Bridge and method of constructing the same

The innovative bridge construction method using precast girder members and prestressed steel materials addresses weight and traffic restriction issues, reducing the burden on lower structures and shortening construction periods while maintaining traffic flow.

JP2024151537APending Publication Date: 2024-10-25PS CONSTRUCTION CO LTD

Patent Information

Application Number
JP2023064963
Authority / Receiving Office
JP · JP
Patent Type
Applications
Current Assignee / Owner
Filing Date
2023-04-12
Publication Date
2024-10-25

AI Technical Summary

Technical Problem

Conventional bridge replacement methods, such as those for RC hollow deck bridges, result in increased weight on lower structures, require traffic restrictions, and have long construction periods due to the sequential removal and installation of precast cross beams and decks, leading to significant social losses.

Method used

A bridge construction method involving precast longitudinal girder members supported by substructure cross beams with prestressed steel materials, allowing for simultaneous installation of decks and reduced weight on lower structures, enabling construction while maintaining existing traffic.

Benefits of technology

The method reduces the burden on lower structures like piers and abutments, shortens construction time, and minimizes social losses by allowing renovation work to proceed with existing traffic in service.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 2024151537000001_ABST
    Figure 2024151537000001_ABST
Patent Text Reader

Abstract

To provide a bridge and its construction method capable of reducing a burden on a lower structure such as a bridge pier and shortening a construction period.SOLUTION: A bridge 1 comprises a substructure transverse beam 4 supported on the upper parts of each lower structure 3a, 3a in the direction perpendicular to the bridge-axis, vertical girder parts LB, LB composed of one or a plurality of hollow rectangular parallelepiped precast vertical girder members 6, 6 directed in the bridge-axis direction supported on the substructure transverse beam 4 through bearing members 5, and precast slab 7 installed between vertical girder parts LB, LB adjacent to each other at an interval in the direction perpendicular to the bridge axis, and prestress is introduced by a post-tensioning system over the whole width in the direction perpendicular to the bridge axis of a superstructure 8 by PC steel materials 9, 9... inserted in the direction perpendicular to the bridge axis of the superstructure 8 comprising the precast vertical girder members 6, 6 and the precast slab 7.SELECTED DRAWING: Figure 3
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to a bridge, including an elevated road or the like, to be replaced or newly constructed, and a method for constructing the same. [Background technology]

[0002] In recent years, concrete bridges have been facing problems not only with age, but also with the worsening environment due to larger vehicles and the effects of spraying antifreeze, leading to large-scale renovation work being carried out to replace bridges.

[0003] In particular, RC hollow deck bridges have gaps inside the deck, which is supported by substructures such as piers, for the purpose of reducing dead loads, etc.; therefore, in addition to being susceptible to salt and frost damage from antifreeze, the existence of these gaps makes it difficult to ensure sufficient cover, making the upper surface prone to deformation due to heavy traffic and seepage water; if deformation occurs in the upper surface, the entire deck must be replaced.

[0004] In addition, RC hollow deck bridges are widely used as the standard structure for viaducts, and it is expected that many renovation works will be required in the future.

[0005] Traditionally, the most common method for replacing bridges such as RC hollow deck bridges has been to remove the existing superstructure using shoring or girders, and then build a new hollow deck or steel girder bridge in the removed area.

[0006] Another construction method that has been developed is to remove the existing superstructure, then install precast cross beams perpendicular to the bridge axis on the substructure such as piers or abutments, and then lay multiple hollow rectangular precast vertical beam members on top of the precast cross beams in a direction perpendicular to the bridge axis to construct a hollow deck (see, for example, Patent Document 1).

