Framing plan creation support device, framing plan creation support program and framing plan creation support method
The floor plan creation support device efficiently partitions wooden building plans by prioritizing candidate line comparisons, reducing steps and improving the structural stability of the generated plans.
Patent Information
- Application Number
- JP2023073008
- Authority / Receiving Office
- JP · JP
- Patent Type
- Applications
- Current Assignee / Owner
- Filing Date
- 2023-04-27
- Publication Date
- 2024-11-08
AI Technical Summary
Existing floor plan creation systems for wooden buildings require numerous steps to determine division lines, leading to inefficiencies in the partitioning process.
A floor plan creation support device that extracts column and exterior wall information, generates an outline, and efficiently compares candidate lines using priority-based conditions to determine division lines, reducing the number of steps required to partition the outline into rectangular sections.
The system efficiently divides the outline into stable, rectangular sections, facilitating the creation of structurally sound wooden building plans with reduced user intervention and minimizing unnecessary beam arrangements.
Smart Images

Figure 2024158115000001_ABST
Abstract
Description
[Technical field]
[0001] The present invention relates to a framing plan creation support device, a framing plan creation support program, and a framing plan creation support method that support the creation of framing plans for, for example, wooden buildings. [Background technology]
[0002] Nowadays, wooden houses and other wooden buildings are constructed on-site by assembling pre-cut lumber using floor plans created from floor plan data. The floor plans used for pre-cutting lumber are created using a floor plan creation support device such as that described in Patent Document 1.
[0003] More specifically, the floor plan creation support device of Patent Document 1 acquires the positions of columns on each floor based on floor plan data, and generates an outline showing the contour of a wooden building from the acquired positions of the columns. The framing plan creation support device of Patent Document 1 then generates division lines that divide the interior of the outline into compartments based on the positions of the columns, and then generates a framing plan based on the outline and the division lines.
[0004] In Patent Document 1, when dividing the inside of an outline into sections, multiple candidate lines that are candidates for demarcation lines are evaluated based on multiple specified conditions, scores are assigned to each candidate line, and the candidate line with the highest score is selected as the demarcation line.
[0005] As a result, Patent Document 1 requires a large number of steps to determine one demarcation line from multiple candidate lines, and because such steps are applied to the determination of all demarcation lines, there is room for improvement in terms of efficiently determining demarcation lines. [Prior art documents] [Patent documents]
[0006] [Patent Document 1] Patent No. 5654164 Summary of the Invention [Problem to be solved by the invention]
[0007] In view of the above-mentioned problems, the present invention has an object to provide a framing plan creation support device, a framing plan creation support program, and a framing plan creation support method that efficiently divide the inside of a contour line to support the creation of a framing plan. [Means for solving the problem]
[0008] This invention is a floor plan creation support device that supports the creation of floor plans based on floor plan data that shows the layout of a wooden building, and is characterized by comprising: an information acquisition means for acquiring at least column information that shows the positions of the columns and exterior wall information that shows the exterior walls from the floor plan data; an exterior line generation means for generating an exterior line that shows the contour of the floor plan based on the exterior wall information; a candidate line extraction means for extracting candidate lines for dividing the interior of the exterior line into approximately rectangular sections in a plan view based on the positions of the columns; a narrowing down means for comparing the candidate lines using a comparison condition with a high priority, and if there are two or more top candidate lines in the comparison result, comparing the top candidate line using the comparison condition with the next highest priority, and if there is only one top candidate line, determining that one top candidate line is the section line that divides the interior of the exterior line; and a floor plan generation means for generating the floor plan based on section data in which the interior of the exterior line is divided by the section lines.
[0009] The present invention is also a floor plan creation support program that supports the creation of a floor plan based on floor plan data that shows the layout of a wooden building, and is characterized by executing the following steps: an information acquisition step of acquiring at least column information that shows the positions of the columns and exterior wall information that shows the exterior walls from the floor plan data; an exterior line generation step of generating an exterior line that shows the contour of the floor plan based on the exterior wall information; a candidate line extraction step of extracting candidate lines for dividing the interior of the exterior line into approximately rectangular sections in a plan view based on the positions of the columns; a narrowing down step of comparing the candidate lines using a comparison condition with a high priority, and if there are two or more top candidate lines in the comparison result, comparing the top candidate line using the comparison condition with the next highest priority, and if there is only one top candidate line, determining that one top candidate line as the section line that divides the interior of the exterior line; and a floor plan generation step of generating the floor plan based on section data in which the interior of the exterior line is divided by the section lines.
[0010] The present invention is also a floor plan creation support method for supporting the creation of a floor plan based on floor plan data showing the layout of a wooden building, the method comprising the steps of: an information acquisition step in which an information acquisition means acquires at least column information showing the positions of the columns and exterior wall information showing the exterior walls from the floor plan data; an exterior line generation step in which an exterior line generation means generates an exterior line showing the contour of the floor plan based on the exterior wall information; a candidate line extraction step in which a candidate line extraction means extracts candidate lines for dividing the interior of the exterior line into approximately rectangular sections in a plan view based on the positions of the columns; a narrowing down step in which a narrowing down means compares the candidate lines using a comparison condition with a high priority, and if there are two or more top candidate lines in the comparison result, compares the top candidate line using the comparison condition with the next highest priority, and if there is only one top candidate line, determines that one top candidate line is the section line that divides the interior of the exterior line into sections; and a floor plan generation step in which a floor plan generation means generates the floor plan based on section data in which the interior of the exterior line is divided by the section lines.
[0011] The above wooden buildings refer to single-story or two-story or higher buildings such as wooden houses, wooden stores, wooden offices or workshops, or wooden warehouses. The inside of the outline refers to the area enclosed by the outline.
[0012] According to this invention, the number of steps required to determine the division lines can be reduced, so that the interior of the outline can be efficiently divided into sections to assist in the creation of framing plans. Specifically, the inside of the outline line is divided into sections that are approximately rectangular in plan view by the candidate lines extracted by the candidate line extraction means, so that the framing plan creation support device can form structurally stable sections within the outline line.
[0013] The narrowing down means compares such candidate lines using high priority comparison conditions, and if there are two or more top-ranking candidate lines in the comparison results, the top-ranking candidate lines are compared using the next highest priority comparison conditions, so that the framing plan creation support device can reduce the number of candidate lines to be compared each time the comparison conditions are changed to lower priority comparison conditions.
[0014] As a result, the framing plan creation support device can reduce the number of steps required to determine one division line from multiple candidate lines, compared to when all of the multiple candidate lines are evaluated and scored. For example, when three candidate lines are scored based on five specified conditions, at least 15 processes are required to determine one dividing line.
[0015] In contrast, when a floor plan creation support device compares three candidate lines using the highest priority comparison conditions to obtain one top candidate line, it can determine one division line in one process.
[0016] Therefore, the framing plan creation support device, the framing plan creation support program, and the framing plan creation support method can reduce the number of steps required to determine division lines, and can efficiently divide the interior of the outline lines into sections to support the creation of the framing plan.
[0017] In addition, since the division data is generated in which the division lines are used to divide the land into approximately rectangular sections in plan view, the framing plan creation support device, the framing plan creation support program, and the framing plan creation support method can generate a framing plan that shows a wooden building made up of connected cubic structural units. Therefore, the framing plan creation support device, the framing plan creation support program, and the framing plan creation support method can facilitate the construction of structurally stable wooden buildings.
[0018] As an aspect of the present invention, a completion determination means may be provided which, if the partition surrounded by the demarcation lines does not satisfy a predetermined determination condition, causes the candidate line extraction means and the narrowing down means to divide the partition surrounded by the demarcation lines, and, if the partition surrounded by the demarcation lines satisfies the determination condition, completes the division of the partition surrounded by the demarcation lines.
[0019] According to this configuration, the area surrounded by the dividing lines can be prevented from being divided into excessively small areas, thereby preventing the generation of a floor plan in which beam members are excessively positioned.
[0020] As a further aspect of the present invention, the determination condition may be that the size of the section surrounded by the section lines is equal to or smaller than a predetermined size. This configuration makes it possible to prevent the sections enclosed by the dividing lines from being divided into smaller sections of undesirable size.
[0021] In another aspect of the invention, the outline generating means is configured to generate the outline of each floor in the wooden building having two or more stories, and when a portion of the outline generated by the outline generating means is located inside the outline of the floor directly above, or inside a roof area line that indicates the contour of the roof directly above, an upper floor reflection means is provided for generating a new outline in which a portion of the outline is replaced with the outline or roof area line of the floor directly above, and the floor plan generating means may be configured to generate the floor plan corresponding to the second floor or higher based on the section data of the floor directly below.
[0022] According to this configuration, a floor plan corresponding to the second floor and above is generated based on section data that reflects the outline or roof contour of the floor directly above, making it easy to generate a floor plan that includes the placement of girder beams and overhanging beams that support the overhangs and eaves.
[0023] As a result, the floor plan creation support device can improve user convenience, for example, by eliminating the need for the user to modify the floor plan and add girder beams or overhanging beams to support the overhanging portions or eaves.
[0024] In another aspect of the invention, the outline generating means may be configured to generate the outline of each floor in the wooden building having two or more stories, and when a portion of the outline of the floor directly above is located inside the outline generated by the outline generating means, an upper floor reflection means is provided for determining the portion of the outline of the floor directly above as the division line that divides the inside of the outline, and the floor plan generating means may be configured to generate the floor plan corresponding to the second floor or higher based on the division data for the floor directly below.
[0025] With this configuration, a roughly rectangular section in plan view that takes into account the exterior wall of the floor directly above can be formed within the outline, making it easy to generate a floor plan that reflects the beam members supporting the exterior wall of the floor directly above, even if the floor area of the upper floor is smaller than the floor area of the lower floor. As a result, the framing plan creation support device eliminates the need for the user to modify the framing plan and add beam members, thereby improving user convenience.
[0026] In another aspect of the present invention, when a partition that is approximately L-shaped in plan view is located inside the outline line, an extension line extraction means is provided for extracting an extension line extending from the outline line or the partition line that passes through a bend point of the approximately L-shaped shape in plan view to the outline line or the partition line that faces the bend point, and the narrowing down means may be configured to compare the extension line as the candidate line using the comparison conditions.
[0027] According to this configuration, the interior of the outline can be reliably divided into structurally stable substantially rectangular sections in plan view, rather than substantially L-shaped sections in plan view. At this time, the extension lines are compared under comparative conditions to determine the division lines, so the framing plan creation support device can efficiently divide the divisions that are approximately L-shaped in plan view. In addition, the floor plan creation support device can save the user the trouble of dividing a section that is approximately L-shaped in plan view, thereby improving user convenience.
[0028] As a further aspect of the present invention, an exclusion setting means may be provided for setting an exclusion range that excludes extraction of the candidate lines by the candidate line extraction means. The above-mentioned exclusion setting means refers to a means for automatically setting an exclusion range based on floor plan data, or a means for setting an exclusion range by accepting an operation by a user.
