Information processing device and information processing method

JP2024154705AActive Publication Date: 2024-10-31TOYOTA JIDOSHA KK +1
View PDF 4 Cites 0 Cited by

Patent Information

Application Number
JP2023068677
Authority / Receiving Office
JP · JP
Patent Type
Applications
Current Assignee / Owner
Filing Date
2023-04-19
Publication Date
2024-10-31
Estimated Expiration
2043-04-19

Smart Images

  • Figure 2024154705000001_ABST
    Figure 2024154705000001_ABST
Patent Text Reader

Abstract

To provide an information processing device capable of reducing power loss due to the repetition of charge and discharge.SOLUTION: In a charge and discharge planning device 10 according to the present invention, a charge and discharge planning unit 13 has functions of: a first charge and discharge planning unit for creating a first charge and discharge plan to instruct power charge and discharge using a first charge and discharge command value; and a second charge and discharge planning unit for creating a second charge and discharge plan to instruct an electric motor car to perform charge and discharge using a second charge and discharge command value upon receiving an addition request about power adjustment after the first charge and discharge plan is instructed. The second charge and discharge planning unit calculates the second charge and discharge command value that satisfies the following (i) or (ii) condition, and creates the second charge and discharge plan. (i) The first charge and discharge command value is equal to the second charge and discharge command value. (ii) A product of the first charge and discharge command value and the second charge and discharge command value is larger than zero, and an absolute value of the second charge and discharge command value is larger than an absolute value of the first charge and discharge command value.SELECTED DRAWING: Figure 2
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present disclosure relates to an information processing device and an information processing method. [Background technology]

[0002] There is known technology related to a Virtual Power Plant (VPP) that uses electric vehicles. In a VPP that uses electric vehicles, it is necessary to create a charge and discharge plan for using the battery of the electric vehicle so that the electric vehicle functions both as a means of transportation and as an energy resource.

[0003] As a related technology, Patent Document 1 discloses a power adjustment device that, when an additional request regarding power adjustment is received after a charge / discharge plan is instructed, creates a modified charge / discharge plan that meets the additional request based on the predicted behavior of the electric vehicle and presents the modified charge / discharge plan to the electric vehicle. [Prior art documents] [Patent documents]

[0004] [Patent Document 1] JP 2022-113460 A Summary of the Invention [Problem to be solved by the invention]

[0005] In the actual operation of the charge / discharge plan and charge / discharge control, it is necessary to update the previously created charge / discharge plan to an appropriate content according to the operation status of the electric vehicle, the generation status of renewable energy, or fluctuations in loads other than the target in the system. The charge / discharge plan includes information on charge / discharge command values ​​for controlling charge / discharge. When the charge / discharge plan is updated, if the charge / discharge command value immediately before the update differs from the charge / discharge command value after the update, charging / discharging may be switched. The switching of charging / discharging may cause repeated charging / discharging in a short period of time, which may increase power loss. The technology disclosed in Patent Document 1 does not take into consideration the power loss associated with such repeated charging / discharging.

[0006] In view of the above-mentioned problems, an object of the present disclosure is to provide an information processing device and an information processing method capable of reducing power loss caused by repeated charging and discharging. [Means for solving the problem]

[0007] The information processing device according to the present disclosure includes a first charge / discharge planning unit that creates a first charge / discharge plan for instructing an electric vehicle to charge / discharge power using a first charge / discharge command value, and a second charge / discharge planning unit that creates a second charge / discharge plan for instructing the electric vehicle to charge / discharge power using a second charge / discharge command value when an additional request for power adjustment is received after the first charge / discharge plan is instructed. The second charge / discharge planning unit calculates the second charge / discharge command value that satisfies the following condition (i) or (ii), and creates the second charge / discharge plan using the second charge / discharge command value: (i) the first charge / discharge command value and the second charge / discharge command value are equal; (ii) the product of the first charge / discharge command value and the second charge / discharge command value is greater than 0, and the absolute value of the second charge / discharge command value is greater than the absolute value of the first charge / discharge command value. With this configuration, it is possible to reduce the power loss caused by repeated charging and discharging.

