Beam structure
The beam structure with reinforcing bars and cross-shaped reinforcement bars supports sheath tubes to maintain proof strength and integrity, addressing the challenge of through holes in beam structures.
Patent Information
- Application Number
- JP2023072558
- Authority / Receiving Office
- JP · JP
- Patent Type
- Applications
- Current Assignee / Owner
- Filing Date
- 2023-04-26
- Publication Date
- 2024-11-08
AI Technical Summary
Existing beam structures face a decrease in proof strength due to the formation of multiple through holes, which are necessary for equipment wiring and piping, especially in common areas like apartment building hallways, and it is challenging to maintain sufficient intervals between these holes.
A beam structure with reinforcing bars that divide a virtual cylindrical penetration area, incorporating at least two sheath tubes arranged at specific locations, and reinforcing bars arranged in a cross shape to support and reinforce the penetration regions, ensuring close arrangement of sheath tubes without dispersing them.
The solution effectively suppresses the decrease in proof stress and crack formation in the beam, maintaining structural integrity and water-tightness, even with multiple penetration areas, by concentrating reinforcing bars and sheath tubes.
Smart Images

Figure 2024157901000001_ABST
Abstract
Description
[Technical field]
[0001] The present invention relates to a beam structure. [Background technology]
[0002] The following Patent Document 1 describes a method for reinforcing beams in reinforced concrete construction, in which a web plate is inserted in the center of the beam to connect the upper and lower beam main bars, reinforcing the strength of the concrete. This web plate has a sleeve through hole, so that a duct sleeve can be passed through the beam. [Prior art documents] [Patent documents]
[0003] [Patent Document 1] JP 2005-163508 A Summary of the Invention [Problem to be solved by the invention]
[0004] As shown in the above-mentioned Patent Document 1, when a through hole is provided in a beam, a cross-sectional defect occurs in the concrete forming the beam. For this reason, it is common to impose restrictions on the size and spacing of the through holes. When many through holes are provided, it is difficult to ensure sufficient spacing between the through holes.
[0005] However, there is a demand for forming many through holes in order to arrange many equipment wiring and piping in, for example, a corridor of a common area in an apartment building. In order to form many through holes, it is preferable to suppress a decrease in the bearing strength of the beam due to the through holes.
[0006] In consideration of the above, an object of the present invention is to provide a beam structure that can suppress a decrease in the strength of the beam due to a through hole. [Means for solving the problem]
[0007] The beam structure of claim 1 comprises a reinforced concrete beam, reinforcing bars which, when viewed from the front, divide a cylindrical virtual penetration area that penetrates the beam into upper and lower or left and right sections, and at least two sheath tubes each arranged in a location divided by the cross bars within the penetration area.
[0008] In the beam structure of claim 1, at least two sheathed pipes are arranged in a cylindrical imaginary penetration area that penetrates the beam. Reinforcements are arranged in this penetration area, and the sheathed pipes are arranged in the locations partitioned by the reinforcing bars.
[0009] Therefore, the decrease in strength in the penetration area due to the through holes formed by the sheath tubes is suppressed compared to the case where there is no reinforcing bar. Also, at least two sheath tubes are arranged in the penetration area. This suppresses the decrease in strength outside the penetration area compared to the case where the respective sheath tubes are arranged inside and outside the penetration area.
[0010] Furthermore, the reinforcing bars can suppress cracks in the concrete filled around the sheath pipe in the penetration area, so that waterproofing around the sheath pipe can be ensured even if the beam is used as a foundation beam, for example.
[0011] The beam structure of claim 2 is the beam structure described in claim 1, in which the reinforcing bars are arranged in a cross shape that divides the penetration area into upper and lower and left and right when viewed from the front of the beam, and the sheath tubes are respectively arranged in four locations partitioned by the reinforcing bars.
[0012] In the beam structure of claim 2, the four sheathed pipes can be arranged close to each other. Therefore, compared to the case where the four sheathed pipes are arranged while maintaining a certain distance between them, the sheathed pipes are not dispersed, and the beam reinforcement can be easily arranged.