[0029] According to this configuration, for example, it is possible to prevent a candidate line from being extracted across a staircase or an atrium in the floor plan data. As a result, the framing plan creation support device can prevent a framing plan in which a beam member is placed in a staircase or an atrium from being generated.
[0030] In another aspect of the present invention, the information acquisition means is configured to acquire staircase information indicating a staircase and atrium information indicating an atrium from the floor plan data, and the exclusion setting means is configured to set the exclusion range based on the staircase information and the atrium information.
[0031] According to this configuration, the exclusion range can be automatically set based on the floor plan data. This eliminates the need for the user to set the exclusion range, improving user convenience.
[0032] In one embodiment of the present invention, the comparison conditions are set in advance in order of priority, with condition (1) being the condition with the highest priority, and conditions (1) to (7) are set in advance, with condition (1) being the condition with the highest priority, and condition (1) being ranked higher the higher the proportion of the pillar located at the end of the candidate line, condition (2) being ranked higher the higher the proportion of a fixed interior wall on the candidate line, condition (3) being ranked higher if there is a floor directly above, and condition (4) being ranked higher if there is a fixed interior wall of the floor directly above or directly below. If there are floors, the higher the percentage of columns located at both ends of the candidate line that match with columns on the floor directly above or directly below, condition (5) is, if there is a floor directly above or directly below, the higher the percentage of fixed interior walls on the candidate line that match with fixed interior walls on the floor directly below or directly above, condition (6) is, the higher the candidate line that is approximately parallel to the short side of the section enclosed by the partition line, and condition (7) is, the higher the candidate line that is closest to the center of the section enclosed by the partition line.
[0033] The above-mentioned fixed interior walls refer to walls other than fixtures, handrails, and openings located inside the floor plan. According to this configuration, the candidate lines extracted by the candidate line extracting means can be efficiently narrowed down.
[0034] Furthermore, since the proportion of columns located on both ends of a candidate line is given high priority, the floor plan creation support device can turn a roughly rectangular area in plan view separated by a candidate line into a more structurally stable area.
[0035] In addition, since the next highest priority condition is the proportion of interior walls on the candidate line, the floor plan creation support device can generate partition data in which partition lines are preferentially placed at the positions of interior walls.
[0036] This allows the framing plan creation support device to place beam members along the position of the inner wall, making it easy to add columns and braces to the inside of the inner wall later. For example, even if a column is not located at one end of the division line, the framing plan creation support device can easily add a column to a position corresponding to one end of the division line. Effect of the Invention
[0037] According to the present invention, it is possible to provide a framing plan creation support device, a framing plan creation support program, and a framing plan creation support method that efficiently divide the inside of a contour line to support the creation of a framing plan. [Brief description of the drawings]
[0038] [Figure 1] FIG. 1 is a diagram showing the configuration of a framing plan creation support device. [Diagram 2] FIG. 2 is a block diagram showing the internal configuration of the framing plan creation support device. [Diagram 3] 11 is a flowchart showing the processing operation of a framing plan creation support process. [Figure 4] 11 is a flowchart showing the processing operation of a visible line generation process. [Diagram 5] FIG. 4 is an explanatory diagram for explaining an outline of a visible line generation process. [Figure 6] FIG. 4 is an explanatory diagram for explaining an outline of a visible line generation process. [Figure 7] 11 is a flowchart showing the processing operation of upper floor reflection processing. [Figure 8] FIG. 13 is an explanatory diagram for explaining an overview of upper floor reflection processing. [Figure 9] 13 is a flowchart showing the processing operations of an L-shaped section resolution process. [Figure 10] 11 is a flowchart showing the processing operation of a lane line generation process. [Figure 11] FIG. 4 is an explanatory diagram illustrating an example of floor plan data. [Figure 12] FIG. 13 is an explanatory diagram outlining the process of generating outlines of the outline of the first floor. [Figure 13] FIG. 13 is an explanatory diagram outlining the process of generating visible lines for the second floor. [Figure 14]An explanatory diagram showing how the roof outline is reflected in the outline of the second floor. [Figure 15] FIG. 4 is an explanatory diagram for explaining an outline of an exclusion range. [Figure 16] FIG. 13 is an explanatory diagram outlining the L-shaped section resolution process for the outline of the second floor. [Figure 17] FIG. 13 is an explanatory diagram outlining the L-shaped section resolution process for the outline of the first floor. [Figure 18] FIG. 13 is an explanatory diagram outlining the L-shaped section resolution process for the outline of the first floor. [Figure 19] An explanatory diagram outlining the division line generation process for the outline of the second floor. [Figure 20] An explanatory diagram outlining the division line generation process for the outline of the second floor. [Figure 21] An explanatory diagram outlining the division line generation process for the outline of the second floor. [Figure 22] An explanatory diagram outlining the division line generation process for the outline of the second floor. [Diagram 23] An explanatory diagram outlining the division line generation process for the outline of the second floor. [Figure 24] FIG. 13 is an explanatory diagram outlining the division line generation process for the outline of the first floor. [Diagram 25] FIG. 13 is an explanatory diagram outlining the division line generation process for the outline of the first floor. [Figure 26] FIG. 13 is an explanatory diagram outlining the division line generation process for the outline of the first floor. [Figure 27] FIG. 13 is an explanatory diagram outlining the division line generation process for the outline of the first floor. [Figure 28] FIG. 13 is an explanatory diagram outlining the division line generation process for the outline of the first floor. [Figure 29] FIG. 13 is an explanatory diagram outlining the division line generation process for the outline of the first floor. [Diagram 30] FIG. 13 is an explanatory diagram illustrating the process of generating floor plan data for the first floor. [Diagram 31] FIG. 13 is an explanatory diagram illustrating the process of generating floor plan data for the second floor. [Diagram 32] An explanatory diagram explaining the process of generating floor plan data for a two-story shed. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0039] An embodiment of the present invention will now be described with reference to the drawings. The floor plan creation support device 1 of the present embodiment is a device that supports the creation of floor plans for wooden houses having two or more floors. Such floor plan creation support device 1 will be described with reference to Figs. 1 and 2. FIG. 1 shows a configuration diagram of the framing plan creation support device 1, and FIG.
[0040] As shown in FIG. 1, a framing plan creation support device 1 of this embodiment is a terminal capable of communicating with a server 3 via a communication line 2, and is, for example, a desktop personal computer.
[0041] 2, the server 3 stores a building material database 3a to be transmitted to the floor plan creation support device 1 as response information to a request from the floor plan creation support device 1. Information on various building materials, such as lumber and metal fittings, required for the construction of a wooden building is registered in the building material database 3a.
[0042] On the other hand, as shown in Figures 1 and 2, the floor plan creation support device 1 is equipped with a display unit 11 that displays various information, an operation receiving unit 12 that receives user operations, and an input / output unit 13 through which various information is input and output between the device and external devices.
[0043] Furthermore, the framing plan creation support device 1 includes a line connection unit 14 that connects to the communication line 2, a storage unit 15 that stores various information, and a control unit 16 that controls the operation of each unit. Specifically, the display unit 11 is configured with, for example, a liquid crystal display as shown in FIG. 1, and has a function of displaying various information according to instructions from the control unit 16.
[0044] As shown in FIG. 1, the operation reception unit 12 is composed of a keyboard 12a and a mouse 12b, and has a function of receiving various operations from a user and a function of outputting information indicating the received operations to the control unit 16.
[0045] The input / output unit 13 is configured with a serial bus such as a USB and has a function to connect to an external device and a function to transmit and receive various information to and from the external device. As shown in FIG. 2, the input / output unit 13 in this embodiment is connected to a printer 17 as an external device.
[0046] The line connection unit 14 is formed of, for example, a wired LAN module, and has a function of connecting to the communication line 2 and a function of transmitting and receiving various information via the communication line 2. The storage unit 15 is configured with a hard disk or a non-volatile memory, and has the function of writing and storing various information, and the function of reading out various information.
[0047] As shown in FIG. 2, this memory unit 15 stores a floor plan creation support program 18 that realizes the function of supporting the creation of floor plan data, a building materials database 19 acquired from the server 3, and project data 20 that is set and registered for each wooden house.
[0048] More specifically, the project data 20 stores various pieces of information related to the construction of a wooden house, such as the project name, the owner of the wooden house, the location of the land, and the shape and size of the land, in association with each other.
[0049] Furthermore, as shown in FIG. 2, the project data 20 stores, in association with each other, design data 21 showing the design of the wooden house as three-dimensional model data, floor plan data 22 generated from the design data 21, and section data 23 for each floor and floor plan data 24 for each level generated from the floor plan data 22.
[0050] The floor plan data 22 is data showing the floor plan of a wooden house, and is generated for each floor. This floor plan data 22 is data in which part data to which attributes of pillars have been assigned, part data to which attributes of fixed interior walls have been assigned, part data to which attributes of fittings have been assigned, part data to which attributes of porches have been assigned, and part data to which attributes of verandas have been assigned are arranged in a desired layout.
[0051] The section data 23 is data obtained by dividing each floor into sections based on the floor plan data 22, and is generated in the process of creating the floor plan data 24 from the floor plan data 22. The floor plan data 24 is data showing a floor plan generated from the block data 23, and is generated in association with each floor.
[0052] Of this floor plan data 24, the floor plan data 24 for the first floor is generated based on the section data 23 for the first floor. Furthermore, floor plan data 24 for the second floor and above is generated based on the section data 23 of the floor immediately below, and floor plan data 24 for the shed on the top floor is generated based on the section data 23 of the top floor.
[0053] The control unit 16 is composed of hardware such as a CPU and a memory, and software such as a control program. This control unit 16 has a processing function related to the transmission and reception of various signals between the display unit 11, the operation reception unit 12, the input / output unit 13, the line connection unit 14, and the memory unit 15, and a function to control the operation of each unit connected via a specified bus.
[0054] Next, the operation of the framing plan creation support process when the framing plan creation support program 18 is executed in the above-mentioned framing plan creation support device 1 will be described with reference to FIGS. FIG. 3 shows a flowchart of the framing plan creation support process, FIG. 4 shows a flowchart of the visible line generation process, and FIGS. 5 and 6 show explanatory diagrams for explaining an outline of the visible line generation process.
[0055] Furthermore, Figure 7 shows a flowchart of the upper floor reflection processing, Figure 8 shows an explanatory diagram outlining the upper floor reflection processing, Figure 9 shows a flowchart of the L-shaped partition resolution processing, and Figure 10 shows a flowchart of the partition line generation processing.
[0056] When a user operates the operation receiving unit 12 to execute the framing plan creation support program 18, the control unit 16 of the framing plan creation support device 1 executes the framing plan creation support program 18, as shown in FIG. 3, and displays a menu screen (not shown) on the display unit 11 (step S101).
