Information processing device, information processing method, and program
The information processing device uses orthogonal power calculations to estimate solar power generation, addressing voltage control challenges in sensor-less areas by determining vector angles and amounts, enhancing voltage regulation efficiency.
Patent Information
- Application Number
- JP2023070079
- Authority / Receiving Office
- JP · JP
- Patent Type
- Applications
- Current Assignee / Owner
- Filing Date
- 2023-04-21
- Publication Date
- 2024-10-31
AI Technical Summary
Existing centralized voltage control systems in power distribution systems struggle to accurately adjust voltage at locations without sensors, particularly due to the influence of solar power generation devices, necessitating a method to estimate the power generation state of solar power generation devices without complex synchronization with weather data.
An information processing device that calculates active and reactive power using sensor measurements, utilizes an orthogonal coordinate system to determine the power generation status of solar power devices by analyzing vector angles and power generation amounts, and adjusts voltage regulators accordingly.
Enables easy estimation of solar power generation in power distribution systems, allowing precise voltage control without requiring meteorological data, thereby simplifying system complexity and improving voltage regulation.
Smart Images

Figure 2024155399000001_ABST
Abstract
Description
[Technical field]
[0001] The present invention relates to an information processing device, an information processing method, and a program, and more particularly to an information processing device, an information processing method, and a program for estimating a power generation state of a photovoltaic power generation device connected to a power distribution system, for example. [Background technology]
[0002] Due to the widespread use of solar power generation equipment installed at general consumers, etc., the voltage fluctuations in the power distribution system are becoming more complex due to weather, time of day, etc. Conventionally, the voltage of the power distribution system was adjusted by an operator going to the site and changing the settings related to tap switching control, etc., set in voltage control devices such as LRTs (Load Ratio Control Transfomers) installed at substations and SVRs (Step Voltage Regulators) installed on distribution lines (self-end control method). However, in recent years, in order to respond to voltage fluctuations in the power distribution system due to weather, time of day, etc., the introduction of a centralized voltage control method to replace the conventional self-end control method is progressing.
[0003] The centralized voltage control method is a method in which the voltage, current, etc. in the distribution system are measured using sensors built into switches, voltage regulators, etc. installed in the distribution system, appropriate setting values are calculated based on these measurements, and voltage control devices such as LRTs and SVRs are controlled via a communication network (see Patent Document 1).
[0004] According to the voltage centralized control method, it is possible to adjust the voltage at the points where sensors are installed in the power distribution system to an appropriate value. On the other hand, since the measured voltage values at the points where sensors are not installed, such as high-voltage branch lines and low-voltage systems in the power distribution system, cannot be obtained, some ingenuity is required to appropriately adjust the voltage at these points. For example, it is necessary to determine the setting value of the voltage regulator so that the voltage at the points where sensors are not installed falls within an allowable range, based on the measured voltage values at the points where sensors are installed in the power distribution system, taking into account the voltage difference between the points where sensors are installed and the points where sensors are not installed.
[0005] However, the voltage difference between a point where a sensor is installed and a point where a sensor is not installed in the power distribution system depends greatly on the power generation state of the photovoltaic power generation device connected to the power distribution system. Therefore, in order to set the setting value of the voltage regulator to an appropriate value, it is necessary to take into account the power generation state of the photovoltaic power generation device.
[0006] As a method for grasping the power generation state of a photovoltaic power generation device connected to a power distribution system, for example, Patent Document 2 discloses a technique for calculating the amount of power generated by a photovoltaic power generation device using meteorological data. [Prior art documents] [Patent documents]
[0007] [Patent Document 1] JP 2012-217248 A [Patent Document 2] JP 2022-121028 A Summary of the Invention [Problem to be solved by the invention]
[0008] However, in order to grasp the power generation state of a photovoltaic power generation device using meteorological data as in Patent Document 2, it is necessary to periodically synchronize the meteorological data with the calculation processing by the centralized voltage control method, which leads to a complication of the system.
[0009] Therefore, the inventors of the present application have considered estimating the amount of power generated by a photovoltaic power generation device from the measurements of sensors installed in a power distribution system. The power simply calculated from the measurements of sensors installed in a power distribution system contains a mixture of power consumed by a load and power generated by the photovoltaic power generation device. Therefore, it is necessary to separate the power generated by the photovoltaic power generation device from the power calculated from the measurements of each sensor. However, it is not easy to separate the power generated by the photovoltaic power generation device from the power calculated from the measurements of the sensors.
[0010] The present invention has been made in consideration of the above-mentioned problems, and has an object to make it possible to easily estimate the power generation state of a photovoltaic power generation device in a power distribution system. [Means for solving the problem]
[0011] An information processing device according to a representative embodiment of the present invention is characterized in having a measurement result acquisition unit that acquires measured values of voltage and current of a power distribution system measured by a sensor; a power calculation unit that calculates an active power and a reactive power of the power distribution system based on the measured values acquired by the measurement result acquisition unit; a vector calculation unit that, in a Cartesian coordinate system in which the active power is on a first axis and the reactive power is on a second axis and the first axis and the second axis are perpendicular to each other, sets a point determined by the active power and the reactive power of the power distribution system to be determined at a specified time or time period as a reference point and a point determined by the active power and the reactive power of the power distribution system to be determined at the time or time period to be determined as a judgment target point, and calculates a vector connecting the reference point to the judgment target point; and a power generation determination unit that determines whether or not power is being generated by a solar power generation device connected to the power distribution system to be determined at the time or time period to be determined based on the direction of the vector. Effect of the Invention
[0012] According to the information processing device of the present invention, it is possible to easily estimate the power generation state of a photovoltaic power generation device in a power distribution system. [Brief description of the drawings]
[0013] [Figure 1] 1 is a diagram showing a configuration of a power supply system including an information processing device according to an embodiment; [Diagram 2] FIG. 2 is a diagram showing an example of voltage in a power distribution system. [Diagram 3] 1 is a scatter plot of actual measured values of active power and reactive power at a start-up point of a power distribution system. [Figure 4]1 is a scatter plot of actual measured values of active power and reactive power at a start-up point of a power distribution system. [Diagram 5] 1 is a scatter plot of actual measured values of active power and reactive power at a start-up point of a power distribution system. [Figure 6] 4 is a diagram for explaining a method for estimating a power generation state of a photovoltaic power generation device by a centralized control system according to an embodiment. FIG. [Figure 7] FIG. 1 is a diagram for explaining a method for estimating the amount of power generated by a solar power generation device. [Figure 8] 1 is a block diagram showing a configuration of a centralized control system according to an embodiment; [Figure 9] 5 is a flowchart showing an example of a process flow for estimating a power generation state of a photovoltaic power generation device in the centralized control system according to the embodiment. [Figure 10A] FIG. 2 is a diagram showing changes in power generation rate over time in one power distribution system. [Figure 10B] FIG. 2 is a diagram showing changes in power generation rate over time in one power distribution system. [Figure 10C] FIG. 2 is a diagram showing changes in power generation rate over time in one power distribution system. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0014] 1. Overview of the embodiment First, a typical embodiment of the invention disclosed in this application will be outlined. In the following description, as an example, reference numerals in the drawings corresponding to components of the invention are given in parentheses.
[0015] [1] An information processing device (2) according to a representative embodiment of the present invention includes a measurement result acquisition unit (21) that acquires measured values of voltage and current of a power distribution system measured by sensors (5, 11, 12, 91_1 to 91_4, 92, 92_1 to 92_4), a power calculation unit (22) that calculates active power and reactive power of the power distribution system based on the measured values acquired by the measurement result acquisition unit, and a power calculation unit (22) that calculates active power and reactive power of the power distribution system to be determined at a predetermined time or time zone in an orthogonal coordinate system in which the active power is on a first axis and the reactive power is on a second axis, the first axis and the second axis being orthogonal to each other. the power distribution system to be judged at the time or time zone to be judged, based on the direction of the vector; and a power generation judgment unit (27) that judges whether or not power is being generated by a solar power generation device connected to the power distribution system to be judged at the time or time zone to be judged, based on the direction of the vector.