[0008] The information processing method according to the present disclosure includes a first charge / discharge planning step of creating a first charge / discharge plan for instructing an electric vehicle to charge / discharge power using a first charge / discharge command value, and a second charge / discharge planning step of creating a second charge / discharge plan for instructing the electric vehicle to charge / discharge power using a second charge / discharge command value when an additional request for power adjustment is received after the first charge / discharge plan is instructed. In the second charge / discharge planning step, the second charge / discharge command value that satisfies the following condition (i) or (ii) is calculated, and the second charge / discharge plan is created using the second charge / discharge command value: (i) the first charge / discharge command value and the second charge / discharge command value are equal; (ii) the product of the first charge / discharge command value and the second charge / discharge command value is greater than 0, and the absolute value of the second charge / discharge command value is greater than the absolute value of the first charge / discharge command value. With this configuration, it is possible to reduce the power loss caused by repeated charging and discharging. Effect of the Invention

[0009] The information processing device and information processing method according to the present disclosure can reduce power loss caused by repeated charging and discharging. [Brief description of the drawings]

[0010] [Figure 1] 1 is a diagram showing an overall configuration of a charge / discharge control system according to an embodiment; [Diagram 2] 1 is a block diagram showing a configuration of a charge / discharge planning device and a charge / discharge control device according to an embodiment. [Diagram 3] FIG. 4 is a diagram showing a flow of creating a charge / discharge plan and charge / discharge control according to the embodiment. [Figure 4] 4 is a flowchart showing a process performed by the charge and discharge planning device according to the embodiment. [Diagram 5] 4 is a flowchart showing a process performed by a charge / discharge control device according to an embodiment. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0011] Hereinafter, embodiments of the present disclosure will be described in detail with reference to the drawings. In each drawing, the same or corresponding elements are denoted by the same reference numerals. For clarity of explanation, duplicate explanations will be omitted as necessary.

[0012] (Configuration of charge / discharge control system 1) First, a charge / discharge control system 1 according to an embodiment will be described with reference to Fig. 1. Fig. 1 is a diagram showing the overall configuration of the charge / discharge control system 1 according to the present embodiment. As shown in the figure, the charge / discharge control system 1 includes a charge / discharge planning device 10, a charge / discharge control device 20, an information terminal 30, a power distribution network 2, a plurality of charge / discharge devices 4, and a plurality of electric vehicles 5. The charge / discharge control system 1 is a system for controlling the charging and discharging of the plurality of electric vehicles 5 by performing predetermined processing.

[0013] The charge / discharge planning device 10, the charge / discharge control device 20, the information terminal 30, and the multiple charge / discharge devices 4 are each connected via a network N. The network N is a wired or wireless communication line. The network N may be, for example, the Internet, a dedicated line, a telephone line, a mobile communication network, or other communication lines. The network N may also be a combination of these.

[0014] The information terminal 30 is an input terminal for inputting information in the charge / discharge control system 1. The information terminal 30 is, for example, a PC (Personal Computer) or a smartphone. The information terminal 30 accepts input from a user via the network N. The user is, for example, a user of the electric vehicle 5, a user of a VPP using the electric vehicle 5, or an administrator of the charge / discharge control system 1. For example, the user inputs, via the information terminal 30, whether or not he or she agrees to the execution of a charge / discharge plan.

[0015] The power distribution network 2 is a power network for supplying power to homes, commercial and industrial facilities, and the like. The power distribution network 2 may include power cables that supply power. A power system having a centralized power source such as a thermal power plant may be connected to the power distribution network 2. A distributed power source that generates power using natural energy such as solar power may also be connected to the power distribution network 2.

[0016] The charging / discharging device 4 is a device for charging / discharging a battery included in the electric vehicle 5. The charging / discharging device 4 charges the electric vehicle 5 by supplying power to the electric vehicle 5 from the connected power distribution network 2. The charging / discharging device 4 also discharges the electric vehicle 5 by receiving surplus power from the electric vehicle 5. The charging / discharging device 4 may be, for example, a V2H (Vehicle to Home) device for supplying the surplus power received from the electric vehicle 5 to a home.

[0017] The electric vehicle 5 is a vehicle that runs using all or part of the electric energy stored in a battery as motive power. The electric vehicle 5 is, for example, a battery electric vehicle (BEV) or a plug-in hybrid electric vehicle (PHEV). A plurality of electric vehicles 5 can be used as an energy resource in the VPP.

