even if a force acts on the stone to pull out toward the front side of the stone wall due to earth pressure from the back side of the stone or vibration of the stone due to earthquake motion, the stone wrapped around the first sling and the second sling is pulled by the first sling and the second sling due to the pull-out resistance of each resistance material in the ground to which either or both of the first sling and the second sling are connected, and remains at the front side of the stone wall. If the ground to which the resistance material is fixed is strong, the pull-out resistance generated by the resistance material in the ground can sufficiently counter the large force acting on the stone due to large earthquake motion, and the earthquake resistance of the stone wall can be improved. Also, if the ground is not strong, the earthquake resistance of the stone wall can be improved by increasing the length of the reinforcing material installed in the ground.

[0041] In addition, this configuration can minimize the amount of ground excavated behind the masonry, making it effective when constructing a stone wall in a location where excavation of the ground behind the masonry is restricted.

[0042] The present invention is further characterized in that the tightening force with which the first sling and the second sling obtain pull-out resistance and tighten around each of the retaining portions is set to a tightening force that can maintain the first sling and the second sling in a tight binding state around each of the retaining portions, countering the pushing force that causes the masonry to escape from the binding of the first sling and the second sling and be pushed toward the front side of the stone wall.

[0043] With this configuration, it is possible to avoid a situation in which it is discovered after the stones have been installed that the tightening force applied by the first and second slings around each of the retaining parts is insufficient to withstand the pushing force that the stones experience due to earth pressure from behind them or the inertial force generated during an earthquake due to the stone's own weight, and therefore the need to redo the installation of the stones.

[0044] The present invention is also characterized in that the pushing force is set to a value that takes into account a predetermined safety factor in the pushing force required for the first sling and the second sling to maintain the designed restraint state.

[0045] According to this configuration, the tightening force with which the first and second slings tighten around the periphery of each of the bracing parts is ensured to have the standard tightening force. Therefore, even if an unexpected pushing force acts on the masonry, the masonry is reliably kept in a state where it is bound by the first and second slings.

[0046] The present invention is also characterized in that a resistance member that increases the contact resistance with the first sling or the second sling is fixed around the retaining portion around which the first sling or the second sling is wrapped, so that the retaining portion cannot be tightly bound against the pushing force that would cause the stone to escape from the constraints of the first sling and the second sling and be pushed toward the front side of the stone wall.

[0047] This configuration increases the contact resistance between the first sling or the second sling, which cannot bind the periphery of the bracing part against the pushing force, and the periphery of the bracing part, making it possible to reliably bind the periphery of the bracing part with the first sling and the second sling.

[0048] The present invention also provides a method for producing a method for manufacturing a semiconductor device comprising the steps of: a winding process in which the first end of one end of the first sling provided with a loop is positioned on one side of the bracing part of the masonry, the first sling is passed through the loop provided on the third end of one end of the second sling on the other side of the bracing part facing the one side, covering a part of the periphery of the bracing part from one side, and the second sling is passed through the loop of the first end positioned on one side, covering the remaining part of the periphery, from the other side; a tightening process in which the second end of the first sling and the fourth end of the second sling are lifted to suspend the masonry in the air, so that the first sling on the terminal side of the first end tightens a part of the periphery of the bracing part and the second sling on the terminal side of the third end tightens the remaining part of the periphery; a first fastening step in which, with the periphery of the bracing portion fastened by a first sling on the terminal side of the first end and a second sling on the terminal side of the third end, the loop portion provided on the third end is fastened to the first sling with a first fastening material at a location where the first sling passes through the loop portion provided on the third end, thereby maintaining a state in which the first sling on the terminal side of the first end fastens a portion of the periphery of the bracing portion; a second fastening step of fastening the loop portion provided at the first end and the second sling with a second fastening material at a location where the second sling passes through the loop portion provided at the first end in a state in which the periphery of the stay portion is fastened by a first sling on the terminal side of the first end and a second sling on the terminal side of the third end, thereby maintaining a state in which the second sling on the terminal side of the third end fastens the remainder of the periphery; an installation process in which the stone on which the first sling and the second sling are wound and the first fastening material and the second fastening material are attached is lowered once and its posture is corrected, and then the stone is lifted up again and installed in a specified location; We have developed a method for constructing a stone wall that has the above features.

[0049] In this configuration, the first sling and the second sling are wound around the masonry in a state in which the first sling is passed through the loop provided at the third end of one end of the second sling on the other side of the bracing part, and the second sling is passed through the loop of the first end located on one side of the bracing part by the winding step. The second end of the first sling and the fourth end of the second sling are lifted by the tightening step, and the first sling on the terminal side of the first end tightens a part of the circumference of the bracing part of the masonry, and the second sling on the terminal side of the third end tightens the remaining part of the circumference. In this state, the first fastening step is performed to tighten the loop provided at the third end and the first sling, and the first sling on the terminal side of the first end is kept in a state of tightening a part of the circumference of the bracing part. In addition, the second fastening step is performed to fasten the loop portion provided at the first end to the second sling, and the second sling at the terminal side of the third end is kept in a state of fastening the remaining portion of the periphery. Then, the installation step is performed to install the stone in a predetermined place.

[0050] Therefore, according to this configuration, the masonry can be installed in a predetermined location without using the fastening tool that was conventionally required to wrap a belt around the masonry, and without the conventional effort of wrapping a belt around the masonry with a fastening tool. In addition, for masonry of various shapes and sizes, the first sling and the second sling can be reliably wrapped around the masonry in the same manner, without the need for special tools or effort, and the masonry can be installed in a predetermined location.

[0051] In addition, the first fastening material fastens the loop provided at the third end to the first sling, and the second fastening material fastens the loop provided at the first end to the second sling, thereby reliably preventing the first and second slings from loosening their fastening to the masonry during the masonry installation process. Even if the masonry is subjected to earthquake motion and vibrates, the fastening force of the first and second slings to the masonry will not decrease.

[0052] The present invention also provides a method for producing a method for manufacturing a semiconductor device comprising the steps of: a winding process for winding the first sling and the second sling around the bracing part in such a state that, on one side of the bracing part of the masonry, a second end of the other end of the first sling is passed through a loop provided at a first end of one end of the first sling while covering the entire periphery of the bracing part, and, on the other side of the bracing part facing the one side, a fourth end of the other end of the second sling is passed through a loop provided at a third end of one end of the second sling while covering the entire periphery of the bracing part; a tightening process in which the second end and the fourth end are lifted to suspend the masonry in the air, so that the first sling on the terminal side of the first end and the second sling on the terminal side of the third end are tightened around the entire circumference of the bracing portion; a first fastening step in which, with the periphery of the bracing portion fastened by a first sling on the terminal side of the first end and a second sling on the terminal side of the third end, the loop portion provided on the first end and the first sling are fastened with a first fastening material at a location where the first sling passes through the loop portion provided on the first end, thereby maintaining a state in which the first sling on the terminal side of the first end fastens the entire periphery of the bracing portion; a second fastening step in which, with the periphery of the bracing portion fastened by the first sling on the terminal side of the first end and the second sling on the terminal side of the third end, the loop portion provided on the third end and the second sling are fastened with a second fastening material at a location where the second sling passes through the loop portion provided on the third end, thereby maintaining a state in which the second sling on the terminal side of the third end fastens the entire periphery of the bracing portion; an installation process in which the stone on which the first sling and the second sling are wound and the first fastening material and the second fastening material are attached is lowered once and its posture is corrected, and then the stone is lifted up again and installed in a specified location; We have developed a method for constructing a stone wall that has the above features.

[0053] In this configuration, the first sling and the second sling are wound around the masonry in such a state that the second end of the first sling is passed through the loop provided at the first end of one end of the first sling on one side of the bracing part, and the fourth end of the second sling is passed through the loop provided at the third end of one end of the second sling on the other side of the bracing part. The tightening process brings the first sling on the terminal side of the first end and the second sling on the terminal side of the third end into a state in which they tighten the entire circumference of the bracing part. In this state, the first fastening process is carried out to keep the first sling on the terminal side of the first end in a state in which it tightens the entire circumference of the bracing part. Also, the second fastening process is carried out to keep the second sling on the terminal side of the third end in a state in which it tightens the entire circumference of the bracing part. Thereafter, the installation process is carried out to install the masonry at a predetermined location.

[0054] Therefore, with this configuration, the masonry can be installed in a predetermined location without using the fastening tool that was previously required to wrap a belt around the masonry, and without the traditional labor of wrapping a belt around the masonry with a fastening tool. In addition, for masonry of various shapes and sizes, the first sling and the second sling can be reliably wrapped around the masonry in the same manner, without the need for special tools or labor, and the masonry can be installed in a predetermined location.

[0055] In addition, by fastening the loop provided at the first end to the first sling with the first fastening material, and fastening the loop provided at the third end to the second sling with the second fastening material, it is possible to reliably prevent the fastening of the first sling and the second sling to the masonry from loosening during the masonry installation process. In addition, even if the masonry is subjected to earthquake motion and vibrates, the fastening force of the first sling and the second sling to the masonry will not decrease.

[0056] The present invention also provides a method for producing a method for manufacturing a semiconductor device comprising the steps of: a reinforced soil structure construction process in which the reinforced soil structure is stacked in multiple layers to build a reinforced soil structure of a desired height, while exposing the connection parts with each resistance material fixed to the reinforced soil structure on the front side of either the reinforced soil structure in which the front side of the masonry side is covered with wall work and embankment reinforcement material is laid in the embankment, or the reinforced soil structure constructed by restraining and reinforcing the embankment material; a stone wall construction step of constructing a stone wall of a desired height by piling up multiple layers of stone walls having the above-described construction structure of a stone wall using a resistance material provided in the embankment on the front side of the reinforced soil structure of the desired height while connecting either one or both of the second end and the fourth end to each connecting part after the reinforced soil structure of the desired height is constructed by the reinforced soil structure construction step; We have developed a method for constructing a stone wall that has the above features.

[0057] According to this configuration, the reinforced earth structure construction process, in which the reinforced earth structure is stacked in multiple layers to build a reinforced earth structure of the desired height, is carried out first, and then the stone wall construction process, in which the stone walls are stacked in multiple layers to build a stone wall of the desired height, is carried out. Therefore, it is possible to carry out the reinforced earth structure construction process by workers who specialize in building reinforced earth structures and the stone wall construction process by workers who specialize in building stone walls separately. This allows the stone walls to be constructed efficiently, and also reduces the risk of workers of each specialized type of work overlapping during construction.

[0058] In addition, the present invention provides a method for fastening a fastener after the fastening step. a performance evaluation process for judging whether the tightening force with which the first sling and the second sling obtain a pull-out resistance force and tighten each periphery of the retaining portion has a standard tightening force that can maintain the first sling and the second sling in a binding state in which they bind each periphery of the retaining portion against a pushing force that causes the masonry to escape from the binding of the first sling and the second sling and be pushed toward the front side of the stone wall, The first fastening step and the second fastening step are performed when the fastening force is determined to be equal to the reference fastening force in the performance evaluation step. It is characterized by:

[0059] With this configuration, it is possible to avoid a situation in which it is discovered after the stones have been installed that the tightening force applied by the first and second slings around each of the retaining parts is insufficient to withstand the pushing force that the stones experience due to earth pressure from behind them or the inertial force generated during an earthquake due to the stone's own weight, and therefore the need to redo the installation of the stones. Effect of the Invention

[0060] According to the present invention, it is possible to provide a stone wall construction structure and construction method that allows stones to be placed at desired locations without using the fastening devices that were previously required to wrap belts around the stones, and without the previously required laborious task of wrapping belts around the stones with fastening devices. [Brief description of the drawings]

[0061] [Figure 1] 1 shows a construction structure of a stone wall according to a first embodiment of the present invention. [Diagram 2] This is a diagram showing how a first sling and a second sling are wrapped around a stone in the stone wall construction structure and construction method according to each embodiment of the present invention. [Diagram 3] This is an oblique view of a layer of stones that make up a stone wall in the construction structure of each embodiment, viewed diagonally from behind. [Figure 4] FIG. 2 is a diagram illustrating a method for constructing a stone wall according to the first embodiment of the present invention. [Diagram 5] This figure shows a modified manner in which the first sling and the second sling are wrapped around a stone in the stone wall construction structure and construction method according to each embodiment. [Figure 6] FIG. 11 is a diagram showing a construction of a stone wall according to a second embodiment of the present invention. [Figure 7] FIG. 11 is a diagram showing a construction structure of a stone wall according to a third embodiment of the present invention. [Figure 8] FIG. 11 is a side view showing an overall view of a stone wall constructed on the ground using the stone wall construction structure according to the third embodiment. [Figure 9]FIG. 11 is a diagram showing a construction of a stone wall according to a fourth embodiment of the present invention. [Figure 10] FIG. 13 is a diagram showing a construction structure of a stone wall according to a fifth embodiment of the present invention. [Figure 11] FIG. 13 is a diagram showing a construction structure of a stone wall according to a sixth embodiment of the present invention. [Figure 12] FIG. 13 is a diagram showing a construction structure of a stone wall according to a seventh embodiment of the present invention. [Figure 13] FIG. 13 is a diagram showing a construction structure of a stone wall according to an eighth embodiment of the present invention. [Figure 14] FIG. 13 is a diagram showing a construction structure of a stone wall according to a ninth embodiment of the present invention. [Figure 15] FIG. 17 is a diagram showing the construction structure of a stone wall according to the tenth embodiment of the present invention. [Figure 16] FIG. 17 is a diagram showing the construction structure of a stone wall according to the eleventh embodiment of the present invention. [Figure 17] A side view showing an overall view of a stone wall constructed on the ground using the stone wall construction structure according to the eleventh embodiment. [Figure 18] FIG. 15 is a diagram showing the construction structure of a stone wall according to the 12th embodiment of the present invention. [Figure 19] FIG. 11 is a diagram showing a stone wall constructed by a stone wall construction method according to a third embodiment of the present invention. [Figure 20] FIG. 11 is a diagram showing a stone wall constructed by a stone wall construction method according to a fourth embodiment of the present invention. [Figure 21] 13 is a diagram illustrating the performance evaluation process carried out after the tightening process in which the first sling and the second sling are tightened to the masonry in the stone wall construction method according to the first embodiment. FIG. [Figure 22] 22 is a partially enlarged view for explaining a modified example of the performance evaluation step explained with reference to FIG. 21. FIG. [Figure 23] This is an oblique view showing an example of how the first sling and the second sling shown in Figure 2 are wrapped around the masonry, in which a resistance member is fixed to a location where the first sling or the second sling cannot be tightened around the retaining portion of the masonry. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0062] Next, an embodiment for carrying out the stone wall construction structure and construction method according to the present invention will be described. Note that the same or corresponding parts in each drawing will be denoted by the same reference numerals.

[0063] FIG. 1(a) shows a construction of a stone wall 1A according to a first embodiment of the present invention, in which FIG. 1(a) is a plan view of one layer of the stone wall 1A, and FIG. 1(b) is a side view.