[0057] This menu screen displays an input field for selecting and inputting a project name, buttons for reading out design data 21 and floor plan data 22 corresponding to the project name, a button for starting creation of a floor plan, and a button for reading out floor plan data 24.
[0058] When the user selects and inputs a project name according to the instructions on the menu screen and presses a button to start creating a floor plan, the control unit 16 reads the floor plan data 22 from the project data 20 corresponding to the project name, as shown in FIG. 3 (step S102).
[0059] At this time, the control unit 16 reads the floor plan data 22 for each floor while maintaining the relative position on the XY coordinate plane. Furthermore, the control unit 16 acquires part data to which a pillar attribute has been assigned from the floor plan data 22 as pillar information, and acquires part data to which an exterior wall attribute has been assigned from the floor plan data 22 as exterior wall information.
[0060] Then, based on the position of the pillar indicated by the pillar information, the control unit 16 generates data plotting the pillar on an XY coordinate plane in which coordinate positions spaced apart by a predetermined distance in the X-axis direction and coordinate positions spaced apart by a predetermined distance in the Y-axis direction are assigned. The predetermined interval in the X-axis direction and the predetermined interval in the Y-axis direction are substantially the same.
[0061] Thereafter, the control unit 16 starts a contour line generation process for generating a contour line indicating the outline of each floor in plan view based on the exterior wall information acquired from the floor plan data 22, as shown in FIG. 3 (step S103).
[0062] Specifically, when the outline generation process starts, the control unit 16 extracts the outline of each floor based on the position and shape of the exterior wall indicated by the exterior wall information, as shown in FIG. 4, and generates an outline for each floor, which is a closed linear line following the outline, and places it on the XY coordinate plane on which the columns are plotted (step S111).
[0063] Thereafter, the control unit 16 determines whether or not the contour of the upper floor is located directly above the entrance when the contour of the upper floor is superimposed on the outline of the floor where the entrance is located (step S112). The contour of the upper floor refers to the contour of the floor directly above, the contour of the porch roof, etc.
[0064] If the contour of the upper floor is not located directly above the entrance (step S112: No), the control unit 16 advances the process to step S114 as shown in FIG. On the other hand, if the contour of the upper floor is located directly above the entrance (step S112: Yes), the control unit 16 generates a new outline that reflects the contour of the upper floor on the outline of the floor where the entrance is located (step S113).
[0065] More specifically, as shown in FIG. 5, the control unit 16 replaces a portion of the outline of the floor where the entrance is located, which is shown as a thick dashed line, with the outline of the upper floor (thin dashed line in the figure), to generate a new outline (thick solid line in the figure).
[0066] After performing the above-mentioned processing from step S111 to step S113, the control unit 16 determines whether or not a roof area line indicating the outline of the roof is located directly above the part data to which the attribute of a balcony has been assigned, as shown in FIG. 4 (step S114). If the roof area line is not located directly above the part data to which the attribute of a balcony has been assigned (step S114: No), the control unit 16 advances the process to step S116.
[0067] On the other hand, if the roof area line is located directly above the part data to which a balcony attribute has been assigned (step S114: Yes), the control unit 16 generates a new outline that reflects the roof area line on the outline of the floor on which the balcony is located, as shown in FIG. 4 (step S115).
[0068] For example, as shown in FIG. 6(a), when the roof area line RL shown by a thin dashed line in the figure is located along the contour of the balcony, the control unit 16 replaces a part of the contour line of the floor on which the balcony is located, shown by a thick dashed line, with the roof area line RL indicating the contour of the roof, to generate a new contour line (thick solid line in the figure).
[0069] Alternatively, as shown in Figure 6(b), if the roof area line RL covers part of the balcony, the control unit 16 replaces part of the outline of the floor on which the balcony is located, which is shown as a thick dashed line, with the roof area line RL that indicates the contour of the roof covering part of the balcony, and generates a new outline (the thick solid line in the figure).
[0070] When the processes of steps S114 and S115 are completed, the control unit 16 determines whether or not the processes of steps S111 to S115 described above have been performed for the outlines of all floors as shown in FIG. 4 (step S116).
[0071] If the process has not been completed for all the outlines (step S116: No), the control unit 16 returns the process to step S112 and repeats the processes from step S112 to step S116 until the process has been completed for all the outlines.
[0072] On the other hand, if processing has been completed for all the outlines (step S116: Yes), the control unit 16 temporarily stores the outlines of each floor as shown in FIG. 4, then terminates the outline generation processing and proceeds to step S104 in FIG. 3. Returning to FIG. 3, when the external shape line generating process is completed, the control unit 16 sets an exclusion range for excluding the placement of beam members based on the floor plan data 22 for each floor (step S104).
[0073] Specifically, the control unit 16 extracts part data that has been assigned the attributes of a staircase and / or the attributes of an atrium from the floor plan data 22, and sets the range corresponding to the part data that has been assigned the attributes of a staircase and / or the attributes of an atrium as an exclusion range within the outline of the floor on which the part data that has been assigned the attributes of a staircase and / or the attributes of an atrium is located or the floor immediately below.
[0074] For example, in the case of a two-story wooden house, the stairs and atrium on the first floor are set as excluded areas within the outline of the first floor, and in the case of a three-story wooden house, the stairs and atrium on the first floor and the stairs and atrium on the second floor are set as excluded areas within the outline of the second floor.
[0075] When the exclusion range is set, the control unit 16 starts an upper floor reflection process for reflecting the outline of the floor immediately above, as shown in FIG. 3 (step S105). Specifically, when the upper floor reflection process is started, the control unit 16 reads out the temporarily stored outline of the first floor, as shown in FIG. 7 (step S121).
[0076] Thereafter, the control unit 16 determines whether or not a part of the outline of the floor in question is located inside the outline of the floor immediately above when the outline of the floor in question is superimposed on the temporarily stored outline of the floor in question (step S122).
[0077] If a part of the outline of the relevant floor is not located inside the outline of the floor immediately above (step S122: No), the control unit 16 advances the process to step S124. On the other hand, if a portion of the outline of the floor in question is located inside the outline of the floor directly above (step S122: Yes), the control unit 16 replaces a portion of the outline of the floor in question with the outline of the floor directly above and generates a new outline of the floor in question (step S123).
[0078] For example, as shown in Figure 8(a), if the outline 31A of the first floor shown in a thick solid line and the outline 32 of the second floor shown in a thin solid line do not coincide with each other, when the outline 32 of the second floor is superimposed on the outline 31A of the first floor, a part 31a (see Figure 8(b)) of the outline 31A of the first floor shown in a thick dashed line will be located inside the outline 32 of the second floor.
[0079] In this case, the control unit 16 replaces part of the first floor outline 31A with part of the second floor outline 32 surrounded by part 31a of the first floor outline 31A, as shown in Figure 8(b), to generate a new first floor outline 31B (thick solid line in the figure).
[0080] Thereafter, as shown in FIG. 7, the control unit 16 determines whether or not the inside of the outline of the floor in question is separated by a part of the outline of the floor immediately above when the outline of the floor in question is superimposed on the outline of the floor immediately above (step S124). When the inside of the outline of the relevant floor is not separated by a part of the outline of the floor immediately above (step S124: No), the control unit 16 advances the process to step S126.
[0081] On the other hand, if the inside of the outline of the floor in question is divided by part of the outline of the floor directly above (step S124: Yes), the control unit 16 determines the part of the outline of the floor directly above as a dividing line that divides the inside of the outline of the floor in question (step S125).
[0082] For example, as shown in Figure 8 (b), when the outline 32 of the second floor is superimposed on the outline 31A of the first floor, if the interior of the outline 31A of the first floor is divided by part of the outline 32 of the second floor, the control unit 16 determines part of the outline 32 of the second floor as the division lines 33, 34 (thin solid lines in the figure).
[0083] 7, the control unit 16 determines whether the floor is one floor below the top floor (step S126). For example, in the case of a two-story wooden house, the control unit 16 determines whether the currently processed floor is the first floor, and in the case of a three-story wooden house, the control unit 16 determines whether the currently processed floor is the second floor.
[0084] If the floor in question is not one floor below the top floor (step S126: No), the control unit 16 reads out the outline of the floor directly above the floor in question (step S127), and then performs the processing of steps S122 to S126 described above on the outline of the floor directly above.
[0085] On the other hand, if the floor is one floor below the top floor (step S126: Yes), the control unit 16 ends the upper floor reflection process because the upper floor of the floor directly above is the roof, and proceeds to step S106 in FIG.
[0086] Returning to FIG. 3, when the upper floor reflection process is completed, the control unit 16 determines for each floor whether or not a section that is approximately L-shaped in plan view with an inside corner and / or an outside corner (hereinafter referred to as a corner) as a bending point is within the outline (step S106), as shown in FIG. 3.
[0087] In addition, recessed corners and protruding corners are defined as corners formed by the intersection of outline lines or the intersection of compartment lines. If there is no section that is substantially L-shaped in plan view (step S106: No), the control unit 16 advances the process to step S108.
[0088] On the other hand, if there is a partition that is approximately L-shaped when viewed from above (step S106: Yes), the control unit 16 starts an L-shaped partition resolution process to divide the partition that is approximately L-shaped when viewed from above into partitions that are approximately rectangular when viewed from above based on the corner and pillar information (step S107).
[0089] Specifically, when the L-shaped section resolution process is started, the control unit 16 determines whether or not there is a pillar at a corner and / or a pillar facing the corner, as shown in FIG. 9 (step S131). At this time, the control unit 16 determines the pillar located at the intersection of an extension line of the outline line or division line passing through the corner and the outline line or division line facing the corner as the pillar facing the corner.
[0090] If there is no pillar at the corner and no pillar facing the corner (step S131: No), the control unit 16 ends the L-shaped section resolution process and proceeds to step S108 in FIG.
[0091] On the other hand, if there is a pillar at the corner and / or a pillar facing the corner (step S131: Yes), the control unit 16 extracts an extension line extending from the outline line or demarcation line passing through the corner to the outline line or demarcation line facing the corner as a candidate line for dividing the inside of the outline line (step S132).
[0092] For example, as shown in Figure 8(b), when column 35 is located at the inside corner of partition line 33 and column 36 opposite column 35 in the X-axis direction (arrow X in the figure) is located on outline line 31B, control unit 16 extracts the line connecting columns 35 and 36 as candidate line 37 for dividing the inside of outline line 31B.
[0093] Furthermore, as shown in Figure 8(b), when column 38 facing column 35 in the Y-axis direction (arrow Y in the figure) is located on partition line 34, control unit 16 extracts the line connecting columns 35 and 38 as candidate line 39 for partitioning the inside of outline line 31B.
[0094] When the candidate lines 37 and 39 are extracted, the control unit 16 compares the candidate lines with the comparison condition with the highest priority among the comparison conditions to which priority has been assigned (step S133). Here, the comparison conditions are preset in descending order of priority, with condition (1) being the condition with the highest priority. Conditions (1) to (7) are set in descending order of priority.