[0018] Here, an overview of the processing performed by the charge / discharge control system 1 will be described. First, the charge / discharge planning device 10 creates a charge / discharge plan for controlling charging and discharging of the multiple electric vehicles 5. The charge / discharge plan is information for managing the timing of charging or discharging the multiple electric vehicles 5 in a chronological order. Based on the charge / discharge plan, the charge / discharge planning device 10 generates a vehicle group charge / discharge command for instructing the multiple electric vehicles 5 to charge or discharge, and transmits it to the charge / discharge control device 20. The vehicle group charge / discharge command includes a charge / discharge command value for instructing charging and discharging. The charge / discharge command value is a charge power value or a discharge power value.

[0019] The charge / discharge control device 20 receives the vehicle group charge / discharge command and creates an individual vehicle charge / discharge plan for each electric vehicle 5. The charge / discharge control device 20 may create the individual vehicle charge / discharge plan by taking into account the movement schedule of each of the multiple electric vehicles 5. The charge / discharge control device 20 controls the charging / discharging of each of the multiple electric vehicles 5 based on the created individual vehicle charge / discharge plan.

[0020] Furthermore, when an additional request for power adjustment is received after the charge / discharge planning device 10 has instructed a charge / discharge plan, the charge / discharge planning device 10 creates a new charge / discharge plan. As described in "Problem to be Solved by the Invention", repeated charging and discharging of the electric vehicle 5 may increase power loss. However, depending on the power operation record and the power supply and demand predicted based on the operation record, the created charge / discharge plan may include switching between charging and discharging.

[0021] When creating an updated charge / discharge plan, the charge / discharge planning device 10 refers to the charge / discharge command values ​​used at the time of updating among the charge / discharge command values ​​created in the immediately preceding charge / discharge plan, and creates a charge / discharge plan that does not cause unnecessary switching of charge / discharge. In this way, the charge / discharge planning device 10 makes it possible to reduce power loss due to repeated charging and discharging.

[0022] Next, configurations of the charge / discharge planning device 10 and the charge / discharge control device 20 will be described with reference to Fig. 2. Fig. 2 is a block diagram showing configurations of the charge / discharge planning device 10 and the charge / discharge control device 20. Note that the unidirectional arrows shown in the figure simply show the flow of information (data, signals, etc.) and do not exclude the two-way nature of information.

[0023] (Configuration of charge / discharge planning device 10) The charge / discharge planning device 10 includes a related information acquisition unit 11, a supply / demand prediction unit 12, and a charge / discharge planning unit 13. The charge / discharge planning device 10 includes a processor, a memory, and a storage device, which are not shown in the figure. The storage device stores a program in which the processing according to this embodiment is implemented. The processor can load the program from the storage device into the memory and execute the program. In this way, the processor realizes the functions of the related information acquisition unit 11, the supply / demand prediction unit 12, and the charge / discharge planning unit 13. Alternatively, the related information acquisition unit 11, the supply / demand prediction unit 12, and the charge / discharge planning unit 13 may each be realized by dedicated hardware.

[0024] The related information acquisition unit 11 acquires related information related to the supply and demand of electricity. The related information may include, for example, performance information A indicating past performance related to supply and demand. The performance information A is, for example, information indicating performance such as power, temperature, amount of solar radiation, weather, or electricity production volume. The related information may also include prediction information B regarding prediction of supply and demand. The prediction information B is, for example, information indicating prediction of future weather or electricity production volume.

[0025] The supply and demand prediction unit 12 predicts the supply and demand of electricity based on the related information acquired by the related information acquisition unit 11. The supply and demand prediction unit 12 can predict the supply and demand by predicting the power load situation and the power generation situation. The supply and demand prediction unit 12 may predict the supply and demand by using, for example, a trained model trained using the performance information A as training data.

[0026] In addition, although the charge / discharge planning device 10 is described here as having the power supply prediction unit 12, an external device may have the function of the power supply prediction unit 12. For example, the power supply prediction unit 12 may obtain a prediction result from an external device via the network N.

[0027] The charge / discharge planning unit 13 creates a charge / discharge plan for issuing instructions to the multiple electric vehicles 5 based on the prediction result in the supply / demand prediction unit 12. The charge / discharge planning unit 13 may also acquire environmental information C relating to costs or the environment, and create a charge / discharge plan based on the prediction result in the supply / demand prediction unit 12 and the environmental information C. The environmental information C may include, for example, information such as the electricity unit price, contract information, CO2 intensity, or power source configuration.

