The painting management system addresses inappropriate analysis frequencies by timing analysis based on workpiece volume, ensuring efficient resource use and maintaining painting quality through adaptive adjustments.
Patent Information
- Application Number
- JP2023067266
- Authority / Receiving Office
- JP · JP
- Patent Type
- Applications
- Current Assignee / Owner
- Filing Date
- 2023-04-17
- Publication Date
- 2024-10-29
AI Technical Summary
Existing chemical solution management systems for painting processes face issues with inappropriate analysis frequencies, leading to excessive consumption of resources or inadequate maintenance of pretreatment and painting quality due to insufficient analysis.
A painting management system that analyzes pretreatment liquid and paint based on the cumulative surface area of workpieces, generating timely analysis instructions and adjusting coating conditions and replenishment amounts to maintain quality.
Ensures appropriate analysis timing and resource efficiency by adjusting analysis and replenishment based on workpiece volume, maintaining pretreatment and painting quality while reducing unnecessary consumption.
Smart Images

Figure 2024153393000001_ABST
Abstract
Description
[Technical field]
[0001] The present invention relates to a coating management system and a coating management method for managing a coating facility having a pretreatment and coating process. [Background technology]
[0002] In painting, it is common to apply pretreatment, such as removing impurities such as oil and rust from the workpiece before painting, and applying a chemical coating to enhance corrosion resistance. In these pretreatments and paintings, the workpiece is immersed in a tank filled with a pretreatment liquid or paint, or the pretreatment liquid or paint is directly applied to the workpiece.
[0003] The quality of the pre-treatment liquid and paint in each tank is maintained by controlling the appropriate concentration and mixture, but in order to do so, it is necessary to select the pre-treatment liquid chemicals and paint to be replenished and calculate the replenishment amount based on the concentration determined by sampling and analyzing the pre-treatment liquid and paint.However, this method requires a certain level of experience for tasks such as sampling, analysis, and calculation of replenishment amounts, and the work takes time.
[0004] To address this issue, for example, the chemical liquid management system described in Patent Document 1 is configured to automatically manage a series of processes such as sampling, analysis, calculation, replenishment, and valve opening adjustment of the pretreatment liquid by outputting analysis instructions at pre-registered times or by manual operation. [Prior art documents] [Patent documents]
[0005] [Patent Document 1] JP 2019-125034 A Summary of the Invention [Problem to be solved by the invention]
[0006] The chemical liquid management system described in Patent Document 1 issues operation commands at any timing, so there is a possibility that the analysis frequency may be excessive or insufficient. If the analysis frequency is less than appropriate, the amount of pretreatment liquid adhering to the workpiece in the pretreatment consisting of multiple steps that is carried over to the next process increases, and impurities such as oil and rust removed from the workpiece remain in the pretreatment liquid, so that the detection of changes in the liquid state (contamination) of the pretreatment liquid and paint is delayed, making it impossible to properly maintain the pretreatment and coating processing functions. On the other hand, if the analysis frequency is more than appropriate, the liquid state of the pretreatment liquid and paint has not yet changed, and even though it is possible to reduce the analysis frequency, this leads to excessive consumption of analytical chemicals, water, electricity, etc.
[0007] The present invention has been made in consideration of the above circumstances, and an object of the present invention is to enable analysis of pretreatment liquid and paint in painting equipment to be carried out at an appropriate time. [Means for solving the problem]
[0008] In order to solve the above problems, a painting management system of one embodiment of the present invention includes a design information storage unit that stores at least information on the name, type, surface area, and plate thickness of the workpiece as design information for each workpiece input into the painting equipment; a processing results storage unit that stores processing results including at least information on the input date and time, input order, and surface area of multiple workpieces input into the painting equipment; an analysis instruction generation unit that generates an analysis instruction for a pretreatment liquid and a paint when a cumulative value of the surface areas of the multiple workpieces stored in the processing results storage unit exceeds a predetermined threshold value; and a display processing unit that displays on a display unit that an analysis instruction has been generated by the analysis instruction generation unit. Effect of the Invention
[0009] According to at least one aspect of the present invention, an instruction to analyze the pretreatment liquid and paint is given based on the cumulative value of the surface area of the workpieces input into the painting equipment, so that the analysis of the pretreatment liquid and paint can be performed at an appropriate timing depending on the processing amount of the workpieces. Problems, configurations and effects other than those described above will become apparent from the following description of the embodiments. [Brief description of the drawings]
[0010] [Figure 1] 1 is a diagram showing an example of the configuration of a paint management system according to an embodiment of the present invention; [Diagram 2] FIG. 2 is a diagram illustrating an example of a structure of drawing data. [Diagram 3] 11 is a diagram showing an example of a data structure of machining performance data generated by a display program according to an embodiment of the present invention; FIG. [Figure 4] 13 is a diagram showing an example of a data structure of total processing amount data generated by a display program according to an embodiment of the present invention; FIG. [Diagram 5] 13A and 13B are diagrams showing examples of a screen created based on machining record data and total machining amount data in a display program according to an embodiment of the present invention. [Figure 6] FIG. 13 is a diagram showing an example of a screen created based on update history data in a display program according to an embodiment of the present invention. [Figure 7] FIG. 13 is a diagram showing an example of quality control reference values in one embodiment of the present invention. [Figure 8] FIG. 2 is a diagram showing a correlation between coating quality (e.g., film thickness) and applied voltage value according to one embodiment of the present invention, and an example of the applied voltage value. [Figure 9] FIG. 2 is a diagram showing an example of the correlation between the replenishment amount of each paint and the gloss and color, as well as the coating film quality (achieved quality value) before and after replenishment according to one embodiment of the present invention. [Figure 10] FIG. 11 is a diagram showing an example of the relationship between the cumulative value of the surface area of a workpiece and the amount of replenishment according to an embodiment of the present invention. [Figure 11] 1 is a flowchart (1) showing an example of a procedure of a painting management process by a painting management system according to an embodiment of the present invention. [Figure 12] 11 is a flowchart (2) showing an example of a procedure of a painting management process by the painting management system according to one embodiment of the present invention. [Figure 13]1 is a diagram showing an example of a procedure for generating and displaying an update history by a paint management system according to an embodiment of the present invention; DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0011] Hereinafter, examples of modes for carrying out the present invention (hereinafter referred to as "embodiments") will be described with reference to the accompanying drawings. In this specification and the accompanying drawings, identical components or components having substantially the same functions are designated by the same reference numerals, and duplicated descriptions will be omitted.