[0095] Specifically, the wall portion excluding fixtures, handrails, and openings is considered to be a fixed interior wall, and condition (1) is compared based on the height of the proportion of columns located at the ends of the candidate line. Condition (2) compares the height of the proportion of the fixed inner wall on the candidate line. If condition (3) is true, and there is a floor directly above, the height of the fixed interior wall of the floor directly above on the candidate line is compared. If condition (4) is true, and there is a floor directly above or below, the columns located at both ends of the candidate line are compared based on the percentage of height that matches the columns on the floor directly above or below. If condition (5) is true, and there is a floor directly above or below, the height of the fixed interior wall on the candidate line that matches the fixed interior wall on the floor directly below or above is compared. Condition (6) is compared to see if it is approximately parallel to the short side of the lot enclosed by the lot lines. Condition (7) compares proximity to the center of the lot surrounded by lot lines.
[0096] Among conditions (1) to (7), conditions (1) to (5) are ranked higher the higher the percentage, condition (6) ranks candidate lines that are approximately parallel to the short side, and condition (7) ranks candidate lines closer to the center.
[0097] In addition, the ratios in conditions (2), (3), and (5) are the ratios of the number of divisions of part data to the number of divisions of candidate lines when the part data to which candidate line and inner wall attributes have been assigned are divided at coordinate positions in the X-axis direction or coordinate positions in the Y-axis direction, respectively.
[0098] In step S133 of FIG. 9, when the candidate lines are compared under condition (1), which is the comparison condition with the highest priority, the control unit 16 determines whether or not there is one top-ranked candidate line (step S134).
[0099] If there are two or more top-level candidate lines (step S134: No), the control unit 16 compares the top-level candidate line with the comparison condition with the next highest priority (step S135), and then returns the process to step S134 to determine whether there is one top-level candidate line. On the other hand, if there is one top-level candidate line (step S134: Yes), the control unit 16 determines the top-level candidate line as a demarcation line that divides the inside of the outline (step S136).
[0100] More specifically, for example, as shown in FIG. 8(b), when candidate lines 37 and 39 are compared under the above-mentioned condition (1), pillars 35 and 36 are located at both ends of candidate line 37, and pillars 35 and 38 are located at both ends of candidate line 39, so the percentage of pillars located at the ends of the candidate lines is 100% for both.
[0101] Therefore, the candidate lines 37 and 39 are compared using the above-mentioned condition (2), which has the next highest priority. At this time, if the proportion of the interior wall on the candidate line 37 connecting the columns 35 and 36 is higher than that of the candidate line 39 connecting the columns 35 and 38, the candidate line 37 connecting the columns 35 and 36 is determined to be the division line.
[0102] Thereafter, the control unit 16 determines whether or not the processes from step S132 to step S136 described above have been performed on all corners (step S137). If the process has not been completed for all corners (step S137: No), the control unit 16 returns the process to step S132 and repeats steps S132 to S137 until the process has been completed for all corners.
[0103] On the other hand, if processing has been completed for all corners (step S137: Yes), the control unit 16 associates the partition line with the outline and temporarily stores it, then ends the L-shaped partition resolution processing and proceeds to step S108 in FIG.
[0104] Returning to FIG. 3, when the L-shaped partition resolution process is completed, the control unit 16 starts a partition line generation process for determining partition lines for dividing the inside of the outline based on the pillar information (step S108). Specifically, when the demarcation line generation process is started, the control unit 16 extracts candidate lines that are candidates for demarcation lines that divide the inside of the outline into sections, based on the column information of each floor, as shown in FIG. 10 (step S141).
[0105] At this time, the control unit 16 extracts as candidate lines the lines connecting the pillars located on the outline line, the lines connecting the pillars on the outline line and the pillars on the division line, or the lines connecting the pillars on the division line among the pillars arranged approximately parallel to the outline line.
[0106] Furthermore, the control unit 16 extracts a straight line from a pole located on the outline or division line to the outline or division line opposite the pole as a candidate line. The straight line to be the candidate line is a line perpendicular to the outline or division line on which the pole is located, or a line perpendicular to the outline or division line opposite the pole. As a result, a section surrounded by an outline or a section divided by a dividing line is divided into sections having a substantially rectangular shape in a plan view by the candidate lines.
[0107] Thereafter, the control unit 16 compares the candidate line with the comparison condition having the highest priority among the comparison conditions to which the priorities have been assigned (step S142). In this case, the comparison conditions are the same as the comparison conditions in step S133 of the L-shaped section resolution processing described above, with the highest priority condition being condition (1), and conditions (1) to (7) are pre-set in order of priority.
[0108] Specifically, condition (1) compares the height of the proportion of pillars located at the ends of the candidate line. Condition (2) compares the height of the proportion of the fixed inner wall on the candidate line. If condition (3) is true, and there is a floor directly above, the height of the fixed interior wall of the floor directly above on the candidate line is compared. If condition (4) is true, and there is a floor directly above or below, the columns located at both ends of the candidate line are compared based on the percentage of height that matches the columns on the floor directly above or below. If condition (5) is true, and there is a floor directly above or below, the height of the fixed interior wall on the candidate line that matches the fixed interior wall on the floor directly below or above is compared. Condition (6) is compared to see if it is approximately parallel to the short side of the lot enclosed by the lot lines. Condition (7) compares proximity to the center of the lot surrounded by lot lines.
[0109] Among conditions (1) to (7), conditions (1) to (5) are ranked higher the higher the percentage, condition (6) ranks candidate lines that are approximately parallel to the short side, and condition (7) ranks candidate lines closer to the center.
[0110] In addition, the ratios in conditions (2), (3), and (5) are the ratios of the number of divisions of part data to the number of divisions of candidate lines when the part data to which candidate line and inner wall attributes have been assigned are divided at coordinate positions in the X-axis direction or coordinate positions in the Y-axis direction, respectively.
[0111] In step S142 of FIG. 10, when the candidate lines are compared under condition (1), which is the comparison condition with the highest priority, the control unit 16 determines whether or not there is one top-ranked candidate line (step S143).
[0112] If there are two or more top-level candidate lines (step S143: No), the control unit 16 compares the top-level candidate line with the comparison condition with the next highest priority (step S144), and then returns the process to step S143 to determine whether there is one top-level candidate line.
[0113] On the other hand, if there is one top-level candidate line (step S143: Yes), the control unit 16 determines the top-level candidate line as a demarcation line that divides the inside of the outline line (step S145).
[0114] When the demarcation line is determined, the control unit 16 determines whether or not at least one of the two sections separated by the demarcation line determined in step S145 satisfies a predetermined determination condition (step S146).
[0115] In this embodiment, the determination condition is set based on the number of squares when a section separated by a dividing line is divided by the coordinate positions in the X-axis direction and the Y-axis direction. For example, the determination condition is that the short side of the section separated by the dividing line is 4 squares or less and the long side is 5 squares or less.
[0116] If the section separated by the demarcation line does not satisfy the determination condition (step S146: No), the control unit 16 returns the process to step S141 and repeats the processes from step S141 to step S146 until the section separated by the demarcation line satisfies the determination condition.
[0117] On the other hand, if the section separated by the demarcation line satisfies the determination condition (step S146: Yes), the control unit 16 determines the section that satisfies the determination condition as a determined section (step S147). After that, the control unit 16 determines whether or not there is an unconfirmed section that has not been confirmed as a confirmed section (step S148).
[0118] If there is an undetermined section (step S148: No), the control unit 16 returns the process to step S141 and repeats the processes from step S141 to step S148 until there is no undetermined section.
[0119] On the other hand, if there are no unconfirmed sections (step S148: Yes), the control unit 16 associates the section data 23, in which the outline is divided by section lines, with the pillar information and stores it in the memory unit 15, terminates the section line generation process, and proceeds to step S109 in Figure 3. Returning to FIG. 3, when the division line generating process is completed, the control unit 16 determines whether or not division of all floors has been completed (step S109).
[0120] If the division of all floors has not been completed (step S109: No), the control unit 16 returns the process to step S108 and repeats the processes of steps S108 and S109 until the division of all floors has been completed. On the other hand, if the division of all floors has been completed (step S109: Yes), the control unit 16 generates floor plan data 24 for each floor based on the division data 23 (step S110).
[0121] Specifically, the control unit 16 generates drawing data in which pillars are arranged based on pillar information in the division data 23 and girders are arranged on the outline and division lines while referring to the building material database 19. Furthermore, the control unit 16 generates floor plan data 24 by arranging sub-girders that bridge the girders and rafters that connect the beams together.
[0122] At this time, the control unit 16 generates floor plan data 24 for the first floor and floor plan data 24 for the second floor based on the section data 23 for the first floor, and generates floor plan data 24 for the second floor shed between the second floor and the roof based on the section data 23 for the second floor. Thereafter, the control unit 16 stores the generated framing plan data 24 in the storage unit 15, and then ends all processing.
[0123] Next, the process from step S102 to step S110 in FIG. 3 described above will be described in more detail with reference to FIGS. 11 to 32, taking a two-story wooden house as an example of the floor plan data 22.
[0124] Note that Figure 11 is an explanatory diagram illustrating an example of floor plan data 22, Figure 12 is an explanatory diagram illustrating an outline of the outline generation process for the first floor, Figure 13 is an explanatory diagram illustrating an outline of the outline generation process for the second floor, and Figure 14 is an explanatory diagram illustrating the state in which the roof outline is reflected in the outline 82 of the second floor.
[0125] Furthermore, Figure 15 shows an explanatory diagram outlining the outline of the exclusion range, Figure 16 shows an explanatory diagram outlining the L-shaped partition resolution processing for the outline line 82 of the second floor, and Figures 17 and 18 show explanatory diagrams outlining the L-shaped partition resolution processing for the outline line 52 of the first floor.
[0126] In addition, Figures 19 to 23 show explanatory diagrams outlining the division line generation process for the outline line 82 of the second floor, and Figures 24 to 29 show explanatory diagrams outlining the division line generation process for the outline line 52 of the first floor.
[0127] Figure 30 shows an explanatory diagram explaining the process of generating floor plan data 24 for the first floor, Figure 31 shows an explanatory diagram explaining the process of generating floor plan data 24 for the second floor, and Figure 32 shows an explanatory diagram explaining the process of generating floor plan data 24 for the second floor cabin.
[0128] 12 to 29, (a) in the figure shows an explanatory diagram of the process of generating the block data 23, and (b) in the figure shows an explanatory diagram in which the main parts of the process of generating the block data 23 are superimposed on the floor plan data 22.