[0028] The charge / discharge planning unit 13 functions as a first charge / discharge planning unit that creates a first charge / discharge plan for instructing the electric vehicle to charge / discharge power using a first charge / discharge command value. In addition, when an additional request regarding power adjustment is received after the first charge / discharge plan is instructed, the charge / discharge planning unit 13 also functions as a second charge / discharge planning unit that creates a second charge / discharge plan for instructing the electric vehicle to charge / discharge power using a second charge / discharge command value. Here, an overview of the function of the charge / discharge planning unit 13 as the second charge / discharge planning unit will be described. A specific example will be described later.

[0029] The charge / discharge planning unit 13 calculates a second charge / discharge command value that satisfies the following condition (i) or (ii), and creates a second charge / discharge plan using the second charge / discharge command value. (i) The first charge / discharge command value is equal to the second charge / discharge command value. (ii) The product of the first charge / discharge command value and the second charge / discharge command value is greater than 0, and the absolute value of the second charge / discharge command value is greater than the absolute value of the first charge / discharge command value.

[0030] In the condition (i), "the first charge / discharge command value and the second charge / discharge command value are equal" is not limited to the case where the first charge / discharge command value and the second charge / discharge command value are strictly the same. In other words, it may include the case where the difference between the first charge / discharge command value and the second charge / discharge command value is within a predetermined range. The predetermined range may be appropriately set by the user of the charge / discharge control system 1, etc.

[0031] The charge / discharge planning unit 13 may calculate the second charge / discharge command value by solving a minimization problem for minimizing the difference between the first charge / discharge command value and the second charge / discharge command value. Furthermore, the charge / discharge planning unit 13 may calculate the second charge / discharge command value so that the second charge / discharge command value is equal to or greater than a predetermined threshold value.

[0032] The charge / discharge planning unit 13 generates a vehicle group charge / discharge command D for causing the multiple electric vehicles 5 to execute the created charge / discharge plan. The vehicle group charge / discharge command D may include information on charge / discharge instructions per time period. The charge / discharge planning device 10 controls the charge / discharge of the multiple electric vehicles 5 so that charging / discharging is performed according to the first charge / discharge plan until the second charge / discharge plan is created, and then, in response to the creation of the second charge / discharge plan, charging / discharging is performed according to the second charge / discharge plan. This control may be performed by the charge / discharge control device 20.

[0033] Further, the charge / discharge planning unit 13 may generate an appliance command E including various commands for appliances such as the charging / discharging appliance 4, in addition to the vehicle group charge / discharge command D.

[0034] Here, a specific example of a charge / discharge plan created by the charge / discharge plan unit 13 will be described with reference to Fig. 3. Fig. 3 is a diagram showing the flow of creating a charge / discharge plan and controlling charge / discharge. The horizontal axis of the diagram indicates time t.

[0035] First, the charge / discharge command value V used in the charge / discharge plan described below will be described. The charge / discharge command value V is information for instructing the amount of charge / discharge. The charge / discharge command value V is expressed as V(t1, t2) using the time t1 when the charge / discharge plan is created and the time t2 when the charge / discharge plan is applied, where t1≦t2. The charge / discharge command value V indicates a positive value during charging and a negative value during discharging.

[0036] A specific description will be given with reference to Fig. 3. First, the charge / discharge planning unit 13 (first charge / discharge planning unit) creates a charge / discharge plan P1 (first charge / discharge plan) at time t=k. A charge / discharge command value (first charge / discharge command value) in the charge / discharge plan P1 is represented by V1(k, k+1). The charge / discharge planning unit 13 generates a vehicle group charge / discharge command D (see Fig. 2) including V1(k, k+1).

[0037] The charge / discharge planning unit 13 generates a vehicle group charge / discharge command D to immediately perform charge / discharge control of the multiple electric vehicles 5 using V1(k, k+1) included in the charge / discharge plan for the period T1 out of the charge / discharge plan P1 created at the time t=k. As a result, V1(k, k+1) is immediately used for the charge / discharge control of the multiple electric vehicles 5 in the period T1.

[0038] Here, it is assumed that the charge / discharge planning unit 13 receives an additional request for power adjustment at time t=k+1 after issuing an instruction for the charge / discharge plan P1. The charge / discharge planning unit 13 (second charge / discharge planning unit) creates a charge / discharge plan P2 (second charge / discharge plan) at time t=k+1. The charge / discharge command value (second charge / discharge command value) in the charge / discharge plan P2 is represented by V2(k+1, k+1).

