Relocating method of temporary elevator
The method of extending and replacing temporary elevators with phased operations and shared permanent shafts maintains construction efficiency by allowing continuous elevator use during repositioning, reducing interruptions and shortening construction timelines.
Patent Information
- Application Number
- JP2023072425
- Authority / Receiving Office
- JP · JP
- Patent Type
- Applications
- Current Assignee / Owner
- Filing Date
- 2023-04-26
- Publication Date
- 2024-11-08
AI Technical Summary
Conventional temporary elevator repositioning methods disrupt construction efficiency by requiring the elevator to be out of service during replacement, leading to interruptions in construction progress.
A method involving multiple temporary elevators with extendable rail systems and hoisting machines, allowing simultaneous operation and phased replacement without interrupting construction, using permanent elevator shafts when possible, and optimizing hoist placement to minimize space requirements.
Enables continuous construction by allowing simultaneous operation of temporary elevators during replacement, reducing efficiency losses and shortening construction periods by minimizing interruptions and reducing the need for temporary elevator shafts.
Smart Images

Figure 2024157828000001_ABST
Abstract
Description
[Technical field]
[0001] The present invention relates to a method for replacing a temporary elevator. [Background technology]
[0002] Temporary elevators installed in structures under construction are extended and used as the construction progresses by performing re-piling work. When constructing a high-rise building, the temporary elevators are extended and used as the construction progresses by repeatedly performing re-piling work. For example, in the lifting device described in Patent Document 1, a temporary lift and a temporary elevator are arranged vertically in an open space that extends vertically to multiple floors. The temporary elevator is installed from the first floor of the structure to the floor where the framework work has been completed, and the elevator hoisting machine is configured by mounting a top sheave and a drive unit on a pedestal arranged near the temporary lift on the elevator mast. As the work progresses, the elevator mast is extended upward and the elevator hoisting machine is moved to the top of the elevator mast, thereby extending the temporary elevator upward. [Prior art documents] [Patent documents]
[0003] [Patent Document 1] JP 2007-284179 A Summary of the Invention [Problem to be solved by the invention]
[0004] However, in the conventional method of replacing a temporary elevator as described in Patent Document 1, in order to extend the temporary elevator upward, first the temporary lift arranged above the temporary elevator is replaced, the lift mast is extended upward to raise the lift base and the lift carriage, and then the temporary elevator is replaced. In the temporary elevator replacement work, the elevator mast is extended upward, and a mechanism for raising the lotus pedestal along the elevator mast is installed on the lotus pedestal and elevator mast, the lotus pedestal is raised along the elevator mast together with the top sheave and the drive unit, and the wire rope that suspends and supports the carriage is adjusted. Since the temporary elevator cannot be used during such replacement work, there is a problem that the replacement work reduces the construction efficiency of the structure.
[0005] The present invention has been made in consideration of the above circumstances, and has an object to provide a method for replacing a temporary elevator that can suppress a decrease in construction efficiency due to the work of replacing a temporary elevator. [Means for solving the problem]
[0006] The temporary elevator relocation method of the present invention that solves the above-mentioned problems involves installing a temporary elevator within an opening space formed in a structure under construction by placing an elevator hoist, a carriage suspended and supported by the elevator hoist so that it can be raised and lowered, and a rail section that guides the raising and lowering of the carriage, and using the temporary elevator to proceed with the construction of the structure while increasing the number of floors of the structure to extend the opening space upward and extend the operating range of the temporary elevator to the increased floors.The method is characterized in that a plurality of temporary elevators are installed in the structure, and while operating at least one temporary elevator, the rail section of the other temporary elevators is extended upward, and the elevator hoist is raised and positioned to the extended position of the rail section of the other temporary elevator, thereby extending the operating range of the other temporary elevator.
[0007] In this way, multiple temporary elevators can be installed in the structure under construction, and some of the temporary elevators can be operated while the other temporary elevators can be extended. Therefore, even during the temporary elevator relocation work, some of the temporary elevators can be used to proceed with the construction of the structure, and the construction of the structure is not interrupted by the temporary elevator relocation work, and a decrease in construction efficiency can be suppressed.
[0008] In the temporary elevator relocation method of the present invention, the elevator hoist of the other temporary elevator whose operating range is extended may be raised to the extended position at a different height than the elevator hoist of the at least one temporary elevator that is in operation. In this way, in the progress of construction work to gradually increase the number of floors of the structure, the relocation work of some temporary elevators and the relocation work of other temporary elevators can be carried out in a distributed manner at different times. Therefore, it is possible to reliably prevent the construction of the structure from being interrupted due to the relocation work of the temporary elevators, and it is possible to suppress a decrease in the efficiency of the construction of the structure.
