Information processing system
The information processing system predicts emergency dispatches and simulates emergency team deployment to enhance operational efficiency and reduce response times by optimizing team placement and routes.
Patent Information
- Application Number
- JP2023069955
- Authority / Receiving Office
- JP · JP
- Patent Type
- Applications
- Current Assignee / Owner
- Filing Date
- 2023-04-21
- Publication Date
- 2024-10-31
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
Existing systems can predict the number of emergency dispatches but fail to simulate how deployed emergency teams will operate or be deployed efficiently.
An information processing system that predicts emergency dispatch requests using a learning model and simulates the operation status and arrangement of emergency services, including priority assignment and route calculation for emergency teams.
Enables efficient operation of emergency services by simulating the deployment of emergency teams based on predicted requests, optimizing their placement and reducing response times.
Smart Images

Figure 2024155320000001_ABST
Abstract
Description
[Technical field]
[0001] The present invention relates to an information processing system capable of predicting the number of emergency dispatches of ambulance teams and simulating appropriate deployment of ambulance teams based on the prediction results. [Background technology]
[0002] In recent years, the number of emergency dispatches has increased, and the importance of emergency medical teams has grown. However, there are limitations on the number of ambulances and emergency medical team members, and there is a need to allocate emergency medical teams efficiently in order to operate them efficiently.
[0003] For example, Patent Document 1 and Non-Patent Documents 1 to 3 below disclose a system that predicts the number of emergency dispatches in order to efficiently allocate emergency teams. [Prior art documents] [Patent documents]
[0004] [Patent Document 1] Patent No. 7087946 [Non-patent literature]
[0005] [Non-Patent Document 1] Kosuke Nakayama, "Verifying the effectiveness of an optimal ambulance operation system using emergency big data - Aiming to reduce ambulance transport times through real-time emergency demand forecasting, etc.", NTT Technical Journal, April 2019, p.70-p.72, [online], Internet<URL:https: / / journal.ntt.co.jp / wp-content / uploads / 2020 / 06 / JN20190470.pdf> [Non-Patent Document 2] Genmune Kataoka, Toshio Yoshii, Toru Futagami, and Takashi Oguchi, "Development of a method for forecasting emergency medical transport demand," Proceedings of the Institute of Civil Engineering, Vol. 32, No. 71, 2015, p. I_407-I_414 [Non-Patent Document 3] Tetsuya Nakai, Yukio Saeki, Masahide Nakamura, "Analysis and prediction of emergency demand related to heat stroke using emergency dispatch records," IEICE Technical Report, BSE2020-11, SC2020-15, [online], Internet<URL:https: / / cs27.org / achieve / data / pdf / 1413.pdf> Summary of the Invention [Problem to be solved by the invention]
[0006] By using the technologies described in the above Patent Document 1 and Non-Patent Documents 1 to 3, it is possible to predict the number of emergency dispatches, which can help with the efficient allocation of emergency teams. However, it is not possible to predict how the deployed emergency teams will actually operate or what will happen after they are deployed. [Means for solving the problem]
[0007] In view of the above problems, the present inventors have invented an information processing system that predicts the number of emergency dispatches of ambulance teams and outputs appropriate deployment of ambulance teams based on the prediction results.
[0008] A first invention is an information processing system for predicting the dispatch of an ambulance team, the information processing system having a learning processing unit that accepts input of emergency request data and generates a learning model for predicting emergency dispatch requests for the ambulance team, a prediction processing unit that predicts emergency dispatch requests using the date and time segment for predicting the emergency dispatch request and the learning model, and a simulation processing unit that performs simulation processing on the operation status or deployment of the ambulance team using the emergency dispatch request predicted by the prediction processing unit.
[0009] By using the information processing system of the present invention, it is possible to perform simulation processing of the operating status and deployment of emergency teams using predicted emergency dispatch requests. Therefore, it is possible to consider the operating status and deployment of emergency teams in order to operate them efficiently.
[0010] In the above-mentioned invention, the simulation processing unit can be configured as an information processing system that identifies sample emergency dispatch occurrence locations and dates and times corresponding to the emergency dispatch requests predicted by the prediction processing unit, assigns priorities of emergency teams to be dispatched to each emergency dispatch occurrence location using the distance between the emergency dispatch occurrence location and the fire station where the emergency dispatch team is located, assigns emergency teams to be dispatched to the emergency dispatch occurrence locations in chronological order of the dates and times of the sample emergency dispatches using the priorities, and calculates the route and / or required time to the emergency dispatch occurrence location for the assigned emergency dispatch team, thereby simulating the operation status of the emergency dispatch team.
[0011] In the above-mentioned invention, the simulation processing unit can be configured as an information processing system that generates a sample dataset including sample emergency dispatch occurrence locations and dates and times corresponding to emergency dispatch requests predicted by the prediction processing unit in each mesh obtained by dividing the target area into predetermined sizes, assigns priorities from nearby emergency dispatch teams to each emergency dispatch occurrence location using the distance between the emergency dispatch occurrence location in the sample dataset and the fire station where the emergency dispatch team is located, assigns emergency dispatch teams to be dispatched to the emergency dispatch occurrence location in chronological order of the emergency dispatch dates and times in the sample dataset using the priorities, and calculates the route and / or travel time to the emergency dispatch occurrence location for the assigned emergency dispatch team, thereby simulating the operation status of the emergency dispatch team.
[0012] In the above-mentioned invention, the simulation processing unit can be configured as an information processing system that assigns emergency teams to be dispatched to the emergency dispatch locations in chronological order of the dates and times of the sample emergency dispatches, using the priority and the time and / or distance of the emergency teams in the emergency request data.
[0013] By configuring the invention as described above, it is possible to perform simulation processing of the operating status of emergency responders.
[0014] In the above-mentioned invention, the prediction processing unit uses the learning model to perform prediction processing of emergency dispatch requests for different dates and time segments, and the simulation processing unit uses the results of emergency dispatch requests predicted by the prediction processing unit for each date and time segment to identify an emergency team with a pattern having the shortest reference value for the time and / or distance to the point where the emergency dispatch occurs, and identifies, from among the identified emergency teams, emergency teams that appear frequently as emergency teams to be increased.The information processing system can be configured to do this.
