Method and system for proposing electric appliance
The method addresses the inadequacy of tatami-based air conditioner capacity selection by calculating and proposing equipment with appropriate capacities based on user lifestyles and insulation, enhancing comfort and efficiency.
Patent Information
- Application Number
- JP2023071052
- Authority / Receiving Office
- JP · JP
- Patent Type
- Applications
- Current Assignee / Owner
- Filing Date
- 2023-04-24
- Publication Date
- 2024-11-06
AI Technical Summary
Existing air conditioner capacity selection methods based on tatami mats are inadequate for buildings with varying user lifestyles and insulation specifications, leading to inappropriate capacity choices due to differences in sunlight exposure, user preferences, and timing of high air conditioning loads.
A method that acquires outside air conditions and power consumption data to calculate the actual heat processed by existing equipment, determines a new electrical device based on this data, and proposes a replacement with appropriate capacity considering user lifestyles and insulation specifications.
Enables the selection of electrical equipment with capacities tailored to user lifestyles, improving comfort and energy efficiency by accounting for actual heat processing needs.
Smart Images

Figure 2024156519000001_ABST
Abstract
Description
[Technical field]
[0001] The present invention relates to a method and system for proposing an electric device. [Background technology]
[0002] 2. Description of the Related Art Conventionally, heat pump air conditioners are installed in buildings such as houses and offices to provide indoor air conditioning (see, for example, Patent Document 1 below). [Prior art documents] [Patent documents]
[0003] [Patent Document 1] JP 2020-166484 A Summary of the Invention [Problem to be solved by the invention]
[0004] In general, the capacity of an air conditioner is selected according to the number of tatami mats in the target room. However, the lifestyle patterns of building users and the insulation specifications of buildings vary, so it is not appropriate to select an air conditioner based solely on the number of tatami mats. For example, when the building's exterior construction plan makes it difficult for sunlight to enter the room, or when users have different preferred temperature settings due to being sensitive to heat or cold, the capacity required for the air conditioner tends to differ. In addition, when people often return home at a time when the air conditioning load is high and the amount of heat processed at start-up is large, or when air conditioning is often performed continuously and the maximum amount of heat processed is small, the capacity required for the air conditioner also tends to differ.
[0005] The present invention has been devised in consideration of the above-described situation, and its main objective is to provide a method capable of suggesting electrical appliances with appropriate capacities based on the lifestyle patterns, etc. of building users. [Means for solving the problem]
[0006] The present invention is a method for proposing replacement of electrical equipment, including heat pump type air conditioners or water heaters, installed in a building to a user of the building, the method including the steps of: acquiring outdoor air conditions, including the outdoor air temperature, for a predetermined period in an area where the building is located, and the amount of power consumption of the electrical equipment for each predetermined unit time within the period; a calculation step of calculating a first heat amount, which is the amount of heat processed by the electrical equipment for each unit time, based on the acquired outdoor air conditions and the amount of power consumption; a decision step of determining a new electrical equipment based on the first heat amount; and a proposal step of proposing the new electrical equipment to the user. Effect of the Invention
[0007] By employing the above steps, the method for suggesting an electric device of the present invention makes it possible to suggest an electric device with an appropriate capacity based on the lifestyle patterns of users of a building, etc. [Brief description of the drawings]
[0008] [Figure 1] FIG. 1 is a cross-sectional view conceptually illustrating an example of a building in which electrical equipment is installed. [Diagram 2] 1 is a block diagram showing an example of a configuration of a system for proposing an electrical device; [Diagram 3] FIG. 2 is a diagram showing specifications of the electrical device of the present embodiment. [Figure 4] FIG. 11 is a diagram showing specifications of a plurality of candidate electric devices. [Diagram 5] 4 is a flowchart showing a processing procedure of a method for proposing an electric device according to the present embodiment. [Figure 6] FIG. 1 is a diagram showing the outdoor air conditions in an area where a building is located and some of the power consumption amounts of existing electrical appliances. [Figure 7] 10 is a flowchart showing a processing procedure of a calculation step according to the present embodiment. [Figure 8] 1 is a graph showing the relationship between energy consumption efficiency and load factor during heating. [Figure 9] 1 is a graph showing the relationship between energy consumption efficiency and load factor during cooling. [Figure 10] FIG. 7 is a diagram showing the outdoor air conditions and power consumption shown in FIG. 6, and a corrected coefficient of performance during heating. [Figure 11] 11 is a diagram showing the outdoor air conditions, the power consumption, the corrected coefficient of performance during heating, and the first heat quantity shown in FIG. 10. FIG. [Figure 12] 12 is a diagram showing the outside air conditions, the power consumption, the corrected coefficient of performance during heating, and the first heat quantity shown in FIG. 11, and the power consumption of a new electric appliance. FIG. [Figure 13] FIG. 13 is a diagram showing a new electrical device displayed on a display device. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0009] Hereinafter, an embodiment of the present invention will be described with reference to the drawings. It should be understood that the drawings include exaggerated expressions and expressions different from the dimensional ratio of the actual structure in order to help understand the contents of the invention. Furthermore, the same or common elements are given the same reference numerals throughout the embodiments, and duplicated explanations are omitted. Furthermore, the specific configurations shown in the embodiments and drawings are for understanding the contents of the present invention, and the present invention is not limited to the specific configurations shown in the drawings.
[0010] In the electrical equipment proposal method (hereinafter sometimes referred to as the "proposal method") of this embodiment, replacement of electrical equipment (hereinafter sometimes referred to as the "existing electrical equipment") installed in the building is proposed to the building users. The electrical equipment includes heat pump type air conditioners or water heaters. In this embodiment, a case where replacement of air conditioners is proposed is exemplified. In addition, the users include, for example, the owner, landlord, and management company of building H.
[0011] [building] 1 is a cross-sectional view conceptually illustrating an example of a building H in which an electric device 1 is installed. The building H may be, for example, a house or a building. A plurality of rooms 2 are provided inside the building H. These rooms 2 include, for example, a living room 2A and a bedroom 2B.
[0012] In the living room 2A and the bedroom 2B, air conditioners 3 are installed as electrical equipment 1. In addition, if there is a difference in the amount of solar radiation between the living room 2A and the bedroom 2B due to, for example, the exterior plan (exterior) of the building H or the direction, there may be a difference in the amount of heat processed by the air conditioners 3.
[0013] [Air conditioning equipment (electrical equipment)] The air conditioning equipment 3 is not particularly limited as long as it is a heat pump type. Examples of the air conditioning equipment 3 include an air conditioner 4 and a floor heating device (not shown). In this embodiment, of these air conditioning equipment 3, replacement of the air conditioner 4 is proposed.
[0014] The air conditioner 4 is, for example, a typical household split-type air conditioner. The air conditioner 4 includes an indoor unit 4A and an outdoor unit (not shown) installed outside the building H as a set.