[0009] In the temporary elevator replacement method of the present invention, the multiple open spaces may include a shaft for a permanent elevator, and the elevator hoisting machine and the carrier may be positioned in the shaft for the permanent elevator to install the temporary elevator. In this way, the temporary elevator can be installed using the permanent elevator shaft, eliminating the need to provide a separate opening space for the temporary elevator. This eliminates the need for construction work to later close the opening space for the temporary elevator, and shortens the construction period for the structure.
[0010] In the temporary elevator relocation method of the present invention, the outer shape of the elevator hoisting machine in a plan view may be deformed to be smaller than the opening space, raised within the opening space, and then the deformation may be restored to place it in the extended position. This simplifies the labor involved in raising the elevator hoist and placing it in the extended position when replacing the temporary elevator, improving the work efficiency of the temporary elevator replacement work. Effect of the Invention
[0011] According to the temporary elevator replacement method of the present invention, it is possible to suppress a decrease in construction efficiency due to the temporary elevator replacement work. [Brief description of the drawings]
[0012] [Figure 1] FIG. 1 is a schematic diagram showing a structure to which a temporary elevator relocation method according to an embodiment of the present invention is applied. [Diagram 2] FIG. 1 is a schematic front view showing a temporary elevator installed in an opening space of a structure to which the temporary elevator relocation method of this embodiment is applied. [Diagram 3] FIG. 1 is a schematic plan view showing a temporary elevator installed in an opening space of a structure to which the temporary elevator relocation method of this embodiment is applied. [Figure 4] FIG. 2 is a side view of the base part of the elevator hoisting machine used in the temporary elevator relocation method of this embodiment. [Diagram 5] FIG. 2 is a front view showing the base part of the elevator hoisting machine used in the temporary elevator relocation method of this embodiment. [Figure 6] 1A and 1B are plan views of the telescopic legs of the base part of the elevator hoisting machine used in the temporary elevator relocation method of this embodiment, in which (a) shows the telescopic legs in an extended state, and (b) shows the telescopic legs in a contracted state. [Figure 7] 1A to 1D are diagrams for explaining the construction state of a structure by applying the temporary elevator relocation method of this embodiment, in which the structure is constructed in the order of (a) to (d). DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0013] Hereinafter, an embodiment of the present invention will be described in detail with reference to the drawings. FIG. 1 is a schematic diagram showing a structure to which the temporary elevator relocation method of this embodiment is applied, and FIG. 2 and FIG. 3 are a schematic front view and a schematic plan view showing a temporary elevator installed in an opening space of the structure.
[0014] The structure 1 to which the reloading method of this embodiment is applied is a high-rise building under construction. More specifically, it is a framework in which the number of floors is increasing as construction progresses, and each floor is provided with a floor structure 11 that constitutes the floor. A plurality of openings 12a that penetrate vertically are formed in the floor structure 11 of each floor, and a plurality of opening spaces 12 are formed by arranging the openings 12a of each floor in the vertical direction. In this embodiment, two opening spaces 12A, 12B are formed.
[0015] The opening space 12 includes an opening space 12A for a permanent elevator in which a permanent elevator that will be used after the building is completed will be installed, and an opening space 12B for a temporary elevator that will be used during the construction period of the building and closed before completion.
[0016] As shown in Figures 2 and 3, in each opening space 12A, 12B, a temporary elevator 17 for construction use is installed, which is equipped with an elevator hoisting machine 10, a carrier 13 suspended from the elevator hoisting machine 10 so that it can be raised and lowered, and a rail section 15 that guides the carrier 13 as it rises and falls.
[0017] The elevator hoist 10 is installed at a height that corresponds to the progress of the construction work. A carriage 13 and a weight 18 are arranged below the elevator hoist 10 so that they can be raised and lowered. The carriage 13 and the weight 18 are connected by a wire rope 14, and the wire rope 14 is supported by the elevator hoist 10 so that they can be driven to rise and fall.
[0018] In the open space 12 below the elevator hoist 10, a rail section 15 for guiding the lifting and lowering of the carriage 13 and weight 18 is installed continuously in the vertical direction from the lower end to the height position of the elevator hoist 10, protruding into the inside of the open space 12. The rail section 15 may be a rack gear, or may be installed separately for the carriage 13 and the weight 18.