[0015] With the configuration of the present invention, it is possible to perform a simulation process when increasing the number of emergency teams, and to specify where the number of emergency teams should be increased.
[0016] In the above-mentioned invention, the simulation processing unit can be configured as an information processing system that performs processing to: assign additional ambulance teams to any fire station for a predetermined number of times for each date and time segment, identify sample emergency dispatch locations and dates and times, use the distance between the emergency dispatch locations and the fire station where the ambulance teams are located to assign priorities to the ambulance teams that will be dispatched to each emergency dispatch location using the distance between the emergency dispatch locations and the fire station where the ambulance teams are located, assign the ambulance teams that will be dispatched to the emergency dispatch locations in chronological order of the sample emergency dispatch dates and times using the priorities, and calculate standard values for the arrival time and / or traveling distance of the assigned ambulance teams to the emergency dispatch location; identify the ambulance teams in the pattern with the shortest standard values for the arrival time and / or traveling distance of the ambulance teams in each of the processing steps; and identify the ambulance teams that appear frequently among the identified ambulance teams as the ambulance teams to be increased.
[0017] In the above-mentioned invention, the simulation processing unit performs the following process: for each date and time segment, an additional ambulance team is assigned to any fire station for a predetermined number of times; for each mesh obtained by dividing the target area into predetermined sizes, a sample dataset is generated including sample emergency dispatch occurrence locations and dates and times corresponding to the emergency dispatch requests predicted by the prediction processing unit; using the distance between the emergency dispatch occurrence location in the sample dataset and the fire station where the emergency dispatch team is located, a priority is assigned from the emergency dispatch teams close to each emergency dispatch occurrence location; the emergency dispatch teams to be dispatched to the emergency dispatch occurrence location are assigned in chronological order of the dates and times of the emergency dispatches in the sample dataset using the priority; and a standard value for the arrival time and / or travel distance of the assigned emergency dispatch team to the emergency dispatch occurrence location is calculated; and a process is performed to identify the emergency dispatch team in the pattern with the shortest standard value for the arrival time and / or travel distance of the emergency dispatch team in each of the processes; and the emergency dispatch team that appears frequently among the identified emergency dispatch teams is identified as the emergency dispatch team to be increased.
[0018] There are various methods for simulation processing when increasing the number of rescue teams, but it is preferable to carry out the processing as in the present invention.
[0019] In the above-mentioned invention, The prediction processing unit can be configured as an information processing system in which the prediction processing unit uses the learning model to perform prediction processing of emergency dispatch requests for different dates and time segments, and the simulation processing unit uses the results of emergency dispatch requests predicted by the prediction processing unit for each date and time segment to identify an emergency team with a pattern having the shortest standard value for the time and / or distance to the point where the emergency dispatch occurs, and identifies, among the identified emergency teams, those that appear frequently and the fire stations to which they are to be moved.
[0020] With the configuration of the present invention, it is possible to perform a simulation process when moving and deploying rescue teams, and to specify which rescue teams should be moved to which fire stations and deployed there.
[0021] In the above-mentioned invention, the simulation processing unit can be configured as an information processing system that performs processing to move and deploy an ambulance team from any fire station to another fire station for a predetermined number of times for each date and time segment, identifies sample emergency dispatch occurrence locations and dates and times, assigns priority levels to the ambulance teams dispatched to each emergency dispatch occurrence location using the distance between the emergency dispatch occurrence location and the fire station where the ambulance team is located, assigns the ambulance teams to be dispatched to the emergency dispatch occurrence locations in chronological order of the date and time of the sample emergency dispatches using the priority levels, and calculates standard values for the arrival time and / or traveling distance of the assigned ambulance teams to the emergency dispatch occurrence location, performs processing to identify the ambulance teams and their destination fire stations in the pattern with the shortest standard values for the arrival time and / or traveling distance of the ambulance teams in each of the processing steps, and identifies the ambulance teams and their destination fire stations as those that appear frequently among the identified ambulance teams.
[0022] In the above-mentioned invention, the simulation processing unit can be configured as an information processing system that generates a sample dataset including sample emergency dispatch occurrence locations and dates and times corresponding to emergency dispatch requests predicted by the prediction processing unit for each date and time segment, for a predetermined number of times, in each mesh obtained by dividing the target area into predetermined sizes, assigns priorities from emergency dispatches close to each emergency dispatch occurrence location using the distance between the emergency dispatch occurrence location in the sample dataset and the fire station where the emergency dispatch is located, assigns emergency dispatches to the emergency dispatch occurrence location using the priority order in chronological order of the emergency dispatch dates and times in the sample dataset, and calculates a standard value for the arrival time and / or driving distance of the assigned emergency dispatch to the emergency dispatch occurrence location, performs a process to identify the emergency dispatches and the destination fire station in the pattern with the shortest standard value for the arrival time and / or driving distance of the emergency dispatch in each process, and identifies the emergency dispatches and the destination fire station as the most frequent among the identified emergency dispatches.
[0023] There are various methods for simulating the movement and deployment of emergency teams, but it is preferable to carry out the processing as described in the present invention.
[0024] In the above-mentioned invention, the learning processing unit can be configured as an information processing system that accepts input of the emergency request data, weather data, and area data, counts the number of emergency dispatch requests for each time segment in each mesh that divides the target area into predetermined sizes, chronologically serializes the counted number of emergency dispatch requests for each mesh, adds weather data for the day of the emergency request and area data for each mesh, performs machine learning using a table including the number of emergency dispatch requests, weather data, and area data, and generates the learning model.
[0025] To generate the learning model, it is preferable to carry out a process such as that of the present invention.
[0026] In the above-mentioned invention, the prediction processing unit can be configured as an information processing system that predicts an emergency dispatch request for the time segment on the date by inputting data including the date, time segment, and weather forecast data for the date as input values into the learning model.