[0015] In general, the capacity (processing capacity) of an air conditioner 4 is selected according to the number of tatami mats in the room 2 in which the air conditioner 4 is installed. However, there are cases in which it is not appropriate to select the capacity of the air conditioner 4 based solely on the number of tatami mats. That is, there are cases in which it is preferable to select an air conditioner 4 with a larger capacity than the capacity selected based on the number of tatami mats, and there are also cases in which it is preferable to select an air conditioner 4 with a smaller capacity.
[0016] For example, a room 2 that receives little sunlight is less affected by the heat of sunlight and is less likely to warm up when the air conditioner 4 is used for heating, so there is a tendency for the air conditioner 4 to process a large amount of heat. It is preferable to select an air conditioner 4 with a capacity larger than that selected based on the number of tatami mats for the air conditioner 4 to be installed in such a room 2.
[0017] In rooms 2 that are primarily used by users who are sensitive to heat, the cooling temperature setting tends to be set lower than normal. On the other hand, in rooms 2 that are primarily used by users who are sensitive to cold, the heating temperature setting tends to be set higher than normal. Air conditioners 4 installed in these rooms 2 tend to process a large amount of heat, so it is preferable to select an air conditioner 4 with a capacity larger than the capacity selected based on the number of tatami mats.
[0018] In rooms 2 where people often return home and start air conditioning at times when the air conditioning load is high, there is a tendency for a large amount of heat to be processed when the air conditioner 4 starts up. For such rooms 2, it is preferable to select an air conditioner 4 with a capacity larger than that selected based on the number of tatami mats.
[0019] In rooms 2 where users stay for long periods and where air conditioning is often continuous, the amount of heat processed by the air conditioner 4 tends to be small. For such rooms 2, it is preferable to select an air conditioner 4 with a capacity smaller than that selected based on the number of tatami mats.
[0020] A room 2 with high thermal insulation performance tends to have a small amount of heat processed by the air conditioner 4. For such a room 2, it is preferable to select an air conditioner 4 with a capacity smaller than the capacity selected based on the number of tatami mats.
[0021] As such, the lifestyle patterns of the users of building H (room 2), as well as the solar radiation conditions and insulation specifications of building H, vary widely, and it may not be appropriate to select the capacity of the air conditioner 4 based solely on the number of tatami mats.
[0022] [How to propose electrical equipment] In the proposed method of this embodiment, an electrical appliance 1 with an appropriate capacity (processing capability) is proposed based on the amount of heat (first amount of heat) actually processed by the existing electrical appliance 1 (air conditioner 4) taking into account the lifestyle patterns, etc. of the users of building H (room 2).
[0023] In the case where an air conditioner 4 is installed in each of multiple rooms 2 as in this embodiment, it may be proposed to replace the air conditioner 4 installed in at least one of these rooms 2 (e.g., living room 2A). Also, in a building H equipped with a central air conditioning system that air-conditions multiple rooms 2 with a single air conditioner (not shown), it may be proposed to replace that air conditioner.
[0024] [Electrical equipment suggestion system] The proposal method of this embodiment uses an electric appliance proposal system (hereinafter, sometimes referred to as a "proposal system") 11. Fig. 2 is a block diagram showing an example of the configuration of the electric appliance proposal system 11.
[0025] The proposed system 11 of this embodiment has an input device 12, a display device 13, and a calculation processing device 14 (computer 15). Furthermore, a power acquisition device 16 is connected to the proposed system 11 of this embodiment. A collection of these devices can configure the proposed system 11 that can perform the function of proposing replacement of the existing electrical device 1 shown in FIG. 1. The calculation processing device 14 (computer 15) of this embodiment is configured as a server (cloud server), but is not particularly limited thereto, and may be configured as, for example, a personal computer or a mobile information terminal (tablet type, etc.).
[0026] [Power acquisition device] The power acquisition device 16 is for acquiring the amount of power consumed by the existing electrical appliance 1 (air conditioner 4) shown in Fig. 1. This amount of power consumption is used to calculate the amount of heat processed by the existing electrical appliance 1.
[0027] The power acquisition device 16 is not particularly limited as long as it can acquire the power consumption amount. For example, a HEMS (Home Energy Management Service) controller, a power meter, or the like is adopted as the power acquisition device 16. In the HEMS, the power consumption amount can be acquired by communication with the existing electric appliance 1. On the other hand, in the power meter, the power consumption amount of the existing electric appliance 1 can be measured by being connected between the power plug of the existing electric appliance 1 and an outlet. By connecting the arithmetic processing device 14 to the HEMS, the power meter, or the like, the power consumption amount of the existing electric appliance 1 can be easily acquired. When the arithmetic processing device 14 is configured as a cloud server as in this embodiment, the power acquisition device 16 and the arithmetic processing device 14 can be connected via a communication network 7 such as a WAN.
[0028] In the power acquisition device 16 of the present embodiment, the amount of power consumption of the existing electric device 1 can be acquired for each predetermined unit time. The unit time is set according to the frequency of calculating the amount of heat processed by the existing electric device 1, and is set to, for example, 10 to 60 minutes (60 minutes in this example).
[0029] [Input / display device] 2, for example, a keyboard, a mouse, or a touch panel is used as the input device 12. For example, a display device or a printer is used as the display device 13.
[0030] [Processing unit] The arithmetic processing device 14 includes a calculation unit (CPU) 17 that performs various calculations, a storage unit 18 that stores data, programs, etc., and a working memory 19.
[0031] [Storage] The storage unit 18 is a non-volatile information storage device formed of, for example, a magnetic disk, an optical disk, an SSD, etc. The storage unit 18 includes a data unit 21 and a program unit 22.
[0032] The data unit 21 is for storing information necessary for proposing replacement of an existing electric appliance 1 (air conditioner 4). The data unit 21 in this embodiment includes an outdoor air condition input unit 21A, a power consumption input unit 21B, an existing electric appliance input unit 21C, a corrected coefficient of performance input unit 21D, a first heat input unit 21E, a candidate electric appliance input unit 21F, and a selected electric appliance input unit 21G. Note that the data unit 21 is not limited to such an embodiment, and for example, some of these may be omitted, or an input unit (not shown) for storing other data may be further included.
[0033] The existing electric device input unit 21C stores in advance, as a database (table), the specifications of the existing electric device 1 shown in Fig. 1. Fig. 3 is a diagram showing the specifications of the electric device 1 of this embodiment.
[0034] The specifications of the electrical equipment 1 include a rated heating capacity 31, a rated cooling capacity 32, a maximum heating capacity 33, a maximum cooling capacity 34, a coefficient of performance during heating 35, and a coefficient of performance during cooling 36.
[0035] The coefficient of performance (COP) indicates the energy consumption efficiency when the existing electrical equipment 1 is operated at rated capacity under the outdoor temperature conditions defined in JIS C9612 (hereinafter sometimes referred to as "JIS measurement conditions"). The JIS measurement conditions are 7°C for heating and 35°C for cooling. Specifications including such a coefficient of performance are determined in advance by, for example, the manufacturer of the existing electrical equipment 1.