[0007] Furthermore, when replacing this type of bridge, traffic restrictions are imposed due to the removal of the existing superstructure, such as the deck, so there is a demand for a construction method that enables replacement in a short period of time in order to minimize the social losses caused by traffic restrictions. [Prior art documents] [Patent documents]

[0008] [Patent Document 1] JP 2009-256873 A Summary of the Invention [Problem to be solved by the invention]

[0009] However, in the conventional technology such as that shown in Patent Document 1 mentioned above, multiple precast vertical beam members are laid in a line perpendicular to the bridge axis on precast cross beams installed on substructures such as piers or abutments, which increases the weight of the entire superstructure and raises concerns about insufficient strength of the substructure supporting it.

[0010] Furthermore, with conventional technology, precast cross beams could not be installed until the existing superstructure had been removed, meaning that traffic restrictions had to be implemented throughout the entire period from the removal of the existing superstructure through the installation of the precast cross beams to the formation of the new deck, resulting in significant social losses due to the traffic restrictions.

[0011] In view of the above-mentioned problems, the present invention has been made with the objective of providing a bridge and a method for constructing the same that can reduce the burden on substructures such as piers and shorten the construction period. [Means for solving the problem]

[0012] The feature of the invention described in claim 1 for solving the above-mentioned conventional problems is a bridge in which a superstructure is erected between substructures erected at intervals in the bridge axis direction, the bridge comprises substructure cross beams supported on the upper parts of the substructures in the direction perpendicular to the bridge axis, vertical beam sections made of one or more hollow rectangular parallelepiped precast vertical beam members oriented in the bridge axis direction and supported on the substructure cross beams via bearing members, and precast slabs erected between the vertical beam sections adjacent to each other at intervals in the direction perpendicular to the bridge axis, The cross beam section is formed by filling the area surrounded by the adjacent vertical beam sections and the precast plate with concrete at a distance above the cross beam, and prestress is introduced by the post-tensioning method across the entire width perpendicular to the bridge axis of the structure consisting of the vertical beam sections, the precast plate and the cross beam section, by the PC steel members inserted across the entire width perpendicular to the bridge axis of the deck section consisting of the precast vertical beam members and the precast plate, and the PC steel members inserted across the entire width perpendicular to the bridge axis of the cross beam section.

[0013] The invention described in claim 2 is characterized in that, in addition to the configuration of claim 1, the substructure cross beam is supported at a position a predetermined height lower than the upper end of the substructure.

[0014] The feature of the invention described in claim 3 is that, in addition to the configuration of claim 1 or 2, prestress is introduced to the precast slab by a pretensioning method using PC steel members oriented in the bridge axis direction.

[0015] The invention described in claim 4 is characterized in that in a method of constructing a bridge in which a superstructure is erected between substructures erected at intervals in the bridge axis direction, a substructure cross beam oriented perpendicular to the bridge axis is supported on the upper part of each substructure, and one or more hollow rectangular parallelepiped precast vertical beam members oriented in the bridge axis direction are supported on the substructure cross beams via bearing members to form vertical beam sections, and then a precast plate is erected between the vertical beam sections adjacent to each other at intervals in the bridge axis direction, and a precast plate is supported at intervals on the substructure cross beams to form vertical beam sections. Concrete is poured into the area surrounded by adjacent vertical beam sections and the precast plate to form a cross beam section, and PC steel is inserted across the entire width of the deck section consisting of the precast vertical beam members and the precast plate in the direction perpendicular to the bridge axis, and PC steel is inserted across the entire width of the cross beam section in the direction perpendicular to the bridge axis, and prestress is introduced by the post-tensioning method using the PC steel across the entire width of the structure consisting of the vertical beam sections, the precast plate and the cross beam section in the direction perpendicular to the bridge axis.