[0027] The first invention can be realized by loading and executing the program of the present invention into a computer. That is, the information processing program causes a computer to function as a learning processing unit that receives input of emergency request data and generates a learning model for predicting emergency dispatch requests for emergency teams, a prediction processing unit that predicts emergency dispatch requests using the date and time segment for predicting emergency dispatch requests and the learning model, and a simulation processing unit that performs simulation processing on the operating status or deployment of emergency teams using the emergency dispatch requests predicted by the prediction processing unit. Effect of the Invention
[0028] By using the information processing system of the present invention, it is possible to predict emergency dispatch requests for ambulance teams and to simulate appropriate deployment of ambulance teams based on the prediction results. [Brief description of the drawings]
[0029] [Figure 1] 1 is a block diagram illustrating an example of a system configuration of an information processing system according to the present invention. [Diagram 2] FIG. 2 is a diagram illustrating an example of a hardware configuration of a computer used in the information processing system of the present invention. [Diagram 3] 11 is a flowchart showing an example of a learning process in the information processing system of the present invention. [Figure 4] 11 is a flowchart illustrating an example of a prediction process in the information processing system of the present invention. [Diagram 5] 4 is a flowchart showing an example of a simulation process in the information processing system of the present invention. [Figure 6] 4 is a flowchart showing an example of a simulation process in the information processing system of the present invention. [Figure 7] 4 is a flowchart showing an example of a simulation process in the information processing system of the present invention. [Figure 8] 11 is a diagram showing an example of a table used in the learning process in the learning processing unit; FIG. [Figure 9] 13 is an example of a screen for inputting a date and a time segment to be predicted during prediction processing in a prediction processing unit. [Figure 10] 13 is an example of a screen showing an example of a predicted number of emergency dispatch requests output by the prediction process in the learning processing unit. [Figure 11] 13 is an example of a screen showing an output result of the simulation process in the second embodiment. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0030] An example of the system configuration of an information processing system 1 of the present invention is shown in a block diagram of Fig. 1. Also, an example of the hardware configuration of a computer 2 used in the information processing system 1 of the present invention is shown in Fig. 2.
[0031] The information processing system 1 uses a computer 2. The computer 2 may be any of various electronic calculators such as a server, a personal computer, a portable communication terminal, etc. The computer 2 has a calculation device 70 such as a CPU that executes calculation processing of a program, a storage device 71 such as a RAM, a ROM, a hard disk, or an SSD that stores information, a display device 72 such as a display, an input device 73 that inputs information, and a communication device 74 that communicates the processing results of the calculation device 70 and the information stored in the storage device 71.
[0032] If the computer 2 is equipped with a touch panel display, the input device 73 and the display device 72 may be configured as one unit. Touch panel displays are often used in portable communication terminals such as tablet computers and smartphones, but are not limited to these. The touch panel display is a device that integrates the functions of the display device 72 and the input device 73 in that input can be made directly on the display by a predetermined input device (such as a touch panel pen) or a finger.
[0033] The functions may be realized by a single computer 2, or may be realized by multiple computers 2. In this case, the computer 2 may be, for example, a cloud server.
[0034] Furthermore, the means in the information processing system 1 of the present invention may be merely logically differentiated in function, and may physically or practically form the same area.
[0035] The computer 2 realizes each function of the information processing system 1 of the present invention. The computer 2 has a learning processing unit 10, a prediction processing unit 11, and a simulation processing unit 12.
[0036] The learning processing unit 10 receives input of data such as emergency request data, weather data, and area data, and performs predetermined machine learning to generate a learning model to be used in the prediction processing in the prediction processing unit 11.
[0037] The emergency call data is data when an emergency team is dispatched in response to an emergency call, and includes, for example, the call date and time, location information of the dispatch site (e.g., latitude and longitude information), the distance traveled by the emergency team from the fire station to the dispatch site, the date and time of arrival at the dispatch site, and the date and time of return from the dispatch site. The emergency call data is not limited to the above data as long as it is data when an emergency team is requested to be dispatched, and it can be appropriately selected as long as it is data necessary for the learning model used in the prediction processing in the prediction processing unit 11 described later. The emergency call data can be obtained from administrative agencies that manage the necessary data, such as the Fire and Disaster Management Agency, administrative agencies in the area to be subjected to the learning processing, fire department headquarters, fire stations, and emergency teams.
[0038] The weather data is data on the weather in the area including the site of the emergency dispatch on the day the emergency call was made, such as temperature, relative humidity, wind speed, wind direction, discomfort index, weather, etc. The weather data can be obtained, for example, from the Japan Meteorological Agency or a weather information provider.
[0039] Regional data is data such as demographic statistics for regions where emergency dispatch sites and fire stations to which emergency teams belong, and includes data such as the total population, total number of households, total number of people over a certain age (for example, total number of people aged 65 and over), total population by age group, total population by gender, etc. Such demographic data can be obtained from publicly available data collected through censuses and other surveys.
[0040] The learning processing unit 10 accepts input of data such as emergency request data, weather data, and area data. Then, based on the data, machine learning is performed using the number of emergency dispatches, weather data, and area data for each mesh of a predetermined size, for example, 2 km square, and for each predetermined time period (for example, every 4 hours) as input values. In this case, as the machine learning method, it is preferable to use a machine learning method using gradient boosting, but machine learning methods such as deep learning may also be used. For this mesh, an area where an emergency dispatch site, a fire station to which an emergency team belongs, and the like, for example, an administrative unit area such as a prefecture, city, ward, town, or village, is located may be meshed into a mesh of a certain size. In addition, the area of the mesh can be specified using position information such as the latitude and longitude of the vertices constituting the mesh, and information for identifying each mesh is attached, making the mesh identifiable.
[0041] Through the above-described processing, the learning processing unit 10 generates a learning model for predicting the number of emergency dispatches.