[0129] Here, an example of the floor plan data 22 is a two-story wooden house with a four-bedroom, four-dining, four-kitchen, four-room, four-room kitchen, as shown in Fig. 11. Of the floor plan data 22, the floor plan data 22A for the first floor is configured with a kitchen, a living room, and a Japanese-style room, while the floor plan data 22B for the second floor is configured with a veranda and three Western-style rooms. The two-dot chain line in the floor plan data 22B for the second floor indicates the roof area line RL that shows the outline of the roof covering the second floor.
[0130] First, when the floor plan creation support process is started and a button to start creating the floor plan is pressed, in step S102 of FIG. 3, the control unit 16 extracts column information to which column attributes have been assigned and exterior wall information to which exterior wall attributes have been assigned from the first floor floor plan data 22A and the second floor floor plan data 22B.
[0131] Thereafter, the control unit 16 plots the pillar 51 on the first floor on the XY coordinate plane based on the position of the pillar indicated by the pillar information on the first floor, as shown in FIG. 12(a). Similarly, the control unit 16 plots a pillar 81 on the second floor on the XY coordinate plane based on the position of the pillar indicated by the pillar information on the second floor, as shown in FIG. 13(a).
[0132] In addition, the XY coordinate plane is pre-assigned coordinate positions (X coordinate X1 to X coordinate X10) spaced at a predetermined interval in the X-axis direction indicated by the arrow X, and coordinate positions (Y coordinate Y1 to Y coordinate Y11) spaced at a predetermined interval in the Y-axis direction indicated by the arrow Y.
[0133] Thereafter, when the outline generation process is started, in step S111 of FIG. 4, the control unit 16 generates outline 52 indicating the outline of the first floor and outline 82 indicating the outline of the second floor extracted based on the exterior wall information, as shown by the thick solid lines in FIG. 12(a) and FIG. 13(a).
[0134] Furthermore, since the contour of an upper floor is not located in front of the entrance of the first floor floor plan data 22A, the control unit 16 proceeds from step S112: No in FIG. 4 to step S114 to determine whether or not there is a roof directly above the balcony.
[0135] According to the floor plan data 22B for the second floor, the roof area line RL indicating the outline of the roof is positioned so as to cover the entire balcony, so the control unit 16 proceeds from step S114: Yes in FIG. 4 to step S115.
[0136] Then, in step S115, the control unit 16 replaces a portion 82a of the outline line 82 that runs from the column 81 located at the intersection of the X coordinate X6 and the Y coordinate Y2, through the column 81 located at the intersection of the X coordinate X6 and the Y coordinate Y3, to the column 81 located at the intersection of the X coordinate X10 and the Y coordinate Y3, with the roof area line RL shown by a thin dashed line, as shown in Figures 13(a) and 14(a), to generate a new outline line 82 for the second floor.
[0137] After that, when the outline generation process is completed, in step S104 of FIG. 3, the control unit 16 sets the range in the floor plan data 22A for the first floor to which the attribute of stairs has been assigned as an exclusion range S, as shown in FIG. 15(a), and then starts the upper floor reflection process in step S105.
[0138] Having started the upper floor reflection process, the control unit 16 proceeds from step S122: No in FIG. 7 to step S124, because a portion of the outline 52 of the first floor is not located inside the outline 82 of the second floor, and determines whether the interior of the outline 52 of the first floor is separated by the outline of the second floor.
[0139] Here, according to Figures 13 and 15(a), the inside of the outline 52 of the first floor is divided by a part 82b of the outline 82 of the second floor extending in the Y-axis direction so as to connect the column 51 located at the intersection of the X coordinate X3 and the Y coordinate Y5 to the column 51 located at the intersection of the X coordinate X3 and the Y coordinate Y11.
[0140] Therefore, the control unit 16, which has proceeded to step S125 in FIG. 7, determines a portion 82b of the second floor outline 82 connecting the column 51 located at the intersection of the X coordinate X3 and the Y coordinate Y5 and the column 51 located at the intersection of the X coordinate X3 and the Y coordinate Y11, as a division line dividing the interior of the outline 52 of the first floor, as shown in FIG. 15(a).
[0141] Thereafter, in step S126, since the floor in question is the first floor of a two-story wooden house, the control unit 16 ends the upper floor reflection process and proceeds to step S106 in FIG. 3 to determine whether there is a section that is approximately L-shaped in plan view.
[0142] 16(a), the outline 82 of the second floor is generally L-shaped in plan view, with the column 81 located at the intersection of the X coordinate X6 and the Y coordinate Y2 as the bend point. Therefore, the control unit 16 starts the L-shaped section resolution process of step S107, with the intersection of the X coordinate X6 and the Y coordinate Y2 as the corner.
[0143] Here, according to Figure 16(a), the outline 82 extending in the Y-axis direction on the X-coordinate X3 does not have a pillar opposite the corner pillar 81 in the X-axis direction, but the outline 82 extending in the X-axis direction on the Y-coordinate Y11 has a pillar 81 opposite the corner pillar 81 in the Y-axis direction.
[0144] Therefore, the control unit 16, which has transitioned from step S131: Yes in FIG. 9 to step S132, extracts, as a candidate line (not shown), an extension line obtained by extending the outline line 82 on the Y coordinate Y2 that passes through the corner column 81 to the outline line 82 on the X coordinate X3 that faces the corner. Furthermore, the control unit 16 extracts, as a candidate line 83, an extension line obtained by extending the outline 82 on the X coordinate X6 that passes through the corner pillar 81 to the outline 82 on the Y coordinate Y11 that faces the corner.
[0145] Thereafter, in step S133, the control unit 16 compares the two candidate lines using the condition (1) that has the highest priority among the comparison conditions. Here, as described above, there is no column 81 at the end of the candidate line obtained by extending the outline line 82 on the Y coordinate Y2 that passes through the column 81 at the corner to the outline line 82 on the X coordinate X3 that faces the corner.
[0146] On the other hand, a candidate line 83 is formed by extending an outline 82 on an X coordinate X6 that passes through a column 81 at the corner to an outline 82 on a Y coordinate Y11 that faces the corner, and at the tip of the candidate line 83 is a column 81. Therefore, in step S134, the topmost candidate line under condition (1) is only the candidate line 83, so the control unit 16 determines the candidate line 83 as the lane marking in step S136.
[0147] 17(a), a substantially L-shaped section in plan view is formed on the outline 52 of the first floor, with the column 51 located at the intersection of the X coordinate X6 and the Y coordinate Y2 as a bend point. Therefore, the control unit 16 starts the L-shaped section resolution process in step S107, with the intersection of the X coordinate X6 and the Y coordinate Y2 as a corner.
[0148] Here, according to Figure 17(a), on the X-coordinate X3, there is an outline 52 extending in the Y-axis direction, which has a column 51 facing the corner column 51 in the X-axis direction, and on the Y-coordinate Y11, there is an outline 52 extending in the X-axis direction, which has a column 51 facing the corner column 51 in the Y-axis direction.
[0149] Therefore, in step S132, the control unit 16 extracts, as a candidate line 53, a straight line connecting a pillar 51 located at the intersection of the X coordinate X6 and the Y coordinate Y2, and a pillar 51 located at the intersection of the X coordinate X3 and the Y coordinate Y2, as shown in FIG. 17(a).
[0150] Furthermore, the control unit 16 extracts, as a candidate line 54, a straight line connecting a pillar 51 located at the intersection of the X coordinate X6 and the Y coordinate Y2, and a pillar 51 located at the intersection of the X coordinate X6 and the Y coordinate Y11, as shown in FIG. 17(a).
[0151] Thereafter, in step S133, the control unit 16 compares the candidate lines 53 and 54 using the condition (1) having the highest priority among the comparison conditions. Here, condition (1) is the height of the proportion of pillars located at the ends of the candidate line, as described above.
[0152] On the other hand, as described above, since pillars 51 exist at both ends of candidate line 53 and candidate line 54, the percentage of pillars located at the ends of the candidate line is 100% for both candidate line 53 and candidate line 54.
[0153] Therefore, in step S135, the control unit 16 compares the candidate lines 53 and 54 under the condition (2) having the next highest priority. Here, the condition (2) is, as described above, the height of the proportion of the fixed inner wall on the candidate line.
[0154] On the other hand, according to FIG. 17(b), since there is no fixed inner wall on the candidate line 53 extending in the X-axis direction, the proportion of the fixed inner wall on the candidate line 53 is 0%.
[0155] Furthermore, on the candidate line 54 extending in the Y-axis direction, as shown in FIG. 17(b), there are fixed inner walls between Y coordinates Y4 and Y coordinates Y6, and between Y coordinates Y7 and Y coordinates Y9.
[0156] Here, the candidate line 54 extending in the Y-axis direction is divided into 9 squares by the coordinate positions in the Y-axis direction (Y coordinate Y2 to Y coordinate Y11), and the fixed inner wall is divided into 4 squares by the coordinate positions in the Y-axis direction, so the proportion of the fixed inner wall on the candidate line 54 is 4 squares / 9 squares×100=44%.
[0157] Therefore, in step S136, the control unit 16 determines the top-level candidate line 54 as the demarcation line, as shown in Figure 18(a), and then terminates the L-shaped demarcation resolution processing and proceeds to step S108 in Figure 3 to start the demarcation line generation processing.
[0158] When the demarcation line generation process is started, in step S141 of Figure 10, the control unit 16 extracts candidate lines to divide the left-hand side of the figure, which are separated by a demarcation line (symbol omitted) extending in the Y-axis direction on the X-coordinate X6, within the outline 82 of the second floor, as shown in Figure 19(a).
[0159] Specifically, as shown in FIG. 19(a), pillar 81a located at the intersection of X-coordinate X4 and Y-coordinate Y1, and pillar 81a located at the intersection of X-coordinate X4 and Y-coordinate Y11 are located on outline line 82 and are arranged opposite each other in the Y-axis direction that is approximately parallel to outline line 82. Therefore, the control unit 16 determines, at the position of the X coordinate X4, as the candidate line 84, the line connecting the pair of pillars 81a facing each other in the Y-axis direction.
[0160] Furthermore, as shown in Figure 19(a), pillar 81b located at the intersection of X coordinate X3 and Y coordinate Y3 is located on the outline line 82, and pillar 81b located at the intersection of X coordinate X6 and Y coordinate Y3 is located on the division line and is arranged opposite each other in the X-axis direction that is approximately parallel to the outline line 82. Therefore, the control unit 16 determines, as the candidate line 85, the line connecting the pair of pillars 81b facing each other in the X-axis direction at the position of the Y coordinate Y3.
[0161] Similarly, as shown in Figure 19(a), the control unit 16 determines the line connecting a pair of pillars 81c facing each other in the X-axis direction at the Y coordinate position Y5 as candidate line 86, and determines the line connecting a pair of pillars 81d facing each other in the X-axis direction at the Y coordinate position Y6 as candidate line 87.