[0012] <First embodiment> First, the configuration of a paint management system according to an embodiment of the present invention will be described with reference to FIG.
[0013] [Paint management system configuration] Fig. 1 is a diagram showing an example of the configuration of a paint management system according to one embodiment of the present invention. As shown in Fig. 1, a paint management system 100 according to this embodiment is a system that is connected to a paint facility 10 and manages and controls the paint facility 10.
[0014] The coating equipment 10 is an electrocoating device that performs pretreatment on the workpieces inputted therein, and then performs a coating process and a drying process. In the pretreatment and coating processes, the workpieces are transported while placed on a mounting table (a so-called platen), and the workpieces, together with the mounting table, are immersed in a tank that stores a pretreatment liquid and paint. In general, the pretreatment process involves a number of processes, such as degreasing, rust removal, coating conversion, and water washing.
[0015] The main functions of the coating management system 100 include a storage unit 20 and a calculation unit 30. The storage unit 20 includes a drawing storage unit 21, a processing record storage unit 22, and a quality record storage unit 23. The calculation unit 30 includes a display program 31, an analysis instruction generation unit 32, a coating condition generation unit 33, and a supply instruction generation unit 34.
[0016] The drawing storage unit 21 (an example of a design information storage unit) is an area for storing in advance drawing data, which is design information of all workpieces. The drawing storage unit 21 also stores information (used for processing results) read by an RFID (Radio Frequency Identifier) reader 4. The structure of data included in the drawing data will be described below with reference to FIG. 2.
[0017] [Drawing Data Property Data] 2 is a diagram showing an example of a data structure when the drawing data is three-dimensional CAD (Computer-Aided Design) data. The three-dimensional CAD data includes information about the workpiece, such as the name, type, surface area, and thickness of the workpiece, as in property data 200. In FIG. 2, as an example, a workpiece named "Workpiece (20)" is a "plate" type, has a surface area of "100 cm 2 " and the plate thickness is "1.0mm".
[0018] The machining record storage unit 22 stores data related to the machining record of the workpiece. The machining record storage unit 22 receives and stores the machining record data 300 shown in Fig. 3 and the total machining number data 400 shown in Fig. 4, which are extracted from the 3D CAD data stored in the drawing storage unit 21 by a program in the display program 31.
[0019] [Processing performance data] Fig. 3 is a diagram showing an example of the data structure of the machining performance data 300 generated by the display program 31. The machining performance data 300 includes information on property data (in this example, the name, type, and surface area of the workpiece) of each workpiece in the drawing data shown in Fig. 2, the input date and time, and the input order.
[0020] In Figure 3, the processing results for the input date and time of "April 1, 9:11:34" in a certain year are "Workpiece (20)", type "Plate", surface area "100 cm 2" is shown as an example. The input sequence of this workpiece "Workpiece (20)" on April 1st is "1". Also, as a processing record at the input date and time "April 1, 10:27:05" in the same year, an example is shown in which the workpiece name is "empty" and the type and surface area are "-", indicating no processing record. "Empty" refers to an empty state, which will be described later. The input sequence of this workpiece name "empty" on April 1st is "3". In reality, the workpiece was not input to the painting equipment 10 because it did not make it in time for the setup process, but since a setting table without a workpiece placed on it is transported on the painting line, the input sequence is incremented. Then, on the following day, April 2nd, a new input sequence is calculated, and the input operation at the input date and time "April 2, 9:04:19" becomes the input sequence "1" on April 2nd.
[0021] Generally, the installation table used in pretreatment and painting has a structure that allows the workpiece to be hung or placed on it. Large workpieces are placed on the installation table, and in the case of small workpieces, multiple workpieces are hung from a bar attached to the installation table. In the setup process of placing such workpieces on the installation table, the more workpieces to be placed, the longer it takes. Since the installation table with the workpieces placed on it flows to the drying process in a certain takt time (they are transported to each tank by a cyclic operation), if the setup process cannot be completed in time for the takt time, a state occurs in which the installation table is transported without the workpieces placed on it (hereinafter referred to as "empty state"). In other words, the empty state indicates a state in which the workpieces cannot be input in time for the takt time in equipment that processes in a certain takt time, and no workpieces are input into the equipment.
[0022] [Total number of processing data] 4 is a diagram showing an example of the data structure of the total processing number data 400 generated by the display program 31. The total processing number data 400 includes information on the total processing number of each type of workpiece on each input date. For example, the total processing number on the input date "April 1" in a certain year is "30" plates, "25" doors, and "45" frames.