[0064] Stone wall 1A is constructed by piling up stones 3 on the front side of embankment 2. Stones 4 are placed between the stones 3 and the embankment 2. The stones 3 have recessed portions 3b that taper from their surface 3a, which is exposed on the surface of the stone wall, towards the embankment 2 behind it, and have a smaller cross-section. For this reason, as shown in the same figure (b), intermediate stones 5 are placed between each recessed portion 3b of the stones 3, so that their orientation is maintained so that the surface 3a is flush.

[0065] The first sling 6 and the second sling 7 are wound around each masonry stone 3 as shown in Fig. 2, and the second end 6b of the first sling 6 and the fourth end 7b of the second sling 7 are fixed to the embankment 2, and fixed to the front of the embankment 2 via stones 4. As shown in Fig. 1(b), the second end 6b and the fourth end 7b are temporarily fixed to the embankment 2 by anchor pins 8 during the construction process of the embankment 2, and the first sling 6 and the second sling 7 stretched from the masonry stone 3 are prevented from loosening. In this embodiment, the first sling 6 and the second sling 7 are described as being made of a belt made of high-strength fiber, but they may be made of high-strength rope, wire rope, chain, etc.

[0066] Figure 2(a) is a side view showing how the first sling 6 and the second sling 7 are wrapped around the masonry 3, (b) is a rear view, and (c) is a plan view.

[0067] The first sling 6 has an eye formed as a loop at its first end 6a and second end 6b, and the second sling 7 has an eye formed as a loop at its third end 7a and fourth end 7b. In the case of a belt made of high-strength fibers, these loops are formed by sewing the base of the loop-shaped belt end. In the case of a high-strength rope or wire rope, the rope fibers of the ropes constituting the first sling 6 and the second sling 7 are once unwound, a loop is made, and then the rope is again woven into the belt by a Satsuma weaving process. However, the loops are not limited to these configurations, and may be formed by compressing the base of the loop-shaped rope end with an aluminum alloy sleeve or tightening it with a wire clip.

[0068] As shown in FIG. 1B, the first end 6a of the first sling 6, which is provided with a loop, is positioned on one side 3b1 of the bracing part 3b of the masonry 3. The second end 6b of the other end is provided with a pull-out resistance force from a resistance material provided in the embankment 2 behind the bracing part 3b. The second sling 7 is passed through the ring provided on the third end 7a of one end on the other side 3b2 of the bracing part 3b facing the one side 3b1, covering approximately the lower half of the circumference of the bracing part 3b from one side 3b1. The second sling 7 is passed through the ring provided on the first end 6a positioned on one side 3b1, covering approximately the upper half of the remaining part of the circumference of the bracing part 3b from the other side 3b2. The fourth end 7b of the other end is passed through the ring provided on the first end 6a of the first sling 6, which is positioned on one side 3b1, covering approximately the upper half of the remaining part of the circumference of the bracing part 3b from the other side 3b2. The fourth end 7b of the second sling 7 is provided with a pull-out resistance force from a resistance material provided in the embankment 2.

[0069] The first sling 6 on the terminal side of the first end 6a tightens approximately the lower half of the circumference of the bracing part 3b, and the second sling 7 on the terminal side of the third end 7a tightens approximately the upper half of the circumference of the bracing part 3b. At least one of each of the first sling 6 and second sling 7 is wound around the masonry 3, and the direction of each pull-out resistance force applied from each resistance material to the masonry 3 is adjusted by the first sling 6 and second sling 7 that are wound around it.

[0070] In the construction structure of the stone wall 1A according to the first embodiment, when the masonry stone 3 is placed in a desired location, the first sling 6 and the second sling 7 are wrapped around the masonry stone 3 in the above-mentioned predetermined manner, and the second end 6b of the first sling 6 and the fourth end 7b of the second sling 7 are lifted up. By temporarily suspending the masonry stone 3 in the air in this manner, the first sling 6 on the terminal side of the first end 6a tightens approximately the lower half of the periphery of the bracing portion 3b of the masonry stone 3, and the second sling 7 on the terminal side of the third end 7a tightens approximately the upper half of the remaining periphery of the bracing portion 3b.

[0071] As a result, it is possible to wrap a first sling 6 and a second sling 7 such as a belt around the masonry 3 by simply lifting the masonry 3 once, without using the fastening device that was previously required to wrap a belt around the masonry 3, and without the previously required effort of wrapping a belt around the masonry 3 with a fastening device.

[0072] At the same time, it is easy to check whether the wrapped first sling 6 and second sling 7 will not come loose from the masonry 3. It is also possible to reliably wrap the first sling 6 and second sling 7 around masonry 3 of various shapes and sizes in the same manner, without the need for special tools or labor. By providing at least one each of such first sling 6 and second sling 7 and increasing the number of pairs of first slings 6 and second slings 7 wrapped around the masonry 3 as necessary, and adjusting the direction of each pull-out resistance force applied from each resistance material to the masonry 3, it is possible to install the masonry 3 in a desired position even for a masonry 3 with an irregular shape.

[0073] In addition, in this embodiment, the resistance material provided in the embankment 2 to provide pull-out resistance to each end 6b, 7b is constituted by a first sling 6 on the second end 6b side and a second sling 7 on the fourth end 7b side, each buried a predetermined length in the embankment 2, as shown in Figure 1.

[0074] According to this configuration, the first sling 6 itself on the second end 6b side and the second sling 7 itself on the fourth end 7b side, which are buried in the embankment 2 for a predetermined length, become resistance materials that generate friction resistance with the embankment 2 with the minimum number of components. Therefore, the first sling 6 on the second end 6b side and the second sling 7 on the fourth end 7b side are fixed to the embankment 2 by their own pull-out resistance. Therefore, even if a force acts on the masonry 3 to pull out toward the front side of the stone wall 1A due to earth pressure from the back side of the masonry 3 or vibration of the masonry 3 due to earthquake motion, the masonry 3 with the first sling 6 and the second sling 7 wrapped around it is pulled by the first sling 6 and the second sling 7, whose second end 6b side and fourth end 7b side are fixed to the embankment 2 behind it, by the pull-out resistance of the first sling 6 itself and the second sling 7 itself, and remains at the front of the stone wall 1A, preventing the collapse of the stone wall 1A. This configuration is often applied when the embankment 2 is soil and sand.

[0075] Furthermore, with this configuration, no restrictions are placed on the fixing positions of the first sling 6 and the second sling 7 in the embankment 2. Therefore, even if the sizes of the stones 3 are not uniform, the first sling 6 and the second sling 7 can be easily fixed in the embankment 2 at a laying height that matches the size of each of the stones 3. Therefore, the construction structure of the stone wall 1A according to the first embodiment can be easily applied even if the sizes of the stones 3 are not uniform.

[0076] In addition, in this embodiment, as shown in Figure 2(b), the first sling 6 and the second sling 7 are wrapped around the masonry 3 and kept in a tightened state by the first fastening material 9 and the second fastening material 10, which are made of high-strength rope.

[0077] The first fastening material 9 fastens the first sling 6 to the loop provided at the third end 7a of the second sling 7 at the location where the first sling 6 passes through the loop provided at the third end 7a of the second sling 7. The second fastening material 10 fastens the second sling 7 to the loop provided at the first end 6a at the location where the second sling 7 passes through the loop provided at the first end 6a.

[0078] According to this configuration, the first sling 6 is fastened to the annular portion provided at the third end 7a by the first fastening material 9, so that the first sling 6 at the terminal side of the first end 6a is kept fastening approximately the lower half of the circumference of the bracing portion 3b of the masonry 3. Also, the second sling 7 is fastened to the annular portion provided at the first end 6a by the second fastening material 10, so that the second sling 7 at the terminal side of the third end 7a is kept fastening approximately the upper half of the remaining portion of the circumference of the bracing portion 3b. Therefore, during the installation process of the masonry 3, the fastening of the first sling 6 and the second sling 7 to the masonry 3 can be reliably prevented from loosening. Also, even if the masonry 3 is subjected to earthquake motion and vibrates, the fastening force of the first sling 6 and the second sling 7 to the masonry 3 does not decrease.

[0079] In this embodiment, as shown in Fig. 3(a) as an example, adjacent first slings 6, adjacent second slings 7, or a first sling 6 and a second sling 7 that are adjacent between adjacent stones 3 and cover the retaining portions 3b, or that are adjacently pulled into the embankment 2, are connected by binding materials. In this embodiment, the binding materials are composed of high-strength ropes 11, steel rings 12, or the like. Fig. 3(a) is a perspective view of a stone 3 in a certain layer that constitutes a stone wall 1A, viewed obliquely from behind.

[0080] In the illustrated example, adjacent second slings 7 covering the bracing parts 3b between adjacent masonry stones 3 are connected using high-strength ropes 11 and steel rings 12, as shown in the partially enlarged view of Fig. 3(b). Also, adjacent second slings 7 covering the bracing parts 3b are connected using high-strength ropes 11 knotted in an eight-shape, as shown in the partially enlarged view of Fig. 3(c). Also, adjacent first slings 6 and second slings 7 between adjacent masonry stones 3, which are pulled into the embankment 2, are connected using high-strength ropes 11, as shown in the partially enlarged views of Fig. 3(b) and (c).

[0081] When subjected to a large earthquake motion, stone walls that are not firmly fixed with concrete or the like move in all directions, and may deform or collapse. However, according to this configuration, the first slings 6, the second slings 7, or the first slings 6 and the second slings 7, which are adjacent to each other and cover the retaining portion 3b between adjacent stones 3, or which are pulled into the embankment 2, are connected by a bundling material. Therefore, the adjacent stones 3 are flexibly connected by the bundling material, and do not move significantly even when subjected to a large earthquake motion, improving the earthquake resistance of the stone wall 1A to be constructed. In addition, in the construction structure of the stone walls according to each embodiment described below, as shown in an example in FIG. 3, the first slings 6, the second slings 7, or the first slings 6 and the second slings 7 are connected by a bundling material between adjacent stones 3, and similar effects can be achieved.

[0082] In this embodiment, as shown in FIG. 2, a ring-shaped portion is provided at a first end 6a and a second end 6b at both ends of the first sling 6, and at a third end 7a and a fourth end 7b at both ends of the second sling 7.

[0083] According to this configuration, the second end 6b and the fourth end 7b are also provided with ring-shaped portions, so that when the resistance material provided in the embankment 2 is not the first sling 6 itself and the second sling 7 itself but is connected to the second end 6b and the fourth end 7b, the connection between the first sling 6 and the second sling 7 and the resistance material provided in the embankment 2 can be performed easily, reliably, and at low cost without the need for special connecting tools.

[0084] Next, a method for constructing the stone wall 1A according to the first embodiment of the present invention will be described.

[0085] First, a winding process is performed in which the first sling 6 and the second sling 7 are wound around the bracing part 3b of the masonry 3 as shown in Fig. 2. In this winding process, the first end 6a at one end of the first sling 6 provided with a loop is positioned on one side 3b1 of the bracing part 3b of the masonry 3. Next, the first sling 6 is passed through the loop provided on the third end 7a at one end of the second sling 7 on the other side 3b2 of the bracing part 3b opposite to the one side 3b1, covering approximately the lower half of the circumference of the bracing part 3b from one side 3b1. Then, the second sling 7 is passed through the loop of the first end 6a positioned on one side 3b1, covering approximately the upper half of the circumference of the bracing part 3b from the other side 3b2.

[0086] Next, a tightening process is carried out to tighten the first sling 6 and the second sling 7 to the masonry 3. In this tightening process, first, as shown in Figures 4(a) and (b), the second end 6b at the other end of the first sling 6 and the fourth end 7b at the other end of the second sling 7 are lifted up to suspend the masonry 3 in the air. By suspending the masonry 3 in the air, the first sling 6 on the terminal side of the first end 6a tightens a part of the periphery of the bracing portion 3b, and the second sling 7 on the terminal side of the third end 7a tightens the remaining part of the periphery of the bracing portion 3b.

[0087] Next, a first fastening step is performed to fasten the loop portion provided at the third end 7a to the first sling 6. This first fastening step is performed in a state in which the periphery of the bracing portion 3b is fastened by the first sling 6 at the terminal side of the first end 6a and the second sling 7 at the terminal side of the third end 7a. In this embodiment, the masonry 3 is suspended in the air as shown in FIG. 4(b), and the loop portion provided at the third end 7a and the first sling 6 are fastened by the first fastening material 9 at the location where the first sling 6 passes through the loop portion provided at the third end 7a, as shown in FIG. 2(a), (b) and FIG. 4(b). This fastening keeps the first sling 6 at the terminal side of the first end 6a in a state in which it fastens a part of the periphery of the bracing portion 3b.

[0088] Next, a second fastening step is performed to fasten the loop provided at the first end 6a to the second sling 7. This second fastening step is also performed in a state where the periphery of the bracing part 3b is fastened by the first sling 6 at the terminal side of the first end 6a and the second sling 7 at the terminal side of the third end 7a. In this embodiment, the masonry 3 is also performed in a state where it is suspended in the air as shown in FIG. 4(b), and the loop provided at the first end 6a and the second sling 7 are fastened by the second fastening material 10 at the place where the second sling 7 passes through the loop provided at the first end 6a, as shown in FIG. 2(b). This fastening keeps the second sling 7 at the terminal side of the third end 7a in a state where it is fastening the remaining part around the bracing part 3b.

[0089] Next, the installation process is performed to install the masonry 3 at a specified location. In this installation process, the masonry 3 to which the first sling 6 and the second sling 7 are wound and the first fastening material 9 and the second fastening material 10 are attached as described above is lowered to the ground once as shown in FIG. 4(c). At this time, the second end 6b and the fourth end 7b are lifted up, and the posture in which the surface 3a of the masonry 3 faces the ground is corrected to a posture in which the surface 3a of the masonry 3 stands vertically to the ground as shown in FIG. 4(c). In addition, the first sling 6 and the second sling 7 are bundled as shown in the figure so as not to get in the way when the masonry 3 is moved or installed. After that, the wire rope 13 is wound around the supporting portion 3b of the masonry 3, and the masonry 3 is lifted up again by the wire rope 13 in the correct posture as shown in FIG. 4(d). The lifted masonry 3 is lowered to a specified location as shown in FIG. 4(e) and installed.

[0090] According to the above-mentioned method for constructing the stone wall 1A, the masonry stone 3 can be installed in a predetermined location without using the fastening tool that was conventionally required to wrap a belt around the masonry stone 3, and without the conventional effort of wrapping a belt around the masonry stone 3 with a fastening tool. In addition, for masonry stones 3 of various shapes and sizes, the first sling 6 and the second sling 7 can be securely wrapped around them in the same manner, without the need for special tools or effort, and the masonry stone 3 can be installed in a predetermined location.