[0036] The candidate electric appliance input unit 21F shown in Fig. 2 stores in advance the specifications of a plurality of candidate electric appliances as a database (table). Fig. 4 is a diagram showing the specifications of a plurality of candidate electric appliances 5. In Fig. 4, a first candidate electric appliance 5A to a third candidate electric appliance 5C are shown as representatives of the plurality of candidate electric appliances 5.
[0037] The multiple candidate electric devices 5 are new electric devices that can replace (are replacement candidates for) the existing electric devices 1 shown in Fig. 1. The total number of the multiple candidate electric devices 5 can be set appropriately. From the viewpoint of proposing electric devices 1 with appropriate capacity, it is preferable that, for example, 3 to 30 candidate electric devices 5 are included.
[0038] When the candidate electric appliance 5 is an air conditioner 4, the specifications of the candidate electric appliance 5 include a rated heating capacity 31, a rated cooling capacity 32, a maximum heating capacity 33, a maximum cooling capacity 34, a coefficient of performance during heating 35, and a coefficient of performance during cooling 36. These specifications are determined in advance, for example, by each manufacturer of the multiple candidate electric appliances 5. Furthermore, the multiple candidate electric appliances 5 differ from each other in at least one of these specifications (in this example, all of the specifications).
[0039] The outdoor air condition input section 21A, the power consumption input section 21B, the corrected coefficient of performance input section 21D, the first heat quantity input section 21E, and the selected electric appliance input section 21G shown in Fig. 2 store data (calculation results) acquired by executing the proposed method of this embodiment. Details of these data will be described later.
[0040] [Program section] The program unit 22 is a program (computer program) necessary for executing the proposed method. The program unit (program) 22 is executed by the calculation unit 17 to cause the computer 15 to function as a specific means for proposing replacement of the existing electric device 1 shown in FIG.
[0041] The program unit 22 in this embodiment includes an acquisition unit 22A, a calculation unit 22B, a determination unit 22C, and a proposal unit 22D. Note that the program unit 22 is not limited to such an embodiment, and for example, some of these may be omitted, or a program unit (not shown) having other functions may be further included. The functions of these program units 22 will be described in detail later.
[0042] [Get outdoor air conditions and power consumption] 5 is a flowchart showing the processing procedure of the electric appliance suggestion method of the present embodiment. In the suggestion method of the present embodiment, first, the outdoor air condition and the power consumption amount of the existing electric appliance 1 shown in FIG.
[0043] In step S1 of this embodiment, first, the acquisition unit 22A included in the program unit 22 shown in Fig. 2 is loaded into the working memory 19. The acquisition unit 22A is a program for acquiring the outside air conditions and the power consumption of the existing electric device 1. The acquisition unit 22A is executed by the calculation unit 17, whereby the computer 15 can function as a means for acquiring the outside conditions and the power consumption.
[0044] The outdoor air conditions include the outdoor air temperature in the area where the building H shown in Fig. 1 is located (for example, Osaka Prefecture). This outdoor air temperature is acquired during a predetermined period. In addition to the outdoor air temperature, the outdoor air conditions may further include the outdoor air humidity (relative humidity).
[0045] The weather conditions can be appropriately acquired if the outside air temperature and humidity of the area where the building H is located are specified. In this embodiment, for example, the weather conditions may be acquired from weather data provided by the Japan Meteorological Agency or the like, or may be acquired by actual measurement in the area where the building H is located. The weather conditions in this embodiment are acquired from the weather data.
[0046] The period for which the outdoor air conditions are acquired is set appropriately according to the period from the date on which a request to replace the existing electric appliance 1 is made to the planned date on which the new electric appliance 23 is proposed, for example, and is set to 1 to 60 days (30 days in this example). From the viewpoint of acquiring the amount of power consumption of the existing electric appliance 1 (air conditioner 4), the period preferably includes days on which the existing electric appliance 1 is actually operating (heating operation and cooling operation).
[0047] The outdoor air conditions in this embodiment are acquired every unit time (for example, 60 minutes) in the same manner as the power consumption of the existing electric device 1. Thus, in step S1, the outdoor air conditions can be acquired every unit time within the above-mentioned period.
[0048] Fig. 6 is a diagram showing outdoor air conditions 41 in an area where building H is located, and part of the power consumption 42 of existing electrical appliances 1. Fig. 6 shows outdoor air conditions 41 and power consumption 42 for one day representatively out of the above-mentioned period (30 days in this example). The outdoor air conditions 41 include temperature 41A and relative humidity 41B. The outdoor air conditions 41 are acquired for each unit time, and stored in the outdoor air condition input unit 21A shown in Fig. 2.
[0049] The power consumption 42 of the existing electrical appliance 1 is acquired within the period (30 days in this example) during which the outdoor air conditions 41 are acquired. As described above, the power consumption 42 is acquired in advance for each unit time (60 minutes in this example) by the power acquisition device 16 shown in Figs. 1 and 2. For this reason, in step S1 of this embodiment, the power consumption 42 acquired within the above-mentioned period among these power consumption amounts 42 is transmitted to the arithmetic processing device 14. As a result, the power consumption 42 of the existing electrical appliance 1 is acquired for each unit time during the above-mentioned period. The power consumption is stored in the power consumption input unit 21B shown in Fig. 2.
[0050] [Calculate the first heat quantity (calculation step)] Next, in the proposed method of this embodiment, a first heat amount, which is the amount of heat processed by the existing electric appliance 1, is calculated for each unit time (calculation step S2). In the calculation step S2 of this embodiment, the first heat amount is calculated for each unit time of the above-mentioned period based on the outside air condition 41 and the power consumption amount 42 of the existing electric appliance 1 shown in FIG.
[0051] In the calculation step S2 of this embodiment, first, the outdoor air conditions 41 (shown in FIG. 6) stored in the outdoor air condition input unit 21A shown in FIG. 2 and the power consumption 42 (shown in FIG. 6) stored in the power consumption input unit 21B are loaded into the work memory 19. Next, the calculation unit 22B included in the program unit 22 is loaded into the work memory 19. This calculation unit 22B is a program for calculating a first amount of heat processed by the existing electric device 1 per unit time based on the outdoor air conditions 41 and the power consumption 42. The calculation unit 22B is executed by the operation unit 17, thereby allowing the computer 15 to function as a means for calculating the first amount of heat.
[0052] 6, the outdoor air condition 41 and the power consumption 42 of the existing electric device 1 are acquired for each unit time (60 minutes in this example) within the above-mentioned period (30 days in this example). The first heat quantity calculated based on the outdoor air condition 41 and the power consumption 42 can also be calculated for each unit time within the above-mentioned period.