[0016] The invention described in claim 5 is characterized in that in a bridge construction method for replacing an existing superstructure erected between substructures erected at intervals in the bridge axis direction with a new superstructure, a substructure cross beam facing perpendicular to the bridge axis is constructed in advance at a position a predetermined distance lower than the upper end of the substructure supporting the existing superstructure, and after removing the existing superstructure, one or more hollow rectangular parallelepiped precast vertical beam members facing in the bridge axis direction are supported via bearing members on both sides of the upper end of the substructure of the substructure to form a vertical beam portion, and then, a vertical beam portion is formed by supporting the upper end of the substructure of the substructure on both sides of the upper end of the substructure via bearing members, and then, a vertical beam portion is formed by supporting the upper end of the substructure of the substructure on both sides of the upper end of the substructure of the substructure at intervals. A precast plate is erected between adjacent vertical beam sections at a distance from each other, concrete is poured into the area on the substructure cross beam surrounded by adjacent vertical beam sections and the precast plate to form a cross beam section, and PC steel is inserted across the entire width of the deck section consisting of the precast vertical beam member and the precast plate in the direction perpendicular to the bridge axis, and PC steel is inserted across the entire width of the cross beam section in the direction perpendicular to the bridge axis, and prestress is introduced by the post-tensioning method using the PC steel across the entire width of the structure consisting of the vertical beam sections, the precast plate and the cross beam section in the direction perpendicular to the bridge axis.

[0017] Furthermore, the feature of the invention described in claim 6 is, in addition to the configuration of claim 4 or 5, that both ends perpendicular to the bridge axis of the girder support plate material installed on the support member are supported by the substructure cross beam via temporary support members, and a plurality of the precast vertical beam members are installed in a line perpendicular to the bridge axis on the girder support plate material, and prestress is introduced by the post-tensioning method using the PC steel across the entire width perpendicular to the bridge axis of the structure consisting of the vertical beam portion, the precast plate and the cross beam portion, and then the temporary support members are removed.

[0018] The feature of the invention described in claim 7 is that, in addition to the configuration of claim 4 or 5, prestress is introduced to the precast slab by a pretensioning method using PC steel members oriented in the bridge axis direction. Effect of the Invention

[0019] By providing the bridge according to the present invention with the configuration recited in claim 1, the weight of the entire superstructure can be reduced, and the burden on the substructures such as piers and abutments can be reduced.

[0020] In addition, in the present invention, by providing the configuration described in claim 2, the position where the precast vertical beam members are supported is lower than the upper end of the substructure, and the girder height of the precast vertical beam members can be increased accordingly. In addition, the renovation work can be started while the existing superstructure remains in service, shortening the construction period and reducing social losses due to traffic restrictions.

[0021] Furthermore, in the present invention, by providing the configuration described in claim 3, the strength of the precast deck installed between the precast stringer members can be increased, and a high-strength superstructure can be constructed.

[0022] By providing the bridge construction method according to the present invention with the configuration described in claim 4, it is possible to reduce the weight of the entire superstructure and reduce the burden on the substructure such as piers and abutments.

[0023] In addition, in this invention, by adopting the configuration described in claim 5, it is possible to start renovation work while keeping the existing superstructure in service, thereby shortening the construction period and reducing social losses due to traffic restrictions.

[0024] Furthermore, in the present invention, by providing the configuration recited in claim 6, a plurality of precast stringer members can be supported by one support member.

[0025] Furthermore, in the present invention, by providing the configuration described in claim 7, the strength of the precast deck installed between the precast vertical beam members can be increased, and a high-strength superstructure can be constructed. [Brief description of the drawings]