[0091] Furthermore, the first fastening material 9 fastens the first sling 6 to the ring-shaped portion provided at the third end 7a, and the second fastening material 10 fastens the second sling 7 to the ring-shaped portion provided at the first end 6a, thereby reliably preventing the fastening of the first sling 6 and the second sling 7 to the masonry 3 from loosening during the construction process of installing the masonry 3. Furthermore, even if seismic motion acts on the masonry 3 and causes it to vibrate, the fastening force of the first sling 6 and the second sling 7 to the masonry 3 will not decrease.

[0092] Fig. 5(a) is a side view showing a modified embodiment of the first sling 6 and the second sling 7 wrapped around the masonry 3, Fig. 5(b) is a rear view, and Fig. 5(c) is a plan view. Fig. 5(d) is a view showing the state in which the first sling 6 is tied around the masonry 3 in the wrapping manner according to this modified embodiment, and Fig. 5(e) is a view showing the state in which the second sling 7 is tied around the masonry 3.

[0093] The first sling 6 is provided on one side 3b1 of the bracing part 3b of the masonry 3, covering the entire periphery of the bracing part 3b, with the second end 6b at the other end passed through a ring-shaped section provided at the first end 6a at one end. A pull-out resistance force is applied to the second end 6b from a resistance material provided in the embankment 2 behind the bracing part 3b. The second sling 7 is provided on the other side 3b2 of the bracing part 3b opposite the one side 3b1, covering the entire periphery of the bracing part 3b, with the fourth end 7b at the other end passed through a ring-shaped section provided at the third end 7a at one end. A pull-out resistance force is applied to the fourth end 7b from a resistance material provided in the embankment 2.

[0094] The first sling 6 on the terminal side of the first end 6a and the second sling 7 on the terminal side of the third end 7a each tighten the entire circumference of the bracing part 3b. At least one of each of the first sling 6 and the second sling 7 is wound around the masonry 3, and the direction of each pull-out resistance force applied from each resistance material to the masonry 3 is adjusted by the first sling 6 and the second sling 7 that are wound around it.

[0095] Even in this modified wrapping method around the masonry 3, when the masonry 3 is placed in a desired location, the first sling 6 and the second sling 7 are wrapped around the masonry 3 in the above-mentioned predetermined manner, and the second end 6b of the first sling 6 and the fourth end 7b of the second sling 7 are lifted up. By temporarily suspending the masonry 3 in the air in this way, the first sling 6 on the terminal side of the first end 6a and the second sling 7 on the terminal side of the third end 7a each tighten around the entire periphery of the bracing part 3b of the masonry 3.

[0096] Therefore, even in the case of wrapping the masonry 3 in this modified example, it is possible to wrap the first sling 6 and the second sling 7, such as a belt, around the masonry 3 by simply lifting the masonry 3 once, without using the fastening device that was previously required to wrap the belt around the masonry 3, and without the previously required effort of wrapping the belt around the masonry 3 with a fastening device.

[0097] At the same time, it is easy to check whether the wrapped first sling 6 and second sling 7 do not come out of the masonry 3. In addition, it is possible to reliably wrap the first sling 6 and second sling 7 around masonry 3 of various shapes and sizes without requiring special tools or labor. In addition, by providing at least one each of such first sling 6 and second sling 7, and increasing the number of pairs of first slings 6 and second slings 7 wrapped around the masonry 3 as necessary, or by changing the circumferential position of the first end 6a through which the second end 6b of the first sling 6 is passed, and the circumferential position of the third end 7a through which the fourth end 7b of the second sling 7 is passed, the direction of each pull-out resistance force applied from each resistance material to the masonry 3 can be adjusted to install the masonry 3 in a desired position even for a distorted shape.

[0098] In this modified example, as shown in Figure 5(b), the first sling 6 and the second sling 7 are wrapped around the masonry 3 and kept in a tightened state by the first fastening material 9 and the second fastening material 10, which are made of high-strength rope.

[0099] The first fastening material 9 fastens the first sling 6 to the loop provided at the first end 6a at the location where the first sling 6 passes through the loop provided at the first end 6a. The second fastening material 10 fastens the second sling 7 to the loop provided at the third end 7a at the location where the second sling 7 passes through the loop provided at the third end 7a.

[0100] According to this configuration, the first sling 6 at the terminal side of the first end 6a is fastened to the ring-shaped portion 6a, so that the first sling 6 at the terminal side of the first end 6a is kept fastening the entire circumference of the bracing portion 3b. Furthermore, the second sling 7 at the terminal side of the third end 7a is kept fastening the entire circumference of the bracing portion 3b, so that the second sling 7 at the terminal side of the third end 7a is kept fastening the entire circumference of the bracing portion 3b. Therefore, this modified example also reliably prevents the fastening of the first sling 6 and the second sling 7 to the masonry 3 from loosening during the construction process of the masonry 3. Furthermore, even if the masonry 3 is subjected to earthquake motion and vibrates, the fastening force of the first sling 6 and the second sling 7 to the masonry 3 does not decrease.

[0101] The wrapping around the stone 3 according to this modified example can also be applied to the construction of the stone wall 1A described above, similar to the wrapping around the stone 3 shown in Fig. 2. Even if the construction of the stone wall 1A described above is constructed in the wrapping around the stone 3 according to this modified example, the same effects as those of the construction of the stone wall 1A according to the first embodiment can be achieved.

[0102] The method for constructing the stone wall 1A' according to the second embodiment of the present invention, in which the construction structure of the stone wall 1A is constructed in the manner of wrapping around the masonry stone 3 according to this modified example, will be described as follows.

[0103] First, a winding process is performed in which the first sling 6 and the second sling 7 are wound around the bracing portion 3b as shown in Fig. 5. In this winding process, the second end 6b at the other end of the first sling 6 is passed through a loop provided at the first end 6a at one end of the first sling 6 on one side 3b1 of the bracing portion 3b of the masonry 3, while covering the entire circumference of the bracing portion 3b. Next, the fourth end 7b at the other end of the second sling 7 is passed through a loop provided at the third end 7a at one end of the second sling 7 on the other side 3b2 of the bracing portion 3b opposite the one side 3b1, while covering the entire circumference of the bracing portion 3b.

[0104] Next, a tightening process is performed to tighten the first sling 6 and the second sling 7 to the masonry 3. In this tightening process, the second end 6b and the fourth end 7b are lifted up first to suspend the masonry 3 in the air. By suspending the masonry 3 in the air, the first sling 6 on the terminal side of the first end 6a and the second sling 7 on the terminal side of the third end 7a are each tightened around the entire periphery of the bracing portion 3b.

[0105] Next, a first fastening step is performed to fasten the loop provided at the first end 6a to the first sling 6. This first fastening step is performed in a state in which the periphery of the bracing portion 3b is fastened by the first sling 6 on the terminal side of the first end 6a and the second sling 7 on the terminal side of the third end 7a. In this embodiment, this step is performed in a state in which the masonry 3 is suspended in the air, and the loop provided at the first end 6a and the first sling 6 are fastened by the first fastening material 9 at the location where the first sling 6 passes through the loop provided at the first end 6a. This fastening keeps the first sling 6 on the terminal side of the first end 6a in a state in which it is fastening the entire periphery of the bracing portion 3b.

[0106] Next, a second fastening step is performed to fasten the loop provided at the third end 7a to the second sling 7. This second fastening step is also performed in a state in which the periphery of the bracing portion 3b is fastened by the first sling 6 on the terminal side of the first end 6a and the second sling 7 on the terminal side of the third end 7a. In this embodiment, the step is also performed in a state in which the masonry 3 is suspended in the air, and the loop provided at the third end 7a and the second sling 7 are fastened by the second fastening material 10 at the location where the second sling 7 passes through the loop provided at the third end 7a, so that the second sling 7 on the terminal side of the third end 7a is kept in a state in which it is fastening the entire periphery of the bracing portion 3b.

[0107] Next, an installation process is performed to install the masonry 3 at a specified location. In this installation process, the masonry 3 to which the first sling 6 and the second sling 7 are wound and the first fastening material 9 and the second fastening material 10 are attached as described above is lowered to the ground. At this time, the second end 6b and the fourth end 7b are lifted up, and the attitude of the surface 3a of the masonry 3 facing the ground is corrected to an attitude in which the surface 3a of the masonry 3 stands vertically to the ground. In addition, the first sling 6 and the second sling 7 are bundled up so as not to get in the way when the masonry 3 is moved or installed. After that, a wire rope is wound around the supporting portion 3b of the masonry 3, and the masonry 3 is lifted up again by the wire rope in the corrected position. The lifted masonry 3 is then lowered to a specified location and installed.

[0108] The construction method for constructing the stone wall 1A by wrapping the slings around the masonry stone 3 according to this modified example also makes it possible to install the masonry stone 3 in a predetermined location without using the fastening tool that was conventionally required to wrap a belt around the masonry stone 3, and without the conventional effort of wrapping a belt with a fastening tool around the masonry stone 3. Furthermore, for masonry stones 3 of various shapes and sizes, the first sling 6 and the second sling 7 can be securely wrapped around them in the same manner, without the need for special tools or effort, and the masonry stone 3 can be installed in a predetermined location.

[0109] Furthermore, the first fastening material 9 fastens the first sling 6 to the ring-shaped portion provided at the first end 6a, and the second fastening material 10 fastens the second sling 7 to the ring-shaped portion provided at the third end 7a, thereby reliably preventing the fastening of the first sling 6 and the second sling 7 to the masonry 3 from loosening during the construction process of installing the masonry 3. Furthermore, even if seismic motion acts on the masonry 3 and causes it to vibrate, the fastening force of the first sling 6 and the second sling 7 to the masonry 3 will not decrease.

[0110] Next, a construction of a stone wall according to a second embodiment of the present invention will be described.

[0111] FIG. 6(a) shows a construction of a stone wall 1B according to the second embodiment, in which a plan view of one layer of the stone wall 1B is shown, and FIG. 6(b) is a side view.

[0112] The construction of the stone wall 1B according to the second embodiment differs from that of the stone wall 1A according to the first embodiment in the configuration of the resistance material that provides pull-out resistance to the first sling 6 and the second sling 7. The other configurations are the same as those of the stone wall 1A according to the first embodiment.

[0113] The resistance materials used in the construction of stone wall 1A according to the first embodiment were the first sling 6 itself and the second sling 7 itself, which were used as strip-shaped resistance materials. The resistance materials used in the construction of stone wall 1B according to the second embodiment are composed of strip steel 21 and connecting material 22. Strip steel 21 is made of strip-shaped steel plate, and either or both of second end 6b of first sling 6 and fourth end 7b of second sling 7 are connected via connecting material 22.

[0114] As shown in the plan view of the same figure (a), the first sling 6 and the second sling 7 wrapped around the masonry 3 may have the second end 6b and the fourth end 7b each connected individually to the steel band 21 via a connecting member 22, or the second end 6b and the fourth end 7b both connected together to one steel band 21 via one connecting member 22. When the second end 6b and the fourth end 7b are both connected to one steel band 21 via one connecting member 22, the angle between the first sling 6 and the second sling 7 at the connection part with the connecting member 22 is set to 90 degrees or less.

[0115] The connecting material 22 has a length according to the distance between the second end 6b and the fourth end 7b and the end of the steel band 21 on the masonry 3 side. The distance between the second end 6b and the fourth end 7b and the end of the steel band 21 on the masonry 3 side varies because the length by which the first sling 6 and the second sling 7 are wound around the masonry 3 differs depending on the size of the masonry 3. The connecting material 22 may be composed of a shackle 22a, a steel plate 22b, a bolt 22c and a nut 22d, or it may be composed of only the shackle 22a.

[0116] When the distance between the second end 6b and the fourth end 7b and the end of the steel band 21 on the masonry 3 side is long, the connecting member 22 is composed of a shackle 22a, a steel plate 22b, a bolt 22c, and a nut 22d, as shown in the partially enlarged side view of FIG. 1C. The end of the steel band 21 on the masonry 3 side and the steel plate 22b are formed with holes at predetermined intervals along their longitudinal direction. The shackle 22a is connected to one end of the steel plate 22b by inserting its pin into the hole closest to the masonry 3 side among the holes formed in the steel plate 22b. The other end of the steel plate 22b is fixed to each hole at an appropriate position among the holes formed in the steel plate 22b and the steel band 21 by the bolt 22c and the nut 22d according to the distance between the second end 6b and the fourth end 7b and the end of the steel band 21 on the masonry 3 side, and is connected to the steel band 21.

[0117] When the distance between the second end 6b and the fourth end 7b and the end of the steel band 21 on the masonry 3 side is short, the connecting member 22 is composed of only the shackle 22a. In this case, the shackle 22a is connected to one end of the steel band 21 by inserting its pin into the hole formed in the steel band 21 that is closest to the masonry 3 side.

[0118] According to the construction of the stone wall 1B according to the second embodiment, the steel band 21 is fixed to the embankment 2 by the pull-out resistance force due to frictional resistance with the embankment 2. Therefore, even if a force acts on the masonry 3 to pull out toward the front side of the stone wall 1B due to earth pressure from the back side of the masonry 3 or vibration of the masonry 3 due to earthquake motion, the masonry 3 with the first sling 6 and the second sling 7 wrapped around it will be pulled by the first sling 6 and the second sling 7 due to the pull-out resistance of each steel band 21 to which either or both of the first sling 6 and the second sling 7 are connected, and will remain at the front side of the stone wall 1B, preventing the collapse of the stone wall 1B.

[0119] Furthermore, according to the construction structure of the stone wall 1B of the second embodiment, when both the second end 6b and the fourth end 7b are connected to one steel band 21 via the connecting members 22, the number of steel bands 21 and connecting members 22 used can be reduced. This makes it possible to reduce the complexity and construction costs during the construction work of the stone wall 1B. When the size of the stone 3 is small, the number of stone stones 3 piled up to the same height of the stone wall 1B increases, so this effect of reducing the number of steel bands 21 and connecting members 22 used is particularly high.

[0120] According to the construction structure of the stone wall 1B of the second embodiment, when both the second end 6b and the fourth end 7b are connected to one steel band 21 via the connecting member 22, the angle between the first sling 6 and the second sling 7 at the connection with the connecting member 22 is set to 90 degrees or less and does not exceed 90 degrees, thereby suppressing the magnitude of the tension acting on the first sling 6 and the second sling 7. Also, since the angle between the first sling 6 and the second sling 7 does not exceed 90 degrees, it is possible to suppress the load load acting on the connecting members such as the shackle 22a at the connection point between the first sling 6 and the second sling 7 in the angle direction between them, which tends to spread the shackle 22a, etc., from becoming excessive.

[0121] Furthermore, the construction structure of the stone wall 1B according to the second embodiment also places no restrictions on the fixing positions of the first sling 6 and the second sling 7 in the embankment 2. Therefore, even if the sizes of the stones 3 are not uniform, the first sling 6 and the second sling 7 can be easily fixed in the embankment 2 at a laying height that matches the size of each of the stones 3. Therefore, the construction structure of the stone wall 1B according to the second embodiment can be easily applied even if the sizes of the stones 3 are not uniform.