[0016] [2] In the information processing device (2) described in [1] above, the vector calculation unit may calculate an angle between the vector and either one of the first axis or the second axis as the direction of the vector, and the power generation determination unit may determine whether or not power generation is occurring by the solar power generation device based on the magnitude of the angle.
[0017] [3] In the information processing device described in [2] above, when the reactive power when the current lags behind the voltage is considered positive, the vector calculation unit calculates the angle (θ) of the vector with respect to the positive direction of the first axis, and the power generation determination unit determines that there is no power generation by the solar power generation device connected to the distribution system being determined at the time or time period being determined if the angle is in the range of 0° to 90°, and determines that there is power generation by the solar power generation device connected to the distribution system at the time or time period being determined if the angle is in the range of 90° to 180°.
[0018] [4] In the information processing device described in [1] above, the reference point may be a point determined by the active power and the reactive power at a time or time period during a day when the active power of the distribution system being evaluated is at a minimum.
[0019] [5] In the information processing device described in [1] above, the information processing device may further include a power generation amount calculation unit (28) that calculates the power generation amount of the solar power generation device connected to the distribution system to be judged based on the amount of change in apparent power at the judgment point relative to the apparent power at the reference point.
[0020] [6] In the information processing device described in [5] above, the power generation amount calculation unit may calculate an amount of change (ΔS) in the apparent power based on a magnitude of the vector.
[0021] [7] In the information processing device described in [6] above, the power generation calculation unit may further calculate a power generation rate (R) which is a ratio of the power generation amount to a PV interconnection amount (Pa), which is a total value of the maximum power generation amounts of each of the photovoltaic power generation devices connected to the distribution system being judged.
[0022] [8] An information processing method according to a representative embodiment of the present invention includes a first step (S1) of acquiring measured values of voltage and current of a power distribution system measured by a sensor; a second step (S2) of calculating active power and reactive power of the power distribution system based on the measured values acquired in the first step; a third step (S3) of calculating a vector connecting the reference point and the target point in a Cartesian coordinate system in which the active power is a first axis and the reactive power is a second axis, the first axis and the second axis are perpendicular to each other, the reference point being a point determined by the active power and reactive power of the power distribution system to be judged at a specified time or time period, and the target point being a point determined by the active power and reactive power of the power distribution system to be judged at the specified time or time period; and a fourth step (S4, S5, S6, S7) of determining whether or not power is being generated by a solar power generation device connected to the power distribution system to be judged at the specified time or time period based on the direction of the vector.
[0023] [9] A program according to a representative embodiment of the present invention causes a computer (2) to execute a first step (S1) of acquiring measured values of voltage and current of a power distribution system measured by a sensor; a second step (S2) of calculating active power and reactive power of the power distribution system based on the measured values acquired in the first step; a third step (S3) of calculating a vector connecting the reference point and the target point in an orthogonal coordinate system in which the active power is defined as a first axis and the reactive power is defined as a second axis and the first axis and the second axis are perpendicular to each other, the reference point being a point determined by the active power and reactive power of the power distribution system to be judged at a specified time or time period, and the target point being a point determined by the active power and reactive power of the power distribution system to be judged at the specified time or time period; and a fourth step (S4, S5, S6, S7) of determining whether or not power is being generated by a solar power generation device connected to the power distribution system to be judged at the specified time or time period based on the direction of the vector.
[0024] 2. Specific examples of embodiments DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS Hereinafter, specific examples of embodiments of the present invention will be described with reference to the drawings. In the following description, components common to the respective embodiments are designated by the same reference numerals, and repeated description will be omitted.
[0025] <Embodiment> FIG. 1 is a diagram showing a configuration of a power supply system 100 including an information processing device according to an embodiment.
[0026] The power supply system 100 shown in FIG. 1 is a system that supplies power from a higher-level system including a distribution substation 4 to multiple power supply paths 10_1 to 10_n (n is an integer of 2 or more) via distribution circuit breakers 7_1 to 7_n (n is an integer of 2 or more).
[0027] In this embodiment, as shown in Fig. 1, power supply paths 10_1 to 10_n formed on the secondary side of each of the distribution circuit breakers 7_1 to 7_n are also referred to as "power distribution systems 10_1 to 10_n." For example, as shown in Fig. 1, the power distribution systems 10_1 to 10_n are connected to each other via switches or the like to form a power supply network that supplies power supplied from a higher-level system to each consumer.
[0028] In this specification, when describing components such as distribution circuit breakers 7_1 to 7_n, if there is no need to distinguish between the components, they may be referred to as "distribution circuit breaker 7" without adding a suffix.
[0029] The power supply system 100 stabilizes the power supply to each of the power distribution systems 10_1 to 10_n by, for example, a centralized voltage control method. Specifically, an information processing device such as a server installed in the control center 1 receives physical quantities related to the power supply, such as voltage and current, measured by various sensors installed in the power distribution substation 4 and each of the power distribution systems 10_1 to 10_n via a communication network, and controls the voltage regulators 5, 11, and 12 and switches 91 and 92 installed in the power distribution substation 4 and each of the power distribution systems 10_1 to 10_n based on the measured values of the received physical quantities.
[0030] As shown in FIG. 1, a power supply system 100 includes, for example, a distribution substation 4, a secondary bus 6, distribution circuit breakers 7_1 to 7_n, distribution systems 10_1 to 10_n, and a control center 1.
[0031] The power distribution substation 4 transforms power supplied to a primary bus (not shown) from a large-scale power plant such as a thermal power plant, and outputs the transformed power to a secondary bus 6 (e.g., a 6 kV bus). A plurality of distribution circuit breakers 7_1 to 7_n are connected to the secondary bus 6. When the distribution circuit breakers 7_1 to 7_n are closed, power is supplied from the secondary bus 6 connected to the primary side of the distribution circuit breakers 7_1 to 7_n to the distribution systems 10_1 to 10_n connected to the secondary sides of the distribution circuit breakers 7_1 to 7_n, and when the distribution circuit breakers 7_1 to 7_n are opened, power supply from the secondary bus 6 to the distribution systems 10_1 to 10_n is stopped. Each of the distribution circuit breakers 7_1 to 7_n can be controlled individually. The distribution circuit breakers 7_1 to 7_n are controlled to be opened or closed by an information processing device (eg, an optical central device) installed in the distribution substation 4, for example.
[0032] The distribution substation 4 is provided with a voltage regulator 5. The voltage regulator 5 is a device that controls the voltage supplied from a primary bus (not shown) to a secondary bus 6. The voltage regulator 5 is, for example, an on-load tap changer (LRT). The voltage regulator 5 includes, for example, a transformer, a tap changer, a sensor, a communication device, and the like (not shown). The transformer transforms the voltage of the primary bus (not shown) and outputs it to the secondary bus 6. The tap changer adjusts the voltage output from the transformer by switching the tap of the transformer winding according to tap switching information (setting value) received by a communication device described later. The sensor measures physical quantities such as the voltage and current on the primary and secondary sides of the transformer. The communication device communicates with an external information processing device or the like via a known communication network such as the Internet line or optical communication. For example, the communication device transmits the measurement results by the sensor to the distribution control system 3, and also receives tap switching information from the distribution control system 3 and provides it to the tap changer.
[0033] The power distribution systems 10_1 to 10_n are, for example, known power supply networks in which a plurality of power distribution lines are connected via a plurality of switches. In Fig. 1, as an example, a power distribution system 10_1 in which a plurality of power distribution lines 81 are connected via a plurality of switches 91_1 to 91_4 and a voltage regulator 11, and a power distribution system 10_2 in which a plurality of power distribution lines 81 are connected via a plurality of switches 92_1 to 92_4 and a voltage regulator 12 are representatively illustrated.