[0023] The display program 31 (an example of a display processing unit) performs addition processing such as increment processing on the input record and processing record to calculate the input sequence and the total number of processing in Figures 3 and 4. In addition, the input date and time uses the time information held in the display program 31 when the information on the work instruction sheet 3 is read by the RFID reader 4 described later.
[0024] The quality record storage unit 23 receives the analysis results for the pretreatment liquid and paint from the analysis result output unit 14. The analysis results are quality records indicating the concentration and contamination level of the pretreatment liquid and paint. For example, when a problem occurs in pretreatment or painting, the quality records (analysis results) of the treatment liquid and paint at that time can be reviewed and used to analyze the cause of the problem. The analysis results may include, for example, the concentration of the pretreatment liquid and paint, the concentration of chemicals, the strength of alkalinity, the contamination level (state of contamination due to rust or impurities), etc.
[0025] Furthermore, the quality record storage unit 23 stores, as quality record values, values for film thickness, gloss, color, etc. obtained by measuring the workpiece that has undergone the coating process by the inspection instrument 2. Furthermore, when the pretreatment liquid and paint become contaminated and deteriorated and periodic updates of the pretreatment liquid and paint are implemented, the quality record storage unit 23 stores the process name, update history (update date and time), and update amount input using the console 1 (operation terminal) as update history data 600 shown in Fig. 6. Note that the update amounts of the pretreatment liquid and paint are omitted in Fig. 6.
[0026] The display program 31 (an example of a display processing unit) is a program that executes a process of receiving the processing record data 300 stored in the processing record storage unit 22, the total processing count data 400, and the update history data 600 stored in the quality record storage unit 23, and displaying the information on the display unit 5. The display unit 5 is a display device such as a liquid crystal panel.
[0027] [Processing results screen] 5 is a diagram showing an example of a screen created based on the processing result data 300 and the total processing number data 400 in the display program 31. The processing result screen 500 has a processing result display area 510, a total processing number display area 520, and an empty status display area 530.
[0028] For example, as shown in Fig. 5, the display program 31 displays in a graph the number of each type of workpiece input during an arbitrary period based on the total processed number data 400 (total processed number display area 520). In Fig. 5, the total processed number of 100 on April 1st is broken down into 30 plates, 45 frames, and 25 doors. The period for tallying up the total processed number may be one day or multiple days.
[0029] The display program 31 also displays the order of input of the workpieces into the painting equipment 10 by input date in chronological order, color-coded by type of workpiece, based on the processing performance data 300 (processing performance display area 510). Fig. 5 shows an example in which the input order on April 1st is plate first, door second, blank third, plate fourth, door fifth, and frame sixth. The input order on the following day, April 2nd, is door first, door second, frames third to fifth, and plate sixth. Fig. 5 shows an example of one month (30 days) as the target period for displaying the input order, but is not limited to this example.
[0030] Furthermore, the display program 31 displays the time when the empty state occurred ("time when empty occurred" in the figure), the loading order, and a combination of the type of workpiece loaded just before the empty state occurred ("just before loading" in the figure) and the type of workpiece loaded just after it ("just after loading" in the figure) (empty state display area 530). In Figure 5, an example is shown in which the loading order is "third," the workpiece just before loading was a "door," and the workpiece just after loading was a "plate," as information about an empty state that occurred on April 1.
[0031] In this way, the display program 31 displays on the display unit 5 the time when an empty state occurred in the painting equipment 10 because the workpieces could not be fed into the painting equipment 10 in time. The processing record storage unit 22 stores the types of workpieces fed into the painting equipment 10 as processing records, and displays on the display unit 5 the combination of the types of workpieces fed before and after the empty state occurred.
[0032] As shown in the example of the processing history screen 500 (processing history display area 510), by displaying the information of the processing history data 300, the worker can use it to analyze the cause of delay in the setup process, which is the process before the painting process (including pretreatment). Of course, a computer may execute software to use the above-mentioned processing history data 300 to analyze the cause of delay in the setup process.
[0033] Furthermore, the console 1 calculates the average update interval (average update interval) of the pretreatment liquid and paint from the update date information in the update history data 600 (see FIG. 6 described later), and stores it in the quality record storage unit 23. The display program 31 displays the information of the update history data 600 stored in the quality record storage unit 23, as shown in FIG. 6. This display function allows the worker to know the approximate time of the next regular update for the pretreatment liquid and paint. The contents of the update history data 600 may be displayed on the processing record screen 500 (see FIG. 5).
[0034] [Update history data] 6 is a diagram showing an example of update history data 600 created by the display program 31. The update history data 600 has the following items: process name, average update interval, next prediction, and update history.
[0035] The "process name" stores the name of the process (pre-treatment, painting, etc.) carried out on the workpiece. The "average update interval" stores the average value [months] of the interval from the update date when the pretreatment liquid and paint were updated to the next update date. The "next forecast" stores the time (for example, the year and month) when the pretreatment liquid and paint will be next updated. In other words, the next forecast is information indicating the next regular update time. The "update history" stores the history of past updates of the pretreatment liquid and paint (in FIG. 6, the year and month when the update was performed).
[0036] FIG. 6 shows an example of an update history in which the update times for the chemicals used in the process name “Pretreatment (1)” are “July 2022”, “November 2022”, “March 2023”, and “July 2023”, the average update interval is “4 months”, and the next forecast is “November 2023”.