[0042] The prediction processing unit 11 inputs the date, time period, weather data, etc. for which emergency dispatches are to be predicted into the learning model generated by the learning processing unit 10 as input values, and outputs the predicted number of emergency dispatches for each mesh.
[0043] The simulation processing unit 12 executes various simulation processes based on the predicted number of emergency dispatches predicted by the prediction processing unit 11. For example, based on the predicted number of emergency dispatches predicted by the prediction processing unit 11, it executes a simulation process of the dispatch route and required time of each emergency team (Example 1), a simulation process in which the number of emergency teams is increased (Example 2), a simulation process in which the emergency teams are moved and allocated (Example 3), and the like.
[0044] Information such as where fire stations are located in the target area and which fire stations emergency teams are assigned to is stored in advance, and the simulation processing unit 12 uses this information when processing the simulation. EXAMPLES
[0045] Next, an example of processing using the information processing system 1 of the present invention will be described with reference to the flowcharts of FIGS.
[0046] The learning processing unit 10 of the computer 2 accepts input of emergency call data for the target area. For example, as the emergency call data, the input of the call date and time, the location information of the emergency call site (e.g., latitude and longitude), the distance traveled by the emergency team from the fire station to the call site, and the date and time of arrival at the call site (S100). Similarly, the learning processing unit 10 accepts input of data such as temperature, relative humidity, wind speed, wind direction, discomfort index, and weather as meteorological data for the target area, and data such as total population, total number of households, and total number of people aged 65 or over as regional data for the target area (S100).
[0047] The learning processing unit 10 then divides the target area for which the learning model is to be generated into meshes of a predetermined size, for example, 2 km square, and counts the number of emergency dispatches for each mesh, for example, for each preset time period, for example, for each 4-hour period, using the notification date and time in the emergency request data and the location information of the emergency dispatch site (S110).Then, the number of emergency dispatch requests for each mesh is rearranged in chronological order (S120). That is, the number of emergency dispatches for each date and time period is associated with each mesh and compiled into a table.
[0048] Then, the weather data at the time of the emergency call is added to the table for each mesh (S130), and the area data is added to the table for each mesh (S140).
[0049] In the table generated from S110 to S140, the number of emergency dispatch requests, weather data, and area data are associated with each date and time period, so the year, month, date, day of the week, hour, national holiday, weekend, time period (early morning, daytime, night, late night), etc. are added as independent variables (S150). An example of this table is shown in Figure 8. Note that independent variables can be added at will.
[0050] The learning processing unit 10 performs learning by a predetermined machine learning learning method using the time series data in the above table. For example, machine learning by gradient boosting is performed to generate a learning model (S160).
[0051] In addition, since the number of emergency dispatch requests for many different regional meshes is consecutive in the table in Fig. 8, in order to improve the prediction accuracy, appropriate data conversion may be performed, such as creating a table for each mesh. For example, the following processing can be performed as data conversion.
[0052] Emergency dispatch requests do not necessarily occur in all meshes. In fact, there are many meshes that do not receive any emergency dispatch requests. On the other hand, if a mesh includes a downtown area, emergency dispatches may be concentrated in that area. As a result, the number of emergency dispatch requests in many meshes will be "0", while the number of emergency dispatch requests in a few meshes will be "1" or more, which may result in bias in the learning data. If such data is used for learning as is, it will cause a deterioration in accuracy. Therefore, it is preferable to adjust it using undersampling and logarithmic transformation.
[0053] For example, in undersampling, many meshes in the target area have a number of emergency dispatch requests of "0", while a very small number of meshes have a number of emergency dispatch requests of "1" or more. Therefore, the number of meshes with a number of emergency dispatch requests of "1" or more is counted. Then, among the meshes with a number of emergency dispatch requests of "0", the same number of meshes as the counted number or approximately the same number (a number within a predetermined range) are sampled and used as learning data. Meshes that were not sampled are excluded from the learning subjects.
[0054] In addition, if the number of emergency dispatch requests in a very small number of meshes is high, for example, if the target area includes a busy shopping district such as Kabukicho, the number of emergency dispatch requests will be high only in meshes that include the busy shopping district, which will cause the learning accuracy to deteriorate. Therefore, the number of emergency dispatch requests for each mesh may be logarithmically transformed and used as the data to be learned.
[0055] Regarding the data conversion of the number of emergency requests per mesh used for machine learning, depending on the characteristics of the number of emergency dispatch requests for each target area, undersampling processing and logarithmic transformation processing for the mesh may be performed together, either one or neither may be performed.
[0056] By performing the above-mentioned processing, a learning model can be generated for predicting the number of emergency dispatch requests.
[0057] Then, when predicting the number of emergency dispatch requests next, the date and time segment to be predicted are input from the screen shown in Fig. 9, and these inputs are accepted (S200). When a button such as "Predict" is pressed, an instruction to perform prediction processing in the prediction processing unit 11 and the date and time segment to be predicted are accepted.
[0058] When the prediction processing unit 11 receives an instruction to perform prediction processing and the date and time segment to be predicted, it acquires weather data for the date and time segment, such as temperature, relative humidity, wind speed, wind direction, discomfort index, and weather, from a database of weather forecast data acquired at a predetermined timing in advance (S210). Note that the weather forecast data may be acquired in advance from the computer 2 system of the Japan Meteorological Agency or a weather information provider, or may be acquired from the computer 2 system of the Japan Meteorological Agency or a weather information provider by receiving an instruction to perform prediction processing.
[0059] The prediction processing unit 11 then inputs the date to be predicted, the time segment, and the acquired weather forecast data as input values into the learning model generated in S160, and executes the prediction process (S220). This prediction process executes prediction processes for all meshes in the target area, and the prediction processing unit 11 displays the number of emergency dispatches predicted for each mesh on a map. At this time, the display may be performed using a heat map that changes color according to the number of emergency dispatches. An example of this is shown in FIG. 10. Note that, although FIG. 10 shows a case in which the prediction processing unit 11 visualizes and displays the number of emergency dispatches for each mesh on a map using a heat map, other display methods may also be used.