[0034] In Fig. 1, only components necessary for explaining the present invention as components of the power distribution systems 10_1 and 10_2 are representatively illustrated, and other components are omitted. Also, the numbers of the power distribution lines 81, the switches 91 and 92, and the voltage regulators 11 and 12 provided in each of the power distribution systems 10_1 to 10_n are not limited to the example shown in Fig. 1. In this embodiment, the power distribution systems 10_3 to 10_n are also assumed to have the same configuration as the power distribution systems 10_1 and 10_2, and the power distribution systems 10_1 and 10_2 will be representatively explained.
[0035] The switches 91 and 92 are devices connected between adjacent distribution lines 81, and switch between electrical connection and interruption (opening and closing) between one distribution line 81 and the other distribution line 81. For example, the switches 91 and 92 are automatic switches.
[0036] The switches 91 and 92 can be opened and closed by remote control by the power distribution control system 3. For example, the power distribution control system 3 and the switches 91 and 92 can communicate with each other via the above-mentioned publicly known communication network. When the power distribution control system 3 transmits an "open" instruction to the switch 91_1 in the closed state, the switch 91_1 changes from the closed state to the open state. In addition, when the switches 91 and 92 detect that the power supply to the distribution line 81 connected to the primary side of the switches 91 and 92 has stopped, the switches change from the "closed state" to the "open state". The switches 91 and 92 may have an opening and closing function based on, for example, a time-limited accident investigation method.
[0037] At least one of the switches 91, 92 provided in each of the power distribution systems 10_1 to 10_n is, for example, a switch with a built-in sensor (a switch with a sensor). In addition to the functions of a conventional switch, the switch with a sensor has a function of measuring various physical quantities related to power supply, such as voltage and current, on at least one of the primary side and secondary side of the switch, by the sensor and transmitting the measured values to an external device.
[0038] In this embodiment, for example, among the multiple switches 91, 92 provided in each of the power distribution systems 10_1 to 10_n, at least the switches 91_1, 92_1 provided at the most upstream of the power distribution system 10 (for example, the rising point of the power distribution system 10) are switches with sensors.
[0039] The switches 91_1 and 91_2 transmit the measured results of the currents and voltages of the power distribution systems 10_1 and 10_2 to the power distribution control system 3 via a known network.
[0040] The voltage regulators 11 and 12 are devices connected between adjacent distribution lines and control the voltage supplied from one distribution line to the other distribution line. The voltage regulators 11 and 12 are, for example, automatic voltage regulators (SVR). The voltage regulators 11 and 12 include, for example, a transformer, a tap changer, a sensor, a communication device, and the like (not shown) similar to the voltage regulator 5. The transformer transforms the voltage of the primary distribution line 81 and outputs it to the secondary distribution line 81. The tap changer adjusts the voltage output from the transformer by switching the tap of the transformer winding according to tap switching information (setting value) received by a communication device described later. The sensor measures physical quantities such as the voltage and current on the primary and secondary sides of the transformer. The communication device communicates with an external information processing device, etc. via a known communication network such as the Internet line or optical communication. For example, the communication device transmits the measurement results from the sensor to the power distribution control system 3, and also receives tap switching information from the power distribution control system 3 and provides it to the tap changer.
[0041] A plurality of consumers (consumer facilities) that receive power supply are connected to each of the power distribution systems 10_1 to 10_n. At least some of the consumer facilities include distributed power supply devices.
[0042] The distributed power supply device is a device that outputs generated or stored electric power. The distributed power supply device is linked to any one of the power distribution systems 10_1 to 10_n, and the electric power generated or stored by the distributed power supply device can be supplied to the power distribution system.
[0043] Examples of the distributed power supply device include an emergency generator that generates electric power based on mechanical energy such as a photovoltaic power generation device (PV) or a diesel generator (emergency DG). In this embodiment, as shown in Fig. 1, a photovoltaic power generation device (PV) 61 as a distributed power supply device will be described as being connected to each of the power distribution systems 10_1_10_n.
[0044] The control center 1 is a facility in which various devices are installed that monitor the power distribution systems (upper system and lower system) in the power supply system 100 and control the supply and stop of power in the power distribution systems. The control center 1 includes, for example, a power distribution control system 3 and a centralized control system 2.
[0045] The distribution control system 3 communicates with the voltage regulator 5 etc. of the distribution substation 4 described above and devices such as voltage regulators 11 and 12, various sensors, and switches provided in each distribution system, which will be described later, via a known communication network such as the Internet line or optical communication. The distribution control system 3 receives measurement results by the voltage regulator 5 and the voltage regulators 11 and 12 and switches 91 and 92 of each distribution system 10_1 to 10_n via the communication network. The distribution control system 3 is also capable of transmitting and receiving data to and from the centralized control system 2.
[0046] The centralized control system 2 acquires measurement results and the like received from the voltage regulator 5 and various devices of each distribution system via the distribution control system 3, and performs arithmetic processing based on the acquired measurement results and the like to calculate control information such as setting values of the voltage regulators 5, 11, and 12 and operation information for operating the switches 91 and 92, and provides the control information to the distribution control system 3. The distribution control system 3 controls the voltage regulators 5, 11, and 12 and the switches 91 and 92 by transmitting the control information provided from the centralized control system 2 to the voltage regulators 5, 11, and 12 and the switches 91 and 92 via a communication network. For example, the distribution control system 3 controls the opening and closing of the switches 91 and 92 based on the operation information received from the centralized control system 2, and sets the setting values received from the centralized control system 2 in the voltage regulators 5, 11, and 12.
[0047] The power distribution control system 3 and the centralized control system 2 are realized by an information processing device that processes programs, such as a server. The power distribution control system 3 and the centralized control system 2 are realized, for example, by separate information processing devices. The power distribution control system 3 may be realized by one information processing device, or may be realized by multiple information processing devices. Similarly, the centralized control system 2 may be realized by one information processing device, or may be realized by multiple information processing devices.
[0048] The centralized control system 2 generates tap switching information as setting values for the voltage regulators 5, 11, and 12 based on the measurement results measured by the voltage regulator 5, switches 91, 92 provided in each distribution system 10_1 to 10_n, and voltage regulators 11, 12, and controls the voltage of each distribution system 10_1 to 10_n to be within an allowable range by switching the taps of the voltage regulators 5, 11, and 12 based on the tap switching information via the distribution control system 3.
[0049] FIG. 2 is a diagram illustrating an example of voltage in a power distribution system.
[0050] In Fig. 2, the horizontal axis represents time and the vertical axis represents voltage. Reference numeral 201 represents the change over time in voltage (measured voltage) measured by a switch with a sensor at a location in the distribution system where the switch with a sensor is installed. Reference numeral 202 represents the change over time in voltage at a customer facility (end customer) connected downstream from the location in the distribution system where the switch with a sensor is installed.
[0051] The centralized control system 2 switches the taps of the voltage regulators 5, 11, and 12 via the power distribution control system 3, thereby controlling the voltage in each power distribution system 10 to be within a predetermined range, for example, between 95V and 107V.
[0052] In general, the voltage in a distribution system varies depending on the distance from a substation, the presence or absence of power generation by distributed power sources such as photovoltaic power generation devices, the power usage status at consumers, and the like. For example, as can be seen from reference numerals 201 and 202 in FIG. 2, the voltage at a location where a switch with a sensor is installed in the distribution system differs from the voltage at a consumer facility (end consumer) connected downstream from the location where the switch with the sensor is installed. In particular, when the consumer facility (end consumer) includes a photovoltaic power generation device and the photovoltaic power generation device is generating power, the photovoltaic power generation device supplies power to the distribution system 10, so that the voltage at the end consumer becomes higher than the voltage at the location where the switch with a sensor is installed, as shown in FIG. 2. Even in such a case, it is necessary to make the voltage at the end consumer fall within the range of 95V to 107V.
[0053] However, as described above, while it is possible to measure the voltage at locations in the power distribution system 10 where sensors such as voltage regulators 11, 12 and switches 91, 92 (switches with sensors) are installed, it is not possible to measure the voltage at locations in the power distribution system 10 where sensors are not installed.