[0053] The first amount of heat can be calculated as appropriate so long as it is the amount of heat actually processed by the existing electric appliance 1 shown in Fig. 1 (hereinafter, sometimes referred to as the "processed amount of heat"). In general, the processed amount of heat (processing capacity) can be calculated by multiplying the power consumption 42 (shown in Fig. 6) of the existing electric appliance 1 by the coefficient of performance (coefficient of performance 35 during heating or coefficient of performance 36 during cooling shown in Fig. 3) of the existing electric appliance 1.
[0054] As described above, the coefficient of performance 35 during heating and the coefficient of performance 36 during cooling shown in Fig. 3 indicate the energy consumption efficiency when the existing electrical equipment 1 is operated at rated capacity under predetermined outdoor conditions (JIS measurement conditions). The coefficient of performance 35 during heating is calculated by dividing the rated heating capacity 31 by the rated power consumption during heating (not shown). On the other hand, the coefficient of performance 36 during cooling is calculated by dividing the rated cooling capacity 32 by the rated power consumption during cooling (not shown).
[0055] The actual heating capacity, cooling capacity, and power consumption of the existing electrical equipment 1 tend to be influenced by ever-changing outdoor air conditions 41 (shown in FIG. 6). For this reason, the actual coefficient of performance (not shown) may deviate from the coefficient of performance under JIS measurement conditions (coefficient of performance 35 during heating and coefficient of performance 36 during cooling shown in FIG. 3).
[0056] 6 (conditions in which outdoor air temperature 41A is low and outdoor air relative humidity 41B is high), frost may form on the outdoor unit (not shown) of the existing electrical equipment 1. When a defrosting operation is performed to remove such frost, the heating operation is temporarily stopped and the actual coefficient of performance (not shown) decreases, deviating from the coefficient of performance of 35 (shown in FIG. 3) during heating under JIS measurement conditions.
[0057] In this way, the actual coefficient of performance (not shown) may deviate from the coefficient of performance under the JIS measurement conditions (coefficient of performance 35 during heating and coefficient of performance 36 during cooling shown in FIG. 3). Therefore, it may not be appropriate to calculate the amount of heat processed by the existing electrical equipment 1 based on these coefficients of performance 35 and 36.
[0058] In the calculation step S2 of this embodiment, a corrected coefficient of performance (not shown) is calculated by correcting the coefficient of performance of the existing electric appliance 1 (coefficient of performance 35 during heating or coefficient of performance 36 during cooling shown in FIG. 3) based on the ever-changing outside air conditions 41 (shown in FIG. 6). Then, the first heat quantity is calculated based on the corrected coefficient of performance and the power consumption amount 42 (shown in FIG. 6) of the existing electric appliance 1. FIG. 7 is a flowchart showing the processing procedure of the calculation step S2 of this embodiment.
[0059] [Get Coefficient of Performance] In the calculation step S2 of this embodiment, first, the coefficient of performance of the existing electric equipment 1 (the coefficient of performance 35 during heating and the coefficient of performance 36 during cooling shown in FIG. 3) is acquired (step S21). In step S21 of this embodiment, the coefficients of performance 35, 36 of the existing electric equipment 1 stored in the existing electric equipment input unit 21C shown in FIG. 2 are read into the working memory 19, thereby acquiring the coefficients of performance 35, 36 of the existing electric equipment 1. Note that, when the coefficients of performance 35, 36 of the existing electric equipment 1 are not stored in advance in the existing electric equipment input unit 21C, for example, a screen for inputting the coefficients of performance 35, 36 may be displayed on the display device 13, and an operator or the like may directly input the coefficients of performance 35, 36.
[0060] [Calculate the adjusted coefficient of performance] Next, in a calculation step S2 of this embodiment, a corrected coefficient of performance is calculated by correcting the coefficient of performance of the existing electric equipment 1 (coefficient of performance 35 during heating or coefficient of performance 36 during cooling shown in FIG. 3) based on the outdoor air condition 41 (shown in FIG. 6) (step S22). In step S22 of this embodiment, a corrected coefficient of performance is calculated for each of heating and cooling.
[0061] FIG. 8 is a graph showing the relationship between the energy consumption efficiency during heating and the load factor. The solid curve 51 shows the relationship between the energy consumption efficiency and the load factor under the JIS measurement conditions (7°C). Such a solid curve 51 can be appropriately specified based on, for example, the specifications of the existing electrical equipment 1 shown in FIG. 3 (rated heating capacity 31, maximum heating capacity 33, coefficient of performance during heating 35, and rated heating power consumption (not shown), etc.). In this embodiment, for example, the energy consumption efficiency is determined based on the specifications of the existing electrical equipment 1 shown in FIG. 3 (rated heating capacity 31, maximum heating capacity 33, coefficient of performance during heating 35, and rated heating power consumption (not shown), etc.).<URL:https: / / www.kenken.go.jp / becc / documents / house / 4-3_210401_v07.pdf> ) in the formula (5) described in the previous section, the specifications of the existing electrical equipment 1, the JIS measurement temperature (7°C), and the changed correction processing heating load Q' T,H,d,tBy substituting and, the corrected heating load Q' T,H,d,t and power consumption E E,H,d,t The solid curve 51 is obtained from the above. The JIS measurement temperature (7°C) is calculated by the reference input / output function f H,θ In the equations (6) and (7) that specify the outside air temperature θ ex Then, the energy consumption efficiency C1 at which the rated capacity is reached on the solid curve 51 is identified as the coefficient of performance during heating under the JIS measurement conditions (i.e., the coefficient of performance during heating of the existing electrical equipment 1 shown in FIG. 3) 35.
[0062] In FIG. 8, the dashed-dotted curve 52 shows the relationship between the energy consumption efficiency and the load factor at an outside air temperature 41A (for example, 2°C) that is lower than the JIS measurement condition (7°C). This dashed-dotted curve 52 can be specified as appropriate. In this embodiment, for example, the reference input / output function f H,θ In the equations (6) and (7) that specify the outside air temperature θ ex By substituting the outside air temperature (in this example, "2° C.") into the above, the dashed dotted curve 52 can be obtained.
[0063] In addition, in the dashed-dotted curve 52, the energy consumption efficiency C2 at the rated capacity is specified as the corrected coefficient of performance 37 during heating obtained by correcting the coefficient of performance 35 (C1) during heating under the JIS measurement conditions by the outdoor air condition 41 (outdoor air temperature 41A: 2°C). Thus, under conditions where the outdoor air temperature 41A is lower than the JIS measurement conditions (7°C), the corrected coefficient of performance 37 (C2) during heating is smaller than the coefficient of performance 35 (C1) during heating under the JIS measurement conditions, and the energy consumption efficiency deteriorates.
[0064] In FIG. 8, dashed curve 53 shows the relationship between the energy consumption efficiency and the load factor at an outside air temperature 41A (for example, 12°C) higher than the JIS measurement condition (7°C). This dashed curve 53 can be specified as appropriate. In this embodiment, for example, the reference input / output function f H,θIn the equations (6) and (7) that specify the outside air temperature θ ex By substituting the outside air temperature 41A (in this example, "12° C.") into the above, the dashed curve 53 can be obtained.