[0060] Next, a case where a simulation process is performed in the simulation processing unit 12 using the predicted number of emergency dispatch requests outputted by the prediction processing unit 11 will be described.
[0061] The simulation processing unit 12 calculates reference values such as the median or average of the arrival time at the scene and the return time for each ambulance team using the time from the call to the arrival time at the scene and the time from the call to the return to the station in the emergency request data input in S100 (S300). In the following, a case where the average is used as the reference value will be described, but the same processing can be performed using the median.
[0062] Then, the simulation processing unit 12 uses the predicted number of emergency dispatches output by the prediction processing unit 11 to randomly identify, as samples, location information of the site of the emergency dispatch request within the mesh for the number of emergency dispatch requests predicted for each mesh. That is, within the mesh area, location information for the predicted number of emergency dispatch requests is randomly identified, and these location information are identified as samples of the site of the emergency dispatch (S310). For example, if there are three predicted numbers of emergency dispatch requests in a certain time segment of a certain mesh, location information of three points is randomly identified within the mesh area, and each point is used as a sample of the site of the emergency dispatch request.
[0063] Furthermore, the simulation processing unit 12 randomly identifies times corresponding to the number of emergency dispatch requests in the time segment used by the prediction processing unit 11, and sets these as samples of times when emergency dispatch requests were made (S320).
[0064] The sample of the scene of the emergency dispatch identified in S310 is associated with the sample of the time of the emergency dispatch request identified in S320, and a data set of the location information of the sample point of the emergency dispatch request and the sample date and time is created (S330). The combination of the sample point and the sample date and time is referred to as sample data.
[0065] Then, the simulation processing unit 12 uses the location information of the sample location of the emergency dispatch request and the location information of the fire station to which each emergency team belongs to calculate the straight-line distance between the location information of the sample location and the fire station, and assigns a priority to each emergency team in order of proximity to the sample location (S340). In addition, the emergency team closest to the sample location, i.e., the emergency team with the first priority, is designated as the "original highest priority emergency team" and the location of that emergency team is recorded (S350).
[0066] In the data set created in S330, the sample location of the emergency dispatch request and the sample date and time are associated as sample data, so an emergency dispatch team is assigned for each sample data in the chronological order of the sample date and time (S360). In this case, the emergency dispatch team is assigned in order starting from the emergency dispatch team with the highest priority. The emergency dispatch team assigned to the emergency dispatch cannot be assigned again until the time when the average return time calculated in S300 is added to the sample date and time in the sample data (the sample time when the emergency request was made). At this time, a predetermined time (for example, any time such as a break time) may be added to the average return time to the sample date and time. If the emergency dispatch team with the highest priority cannot be dispatched, the emergency dispatch team with the next highest priority (the emergency dispatch team next closest to the location information of the sample location) is assigned. This is repeated until an emergency dispatch team capable of emergency dispatch is assigned to the emergency dispatch team.
[0067] Then, when an ambulance team is assigned to each sample data in the data set created in S330, the route (distance) and required time from the fire station to which the ambulance team will be dispatched to the sample point in the sample data are derived (S370). Then, the simulation processing unit 12 displays the calculated route and required time as map information.
[0068] By performing the above-mentioned processing, it is possible to simulate the predicted number of emergency dispatch requests in a certain time slot on a certain date and time, as well as the operational status of each emergency team, such as the route that each team will take and the time required. EXAMPLES
[0069] Next, a description will be given of a case where a simulation process is performed in the simulation processing unit 12 when the number of rescue teams is increased. The learning process in the learning processing unit 10 and the prediction process in the prediction processing unit 11 are the same as those in the first embodiment.
[0070] The number of ambulance teams is arbitrarily increased at fire stations in the target area (virtually increasing and deploying ambulance teams at fire stations). For example, if there are 20 ambulance teams at 10 fire stations in the target area, a 21st ambulance team is added to a certain fire station (adding one ambulance team) (S400, S410). The increase in team size may be performed automatically by the simulation processing unit 12, or the operator may set an increase in team size at a specific fire station.
[0071] Then, similarly to S300, the simulation processing unit 12 calculates the reference values as the median or average value of the arrival time at the scene and the return time for each ambulance team using the time from the call to the arrival time at the scene and the time from the call to the return time in the emergency request data received in S100 (S420). The additional ambulance team may calculate the median or average value of the arrival time at the scene and the return time of all ambulance teams and use the calculated values, or may use the values if there is an ambulance team already deployed in the same fire station. In addition to using the time as described above, the travel distance may be used. In this case, the travel distance from the call to the scene and the travel distance from the dispatch to the return time in the emergency request data may be used to calculate the reference values as the median or average value of the travel distance to the scene and the travel distance to the return time for each ambulance team. In this case, the additional ambulance team may calculate the median or average value of the travel distance to the scene and the travel distance to the return time of all ambulance teams and use the calculated values, or may use the values if there is an ambulance team already deployed in the same fire station.
[0072] Then, the simulation processing unit 12 executes the simulation process in the same manner as in the first embodiment, that is, executes the same processes from S310 to S370.
[0073] First, the simulation processing unit 12 randomly identifies, as samples, location information of the site of the emergency dispatch request within a mesh for the number of emergency dispatch requests predicted for each mesh using the predicted number of emergency dispatches output by the prediction processing unit 11. That is, within the mesh location information, location information for the predicted number of emergency dispatch requests is randomly identified, and these location information are identified as samples of the site of the emergency dispatch (S430).
[0074] Furthermore, the simulation processing unit 12 randomly identifies times corresponding to the number of emergency dispatch requests in the time segments used by the prediction processing unit 11, and identifies these as samples of times when emergency dispatch requests were made (S440).
[0075] The sample of the site of the emergency dispatch identified in S430 is associated with the sample of the time of the emergency dispatch request identified in S440, and a data set of the sample location and sample date and time of the emergency dispatch request is created (S450).