[0162] Furthermore, as shown in Figure 19 (a), the control unit 16 determines the line connecting a pair of pillars 81e facing each other in the X-axis direction at the Y coordinate position Y8 as candidate line 88, and determines the line connecting a pair of pillars 81f facing each other in the X-axis direction at the Y coordinate position Y9 as candidate line 89.
[0163] In addition, as shown in FIG. 19(a), the control unit 16 determines, on the outline line 82 extending in the Y-axis direction from the position of X-coordinate X3 to the position of X-coordinate X4, the pillar 81 located at the Y-coordinate Y7, and the pillar 81 located at the Y-coordinate Y10, as candidate lines (not shown), respectively, in the X-axis direction connecting the partition line extending in the Y-axis direction from the position of X-coordinate X6 to the position of X-coordinate X4, the pillar 81 located at the Y-coordinate Y7, and the pillar 81 located at the Y-coordinate Y10.
[0164] Furthermore, as shown in FIG. 19(a), the control unit 16 determines a straight line connecting a pillar 81 located at a Y coordinate Y2 and an outline 82 extending in the Y-axis direction from a position of an X coordinate X3 to the position of an X coordinate X6 on the outline 82 extending in the Y-axis direction as a candidate line (not shown).
[0165] Furthermore, as shown in FIG. 19(a), the control unit 16 determines a straight line connecting the pillar 81 located at the X-coordinate X5 and the outline 82 extending in the X-axis direction from the position of the Y-coordinate Y11 to the position of the Y-coordinate Y1 in the X-axis direction as a candidate line (not shown).
[0166] Here, in step S142 of FIG. 10, when the control unit 16 compares the candidate lines using condition (1), which is the comparison condition with the highest priority, since condition (1) is the proportion of pillars located at the ends of the candidate lines, the control unit 16 determines the top candidate lines to be candidate lines 84, 85, 86, 87, 88, and 89.
[0167] Thereafter, in step S144 of FIG. 10, the control unit 16 compares the candidate lines 84, 85, 86, 87, 88, and 89 under condition (2), which is the comparison condition with the next highest priority. Here, the condition (2) is, as described above, the height of the proportion of the fixed inner wall on the candidate line.
[0168] On the other hand, according to Figure 19 (b), on candidate line 84 extending in the Y-axis direction, a staircase handrail exists between Y coordinate Y7 and Y coordinate Y9, and fixed interior walls exist between Y coordinate Y5 and Y coordinate Y6, and between Y coordinate Y10 and Y coordinate Y11.
[0169] Furthermore, since the candidate line 84 extending in the Y-axis direction is divided into 10 squares by the coordinate positions in the Y-axis direction (Y coordinate Y1 to Y coordinate Y11), and the fixed inner wall is divided into 2 squares by the coordinate positions in the Y-axis direction, the proportion of the fixed inner wall on the candidate line 84 is 2 squares / 10 squares x 100 = 20%.
[0170] Calculating in a similar manner, the percentage of fixed inner walls on the candidate lines is 0% on candidate line 85 and candidate line 86, 2 squares / 3 squares x 100 = 67% on candidate line 87, 0% on candidate line 88, and 2 squares / 3 squares x 100 = 67% on candidate line 89.
[0171] As a result, the two highest-ranking candidate lines are candidate line 87 and candidate line 89, so the control unit 16 proceeds from step S143: No to step S144 and compares candidate line 87 and candidate line 89 using condition (3), which is the comparison condition with the next highest priority.
[0172] In this case, condition (3) is the height of the proportion of the fixed interior wall of the floor directly above on the candidate line if there is a floor directly above, but since a candidate line that divides the outline of the second floor has currently been extracted, the control unit 16 skips condition (3) and compares candidate line 87 and candidate line 89 under condition (4).
[0173] Here, condition (4) is the height of the percentage of columns located at both ends of the candidate line that match the columns on the floor directly above or below, when there is a floor directly above or below as described above. On the other hand, according to Figures 12 and 20(a), columns 81d, 81d located at both ends of candidate line 87 both match column 51 on the first floor, and columns 81f, 81f located at both ends of candidate line 89 both match column 51 on the first floor.
[0174] Therefore, the comparison result under condition (4) shows that the match rate for both candidate line 87 and candidate line 89 is 100%. Therefore, the control unit 16 sets the candidate line 87 and the candidate line 89 as the top-ranked candidate line, and compares the candidate line 87 and the candidate line 89 with the condition (5), which is the comparison condition with the next highest priority.
[0175] Here, condition (5) is the height of the percentage of fixed interior walls on the candidate line that match fixed interior walls on the floor directly above or below, as described above, when there is a floor directly above or below. On the other hand, according to FIG. 20(b), on candidate line 87 located at Y coordinate Y6, there is an interior wall between X coordinate X4 and X coordinate X6, and directly below that is the interior wall of the first floor (see FIG. 12(b)).
[0176] Furthermore, according to FIG. 20(b), on candidate line 89 located at Y coordinate Y9, there is an interior wall between X coordinate X4 and X coordinate X6, and directly below that is the interior wall of the first floor (see FIG. 12(b)).
[0177] Therefore, the percentage of the fixed interior wall on the candidate line that matches the fixed interior wall on the floor directly below is 100% for both candidate line 87 and candidate line 89. Therefore, the control unit 16 sets the candidate line 87 and the candidate line 89 as the top-ranked candidate line, and compares the candidate line 87 and the candidate line 89 with the condition (6), which is the comparison condition with the next highest priority.
[0178] Here, condition (6) is whether the line is approximately parallel to the short side of the section enclosed by the section lines, as described above. On the other hand, according to Figure 20(a), candidate line 87 and candidate line 89 are approximately parallel to the short side (outline line 82 extending in the Y-axis direction) of the section surrounded by the division line extending in the Y-axis direction on the X-coordinate X6 and outline line 82.
[0179] As a result, the two highest-ranked candidate lines are the candidate lines 87 and 89, so the control unit 16 compares the candidate lines 87 and 89 with the condition (7), which is the comparison condition with the next highest priority. Here, condition (7) is, as described above, the proximity to the center of the section bounded by the section lines.
[0180] On the other hand, according to Figure 20(a), in a section surrounded by a partition line extending in the Y-axis direction on the X-coordinate X6 and an outline line 82, candidate line 87 and candidate line 89 are located approximately equally close to the center in the X-axis direction, and candidate line 87 is located closer to the center in the Y-axis direction than candidate line 89. Therefore, in step S145 in FIG. 10, the control unit 16 determines the candidate line 87 as the lane marking, as shown in FIG. 21(a).
[0181] Furthermore, since the size of each of the two sections newly separated by the dividing line (candidate line 87) is such that the short side is 4 squares or less and the long side is 5 squares or less, in step S147 of Figure 10, the control unit 16 determines the two sections separated by the dividing line as confirmed sections, as indicated by the "X" marks in Figure 21(a).
[0182] According to FIG. 21(a), since there is an undetermined section inside the outline 82 of the second floor, the control unit 16 returns the process from step S148: No in FIG. 10 to step S141, and then performs the processes from step S141 to step S148 in FIG. 10 on the sections on the right side in the drawing that are separated by a dividing line extending in the Y-axis direction at the X-coordinate position X6, until there are no more undetermined sections.
[0183] Specifically, in step S141 of FIG. 10, the control unit 16 determines, as shown in FIG. 21(a), the line connecting a pair of pillars 81g facing each other in the X-axis direction at the Y coordinate position Y3 as candidate line 90, and the line connecting a pair of pillars 81h facing each other in the X-axis direction at the Y coordinate position Y5 as candidate line 91.
[0184] Furthermore, as shown in Figure 21 (a), the control unit 16 determines the line connecting a pair of pillars 81i that face each other in the X-axis direction at Y coordinate Y6 as candidate line 92, the line connecting a pair of pillars 81j that face each other in the X-axis direction at Y coordinate Y8 as candidate line 93, and the line connecting a pair of pillars 81k that face each other in the X-axis direction at Y coordinate Y9 as candidate line 94.
[0185] In addition, as shown in FIG. 21(a), the control unit 16 determines as candidate lines (not shown) a pillar 81 located between Y coordinates Y7 and Y coordinates Y8 on an outline line 82 extending in the Y-axis direction from the position of X-coordinate X10 to the position of X-coordinate X10, and a straight line connecting the pillar 81 located at Y coordinate Y10 to the division line extending in the Y-axis direction from the position of X-coordinate X6.
[0186] Furthermore, as shown in FIG. 21(a), the control unit 16 determines, on the outline 82 extending in the X-axis direction at the position of Y coordinate Y11, as candidate lines (not shown), respectively, straight lines connecting the column 81 located at the X-coordinate X7 and the column 81 located at the X-coordinate X9 with the outline 82 extending in the X-axis direction at the position of Y coordinate Y2.
[0187] Here, in step S142 of FIG. 10, when the control unit 16 compares the candidate lines using condition (1), which is the comparison condition with the highest priority, since condition (1) is the proportion of pillars located at the ends of the candidate lines, the control unit 16 determines the top candidate lines to be candidate lines 90, 91, 92, 93, and 94.
[0188] Thereafter, in step S144 of FIG. 10, the control unit 16 compares the candidate lines 90, 91, 92, 93, and 94 under condition (2), which is the comparison condition with the next highest priority. Here, the condition (2) is, as described above, the height of the proportion of the fixed inner wall on the candidate line.
[0189] On the other hand, according to FIG. 21(b), the proportion of fixed inner walls on the candidate lines is 2 squares / 4 squares x 100 = 50% on candidate line 90, 0% on candidate line 91, 1 square / 4 squares x 100 = 25% on candidate line 92, 3 squares / 4 squares x 100 = 75% on candidate line 93, and 0% on candidate line 94. As a result, the topmost candidate line becomes one of the candidate lines 93, and therefore in step S145 of FIG. 10, the control unit 16 determines the candidate line 93 as a lane marking.
[0190] Furthermore, since the size of the section from Y coordinate Y8 to Y coordinate Y11 newly separated by the separating line (candidate line 93) has a short side of 4 squares or less and a long side of 5 squares or less, the control unit 16 determines the section separated by the separating line to be the confirmed section, as shown by the "X" mark in Figure 22(a).
[0191] Thereafter, the control unit 16 performs the processes of steps S141 to S148 in FIG. 10 for the sections from the Y coordinate Y2 to the Y coordinate Y8 newly partitioned by the partition line (candidate line 93) until there are no more undetermined sections.
[0192] Specifically, in step S141 of FIG. 10, the control unit 16 determines, as shown in FIG. 22(a), the line connecting a pair of pillars 81g facing each other in the X-axis direction at Y coordinate Y3 as candidate line 90, the line connecting a pair of pillars 81h facing each other in the X-axis direction at Y coordinate Y5 as candidate line 91, and the line connecting a pair of pillars 81i facing each other in the X-axis direction at Y coordinate Y6 as candidate line 92.