[0013] The beam structure of claim 3 is the beam structure described in claim 1 or 2, in which a plurality of through-holes in which the reinforcing bars and the sheath tubes are arranged are provided, and the center-to-center distance between the through-holes is three or more times the diameter of the through-holes.
[0014] In the beam structure of claim 3, even if there are multiple penetration areas where the sheath tubes are arranged together, the respective areas are arranged at intervals and reinforced by reinforcing bars, so that the strength of the beam is unlikely to decrease. Effect of the Invention
[0015] According to the present invention, it is possible to suppress a decrease in the bearing strength of the beam due to the through hole. [Brief description of the drawings]
[0016] [Figure 1] FIG. 2A is an elevational view showing a beam structure according to an embodiment of the present invention, and FIG. 2B is an elevational view showing a reinforcing structure of a penetration region inside the beam. [Diagram 2] 1A is an elevational view showing a modified example of the arrangement of reinforcing bars, and FIG. 1B is an elevational view showing another modified example. [Diagram 3] FIG. 13 is an elevation view showing a beam structure according to a comparative example. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0017] Hereinafter, a beam structure according to an embodiment of the present invention will be described with reference to the drawings. Components indicated by the same reference numerals in each drawing are the same components. However, unless otherwise specified in the specification, each component is not limited to one, and may be present in multiple numbers.
[0018] In addition, explanations of configurations and symbols that are duplicated in each drawing may be omitted. Note that the present disclosure is not limited to the following embodiments, and may be implemented by making appropriate modifications, such as omitting configurations, replacing them with different configurations, or combining one embodiment and various modified examples, within the scope of the purpose of the present disclosure.
[0019] In each drawing, the directions indicated by the arrows X and Y are directions along a horizontal plane and are perpendicular to each other. The direction indicated by the arrow Z is a direction along the vertical direction (up and down direction). The directions indicated by the arrows X, Y, and Z in each drawing are assumed to be mutually consistent.
[0020] <Beam structure> (sheath tube, penetration area) 1(A) shows a beam structure according to an embodiment of the present invention. In this beam structure, a plurality of sheath tubes 20 penetrate a reinforced concrete beam 12. The sheath tubes 20 are metal tubes through which facility wiring, piping, etc. can be passed.
[0021] There is no particular limitation on the position of the beam 12 in the building to which this beam structure is applied, but for example, the beam 12 can be a foundation beam in the common corridor area of an apartment building.
[0022] A plurality of sheath tubes 20 are arranged together in the penetration region 30. The penetration region 30 is a cylindrical imaginary region that penetrates the beam 12 in a direction (Y direction) perpendicular to the extension direction of the beam 12 (X direction).
[0023] The "virtual area" refers to an area defined by a boundary (the boundary line shown by the two-dot chain line in Figs. 1(A) and (B)) conveniently set on the beam 12. No pipe or the like is arranged on the beam 12 to separate the inside and outside of the penetration area 30.
[0024] When the side surface of the beam 12 is viewed from the front, a plurality of penetration regions 30 are provided. A plurality of sheath tubes 20 are arranged together in each penetration region 30. More specifically, three or four sheath tubes 20 are arranged in each penetration region 30. In the present invention, it is assumed that at least two sheath tubes 20 are arranged in each penetration region 30.
[0025] 1(B) is not particularly limited, but is appropriately determined depending on the size of the sheath tube 20 to be placed. However, since at least two sheath tubes 20 are placed in the penetrating region 30, the diameter D1 of the penetrating region 30 is greater than twice the diameter of the sheath tube 20.
[0026] From the viewpoint of arranging a plurality of sheath tubes 20 in a concentrated manner, the diameter D1 of the penetration region 30 is preferably set to be four times or less the diameter of the sheath tube 20. Moreover, the diameter D1 is more preferably set to be three times or less the diameter of the sheath tube 20. When the diameters of the plurality of sheath tubes 20 are different, the diameter D1 is set to be four times or less, or three times or less the average value of these diameters.