[0076] Then, the simulation processing unit 12 uses the location information of the sample location of the emergency dispatch request and the location information of the fire station to which each emergency team belongs to calculate the straight-line distance between the location information of the sample location and the fire station, and assigns a priority to each emergency team in order of proximity to the sample location (S460). In addition, the emergency team closest to the sample location, i.e., the emergency team with the first priority, is designated as the "original highest priority emergency team" and the location of that emergency team is recorded (S470).
[0077] In the data set created in S450, the sample location of the emergency dispatch request and the sample date and time are associated as sample data, so an emergency dispatch is assigned to each sample data in the chronological order of the sample date and time (S480). In this case, the emergency dispatch is assigned in order starting from the emergency dispatch with the first priority. As in the first embodiment, an emergency dispatch assigned to an emergency dispatch cannot be assigned again until the time calculated by adding the average return time calculated in S420 to the sample date and time in the sample data (the sample time when the emergency request was made). In that case, the emergency dispatch with the next priority (the emergency dispatch next closest to the location information of the sample location) is assigned. This is repeated until an emergency dispatch capable of emergency dispatch is assigned to the emergency dispatch.
[0078] Then, when an ambulance team is assigned to each sample data in the data set created in S450, the time or distance required for the ambulance team to travel from the fire station to which the ambulance team will be dispatched to the sample point in the sample data is calculated (S490).
[0079] Then, based on the time or distance required by the ambulance assigned to each sample calculated in S490, the average arrival time or average travel distance from the fire station to the sample location is calculated (S500).
[0080] By performing the above-mentioned processing, the average arrival time or average travel distance when an additional rescue team is added to a certain fire station has been calculated, and the simulation processing unit 12 then adds an additional rescue team to another fire station, as in S410, and executes the processing from S410 onwards again.
[0081] This process is repeated multiple times, for example, for all fire stations, and a simulation process is performed (S400) in which the number of rescue teams is increased. The simulation pattern with the shortest average arrival time or average travel distance calculated in S500 is identified, and the number of rescue teams added at that time is identified and stored (S510).
[0082] The additional ambulance team identified in S510 is the optimal ambulance team based on the date and time segment input in the prediction processing unit 11, so a different date and time segment are used as input values for the date and time segment to be predicted in the prediction processing unit 11, and a prediction process in the prediction processing unit 11 similar to that in Example 1 and a simulation process in the simulation processing unit 12 based on the output results are automatically executed a predetermined sufficient number of times, for example 100 times (S520, S530).
[0083] The simulation processing unit 12 determines the most frequently occurring ambulance team among the additional ambulance teams in the pattern with the shortest average arrival time or average travel distance in each simulation pattern (the additional ambulance teams identified in S510) as the ambulance team to be increased (S540). An example of the screen is shown in Figure 11.
[0084] By the above processing, when the number of rescue teams is to be increased, the simulation processing unit 12 can execute a simulation process to determine to which fire station the rescue teams should be increased.
[0085] It is preferable that the user can select whether to determine the number of rescue teams to be increased based on the average arrival time or the average travel distance. Also, both may be displayed.
[0086] In the above description, the average value is used as the reference value, but the median value may be used instead. EXAMPLES
[0087] Next, a description will be given of a case where a simulation process is performed in the simulation processing unit 12 when an ambulance team is moved and deployed. The learning process in the learning processing unit 10 and the prediction process in the prediction processing unit 11 are the same as those in the first embodiment.
[0088] An ambulance team stationed at a fire station in the target area is moved and deployed to another fire station (an ambulance team stationed at a certain fire station is virtually moved and deployed to another fire station). For example, one of the ambulance teams stationed at fire station A in the target area is moved and deployed to fire station B (S600, S610). The movement and deployment of the ambulance team may be performed automatically by the simulation processing unit 12, or the operator may set the source and destination fire stations. In this case, either the source or destination fire station may be set by the operator, and the other may be set automatically by the simulation processing unit 12.
[0089] Then, similarly to S300, the simulation processing unit 12 calculates the median or average value of the arrival time at the scene and the return time for each ambulance team using the time from the call to the arrival time at the scene and the time from the call to the return time in the emergency request data received in S100 (S620). The ambulance team that has been moved and deployed may calculate the median or average value of the arrival time at the scene and the return time of all ambulance teams and use the calculated value, or may use the value if there is an ambulance team already deployed in the same fire station. Also, similarly to the second embodiment, in addition to the time, the travel distance may be used. In this case, the travel distance from the call to the scene in the emergency request data and the travel distance from the dispatch to the return time may be used to calculate the reference value as the median or average value of the travel distance to the scene and the travel distance to the return time for each ambulance team. In this case, the increased ambulance team may calculate the median or average value of the travel distance to the scene and the travel distance to the return time of all ambulance teams and use the calculated value, or may use the value if there is an ambulance team already deployed in the same fire station.
[0090] Then, the simulation processing unit 12 executes the simulation process in the same manner as in the first embodiment, that is, executes the same processes from S310 to S370.
[0091] First, the simulation processing unit 12 randomly identifies the sites of emergency dispatch requests within a mesh as samples for the number of emergency dispatch requests predicted for each mesh using the predicted number of emergency dispatches output by the prediction processing unit 11. That is, within the mesh position information, location information for the predicted number of emergency dispatch requests is randomly identified, and these location information are identified as samples of emergency dispatch sites (S630).
[0092] Furthermore, the simulation processing unit 12 randomly identifies times corresponding to the number of emergency dispatch requests in the time segments used by the prediction processing unit 11, and identifies these as samples of times when emergency dispatch requests were made (S640).
[0093] The sample of the site of the emergency dispatch identified in S630 is associated with the sample of the time of the emergency dispatch request identified in S640, and a data set of the sample location and sample date and time of the emergency dispatch request is created (S650).
[0094] Then, the simulation processing unit 12 uses the location information of the sample location of the emergency dispatch request and the location information of the fire station to which each emergency team belongs to calculate the straight-line distance between the location information of the sample location and the fire station, and assigns a priority to each emergency team in order of proximity to the sample location (S660). In addition, the emergency team closest to the sample location, i.e., the emergency team with the first priority, is designated as the "original highest priority emergency team" and the location of that emergency team is recorded (S670).