[0193] Furthermore, as shown in FIG. 22(a), the control unit 16 determines, on the partition line (candidate line 93) extending in the X-axis direction at the position of Y coordinate Y8, straight lines connecting the pillar 81 located at the X-coordinate X7 and the pillar 81 located at the X-coordinate X9 with the outline line 82 extending in the X-axis direction at the position of Y coordinate Y2 in the Y-axis direction as candidate lines (not shown).
[0194] In addition, as shown in FIG. 22(a), the control unit 16 determines a straight line connecting a pillar 81 located between Y coordinates Y7 and Y coordinates Y8 on an outline line 82 extending in the Y-axis direction at a position of X-coordinate X10 and a division line extending in the Y-axis direction at a position of X-coordinate X6, as a candidate line (not shown).
[0195] Here, in step S142 of FIG. 10, when the control unit 16 compares the candidate lines using condition (1), which is the comparison condition with the highest priority, since condition (1) is the proportion of pillars located at the ends of the candidate lines, the control unit 16 determines the top candidate lines to be candidate lines 90, 91, and 92.
[0196] Thereafter, in step S144 of FIG. 10, the control unit 16 compares the candidate lines 90, 91, and 92 under condition (2), which is the comparison condition with the next highest priority. Here, the condition (2) is, as described above, the height of the proportion of the fixed inner wall on the candidate line.
[0197] On the other hand, according to FIG. 22(b), the proportion of fixed inner walls on the candidate lines is 2 squares / 4 squares×100=50% on candidate line 90, 0% on candidate line 91, and 1 square / 4 squares×100=25% on candidate line 92. As a result, the topmost candidate line becomes one of the candidate lines 90, and therefore in step S145 of FIG. 10, the control unit 16 determines the candidate line 90 as a lane marking.
[0198] Furthermore, since the size of the two sections newly separated by the dividing line (candidate line 90) is such that the short side is 4 squares or less and the long side is 5 squares or less, in step S147, the control unit 16 determines the section separated by the dividing line as the confirmed section, as indicated by the "X" mark in Figure 23(a).
[0199] As a result, since there are no undetermined sections within the outline 82 of the second floor, the control unit 16 stores the section data 23B of the second floor, in which the inside of the outline 82 is divided by section lines, and then proceeds to step S109 in Figure 3.
[0200] At this time, since the division of the first floor has not been completed, the control unit 16 returns the process to step S108 and starts the division line generation process for the outline 52 of the first floor. The process for generating demarcation lines for the outline 52 of the first floor is the same as the process for generating demarcation lines for the outline 82 of the second floor described above, so it will be explained briefly here.
[0201] Specifically, when the demarcation line generation process is started, in step S141 of Figure 10, the control unit 16 determines, as shown in Figure 24(a), a line connecting a pair of pillars 51a facing each other in the X-axis direction at the Y coordinate position Y6 as candidate line 55, and a line connecting a pair of pillars 51b facing each other in the X-axis direction at the Y coordinate position Y8 as candidate line 56. Furthermore, the control unit 16 determines, as a candidate line 57, a line connecting a pair of pillars 51c facing each other in the X-axis direction at a position of Y coordinate Y9, as shown in FIG. 24(a).
[0202] In addition, as shown in FIG. 24(a), the control unit 16 determines, on the outline 52 extending in the Y-axis direction from the position of X-coordinate X1, as candidate lines (not shown), respectively, the pillar 51 located between Y-coordinate Y6 and Y-coordinate Y7, and the pillar 51 located between Y-coordinate Y9 and Y-coordinate Y10, and the straight lines connecting the position of X-coordinate X3 with the division line extending in the Y-axis direction.
[0203] Furthermore, as shown in FIG. 24(a), the control unit 16 determines, on the partition line extending in the Y-axis direction from the position of X-coordinate X3, as candidate lines (not shown), respectively, a pillar 51 located at Y-coordinate Y10, and a pillar 51 located between Y-coordinate Y10 and Y-coordinate Y11, and a straight line connecting the position of X-coordinate X1 to the outline line 52 extending in the Y-axis direction.
[0204] Here, in step S142 of FIG. 10, when the control unit 16 compares the candidate lines using condition (1), which is the comparison condition with the highest priority, the control unit 16 determines that the top candidate lines are candidate lines 55, 56, and 57, since condition (1) is the proportion of pillars located at the ends of the candidate lines.
[0205] Thereafter, in step S144 of FIG. 10, the control unit 16 compares the candidate lines 55, 56, and 57 with the condition (2), which is the comparison condition with the next highest priority.
[0206] Here, the condition (2) is, as described above, the height of the proportion of the fixed inner wall on the candidate line. On the other hand, according to FIG. 24(b), the proportion of the fixed inner wall on the candidate lines is 0% on candidate line 55, and 2 squares / 2 squares×100=100% on candidate lines 56 and 57.
[0207] As a result, the two highest-ranking candidate lines are candidate line 56 and candidate line 57, so in step S144 of FIG. 10, the control unit 16 compares candidate line 56 and candidate line 57 using condition (3), which is the comparison condition with the next highest priority.
[0208] In this case, condition (3) is the height of the proportion of the fixed interior wall of the floor directly above on the candidate line if there is a floor directly above, but since there is no second floor directly above the relevant section on the first floor, the control unit 16 skips condition (3) and compares candidate line 56 and candidate line 57 with condition (4). Here, condition (4) is the height of the percentage of columns located at both ends of the candidate line that match the columns on the floor directly above or below, when there is a floor directly above or below as described above.
[0209] On the other hand, according to Figures 13 and 25(a), of the columns 51b, 51b located at both ends of the candidate line 56, the column 51b located on the X-coordinate X3 matches the column 81 on the second floor, and of the columns 51c, 51c located at both ends of the candidate line 57, the column 51c located on the X-coordinate X3 matches the column 81 on the second floor.
[0210] Therefore, the comparison result under condition (4) shows that the match rate for both candidate line 56 and candidate line 57 is 50%. Therefore, the control unit 16 sets the candidate line 56 and the candidate line 57 as the top-ranked candidate line, and compares the candidate line 56 and the candidate line 57 with the condition (5), which is the comparison condition with the next highest priority.
[0211] Here, condition (5) is the height of the percentage of fixed interior walls on the candidate line that match fixed interior walls on the floor directly above or below, as described above, when there is a floor directly above or below. On the other hand, according to Figures 12 and 13, since there is no second floor directly above the section on the first floor, the control unit 16 skips condition (5) and compares candidate line 56 and candidate line 57 using condition (6), which is the comparison condition with the next highest priority.
[0212] Here, condition (6) is whether the line is approximately parallel to the short side of the section enclosed by the section lines, as described above. On the other hand, according to Figure 25 (a), candidate line 56 and candidate line 57 are approximately parallel to the short side (outline line 52 extending in the Y-axis direction) of the section surrounded by the division line extending in the Y-axis direction on the X-coordinate X3 and the outline line 52.
[0213] As a result, the two highest-ranked candidate lines are the candidate line 56 and the candidate line 57, so the control unit 16 compares the candidate line 56 and the candidate line 57 with the condition (7), which is the comparison condition with the next highest priority. Here, condition (7) is, as described above, the proximity to the center of the section bounded by the section lines.
[0214] On the other hand, according to Figure 25 (a), in the section surrounded by the partition line extending in the Y-axis direction on the X-coordinate X3 and the outline line 52, candidate line 56 and candidate line 57 are located approximately equally close to the center in the X-axis direction, and candidate line 56 is located closer to the center in the Y-axis direction than candidate line 57. Therefore, in step S145 in FIG. 10, the control unit 16 determines the candidate line 56 as the lane marking, as shown in FIG. 26(a).
[0215] Furthermore, since the size of each of the two sections newly separated by the dividing line (candidate line 56) is such that the short side is 4 squares or less and the long side is 5 squares or less, in step S147, the control unit 16 determines the two sections separated by the dividing line as confirmed sections, as indicated by the "X" marks in Figure 26(a).
[0216] According to FIG. 26(a), since there is an undetermined section inside the outline 52 of the first floor, the control unit 16 returns the process from step S148: No in FIG. 10 to step S141, and then performs the processes from step S141 to step S148 in FIG. 10 on the sections on the left side of the drawing, which are separated by a section line extending in the Y-axis direction at the X-coordinate position X6, until there are no more undetermined sections.
[0217] Specifically, in step S141 of FIG. 10, the control unit 16 determines, as shown in FIG. 26(a), the line connecting a pair of pillars 51d facing each other in the Y-axis direction at the X-coordinate position X4 as candidate line 58, the line connecting a pair of pillars 51e facing each other in the X-axis direction at the Y-coordinate position Y2 as candidate line 59, and the line connecting a pair of pillars 51f facing each other in the X-axis direction at the Y-coordinate position Y4 as candidate line 60.
[0218] Furthermore, as shown in Figure 26 (a), the control unit 16 determines the line connecting a pair of pillars 51g that face each other in the X-axis direction at Y coordinate Y5 as candidate line 61, the line connecting a pair of pillars 51h that face each other in the X-axis direction at Y coordinate Y6 as candidate line 62, and the line connecting a pair of pillars 51i that face each other in the X-axis direction at Y coordinate Y9 as candidate line 63.
[0219] In addition, as shown in FIG. 26(a), the control unit 16 determines, as candidate lines (not shown), straight lines connecting, in the X-axis direction, the pillar 51 located at the Y-coordinate Y10, and the pillar 51 located between the Y-coordinate Y10 and the Y-coordinate Y11, on the demarcation line extending in the Y-axis direction from the position of the X-coordinate X3 to the position of the X-coordinate X6, respectively.
[0220] Furthermore, as shown in FIG. 26(a), the control unit 16 determines a straight line connecting the pillar 51 located at the X-coordinate X5 and the outline 52 extending in the X-axis direction from the position of the Y-coordinate Y11 to the position of the Y-coordinate Y1 in the X-axis direction as a candidate line (not shown).
[0221] Here, in step S142 of FIG. 10, when the control unit 16 compares the candidate lines using condition (1), which is the comparison condition with the highest priority, since condition (1) is the proportion of pillars located at the ends of the candidate lines, the control unit 16 determines the top candidate lines to be candidate lines 58, 59, 60, 61, 62, and 63.
[0222] Thereafter, in step S144 of FIG. 10, the control unit 16 compares the candidate lines 58, 59, 60, 61, 62, and 63 with the condition (2), which is the comparison condition with the next highest priority. Here, the condition (2) is, as described above, the height of the proportion of the fixed inner wall on the candidate line.
[0223] On the other hand, according to FIG. 26(b), the proportion of fixed inner walls on the candidate lines is 3 squares / 10 squares×100=30% on candidate line 58, 0% on candidate line 59, candidate line 60 and candidate line 61, 3 squares / 3 squares×100=100% on candidate line 62, and 2 squares / 3 squares×100=67% on candidate line 63. As a result, the topmost candidate line becomes one of the candidate lines 62, and therefore in step S145 of FIG. 10, the control unit 16 determines the candidate line 62 as a lane marking.