[0065] In addition, in dashed curve 53, energy consumption efficiency C3 at rated capacity is specified as corrected coefficient of performance 37 during heating obtained by correcting coefficient of performance 35 (C1) during heating under JIS measurement conditions by outdoor air conditions 41 (outdoor air temperature 41A: 12°C). Thus, under conditions where outdoor air temperature 41A is higher than JIS measurement conditions (7°C), corrected coefficient of performance 37 (C3) during heating is larger than coefficient of performance 35 (C1) during heating under JIS measurement conditions, and energy consumption efficiency is good.
[0066] FIG. 9 is a graph showing the relationship between energy consumption efficiency and load factor during cooling. A solid curve 54 shows the relationship between energy consumption efficiency and load factor under JIS measurement conditions (35°C). Such a solid curve 54 can be determined, for example, based on the specifications of the existing electrical equipment 1 shown in FIG. 3 (rated cooling capacity 32, maximum cooling capacity 34, coefficient of performance during cooling 36, and rated cooling power consumption (not shown), etc.). In this embodiment, for example, the specifications of the existing electrical equipment 1, the JIS measurement temperature (35°C), and the changed corrected heating load Q' are added to equation (20) in the above document. T,C,d,t By substituting and, the corrected heating load Q' T,C,d,t and power consumption E E,C,d,t The solid curve 54 is obtained from the above. The JIS measurement temperature (35°C) is calculated by the reference input / output function f C,θ In the equations (21) and (22) that specify the outside air temperature θ ex Then, the energy consumption efficiency C4 at which the rated capacity is achieved on the solid curve 54 is identified as the coefficient of performance during cooling under the JIS measurement conditions (i.e., the coefficient of performance during cooling of the existing electrical equipment 1 shown in FIG. 3) 36.
[0067] The relationship between the outdoor air condition 41 and the energy consumption efficiency is reversed for the dashed line curve 55 and the dashed line curve 56 during cooling shown in FIG. 9 compared to the dashed line curve 52 and the dashed line curve 53 during heating shown in FIG.
[0068] The dashed-dotted curve 52 during heating shown in Fig. 8 shows the relationship between energy consumption efficiency and load factor at an outdoor air temperature 41A (2°C) that is lower than the JIS measurement conditions (7°C). On the other hand, the dashed-dotted curve 55 during cooling shown in Fig. 9 shows the relationship between energy consumption efficiency and load factor at an outdoor air temperature 41A (e.g., 40°C) that is higher than the JIS measurement conditions (35°C). Although the dashed-dotted curves 52 and 55 have different relationships between the outdoor air conditions 41 and the JIS measurement conditions, they show that energy consumption efficiency deteriorates during both heating and cooling.
[0069] The dashed-dotted curve 55 during cooling can be obtained as appropriate. In this embodiment, for example, the reference input / output function f C,θ In the equations (21) and (22) that specify the outside air temperature θ ex By substituting the outdoor air temperature (in this example, "40°C") into, it is possible to obtain the dashed-dotted curve 55 during cooling. In such dashed-dotted curve 55, the energy consumption efficiency C5 at the rated capacity is specified as the corrected coefficient of performance 38 during cooling obtained by correcting the coefficient of performance 36 (C4) during cooling under the JIS measurement conditions by the outdoor air condition 41 (outdoor air temperature 41A: 40°C).
[0070] Moreover, dashed curve 53 during heating shown in Fig. 8 shows the relationship between energy consumption efficiency and load factor at an outdoor air temperature (12°C) that is higher than the JIS measurement conditions (7°C). Meanwhile, dashed curve 56 during cooling shown in Fig. 9 shows the relationship between energy consumption efficiency and load factor at an outdoor air temperature (e.g., 30°C) that is lower than the JIS measurement conditions (35°C). Although these dashed curves 53 and 56 have different relationships between the high and low outdoor air conditions 41 relative to the JIS measurement conditions, they show that the energy consumption efficiency is good during both heating and cooling.
[0071] The dashed curve 56 during cooling can be obtained as appropriate. In this embodiment, for example, the reference input / output function f C,θ In the equations (21) and (22) that specify the outside air temperature θ ex By substituting the outdoor air temperature (in this example, "30°C") into , a dashed curve 56 during cooling can be obtained. In such dashed curve 56, the energy consumption efficiency C6 at the rated capacity is specified as a corrected coefficient of performance 38 during cooling obtained by correcting the coefficient of performance 36 (C4) during cooling under JIS measurement conditions by the outdoor air condition 41 (outdoor air temperature 41A: 30°C).
[0072] In this manner, in step S22 of the present embodiment, a corrected coefficient of performance (corrected coefficient of performance 37 during heating shown in FIG. 8 or corrected coefficient of performance 38 during cooling shown in FIG. 9) obtained by correcting the coefficient of performance shown in FIG. 3 (coefficient of performance 35 during heating or coefficient of performance 36 during cooling) based on an outside air temperature 41A (shown in FIG. 6) different from the JIS measurement conditions (7° C. during heating, 35° C. during cooling) can be easily obtained. This makes it possible to obtain the coefficient of performance (i.e., corrected coefficients of performance 37, 38) of the existing electrical equipment 1 under actual outside air conditions.
[0073] In step S22 of this embodiment, according to the above-mentioned procedure, a corrected coefficient of performance 37 during heating is obtained by correcting the coefficient of performance 35 during heating (shown in FIG. 3) based on the outdoor air conditions 41 (outdoor air temperature 41A) for each unit time (hour) shown in FIG. 6. FIG. 10 is a diagram showing the outdoor air conditions 41 and power consumption 42 shown in FIG. 6, and the corrected coefficient of performance 37 during heating.
[0074] As described above, when a defrosting operation is performed, the heating operation is temporarily stopped, and the energy consumption efficiency decreases. For this reason, it is preferable to obtain a corrected coefficient of performance 37 for heating when a defrosting operation is performed in the unit time (hour) when the defrosting operation is performed. In this embodiment, for example, the corrected heating load Q' in the formula (5) in the above document used to obtain the solid curve 51 is T,H,d,t In equation (10) for determining the heating output correction coefficient C af,H The curve for defrosting operation is obtained by substituting "0.77" into . Then, on the curve for defrosting operation, the energy consumption efficiency at the rated capacity is specified as the corrected coefficient of performance 37 for heating during defrosting operation. Note that the heating output correction coefficient C af,H The "0.77" substituted into is, for example, a constant when the outside air temperature is less than 5°C and the relative humidity is 80% or more. Therefore, the heating output correction coefficient C af,H The constants substituted into can be appropriately set according to the outside air temperature and relative humidity. The corrected coefficient of performance 37 during heating and the corrected coefficient of performance 38 during cooling are stored in the corrected coefficient of performance input unit 21D shown in FIG.