[0054] Therefore, the centralized control system 2 sets a lower voltage limit value Vlth and an upper voltage limit value Vuth that determine the allowable voltage range, taking into consideration the voltage difference between the locations where sensors are installed and the locations where sensors are not installed in the power distribution system. For example, as shown in FIG. 2, the lower voltage limit value Vlth is set to a value higher than 95V, and the upper voltage limit value Vuth is set to a value lower than the range of 107V. Then, the centralized control system 2 calculates tap switching information as the setting value of the voltage regulators 5, 11, and 12 so that the measured voltage at the locations where sensors are installed falls within the range determined by the lower voltage limit value Vlth and the upper voltage limit value Vuth. This makes it possible to control the voltage to fall within the range from 95V to 107V even at locations where sensors are not installed.
[0055] On the other hand, as described above, the voltage difference between the location where the sensor is installed and the location where the sensor is not installed in the power distribution system depends greatly on the power generation state of the photovoltaic power generation device connected to the power distribution system. Therefore, in order to make the voltage at the location where the sensor is not installed fall within the range of 95 V to 107 V, it is necessary to set an appropriate voltage lower limit value Vlth and voltage upper limit value Vuth in consideration of the power generation state of the photovoltaic power generation device connected to the power distribution system 10.
[0056] Therefore, the centralized control system 2 according to the embodiment has an equipment control function for generating control information including setting values such as tap switching information, a voltage lower limit value Vlth, and a voltage upper limit value Vuth, and controlling the voltage regulators 5, 11, and 12 based on the control information, as well as a power generation estimation function for estimating the power generation state of the photovoltaic power generation device connected to the power distribution system 10. The power generation estimation function includes a function for determining whether or not the photovoltaic power generation device is generating power, and a function for estimating the amount of power generation by the photovoltaic power generation device.
[0057] First, among the power generation estimation functions, the function of determining whether or not the photovoltaic power generation device is generating power will be described.
[0058] 3 and 4 are scatter plots of the measured values of active power and reactive power at the start-up point of a power distribution system.
[0059] In Figures 3 and 4, the horizontal axis (X-axis) represents active power (kW), and the vertical axis (Y-axis) represents reactive power (kvar). In the following explanation, reactive power is considered positive when the phase of the current lags the phase of the voltage. That is, in Figures 3 and 4, the positive direction of the Y-axis is the direction in which the current lags the phase of the voltage, and the negative direction of the Y-axis is the direction in which the current leads the phase of the voltage.
[0060] 3 plots the measured values of active power and reactive power measured every hour on May 4, 2021 (weather: sunny) at the start-up point of the power distribution system to which the photovoltaic power generation device is connected. Reference numeral 301 indicates the direction of time change of the measured values of active power and reactive power in the morning of that day, and reference numeral 302 indicates the direction of time change of the measured values of active power and reactive power in the afternoon of that day.
[0061] As can be seen from FIG. 3, in the morning, there is a tendency for active power to decrease and lagging reactive power to increase over time. This is believed to be due to an increase in reverse power flow to the power distribution system and an increase in the supply of lagging reactive power as the power generation of the photovoltaic power generation device increases. On the other hand, in the afternoon, there is a tendency for active power to increase and lagging reactive power to decrease over time. This is believed to be due to a decrease in reverse power flow to the power distribution system and a decrease in the supply of lagging reactive power as the power generation of the photovoltaic power generation device decreases.
[0062] 4 plots the measured values of active and reactive power measured hourly at the start-up point of the power distribution system to which the photovoltaic power generation device is connected on a sunny day (May 4, 2021), a cloudy day (May 15, 2021), and a rainy day (May 27, 2021). Reference numeral 301 indicates the direction of time change of the measured values of active and reactive power in the morning of the day, and reference numeral 302 indicates the direction of time change of the measured values of active and reactive power in the afternoon of the day.
[0063] In FIG. 4, the plots shown with circles represent the active and reactive power measurements on a sunny day, the plots shown with squares represent the active and reactive power measurements on a cloudy day, and the plots shown with diamonds represent the active and reactive power measurements on a rainy day.
[0064] As can be seen from Fig. 4, the range in which the measured values of active power and reactive power are plotted varies depending on the weather. That is, the range in which the data pairs of the measured values of active power and reactive power are plotted narrows in the order of sunny days, cloudy days, and rainy days. This is thought to be because the amount of power generated by the photovoltaic power generation device decreases in the order of sunny days, cloudy days, and rainy days.
[0065] As can be seen from Figs. 3 and 4, it is possible to grasp the power generation state of a photovoltaic power generation device from the locus and range of the plots of the measured values of active power and reactive power in a power distribution system.
[0066] Next, a method for estimating the power generation state of a photovoltaic power generation device based on a plot of measured values of active power and reactive power in a power distribution system will be described.
[0067] FIG. 5 is a scatter plot of the measured values of active power and reactive power at the start-up point of a power distribution system.
[0068] In Fig. 5, the horizontal axis (X axis) represents active power (kW) and the vertical axis (Y axis) represents reactive power (kvar), similar to Fig. 3 and Fig. 4. In Fig. 5, the positive direction of the Y axis is the direction in which the current lags behind the voltage, and the negative direction of the Y axis is the direction in which the current leads the voltage.
[0069] Figure 5 plots the measured values of active power and reactive power measured every hour on May 4, 2021 (weather: sunny) at the start-up point of the distribution system to which the photovoltaic power generation device is connected (PV connection amount 3844 kW), which is a point different from that in Figure 3. Reference symbol 501 represents the range that includes the measured values of active power and reactive power at the time when power was generated by the photovoltaic power generation device on the day of measurement (daytime), and reference symbol 502 represents the range that includes the measured values of active power and reactive power at the time when no power was generated by the photovoltaic power generation device on the day of measurement (nighttime).
[0070] Here, the reference point is a point determined by the active power and reactive power of the distribution system to be evaluated at a specific time or time period. For example, the reference point is a point determined by the measured values of active power and reactive power at a time or time period when power generation by a photovoltaic power generation device is not being performed (is deemed not to be performed). For example, as shown in Fig. 5, in an orthogonal coordinate system in which the first axis (X-axis) represents active power and the second axis (Y-axis) are orthogonal to each other, a point determined by the active power and reactive power at a time of day when the active power of the distribution system 10 to be evaluated is the smallest (for example, 2:00 a.m.) is considered to be the reference point P0.
[0071] In this case, the plot of the measured values of active power and reactive power when there is power generation by the solar power generation device is distributed diagonally upward to the right (negative direction of the X-axis and positive direction of the Y-axis) as viewed from reference point P0, as shown in Figure 5. On the other hand, the plot of the measured values of active power and reactive power when there is no power generation by the solar power generation device is distributed diagonally upward to the left (positive direction of the X-axis and positive direction of the Y-axis) as viewed from reference point P0, as shown in Figure 5.
[0072] Therefore, in the centralized control system 2 of the embodiment, in a Cartesian coordinate system with active power as the first axis (X-axis) and reactive power as the second axis (Y-axis), a point determined by the active power and reactive power of the distribution system to be determined at the time or time period to be determined is determined as a judgment target point Px, and the power generation state of the solar power generation device connected to the distribution system to be determined at the time or time period to be determined is estimated based on the positional relationship between the judgment target point Px and a reference point P0.
[0073] FIG. 6 is a diagram for explaining a method for estimating the power generation state of a photovoltaic power generation device by the centralized control system 2 according to the embodiment.
[0074] In Fig. 6, like Fig. 3, the horizontal axis (X axis) represents active power (kW) and the vertical axis (Y axis) represents reactive power (kvar). In Fig. 6, the positive direction of the Y axis is the direction in which the current lags the voltage, and the negative direction of the Y axis is the direction in which the current leads the voltage.