[0026] [Figure 1] FIG. 1 is a side view showing an example of a bridge according to the present invention. [Diagram 2] FIG. 2 is a cross-sectional view taken along line AA in FIG. [Diagram 3] An enlarged cross-sectional view taken along line AA showing the structural portion supporting the above-mentioned superstructure. [Figure 4] An enlarged cross-sectional view along line BB showing the structural portion supporting the above-mentioned superstructure. [Diagram 5] 1A is a plan view showing the end of the precast vertical beam member of the same, FIG. 1B is a side view of the same end, and FIG. 1C is a cross-sectional view taken along line CC of the same. [Figure 6] 1A is a plan view of the precast slab shown in FIG. 1, (b) is a side view of the same, and (c) is a cross-sectional view of the same. [Figure 7] FIG. 2 is a plan view showing the joint between the precast slabs. [Figure 8] FIG. 1 is an enlarged cross-sectional view showing the steps of the bridge construction method according to the present invention, in which (a) shows the state after the existing superstructure has been installed, (b) shows the state after the substructure cross beam has been constructed, and (c) shows the state after the support member has been installed. [Figure 9](d) is a diagram showing the precast vertical beam members after installation, (e) is a diagram showing the precast plate after it has been erected, and (f) is a diagram showing the area surrounded by the two precast vertical beam members and the precast plate on the substructure cross beam after concrete has been poured. [Figure 10] (g) shows the state after prestressing has been applied across the entire width of the superstructure, and (h) shows the completed bridge. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0027] Next, an embodiment of a bridge and a method for constructing the bridge according to the present invention will be described based on the examples shown in Figures 1 to 10. In the figures, reference numeral 1 denotes a bridge, and reference numeral 2 denotes the ground.

[0028] The bridge 1 comprises a substructure 3 such as piers erected at intervals in the bridge axis direction, a substructure cross beam 4 oriented perpendicular to the bridge axis and supported on the upper part of the substructure 3, support members 5 arranged at intervals in the direction perpendicular to the bridge axis on the substructure cross beam 4, vertical beam parts LB, LB consisting of one or more precast vertical beam members 6, 6 installed via each support member 5, and a precast slab 7 erected between adjacent vertical beam parts LB, LB at an interval in the direction perpendicular to the bridge axis. The area surrounded by the precast slab 7 is filled with concrete 23 to form the cross beam section WB, and prestress is introduced by the post-tensioning method across the entire width of the structure 8 (hereinafter referred to as the superstructure 8) consisting of the vertical beam sections LB, LB, precast slab 7 and cross beam section WB, in the direction perpendicular to the bridge axis, through the PC steel members 9, 9... inserted perpendicular to the bridge axis into the superstructure 8 (deck section) consisting of the precast vertical beam members 6, 6 and the precast slab 7, and through the PC steel members 9, 9... inserted across the entire width of the cross beam section WB in the direction perpendicular to the bridge axis.

[0029] Here, the substructure 3 refers to a structure erected on the ground 2 and supporting the superstructure 8, and includes the abutments on which both ends of the bridge 1 are supported, the piers located between the abutments and supporting the underside of the superstructure 8, and the multiple legs 3a, 3a and branched parts that constitute the piers.

[0030] As shown in Figures 1 and 2, the pier 3 has multiple (in this embodiment, a pair of) legs 3a, 3a supported by a footing 3b at intervals perpendicular to the bridge axis, and a substructure cross beam 4 is supported across both legs 3a, 3a.

[0031] The substructure cross beam 4 is formed in a rectangular parallelepiped shape of reinforced concrete or prestressed concrete construction and is supported by each of the legs 3a, 3a.

[0032] This substructure cross beam 4 has a length approximately the same as the width perpendicular to the bridge axis of the bridge 1, and has a width sufficient to allow the installation of one or more precast vertical beam members 6, 6 supported by the legs 3a, 3a and installed at least on both outer sides of the legs 3a, 3a and between the legs 3a, 3a.

[0033] The support member 5 is, for example, a laminated rubber bearing in which rubber material and steel plates are alternately laminated, and its lower end is fixed to the upper surface of the substructure cross beam 4 by bolting or the like, and a girder support plate material 10 made of a steel plate or the like is fixed to its upper end.

[0034] The girder support plate material 10 is formed into a rectangular plate having a width sufficient to support multiple precast vertical beam members 6,6 (a pair in this embodiment), i.e., a width approximately the same as or greater than the total width of the multiple precast vertical beam members 6,6 arranged perpendicular to the bridge axis, and a thickness sufficient to ensure sufficient rigidity to support the superstructure 8 to be constructed.