[0075] [Calculate the first heat quantity] Next, in the calculation step S2 of this embodiment, the power consumption 42 of the existing electric appliance 1 shown in FIG. 10 is multiplied by the corrected coefficient of performance (the corrected coefficient of performance 37 during heating or the corrected coefficient of performance 38 during cooling) to calculate the first heat quantity (step S23). In step S23 of this embodiment, the power consumption 42 is multiplied by the corrected coefficient of performance (the corrected coefficient of performance 37 during heating) for each unit time (60 minutes) within the above-mentioned period (30 days in this example). This calculates the first heat quantity 43, which is the heat quantity processed by the electric appliance 1 for each unit time. FIG. 11 is a diagram showing the outdoor air condition 41, the power consumption 42, the corrected coefficient of performance 37 during heating, and the first heat quantity 43 shown in FIG. 10. The first heat quantity 43 for each unit time is stored in the first heat quantity input unit 21E shown in FIG. 2.
[0076] In the calculation step S2 of this embodiment, a first amount of heat 43 processed by the existing electric appliance 1 is obtained for each unit time from the power consumption 42 of the existing electric appliance 1 based on the coefficient of performance (corrected coefficient of performance 37 during heating) of the existing electric appliance 1 that changes from moment to moment depending on the outside air condition 41. Such a first amount of heat 43 can be obtained as the amount of heat actually processed by the existing electric appliance 1 depending on the actual life patterns of users of the building H shown in Fig. 1, the solar radiation conditions and insulation specifications of the building H, and the like.
[0077] [Deciding on new electrical equipment (decision process)] Next, in the method proposed in this embodiment, a new electric appliance is determined based on the first heat amount 43 (determination step S3). In the determination step S3 in this embodiment, one or more new electric appliances (candidate electric appliances 5) are selected from a plurality of preset candidate electric appliances 5 (shown in FIG. 4).
[0078] In the determination step S3 of the present embodiment, first, the first heat quantity 43 (shown in FIG. 11) stored in the first heat quantity input unit 21E shown in FIG. 2 and a plurality of candidate electric appliances 5 (shown in FIG. 4) stored in the candidate electric appliance input unit 21F are read into the working memory 19. Next, a determination unit 22C included in the program unit 22 is read into the working memory 19. This determination unit 22C is a program for determining a new electric appliance based on the first heat quantity 43. By executing this determination unit 22C by the calculation unit 17, the computer 15 can function as a means for determining a new electric appliance.
[0079] In the determination step S3, a new electric appliance can be appropriately determined based on the first heat quantity 43 (shown in FIG. 11) of the existing electric appliance 1. As described above, the first heat quantity 43 is the heat quantity actually processed by the existing electric appliance 1 per unit time in the above-mentioned period, depending on the actual life pattern of the user of the building H shown in FIG. 1, the solar radiation condition and the heat insulation specification of the building H, and the like. In the above-mentioned period, the load of the existing electric appliance 1 is the largest at the time (unit time) when the first heat quantity 43 is the maximum value. In order to allow the new electric appliance to perform stable processing even at the time when such a load (first heat quantity 43) is the largest, in the determination step S3, it is preferable to select a candidate electric appliance 5 having a processing capacity larger than the maximum value of the first heat quantity 43 from among the multiple candidate electric appliances 5 shown in FIG. 4.
[0080] 11, the maximum value of the first heat quantity 43 is the first heat quantity 43 at the time "2:00" (i.e., 1455 W). Therefore, among the multiple candidate electric appliances 5 shown in FIG. 4, the candidate electric appliances 5 having a rated heating capacity 31 of 1455 W or more (for example, the second candidate electric appliance 5B and the third candidate electric appliance 5C) may be selected.
[0081] The processing load (first heat quantity 43) of the existing electric appliance 1 during heating tends to be the largest on the coldest day of the year in the area where the building H shown in FIG. 1 is located. In order to select a candidate electric appliance 5 capable of performing stable processing (heating) on such a coldest day, it is preferable that the coldest day is included in the above-mentioned period in which the outdoor air condition 41, the power consumption amount 44, and the first heat quantity 43 are acquired. This allows the maximum value of the first heat quantity 43, including the first heat quantity 43 on the coldest day, to be specified, and a candidate electric appliance 5 having a processing capacity greater than this maximum value to be selected. This makes it possible to select a new electric appliance (candidate electric appliance 5) capable of stable processing (heating) on the coldest day.
[0082] On the other hand, the processing load (first heat quantity 43) of the existing electric appliance 1 during cooling tends to be the largest on the hottest day of the year in the area where the building H shown in FIG. 1 is located. In order to select a candidate electric appliance 5 capable of stable processing (cooling) on such a hottest day, it is preferable that the hottest day is included in the above-mentioned period. This allows the maximum value of the first heat quantity 43, including the first heat quantity 43 on the hottest day, to be identified, and a candidate electric appliance 5 having a processing capacity greater than this maximum value to be selected. This makes it possible to select a new electric appliance (candidate electric appliance 5) capable of stable processing (cooling) on the hottest day.
[0083] Furthermore, when a candidate electric appliance 5 having a processing capacity (in this example, the rated heating capacity 31) larger than necessary is selected, the energy consumption efficiency may decrease. In particular, when a candidate electric appliance 5 (not shown) having a processing capacity (rated heating capacity 31: 6700 W) larger than the existing electric appliance 1 shown in FIG. 3 is selected, the energy consumption efficiency decreases compared to the existing electric appliance 1, and the energy saving performance deteriorates. From this viewpoint, in the determination step S3, it is preferable to select a candidate electric appliance 5 (the second candidate electric appliance 5B or the third candidate electric appliance 5C) having a processing capacity smaller than the processing capacity of the existing electric appliance 1 from among a plurality of candidate electric appliances 5 (the second candidate electric appliance 5B and the third candidate electric appliance 5C in FIG. 4) having a processing capacity larger than the maximum value of the first heat quantity 43. As a result, a new electric appliance capable of improving the energy consumption efficiency and achieving energy saving compared to the existing electric appliance 1 shown in FIG. 1 and FIG. 3 can be determined.
[0084] Furthermore, in the determination step S3, it is preferable to select a candidate electric appliance 5 (second candidate electric appliance 5B) having a processing capacity with the smallest difference from the maximum value of the first heat quantity 43 from among multiple candidate electric appliances 5 (second candidate electric appliance 5B and third candidate electric appliance 5C in FIG. 4) having a processing capacity greater than the maximum value of the first heat quantity 43. Such a candidate electric appliance 5 can maximize energy consumption efficiency while performing stable processing even at the time when the processing load (first heat quantity) is greatest. Therefore, it is possible to select a new electric appliance 23 having a more appropriate capacity (processing capacity) taking into account the lifestyle patterns, etc. of users of the building H.