[0075] The centralized control system 2 determines whether or not power is being generated by the photovoltaic power generation device connected to the power distribution system 10 at the time or time zone of the determination point Px, based on the direction of the determination point Px as viewed from the reference point P0.
[0076] For example, the centralized control system 2 determines the direction of a vector Bx connecting a reference point P0 to a determination point Px in a Cartesian coordinate system with active power as the first axis (X-axis) and reactive power as the second axis (Y-axis), and determines whether or not power is being generated by a solar power generation device connected to the power distribution system 10 at the time or time zone of the determination point Px based on the direction of the determined vector Bx.
[0077] Here, the reference point P0 is a point determined by the active power and reactive power at a predetermined time or time period. For example, as described above, the reference point P0 is a point determined by the measured values of active power and reactive power at a time or time period when power generation by the photovoltaic power generation device is not being performed (is deemed not to be performed). Preferably, the reference point P0 is a point determined by the measured values of active power and reactive power at night (e.g., the time period from after sunset to before sunrise). More preferably, as described above, the reference point P0 is a point determined by the active power and reactive power at a time during the day when the active power of the distribution system 10 to be evaluated is the smallest.
[0078] 6, when determining the direction of vector B1 connecting reference point P0 to determination point P1, the centralized control system 2 calculates the angle (angle θ) between vector B1 and either one of the first axis (X axis) or second axis (Y axis) of the Cartesian coordinate system. Also, when determining the direction of vector B2 connecting reference point P0 to determination point P2, for example, the centralized control system 2 calculates the angle (angle θ) between vector B2 and either one of the first axis (X axis) or second axis (Y axis) of the Cartesian coordinate system.
[0079] For example, for vector B1, the centralized control system 2 calculates the angle θ1 of vector B1 with respect to the first axis (X-axis) representing active power, and for vector B2, calculates the angle θ2 of vector B2 with respect to the first axis (X-axis) representing active power.
[0080] The centralized control system 2 determines whether or not power is being generated by the photovoltaic power generation device based on the magnitude of the angle θ. Specifically, when the angle θ is in the range of 0° to 90° (0°≦θ<90°) out of the range of 0° to 180°, the centralized control system 2 determines that power is not being generated by the photovoltaic power generation device connected to the distribution system being determined. On the other hand, when the angle θ is not in the range of 0° to 90° (0°≦θ<90°) out of the range of 0° to 180°, that is, when the angle θ is in the range of 90° to 180° (90°<θ≦180°), the centralized control system 2 determines that power is being generated by the photovoltaic power generation device connected to the distribution system being determined.
[0081] For example, since the angle θ1 of vector B1 is in the range of 0° to 90° (0°≦θ<90°), the centralized control system 2 determines that there is no power generation by the photovoltaic power generation device connected to the distribution system 10 being determined at the time or time period of determination point P1 of vector B1. On the other hand, since the angle θ2 of vector B2 is in the range of 90° to 180° (90°≦θ≦180°), the centralized control system 2 determines that there is power generation by the photovoltaic power generation device connected to the distribution system 10 being determined at the time or time period of determination point P2 of vector B2.
[0082] Next, a function of estimating the amount of power generated by the photovoltaic power generation device, which is one of the power generation estimation functions, will be described.
[0083] FIG. 7 is a diagram for explaining a method for estimating the amount of power generated by a solar power generation device.
[0084] In Fig. 7, like Fig. 3, the horizontal axis (X axis) represents active power (kW) and the vertical axis (Y axis) represents reactive power (kvar). In Fig. 7, the positive direction of the Y axis is the direction in which the current lags the voltage, and the negative direction of the Y axis is the direction in which the current leads the voltage.
[0085] The centralized control system 2 calculates the amount of power generated by the solar power generation device based on the amount of change in apparent power at the determination point Px relative to the apparent power at the reference point P0. Specifically, the centralized control system 2 calculates the amount of change in apparent power from the reference point P0 to the determination point Px based on the magnitude of the vector Bx connecting the reference point P0 to the determination point Px in an orthogonal coordinate system consisting of a first axis (X-axis) and a second axis (Y-axis), that is, based on the movement distance ΔS from the reference point P0 to the determination point Px in the orthogonal coordinate system.
[0086] For example, when the active power of the reference point P0 is x0, the reactive power is y0, and the active power of the judgment target point Px is x1, and the reactive power is y1, the travel distance (vector magnitude) ΔS from the reference point P0 to the judgment target point Px can be expressed by the following equation (1).
[0087]
number
[0088] The centralized control system 2 calculates the travel distance ΔS from the reference point P0 to the determination point Px based on the above formula (1), and regards it as the amount of power generated by the photovoltaic power generation device at the time or time zone of the determination point Px. In other words, the centralized control system 2 regards the travel distance ΔS as an estimate of the total amount of power generated by all the photovoltaic power generation devices 61 connected to the distribution system 10 to be determined.
[0089] The centralized control system 2 further calculates a power generation rate R in the power distribution system based on the power generation amount ΔS by the photovoltaic power generation device. Specifically, the centralized control system 2 calculates the ratio of the power generation amount ΔS to the PV interconnection amount Pa of the power distribution system 10 as the power generation rate R.
[0090] Here, the PV interconnection amount Pa is the total value of the maximum power generation amount (maximum rated output) of each of the photovoltaic power generation devices 61 interconnected to the distribution grid that is the subject of determination.
[0091] The centralized control system 2 calculates the power generation rate R, for example, based on the following formula (2).
[0092]
number
[0093] Next, a specific configuration of the centralized control system 2 for realizing the above-mentioned device control function and power generation estimation function will be described.
[0094] FIG. 8 is a block diagram showing a configuration of a centralized control system 2 according to the embodiment.
[0095] Although not shown, the information processing device as the centralized control system 2 has hardware resources constituting a program processing device such as a server, etc. That is, the information processing device has, for example, a CPU (Central Processing Unit), a RAM (Random Access Memory), a ROM (Read Only Memory), a LAN interface (LAN_I / F), an external interface I / F, a bus, and various peripheral circuits.
[0096] As shown in Figure 8, the centralized control system 2 has a measurement result acquisition unit 21, a power calculation unit 22, a vector calculation unit 23, a power generation determination unit 27, a power generation amount calculation unit 28, a control unit 29, and a memory unit 30 as functional blocks for realizing the above-mentioned equipment control function and power generation estimation function.
[0097] These functional blocks are realized by cooperation of hardware resources and software resources included in the information processing device serving as the above-mentioned centralized control system 2. That is, the measurement result acquisition unit 21, power calculation unit 22, vector calculation unit 23, power generation determination unit 27, power generation amount calculation unit 28, control unit 29, and storage unit 30 are realized by the CPU performing various calculations according to programs stored in memories such as RAM and ROM, and controlling the LAN interface and various peripheral circuits based on the calculation results.
[0098] The storage unit 30 is a functional unit for storing various data such as parameters required for the device control function and the power generation estimation function, calculation results, etc. For example, the storage unit 30 stores measurement results 31, power information 32, vector information 33, power generation information 34, PV grid-connection information 35, and control information 36, which will be described later.
[0099] The measurement result acquisition unit 21 acquires measured values of voltage and current measured by sensors provided in at least one power distribution system 10 to which power is supplied from a higher-level system. Specifically, the measurement result acquisition unit 21 receives measured values of voltage and current measured by the voltage regulators 5, 11, 12 and the switches 91, 92 (sensor-equipped switches) from the power distribution control system 3, and stores them in the storage unit 30 as measurement results 31. Here, the above-mentioned sensors may include not only the sensors built into the voltage regulators 5, 11, 12 and the switches 91, 92 described above, but also other sensors provided in the power distribution system 10, for example.
[0100] The power calculation unit 22 calculates the active power and reactive power of the power distribution system 10 based on the measurement values acquired by the measurement result acquisition unit 21. For example, the power calculation unit 22 calculates the apparent power, active power, and reactive power per unit time for each of the power distribution systems 10_1 to 10_n by a known calculation method based on the measurement values of the voltage and current per unit time and the phase difference between the voltage and current as the measurement results 31 stored in the storage unit 30, and stores them in the storage unit 30 as power information 32.