[0037] Returning to the description of the configuration of the paint management system 100 shown in FIG. The analysis instruction generating unit 32 constantly accumulates the surface area values of the workpieces inserted, which are included in the processing result data 300, against a preregistered threshold value of the surface area, performs a comparison process to see if the accumulated surface area value exceeds the threshold value, and generates an analysis instruction if it exceeds the threshold value. In generating an analysis instruction in this embodiment, it is sufficient that the processing result data 300 includes at least the input order and information on the surface area. In addition, the threshold value for the accumulated surface area value can be prepared, for example, by describing it in a program that realizes the function of the analysis instruction generating unit 32, or by storing it in a memory, a microcomputer, or the like.
[0038] The coating condition generating unit 33 generates coating conditions for coating a workpiece in the coating equipment 10. The coating condition generating unit 33 receives quality record values of the coating film, such as thickness, gloss, and color, stored in the quality record storage unit 23, and compares them with quality control reference values 700 registered in advance in the quality record storage unit 23 as shown in Fig. 7 to generate an applied voltage value and a setting change instruction, which are coating conditions.
[0039] In Fig. 7, examples of standard values for film thickness, gloss, and color are shown as quality control standard values 700. For example, the standard value for film thickness is "30 μm or more," the standard value for gloss is "60 degrees G40±5," and the standard value for color is a color difference ΔE of 1.0 or less (ΔE≦1.0). "60 degrees G40±5" means that a gloss value of 40±5 is within the acceptable range when the angle of incidence is 60 degrees. Gloss is an index that indicates the degree of gloss.
[0040] [Correlation between coating quality (film thickness) and applied voltage value] The applied voltage value can be generated, for example, by storing in advance the correlation between the coating quality (e.g., film thickness) and the applied voltage value as shown in FIG. 8, so that the applied voltage value can be generated from the film thickness value of the workpiece after coating, as shown in FIG. 8 as applied voltage value 810.
[0041] 8 is a diagram showing an example of a correlation 800 between coating quality (e.g., film thickness) and applied voltage value, and an example of an applied voltage value 810. The applied voltage value is a value of a voltage applied to the electrode 17 by the coating condition control unit 12.
[0042] An example of a graph showing the correlation 800 between film thickness and applied voltage value for each chemical compounding ratio is shown on the left side of Figure 8. The vertical axis represents film thickness [μm], and the horizontal axis represents applied voltage [V]. Examples of chemical compounding ratios of 3.0[%], 2.5[%], and 2.0[%] are shown. The higher the chemical compounding ratio, the easier it is for the coating to adhere to the workpiece even with the same applied voltage value.
[0043] An example of the generated applied voltage value 810 is shown on the right side of Fig. 8. When the chemical compounding rate is "3.0" [%], if the current applied voltage value is "180" [V], the film thickness will be only 20 [μm], which does not meet the quality control standard (30 μm or more). Therefore, by increasing the applied voltage value to "190" [V] under the same chemical compounding rate of "3.0" [%], a coating film with a thickness that meets the quality control standard (30 μm or more) can be formed.
[0044] The coating condition generating unit 33 may also receive the analysis results stored in the quality record storage unit 23, and may reflect the correlation between the mixing ratio of chemicals (materials other than paint that assist coating) contained in the paint and the film thickness that changes depending on this mixing ratio in the calculation of the applied voltage value. The surface area of the workpiece stored in the processing record storage unit 22 may also be included in the calculation of the applied voltage value. In general, the lower the chemical mixing ratio and the larger the surface area of the workpiece, the higher the applied voltage required for coating.
[0045] The replenishment instruction generating unit 34 receives the quality results values of the coating film, such as film thickness, gloss, and color, stored in the quality result storage unit 23, and performs a comparison process with the quality control reference value 700 shown in Fig. 7 to calculate the types and amounts of paint and chemicals to be replenished and replenishment amounts, and generates replenishment instructions. For example, by storing in advance in the replenishment instruction generating unit 34 the correlation between the replenishment amount of each paint and each chemical and the gloss and color as shown in Fig. 9, the type and amount of paint and chemicals to be replenished can be generated, such as replenishment amount 930, from the gloss and color of the workpiece after coating.
[0046] [Correlation between color tone and replenishment amount, and correlation between gloss value and replenishment amount] Fig. 9 is a diagram showing an example of the correlation between the supply amount of each paint and the gloss and color, as well as the coating quality (quality performance value) before and after supply. Here, an example of paint is shown, but the concept is the same for chemicals. The upper left side of Fig. 9 shows an example of correlation 910 between the color tone in the red and yellow directions and the supply amount [kg], the lower left side of Fig. 9 shows an example of correlation 920 between gloss value and supply amount [kg], and the right side of Fig. 9 shows an example of the supply amount [kg] and quality performance value of each paint for each category (color, gloss).
[0047] In equipment where workpieces are immersed in a tank filled with paint to paint, the tank is filled with base color paint. With each day of production, the tank is replenished with the amount of base color paint consumed. However, the base color paint in the tank gradually changes color slightly, becoming lighter or darker than the base color. In order to return the color of the base color paint in the tank to the target base color, primary color paint other than the base color (red, yellow, black, etc.) is replenished as appropriate to adjust the color.
[0048] In the example of Fig. 9, the current color tone of the coating film "ΔE = 1.1" exceeds the quality control standard value "ΔE <= 1.0" by 0.1, and does not meet the quality control standard. Therefore, based on the correlation 910 between the color tone in the red and yellow directions and the supply amount, by supplying 2 [kg] of red paint and 1 [kg] of yellow paint, the current color tone "ΔE = 1.1" can be changed to the target color tone "ΔE = 0.6" which is within the acceptable range.