[0085] In the determination step S3 of the present embodiment, one candidate electric appliance 5 is selected from among the multiple candidate electric appliances 5 shown in FIG. 4, but two or more candidate electric appliances 5 may be selected. In this case, for example, a second candidate electric appliance 5B having a processing capacity with the smallest difference from the maximum value of the first heat quantity 43 and a third candidate electric appliance 5C having a processing capacity with the second smallest difference from the maximum value of the first heat quantity 43 may be selected as the new electric appliance 23. In this way, by selecting two or more candidate electric appliances 5, the user of the building H shown in FIG. 1 can select the new electric appliance 23 not only by focusing on the processing capacity of the candidate electric appliances 5 but also by taking into consideration, for example, the introduction cost and the design. The selected new electric appliance 23 (in this example, the second candidate electric appliance 5B) is stored in the selected electric appliance input unit 21G shown in FIG. 2.
[0086] The determination step S3 may include a step of calculating the power consumption of the new electric appliance 23 based on the first heat quantity 43 of the existing electric appliance 1 and the coefficient of performance (coefficient of performance 35 during heating or coefficient of performance 36 during cooling) of the new electric appliance 23 (in this example, the second candidate electric appliance 5B) shown in FIG. 4. In this embodiment, assuming that the first heat quantity 43 of the existing electric appliance 1 and the first heat quantity of the new electric appliance 23 are the same, the power consumption of the new electric appliance 23 can be calculated by dividing the first heat quantity 43 of the existing electric appliance 1 by the coefficient of performance 35 during heating of the new electric appliance 23 shown in FIG. 4. Note that, in order to more accurately calculate the power consumption of the new electric appliance 23, it is preferable to use a corrected coefficient of performance during heating (not shown) obtained by correcting the coefficient of performance 35 during heating of the electric appliance 23 based on the outdoor air condition 41.
[0087] 12 is a diagram showing the outdoor air condition 41, the power consumption 42, the corrected coefficient of performance 37 during heating, and the first heat quantity 43 shown in FIG. 11, and the power consumption 44 of the new electric appliance. By calculating the power consumption 44 of the new electric appliance in this manner, it becomes possible to compare it with the power consumption 42 of the existing electric appliance 1. The power consumption 44 of the new electric appliance is stored in the power consumption input unit 21B shown in FIG. 2.
[0088] [Proposing new electrical equipment (Proposal process)] Next, in the proposal method of the present embodiment, a new electric device 23 (shown in FIG. 4) is proposed to the user of the building H (proposal step S4).
[0089] In the proposal step S4 of this embodiment, first, the new electric appliance 23 (shown in FIG. 4) stored in the selected electric appliance input unit 21G shown in FIG. 2 is read into the working memory 19. Next, the proposal unit 22D included in the program unit 22 is read into the working memory 19. This proposal unit 22D is a program for proposing the new electric appliance 23 to the user of the building H. By executing this proposal unit 22D by the calculation unit 17, the computer 15 can function as a means for proposing the new electric appliance 23.
[0090] The proposal process S4 is appropriately performed if a new electrical appliance 23 (shown in FIG. 4) can be proposed to a user of the building H. In this embodiment, the new electrical appliance 23 is output to the display device 13 (shown in FIG. 2). The new electrical appliance 23 may be displayed on the display device 13 connected to the arithmetic processing device 14 (computer 15) that implemented the proposal method, or may be displayed on a display device (not shown) of a mobile terminal owned by the user via the communication network 7 shown in FIG. 1. FIG. 13 is a diagram showing the new electrical appliance 23 output to the display device 13.
[0091] The specifications of the new electric appliance 23 are outputted on the display device 13. This makes it possible to propose the new electric appliance 23 to the user based on the specific specifications of the new electric appliance 23, such as the rated heating capacity 31.
[0092] As described above, the new electric appliance 23 is determined based on the first heat amount 43 shown in Fig. 12. This first heat amount 43 is calculated according to the actual life patterns of the users of the building H shown in Fig. 1. Therefore, the proposal method of this embodiment makes it possible to propose a new electric appliance 23 with an appropriate capacity based on the life patterns of the users of the building H.
[0093] In this embodiment, the rated heating capacity 31, rated cooling capacity 32, maximum heating capacity 33, maximum cooling capacity 34, coefficient of performance during heating 35, and coefficient of performance during cooling 36 are output as specifications of the new electrical equipment 23, but this is not limited to this form and some of these may be omitted.
[0094] The proposal process S4 may include a process of outputting the model number 61 of the new electric appliance 23, an image 62 of the indoor unit, a price 63, an energy saving standard achievement rate 64, and the like, to the display device 13. With this information (data), it becomes possible to propose the new electric appliance 23 to the user, including the introduction cost, design, and the like of the new electric appliance 23.
[0095] The proposal process S4 may include a process of outputting at least one of the power consumption 42 of the existing electrical appliance 1 and the power consumption 44 of the new electrical appliance 23 shown in Fig. 12 to the display device 13. These power consumption amounts 42, 44 differ from values published by the manufacturers of those electrical appliances, and are values calculated according to the actual life patterns of users of the building H shown in Fig. 1, the solar radiation conditions and insulation specifications of the building H, and the like. Therefore, by outputting these power consumption amounts 42, 44, it is possible to increase the user's satisfaction with the selected new electrical appliance 23.
[0096] In this embodiment, both the power consumption 42 of the existing electric appliance 1 and the power consumption of the new electric appliance 23 are output. This makes it possible to compare these power consumption amounts, and to propose the new electric appliance 23 to the user based on the reduction rate of power consumption from the existing electric appliance 1, etc.
[0097] In the present embodiment, the total value of the power consumption 42 of the existing electric appliances 1 and the total value of the power consumption 44 of the new electric appliance 23 are displayed, but the present invention is not limited to this. For example, the power consumption 42 of the existing electric appliance 1 and the power consumption 44 of the new electric appliance 23 may be output for each unit time (hour) shown in Fig. 12. This allows a detailed comparison between these power consumption amounts 42 and 44.
[0098] In the proposed method of the present embodiment, in the proposal step S4, when a user of the building H shown in Fig. 1 wishes to replace the existing electrical appliance 1 with a new electrical appliance 23, a step of replacing the existing electrical appliance 1 shown in Fig. 1 with the new electrical appliance 23 is carried out. As a result, the electrical appliance is replaced with the new electrical appliance 23 selected based on the lifestyle pattern, etc., of the user of the building H, and it is possible to improve the comfort and energy saving of the room 2 in which the air conditioner 4 is installed.
[0099] [Floor heating system] In the above embodiments, an air conditioner 4 has been exemplified as the electrical equipment 1 (air conditioner 3) shown in Fig. 1, but the present invention is not limited to this embodiment and may be the above-mentioned floor heating equipment (not shown). The floor heating equipment is configured to include, for example, a floor heating unit (not shown) and an outdoor unit (not shown) as in the conventional case.