[0101] Specifically, the power calculation unit 22 calculates the power based on the voltage and current measured by sensors installed at the rising points of the respective distribution systems 10_1 to 10_n. For example, when calculating the power of the distribution system 10_2, the power calculation unit 22 calculates the measured values of the apparent power, the active power, and the reactive power per unit time based on the measured values of the voltage and the current per unit time measured by the switch 92_1 at the rising point of the distribution system 10_2, and stores them in the storage unit 30 as the power information 32 of the distribution system 10_2. By using the measured values of the voltage and the current at the rising point of the distribution system 10, it becomes possible to estimate the entire power downstream of the rising point of the distribution system 10.
[0102] The power calculation unit 22 may calculate the average values of the apparent power, the active power, and the reactive power for each time period (for example, for each hour) and store them as the power information 32.
[0103] The vector calculation unit 23 calculates a vector Bx connecting the reference point P0 to the determination target point Px. For example, the vector calculation unit 23 includes a vector specification unit 24, an angle calculation unit 25, and a movement distance calculation unit .
[0104] The vector identification unit 24 identifies a vector Bx of the judgment point Px in a Cartesian coordinate system with the active power as the first axis and the reactive power as the second axis, based on the active power and reactive power as the power information 32 stored in the memory unit 30.
[0105] For example, consider a case where the presence or absence of power generation by the photovoltaic power generation device 61 in the power distribution system 10_2 at 11:00 a.m. is determined. In this case, first, the vector identification unit 24 identifies a reference point P0. For example, the vector identification unit 24 sets the reference point P0 to a point on an orthogonal coordinate system determined by the measurement values of active power and reactive power at the time when the active power is smallest among the measurement values of active power and reactive power for each time included in the power information 32 of the power distribution system 10_2. For example, as described above, if the active power is smallest at 2:00 a.m., the reference point P0 is set to a point on the orthogonal coordinate system determined by the measurement points of the active power and reactive power at 2:00 a.m.
[0106] Next, the vector identification unit 24 reads out the measurement values of the active power and reactive power at 11:00 a.m. from the power information 32, and sets a point on the Cartesian coordinate system determined by the read-out measurement values as the determination target point Px. Then, the vector identification unit 24 identifies the vector connecting the reference point P0 to the determination target point Px as the vector Bx of the determination target point Px.
[0107] The angle calculation unit 25 calculates the angle (angle θ) between the vector Bx and either one of the first axis (X-axis, active power) and the second axis (Y-axis, reactive power) of the Cartesian coordinate system as the direction of the vector Bx identified by the vector identification unit 24. For example, the angle calculation unit 25 calculates the angle θ that is the angle between the positive direction of the first axis (X-axis, active power) and the vector Bx (see FIG. 6).
[0108] The movement distance calculation unit 26 calculates the movement distance ΔS from the reference point P0 to the determination point Px, that is, the magnitude of the vector Bx. For example, in the case of the above example, the movement distance calculation unit 26 calculates the movement distance ΔS based on the above formula (1).
[0109] The reference point P0, the determination target point Px, the angle θ, and the movement distance ΔS calculated by the vector identification unit 24, the angle calculation unit 25, and the movement distance calculation unit 26 are stored in the storage unit 30 as vector information 33 for each of the power distribution systems 10_1 to 10_n.
[0110] The power generation determination unit 27 determines whether or not power is being generated by a photovoltaic power generation device connected to the distribution system 10 to be determined at the time or time period to be determined, based on the direction of the vector Bx. For example, in the above-mentioned example, the power generation determination unit 27 first reads out the angle θ of the vector Bx at 11:00 a.m. in the distribution system 10_2 as the determination target point Px, from the vector information 33 stored in the storage unit 30. The power generation determination unit 27 determines whether or not power is being generated by a photovoltaic power generation device in the distribution system 10_2, based on the magnitude of the read angle θ.
[0111] Specifically, when the angle θ is in the range of 0° to 90° (0°≦θ<90°), it is determined that there is no power generation by the solar power generation device connected to the power distribution system 10_2 at 11:00 a.m., and when the angle θ is in the range of 90° to 180° (90°≦θ≦180°), it is determined that there is power generation by the solar power generation device connected to the power distribution system 10_2 at 11:00 a.m.
[0112] The power generation amount calculation unit 28 calculates the power generation amount of the photovoltaic power generation device in the distribution system 10 to be determined based on the amount of change in apparent power at the determination point Px relative to the apparent power at the reference point P0. As described above, the magnitude of the vector Bx, i.e., the movement distance ΔS from the reference point P0 to the determination point Px, represents the amount of change in apparent power from the reference point P0 to the determination point Px. Therefore, the power generation amount calculation unit 28 sets the movement distance ΔS as an estimated value of the power generation amount of the photovoltaic power generation device connected to the distribution system 10 to be determined at the time or time period of the determination point Px. In the case of the above example, the power generation amount calculation unit 28 sets the movement distance ΔS based on the vector Bx of the distribution system 10_2 at 11:00 a.m. as the power generation amount ΔS by the photovoltaic power generation device connected to the distribution system 10_2 at 11:00 a.m.
[0113] Further, the power generation amount calculation unit 28 calculates the power generation rate R. For example, in the above-mentioned example, the power generation amount calculation unit 28 calculates the power generation rate R by substituting the PV interconnection amount Pa of the distribution system 10_2 to be determined and the power generation amount ΔS by the photovoltaic power generation device in the distribution system 10_2 at 11:00 a.m. into the above formula (2).
[0114] Here, the PV interconnection amount Pa for each of the power distribution systems 10_1 to 10_n is pre-stored in the storage unit 30 as PV interconnection information 35. In addition, the determination result by the power generation determination unit 27 and the power generation amount ΔS and power generation rate R calculated by the power generation amount calculation unit 28 are stored in the storage unit 30 as power generation information 34 for each power distribution system 10.
[0115] The control unit 29 controls the voltage regulator 5, and the voltage regulators 11, 12 and switches 91, 92 in each of the power distribution systems 10_1-10_n. For example, the control unit 29 calculates tap switching information for the voltage regulators 5, 11, and 12, and calculates a voltage upper limit value Vuth and a voltage lower limit value Vlth, based on the result of determining whether or not power is being generated by the photovoltaic power generation device in each of the power distribution systems 10_1-10_n and the amount of power generation or the power generation rate by the photovoltaic power generation device in each of the power distribution systems 10_1-10_n.
[0116] Moreover, the control unit 29 calculates operation information of the switches 91, 92 in each of the power distribution systems 10_1-10_n by monitoring the power, voltage, current, etc. in each of the power distribution systems 10_1-10_n. The calculated tap switching information, operation information of the switches 91, 92, etc. are stored in the storage unit 30 as control information 36.
[0117] The control unit 29 controls the voltage regulators 5, 11, and 12 and the switches 91 and 92 by transmitting the calculated tap switching information, operation information for the switches 91 and 92, etc. to the voltage regulators 5, 11, and 12 and the switches 91 and 92 via the distribution control system 3.
[0118] Next, a process flow for estimating the power generation state of the photovoltaic power generation device in the centralized control system 2 will be described.
[0119] FIG. 9 is a flowchart showing an example of a process flow for estimating the power generation state of a photovoltaic power generation device in the centralized control system 2. As shown in FIG.
[0120] First, in the centralized control system 2, the measurement result acquisition unit 21 acquires measurement values such as voltage and current from the voltage regulator 5, voltage regulators 11 and 12, and switches 91 and 92 via the distribution control system 3, and stores them in the memory unit 30 as measurement results 31 (step S1).
[0121] Next, based on the measurement results of the voltage, current, etc. stored in the memory unit 30 in step S1, the power calculation unit 22 calculates physical quantities (measured values) related to power, such as apparent power, reactive power, and active power, in each of the power distribution systems 10_1 to 10_n using the method described above, and stores them in the memory unit 30 as power information 32 (step S2).