[0095] In the data set created in S650, the sample location of the emergency dispatch request and the sample date and time are associated as sample data, so an emergency dispatch team is assigned for each sample data in the chronological order of the sample date and time (S680). In this case, the emergency dispatch team is assigned in order starting from the emergency dispatch team with the highest priority. As in the first embodiment, an emergency dispatch team assigned to an emergency dispatch cannot be assigned again until the time calculated by adding the average return time calculated in S620 to the sample date and time in the sample data (the sample time when the emergency request was made). In that case, the emergency dispatch team with the next highest priority (the emergency dispatch team next closest to the location information of the sample location) is assigned. This is repeated until an emergency dispatch team capable of emergency dispatch is assigned.
[0096] Then, when an ambulance team is assigned to each sample data in the data set created in S650, the time or distance required for the ambulance team to travel from the fire station to which the ambulance team will be dispatched to the sample point in the sample data is calculated (S690).
[0097] Then, based on the time or distance traveled by the ambulance assigned to each sample calculated in S690, standard values such as the average arrival time or average travel distance from the fire station to the sample location are calculated (S700).
[0098] By performing the above-mentioned processing, the average arrival time or average travel distance when an ambulance team stationed at one fire station is moved and assigned to another fire station has been calculated. As a result, the simulation processing unit 12 moves the ambulance team stationed at one fire station to another fire station, as in S610, and executes the processing from S610 onwards again.
[0099] This process is repeated multiple times, for example, simulating the patterns in which all ambulance teams are moved and deployed (S600). The simulation pattern that has the shortest average arrival time or average travel distance calculated in S700 is identified, and the ambulance team from the fire station they moved from and the fire station they moved to are identified and stored (S710).
[0100] Since the additional ambulance team identified in S710 is the optimal ambulance team based on the date and time segment input in the prediction processing unit 11, different dates and time segments are used as input values for the date and time segment to be predicted in the prediction processing unit 11, and the prediction processing in the prediction processing unit 11 similar to that in Example 1 and the simulation processing in the simulation processing unit 12 based on the output results are automatically executed a predetermined sufficient number of times, for example 100 times (S720, S730).
[0101] As a result of each of the above processes, the simulation processing unit 12 determines the most frequent ambulance team and destination fire station among the ambulance team from the source fire station and the destination fire station (the ambulance team identified in S710 and its destination fire station) in the pattern with the shortest standard value, such as the average arrival time or the average travel distance, for each simulation pattern (S740).
[0102] By the above process, a simulation process can be executed in which an ambulance team stationed at one fire station is moved to another fire station.
[0103] It is preferable that the user can select whether to determine the number of rescue teams to be increased based on the average arrival time or the average travel distance. Also, both may be displayed.
[0104] In the above description, the average value is used as the reference value, but the median value may be used instead.
[0105] The present invention can be modified in design as appropriate without departing from the spirit of the present invention. The processes are merely examples, and the processes can be executed in a different order. Furthermore, the display on the screen can be modified as appropriate. Also, it is not necessary to provide all the functions, and it is also acceptable to provide only a portion of the functions. [Industrial Applicability]
[0106] By using the information processing system 1 of the present invention, it is possible to predict the number of emergency dispatches of ambulance teams and to simulate appropriate deployment of ambulance teams based on the prediction results. [Explanation of symbols]
[0107] 1: Information processing system 2: Computer 20: Learning processing unit 21: Prediction processing unit 22: Simulation processing section 70: Arithmetic device 71:Storage device 72:Display device 73: Input device 74: Communication equipment
Claims
1. An information processing system for predicting the dispatch of an ambulance, The information processing system includes: A learning processing unit that receives an input of emergency request data and generates a learning model for predicting an emergency dispatch request for an emergency team; A prediction processing unit that predicts an emergency dispatch request using a date and a time segment for predicting an emergency dispatch request and the learning model; A simulation processing unit that performs a simulation process on the operation status or deployment of an ambulance team using the emergency dispatch request predicted by the prediction processing unit; An information processing system comprising:
2. The simulation processing unit: Identifying a sample emergency dispatch occurrence location and date and time corresponding to the emergency dispatch request predicted by the prediction processing unit; Using the distance between the emergency dispatch occurrence point and the fire station where the emergency dispatch team is located, a priority order is assigned to the emergency dispatch team for each emergency dispatch occurrence point; Allocating emergency teams to be dispatched to the emergency dispatch occurrence points using the priority order in chronological order of the dates and times of the sample emergency dispatches; Calculating a route and / or a required time for the assigned ambulance team to the point where the emergency dispatch occurs, thereby simulating the operation status of the ambulance team.
2. The information processing system according to claim 1 .
3. The simulation processing unit: A sample data set is generated for each mesh obtained by dividing the target area into predetermined sizes, the sample data set including a sample emergency dispatch occurrence location and date and time corresponding to the emergency dispatch request predicted by the prediction processing unit; Using the distance between an emergency dispatch occurrence point in the sample data set and a fire station where the emergency dispatch team is located, a priority is assigned to each emergency dispatch occurrence point from the adjacent emergency dispatch team; Allocating emergency teams to be dispatched to the emergency dispatch occurrence points using the priority order in chronological order of the dates and times of the emergency dispatches in the sample data set; Calculating a route and / or a required time for the assigned ambulance team to the point where the emergency dispatch occurs, thereby simulating the operation status of the ambulance team.
2. The information processing system according to claim 1 .
4. The simulation processing unit: Allocating an ambulance team to be dispatched to the location of the emergency dispatch in chronological order of the date and time of the sample emergency dispatch using the priority order and the time and / or distance of the ambulance team in the emergency request data.