[0035] In addition, although not specifically shown, plate-shaped fixing plates are protruding from the girder support plate material 10 at intervals in a direction perpendicular to the bridge axis, and the precast vertical beam members 6, 6 can be fixed to the fixing plates by bolting or the like.

[0036] As shown in Figure 5, the precast vertical beam members 6, 6 have solid partition walls 6b, 6b at both longitudinal ends and, if necessary, in the middle, with a hollow section 6a formed between the partition walls 6b, 6b, forming a hollow rectangular prism of reinforced concrete construction.

[0037] In addition, prestress is introduced into the precast vertical beam members 6, 6 by a pretensioning method using a plurality of PC steel members (not shown) embedded in the longitudinal direction.

[0038] These precast vertical beam members 6, 6 are formed in accordance with a standard prestressed concrete bridge girder for slabs (JIS A 5373); however, by supporting the substructure cross beam 4 at a position a specified height h lower than the upper ends of the legs 3a, 3a which form the substructure 3, when the deck is formed at the same height, it can be formed to be higher than a standard prestressed concrete bridge girder for slabs, thereby increasing the load-bearing capacity.

[0039] In addition, the precast vertical beam members 6, 6 are long enough to be installed across multiple lower structures 3 that are erected at intervals in the bridge axis direction, and both ends and one or more intermediate points are supported by the lower structures 3 via support members 5.

[0040] In addition, the precast vertical beam members 6, 6 have precast plate support portions 12 that extend continuously in the longitudinal direction and protrude integrally from the upper part of the side surface of the precast plate 7 side of the precast vertical beam members 6, 6 that constitute each vertical beam portion LB, LB, and the side edge portions of the precast plate 7 are supported by the precast plate support portions 12 so that the precast plate 7 is erected between each vertical beam portion LB, LB.

[0041] The precast slab support portion 12 protrudes from the upper surfaces of the precast vertical beam members 6, 6 at a position lower by the thickness of the side portion of the precast slab 7, so that when the precast slab 7 is erected between the precast vertical beam members 6, 6, the upper surface of the precast slab 7 and the upper surface of the precast beam member are at the same height.

[0042] Furthermore, the precast vertical beam members 6, 6 have a number of PC insertion holes 13, 13... formed at the top, spaced apart in the longitudinal direction and penetrating perpendicular to the bridge axis, which are designed to connect with the PC insertion holes 14, 14... formed in the precast plate 7 when the precast plate 7 is erected between the two precast vertical beam members 6, 6.

[0043] In addition, in each partition portion 6b, 6b... of the precast vertical beam members 6, 6, i.e., the portion supported on the substructure cross beam 4 via the support member 5 of the precast vertical beam member 6, a plurality of PC insertion holes 15, 15... are formed at intervals in the vertical direction.

[0044] As shown in FIG. 6, the precast slab 7 is made of concrete and formed in a flat plate shape, with supported convex portions 7a, 7a that are supported by the precast slab receiving portion 12 and protrude integrally from the underside of both sides.

[0045] As shown in Figure 6(c), multiple PC steel members 17, 17... are embedded in the precast slab 7 in a tensioned state in the bridge axis direction, and prestress is introduced in the bridge axis direction by the pretensioning method.

[0046] In addition, the precast slab 7 has a number of PC insertion holes 14, 14... that penetrate perpendicular to the bridge axis and are formed at intervals in the bridge axis direction and are continuous with the PC insertion holes 13, 13... of the precast vertical beam members 6, 6. The PC steel members 9, 9... are inserted across both PC insertion holes 13, 14 over the entire width of the part (deck section) formed by the precast vertical beam members 6, 6 and the precast slab 7 in the direction perpendicular to the bridge axis.

[0047] Furthermore, at both ends of the precast slab 7 in the bridge axis direction, joint steel bars 16, 16 protrude from the end faces, and as shown in Figure 7, lap joints are formed between adjacent precast slabs 7 in the direction perpendicular to the bridge axis, and concrete is poured between the end faces to connect adjacent precast slabs 7 in the direction perpendicular to the bridge axis.