[0100] In this embodiment, when replacement of the floor heating device (not shown) is proposed, steps S1 to Suggestion step S4 are carried out similarly to the processing procedures shown in Figures 5 and 7. In the calculation step S2, a corrected coefficient of performance is calculated by correcting the coefficient of performance of the floor heating device based on the same processing procedures as those used when the air conditioner 4 is heating, and the first heat quantity can be calculated by multiplying this corrected coefficient of performance by the amount of power consumption. This makes it possible to propose a new floor heating device with an appropriate capacity based on the lifestyle patterns of the users of building H, etc.
[0101] [Water heater] In the above embodiments, the air conditioner 3 has been exemplified as the electrical appliance 1, but the electrical appliance 1 is not limited to this and may be, for example, the above-mentioned water heater 6. The water heater 6 includes, for example, a hot water storage unit 6A and a heat pump unit (not shown) as a set, similar to the conventional water heater.
[0102] In this embodiment, when replacement of the water heater 6 is proposed, steps S1 to S4 are carried out similarly to the processing procedures shown in Figures 5 and 7. In the calculation step S2, a corrected coefficient of performance is calculated by correcting the coefficient of performance of the water heater 6 based on the same processing procedures as those used when the air conditioner 4 is heating as described above, and the first heat quantity can be calculated by multiplying this corrected coefficient of performance by the amount of power consumption. This makes it possible to propose a new water heater 6 with an appropriate capacity based on the lifestyle patterns of the users of building H, etc.
[0103] Although a particularly preferred embodiment of the present invention has been described in detail above, the present invention is not limited to the illustrated embodiment and can be modified and carried out in various forms.
[0104] [Note] The present invention includes the following aspects.
[0105] [Invention 1] A method for proposing replacement of electrical equipment, including a heat pump type air conditioner or a water heater, installed in a building to a user of the building, comprising: acquiring outdoor air conditions including an outdoor air temperature for a predetermined period in an area where the building is located, and an amount of power consumption of the electrical device for each predetermined unit time within the period; a calculation step of calculating a first amount of heat, which is an amount of heat processed by the electrical device per unit time, based on the acquired outside air condition and the amount of power consumption; a determination step of determining a new electric device based on the first heat amount; and a suggestion step of suggesting the new electrical device to the user. How to propose electrical equipment. [Invention 2] The electric device proposing method according to aspect 1, wherein the determining step selects one or more new electric devices from a plurality of preset candidate electric devices. [Invention 3] The method for proposing an electrical device according to the present invention 2, wherein the determination step selects, as the new electrical device, a candidate electrical device having a processing capacity greater than the maximum value of the first heat quantity and less than the processing capacity of the installed electrical device. [Invention 4] The electric device proposing method according to present invention 3, wherein the determining step selects, as the new electric device, a candidate electric device having a processing capacity with a smallest difference from the maximum value. [Invention 5] The calculation step includes obtaining a coefficient of performance of the installed electrical equipment; Calculating a corrected coefficient of performance by correcting the coefficient of performance based on the outside air conditions; and multiplying the power consumption amount by the corrected coefficient of performance to calculate the first heat amount. [Invention 6] The method for proposing an electrical device according to any one of claims 1 to 5, wherein the determination step includes a step of calculating the power consumption of the new electrical device based on the first heat quantity and a coefficient of performance of the new electrical device. [Invention 7] The method for proposing an electric appliance according to invention 6, further comprising an output step of outputting at least one of the power consumption of the installed electric appliance and the power consumption of the new electric appliance to a display device. [Invention 8] The method for proposing an electrical device according to any one of claims 1 to 7, wherein the period includes the coldest day or the hottest day of the region. [The present invention 9] A system for proposing replacement of electrical equipment, including a heat pump type air conditioner or a water heater, to a user of the building, the system comprising: an acquisition unit that acquires outdoor air conditions including an outdoor air temperature for a predetermined period in an area where the building is located and an amount of power consumption of the electrical device for each predetermined unit time within the period; a calculation unit that calculates a first heat amount, which is a heat amount processed by the electrical device per unit time, based on the acquired outside air condition and the acquired power consumption amount; a determination unit that determines a new electric device based on the first heat amount; a suggestion unit that suggests the new electrical device to the user, Electrical equipment suggestion system. [Explanation of symbols]
[0106] 1. Electrical Equipment 3 Air conditioning equipment 6. Water heater H building
Claims
1. A method for proposing replacement of electrical equipment, including a heat pump type air conditioner or a water heater, installed in a building to a user of the building, comprising: acquiring outdoor air conditions including an outdoor air temperature for a predetermined period in an area where the building is located, and an amount of power consumption of the electrical device for each predetermined unit time within the period; a calculation step of calculating a first amount of heat, which is an amount of heat processed by the electrical device per unit time, based on the acquired outside air condition and the amount of power consumption; a determination step of determining a new electric device based on the first heat amount; and a suggestion step of suggesting the new electrical device to the user. How to propose electrical equipment.
2. The method for proposing an electric device according to claim 1 , wherein the determining step selects one or more of the new electric devices from a plurality of preset candidate electric devices.
3. The method for proposing an electrical device according to claim 2, wherein the determination step selects, as the new electrical device, a candidate electrical device having a processing capacity greater than the maximum value of the first heat quantity and less than the processing capacity of the installed electrical device.
4. The method for proposing an electric device according to claim 3 , wherein the determining step selects, as the new electric device, a candidate electric device having a processing capacity with a smallest difference from the maximum value.
5. The calculation step includes obtaining a coefficient of performance of the installed electrical equipment; Calculating a corrected coefficient of performance by correcting the coefficient of performance based on the outside air conditions; The method for proposing an electric device according to claim 1 , further comprising: multiplying the amount of consumed power by the corrected coefficient of performance to calculate the first amount of heat.
6. The method for proposing an electric device according to claim 1 , wherein the determining step includes a step of calculating an amount of power consumption of the new electric device based on the first heat amount and a coefficient of performance of the new electric device.
7. The method for proposing an electric device according to claim 6 , further comprising: an output step of outputting at least one of the power consumption amount of the installed electric device and the power consumption amount of the new electric device to a display device.
8. The method for suggesting an electric device according to claim 1 , wherein the period includes a coldest day or a hottest day in the region.
9. A system for proposing replacement of electrical equipment, including a heat pump type air conditioner or a water heater, to a user of the building, the system comprising: an acquisition unit that acquires outdoor air conditions including an outdoor air temperature for a predetermined period in an area where the building is located and an amount of power consumption of the electrical device for each predetermined unit time within the period; a calculation unit that calculates a first amount of heat, which is an amount of heat processed by the electrical device per unit time, based on the acquired outside air condition and the acquired amount of power consumption; a determination unit that determines a new electric device based on the first heat amount; a suggestion unit that suggests the new electrical device to the user, Electrical equipment suggestion system.
Citation Information
Patent Citations
Air conditioning apparatus selection assist system
JP2017027433A
Information provision system
JP2017224194A
Method and device for diagnosing health risk
JP2020166484A