[0027] By reducing the diameter D1, it is possible to increase the ratio (D2 / D1) of the spacing (spacing between center points) D2 of the penetrating regions 30 to the diameter D1, as shown in Fig. 1(A). In this embodiment, this ratio (D2 / D1) is set to 3 or more. That is, the spacing D2 of the penetrating regions 30 is three or more times the diameter D1 of the penetrating regions 30. When the diameters of the multiple penetrating regions 30 are different, the average value is used as the diameter D1.
[0028] (Opening reinforcement) 1(B), reinforcing bars 40 are arranged around the penetration region 30. The reinforcing bars 40 are opening reinforcing bars that collectively surround the multiple sheath tubes 20. The arrangement of the reinforcing bars 40 is not particularly limited, but even if concrete is not poured in the penetration region 30, the reinforcing bars 40 are arranged so that the beam 12 can secure the necessary structural strength.
[0029] From the viewpoint of ensuring strength, the reinforcing bars 40 may be replaced with steel plates. When the reinforcing bars 40 are steel plates, the steel plates are provided with through holes having a diameter of D1 or more. Alternatively, instead of or in addition to the reinforcing bars 40, the concrete forming the beam 12 may be fiber-reinforced concrete.
[0030] (Crack reinforcement) Reinforcing bars 50 are arranged in the penetration region 30. The reinforcing bars 50 are steel bars that divide the penetration region 30 into upper and lower and left and right when the beam 12 is viewed from the front, and are crack reinforcing bars arranged in a cross shape. The reinforcing bars 50A that divide the penetration region 30 into upper and lower parts have their left and right ends respectively arranged outside the penetration region. The reinforcing bars 50B that divide the penetration region 30 into left and right parts have their upper and lower ends respectively arranged outside the penetration region.
[0031] The reinforcing bars 50A and 50B are arranged so as to pass through the center O of the penetration region 30. The sheath tubes 20 are arranged in four locations partitioned by the reinforcing bars 50A and 50B. It is preferable to arrange the sheath tubes 20 and the reinforcing bars 50A and 50B with a space between them. This allows the reinforcing bars 50A and 50B to be covered with concrete.
[0032] In other words, it is preferable that the diameter D1 of the penetration region 30 is set to a size that is four or three times the diameter of the sheath tube 20 as described above, while ensuring the covering thickness of the reinforcing bars 50A, 50B. It is preferable that the covering thickness is a predetermined thickness around each of the reinforcing bars 50A, 50B. The "predetermined thickness" is appropriately set depending on the location where the beam 12 is provided.
[0033] <Action and Effects> In the beam structure according to the embodiment of the present invention, as shown in Fig. 1(A), at least two sheath tubes 20 are arranged in a cylindrical imaginary penetration region 30 that penetrates a beam 12. As shown in Fig. 1(B), reinforcing bars 50 that are crack reinforcement bars are arranged in this penetration region 30, and the sheath tubes 20 are arranged in the locations partitioned by the reinforcing bars 50.
[0034] Therefore, the strength inside the penetration region 30 is less likely to decrease compared to when there is no reinforcing bar 50. Also, at least two sheath tubes 20 are arranged in the penetration region 30. Therefore, the strength outside the penetration region is less likely to decrease compared to when each sheath tube 20 is arranged inside and outside the penetration region 30.
[0035] Furthermore, the reinforcing bars 50 can suppress cracks in the concrete filled around the sheath tube 20 in the penetration area 30. This ensures watertightness around the sheath tube 20 even when the beam 12 is used as a foundation beam.
[0036] Moreover, the reinforcing bars 50 are arranged in a cross shape dividing the penetration region 30 into upper and lower and left and right when the beam 12 is viewed from the front, and the sheath tubes 20 are arranged in all or three of the four locations partitioned by the reinforcing bars 50. Therefore, the four or three sheath tubes 20 can be arranged close to each other on the inside of the penetration region 30. As a result, the sheath tubes 20 are not dispersed, and the beam 12 can be easily reinforced, compared to a case in which the four or three sheath tubes 20 are arranged with a certain interval between each other.