[0048] Next, a method for constructing the bridge 1 described above will be explained with reference to Figures 8 and 9. In this embodiment, an example will be described in which an existing superstructure 20 erected between substructures 3 erected at intervals in the bridge axis direction is replaced with a new superstructure 8, and the same components as those in the above embodiment will be described with the same reference numerals. In the drawings, reference numeral 2 denotes the ground, and reference numeral 20 denotes the existing superstructure (hereinafter referred to as the existing superstructure 20).

[0049] The existing bridge comprises a number of substructures 3 erected at intervals in the direction of the bridge axis, and an existing superstructure 20 erected between the multiple substructures 3, and the existing superstructure 20 is supported by each substructure 3 via existing supports 21, 21 installed on the substructures 3 such as piers.

[0050] The existing superstructure 20 is, for example, as shown in FIG. 8( a ), configured by a hollow deck member having a hollow portion therein, and the hollow deck member is installed across a plurality of substructures 3 .

[0051] To replace the existing superstructure 20 of this bridge and construct a new bridge 1, first, while leaving the existing superstructure 20 in use, a substructure cross beam 4 is constructed perpendicular to the bridge axis at a position a predetermined height h lower than the upper end of the substructure 3 that supports the existing superstructure 20, as shown in Figure 8(b).

[0052] Specifically, although not shown, scaffolding is installed around the substructure 3 such as a pier, and a formwork is installed according to the shape of the substructure cross beam 4, and reinforcing bars are placed inside the formwork. Note that it is preferable that the reinforcing bars are integrated with the substructure 3.

[0053] Then, concrete is poured into the formwork by casting in place, and the concrete is cured and hardened to construct the substructure cross beam 4.

[0054] In this case, by constructing the substructure cross beam 4 at a position a specified height h lower than the upper end of the lower structure 3, the existing superstructure 20 can be used during the period required to construct the substructure cross beam 4, i.e., during the series of tasks required for setting up scaffolding, installing formwork, arranging rebar, pouring concrete, curing and hardening the concrete, and stripping the form, and social losses such as traffic restrictions can be minimized.

[0055] Next, once the substructure cross beam 4 has been constructed, the existing superstructure 20 is taken out of service, as shown in Figure 8(c), and the existing superstructure 20 is divided into specified intervals, and then the existing superstructure 20 is removed for each divided section using girders or a crane (not shown).

[0056] Next, as shown in Figure 9 (d), support members 5 are attached to both sides of the substructure cross beam 4, sandwiching the legs 3a, 3a of the lower structure 3, i.e., to the outside of both legs 3a, 3a on the substructure cross beam 4 and between the legs 3a, 3a, and a girder support plate material 10 is fixed to the upper end of the support members 5. Both ends of the girder support plate material 10 perpendicular to the bridge axis are supported by the substructure cross beam 4 via temporary support members 22, 22.

[0057] Then, two precast vertical beam members 6,6 are placed on the girder support plate material 10 in a direction perpendicular to the bridge axis to form vertical beam sections LB,LB, and each precast vertical beam member 6,6 is fixed to the girder support plate material 10 at a predetermined position.

[0058] Of the precast vertical beam members 6, 6 constituting the vertical beam portions LB, LB, the one arranged on the precast slab 7 side has a precast slab receiving portion 12 provided on the upper part of the side facing the precast slab 7.

[0059] In this state, the vertical beam sections LB, LB are not supported by each other, but both ends of the girder support plate material 10 perpendicular to the bridge axis are supported by the substructure cross beam 4 via temporary support members 22, 22, so that the precast vertical beam members 6, 6 are supported by each substructure 3 in a stably state.

[0060] Next, as shown in FIG. 9(e), precast slabs 7 are erected between adjacent vertical beam sections LB, LB spaced apart in the direction perpendicular to the bridge axis, and the multiple precast slabs 7 are laid in the bridge axis direction.