[0049] In addition, the current gloss value of the coating film is 30 (G30) when the angle of incidence is 60 degrees, which is 10 points below the quality control standard value of G40 and does not meet the quality control standard. Therefore, based on the correlation 920 between gloss value and replenishment amount, the gloss value can be changed from the current "30" to "40" within the acceptable range by replenishing 15 kg of gloss adjustment paint.
[0050] In this embodiment, the gloss adjusting paint is treated as a type of paint, but thinner, acetic acid, and the like (not shown) are replenished as chemicals that affect the quality of the coating film.
[0051] In addition, the supply instruction generation unit 34 receives the surface area values accumulated in the analysis instruction generation unit 32, and calculates the paint consumption amount, i.e., the supply amount, as shown in Figure 10, and can generate the supply amount of basic color paint consumed in normal painting processing as supply amount 1010.
[0052] [Relationship between surface area and supply amount] Fig. 10 is a diagram showing an example of the relationship between the cumulative value of the surface area of the workpiece and the supply amount. The left side of Fig. 10 shows the relationship between the cumulative surface area and the supply amount 1000, and the right side of Fig. 10 shows the supply amount [kg] of the basic color paint and the cumulative surface area value [Mcm 2 In the example in Figure 10, the cumulative surface area value is 100Mcm. 2 Therefore, based on the relationship between the cumulative surface area and the amount of replenishment, which is 1000, the amount of replenishment of the basic color paint is calculated to be 10 [kg].
[0053] As described above, by determining the amount of each paint (chemical) to be replenished using the correlations shown in Figures 9 and 10, it is possible to both replenish paint consumed in production and replenish paint for color adjustment.
[0054] [Painting equipment] Here, we will explain the structure of the coating equipment 10. As shown in Fig. 1, the coating equipment 10 includes an analysis control unit 11, a coating condition control unit 12, a replenishment control unit 13, an analysis result output unit 14, an electrode 17, a pretreatment liquid sampling pipe 15, a paint sampling pipe 16, a paint tank 18, and a chemical tank 19.
[0055] The analysis control unit 11 receives the analysis instruction generated by the analysis instruction generation unit 32, samples each liquid from the pretreatment liquid sampling pipe 15 and the paint sampling pipe 16 of the coating equipment 10, and performs an analysis operation in the analysis control unit 11. The analysis result obtained from this analysis operation is sent by the analysis result output unit 14 to the quality record storage unit 23 and is stored as one of the quality records.
[0056] The painting condition control unit 12 receives the setting change instructions and applied voltage value generated by the painting condition generation unit 33, and the painting equipment 10 changes the setting value of the applied voltage value stored in the painting condition control unit, and performs painting by applying the set voltage value to the electrode 17 when painting.
[0057] The replenishment control unit 13 receives the replenishment amounts of paint and chemicals generated by the replenishment instruction generation unit 34, and replenishes paint and chemicals in the pretreatment and painting processes from the paint tank 18 and the chemical tank 19. The actual value of the replenishment amount can be detected by a flow meter or calculated as the replenishment amount converted from the elapsed time from the start of input, and these may be stored in the quality result storage unit 23 to record the replenishment amounts of paint and chemicals.
[0058] The paint tank 18 and the chemical tank 19 are each composed of a plurality of tanks (not shown). That is, a tank is prepared for each type of paint and chemical. For example, the paint tanks 18 include a base color paint tank, a red paint tank, a yellow paint tank, and a gloss adjustment tank. The chemical tanks 19 include a degreasing chemical tank, a rust removal chemical tank, a coating chemical tank, a water tank for rinsing, a thinner tank, and an acetic acid tank.
[0059] The operation of the paint management system 100 according to this embodiment will be described below with reference to the flowcharts shown in FIGS.
[0060] [Hardware configuration of the calculation unit] Here, the calculation unit 30 shown in FIG. 1 is configured using a processing device such as a CPU or MPU, not shown, and a memory as hardware. The processing device of the calculation unit 30 executes a computer program stored in the memory, whereby the functions of the display program 31, the analysis instruction generating unit 32, the painting condition generating unit 33, and the supply instruction generating unit 34 are realized by software. The computer program is stored in a non-volatile storage, such as an HDD (Hard Disk Drive) or an SSD (Solid State Drive). When the software is executed, the target computer program is read from the non-volatile storage into the memory. The storage unit 20 may be configured with a non-volatile storage. Also, the computer program may be stored in a ROM, not shown.
[0061] However, it is also possible to realize some or all of the functions of the calculation unit 30 by hardware such as an integrated circuit. When realizing by hardware, a programmable IC such as an FPGA (Field-Programmable Gate Array) or a PLC (Programmable Logic Controller) can be used. By using hardware such as a programmable IC or PLC for the calculation unit 30, a circuit design can be performed so as to realize the operation of at least some or all of the functions of the display program 31, the analysis instruction generation unit 32, the painting condition generation unit 33, and the supply instruction generation unit 34.
[0062] As described with reference to FIGS. 1 and 2, design information of an object to be painted is stored in the drawing storage unit 21 as three-dimensional CAD data created by three-dimensional CAD software.
[0063] [Painting management processing procedure] FIG. 11 is a flowchart (1) showing an example of a procedure for paint management processing by the paint management system 100. FIG. 12 is a flowchart (2) showing an example of the procedure of the painting management process by the painting management system 100.