[0039] The charge / discharge planning unit 13 generates a vehicle group charge / discharge command D to perform charge / discharge control using V1(k, k+1) of the charge / discharge plan P1 created at t=k during a period T2 until the charge / discharge plan P2 is created. If the charge / discharge planning unit 13 starts creating the charge / discharge plan P2 at t=k+1 and completes the creation at t=X, the period T2 is from t=k+1 to t=X.

[0040] The charge and discharge planning unit 13 updates the charge and discharge plan from the charge and discharge plan P1 to the charge and discharge plan P2 at t=X. The charge and discharge planning unit 13 generates a vehicle group charge and discharge command D to perform charge and discharge control of the multiple electric vehicles 5 by using V2(k+1, k+1) included in the charge and discharge plan P2 during a period T3 after t=X.

[0041] Here, when V1(k,k+1)×V2(k+1,k+1)<0 is satisfied, charging and discharging are repeated in a short period of time. Therefore, the charge and discharge planning unit 13 imposes a constraint on the calculation of V2(k+1,k+1) so that discharging is not performed in period T3 when charging is performed in period T2. Similarly, the charge and discharge planning unit 13 imposes a constraint on the calculation of V2(k+1,k+1) so that charging is not performed in period T3 when discharging is performed in period T2.

[0042] Specifically, in creating the charge / discharge plan P2, the charge / discharge planning unit 13 calculates V2(k+1, k+1) so as to satisfy the following condition (I) or (II). The conditions (I) and (II) correspond to the above-mentioned (i) and (ii).

[0043] (I) V2(k+1,k+1)=V1(k,k+1) (II) V1(k,k+1)×V2(k+1,k+1)>0 and |V2(k+1,k+1)|>|V1(k,k+1)|

[0044] The charge / discharge planning unit 13 calculates V2(k+1, k+1) that minimizes the cost related to charging / discharging under the above-mentioned constraints. Specifically, it calculates V2(k+1, k+1) by solving an optimization problem with the minimization of the charge / discharge cost as an objective function.

[0045] The charge / discharge planning unit 13 may create a charge / discharge plan using conditions other than those described above. For example, it is assumed that the calculated charge / discharge command value is a very small value that is lower than the standby power of the electric vehicle 5. In such a case, the charge / discharge command may reduce the charge / discharge efficiency of the entire system. In order to prevent the charge / discharge efficiency from decreasing, the charge / discharge planning unit 13 may create a charge / discharge plan such that the charge / discharge command value is equal to or higher than a predetermined threshold value. The predetermined threshold value may be set in advance or may be changed as appropriate. By adding a constraint on the minimum charge / discharge power in this way, the charge / discharge planning unit 13 can create a charge / discharge plan that does not include a very small charge / discharge command.

[0046] By performing the above-mentioned processing, the charge / discharge planning unit 13 can optimize the charge / discharge plan.

[0047] (Configuration of the charge / discharge control device 20) Returning to Fig. 2, the charge / discharge control device 20 will be described. As shown in the figure, the charge / discharge control device 20 includes an individual vehicle information acquisition unit 21, an individual vehicle chargeable / dischargeable amount calculation unit 22, and an individual vehicle charge / discharge planning unit 23. Like the charge / discharge planning device 10, the charge / discharge control device 20 includes a processor, a memory, and a storage device as components not shown. The processor realizes the functions of the individual vehicle information acquisition unit 21, the individual vehicle chargeable / dischargeable amount calculation unit 22, and the individual vehicle charge / discharge planning unit 23. Each of the individual vehicle information acquisition unit 21, etc. may be realized by dedicated hardware.

[0048] The individual vehicle information acquisition unit 21 acquires individual vehicle information F related to the electric vehicle 5. The individual vehicle information F is information that can be acquired from the electric vehicle 5. The individual vehicle information F is information indicating, for example, the current position or battery state of the electric vehicle 5. The individual vehicle information acquisition unit 21 can acquire this information using a position information sensor or a battery remaining amount sensor (not shown) that the electric vehicle 5 is equipped with. The individual vehicle information F is associated with identification information for identifying each of the multiple electric vehicles 5.