[0122] Next, based on the power information 32 stored in the storage unit 30 in step S2, the vector calculation unit 23 identifies a vector Bx of the determination target point Px identified by the measured values of the active power and reactive power of the distribution system 10 to be determined at the time or time period to be determined in an orthogonal coordinate system with active power as the first axis and reactive power as the second axis (step S3). Specifically, the vector identification unit 24 identifies the reference point P0 and the determination target point Px in the orthogonal coordinate system with active power as the first axis and reactive power as the second axis by the above-mentioned method, and identifies the vector connecting the reference point P0 to the determination target point Px as the vector Bx of the determination target point Px.
[0123] Next, the vector calculation unit 23 identifies the direction of the vector Bx of the determination point Px (step S4). Specifically, the angle calculation unit 25 calculates the angle (angle θ) between the first axis (X-axis, active power) of the Cartesian coordinate system and the vector Bx as the direction of the vector Bx identified by the vector identification unit 24 by the above-mentioned method.
[0124] Next, the power generation determination unit 27 determines whether the angle θ calculated in step S5 is in the range of 0° to 90° (0°≦θ<90°) (step S5).
[0125] If the angle θ calculated in step S5 is in the range of 0° to 90° (0°≦θ<90°) within the range of 0° to 180° (step S5: YES), the power generation determination unit 27 determines that there is no power generation by the photovoltaic power generation device in the specified power distribution system 10 at the time or time zone of the determination target point Px (step S6). After that, the centralized control system 2 ends the series of processes.
[0126] On the other hand, if the angle θ is not in the range of 0° to 90° (0°≦θ<90°) within the range of 0° to 180°, that is, if the angle θ is in the range of 90° to 180° (90°<θ≦180°) (step S5: NO), the power generation determination unit 27 determines that power generation is occurring by a solar power generation device in the specified distribution system 10 at the time or time period of the determination point Px (step S7).
[0127] Next, the power generation amount calculation unit 28 calculates the amount of power generated by the photovoltaic power generation device connected to the distribution system 10 determined in step S7 to be generating power by the photovoltaic power generation device (step S8). Specifically, the power generation amount calculation unit 28 calculates the magnitude of the vector Bx of the determination target point Px identified in step S3, i.e., the travel distance ΔS from the reference point P0 on the above-mentioned orthogonal coordinate system to the determination target point Px, by the above-mentioned method, and sets this as the power generation amount ΔS by the photovoltaic power generation device connected to the distribution system 10 to be determined at the time or time period to be determined. The power generation amount ΔS is stored in the storage unit 30 as power generation information 34.
[0128] Furthermore, the power generation amount calculation unit 28 calculates the power generation rate R of the photovoltaic power generation device connected to the distribution system 10 determined in step S7 to be generating power by the photovoltaic power generation device (step S9). Specifically, the power generation amount calculation unit 28 calculates the power generation rate R of the photovoltaic power generation device connected to the distribution system 10 to be determined at the time or time period to be determined based on the power generation amount ΔS calculated in step S8 and the PV connection amount Pa stored in the storage unit 30 by the above-mentioned method, and stores it in the storage unit 30 as power generation information 34.
[0129] Through the above processing procedure, the centralized control system 2 determines whether or not power is being generated by the photovoltaic power generation device for each of the power distribution systems 10_1 to 10_n at the time or time period to be determined, and calculates the power generation amount ΔS and power generation rate R by the photovoltaic power generation device.
[0130] The centralized control system 2 may determine the weather based on the power generation rate R calculated by the above-mentioned method.
[0131] 10A, 10B, and 10C are diagrams showing changes over time in the power generation rate R of a photovoltaic power generation device in one power distribution system 10. FIG.
[0132] FIG. 10A shows the power generation rate R of a solar power generation device in one distribution system for each unit time from 6:00 am to 7:00 pm on a sunny day (May 4, 2021). FIG. 10B shows the power generation rate per unit time of a solar power generation device in one distribution system for each unit time from 6:00 am to 7:00 pm on a cloudy day (May 15, 2021). FIG. 10C shows the power generation rate R of a solar power generation device in one distribution system for each unit time from 6:00 am to 7:00 pm on a rainy day (May 27, 2021).
[0133] 10A, there is a tendency that there are many time periods during which the power generation rate R exceeds 50% on sunny days. Therefore, the power generation determination unit 27 of the centralized control system 2 may determine that the weather is "sunny" for the time or time period during which the power generation rate R exceeds a first threshold value (e.g., 50%).
[0134] 10C, there is a tendency that there are many time periods during which the power generation rate R is less than 25% on rainy days. Therefore, the power generation determination unit 27 of the centralized control system 2 may determine that the weather is "rainy" during the time or time period during which the power generation rate R is less than a second threshold value (e.g., 25%).
[0135] 10B, there is a tendency that on cloudy days, there are many time periods during which the power generation rate R is equal to or greater than 25% and less than 50%. Therefore, the power generation determination unit 27 of the centralized control system 2 may determine that the weather is "cloudy" for a time or time period during which the power generation rate R is equal to or greater than the second threshold and less than the first threshold (25%≦R<50%).
[0136] In this manner, the centralized control system 2 may perform a process of determining the weather based on the power generation rate R.
[0137] As described above, the information processing device as the centralized control system 2 according to the embodiment calculates active power and reactive power based on measured values of voltage and current measured by sensors such as voltage regulators 11, 12 and switches 91, 92 provided in at least one distribution system 10 to which power is supplied from a higher-level system. The information processing device sets active power as a first axis (e.g., X-axis) and reactive power as a second axis (e.g., Y-axis), and sets a point determined by a data pair including active power and reactive power of the distribution system 10 to be determined at night in an orthogonal coordinate system in which the first axis and the second axis are orthogonal to each other as a reference point P0, and sets a point in the orthogonal coordinate system determined by a data pair including active power and reactive power at a time or time period to be determined from the reference point P0 as a determination point Px. The information processing device calculates a vector Bx connecting the reference point P0 to the determination point Px, and determines whether or not power is generated by a photovoltaic power generation device connected to the distribution system 10 to be determined at a time or time period to be determined based on the direction of the vector Bx.
[0138] According to this, it is possible to determine whether or not a photovoltaic power generation device in a distribution system to be determined is occurring without separating the power generated by the photovoltaic power generation device from the power calculated from the measurement values of the sensors in the distribution system to be determined, and it is also possible to determine whether or not a photovoltaic power generation device in the distribution system to be determined is occurring. In addition, it is not necessary to use meteorological data. Therefore, according to the information processing device according to the embodiment, it is possible to easily estimate the power generation state of a photovoltaic power generation device in a power distribution system.
[0139] In addition, the information processing device of the embodiment calculates the angle (angle θ) between either the first axis or the second axis and the vector Bx as the direction of the vector Bx of the judgment target point Px, and determines whether or not power is being generated by the solar power generation device based on the magnitude of the angle θ. This makes it possible to easily calculate the direction of the vector Bx of the determination point Px.
[0140] Furthermore, the information processing device according to the embodiment calculates the angle θ of the vector Bx with respect to the positive direction of the first axis when reactive power is positive when the current lags behind the voltage. When the angle θ is in the range of 0° to 90°, the information processing device determines that there is no power generation by the photovoltaic power generation device connected to the distribution system 10 to be determined at the time or time period to be determined, and when the angle θ is in the range of 90° to 180°, the information processing device determines that there is power generation by the photovoltaic power generation device connected to the distribution system 10 to be determined at the time or time period to be determined. This makes it possible to easily determine whether or not power is being generated by a photovoltaic power generation device in a power distribution system.
[0141] In addition, in the information processing device according to the embodiment, among points determined by the active power and reactive power during the night, a point determined by the active power and reactive power at a time or time period when the active power is minimum is set as a reference point P0. According to this, the position of the judgment point Px can be identified based on a point when no power generation is being performed by the solar power generation device, so that it is possible to judge the power generation state of the solar power generation device with higher accuracy.