[0064] When a worker inputs a workpiece into the painting equipment 10, the RFID reader 4 reads the information written on the work instruction sheet 3. For example, the work instruction sheet 3 is a contactless IC card, and information such as a drawing number and a model number that specify the workpiece is recorded in a non-volatile memory in an IC chip. In addition to the example of using the work instruction sheet 3 made of a contactless IC card and the RFID reader 4, a mechanism may be used in which the information on the work instruction sheet 3 written in a barcode or a two-dimensional code is read by the reader. Then, in step S1101, the display program 31 refers to the three-dimensional CAD data of the workpiece stored in the drawing storage unit 21 based on the information on the work instruction sheet 3 read by the RFID reader 4. At this time, the display program 31 obtains the read date and time (input date and time) of the work instruction sheet 3 from the RFID reader 4.
[0065] Next, in step S1102, the display program 31 stores in the processing history storage unit 22 the type and surface area information of the workpiece obtained from the 3D CAD data, the input order calculated by the display program 31, and the time information of the input date and time (read date and time) held by the display program 31, thereby generating the processing history data 300 shown in FIG. 3.
[0066] Next, in step S1103, the display program 31 calculates the total number of processes and stores the total number of processes in the process result storage unit 22, thereby generating the total number of processes data 400 shown in FIG.
[0067] Next, in step S1104, the display program 31 refers to the information of the processing history data 300 shown in FIG. 3 and the total number of processing data 400 shown in FIG. 4 stored in the processing history storage unit 22, generates the processing history screen 500 shown in FIG. 5, and displays it on the display unit 5.
[0068] Next, in step S1105, the analysis instruction generating unit 32 refers to the machining result storage unit 22 and accumulates the surface area of the machining object.
[0069] Next, in step S1106, the analysis instruction generating unit 32 compares the cumulative value of the surface area of the workpiece with a threshold value, and determines whether or not the cumulative value exceeds the threshold value.
[0070] If the cumulative value exceeds the threshold value (YES in S1106), in step S1107, the analysis instruction generation unit 32 generates an analysis instruction and notifies the analysis instruction to the analysis control unit 11 of the painting equipment 10. At this time, the display program 31 may display on the display unit 5 that the analysis instruction has been notified to the painting equipment 10 from the analysis instruction generation unit 32. This allows the worker to recognize that the amount of workpieces processed has accumulated to the extent that analysis is necessary, and to infer that the liquid state of the pretreatment liquid or paint has changed.
[0071] Next, in step S1108, the analysis control unit 11 of the coating equipment 10 that has received the analysis instruction performs a series of analysis operations to sample and analyze the pretreatment liquid and the paint.
[0072] Next, in step S1109, the analysis results of the pretreatment liquid and paint obtained by the analysis operation of analysis control unit 11 are stored in quality record storage unit 23 from analysis result output unit .
[0073] Next, in step S1110, the analysis instruction generating unit 32 resets the cumulative value of the surface area in the analysis instruction generating unit 32, and proceeds to step S1200 shown in Fig. 12. Also, if the cumulative value of the surface area does not exceed the threshold value in step S1106 (NO judgment in S1106), the process proceeds from step S1106 to step S1200 shown in Fig. 12.
[0074] Next, in step S1200, the coating condition generating unit 33 refers to the film thickness value of the workpiece after coating has been completed that is stored in the quality record storing unit 23.
[0075] Next, in step S1201, the coating condition generating unit 33 compares the film thickness value of the workpiece in the quality record storage unit 23 with the film thickness value of the quality control standard value 700 stored in the quality record storage unit 23, and judges whether the film thickness value of the workpiece deviates from the quality control standard. For example, if the film thickness value of the workpiece is within a predetermined range including the quality control standard (for example, within a range of ±10% of the quality control standard), it can be judged that the film thickness value does not deviate from the quality control standard.
[0076] Then, if the film thickness value of the workpiece deviates from the quality control standard (YES judgment in step S1201), in step S1202, the painting condition generation unit 33 generates an applied voltage value and a setting change instruction using data on the correlation between film thickness and applied voltage value (see Figure 8) registered in the painting condition generation unit 33.
[0077] Next, in step S1203, the painting condition control unit 12 of the painting equipment 10 receives the new applied voltage value and the setting change instruction from the painting condition generating unit 33, and changes the set voltage to the applied voltage value. After the process of step S1203, the process proceeds to step S1204.
[0078] In step S1201, if the film thickness value of the workpiece does not deviate from the quality control standard (NO in step S1201), the process proceeds from step S1201 to step S1204.
[0079] In step S1204, similarly to step S1200, the supply instruction generating unit 34 refers to the gloss and color values of the workpiece after painting, which are stored in the quality record storing unit 23.
[0080] Next, in step S1205, the supply instruction generation unit 34 compares the gloss and color values of the workpiece in the quality record storage unit 23 with the gloss and color values of the quality control standard values 700 stored in the quality record storage unit 23, and determines whether the gloss and color values of the workpiece deviate from the quality control standard.
[0081] Then, if the gloss and color values of the workpiece deviate from the quality control standards (YES judgment in step S1205), in step S1206, the replenishment instruction generation unit 34 generates the type of paint (and chemical) to be replenished, the replenishment amount, and a replenishment instruction, using data on the correlation between the replenishment amount of each paint and the gloss and color (see Figures 9 and 10) registered in the replenishment instruction generation unit 34.
[0082] Next, in step S1207, the supply control unit 13 of the painting equipment 10 receives the type of paint (and chemicals) to be replenished, the amount to be replenished, and a supply instruction from the supply instruction generation unit 34, and replenishes the paint and chemicals from the paint tank 18 and the chemical tank 19 to the pre-treatment liquid and paint tanks.