[0061] In this case, as shown in Figure 7, between the precast slabs 7 connected in the bridge axis direction, the joint steel bars 16, 16 protruding from the end faces of each precast slab 7 are arranged in an overlapping state to form lap joints, and mortar or concrete is poured between the precast slabs 7 to connect them.

[0062] In addition, although not specifically shown, the PC insertion holes 13, 13... of the precast vertical beam members 6, 6 and the precast slabs 7, which are continuous in the direction perpendicular to the bridge axis, are connected by sheaths.

[0063] Next, as shown in FIG. 9(f), a formwork is installed to close the area surrounded by the vertical beam sections LB, LB (precast vertical beam members 6, 6) on the substructure cross beam 4 and the precast slab 7, and reinforcing bars and sheaths are placed within the formwork as necessary. After that, concrete 23 is poured in place to form the horizontal beam section WB.

[0064] In addition, gaps between the adjacent precast vertical beam members 6, 6 and gaps between the precast vertical beam members 6, 6 and the precast slabs 7 are filled with a filler such as mortar.

[0065] Then, as shown in Figure 10(g), PC steel members 9, 9... are inserted across the entire width of the deck section consisting of the precast vertical beam members 6, 6 and the precast slab 7, and PC steel members 9, 9... are inserted across the entire width of the cross beam section WB, in the direction perpendicular to the bridge axis. With these PC steel members 9, 9... under tension, both ends are fixed to both sides of the structure (superstructure 8) consisting of the vertical beam sections LB, LB, precast slab 7 and cross beam section WB, and prestress is introduced using the post-tensioning method across the entire width of the superstructure 8, in the direction perpendicular to the bridge axis.

[0066] After the prestress is introduced, as shown in FIG. 10(h), the temporary support members 22, 22 are removed and the superstructure 8 is supported only by the support members 5, and side walls 24, 24, etc. are installed as necessary, completing the construction of the bridge 1.

[0067] In the above embodiment, the case where the existing superstructure 20 is replaced with a new superstructure 8 has been described, but after constructing the lower structure 3, the substructure cross beam 4 can be constructed, and then a new bridge 1 can be constructed by carrying out the work in the same manner as shown in Figures 8(c) to 10(h).

[0068] In this case, the substructure cross beam 4 does not necessarily have to be supported at a position a specified height h lower than the upper end of the substructure 3 (legs 3a, 3a). It may be constructed so that it straddles the upper end of the substructure 3 and that the upper surface of the substructure 3 and the upper surface of the substructure cross beam 4 are on the same plane, or the substructure cross beam 4 may be formed in a state where it is erected on the substructure 3. [Explanation of symbols]

[0069] 1 Bridges 2 Ground 3. Undercarriage 4 Substructure cross beam 5 Supporting members 6 Precast stringer members 7 Precast Plate 8 Superstructure 9 PC steel material 10-digit backing plate material 11 Fixed plate 12 Precast plate support 13~15 PC insertion hole 16 Reinforcement bars for joints 17 PC steel material 20 Existing superstructure 21 Existing support 22 Temporary support members 23 Concrete 24 Side wall LB Stringer WB cross beam section

Claims

1. In a bridge in which a superstructure is erected between substructures spaced apart in the bridge axis direction, A substructure cross beam supported on the upper part of each of the substructures in a direction perpendicular to the bridge axis; A vertical beam portion made of one or more hollow rectangular parallelepiped precast vertical beam members oriented in the bridge axis direction and supported on the substructure cross beam via bearing members; A precast plate is installed between adjacent vertical beam portions spaced apart in a direction perpendicular to the bridge axis, A cross beam portion is formed by filling a portion surrounded by the adjacent vertical beam portions and the precast plate with concrete on the substructure cross beam, A bridge characterized in that prestress is introduced by the post-tensioning method across the entire width perpendicular to the bridge axis of the structure consisting of the vertical beam members, the precast plate and the horizontal beam members, by PC steel members inserted across the entire width perpendicular to the bridge axis of the deck section consisting of the precast vertical beam members and the precast plate, and PC steel members inserted across the entire width perpendicular to the bridge axis of the horizontal beam members.