[0037] In addition, in this beam structure, the penetration region 30 is reinforced by reinforcing bars 40, which are opening reinforcing bars arranged around the penetration region 30. Therefore, even if multiple sheath tubes 20 are arranged in the penetration region 30, the strength of the beam 12 is unlikely to decrease. Also, even if multiple penetration regions 30 are formed, the strength of the beam 12 is unlikely to decrease.
[0038] Furthermore, in this beam structure, a plurality of through-hole regions 30 in which the reinforcing bars 40, 50 and the sheath tube 20 are arranged are provided, and the interval D2 between the through-hole regions 30 is three times or more the diameter D1 of the through-hole region 30. Thus, even when there are a plurality of through-hole regions 30, the respective regions are arranged at intervals and reinforced by the reinforcing bars 40 and 50, so that the strength of the beam 12 is unlikely to decrease.
[0039] In addition, for example, in the beam structure according to the "comparative example" shown in FIG. 3, the sheath tubes 200 are not collected in the above-mentioned penetration region 30, but are arranged discretely. In such an arrangement, it may be difficult to ensure that the interval D20 between the sheath tubes 200 is three times or more the diameter D10 of the sheath tube 200. In addition, when the sheath tubes 200 are arranged side by side at intervals in the vertical direction, multiple cross-sectional loss portions of the beam 12 are arranged at intervals in the vertical direction, which makes it difficult to design the shear force of the beam 12. Furthermore, when reinforcing bars are provided to reinforce the openings through which the sheath tubes 200 penetrate, the reinforcing bars must also be provided for each sheath tube, which is time-consuming to install.
[0040] <Other embodiments> In the above embodiment, the reinforcing bars 50 are arranged in a cross shape that divides the penetration area 30 into upper and lower and left and right, and the sheath tubes 20 are arranged in four or three locations partitioned by the reinforcing bars 50, but the embodiment of the present invention is not limited to this.
[0041] For example, when the reinforcing bars 50 are arranged in a cross shape, the sheath tubes 20 may be arranged in only two of the four partitioned regions. Alternatively, when there are two sheath tubes 20, as shown in Fig. 2(A), one reinforcing bar 50B may be arranged so as to divide the penetration region 30 into left and right. Similarly, one reinforcing bar 50A (see Fig. 1(B)) may be arranged so as to divide the penetration region 30 into top and bottom.
[0042] In addition, from the viewpoint of increasing the crack reinforcement strength, two reinforcing bars 50B may be provided to divide the through-passage region 30 into left and right parts, and two reinforcing bars 50A may be provided to divide the through-passage region 30 into top and bottom parts.
[0043] In addition, in the above embodiment, a plurality of penetration regions 30 in which the reinforcing bars 40, 50 and the sheath tube 20 are arranged are provided, but the embodiment of the present invention is not limited to this. Such a penetration region 30 may be provided at only one location in the beam 12. In this way, the present invention can be embodied in various aspects. [Explanation of symbols]
[0044] 12 Beam 20 Sheath tube 30 Penetration area 40 Reinforcement 50 Reinforcement 50A Reinforcement bar 50B Reinforcement bar
Claims
1. Reinforced concrete beams and A reinforcing bar that divides a cylindrical virtual penetration area penetrating the beam into upper and lower or left and right parts when viewing the beam from the front; At least two sheath tubes are disposed in the penetration area at locations partitioned by the reinforcing bars, A beam structure with
2. The reinforcing bars are arranged in a cross shape dividing the penetration area into upper and lower and left and right parts when viewed from the front of the beam, and the sheath tubes are arranged in four locations partitioned by the reinforcing bars. The beam structure of claim 1 .
3. A plurality of the through-hole regions in which the reinforcing bars and the sheath tubes are arranged are provided, and the center-to-center distance of the through-hole regions is three times or more the diameter of the through-hole regions. A beam structure according to claim 1 or 2.
Citation Information
Patent Citations
Reinforcing method for beam reinforcement of reinforced concrete construction
JP2005163508A