[0083] Next, in step S1208, the supply control unit 13 stores the performance values of the supply amounts of paint and chemicals in the quality performance storage unit .
[0084] In step S1205, if the gloss and color values of the workpiece do not deviate from the quality control standards (NO in step S1205), this process ends.
[0085] [Procedure for generating and displaying update history] Next, the procedure for generating and displaying the update history by the paint management system 100 will be described with reference to FIG.
[0086] 13 is a diagram showing an example of a procedure for generating and displaying an update history by the coating management system 100. In step S1300, when a periodic update of the pretreatment liquid and paint is performed, an operator operates the console 1 to input the update date and time and the update amount, and stores them in the quality record storage unit 23. This input operation is performed when at least either the pretreatment liquid or the paint is updated.
[0087] Next, in step S1301, the console 1 calculates the average interval (average update interval) for periodic updates of the pretreatment liquid and paint, and stores the calculated average update interval in the quality record storage unit 23. The console 1 has the same hardware configuration as the coating management system 100. That is, the console 1 has a processor such as a CPU or MPU, a memory, a non-volatile storage for storing computer programs, and a display unit. The average update interval may be calculated by the display program 31.
[0088] Next, in step S1302, the display program 31 refers to the quality result storage unit 23, generates a screen including the contents of the update history data 600 shown in FIG.
[0089] As described above, the paint management system 100 of this embodiment comprises a design information storage unit (drawing storage unit 21) that stores at least information on the name, type, surface area, and plate thickness of the workpiece as design information for each workpiece input to the painting equipment, a processing results storage unit that stores processing results including at least information on the input date and time, input order, and surface area of a plurality of workpieces input to the painting equipment, an analysis instruction generation unit that generates analysis instructions for the pretreatment liquid and paint when the cumulative value of the surface areas of the plurality of workpieces stored in the processing results storage unit exceeds a predetermined threshold value, and a display processing unit (display program 31) that displays on the display unit that an analysis instruction has been generated by the analysis instruction generation unit.
[0090] According to the coating management system 100 of the present embodiment described above, analysis of the pretreatment liquid and paint is instructed based on the cumulative value of the surface area of the workpieces input into the coating equipment, so that the analysis of the pretreatment liquid and paint can be performed at an appropriate timing according to the processing volume of the workpieces.
[0091] The liquid state of the actual pretreatment liquid and paint changes depending on the amount (quantity) of workpieces being processed. In this embodiment, by issuing an analysis command based on the cumulative value of the surface area of the workpieces input into the coating equipment (see FIG. 10), the pretreatment liquid and paint can be analyzed at an appropriate timing when the liquid state of the pretreatment liquid and paint changes. As a result, even when the amount of workpieces being processed is large, the pretreatment liquid and paint can be analyzed at an appropriate timing, and the pretreatment and coating processing functions can be appropriately maintained. On the other hand, when the amount of workpieces being processed is small, the timing for analyzing the pretreatment liquid and paint can be delayed, which contributes to saving analytical chemicals, water, electricity, and the like.
[0092] Furthermore, in the paint management system 100 according to this embodiment, the display program 31 displays the next scheduled update on the display unit based on the average update interval calculated from the pretreatment liquid and paint update records entered by the worker.
[0093] For example, the chemical liquid management system described in Patent Document 1 automatically manages the concentration by appropriately replenishing the chemical to the pretreatment liquid. However, in the tank storing the pretreatment liquid, the content of impurities removed from the surface of the workpiece gradually increases, causing contamination, so it is difficult to maintain the pretreatment function with only appropriate concentration management. In this case, it is necessary to periodically update part or all of the pretreatment liquid, but in facilities with large tank capacities, the amount of update is large and the construction scale is large. The coating management system 100 according to this embodiment can calculate the average update interval based on the update history of the pretreatment liquid and paint (see FIG. 6) and grasp the update schedule in advance. Therefore, workers can plan and prepare for regular updates in advance.
[0094] In addition, the painting management system 100 of this embodiment is equipped with at least a quality record storage unit that stores analysis result data for the pretreatment liquid and paint, and data indicating the coating quality in terms of film thickness, gloss, and color on the workpiece after painting, a painting condition generation unit that generates the applied voltage value during painting that affects the film thickness and setting change instructions based on the data indicating the coating quality on the workpiece after painting stored in the quality record storage unit, and outputs these to the painting equipment, and a replenishment instruction generation unit that generates the type of pretreatment liquid and paint that affect the gloss and color, the replenishment amount, and replenishment instructions based on the data indicating the coating quality on the workpiece after painting stored in the quality record storage unit, and outputs these to the painting equipment.
[0095] In the embodiment described above, the calculation unit can generate painting conditions (applied voltage values) and give instructions to replenish paint or chemicals based on the actual values of the coating quality of the workpiece after painting (actual quality values), making it possible to control the quality of the painting equipment without manual judgment.
[0096] In the painting process, the way the coating film adheres to the workpiece varies depending on the size and shape of the workpiece, so it is necessary to adjust the coating conditions, such as the applied voltage value. However, it was necessary to change the settings of the coating conditions each time painting was performed. Therefore, it is possible to register the coating conditions in advance for each workpiece put into the painting equipment. However, in a case of high-mix low-volume production, multiple different types of workpieces may be placed on a placement table at the same time, and in a production form in which there are countless combinations, it is difficult to optimize the coating conditions by covering all combinations. In addition, the way the coating film adheres to the workpiece varies depending on the liquid state of the pretreatment liquid and the paint. In contrast, in this embodiment, the coating conditions can be changed appropriately and at any time to meet the quality control standards based on the correlation between the film thickness of the workpiece after painting and the coating conditions.