[0019] The elevator hoisting machine 10 of this embodiment is provided with a platform section 20 that is disposed in each opening space 12A, 12B and fixed to the floor structure section 11 surrounding the opening 12a, and a hoisting machine 21 that is placed on the platform section 20 and supports the wire rope 14 connected to the carrier 13 in a manner that allows it to be hoisted.
[0020] The hoist 21 includes a top sheave 22 that supports the wire rope 14, a drive device 23 that rotates and drives the top sheave 22, and a deflector sheave 24 around which the wire rope 14 is wound together with the top sheave 22.
[0021] 4 and 5 are a side view and a front view showing the base unit of the elevator hoisting machine of this embodiment, and Fig. 6(a) and (b) are plan views of the telescopic leg part of the base unit.
[0022] The frame unit 20 has a frame body 26 to which the hoisting machine 21 is fixed, and an extendable leg unit 27 attached to the frame body 26.
[0023] The telescopic legs 27 are provided at the bottom of the frame body 26 and are configured to be telescopic so that the maximum width can be expanded or contracted in a plan view. The telescopic legs 27 are made of outriggers and include a plurality of leg bodies 27a provided at the bottom of the frame body 26 and a plurality of leg bodies 27b each having one end inserted into the leg body 27a and a support part 27c for the floor structure part 11 provided at the other end. In this embodiment, two telescopic legs 27 are provided. Each leg body 27b can be telescopically expanded and contracted linearly in the approximately horizontal direction by changing the length of one end housed in the leg body 27a, and is configured to be fixed to the leg body 27a in an extended or contracted state. The method of fixing the leg body 27b to the leg body 27a is arbitrary, and for example, it may be fixed using a bolt.
[0024] 6(a), by extending the telescopic legs 27, the platform 20 can have a maximum width in plan view larger than the opening 12a of the floor structure 11. By fixing each support 27c to the floor structure 11 in this state, the elevator hoist 10 can be installed on the structure 1 between the floor structure 11 around the opening 12a.
[0025] In the elevator lifting machine 10 of this embodiment, when it is mounted over the opening 12a by the base portion 20, the rail portion 15 of the carrier 13 and weight 18, and the base portion 20 and the hoisting machine 21 are positioned so as not to interfere with each other when viewed in a plan view.
[0026] Furthermore, the shaft partition wall 16 installed around the open space 12 is disposed in a position that does not interfere with the frame portion 20 and the hoist 21 other than the telescopic leg portion 27 in a plan view.
[0027] As shown in FIG. 6(b), when the telescopic legs 27 are contracted, the maximum width in plan view can be reduced below the opening 12a of the floor structure 11, and the outer shape can be made smaller than the opening space 12.
[0028] 7(a) to (d) are diagrams illustrating the elevator reloading method of this embodiment. The construction of the structure 1 is carried out by applying the temporary elevator relocation method of this embodiment as follows.
[0029] First, as shown in FIG. 7(a), the framework of the lower floors of the structure 1 is constructed, and openings 12a are provided at the same positions in the floor structure 11 of each floor to form a plurality of opening spaces 12A, 12B.
[0030] Elevator hoists 10, 10 are placed at the top of each opening space 12A, 12B. The elevator hoists 10, 10 support wire ropes 14, 14, and the carriages 13, 13 and weights 18, 18 connected to the wire ropes 14, 14 are placed below the elevator hoists 10, 10 so that they can be raised and lowered. The excess of the wire ropes 14, 14 is wound around an excess winding drum (not shown) and stored. In this way, two temporary elevators 17A, 17B are installed on the structure 1, and both temporary elevators 17A, 17B are operated to proceed with the construction. After that, the number of floors (the number of floor structure parts 11) of the structure 1 is increased to extend both opening spaces 12A, 12B upward.
[0031] 7(b), as the construction of the structure 1 progresses, the operating range of at least one temporary elevator 17B is extended. At this time, one temporary elevator 17A is operated while the construction of the structure 1 progresses. The rail portion 15 of the other temporary elevator 17B is extended upward within the opening space 12.
[0032] At this time, the rail portion 15 of the carriage 13 and weight 18 and the platform portion 20 and hoist 21 are arranged in positions that do not interfere with each other, so the rail portion 15 can be extended upward with the other temporary elevator 17B operating in a section below the elevator hoist 10. Also, the shaft partition wall 16 is arranged in a position that does not interfere with the platform portion 20 and hoist 21 other than the telescopic leg portion 27 in a plan view, so the shaft partition wall 16 can be extended upward with the other temporary elevator 17B operating in a section below the elevator hoist 10.