[0122] In addition, the distance between the second end 6b and the fourth end 7b and the end of the steel band 21 on the masonry 3 side changes because the length of the first sling 6 and the second sling 7 wrapped around the masonry 3 varies depending on the size of the masonry 3, as described above, but according to the construction structure of the stone wall 1B according to the second embodiment, the second end 6b and the fourth end 7b and the end of the steel band 21 on the masonry 3 side are connected by a connecting member 22 of a length according to the distance between them. Therefore, the second end 6b and the fourth end 7b and the end of the steel band 21 on the masonry 3 side can be connected without adjusting the length of the first sling 6 and the second sling 7, and the first sling 6 and the second sling 7 do not need to be cut and connected according to the distance between the end of the steel band 21 on the masonry 3 side.

[0123] The construction structure of the stone wall 1B according to the second embodiment can be applied to both cases where the embankment 2 is made of earth and sand, and where it is made of stones 4. Also, in this embodiment, the case where the strip-shaped resistance material is made of strip steel 21 has been described, but it can also be applied to cases where it is made of chains, high-strength plastic plates, or the like.

[0124] Next, a construction of a stone wall according to a third embodiment of the present invention will be described.

[0125] FIG. 7(a) shows a plan view of one layer of a stone wall 1C according to the third embodiment, and FIG. 7(b) is a side view thereof.

[0126] The construction of the stone wall 1C according to the third embodiment differs from that of the stone wall 1A according to the first embodiment in that the resistance material that provides the pull-out resistance to the first sling 6 and the second sling 7 is composed of geosynthetics 23, which is a mesh-like resistance material, and connecting materials 24. The rest of the configuration is the same as that of the stone wall 1A according to the first embodiment.

[0127] Geosynthetics 23 is a general term for geotextiles, geomembranes, and geocomposites, which are polymeric reinforcing materials for ground reinforcement, and the second end 6b of the first sling 6 and the fourth end 7b of the second sling 7 are connected via a connecting material 24. As shown in FIG. 1(b), during the construction process of the embankment 2, the end of the geosynthetics 23 opposite the masonry 3 is temporarily fixed to the embankment 2 by an anchor pin 8, and the geosynthetics 23 stretched from the masonry 3 side is prevented from loosening.

[0128] As shown in the plan view of the same figure (a), the first sling 6 and the second sling 7 wrapped around the masonry 3 may have the second end 6b and the fourth end 7b individually connected to the geosynthetics 23 via the connecting material 24, depending on the distance between the second end 6b and the fourth end 7b and the end of the geosynthetics 23 on the masonry 3 side, or may have both the second end 6b and the fourth end 7b connected together to the geosynthetics 23 via one connecting material 24. When both the second end 6b and the fourth end 7b are connected to the geosynthetics 23 via one connecting material 24, the angle between the first sling 6 and the second sling 7 at the connection part with the connecting material 24 is set to 90 degrees or less.

[0129] The connecting material 24 has a length corresponding to the distance between the second end 6b and the fourth end 7b and the end of the geosynthetics 23 on the masonry 3 side.

[0130] When the distance between the second end 6b and the fourth end 7b and the end of the geosynthetics 23 on the masonry 3 side is long, the connecting material 24 is composed of a clip 24a, steel plates 24b1 and 24b2, a steel pipe 24c, a pair of steel pipe fasteners 24d at the top and bottom, and a steel bar 24e, as shown in the partially enlarged side view of the same figure (c). Between the clip 24a and one end of the steel plate 24b1, one end of the steel plate 24b1 is sandwiched between the ends of the clip 24a and fixed with bolts and nuts. Between the other end of the steel plate 24b1 and the steel pipe 24c, both the other end of the steel plate 24b1 and the steel pipe 24c are sandwiched by a pair of steel pipe fasteners 24d from above and below and fixed with bolts and nuts. At the same time, the steel plate 24b2 is also sandwiched by a pair of steel pipe fasteners 24d from above and below and fixed with bolts and nuts. One end of the geosynthetics 23 on the masonry 3 side is cut at each installation point of the steel pipe fasteners 24d, wrapped around steel pipes 24c, and folded back to the side away from the masonry 3. The end of the geosynthetics 23 overlapping the folded back end is secured by inserting a steel bar 24e into the gap where the lower net passes through the upper net.

[0131] When the distance between the second end 6b and the fourth end 7b and the end of the geosynthetics 23 on the masonry 3 side is short, the connecting material 24 is composed of a clip 24a, steel plates 24b1 and 24b2, a steel pipe 24c, a pair of steel pipe fasteners 24d, and a steel bar 24e, as shown in the partially enlarged side view of the same figure (d). In this case, the clip 24a has one mounting hole at the end and is formed with a short end, and the steel plate 24b1 is also short in length.

[0132] According to the construction of the stone wall 1C according to the third embodiment, the geosynthetics 23 are fixed to the embankment 2 by the pull-out resistance force due to frictional resistance with the embankment 2. Therefore, even if a force acts on the masonry 3 to pull out toward the front side of the stone wall 1C due to earth pressure from the back side of the masonry 3 or vibration of the masonry 3 due to earthquake motion, the masonry 3 with the first sling 6 and the second sling 7 wrapped around it is pulled by the first sling 6 and the second sling 7 by the pull-out resistance of each of the geosynthetics 23 to which both the first sling 6 and the second sling 7 are connected, and remains at the front of the stone wall 1C, preventing the collapse of the stone wall 1C.

[0133] Furthermore, according to the construction structure of the stone wall 1C according to the third embodiment, when both the second end 6b and the fourth end 7b are joined together and connected to the geosynthetics 23, the number of connecting materials 24 used can be reduced. This makes it possible to reduce the complexity and construction costs during the construction work of the stone wall 1C.

[0134] According to the construction structure of the stone wall 1C of the third embodiment, when the second end 6b and the fourth end 7b are both gathered together and connected to the geosynthetics 23 via the connecting material 24, the angle between the first sling 6 and the second sling 7 at the connection part with the connecting material 24 is set to 90 degrees or less and does not exceed 90 degrees, so that the magnitude of the tension acting on the first sling 6 and the second sling 7 can be suppressed. Also, since the angle between the first sling 6 and the second sling 7 does not exceed 90 degrees, it is possible to suppress the load load acting on the connecting materials such as the clip 24a at the connection part with the first sling 6 and the second sling 7 in the angle direction between them, which load tries to spread the clip 24a, etc., from the first sling 6 and the second sling 7 to become excessive.

[0135] In addition, mesh resistance materials such as geosynthetics 23 are applicable when the sizes of the masonry stones 3 are relatively uniform, since the connection positions between the second end 6b of the first sling 6 and the fourth end 7b of the second sling 7 are limited to the ends of the mesh resistance material.

[0136] The distance between the second end 6b and the fourth end 7b and the end of the geosynthetics 23 on the masonry 3 side also changes because the length of the first sling 6 and the second sling 7 wrapped around the masonry 3 varies depending on the size of the masonry 3, as described above, but according to the construction structure of the stone wall 1C according to the third embodiment, the second end 6b and the fourth end 7b and the end of the geosynthetics 23 on the masonry 3 side are connected by a connecting material 24 of a length according to the distance between them. Therefore, the second end 6b and the fourth end 7b and the end of the geosynthetics 23 on the masonry 3 side can be connected without adjusting the length of the first sling 6 and the second sling 7, and the first sling 6 and the second sling 7 do not need to be cut and connected according to the distance between the end of the geosynthetics 23 on the masonry 3 side.

[0137] The construction structure of the stone wall 1C according to the third embodiment is often applied when the embankment 2 is made of earth and sand, because when the embankment 2 is made of stones 4, the mesh resistance material such as the geosynthetics 23 is easily damaged. Also, although the present embodiment has been described as being made of the geosynthetics 23, it can be similarly applied to cases where the mesh resistance material is made of other high-strength nets, wire mesh, etc.

[0138] 8 is a side view showing an overall image of a stone wall 1C constructed on ground 25 using the construction structure of the stone wall 1C according to the third embodiment. The embankment 2 in this stone wall 1C is made of earth and sand, and the height of the stone wall 1C is about 8 m.

[0139] Next, a construction of a stone wall according to a fourth embodiment of the present invention will be described.

[0140] FIG. 9(a) shows a construction of a stone wall 1D according to the fourth embodiment, in which FIG. 9(a) is a plan view of one layer of the stone wall 1D, and FIG. 9(b) is a side view.

[0141] The construction structure of the stone wall 1D according to the fourth embodiment differs from that of the stone wall 1A according to the first embodiment in that the resistance material that provides pull-out resistance to the first sling 6 and the second sling 7 is composed of an anchor resistance material 26 and a connecting material 27. The other configurations are the same as those of the stone wall 1A according to the first embodiment. Note that while Fig. 9 shows a case in which the embankment 2 is composed of stones 4, the construction structure of the stone wall 1D according to the fourth embodiment can be applied to both cases in which the embankment 2 is composed of earth and sand, and cases in which it is composed of stones 4.

[0142] The anchor resistance material 26 is composed of a steel bar 26a which is a rod-shaped member, a steel plate 26b which is an umbrella-shaped resistor, and a nut 26c. The steel bar 26a has a male screw portion 26a1 which screws into the nut 26c at the end opposite the masonry 3. A pair of nuts 26c are provided on both sides of the male screw portion 26a1 which sandwiches the steel plate 26b. The length of the male screw portion 26a1 is secured to a certain extent, and the steel plate 26b is fixed at an arbitrary position of the male screw portion 26a1 by being sandwiched between the nuts 26c from both sides. This position adjustment adjusts the position of the bearing resistance generated by the steel plate 26b, and the anchor resistance material 26 is appropriately adjusted to the fixed position in the embankment 2.

[0143] Furthermore, if the size of the masonry stones 3 is uniform, the steel plate 26b can generate sufficient bearing resistance without adjusting the position of the steel plate 26b. In this case, as shown in the first and second layers of the figure (b), the male thread portion 26a1 is formed with a minimum length required to fix the steel plate 26b to the end of the steel bar 26a with the nut 26c. The steel plate 26b is fixed to the male thread portion 26a1 with a pair of nuts 26c.

[0144] The anchor resistance material 26 is connected to either or both of the second end 6b of the first sling 6 and the fourth end 7b of the second sling 7 via a connecting member 27. As shown in the plan view of the same figure (a), the first sling 6 and the second sling 7 wrapped around the masonry 3 may have the second end 6b and the fourth end 7b individually connected to the anchor resistance material 26 via the connecting member 27, or the second end 6b and the fourth end 7b may be combined and connected to one anchor resistance material 26 via one connecting member 27. When the second end 6b and the fourth end 7b are both connected to one anchor resistance material 26 via one connecting member 27, the first sling 6 and the second sling 7 are set to an angle of 90 degrees or less at the connection part with the connecting member 27.

[0145] The connecting material 27 has a length according to the distance between the second end 6b and the fourth end 7b and the end of the anchor resistance material 26 on the masonry 3 side. The distance between the second end 6b and the fourth end 7b and the end of the anchor resistance material 26 on the masonry 3 side varies because the length of the first sling 6 and the second sling 7 wrapped around the masonry 3 differs depending on the size of the masonry 3.

[0146] The connecting member 27 is composed of a shackle 27a, an eye-shaped connecting bolt 27b, and a turnbuckle 27c. The crown of the shackle 27a is passed through the second end 6b or the fourth end 7b, and the ring of the head of the eye-shaped connecting bolt 27b is passed through the pin. The end of the shaft part on which the male thread of the eye-shaped connecting bolt 27b is formed and the male thread part (not shown) provided on the end of the steel bar 26a on the masonry 3 side are connected by the turnbuckle 27c constituting the steel bar connecting member. By rotating the turnbuckle 27c, the distance between the second end 6b and the fourth end 7b and the end of the steel bar 26a on the masonry 3 side is adjusted, and the connecting member 27 has a length according to the distance between the second end 6b and the fourth end 7b and the end of the anchor resistance member 26 on the masonry 3 side.

[0147] According to the construction of the stone wall 1D according to the fourth embodiment, the anchor resistance material 26 is fixed to the embankment 2 by the pull-out resistance force due to the bearing resistance of the steel plate 26b. Therefore, even if a force acts on the masonry 3 to pull out toward the front side of the stone wall 1D due to earth pressure from the back side of the masonry 3 or vibration of the masonry 3 due to earthquake motion, the masonry 3 with the first sling 6 and the second sling 7 wrapped around it is pulled by the first sling 6 and the second sling 7 due to the pull-out resistance of each anchor resistance material 26 to which either or both of the first sling 6 and the second sling 7 are connected, and remains at the front side of the stone wall 1D, preventing the collapse of the stone wall 1D.

[0148] Furthermore, according to the construction structure of the stone wall 1D according to the fourth embodiment, when the anchor resistance material 26 is connected to both the second end 6b and the fourth end 7b, the number of anchor resistance materials 26 and connecting materials 27 used can be reduced. This makes it possible to reduce the complexity and construction costs during the construction work of the stone wall 1D. When the size of the stone 3 is small, the number of stone stones 3 piled up to the same height of the stone wall 1D increases, so this effect of reducing the number of anchor resistance materials 26 and connecting materials 27 used is particularly high.

[0149] Furthermore, according to the construction structure of the stone wall 1D according to the fourth embodiment, when both the second end 6b and the fourth end 7b are connected to one anchor resistance member 26 via the connecting member 27, the angle between the first sling 6 and the second sling 7 at the connection part with the connecting member 27 is set to 90 degrees or less and does not exceed 90 degrees, thereby suppressing the magnitude of the tension acting on the first sling 6 and the second sling 7. Furthermore, since the angle between the first sling 6 and the second sling 7 does not exceed 90 degrees, it is possible to suppress the load load acting on the connecting members such as the shackle 27a at the connection part with the first sling 6 and the second sling 7 in the angle direction between them, which tends to spread the shackle 27a, etc., from the first sling 6 and the second sling 7 to become excessive.

[0150] Furthermore, the construction structure of the stone wall 1D according to the fourth embodiment also places no restrictions on the fixing positions of the first sling 6 and the second sling 7 in the embankment 2. Therefore, even if the sizes of the stones 3 are not uniform, the first sling 6 and the second sling 7 can be easily fixed in the embankment 2 at a laying height that matches the size of each of the stones 3. Therefore, the construction structure of the stone wall 1D according to the fourth embodiment can be easily applied even if the sizes of the stones 3 are not uniform.