[0049] Furthermore, the individual vehicle information acquisition unit 21 acquires individual vehicle behavior schedule information G relating to the behavior schedule of the electric vehicle 5. For example, the individual vehicle information acquisition unit 21 acquires the individual vehicle behavior schedule information G by accepting an input from the user of the electric vehicle 5 or the like. The user of the electric vehicle 5 inputs the individual vehicle behavior schedule information G via the information terminal 30. Alternatively, the individual vehicle information acquisition unit 21 may acquire the individual vehicle behavior schedule information G by predicting the behavior schedule of the electric vehicle 5 based on the individual vehicle information F.

[0050] The individual vehicle chargeable / dischargeable amount calculation unit 22 calculates the chargeable / dischargeable amount for the electric vehicle 5 based on the individual vehicle information F and the individual vehicle behavior schedule information G acquired by the individual vehicle information acquisition unit 21. The individual vehicle chargeable / dischargeable amount calculation unit 22 may calculate the chargeable / dischargeable amount using either the individual vehicle information F or the individual vehicle behavior schedule information G.

[0051] The individual vehicle charge / discharge planning unit 23 generates an individual vehicle charge / discharge command H for causing each of the electric vehicles 5 to execute the charge / discharge plan, using the calculation result in the individual vehicle charge / dischargeable amount calculation unit 22 and the vehicle group charge / discharge command D. This allows the individual vehicle charge / discharge planning unit 23 to optimize the charge / discharge plan for each of the electric vehicles 5. The individual vehicle charge / discharge planning unit 23 transmits the individual vehicle charge / discharge command H to each of the multiple electric vehicles 5.

[0052] In the electric vehicle 5, an ECU (Electronic Control Unit) (not shown) receives the individual vehicle charge / discharge command H and executes the instructed charge / discharge plan. Note that, instead of using an ECU, the electric vehicle 5 may receive the individual vehicle charge / discharge command H and execute the charge / discharge plan using a car navigation system or the like. Furthermore, the electric vehicle 5 may receive the user's intention via the information terminal 30 and execute the charge / discharge plan if consent is given.

[0053] In addition, the individual vehicle charge / discharge planning unit 23 calculates a vehicle group possible charge / discharge amount I that indicates the amount of charge / discharge possible per time period for the multiple electric vehicles 5, and outputs the vehicle group possible charge / discharge amount I to the charge / discharge planning unit 13.

[0054] The configuration of the charge / discharge control system 1 has been described above, but the configuration of the charge / discharge control system 1 is not limited to that shown in Fig. 1 and Fig. 2. For example, when a part or all of the components of the charge / discharge planning device 10 and the charge / discharge control device 20 are realized by a plurality of information processing devices, circuits, etc., the plurality of information processing devices, circuits, etc. may be centrally arranged or distributed. For example, the information processing devices, circuits, etc. may be realized as a client-server system, a cloud computing system, etc., in a form in which each is connected via a communication network. In addition, the functions of the charge / discharge planning device 10 and the charge / discharge control device 20 may be provided in a SaaS (Software as a Service) format.

[0055] Further, in the present embodiment, the charge / discharge planning device 10 and the charge / discharge control device 20 have been described as separate devices, but the charge / discharge planning device 10 and the charge / discharge control device 20 may be realized by a single device.

[0056] (Processing of the charge / discharge planning device 10) Next, a process performed by the charge and discharge planning device 10 according to the present embodiment will be described with reference to Fig. 4. Fig. 4 is a flowchart showing the process performed by the charge and discharge planning device 10. Here, the description will be given using the examples of Figs. 1 to 3 described above.

[0057] First, the related information acquisition unit 11 acquires the actual result information A and the forecast information B (see FIG. 2 for both) (S11). Next, the supply / demand prediction unit 12 predicts the supply and demand of electricity based on the actual result information A and the forecast information B (S12). Next, the charge / discharge planning unit 13 creates a charge / discharge plan based on the prediction result (S13). The charge / discharge planning unit 13 may create a charge / discharge plan by taking into account the prediction result as well as the environmental information C. Next, the charge / discharge planning unit 13 determines whether the created charge / discharge plan is for an additional request (S14). If the charge / discharge plan is for an additional request (YES in S14), the process proceeds to step S15, and if not (NO in S14), the process proceeds to step S17.

[0058] First, the process when the charge / discharge plan is not for an additional request (NO in S14) will be described. Here, it is assumed that the charge / discharge plan unit 13 has created a charge / discharge plan P1 in step S13. The charge / discharge plan P1 includes information on a charge / discharge command value V1(k, k+1). The charge / discharge plan unit 13 generates a vehicle group charge / discharge command D including V1(k, k+1) (S17). The charge / discharge plan unit 13 transmits the vehicle group charge / discharge command D to the charge / discharge control device 20 (S18).