[0033] After extending the rail portion 15 of the other temporary elevator 17B, the elevator hoisting machine 10 is raised to the extended position in the opening space 12B and placed therein. At this time, while the carriage 13 and the weight 18 are held in a fixed position, the telescopic leg portion 27 is removed from the floor structure portion 11 around the opening 12a, and as shown in FIG. 6(b), the fixation between the leg body 27b and the leg main body 27a is released, and the length of the leg body 27a that houses one end of the leg body 27b is increased, thereby contracting the telescopic leg portion 27. This allows the outer shape of the elevator hoisting machine 10 in a plan view to be smaller than the opening space 12B.
[0034] In this state, while the wire rope 14 is being paid out from the excess drum (not shown), the elevator hoist 10 is hoisted by a crane or the like and raised within the open space 12B to a predetermined extension position according to the increase in the number of floors.
[0035] 6(a), the telescopic legs 27 are extended again to restore the deformation of the elevator hoist 10, and the telescopic legs 27 are fixed again to the floor structure 11 around the opening 12a on the corresponding floor. The elevator hoist 10 is placed in the extended position of the opening space 12B, and the relocation of the other temporary elevator 17B is completed.
[0036] As a result, the elevator hoisting machine 10 of one temporary elevator 17A and the elevator hoisting machine 10 of the other temporary elevator 17B are installed at different height positions. In this state, one temporary elevator 17A is operated in a section below the elevator hoisting machine 10, and the other temporary elevator 17B is operated in a section up to the extended position, and construction of the structure 1 is progressed using both temporary elevators 17A and 17B.
[0037] Next, as shown in Fig. 7(c), when the construction of the structure 1 further progresses and the construction of the floor structure part 11 at a predetermined height is completed, the operation range of one temporary elevator 17A is extended while the other temporary elevator 17B is operated. The method of extending the operation range of the temporary elevator 17A is the same as the method of extending the operation range of the temporary elevator 17B described above. At this time, the operation range of one temporary elevator 17A can be extended while the other temporary elevator 17B is operated in the section below the elevator hoisting machine 10.
[0038] After extending the rail portion 15 of one temporary elevator 17A, the elevator hoisting machine 10 is raised to an extended position within the opening space 12A and placed therein. As with the elevator hoisting machine 10 of the other temporary elevator 17B described above, the telescopic legs 27 are removed while holding the carrier 13 and weight 18, and the telescopic legs 27 are contracted to change the outer shape of the elevator hoisting machine 10 in plan view to be smaller than the opening space 12A.
[0039] In this state, the elevator hoist 10 is raised in the opening space 12A to a new extension position at a height different from that of the elevator hoist 10 of the other temporary elevator 17B. Then, the telescopic legs 27 are extended again, restored, and fixed, thereby disposing the elevator hoist 10 at the new extension position, and the relocation of one temporary elevator 17A is completed.
[0040] In this state, the other temporary elevator 17B is operated in the section below the elevator hoist 10, and the one temporary elevator 17A is operated in the section up to the new extension position, and construction of the structure 1 is progressed using both temporary elevators 17A, 17B.
[0041] Thereafter, as shown in FIG. 7(d), by alternately switching between one temporary elevator 17A and the other temporary elevator 17B, construction of the high-rise structure 1 can be carried out using the temporary elevators 17A and 17B.
[0042] Then, when the period of use of the temporary elevators 17A, 17B ends, the temporary elevator 17A arranged in the opening space 12A for the permanent elevator among the multiple opening spaces 12A, 12B is removed and the permanent elevator is installed. After removing the temporary elevator 17B arranged in the opening space 12B for the temporary elevator, the openings 12a on each floor of the opening space 12B are closed and finishing work is carried out around the openings 12a on each floor.
[0043] According to the method of relocating the temporary elevator 17 of this embodiment as described above, multiple temporary elevators 17 (17A, 17B) can be provided in the structure under construction, and some of the temporary elevators 17 can be operated while other temporary elevators 17 can be extended. Therefore, even during the relocation work, the work can be continued using some of the temporary elevators 17, and the work is not interrupted by the relocation work of the temporary elevators 17, which prevents a decrease in the efficiency of the work.