2. The bridge according to claim 1 , wherein the substructure cross beam is supported at a position a predetermined height lower than an upper end of the substructure.

3. 3. The bridge according to claim 1 or 2, wherein prestress is applied to the precast slab by a pretensioning method using PC steel members oriented in the bridge axis direction.

4. A method for constructing a bridge in which a superstructure is erected between substructures spaced apart in the bridge axis direction, comprising: A substructure cross beam perpendicular to the bridge axis is supported on the upper part of each of the substructures, One or more hollow rectangular parallelepiped precast vertical beam members oriented in the bridge axis direction are supported on the substructure cross beam via bearing members to form a vertical beam portion; Then, a precast plate is erected between adjacent vertical beams spaced apart in the direction perpendicular to the bridge axis, Pour concrete into a portion surrounded by the adjacent vertical beam portions and the precast slabs at an interval on the substructure horizontal beam to form a horizontal beam portion; The PC steel is inserted along the entire width of the deck section consisting of the precast vertical beam member and the precast slab in the direction perpendicular to the bridge axis, and the PC steel is inserted along the entire width of the cross beam section in the direction perpendicular to the bridge axis, A bridge construction method characterized in that prestress is introduced by the post-tensioning method using the PC steel material across the entire width perpendicular to the bridge axis of the structure consisting of the vertical beam section, the precast plate, and the horizontal beam section.

5. A bridge construction method in which an existing superstructure is replaced with a new superstructure between substructures erected at intervals in the bridge axis direction, A substructure cross beam is constructed in advance at a position a predetermined distance lower than the upper end of the substructure supporting the existing superstructure, and is oriented perpendicular to the bridge axis. After removing the existing superstructure, A vertical beam portion is formed by supporting one or more hollow rectangular parallelepiped precast vertical beam members oriented in the bridge axis direction via bearing members on both sides of the upper end portion of the lower structure of the substructure cross beam, Thereafter, a precast plate is erected between the adjacent vertical beam portions with a gap therebetween, sandwiching the upper end portion of the lower structure therebetween; Pour concrete into a portion surrounded by the adjacent vertical beam portions and the precast slabs at an interval on the substructure horizontal beam to form a horizontal beam portion; The PC steel is inserted along the entire width of the deck section consisting of the precast vertical beam member and the precast slab in the direction perpendicular to the bridge axis, and the PC steel is inserted along the entire width of the cross beam section in the direction perpendicular to the bridge axis, A bridge construction method characterized in that prestress is introduced by the post-tensioning method using the PC steel material across the entire width perpendicular to the bridge axis of the structure consisting of the vertical beam section, the precast plate, and the horizontal beam section.

6. With both ends of the girder support plate material installed on the support member in the direction perpendicular to the bridge axis supported by the substructure cross beam via temporary support members, a plurality of the precast vertical beam members are installed on the girder support plate material in a line perpendicular to the bridge axis; 6. A bridge construction method as described in claim 4 or 5, wherein prestress is introduced by the post-tensioning method using the PC steel material across the entire width perpendicular to the bridge axis of the structure consisting of the vertical beam section, the precast plate and the horizontal beam section, and then the temporary support member is removed.

7. 6. The method for constructing a bridge according to claim 4 or 5, wherein prestress is introduced into the precast slab by a pretensioning method using PC steel members oriented in the bridge axis direction.

Citation Information

Patent Citations

  • Bridge equipped with precast cross girder and precast stringer, and its construction method

    JP2009256873A

Cited By

  • Prestressed cast-in-place box girder reinforcing method based on steel-concrete combined system

    CN119824821A