[0151] In addition, the distance between the second end 6b and the fourth end 7b and the end of the anchor resistance material 26 on the masonry 3 side is different depending on the size of the masonry 3, as described above, so the anchor resistance material 26 connected to the first sling 6 and the second sling 7 needs to adjust the fixed position in the embankment 2 by the bearing resistance. According to the construction structure of the stone wall 1D according to the fourth embodiment, the fixed position of the anchor resistance material 26 can be changed by fixing the steel plate 26b to an arbitrary position of the male threaded part 26a1 of the steel bar 26a with the nut 26c. In addition, the distance between the second end 6b and the fourth end 7b and the end of the anchor resistance material 26 on the masonry 3 side can be adjusted by the turnbuckle 27c constituting the connecting material 27. Therefore, the fixing position due to the bearing resistance of the anchor resistance material 26 can be adjusted without adjusting the length of the first sling 6 and the second sling 7, eliminating the need to cut and connect the first sling 6 and the second sling 7 according to the length at which they are wrapped around the masonry 3.

[0152] The construction structure of the stone wall 1D according to the fourth embodiment can be applied to both cases where the embankment 2 is made of earth and sand, and cases where it is made of stones 4, as described above. Also, in this embodiment, the anchor resistance material 26 is configured by combining the steel bar 26a with the steel plate 26b as a resistor, but the present invention can also be applied to cases where the anchor resistance material is configured by combining a resistor such as a chain or a high-strength plastic rod.

[0153] Next, a construction of a stone wall according to a fifth embodiment of the present invention will be described.

[0154] FIG. 10(a) shows a construction of a stone wall 1E according to the fifth embodiment, in which FIG. 10(a) is a plan view of one layer of the stone wall 1E, and FIG. 10(b) is a side view.

[0155] The construction of the stone wall 1E according to the fifth embodiment differs from that of the stone wall 1A according to the first embodiment in that the resistance material that provides pull-out resistance to the first sling 6 and the second sling 7 is composed of concrete blocks 28 as anchor resistance materials. The other configurations are the same as those of the stone wall 1A according to the first embodiment. Note that while Fig. 10 shows a case in which the embankment 2 is composed of stones 4, the construction of the stone wall 1E according to the fifth embodiment can be applied to both cases in which the embankment 2 is composed of earth and sand, and cases in which it is composed of stones 4.

[0156] The concrete block 28 has a rectangular parallelepiped shape, and is connected to either or both of the second end 6b of the first sling 6 and the fourth end 7b of the second sling 7. As shown in the plan view of the same figure (a), the first sling 6 and the second sling 7 wrapped around the masonry 3 may be connected to the concrete block 28 at the second end 6b and the fourth end 7b, respectively, or may be connected to one concrete block 28 at both the second end 6b and the fourth end 7b.

[0157] When the first sling 6 and the second sling 7 are individually connected to a concrete block 28, each end 6b, 7b is fixed to each concrete block 28 by simply hanging the ring-shaped portions formed at each end 6b, 7b on each concrete block 28, as in the masonry 3 shown at the top of Figure (a) and the masonry 3 shown in each of the first and second layers of Figure (b).

[0158] In addition, when the first sling 6 and the second sling 7 are connected to one concrete block 28 with both the second end 6b and the fourth end 7b together, the ends 6b and 7b are wound around one concrete block 28 in opposite directions, as in the masonry 3 shown in the center of FIG. (a) and the masonry 3 shown in the third and fourth layers of FIG. (b), and the ends 6b and 7b are fixed to the concrete block 28. In this case, no loops are formed at the ends 6b and 7b. FIG. (c) is a partially enlarged plan view of the state in which the ends 6b and 7b are wound around the concrete block 28 in opposite directions, and FIG. (d) is a partially enlarged side view.

[0159] In addition, when the first sling 6 and the second sling 7 are connected together at both the second end 6b and the fourth end 7b to a single concrete block 28, the ring-shaped portions formed at each end 6b, 7b may be simply hung on the single concrete block 28, as in the masonry 3 shown at the bottom of the same figure (a), thereby fixing each end 6b, 7b to each concrete block 28.

[0160] According to the construction of the stone wall 1E according to the fifth embodiment, the concrete blocks 28 constituting the anchor resistance material are fixed to the embankment 2 by the pull-out resistance force due to their bearing resistance. Therefore, even if a force acts on the masonry 3 to pull out toward the front side of the stone wall 1E due to earth pressure from the back side of the masonry 3 or vibration of the masonry 3 due to earthquake motion, the masonry 3 with the first sling 6 and the second sling 7 wrapped around it is pulled by the first sling 6 and the second sling 7 due to the pull-out resistance of each concrete block 28 to which either or both of the first sling 6 and the second sling 7 are connected, and remains at the front side of the stone wall 1E, preventing the collapse of the stone wall 1E.

[0161] Furthermore, according to the construction structure of the stone wall 1E of the fifth embodiment, when the concrete blocks 28 are connected to both the second end 6b and the fourth end 7b, the number of concrete blocks 28 used can be reduced. This makes it possible to reduce the complexity and construction costs during the construction work of the stone wall 1E. When the size of the stone 3 is small, the number of stone 3 piled up to the same height of the stone wall 1E increases, so this effect of reducing the number of concrete blocks 28 used is particularly high.

[0162] Furthermore, the construction structure of the stone wall 1E according to the fifth embodiment also places no restrictions on the fixing positions of the first sling 6 and the second sling 7 in the embankment 2. Therefore, even if the sizes of the stones 3 are not uniform, the first sling 6 and the second sling 7 can be easily fixed in the embankment 2 at a laying height that matches the size of each of the stones 3. Therefore, the construction structure of the stone wall 1E according to the fifth embodiment can be easily applied even if the sizes of the stones 3 are not uniform.

[0163] In addition, according to the construction structure of the stone wall 1E of the fifth embodiment, the second end 6b of the first sling 6 and the fourth end 7b of the second sling 7 can be easily connected to the same concrete block 28 by simply wrapping the second end 6b and the fourth end 7b around the same concrete block 28 in opposite directions, thereby balancing the forces applied to the concrete block 28 from each sling 6, 7, and can be easily done without specially tying each sling 6, 7 to the concrete block 28.

[0164] The construction structure of the stone wall 1E according to the fifth embodiment can be applied to both cases where the embankment 2 is composed of earth and sand, and cases where the embankment 2 is composed of stones 4, as described above. In addition, in FIG. 10, the second end 6b and the fourth end 7b are connected to the concrete block 28 by wrapping the second end 6b and the fourth end 7b around the top and bottom surfaces of the concrete block 28 as shown in the figure. However, the second end 6b and the fourth end 7b may be connected to the concrete block 28 by wrapping around the left and right side surfaces of the concrete block 28. In addition, in this embodiment, the case where the anchor resistance material is composed of the concrete block 28 has been described, but the present invention can also be applied to cases where the anchor resistance material is composed of stones, steel plates, steel bars, shaped steel such as H steel, etc.

[0165] Next, a construction of a stone wall according to a sixth embodiment of the present invention will be described.

[0166] FIG. 11(a) shows a construction of a stone wall 1F according to the sixth embodiment, in which FIG. 11(a) is a plan view of one layer of the stone wall 1F, and FIG. 11(b) is a side view.

[0167] In the constructed structure of each of the stone walls 1A, 1B, 1C, 1D, 1E according to the first to fifth embodiments described above, a resistance material that provides pull-out resistance to the first sling 6 and the second sling 7 was provided in the embankment 2. In the constructed structure of the stone wall 1F according to the sixth embodiment, a resistance material 32 that provides pull-out resistance to the first sling 6 and the second sling 7 is provided in the natural ground 31 as a reinforcing material, and the masonry 3 is provided on the front side of the natural ground 31 with stones 4 interposed between them. The natural ground 31 has loose soil on the surface side reinforced by the resistance material 32 as a reinforcing material. The rest of the configuration is the same as that of the constructed structure of the stone wall 1A according to the first embodiment.

[0168] Figure (c) is a partially enlarged horizontal cross-sectional view showing the horizontal cross-section of the connection portion between the second end portion 6b and the fourth end portion 7b and the resistance material 32, and Figure (d) is a partially enlarged vertical cross-sectional view showing the vertical cross-section of the connection portion.

[0169] The resistance material 32 provided as a reinforcing material in the natural ground 31 is composed of a core material 32a composed of a deformed steel bar or a steel pipe, a fixing agent 32b composed of grout, an anchor plate 32c composed of a rectangular steel plate, and a U-shaped metal mounting hook 32d. The core material 32a is inserted into a drilled hole opened in the natural ground 31, and one end portion is exposed on the surface of the natural ground 31. The fixing agent 32b is filled into the drilled hole into which the core material 32a is inserted. The anchor plate 32c is fixed to the end portion of the core material 32a and fixed to the surface of the natural ground 31. The mounting hook 32d is exposed on the surface of the natural ground 31 and fixed to the anchor plate 32c, and either or both of the second end 6b and the fourth end 7b are connected.

[0170] In the plan view shown in Fig. 1(a), the first sling 6 and the second sling 7 wrapped around the masonry 3 are connected by bundling the second end 6b and the fourth end 7b together and tying them to one mounting hook 32d. When the second end 6b and the fourth end 7b are bundling and connected to one mounting hook 32d, the angle between the first sling 6 and the second sling 7 at the connection part with the mounting hook 32d is set to 90 degrees or less.

[0171] According to the construction structure of the stone wall 1F according to the sixth embodiment, the resistance material 32 provided in the natural ground 31 is fixed to the natural ground 31 by a pull-out resistance force generated by frictional resistance between the fixing agent 32b filled around the core material 32a and the natural ground 31. In addition, either or both of the second end 6b of the first sling 6 and the fourth end 7b of the second sling 7 are connected to respective mounting hooks 32d fixed to the end portion of the core material 32a via anchor plates 32c. For this reason, even if a force acts on the masonry 3 to pull out toward the front of the stone wall 1F due to earth pressure from the back of the masonry 3 or vibration of the masonry 3 due to seismic activity, the masonry 3 with the first sling 6 and the second sling 7 wrapped around it will be pulled by the first sling 6 and the second sling 7 due to the pull-out resistance force of each resistance material 32 to which either or both of the first sling 6 and the second sling 7 are connected, and will remain in place at the front of the stone wall 1F, preventing the collapse of the stone wall 1F.

[0172] Furthermore, if the natural ground 31 to which the resistance materials 32 are fixed is strong, the pull-out resistance force generated by the resistance materials 32 in the natural ground 31 can sufficiently counter the large force acting on the masonry 3 due to large seismic motion, improving the earthquake resistance of the stone wall 1F. Furthermore, if the natural ground 31 is not strong, the earthquake resistance of the stone wall 1F can be similarly improved by increasing the length of the reinforcing material provided in the natural ground 31, that is, the resistance materials 32.

[0173] Furthermore, the construction structure of the stone wall 1F according to the sixth embodiment can minimize the amount of excavation of the ground 31 behind the masonry 3, which is effective when constructing the stone wall 1F in a location where excavation of the ground 31 behind the masonry 3 is restricted.

[0174] Furthermore, according to the construction structure of the stone wall 1F of the sixth embodiment, when both the second end 6b and the fourth end 7b are gathered together and connected to one resistance material 32 via one mounting hook 32d, the number of resistance materials 32 used can be reduced. This makes it possible to reduce the complexity and construction costs during the construction work of the stone wall 1F. When the size of the stone 3 is small, the number of stone stones 3 piled up to the same height of the stone wall 1F increases, so this effect of reducing the number of resistance materials 32 used is particularly high.

[0175] Furthermore, according to the construction structure of the stone wall 1F according to the sixth embodiment, when both the second end 6b and the fourth end 7b are connected to one resistance material 32 via one mounting hook 32d, the angle between the first sling 6 and the second sling 7 at the connection part with the mounting hook 32d is set to 90 degrees or less and does not exceed 90 degrees, thereby suppressing the magnitude of the tension acting on the first sling 6 and the second sling 7. Furthermore, since the angle between the first sling 6 and the second sling 7 does not exceed 90 degrees, it is possible to suppress the load burden that tries to spread the mounting hook 32d, etc., applied from the first sling 6 and the second sling 7 in the angle direction between them to the connecting members such as the mounting hook 32d at the connection part with the first sling 6 and the second sling 7, from becoming excessive.

[0176] Next, a construction of a stone wall according to the seventh embodiment of the present invention will be described.

[0177] FIG. 12 is a side view of a stone wall 1G showing the construction of the stone wall 1G according to the seventh embodiment.

[0178] In the construction of each of the stone walls 1A, 1B, 1C, 1D, 1E according to the first to fifth embodiments described above, the stone 3 is provided on the front side of the embankment 2 via a stone 4, and in the construction of the stone wall 1F according to the sixth embodiment, the stone 3 is provided on the front side of the natural ground 31 via a stone 4. In the construction of the stone wall 1G according to the seventh embodiment, the stone 3 is provided on the front side of the embankment 2 constructed as a reinforced soil structure 41 via a stone 4.

[0179] That is, in the construction of the stone wall 1G according to the seventh embodiment, the embankment 2 is constructed as a reinforced earth structure 41, and the front side of the embankment 2 facing the masonry 3 is covered by a wall construction 42. The reinforced earth structure 41 is constructed by laying an embankment reinforcement material 40 in the embankment 2 behind the wall construction 42. The second end 6b of the first sling 6 and the fourth end 7b of the second sling are fixed to the reinforced earth structure 41 by a resistance material provided in the embankment 2 constructed as the reinforced earth structure 41. The other configurations are the same as those in the construction of the stone wall 1A according to the first embodiment.

[0180] The wall work 42 is composed of a wall material 42a which forms the front surface of the reinforced soil structure 41, a support material 42b which supports the wall material 42a, and a clip 42c which connects the base of the support material 42b to the embankment reinforcement material 40. The wall material 42a is composed of flat welded wire mesh or expanded metal, and the support material 42b is composed of a pair of upper and lower hooks. The clip 42c secures the intersection of the upper and lower hooks. The embankment reinforcement material 40 is composed of band steel, which is a band-shaped steel plate. The end of the embankment reinforcement material 40 on the masonry 3 side is fixed to the clip 42c with a bolt and nut.

[0181] In this embodiment, the resistance material provided in the embankment 2 is composed of the first sling 6 itself and the second sling 7 itself, as in the first embodiment, and the first sling 6 on the distal side of the second end 6b and the second sling 7 on the distal side of the fourth end 7b are buried in the embankment 2 for a predetermined length as resistance materials. The distal second end 6b and fourth end 7b of the resistance material are connected to an anchor pin 8 that temporarily prevents the tension of the first sling 6 and second sling stretched from the masonry 3 side from loosening until the embankment 2 is piled. Each resistance material exerts a pull-out resistance force on both the second end 6b and the fourth end 7b.

[0182] According to the construction structure of the stone wall 1G according to the seventh embodiment, the large earth pressure from the back of the stone 3 can be resisted by the reinforced earth structure 41 constructed on the back side of the stone 3, thereby reducing the earth pressure acting on the back of the stone 3. Therefore, even when the stone 3 is piled up high and a large earth pressure is applied from the back of the stone 3, the stone 3 can be kept at the piled up location by the first sling 6 at the end side of the second end 6b and the second sling 7 at the end side of the fourth end 7b fixed to the reinforced earth structure 41, and the earthquake resistance of the stone wall 1G can be improved. In addition, since the earth pressure acting on the back of the stone 3 can be reduced, the fixing length of the first sling 6 at the end side of the second end 6b and the second sling 7 at the end side of the fourth end 7b to the reinforced earth structure 41 can be short. Therefore, by ensuring that the fixing length of these resistance materials to the reinforced earth structure 41 is longer than the necessary length in advance, there is no need to adjust the length of the resistance materials, and the workability of the stone wall 1G is improved.