[0097] In addition, the paint management system 100 according to this embodiment can automatically calculate the amount of paint or chemicals to be replenished so as to satisfy the quality control standards, based on the correlation between the quality performance values, such as the color and gloss of the workpiece after painting, and the replenishment amount of each paint or chemical. Furthermore, in this embodiment, the replenishment amount of basic color paints corresponding to the consumption amount can be automatically calculated based on the relationship between the cumulative value of the surface area and the replenishment amount of basic color paints.
[0098] The present invention is not limited to the above-described embodiment, and various other applications and modifications are possible without departing from the gist of the present invention as described in the claims. For example, the above-described embodiment is a detailed and specific description of the configuration in order to easily explain the present invention, and is not necessarily limited to the configuration including all of the components described. In addition, it is also possible to add, replace, or delete other components to a part of the configuration of the embodiment.
[0099] In the above-described embodiment, the control lines and information lines are those that are considered necessary for the explanation, and not all control lines and information lines in the product are necessarily shown. In reality, it may be considered that almost all components are connected to each other.
[0100] In this specification, the processing steps describing chronological processing include not only processing performed chronologically according to the order described, but also processing that is not necessarily performed chronologically but is performed in parallel or individually (for example, processing by objects). Furthermore, the processing order of the processing steps describing chronological processing may be changed as long as it does not affect the processing result. [Explanation of symbols]
[0101] 10...Painting equipment, 11...Analysis control section, 12...Painting condition control section, 13...Replenishment control section, 14...Analysis result output section, 15...Pretreatment liquid sampling pipe, 16...Paint sampling pipe, 17...Electrode, 18...Paint tank, 19...Chemical tank, 20...Storage section, 21...Drawing storage section, 22...Processing record storage section, 23...Quality record storage section, 30...Calculation section, 31...Display program, 32...Analysis instruction generation section, 33...Painting condition generation section, 34...Replenishment instruction generation section, 100...Painting management system, 200...Property data (example of drawing data), 300...Processing record data, 400...Total processing number data, 500...Processing record screen, 510...Processing record display area, 520...Total processing number display area, 530...Empty state display area, 600...Update history data, 700: Quality control standard value, 800: Applied voltage value, 900: Replenishment amount, 1000: Replenishment amount
Claims
1. A design information storage unit that stores at least the name, type, surface area, and plate thickness of the workpiece as design information for each workpiece input to the coating equipment; a processing record storage unit for storing processing records including at least information on input date and time, input order, and surface area of the plurality of workpieces input to the coating facility; an analysis instruction generating unit that generates an analysis instruction for the pretreatment liquid and the paint when a cumulative value of the surface areas of the plurality of workpieces stored in the processing result storing unit exceeds a preset threshold value; a display processing unit that displays on a display unit that the analysis instruction for the pretreatment liquid and the paint has been generated. Paint management system.
2. The display processing unit refers to the processing results stored in the processing result storage unit, and displays on the display unit the input order of the workpieces during an arbitrary period. The paint management system according to claim 1 .
3. The display processing unit refers to the processing results stored in the processing results storage unit, and displays on the display unit a total number of processed pieces of the workpieces in an arbitrary period. The paint management system according to claim 1 .
4. The display processing unit displays on the display unit a next update schedule based on an average update interval calculated from the update results of the pretreatment liquid and the paint input by an operator. The paint management system according to claim 1 .
5. The display processing unit displays on the display unit a time when an empty state occurred in the painting equipment due to the workpiece not being input in time for the painting equipment, which operates in a cycle with a certain takt time. The paint management system according to claim 1 .
6. The processing record storage unit further stores the type of the workpiece input to the painting facility as the processing record, The display processing unit displays on the display unit a combination of the types of the workpieces that were input before and after the empty state occurred. The paint management system according to claim 5.
7. a quality record storage unit that stores at least data on the analysis results of the pretreatment liquid and the paint, and data showing the coating quality of the workpiece after coating, such as the thickness, gloss, and color of the coating; a coating condition generating unit that generates an applied voltage value during coating that affects a coating thickness and a setting change instruction based on data indicating the coating quality of the workpiece after coating stored in the quality record storing unit, and outputs the generated voltage value and setting change instruction to the coating equipment; and a replenishment instruction generating unit that generates a replenishment instruction, the type of the pretreatment liquid and the paint that affect gloss and color, and a replenishment amount, based on data indicating the coating quality of the workpiece after coating stored in the quality record storing unit, and outputs the replenishment instruction to the coating equipment. The paint management system according to claim 1 .
8. A coating management method using a coating management system including a design information storage unit that stores at least information on the name, type, surface area, and plate thickness of a workpiece as design information for each workpiece input to a coating facility, comprising: A process of storing processing results including at least information on input date and time, input order, and surface area of the plurality of workpieces input to the coating facility in a processing results storage unit by the coating management system; generating an analysis instruction for the pretreatment liquid and the paint when a cumulative value of the surface areas of the plurality of workpieces stored in the processing result storage unit exceeds a preset threshold value by the coating management system; and a process of displaying on a display unit, by the coating management system, that the analysis instruction for the pretreatment liquid and the paint has been generated. Paint management methods.
Citation Information