[0059] Next, the processing when the charge / discharge plan is for an additional request (YES in S14) will be described. Here, it is assumed that the charge / discharge planning unit 13 has created a charge / discharge plan P2 in which the contents of the charge / discharge plan P1 have been changed in step S13. The charge / discharge plan P2 includes information on the charge / discharge command value V2(k+1,k+1). In addition, the description will be given here assuming that the charge / discharge plan generated immediately before from the perspective of the charge / discharge plan P2 is the charge / discharge plan P1. The charge / discharge plan P1 includes V1(k,k+1).

[0060] The charge / discharge planning unit 13 judges whether V2(k+1,k+1)=V1(k,k+1) (S15). This judgement is to judge whether the above-mentioned condition (I) is satisfied. If V2(k+1,k+1)=V1(k,k+1) (YES in S15), the process proceeds to step S17.

[0061] If V2(k+1,k+1)=V1(k,k+1) is not true (NO in S15), the charge / discharge planning unit 13 calculates V2(k+1,k+1) that satisfies V1(k,k+1)×V2(k+1,k+1)>0 and |V2(k+1,k+1)|>|V1(k,k+1)| (S16). As a result, the charge / discharge planning unit 13 calculates V2(k+1,k+1) that satisfies the above-mentioned condition (II).

[0062] Next, the charge / discharge planning unit 13 generates a vehicle group charge / discharge command D including V2(k+1,k+1) (S17). The charge / discharge planning unit 13 transmits the vehicle group charge / discharge command D to the charge / discharge control device 20 (S18).

[0063] (Processing of the charge / discharge control device 20) Next, the process performed by the charge / discharge control device 20 according to the present embodiment will be described with reference to Fig. 5. Fig. 5 is a flowchart showing the process performed by the charge / discharge control device 20. Here, too, the description will be given using the examples of Figs. 1 to 3 described above.

[0064] First, the individual vehicle charge / discharge planning unit 23 receives a vehicle group charge / discharge command D from the charge / discharge planning device 10 (S21). Next, the individual vehicle information acquisition unit 21 acquires individual vehicle information F and individual vehicle behavior schedule information G (S22). The individual vehicle possible charge / discharge amount calculation unit 22 calculates the possible charge / discharge amount of the electric vehicle 5 based on the individual vehicle information F and the individual vehicle behavior schedule information G (S23).

[0065] Next, the individual vehicle charge / discharge planning unit 23 creates a charge / discharge plan for each electric vehicle 5 (S24). The individual vehicle charge / discharge planning unit 23 generates an individual vehicle charge / discharge command H based on the created charge / discharge plan for each electric vehicle 5 (S25). The individual vehicle charge / discharge planning unit 23 transmits the individual vehicle charge / discharge command H to each of the multiple electric vehicles 5 (S26). As a result, for example, the ECU of the electric vehicle 5 controls charging / discharging of a battery provided in the electric vehicle 5 in accordance with the individual vehicle charge / discharge command H.

[0066] As described above, in the charge / discharge control system 1 according to the present embodiment, the charge / discharge planning device 10 creates a charge / discharge plan. When the charge / discharge planning device 10 receives an additional request for power adjustment after instructing a charge / discharge plan, the charge / discharge planning device 10 refers to the charge / discharge command value indicated in the charge / discharge plan created immediately before and calculates a charge / discharge command value that satisfies a predetermined condition. By setting a constraint on the charge / discharge command value, the charge / discharge planning device 10 can create a charge / discharge plan that satisfies the additional request and can reduce power loss due to repeated charging and discharging. This allows the charge / discharge control system 1 to achieve an improvement in charge / discharge energy efficiency.

[0067] Each functional component of the above-mentioned charge / discharge planning device 10 and charge / discharge control device 20 may be realized by hardware (e.g., hardwired electronic circuitry, etc.) that realizes each functional component, or may be realized by a combination of hardware and software (e.g., a combination of an electronic circuitry and a program that controls it, etc.). For example, any process in the present disclosure may be realized by having a CPU execute a program.