[0183] The construction structure of the stone wall 1G according to the seventh embodiment is a structure suitable for a combination in which the embankment 2 constituting the reinforced soil structure 41 is made of earth and sand and the sizes of the masonry stones 3 are irregular.

[0184] Next, a construction of a stone wall according to an eighth embodiment of the present invention will be described.

[0185] FIG. 13 is a side view of a stone wall 1H showing the construction of the stone wall 1H according to the eighth embodiment.

[0186] In the construction of a stone wall 1H according to the eighth embodiment, a masonry 3 is provided with stones 4 interposed between the masonry 3 and the front side of an embankment 2 constructed as a reinforced soil structure 43.

[0187] That is, in the construction of stone wall 1H according to the eighth embodiment, embankment 2 is constructed as reinforced earth structure 43, and the front side of embankment 2 on the masonry 3 side is covered by wall work 44. Reinforced earth structure 43 is constructed by laying embankment reinforcement material 45 in embankment 2 behind wall work 44. The second end 6b of first sling 6 and the fourth end 7b of second sling 6 are fixed to reinforced earth structure 43 by resistance material provided in embankment 2 constructed as reinforced earth structure 43. The other configurations are the same as those in the construction of stone wall 1C according to the third embodiment.

[0188] The wall work 44 is composed of a wall material 44a that forms the front surface of the reinforced soil structure 43, and a diagonal connecting member 44b that diagonally connects each bent surface of the wall material 44a bent into an L shape. A hook portion 44a1 is formed at the end of the horizontally bent surface of the wall material 44a, and a steel bar 44c is hung between the hook portions 44a1 of the same height. The wall material 44a is composed of a welded wire mesh or expanded metal bent into an L shape. The embankment reinforcement material 45 is composed of a mesh-like resistance material such as geosynthetics. The end of the embankment reinforcement material 45 on the masonry 3 side is hung on the steel bar 44c between the hook portions 44a1 and folded back to the opposite side of the masonry 3. In addition, the end of the embankment reinforcement material 45 on the opposite side to the masonry 3 side is temporarily fixed to the embankment 2 by an anchor pin 8, and the embankment reinforcement material 45 extended and stretched from the masonry 3 side is prevented from loosening.

[0189] In this embodiment, the resistance material provided in the embankment 2 is composed of a mesh resistance material such as geosynthetics 23, as in the third embodiment, and is connected to either or both of the second end 6b and the fourth end 7b via connecting materials 24, providing them with a pull-out resistance force. During the construction process of the embankment 2, the end of the geosynthetics 23 opposite the masonry 3 is temporarily fixed to the embankment 2 by an anchor pin 8, and the geosynthetics 23 stretched and tensioned from the masonry 3 side is prevented from loosening.

[0190] With the construction structure of the stone wall 1H according to the eighth embodiment, the large earth pressure acting on the back of the masonry stones 3 can be reduced by having the reinforced earth structure 43 constructed on the back side of the masonry stones 3 resist the large earth pressure acting on the back of the masonry stones 3. Therefore, even when the masonry stones 3 are piled up high and large earth pressure is applied from the back of the masonry stones 3, the network resistance material such as geosynthetics 23 fixed to the reinforced earth structure 43 can keep the masonry stones 3 at the piled location, and the earthquake resistance of the stone wall 1H can be improved. Furthermore, because the earth pressure acting on the back of the masonry stones 3 can be reduced, the length of fixation of the network resistance material such as geosynthetics 23 to the reinforced earth structure 43 can be shortened.

[0191] The construction structure of the stone wall 1H according to the eighth embodiment is a structure suitable for combinations in which the embankment 2 that constitutes the reinforced soil structure 43 is mainly soil and sand or soil and sand with a high clay content, and the sizes of the building stones 3 are relatively uniform.

[0192] Next, a construction of a stone wall according to a ninth embodiment of the present invention will be described.

[0193] FIG. 14 is a side view of a stone wall 1I showing the construction of the stone wall 1I according to the ninth embodiment.

[0194] In the construction of stone wall 1I according to the ninth embodiment, a reinforced soil structure 43 similar to that in the construction of stone wall 1H according to the eighth embodiment is constructed behind the masonry 3. This embodiment differs from the eighth embodiment in the configuration of the resistance material provided in the embankment 2, but the other configurations are the same as those in the construction of stone wall 1H according to the eighth embodiment. The configuration of the resistance material is the same as that in the construction of stone wall 1E according to the fifth embodiment.

[0195] That is, in this embodiment, the resistance material that provides the first sling 6 and the second sling 7 with a pull-out resistance is composed of a concrete block 28 as an anchor resistance material. Either or both of the second end 6b of the first sling 6 and the fourth end 7b of the second sling 7 are connected to the concrete block 28. In FIG. 14, the second end 6b and the fourth end 7b are connected to the concrete block 28 by wrapping around the top and bottom surfaces of the concrete block 28 as shown in the figure. However, the second end 6b and the fourth end 7b may be connected to the concrete block 28 by wrapping around the left and right side surfaces of the concrete block 28.

[0196] The construction structure of the stone wall 1I according to the ninth embodiment achieves the same effects as the construction structure of the stone wall 1H according to the eighth embodiment, improving the earthquake resistance of the stone wall 1H and also improving the workability of the stone wall 1H.

[0197] The construction structure of the stone wall 1I according to the ninth embodiment is a structure suitable for combinations in which the embankment 2 that constitutes the reinforced soil structure 41 is mainly soil and sand or soil and sand with a high clay content, and the building stones 3 are of irregular sizes.

[0198] Next, a construction of a stone wall according to a tenth embodiment of the present invention will be described.

[0199] FIG. 15 is a side view of a stone wall 1J showing the construction structure of the stone wall 1J according to the tenth embodiment.

[0200] In the construction of the stone wall 1J according to the tenth embodiment, a masonry 3 is provided on the front side of an embankment 2 constructed as a reinforced soil structure 46, with stones 4 interposed between the masonry 3 and the embankment 2.

[0201] That is, in the construction of the stone wall 1J according to the tenth embodiment, the embankment 2 is constructed as a reinforced earth structure 46, and the front side of the embankment 2 on the side of the masonry 3 is covered by a wall construction 47. The reinforced earth structure 46 is constructed by laying an embankment reinforcement material 48 in the embankment 2 behind the wall construction 47. The second end 6b of the first sling 6 and the fourth end 7b of the second sling are fixed to the reinforced earth structure 46 by a resistance material provided in the embankment 2 constructed as the reinforced earth structure 46. In this embodiment, the resistance material is composed of an anchor resistance material 49. The other configurations are the same as those in the construction of the stone wall 1A according to the first embodiment.

[0202] The wall work 47 is composed of a number of sandbags 47a piled up. The embankment reinforcement material 48 is composed of a mesh-like resistance material such as geosynthetics. The end of the embankment reinforcement material 48 on the masonry 3 side wraps around the stone 4 side faces of a predetermined number of sandbags 47a from the bottom to the top layer from bottom to top, and is folded back to the side opposite the masonry 3. In addition, the end of the embankment reinforcement material 48 on the side opposite the masonry 3 side is temporarily fixed to the embankment 2 by an anchor pin 8, and the embankment reinforcement material 48, which is stretched and stretched from the masonry 3 side, is prevented from loosening.

[0203] The resistance material provided in the embankment 2 is composed of a shackle 49a, an eye-type connecting bolt 49b, and a steel plate 49c, and is configured as an anchor resistance material 49. The second end 6b or the fourth end 7b is passed through the crown of the shackle 49a, and the loop at the head of the eye-type connecting bolt 49b is passed through the pin of the shackle 49a. The rectangular steel plate 49c is fixed to the eye-type connecting bolt 49b by tightening nuts on both sides of the shaft part where the male thread of the eye-type connecting bolt 49b is formed. The anchor resistance material 49 is connected to either or both of the second end 6b and the fourth end 7b, and provides them with a pull-out resistance force.

[0204] Even with the construction structure of the stone wall 1J according to the tenth embodiment, the large earth pressure from the back of the masonry stone 3 can be resisted by the reinforcing earth structure 46 constructed on the back side of the masonry stone 3, thereby reducing the earth pressure acting on the back of the masonry stone 3. Therefore, even when the masonry stones 3 are piled up high and a large earth pressure is applied from the back of the masonry stone 3, the masonry stone 3 can be kept at the piled location by the anchor resistance material 49 fixed to the reinforcing earth structure 46, and the earthquake resistance of the stone wall 1J can be improved. In addition, since the earth pressure acting on the back of the masonry stone 3 can be reduced, the fixing length of the anchor resistance material 49 to the reinforcing earth structure 46 can be shortened. Therefore, by ensuring in advance that the fixing length of the anchor resistance material 49 to the reinforcing earth structure 43 is longer than necessary, it is not necessary to adjust the length of the anchor resistance material 49, and the workability of the stone wall 1J is improved.

[0205] The construction structure of the stone wall 1J according to the tenth embodiment is a structure suitable for combinations in locations that are mainly affected by salt damage, where the embankment 2 that constitutes the reinforced soil structure 46 is mainly soil or clayey soil, and the building stones 3 are of irregular sizes.

[0206] Next, a construction of a stone wall according to an eleventh embodiment of the present invention will be described.

[0207] FIG. 16 is a side view of a stone wall 1K showing the construction structure of the stone wall 1K according to the eleventh embodiment.

[0208] In the construction structure of the stone wall 1K according to the eleventh embodiment, the embankment 2 is constructed as a reinforced soil structure 51, and the front side of the embankment 2 on the side of the masonry 3 is covered with a wall work 52. The reinforced soil structure 51 is constructed by constraining and reinforcing the embankment material of the embankment 2 between the wall work 52 and the steel plate 49c of the anchor resistance material 49. The wall work 52 is constructed by packing stones 4 into an iron wire cage frame 52a, and is fixed to the embankment 2 by an embankment reinforcement material 53. The embankment reinforcement material 53 is composed of two steel bars 53a, 53b with male threads formed at both ends, a steel bar connector 53c connecting the two steel bars 53a, 53b, a steel rectangular plate 53d provided at one end of the steel bar 53a, and a steel umbrella-shaped plate 53e provided at the other end of the steel bar 53b.

[0209] The steel bar connector 53c is made of a turnbuckle, and is screwed into a male thread formed on the adjacent ends of the steel bars 53a, 53b to connect the adjacent ends of the steel bars 53a, 53b. By rotating the steel bar connector 53c, the distance between the adjacent ends of the steel bars 53a, 53b is adjusted, and the fixing position of the embankment reinforcement material 53 in the embankment 2 is adjusted. The rectangular plate 53d is fixed to the end of the steel bar 53a with a nut on the face of the iron wire cage frame 52a facing the masonry 3. The umbrella-shaped plate 53e is fixed to the end of the steel bar 53b by tightening both sides with nuts. The other configurations are the same as those of the construction structure of the stone wall 1J according to the tenth embodiment.

[0210] The anchor resistance material 49 provided in the embankment 2 is configured in the same manner as the construction structure of the stone wall 1J according to the tenth embodiment, and is connected to either or both of the second end 6b and the fourth end 7b to provide them with a pull-out resistance force.

[0211] With the construction structure of the stone wall 1K according to the 11th embodiment, the large earth pressure from the back surface of the masonry 3 can be resisted by the reinforced earth structure 51 constructed on the back surface side of the masonry 3, thereby reducing the earth pressure acting on the back surface of the masonry 3. As a result, the same effect as with the construction structure of the stone wall 1J according to the 10th embodiment can be achieved, the earthquake resistance of the stone wall 1K can be improved, and the workability of the stone wall 1K can be improved.

[0212] The construction structure of the stone wall 1K according to the eleventh embodiment is suitable for the case where the embankment 2 constituting the reinforced soil structure 51 is mainly made of stones 4 as shown in the figure, and the sizes of the stones 3 are not uniform. Also, the wall work 52 may be made of large sandbags instead of the iron wire cage frame 52a.

[0213] Fig. 17 is a side view showing an overall image of a stone wall 1K constructed on the ground 25 using the construction structure of the stone wall 1K according to the eleventh embodiment. The embankment 2 in this stone wall 1K is composed of stones 4. As described above, the large earth pressure acting on the back of the masonry 3 can be reduced by resisting it with the reinforced earth structure 51 constructed on the back side of the masonry 3, so that the height of the stone wall 1C is constructed high, for example, at about 20 m. In other words, the stone wall 1K can be constructed high, for example, compared to a stone wall 1C constructed using the construction structure of the stone wall 1C according to the third embodiment shown in Fig. 8, in which the back of the masonry 3 is the embankment 2.

[0214] Next, a construction of a stone wall according to a twelfth embodiment of the present invention will be described.

[0215] FIG. 18 is a side view of a stone wall 1L showing the constructed structure of the stone wall 1L according to the twelfth embodiment.

[0216] In the construction of the stone wall 1L according to the twelfth embodiment, the embankment 2 is constructed as a reinforced earth structure 54. The reinforced earth structure 54 is configured such that stones 4 are packed into an iron wire cage frame 54a and are restrained and reinforced by the iron wire cage frame 54a.

[0217] The anchor resistance material 49 provided in the embankment 2 is configured in the same manner as the construction structure of the stone wall 1J according to the tenth embodiment, and is connected to either or both of the second end 6b and the fourth end 7b to provide them with a pull-out resistance force.

[0218] With the construction structure of the stone wall 1L according to the 12th embodiment, the large earth pressure from the back surface of the masonry 3 can be resisted by the reinforced earth structure 54 constructed on the back surface side of the masonry 3, thereby reducing the earth pressure acting on the back surface of the masonry 3. As a result, the same effect as with the construction structure of the stone wall 1J according to the 10th embodiment can be achieved, the earthquake resistance of the stone wall 1L can be improved, and the workability of the stone wall 1L can be improved.

[0219] The construction structure of the stone wall 1L according to the 12th embodiment is suitable for a combination in which the embankment 2 constituting the reinforced soil structure 54 is mainly made of stones 4, or in which excavation of the ground behind the embankment 2 is restricted and the sizes of the stones 3 are irregular. The reinforced soil structure 54 made of the iron wire cage frame 54a exerts a large resistance force due to its own weight and the constraining and reinforcing effect of the stones 4 even if it is short in the depth direction of the embankment 2, so the construction structure of the stone wall 1L according to the 12th embodiment is suitable for a case in which excavation of the ground behind the embankment 2 is restricted. The reinforced soil structure 54 may be made of large sandbags that constrain and reinforce the soil of the embankment 2 instead of the iron wire cage frame 54a that constrains and reinforces the stones 4 of the embankment 2.