4. The information processing system according to claim 2 or 3.
5. The prediction processing unit: Using the learning model, a prediction process for emergency dispatch requests for different dates and time segments is performed; The simulation processing unit: For each date and time segment, using the results of the emergency dispatch request predicted by the prediction processing unit, an emergency team with a pattern having the shortest reference value for the time and / or distance to the emergency dispatch occurrence point is identified; Among the identified emergency teams, identify those that are frequently called upon as the emergency teams to be increased.
2. The information processing system according to claim 1 .
6. The simulation processing unit: For each date and time period, For a predetermined number of times, Increase the number of emergency rescue teams at any fire station, Identify the location and date of the sample emergency dispatch, Using the distance between the emergency dispatch occurrence point and the fire station where the emergency dispatch team is located, a priority is assigned to the emergency dispatch team for each emergency dispatch occurrence point; Allocating emergency teams to be dispatched to the emergency dispatch occurrence points using the priority order in chronological order of the dates and times of the sample emergency dispatches; Calculating a reference value of the arrival time and / or the travel distance of the assigned ambulance to the emergency dispatch occurrence point; Execute the process, Identifying an ambulance in a pattern with the shortest criterion value of the arrival time and / or the travel distance of the ambulance in each of the processes; Execute the process, Among the identified emergency teams, the emergency teams that appear frequently are identified as the emergency teams to be increased; 6. The information processing system according to claim 5.
7. The simulation processing unit: For each date and time period, For a predetermined number of times, Increase the number of emergency rescue teams at any fire station, A sample data set is generated for each mesh obtained by dividing the target area into predetermined sizes, the sample data set including a sample emergency dispatch occurrence location and date and time corresponding to the emergency dispatch request predicted by the prediction processing unit; Using the distance between an emergency dispatch occurrence point in the sample data set and a fire station where the emergency dispatch team is located, a priority is assigned to each emergency dispatch occurrence point from the adjacent emergency dispatch team; Allocating emergency teams to be dispatched to the emergency dispatch occurrence points using the priority order in chronological order of the dates and times of the emergency dispatches in the sample data set; Calculating a reference value of the arrival time and / or the travel distance of the assigned ambulance to the emergency dispatch occurrence point; Execute the process, Identifying an ambulance in a pattern with the shortest criterion value of the arrival time and / or the travel distance of the ambulance in each of the processes; Execute the process, Among the identified emergency teams, the emergency teams that appear frequently are identified as the emergency teams to be increased; 6. The information processing system according to claim 5.
8. The prediction processing unit: Using the learning model, a prediction process for emergency dispatch requests for different dates and time segments is performed; The simulation processing unit: For each date and time segment, using the results of the emergency dispatch request predicted by the prediction processing unit, an emergency team with a pattern having the shortest reference value for the time and / or distance to the emergency dispatch occurrence point is identified; Among the identified ambulance teams, identify the most frequently dispatched ambulance teams and the fire stations to which they are dispatched.
2. The information processing system according to claim 1 .
9. The simulation processing unit: For each date and time period, For a predetermined number of times, Move and assign ambulances from any fire station to other fire stations, Identify the location and date of the sample emergency dispatch, Using the distance between the emergency dispatch occurrence point and the fire station where the emergency dispatch team is located, a priority is assigned to the emergency dispatch team for each emergency dispatch occurrence point; Allocating emergency teams to be dispatched to the emergency dispatch occurrence points using the priority order in chronological order of the dates and times of the sample emergency dispatches; Calculating a reference value of the arrival time and / or the travel distance of the assigned ambulance to the emergency dispatch occurrence point; Execute the process, Identifying the ambulance and the destination fire station in the pattern with the shortest criterion value of the arrival time and / or the travel distance of the ambulance in each of the above processes; Execute the process, Among the identified ambulance teams, frequently-dispatched ambulance teams and fire stations to which they are transferred are identified.
9. The information processing system according to claim 8.
10. The simulation processing unit: For each date and time period, For a predetermined number of times, A sample data set is generated for each mesh obtained by dividing the target area into predetermined sizes, the sample data set including a sample emergency dispatch occurrence location and date and time corresponding to the emergency dispatch request predicted by the prediction processing unit; Using the distance between an emergency dispatch occurrence point in the sample data set and a fire station where the emergency dispatch team is located, a priority is assigned to each emergency dispatch occurrence point from the adjacent emergency dispatch team; Allocating emergency teams to be dispatched to the emergency dispatch occurrence points using the priority order in chronological order of the dates and times of the emergency dispatches in the sample data set; Calculating a reference value of the arrival time and / or the travel distance of the assigned ambulance to the emergency dispatch occurrence point; Execute the process, Identifying the ambulance and the destination fire station in the pattern with the shortest criterion value of the arrival time and / or the travel distance of the ambulance in each of the above processes; Execute the process, Among the identified ambulance teams, frequently-dispatched ambulance teams and fire stations to which they are transferred are identified.
9. The information processing system according to claim 8.
11. The learning processing unit: Accepting input of the emergency call data, weather data, and area data; The target area is divided into predetermined meshes of a certain size, and the number of emergency dispatch requests is counted for each time period. The number of emergency dispatch requests counted for each mesh is then time-series. For each mesh, weather data on the day of the emergency request and regional data are added; Perform machine learning using a table including the number of emergency dispatch requests, meteorological data, and regional data to generate the learning model.
2. The information processing system according to claim 1 .
12. The prediction processing unit: Data including a date and a time segment for predicting an emergency dispatch request and weather forecast data for the date are input as input values to the learning model, thereby predicting an emergency dispatch request for the time segment on the date.
12. The information processing system according to claim 1 or 11.
13. Computer, A learning processing unit that receives an input of emergency request data and generates a learning model for predicting an emergency dispatch request for an ambulance team; a prediction processing unit that predicts an emergency dispatch request using a date and a time segment for predicting an emergency dispatch request and the learning model; A simulation processing unit that performs a simulation process on the operation status or deployment of an ambulance team using the emergency dispatch request predicted by the prediction processing unit; An information processing program characterized by causing the program to function as follows.
Citation Information
Patent Citations
Emergency demand forecasting device, emergency demand forecasting method, and program
JP7087946B2
SC2020-15