[0068] The program includes a set of instructions (or software code) that, when loaded into a computer, causes the computer to perform one or more functions described in the present embodiment. The program may be stored in a non-transitory computer-readable medium or a tangible storage medium. By way of example and not limitation, the non-transitory computer-readable medium or the tangible storage medium includes random-access memory (RAM), read-only memory (ROM), flash memory, solid-state drive (SSD) or other memory technology, CD-ROM, digital versatile disc (DVD), Blu-ray (registered trademark) disk or other optical disk storage, magnetic cassette, magnetic tape, magnetic disk storage or other magnetic storage device. The program may also be transmitted on various types of transitory computer-readable medium or communication medium. By way of example and not limitation, the transitory computer-readable medium or communication medium includes electrical, optical, acoustic, or other forms of propagated signals.

[0069] The present disclosure is not limited to the above-described embodiment, and can be modified as appropriate without departing from the spirit and scope of the present disclosure. [Explanation of symbols]

[0070] 1: charge / discharge control system, 2: power distribution network, 4: charge / discharge equipment, 5: electric vehicle, 10: charge / discharge planning device, 11: related information acquisition unit, 12: power supply prediction unit, 13: charge / discharge planning unit (first and second charge / discharge planning units), 20: charge / discharge control device, 21: individual vehicle information acquisition unit, 22: individual vehicle charge / dischargeable amount calculation unit, 23: individual vehicle charge / discharge planning unit, 30: information terminal, A: actual information, B: prediction information, C: environmental information, D: vehicle group charge / discharge command, E: equipment command, F: individual vehicle information, G: individual vehicle behavior schedule information, H: individual vehicle charge / discharge command, I: vehicle group charge / dischargeable amount, N: network, P1 to P2: charge / discharge plan, T1 to T3: period, V and V1 to V2: charge / discharge command value

Claims

1. a first charge / discharge planning unit that creates a first charge / discharge plan for instructing the electric vehicle to charge / discharge electric power using a first charge / discharge command value; a second charge / discharge plan unit that creates a second charge / discharge plan for instructing the electric vehicle to perform charging / discharging using a second charge / discharge command value when an additional request for power adjustment is received after the first charge / discharge plan is instructed, The second charge / discharge plan unit calculates the second charge / discharge command value that satisfies the following condition (i) or (ii), and creates the second charge / discharge plan by using the second charge / discharge command value. (i) the first charge / discharge command value is equal to the second charge / discharge command value; (ii) a product of the first charge / discharge command value and the second charge / discharge command value is greater than 0, and an absolute value of the second charge / discharge command value is greater than an absolute value of the first charge / discharge command value. Information processing device.

2. The second charge / discharge plan unit calculates the second charge / discharge command value by solving a minimization problem of power costs related to charging and discharging. The information processing device according to claim 1 .

3. The second charge / discharge plan unit calculates the second charge / discharge command value so that the second charge / discharge command value is equal to or greater than a predetermined threshold value.

3. The information processing device according to claim 1 or 2.

4. The charging and discharging of the electric vehicle is controlled so that charging and discharging are performed according to the first charging and discharging plan until the second charging and discharging plan is created, and charging and discharging are performed according to the second charging and discharging plan in response to the second charging and discharging plan being created.

3. The information processing device according to claim 1 or 2.

5. a first charge / discharge planning step of creating a first charge / discharge plan for instructing the electric vehicle to charge / discharge electric power using a first charge / discharge command value; a second charge / discharge planning step of creating a second charge / discharge plan for instructing the electric vehicle to perform charging / discharging using a second charge / discharge command value when an additional request for power adjustment is received after the first charge / discharge plan is instructed; In the second charge / discharge planning step, the second charge / discharge command value that satisfies the following condition (i) or (ii) is calculated, and the second charge / discharge plan is created using the second charge / discharge command value. (i) the first charge / discharge command value is equal to the second charge / discharge command value; (ii) a product of the first charge / discharge command value and the second charge / discharge command value is greater than 0, and an absolute value of the second charge / discharge command value is greater than an absolute value of the first charge / discharge command value. Information processing methods.

Citation Information

Patent Citations

  • Charging discharging planning apparatus

    JP2020137188A

  • Power adjustment device, power supply-demand balance adjustment system and method

    JP2022113460A

  • Management system, management device, and power adjustment method

    JP2024043088A

  • Charge / discharge plan creating device, command device, power system management system, terminal device, power storage system, charge / discharge system, power storage cell, electric vehicle, charge / discharge plan creating method, and charge / discharge plan creating program

    WO2022162907A1