[0220] Next, a method for constructing a stone wall according to another embodiment of the present invention will be described.

[0221] In the construction of stone walls 1G, 1H, 1I and 1J according to the seventh, eighth, ninth and tenth embodiments shown in Figures 12, 13, 14 and 15, slings 6, 7 and resistance materials 23, 28 and 49 are fixed as resistance materials to reinforced earth structures 41, 43, 43 and 46, the front of which is covered with wall works 42, 44, 44 and 47, and in which embankment reinforcement materials 40, 45, 45 and 48 are laid in the embankment 2. In the construction of stone walls 1K and 1L according to the eleventh and twelfth embodiments shown in Figures 16 and 18, anchor resistance materials 49 are fixed to reinforced earth structures 51 and 54, in which the embankment material of the embankment 2 is restrained and reinforced.

[0222] For example, as shown in Figs. 13 and 14, a method of constructing a stone wall in which resistance materials are fixed to a reinforced soil structure 43 having a wall construction 44 on the front side is as follows.

[0223] FIG. 19 is a side view of a stone wall 1M constructed by the stone wall construction method according to the third embodiment.

[0224] In the stone wall 1M, a resistance material 55 is fixed to the reinforced soil structure 43. As shown in Figs. 13 and 14, the front side of the reinforced soil structure 43 facing the masonry 3 is covered with the wall work 44, and the embankment reinforcement material 45 such as geosynthetics is laid in the embankment 2. The resistance material 55 is made of a band steel 55a made of a belt-shaped steel plate, and the end of the band steel 55a facing the masonry 3 is exposed from the wall work 44. The end of the band steel 55a exposed to the wall work 44 is fixed to the pin of the shackle 55b. Either or both of the second end 6b and the fourth end 7b are connected to the shackle 55b. The other configurations of the stone wall 1M are the same as those of the stone walls 1H and 1I according to the eighth and ninth embodiments shown in Figs. 13 and 14.

[0225] The method for constructing a stone wall 1M having such a structure includes a reinforced soil structure construction process and a stone wall construction process.

[0226] In the reinforced soil structure construction process, the reinforced soil structure 43 is piled up in multiple layers while exposing the shackles 55b, which are the connecting parts with the resistance materials 55 fixed to the reinforced soil structure 43, on the front side of the reinforced soil structure 43, to construct the reinforced soil structure 43 of the desired height. Next, after the reinforced soil structure 43 of the desired height is constructed by this reinforced soil structure construction process, the stone wall 1M is piled up in multiple layers on the front side of the reinforced soil structure 43 of the desired height while connecting either one or both of the second end 6b and the fourth end 7b to the shackles 55b, to construct the stone wall 1M of the desired height. In this way, the construction structure of the stone wall 1M using the resistance materials 55 provided in the embankment 2 is formed.

[0227] According to the method for constructing a stone wall 1M according to the third embodiment, a reinforced earth structure construction process in which the reinforced earth structure 43 is stacked in multiple layers to construct a desired height of the reinforced earth structure 43 is carried out first, and then a stone wall construction process in which the stone walls 1M are constructed in multiple layers to construct a desired height of the stone wall 1M is carried out. Therefore, it is possible to carry out the reinforced earth structure construction process by a worker who specializes in constructing the reinforced earth structure 43 and the stone wall construction process by a worker who specializes in constructing the stone wall 1M separately. This allows the stone wall 1M to be constructed efficiently, and also reduces the risk of workers of each specialized type of work overlapping during construction.

[0228] The stone walls 1G, 1J shown in Figures 12 and 15, which are constructed by fixing resistance materials to reinforced soil structures 41, 46 having wall constructions 42, 47 on the front side, can also be constructed by including a reinforced soil structure construction process and a stone wall construction process, similar to the construction method according to the third embodiment. In this case, the same effects as those of the construction method according to the third embodiment can be achieved.

[0229] FIG. 20 is a side view of a stone wall 1N constructed by the stone wall construction method according to the fourth embodiment.

[0230] In the stone wall 1N, the embankment 2 is constructed as a reinforced earth structure 57. The reinforced earth structure 57 is constructed such that the front side on the side of the masonry 3 is covered with a wall work 52 shown in Fig. 16, and embankment reinforcement material 53 is laid in the embankment 2. The wall work 52 is constructed by packing stones 4 into an iron wire cage frame 52a. The anchor resistance material 56 provides pull-out resistance to either or both of the second end 6b and the fourth end 7b.

[0231] The anchor resistance material 56 is composed of a shackle 56a, an eye-shaped connection bolt 56b, a steel bar connection material 56c, a steel bar 56d, and a steel plate 56e. The shackle 56a is exposed on the surface of the wall construction 52 on the masonry 3 side. The second end 6b or the fourth end 7b is passed through the crown of the shackle 56a, and the ring of the head of the eye-shaped connection bolt 56b is passed through the pin. One end of the steel bar 56d is connected to the shaft part on which the male thread is formed of the eye-shaped connection bolt 56b by the steel bar connection material 56c. The other end of the steel bar 56d is exposed on the surface of the wall construction 52 on the opposite side to the masonry 3 side, and the steel plate 56e is fixed by a nut. The other configuration of the stone wall 1N is the same as the construction structure of the stone wall 1A according to the first embodiment.

[0232] The method for constructing the stone wall 1N having such a structure includes a reinforced soil structure construction process and a stone wall construction process.

[0233] In the reinforced earth structure construction process, the reinforced earth structure 57 is piled up in multiple layers while exposing the shackles 56a, which are the connecting parts with the anchor resistance materials 56 fixed to the reinforced earth structure 57, on the front side of the reinforced earth structure 57, to construct a reinforced earth structure 57 of a desired height. Next, after the reinforced earth structure 57 of a desired height is constructed by this reinforced earth structure construction process, the masonry 3 is piled up in multiple layers on the front side of the reinforced earth structure 57 of a desired height while connecting either or both of the second end 6b and the fourth end 7b to the shackles 56a, to construct a stone wall 1N of a desired height.

[0234] According to the construction method of the stone wall 1N of the fourth embodiment, the reinforced earth structure construction process of stacking the reinforced earth structure 57 in multiple layers to construct the reinforced earth structure 57 of the desired height is performed first, and then the stone wall construction process of stacking the masonry stones 3 in multiple layers to construct the stone wall 1N of the desired height is performed. Therefore, the same effect as the construction method of the stone wall 1M of the third embodiment is achieved, the stone wall 1N can be constructed efficiently, and the risk of workers of each specialized type of work overlapping during construction can be reduced.

[0235] In this embodiment as well, the reinforced soil structure 57 may be composed of large sandbags that constrain and reinforce the soil of the embankment 2 instead of the iron wire cage frame 52a that constrains and reinforces the stones 4 of the embankment 2.

[0236] The methods for constructing stone walls according to the third and fourth embodiments can be similarly applied to the construction of the stone walls 1K and 1L according to the eleventh and twelfth embodiments shown in Figures 16 and 18.

[0237] In this case, the reinforced earth structure construction step involves piling up the reinforced earth structures 51, 54 in multiple layers while exposing the connections with the anchor resistance materials 49 fixed to the reinforced earth structures 51, 54 on the front side of the reinforced earth structures 51, 54 constructed by restraining and reinforcing the embankment material, thereby constructing the reinforced earth structures 51, 54 of the desired height. The stone wall construction step in which the stone walls 1K, 1L of the desired height are constructed by piling up the masonry stones 3 in multiple layers is performed after the reinforced earth structures 51, 54 of the desired height have been constructed in the reinforced earth structure construction step. In this case as well, the same effects as those of the stone wall construction methods according to the third and fourth embodiments are achieved.

[0238] In the construction of the stone walls 1B-1L according to the second to twelfth embodiments, and the construction method of the stone walls 1M, 1N according to the third and fourth embodiments, the first sling 6 and the second sling 7 are wound around the masonry stone 3 as shown in Fig. 2. However, the construction of the stone walls 1B-1L, and the construction method of the stone walls 1M, 1N according to the third and fourth embodiments can also be applied to the winding of the first sling 6 and the second sling 7 around the masonry stone 3 as shown in the modified example in Fig. 5. In these cases, the same effects as those of the respective embodiments can be achieved.

[0239] Furthermore, in the method of constructing a stone wall according to the first embodiment described above, as shown in Figures 4(a) and (b), the second end 6b at the other end of the first sling 6 and the fourth end 7b at the other end of the second sling 7 are lifted up to perform a tightening process in which the first sling 6 and the second sling 7 are tightened to the masonry 3, followed by a first fastening process in which the ring-shaped portion provided at the third end 7a is fastened to the first sling 6 with a first fastening material 9, and a second fastening process in which the ring-shaped portion provided at the first end 6a is fastened to the second sling 7 with a second fastening material 10.

[0240] However, after the tightening process for fastening the first sling 6 and the second sling 7 to the masonry 3, a performance evaluation process may be provided for determining whether the tightening force of the first sling 6 and the second sling 7 has a standard tightening force capable of maintaining the first sling 6 and the second sling 7 in a tightened state that tightens each periphery of the retaining portion 3b, and the first tightening process and the second tightening process may be performed if it is determined in the performance evaluation process that the tightening force for fastening the first sling 6 and the second sling 7 to the masonry 3 has the standard tightening force.

[0241] Here, the standard tightening force is the tightening force that can be maintained by the first sling 6 and the second sling 7 to tighten around each periphery of the retaining portion 3b when they receive a pull-out resistance force applied to the second end 6b and the fourth end 7b from a resistance material provided in the embankment 2 or the natural ground 31, and which can counter the pushing force that causes the masonry 3 to escape from the constraints of the first sling 6 and the second sling 7 and be pushed toward the front side of the stone walls 1A to 1N, thereby maintaining the first sling 6 and the second sling 7 in a tight binding state around each periphery of the retaining portion 3b.

[0242] The performance evaluation in the above performance evaluation process is performed, for example, using a test stand 61 shown in a front view in FIG. 21(a) and a side view in FIG. 21(b). The test stand 61 is configured by attaching an attachment 64 to the lower center of a support 63 configured by assembling H-shaped steel in a gate shape on a base 62. The attachment 64 is configured by stacking columns 64a, which are square steel pipes. The performance evaluation is performed by lifting the second end 6b and the fourth end 7b of the masonry 3 to be the performance evaluation target, which has the first sling 6 and the second sling 7 wrapped around it as shown in FIG. 2, with the lower end of the attachment 64 abutting against the rear end of the masonry 3 as shown in FIG. 21, using a crane (not shown). A cushion 65 is placed on the base 62 below the masonry 3.

[0243] The lifting force of the masonry 3 by the crane is measured by a measuring device 67, such as a load cell or crane scale, attached to the end of the wire rope 66. This lifting force measured by the measuring device 67 corresponds to the pushing force with which the masonry 3 escapes from the constraints of the first sling 6 and the second sling 7 and is pushed out toward the front side of the stone wall 1 due to the earth pressure from behind the masonry 3 and the inertial force generated during an earthquake by the weight of the masonry 3 itself. This pushing force is set, for example, to a value that takes into account a predetermined safety factor for the pushing force required for the first sling 6 and the second sling 7 to maintain the above-mentioned binding state as designed, and is set to a value greater than the minimum necessary pushing force to allow for safety.

[0244] If the tightening force that fastens the first sling 6 and the second sling 7 to the masonry 3 due to the pull-out resistance from the resistance material cannot counter this pushing force and does not meet the standard tightening force, the masonry 3 will escape from the binding of the first sling 6 and the second sling 7 and fall, but the cushion 65 will cushion the impact on the masonry 3 at this time. The impact caused by the fall of the masonry 3 can also be mitigated by adjusting the lifting height of the masonry 3 by the number of stacked columns 64a that make up the attachment 64.

[0245] On the other hand, if the tightening force that tightens the first sling 6 and the second sling 7 to the masonry 3 due to the pull-out resistance force from the resistance material is able to counter this pushing force and the masonry 3 does not fall, the tightening force is performance-evaluated as having the standard tightening force.

[0246] In this way, after the tightening process in which the first sling 6 and the second sling 7 are tightened to the masonry 3, a performance evaluation process is provided in which it is determined whether the tightening force of the first sling 6 and the second sling 7 has a standard tightening force that can maintain the tightened state around each of the retaining portions 3b.This makes it possible to determine whether the tightening force of the first sling 6 and the second sling 7 to tighten around each of the retaining portions 3b is sufficient before the masonry 3 is installed at the actual site.

[0247] It is also possible to provide a stone wall construction in which the tightening force with which the first sling 6 and the second sling 7 obtain a pull-out resistance and tighten around each of the retaining portions 3b is set to a tightening force that can maintain the above-mentioned binding state against the above-mentioned pushing force. In this case, the wrapping of the first sling 6 and the second sling 7 around the masonry 3 can be maintained in a tightened state by the first fastening material 9 and the second fastening material 10, as shown in Figure 2(b).

[0248] Therefore, with these stone wall construction methods and construction structures, it is possible to avoid a situation in which it is discovered after the installation of the masonry 3 that the tightening force with which the first sling 6 and the second sling 7 tighten around each of the retaining portions 3b is insufficient to withstand the pushing force that the masonry 3 receives due to earth pressure from behind the masonry 3 or the inertial force generated during an earthquake due to the masonry 3's own weight, and thus the installation of the masonry 3 has to be redone.

[0249] In addition, by setting the pushing force to a value that takes into account a predetermined safety factor in the pushing force required for the first sling 6 and the second sling 7 to maintain the above-mentioned binding state as designed, the tightening force with which the first sling 6 and the second sling 7 tighten around each of the retaining portions 3b is ensured to have the standard tightening force. Therefore, even if an unexpected pushing force acts on the stone 3, the stone 3 is reliably kept in a state of being bound by the first sling 6 and the second sling 7, ensuring the safety and appearance of the stone wall structure.

[0250] Furthermore, if the shape of the rear end of the masonry 3 is distorted and not flat, and even if an attempt is made to prevent the masonry 3 from tilting when it is lifted by inserting a wedge or the like (not shown) into the gap between the lower end of the attachment 64 and the rear end of the masonry 3, the tilt cannot be prevented and the lifting force of the masonry 3 cannot be accurately measured. In such cases, it is preferable to perform the performance evaluation in the performance evaluation process by providing a jack 71, as shown in the partially enlarged front view of Figure 22, instead of the attachment 64 on the test stand 61 shown in Figure 21.

[0251] In this case, the height at which the tip of the rod abuts against the rear end of the masonry 3 varies depending on the installation position of the jack 71. In other words, by adjusting the stroke length of the jack 71 according to the abutment position with the rear end of the masonry 3, it is possible to control the inclination of the masonry 3, whose rear end has a distorted shape that cannot be corrected by wedges or the like. Therefore, when the second end 6b and the fourth end 7b are lifted by a crane and a pushing force is applied to the rear end of the masonry 3, a vertical downward pushing force can be applied to the rear end of the masonry 3 without the masonry 3 tilting, and performance evaluation can be performed accurately. In this case too, the pushing force applied to the rear end of the masonry 3 is measured by the measuring instrument 67.