[0044] In the above embodiment, the elevator hoists 10 of at least some of the temporary elevators 17 are raised and placed on different floors at different heights from the elevator hoists 10 of the other temporary elevators 17. Therefore, in the progress of construction work to gradually increase the number of floors, the relocation work of some of the temporary elevators 17 and the relocation work of the other temporary elevators 17 can be carried out at different times on different floors in a distributed manner. Therefore, all of the temporary elevators 17 are not stopped, and it is possible to reliably prevent construction work from being interrupted by the relocation work of the temporary elevators 17. As a result, it is possible to suppress a decrease in the construction efficiency of the structure 1.
[0045] Furthermore, in the above embodiment, the multiple open spaces 12A, 12B include a permanent elevator shaft, and the elevator hoist 10 and the carrier 13 are arranged in the permanent elevator shaft to install the temporary elevator 17. Therefore, the temporary elevator 17 can be installed and operated using the permanent elevator shaft, and the number of temporary elevator shafts installed in the structure 1 under construction can be reduced or eliminated. This makes it possible to reduce the number of openings 12a that are provided on each floor as the open spaces 12 and that need to be closed before completion, thereby shortening the construction period.
[0046] In the above embodiment, the outer shape of the elevator hoisting machine 10 in plan view is deformed to be smaller than the opening space 12 (12A, 12B), and the elevator hoisting machine 10 is raised within the opening space 12, and the deformation is restored to allow the elevator hoisting machine 10 to be placed in the extended position. This simplifies the work of raising the elevator hoisting machine 10 and placing it in the extended position during reloading, and improves the work efficiency of the temporary elevator 17 reloading work.
[0047] The above embodiment can be modified as appropriate within the scope of the present invention. For example, in the above embodiment, an example was described in which two opening spaces 12A, 12B are provided and two temporary elevators 17A, 17B are installed in the structure 1, but it is also possible to provide three or more opening spaces 12 and install three or more temporary elevators.
[0048] In addition, in the above embodiment, the opening space 12A is described as a shaft for a permanent elevator and the opening space 12B is described as a shaft for a temporary elevator, but all of the opening spaces 12 may be shafts for a permanent elevator, or all of the opening spaces 12 may be shafts for a temporary elevator.
[0049] In the above embodiment, the telescopic legs 27 of the frame unit 20 are configured to be linearly telescopic in order to change the external shape of the elevator hoisting machine 10 in a plan view, but they may be telescopic in different directions, or may be configured by legs rotatably attached to the frame body 26. Furthermore, parts other than the telescopic legs 27 may be deformable. [Explanation of symbols]
[0050] 10 Elevator lifting machine 11 Floor structure 12(12A,12B) Open space 12a opening 13 Transporter 14 Wire Rope 15 Rail section 16 Shaft partition wall 17(17A,17B) Temporary elevator 20 Stand section 21 Hoisting machine 22 Top Sheave 23 Drive unit 24 Deflector 26 Stand body 27 Telescopic legs 27a Leg body 27b Leg body 27c Support part
Claims
1. An elevator replacement method comprising the steps of: installing a temporary elevator in an opening space formed in a structure under construction by disposing an elevator hoist, a carriage suspended and supported by the elevator hoist so as to be able to rise and fall, and a rail section for guiding the rising and falling of the carriage; and proceeding with construction of the structure using the temporary elevator; and increasing the number of floors of the structure to extend the opening space upward and extend the operating range of the temporary elevator to the increased floors, Installing a plurality of the temporary elevators in the structure; While operating at least one temporary elevator, the rail portion of another temporary elevator is extended upward; A method for relocating a temporary elevator, comprising: raising and positioning the elevator hoisting machine up to the extended position of the rail portion of the other temporary elevator, thereby extending the operating range of the other temporary elevator.
2. 2. The temporary elevator relocation method according to claim 1, wherein the elevator hoist of the other temporary elevator whose operating range is extended is raised to the extended position at a height different from that of the elevator hoist of the at least one temporary elevator currently in operation.
3. 2. A method for relocating a temporary elevator as described in claim 1, wherein the plurality of opening spaces include a shaft for a permanent elevator, and the elevator hoisting machine and the carrier are positioned within the shaft for the permanent elevator to install the temporary elevator.
4. A method for relocating a temporary elevator as described in claim 1, wherein the outer shape of the elevator hoisting machine in a plan view is deformed to be smaller than the opening space, raised within the opening space, and then placed in the extended position by restoring the deformation.