[0142] Moreover, the information processing device according to the embodiment calculates the power generation amount ΔS of the solar power generation device based on the amount of change in the apparent power at the determination point Px relative to the apparent power at the reference point P0. In other words, the information processing device calculates the amount of change in the apparent power based on the magnitude (movement distance ΔS) of the vector Bx. This makes it possible to easily obtain an estimate of the amount of power generated by a photovoltaic power generation device in the distribution system 10 to be determined, without performing complex calculations.
[0143] Moreover, the information processing device according to the embodiment calculates the ratio of the power generation amount ΔS to the PV interconnection amount Pa, which is the total value of the maximum power generation amounts of the photovoltaic power generation devices interconnected to the power distribution system 10, and sets the calculated ratio as the power generation rate R. This makes it possible to easily estimate how much power is being generated by the photovoltaic power generation device in the distribution system 10 to be evaluated. Also, as described above, it becomes possible to estimate the weather at the time or time period to be evaluated based on the power generation rate.
[0144] <<Extension of the embodiment>> The invention made by the inventor has been specifically described above based on an embodiment, but it goes without saying that the invention is not limited thereto and can be modified in various ways without departing from the spirit of the invention.
[0145] For example, the case where the power distribution control system 3 and the centralized control system 2 are realized by separate information processing devices has been exemplified, but the present invention is not limited to this, and the power distribution control system 3 and the centralized control system 2 may be realized by one information processing device, or may be integrated into one system consisting of multiple information processing devices. Also, the power distribution control system 3 and the centralized control system 2 do not necessarily need to be provided in the same control center 1 (site), and may be provided in different locations.
[0146] In the above embodiment, the method of determining the power generation state of a photovoltaic power generation device connected downstream of the rising point of the power distribution system 10 using the measured values of the voltage and current at the rising point of the power distribution system 10 is illustrated, but the present invention is not limited to this. For example, by performing the above-mentioned calculation method using the power calculated based on the voltage and current measured by a specific sensor in the distribution system 10 to be determined, it becomes possible to determine the power generation state of a photovoltaic power generation device connected downstream of the specific sensor. For example, by calculating the active power and reactive power using the voltage and current measured by the voltage regulator 12 of the power distribution system 10_2 and performing the above-mentioned calculation method using the active power and reactive power, it becomes possible to determine the power generation state of a photovoltaic power generation device connected downstream of the voltage regulator 12 in the power distribution system 10_2.
[0147] The above-mentioned flowchart shows an example for explaining the operation, and is not limited to this. That is, the steps shown in each figure of the flowchart are specific examples, and are not limited to this flow. For example, the order of some processes may be changed, other processes may be inserted between each process, and some processes may be performed in parallel. [Explanation of symbols]
[0148] 1...control center, 2...centralized control system (information processing device), 3...power distribution control system (information processing device), 4...power distribution substation, 5...voltage regulator (LRT), 6...secondary busbar, 7_1 to 7_n...power distribution circuit breakers, 10_1 to 10_n...power distribution system (power supply network), 11, 12...voltage regulator (SVR), 21...measurement result acquisition unit, 22...power calculation unit, 23...vector calculation unit , 24...vector identification unit, 25...angle calculation unit, 26...travel distance calculation unit, 27...power generation determination unit, 28...power generation amount calculation unit, 29...control unit, 30...memory unit, 31...measurement results, 32...power information, 33...vector information, 34...power generation information, 35...PV grid connection information, 36...control information, 61...photovoltaic power generation device (PV), 81...distribution line, 91_1 to 91_4, 92_1 to 92_4...switches.
Claims
1. a measurement result acquisition unit that acquires measured values of voltage and current of the power distribution system measured by a sensor; a power calculation unit that calculates active power and reactive power of the power distribution system based on the measurement values acquired by the measurement result acquisition unit; a vector calculation unit that calculates a vector connecting the reference point and the determination point in an orthogonal coordinate system in which the active power is defined as a first axis and the reactive power is defined as a second axis, the first axis and the second axis being orthogonal to each other, the reference point being a point determined by the active power and the reactive power of the distribution system to be determined at a predetermined time or time period, and the determination point being a point determined by the active power and the reactive power of the distribution system to be determined at a time or time period being a determination point; and a power generation determination unit that determines whether or not power is generated by a photovoltaic power generation device connected to the distribution system at the time or time period of the determination based on the direction of the vector. Information processing device.
2. 2. The information processing device according to claim 1, the vector calculation unit calculates, as a direction of the vector, an angle between the vector and one of the first axis and the second axis; The power generation determination unit determines whether or not power generation is occurring due to the solar power generation device based on the magnitude of the formed angle. Information processing device.
3. 3. The information processing device according to claim 2, When the reactive power is positive when the current lags the voltage, the vector calculation unit calculates an angle of the vector with respect to a positive direction of the first axis; The power generation determination unit determines that there is no power generation by the solar power generation device connected to the distribution system of the determination target at the time or time period to be determined when the angle is in a range from 0° to 90°, and determines that there is power generation by the solar power generation device connected to the distribution system of the determination target at the time or time period to be determined when the angle is in a range from 90° to 180°. Information processing device.
4. 2. The information processing device according to claim 1, The reference point is a point determined by the active power and the reactive power at a time or time period during a day when the active power of the distribution system to be determined is at a minimum. Information processing device.
5. 2. The information processing device according to claim 1, The power generation amount calculation unit calculates the power generation amount of the photovoltaic power generation device connected to the distribution system to be determined based on an amount of change in apparent power at the determination point relative to the apparent power at the reference point. Information processing device.
6. 6. The information processing device according to claim 5, The power generation amount calculation unit calculates an amount of change in the apparent power based on the magnitude of the vector. Information processing device.
7. 7. The information processing device according to claim 6, The power generation amount calculation unit further calculates a power generation rate, which is a ratio of the power generation amount to a PV interconnection amount, which is a total value of maximum power generation amounts of the photovoltaic power generation devices connected to the distribution system to be determined. Information processing device.
8. A first step of obtaining measurements of voltage and current in the power distribution system measured by sensors; a second step of calculating active power and reactive power of the power distribution system based on the measured values acquired in the first step; a third step of calculating a vector connecting the reference point and the target point in an orthogonal coordinate system in which the active power is a first axis and the reactive power is a second axis and the first axis and the second axis are orthogonal to each other, the reference point being a point determined by the active power and the reactive power of the distribution system to be determined at a predetermined time or time period, and the target point being a point determined by the active power and the reactive power of the distribution system to be determined at a target time or time period, and calculating a vector connecting the reference point and the target point; and a fourth step of determining whether or not power is generated by a photovoltaic power generation device connected to the distribution system to be determined at the time or time period to be determined based on the direction of the vector. Information processing methods.
9. A first step of obtaining measurements of voltage and current in the power distribution system measured by sensors; a second step of calculating active power and reactive power of the power distribution system based on the measured values acquired in the first step; a third step of calculating a vector connecting the reference point and the target point in an orthogonal coordinate system in which the active power is a first axis and the reactive power is a second axis and the first axis and the second axis are orthogonal to each other, the reference point being a point determined by the active power and the reactive power of the distribution system to be determined at a predetermined time or time period, and the target point being a point determined by the active power and the reactive power of the distribution system to be determined at a target time or time period, and calculating a vector connecting the reference point and the target point; and a fourth step of determining whether or not power is generated by a photovoltaic power generation device connected to the distribution system at the time or time period to be determined based on the direction of the vector. program.
Citation Information
Patent Citations
Power estimation device, power estimation method, and program
JP2014200167A
Photovoltaic power generation amount estimation device and method
JP2018133951A
Load power factor estimation method and device therefor
JP2021035076A
Distribution system voltage control apparatus
JP2012217248A
Power generation amount management system and power generation amount management method
JP2022121028A