[0252] Furthermore, if the shape of the bracing part 3b around which the first sling 6 or the second sling 7 is wound is distorted and the first sling 6 or the second sling 7 cannot bind the periphery of the bracing part 3b against the above-mentioned pushing force, it is preferable to fix a resistance member 81 such as mortar to the part where the periphery of the bracing part 3b cannot be bound tightly, as shown in the perspective view of Figure 23. This resistance member 81 is provided in four places in the figure, but the shape of the first sling 6 or the second sling 7 that wraps around it corresponds to the distorted part, and the number of resistance members is provided in at least one place.

[0253] In this way, by providing resistance members 81 around the supporting portion 3b around which the first sling 6 or the second sling 7 is wound, which cannot bind the periphery of the supporting portion 3b against the pushing force, it is possible to increase the contact resistance between the first sling 6 or the second sling 7 and the periphery of the supporting portion 3b. As a result, the periphery of the supporting portion 3b can be securely bound by the first sling 6 and the second sling 7, and it is possible to reliably prevent the masonry 3 from escaping the binding from the first sling 6 and the second sling 7 and being pushed out to the front side of the stone walls 1A-1N.

[0254] 21 to 23, the first sling 6 and the second sling 7 are wound around the masonry 3 in the manner shown in Fig. 2. However, the same can be said when the first sling 6 and the second sling 7 are wound around the masonry 3 in the manner shown in Fig. 5.

[0255] That is, in the method for constructing a stone wall according to the second embodiment, the above-mentioned performance evaluation step may be provided after the tightening step for tightening the first sling 6 and the second sling 7 to the masonry 3 in the manner shown in Fig. 5, and the first tightening step and the second tightening step may be performed when the tightening force for tightening the first sling 6 and the second sling 7 to the masonry 3 in the manner shown in Fig. 5 is determined to have the reference tightening force in the performance evaluation step. Also, it is possible to provide a construction structure of a stone wall in which the tightening force for tightening each periphery of the retaining portion 3b in the manner shown in Fig. 5 by the first sling 6 and the second sling 7 obtaining a pull-out resistance force is set to a tightening force that can maintain the binding state against the pushing force. Also, the pushing force may be set to a value that allows a predetermined safety factor for the pushing force required for the first sling 6 and the second sling 7 to maintain the binding state by design. Furthermore, a resistance member 81 such as mortar may be fixed to a location where the first sling 6 or the second sling 7 cannot tie down the periphery of the braced portion 3b in the manner shown in FIG. [Industrial Applicability]

[0256] The construction structure and construction method of the stone walls according to the above-mentioned embodiments and modifications can be used for various types of stone walls used in various places, including stone walls in castles. [Explanation of symbols]

[0257] 1A, 1B, 1C, 1D, 1E, 1F, 1G, 1H, 1I, 1J, 1K, 1L, 1M, 1N...stone wall, 2...embankment, 3...stone masonry, 3a...surface of stone masonry 3, 3b...retaining portion of stone masonry 3, 4...stone, 5...intermediate stone, 6...first sling, 6a...first end, 6b...second end, 7...second sling, 7a...third end, 7b...fourth end, 8...anchor pin, 9...first fastening material, 10...second fastening material, 11...high strength rope (binding material), 12...steel ring (binding material), 13...wire rope, 21...steel band, 22...connecting material, 23...geosynthetics, 24,27...connecting material, 25...ground, 26,49,56...anchor resistance material, 28...concrete block, 31...ground, 32,55...resistance material, 41,43,46,51,54,57...reinforced earth structure, 42,44,47,52...wall construction, 40,45,48,53...embankment reinforcement material

Claims

1. a first sling having a first end portion at one end provided with a loop portion, the first end portion being positioned on one side surface of a retaining portion of the masonry, and a pull-out resistance force being applied to a second end portion at the other end portion from a resistance material provided in the embankment or natural ground present behind the retaining portion; and at least one second sling, the first sling being passed from one side surface to a ring portion provided at a third end portion of one end on the other side surface of the bracing portion opposite the one side surface, covering a part of the periphery of the bracing portion from the one side surface, and the fourth end portion of the other end being passed from the other side surface to the ring portion of the first end portion positioned on the one side surface, covering the remainder of the periphery, so that a pull-out resistance force is applied to the fourth end portion from a resistance material provided in the embankment or natural ground, A stone wall construction in which the first sling on the terminal side of the first end tightens a portion of the perimeter, and the second sling on the terminal side of the third end tightens the remainder of the perimeter.

2. a first sling that is attached to one side of a masonry bracing portion, the first sling having a second end at one end passed through a loop provided at a first end at one end while covering the entire periphery of the bracing portion, and a pull-out resistance force is applied to the second end from a resistance material provided in the embankment or natural ground present behind the bracing portion; a second sling, the second sling covering the entire periphery of the bracing portion on the other side surface of the bracing portion opposite to the one side surface, the second sling having a fourth end portion at the other end passed through an annular portion provided at a third end portion at one end, and a pull-out resistance force being applied to the fourth end portion from a resistance material provided in the embankment or natural ground, A stone wall construction in which the first sling on the terminal side of the first end and the second sling on the terminal side of the third end each tighten around the entire periphery of the retaining portion.

3. a first fastening material fastening the loop portion provided on the third end portion and the first sling at a location where the first sling passes through the loop portion provided on the third end portion, thereby maintaining a state in which the first sling on the terminal side of the first end portion fastens a part of the periphery of the stay portion; a second fastening material fastening the loop portion provided at the first end and the second sling at a location where the second sling passes through the loop portion provided at the first end, thereby maintaining a state in which the second sling on the terminal side of the third end fastens the remaining portion of the periphery; The stone wall construction structure according to claim 1, characterized in that it comprises:

4. a first fastening material that fastens the loop portion provided on the first end portion and the first sling at a location where the first sling passes through the loop portion provided on the first end portion, thereby maintaining a state in which the first sling on the terminal side of the first end portion fastens the entire circumference of the stay portion; a second fastening member fastening the loop portion provided at the third end portion and the second sling at a location where the second sling passes through the loop portion provided at the third end portion, thereby maintaining a state in which the second sling on the terminal side of the third end portion fastens the entire periphery of the stay portion; The stone wall construction structure according to claim 2, further comprising:

5. A stone wall construction according to any one of claims 1 to 4, characterized in that the second end and the fourth end are each provided with a ring-shaped portion.

6. A stone wall construction structure as described in any one of claims 1 to 4, characterized in that between adjacent building stones, a binding material is provided that covers the retaining portion and is adjacent to the first slings, or that is pulled into the embankment side or the natural ground side to connect adjacent first slings, or adjacent second slings, or the first sling and the second sling.

7. A stone wall construction structure described in any one of claims 1 to 4, characterized in that the resistance material provided in the embankment is constituted by burying the first sling on the second end side and the second sling on the fourth end side in the embankment for a predetermined length each.

8. A stone wall construction structure as described in any one of claims 1 to 4, characterized in that the resistance material provided in the embankment is composed of a strip-shaped resistance material, a mesh-shaped resistance material, or an anchor resistance material to which either one or both of the second end and the fourth end are connected.

9. The stone wall construction structure described in claim 8, characterized in that the resistance material has connecting materials of a length corresponding to the distance between the second end and the fourth end and the end of the band-shaped resistance material or the mesh-shaped resistance material or the anchor resistance material on the stone-laying side.

10. The stone wall construction structure described in claim 8, characterized in that the resistance material composed of anchor resistance material has a rod-shaped member having a male threaded portion at the end opposite the building stone, and a resistor fixed at any position on the male threaded portion by a nut that screws into the male threaded portion.

11. The stone wall construction structure described in claim 8, characterized in that when the second end and the fourth end of the resistance material composed of anchor resistance material are both connected, the second end and the fourth end are wound in opposite directions to each other.

12. A stone wall construction structure as described in any one of claims 1 to 4, characterized in that the resistance material provided in the natural ground is composed of a core material that is inserted into a hole drilled in the natural ground with one end exposed to the surface of the natural ground, an adhesive that is filled into the hole into which the core material is inserted, a plate that is fixed to the end of the core material and fixed to the surface of the natural ground, and a hook that is exposed on the surface of the natural ground and fixed to the plate, and to which either or both of the second end and the fourth end are connected.

13. A stone wall construction structure described in any one of claims 1 to 4, characterized in that when both the second end and the fourth end of the first sling and the second sling are connected to one of the resistance materials, the angle they form with the resistance material at the connection point is set to 90 degrees or less.

14. The embankment is constructed as a reinforced soil structure in which the front side of the masonry side is covered with a wall construction and embankment reinforcement material is laid in the embankment, or as a reinforced soil structure in which the embankment material is restrained and reinforced, A stone wall construction structure as described in any one of claims 1 to 4, characterized in that the resistance material that provides pull-out resistance to either or both of the second end and the fourth end is fixed to the reinforced soil structure.

15. The ground is reinforced by a reinforcing material having an end portion exposed to the ground surface to prevent loose soil on the surface side, the resistance member providing a pull-out resistance to the second end and the resistance member providing a pull-out resistance to the fourth end are constituted by the reinforcing member; A stone wall construction structure as described in any one of claims 1 to 4, characterized in that either or both of the second end and the fourth end are connected to each of the end portions of the reinforcing material exposed to the ground.

16. A stone wall construction structure as described in any one of claims 1 to 4, characterized in that the tightening force with which the first sling and the second sling obtain the pull-out resistance force and tighten around each of the retaining portions is set to a tightening force that enables the first sling and the second sling to maintain a tight binding state around each of the retaining portions, against the pushing force that causes the stone to escape from the binding force of the first sling and the second sling and be pushed toward the front side of the stone wall.

17. The stone wall construction structure described in claim 16, characterized in that the push-out force is set to a value that takes into account a predetermined safety factor in the push-out force required for the first sling and the second sling to maintain the designed restraint state.

18. A stone wall construction structure as described in any one of claims 1 to 4, characterized in that a resistance member that increases the contact resistance with the first sling or the second sling is fixed around the retaining portion around which the first sling or the second sling is wrapped, so that the stone cannot be tied down around the retaining portion to resist the pushing force that causes the stone to escape the constraints of the first sling and the second sling and be pushed toward the front side of the stone wall.

19. a winding process in which a first end of one end of a first sling provided with a loop portion is positioned on one side of a bracing portion of a masonry, the first sling is passed through a loop portion provided on a third end of one end of a second sling on the other side of the bracing portion opposite the one side, covering a part of the circumference of the bracing portion from the one side, and the second sling is passed through the loop portion of the first end positioned on the one side, covering the remainder of the circumference from the other side; a tightening process in which the second end of the first sling and the fourth end of the second sling are lifted to suspend the masonry in the air, so that the first sling on the terminal side of the first end tightens a part of the periphery of the bracing portion, and the second sling on the terminal side of the third end tightens the remaining part of the periphery; a first fastening step of fastening the loop-shaped portion provided on the third end to the first sling with a first fastening material at a location where the first sling passes through the loop-shaped portion provided on the third end in a state in which the periphery of the bracing portion is fastened by the first sling on the terminal side of the first end and the second sling on the terminal side of the third end, thereby maintaining a state in which the first sling on the terminal side of the first end fastens a portion of the periphery of the bracing portion; a second fastening step of fastening the loop portion provided at the first end to the second sling with a second fastening material at a location where the second sling passes through the loop portion provided at the first end in a state in which the periphery of the stay portion is fastened by the first sling on the terminal side of the first end and the second sling on the terminal side of the third end, thereby maintaining a state in which the second sling on the terminal side of the third end fastens the remaining portion of the periphery; an installation process in which the stone around which the first sling and the second sling are wound and to which the first fastening material and the second fastening material are attached is temporarily lowered and its posture is corrected, and then the stone is lifted up again and installed in a predetermined location; A method for constructing a stone wall comprising:

20. a winding process in which the first sling and the second sling are wound around the bracing portion of the masonry in a state in which a second end of the other end of the first sling is passed through a loop provided at a first end of one end of the first sling while covering the entire circumference of the bracing portion on one side of the bracing portion, and a fourth end of the other end of the second sling is passed through a loop provided at a third end of one end of the second sling while covering the entire circumference of the bracing portion on the other side of the bracing portion opposite the one side; a tightening process in which the second end and the fourth end are lifted to suspend the masonry in the air, so that the first sling on the terminal side of the first end and the second sling on the terminal side of the third end are tightened around the entire circumference of the bracing portion; a first fastening step of fastening the loop-shaped portion provided on the first end to the first sling with a first fastening material at a location where the first sling passes through the loop-shaped portion provided on the first end in a state in which the periphery of the bracing portion is fastened by the first sling on the terminal side of the first end and the second sling on the terminal side of the third end, thereby maintaining a state in which the first sling on the terminal side of the first end fastens the entire periphery of the bracing portion; a second fastening step of fastening the loop-shaped portion provided at the third end to the second sling with a second fastening material at a location where the second sling passes through the loop-shaped portion provided at the third end in a state in which the periphery of the bracing portion is fastened by the first sling on the terminal side of the first end and the second sling on the terminal side of the third end, thereby maintaining a state in which the second sling on the terminal side of the third end fastens the entire periphery of the bracing portion; an installation process in which the stone around which the first sling and the second sling are wound and to which the first fastening material and the second fastening material are attached is temporarily lowered and its posture is corrected, and then the stone is lifted up again and installed in a predetermined location; A method for constructing a stone wall comprising:

21. A reinforced soil structure construction process for constructing a reinforced soil structure of a desired height by stacking the reinforced soil structure in a plurality of layers while exposing the connection parts between the resistance materials fixed to the reinforced soil structure and the front side of any one of the reinforced soil structures according to claim 14; a stone wall construction step of constructing a stone wall of a desired height by piling up a plurality of layers of stone walls having a construction structure of a stone wall using a resistance material provided in the embankment, on a front side of the reinforced soil structure of the desired height, while connecting one or both of the second end portion and the fourth end portion to each of the connecting portions, after the reinforced soil structure of the desired height has been constructed by the reinforced soil structure construction step; A method for constructing a stone wall comprising:

22. After the tightening step, a performance evaluation process for judging whether the tightening force with which the first sling and the second sling obtain the pull-out resistance force and tighten each periphery of the bracing portion has a standard tightening force that can maintain the first sling and the second sling in a binding state in which they bind each periphery of the bracing portion against a pushing force that causes the masonry to escape from the binding of the first sling and the second sling and be pushed toward the front side of the stone wall, The first fastening step and the second fastening step are performed when the fastening force is determined to be equal to the reference fastening force in the performance evaluation step. A method for constructing a stone wall according to claim 19 or 20.

Citation Information

Patent Citations

  • Reinforcement structure of stone walls and stone wall repair methods

    JP7153609B2