[0224] Furthermore, since the size of the two sections newly separated by the dividing line (candidate line 62) is 4 squares or less on the short side and 5 squares or less on the long side, the control unit 16 determines the section separated by the dividing line to be the confirmed section, as shown by the "X" mark in Figure 27(a).
[0225] Thereafter, the control unit 16 performs the processes from step S141 to step S148 in FIG. 10 on the partitions on the right side in the drawing, which are separated by a partition line extending in the Y-axis direction at the position of the X-coordinate X6, until there are no more undetermined partitions.
[0226] Specifically, in step S141 of FIG. 10, the control unit 16 determines, as shown in FIG. 27(a), the line connecting a pair of pillars 51j facing each other in the Y-axis direction at the X-coordinate position X7 as candidate line 64, and the line connecting a pair of pillars 51k facing each other in the Y-axis direction at the X-coordinate position X9 as candidate line 65.
[0227] Furthermore, as shown in Figure 27(a), the control unit 16 determines the line connecting a pair of pillars 51l facing each other in the X-axis direction at Y coordinate Y5 as candidate line 66, the line connecting a pair of pillars 51m facing each other in the X-axis direction at Y coordinate Y6 as candidate line 67, and the line connecting a pair of pillars 51n facing each other in the X-axis direction at a position between Y coordinate Y8 and Y coordinate Y9 as candidate line 68.
[0228] In addition, as shown in FIG. 27(a), the control unit 16 determines, on the partition line extending in the Y-axis direction from the position of X-coordinate X6, as candidate lines (not shown), each of the straight lines connecting the pillar 51 located at the Y-coordinate Y4, the pillar 51 located at the Y-coordinate Y7, the pillar 51 located at the Y-coordinate Y8, and the pillar 51 located at the Y-coordinate Y9 in the X-axis direction with the outline line 52 extending in the Y-axis direction from the position of X-coordinate X10.
[0229] Furthermore, as shown in FIG. 27(a), the control unit 16 determines, on the outline line 52 extending in the Y-axis direction from the position of X-coordinate X10, as candidate lines (not shown), the pillar 51 located at Y-coordinate Y3, the pillar 51 located between Y-coordinate Y9 and Y-coordinate Y10, and the pillar 51 located at Y-coordinate Y10, as well as straight lines connecting in the X-axis direction the partition line extending in the Y-axis direction from the position of X-coordinate X6 to the position of X-coordinate X3.
[0230] Furthermore, as shown in FIG. 27(a), the control unit 16 determines a straight line connecting the pillar 51 located at the X-coordinate X8 and the outline 52 extending in the X-axis direction at the Y-coordinate Y2 position as a candidate line (not shown) on the outline 52 extending in the X-axis direction at the Y-coordinate Y11 position.
[0231] Here, in step S142 of FIG. 10, when the control unit 16 compares the candidate lines using condition (1), which is the comparison condition with the highest priority, since condition (1) is the proportion of pillars located at the ends of the candidate lines, the control unit 16 determines the top candidate lines to be candidate lines 64, 65, 66, 67, and 68.
[0232] Thereafter, in step S144 of FIG. 10, the control unit 16 compares the candidate lines 64, 65, 66, 67, and 68 with the condition (2), which is the comparison condition with the next highest priority. Here, the condition (2) is, as described above, the height of the proportion of the fixed inner wall on the candidate line.
[0233] On the other hand, according to FIG. 27(b), the proportion of fixed inner walls on the candidate lines is 0% for candidate lines 64 and 65, 0% for candidate lines 66 and 67, and 3 squares / 4 squares x 100 = 75% for candidate line 68. As a result, the topmost candidate line becomes one of the candidate lines 68, and therefore in step S145 of FIG. 10, the control unit 16 determines the candidate line 68 as a demarcation line.
[0234] Furthermore, since the size of the section from the candidate line 68 to the Y coordinate Y11 newly separated by the separating line (candidate line 68) has a short side of 4 squares or less and a long side of 5 squares or less, the control unit 16 determines the section separated by the separating line to be the confirmed section, as shown by the "X" mark in Figure 28(a).
[0235] Thereafter, the control unit 16 returns the process to step S141 from step S148: No in FIG. 10, and then performs the processes from step S141 to step S148 in FIG. 10 for the sections between the Y coordinate Y1 and the division line (candidate line 68) until there are no more unconfirmed sections.
[0236] Specifically, in step S141 of FIG. 10, the control unit 16 determines, as shown in FIG. 28(a), a line connecting a pair of pillars 51l facing each other in the X-axis direction at the Y coordinate position Y5 as candidate line 66, and a line connecting a pair of pillars 51m facing each other in the X-axis direction at the Y coordinate position Y6 as candidate line 67.
[0237] Furthermore, as shown in Figure 28 (a), the control unit 16 determines the line connecting columns 51j and 51o, which face each other in the Y-axis direction at the X-coordinate position X7, as candidate line 69, and determines the line connecting columns 51k and 51p, which face each other in the Y-axis direction at the X-coordinate position X9, as candidate line 70.
[0238] In addition, as shown in FIG. 28(a), the control unit 16 determines, on the partition line extending in the Y-axis direction from the position of X-coordinate X6, as candidate lines (not shown), each of the straight lines connecting the pillar 51 located at the Y-coordinate Y4, the pillar 51 located at the Y-coordinate Y7, and the pillar 51 located at the Y-coordinate Y8 in the X-axis direction with the outline line 52 extending in the Y-axis direction from the position of X-coordinate X10.
[0239] Furthermore, as shown in FIG. 28(a), the control unit 16 determines a straight line connecting the pillar 51 located at the Y coordinate Y3 on the outline line 52 extending in the Y axis direction from the position of the X coordinate X10 to the division line extending in the Y axis direction from the position of the X coordinate X6 as a candidate line (not shown).
[0240] Here, in step S142 of FIG. 10, when the control unit 16 compares the candidate lines using condition (1), which is the comparison condition with the highest priority, since condition (1) is the proportion of pillars located at the ends of the candidate lines, the control unit 16 determines the top candidate lines to be candidate lines 66, 67, 69, and 70.
[0241] Thereafter, in step S144 of FIG. 10, the control unit 16 compares the candidate lines 66, 67, 69, and 70 with the condition (2), which is the comparison condition with the next highest priority. Here, the condition (2) is, as described above, the height of the proportion of the fixed inner wall on the candidate line.
[0242] On the other hand, according to FIG. 28(b), the proportion of the fixed inner wall on the candidate lines is 0% on the candidate lines 66 and 67, and 0% on the candidate lines 69 and 70. As a result, the top candidate lines are the four candidate lines 66, 67, 69, and 70, and the control unit 16 compares the candidate lines 66, 67, 69, and 70 with the comparison condition (3) having the next highest priority.
[0243] Here, as described above, condition (3) is the height of the proportion of the fixed interior wall of the floor directly above, if there is a floor directly above, on the candidate line. On the other hand, according to Figures 13 and 28(a), the proportion of the fixed interior walls of the floor directly above on the candidate lines is 0% on candidate line 66, 1 square / 4 squares x 100 = 25% on candidate line 67, and 0% on candidate line 69 and candidate line 70.
[0244] As a result, the topmost candidate line becomes one of the candidate lines 67, and the control unit 16 determines the candidate line 67 as a lane marking in step S145 of FIG. Furthermore, since the size of each of the two sections newly separated by the dividing line (candidate line 67) is such that the short side is 4 squares or less and the long side is 5 squares or less, in step S147 of FIG. 10, the control unit 16 determines the two sections separated by the dividing line as confirmed sections, as indicated by the "X" marks in FIG. 29(a).
[0245] As a result, since there are no undetermined sections within the outline 52 of the first floor, the control unit 16 stores the section data 23A of the first floor in which the inside of the outline 52 is divided by section lines, and then starts generating the floor plan data 24 in step S110.
[0246] Specifically, the control unit 16 generates floor plan data 24A for the first floor based on the first floor section data 23A, generates floor plan data 24B for the second floor based on the first floor section data 23A, and generates floor plan data 24C for the second floor cabin based on the second floor section data 23B.
[0247] More specifically, when generation of the floor plan data 24A for the first floor begins, the control unit 16 places columns 201 (circles in the figure) based on the column information in the division data 23A for the first floor, as shown in Figure 30(a), and places a base 202 along the outline lines (symbol omitted) and division lines (symbol omitted). Furthermore, as shown in FIG. 30(b), the control unit 16 places joists 203 that bridge the foundations 202 and fire-stop foundations 204 that connect the foundations 202 together, and generates floor plan data 24A for the first floor.
[0248] Similarly, when starting to generate the floor plan data 24B for the second floor, the control unit 16 places columns 211 based on the column information of the division data 23A for the first floor, as shown in Figure 31 (a), and places girders 212 along the outline lines (symbols omitted) and division lines (symbols omitted). Furthermore, as shown in FIG. 31(b), the control unit 16 generates floor plan data 24B for the second floor by arranging minor beams 213 bridging the major beams 212 and joists 214 connecting the beams together.
[0249] Furthermore, when generation of the floor plan data 24C of the second floor building begins, the control unit 16 places columns 221 based on the column information of the second floor division data 23B, as shown in Figure 32(a), and places girders 222 along the outline lines (symbols omitted) and division lines (symbols omitted). Furthermore, as shown in FIG. 32(b), the control unit 16 places minor beams 223 that bridge the main beams 222 and joists 224 that connect the beams together, and generates floor plan data 24C for the two-story building.
[0250] In this way, the floor plan creation support device 1 extracts the outline of each floor based on the floor plan data 22, and compares candidate lines for dividing the inside of the outline under comparative conditions to narrow it down to one, thereby dividing the inside of the outline.
[0251] As described above, the floor plan creation support device 1 of the present embodiment is a device that supports the creation of floor plan data 24 based on floor plan data 22 that indicates the floor plan of each floor in a wooden house having at least two or more stories.
[0252] This floor plan creation support device 1 is equipped with an information acquisition means (control unit 16) that acquires from the floor plan data 22 at least column information indicating the positions of columns 51, 81 and exterior wall information indicating the exterior walls, and an exterior line generation means (control unit 16) that generates exterior lines 52, 82 indicating the contours of each floor in a plan view based on the exterior wall information.
[0253] Furthermore, the framing plan creation support device 1 is equipped with a candidate line extraction means (control unit 16) that extracts candidate lines for dividing the inside of the outlines 52, 82 into approximately rectangular sections in a plan view based on the positions of the columns 51, 81.
[0254] In addition, the floor plan creation support device 1 is equipped with a narrowing-down means (control unit 16) that compares candidate lines using comparison conditions with a higher priority, and if there are two or more top-ranked candidate lines in the comparison result, compares the top-ranked candidate line using comparison conditions with the next highest priority, and if there is only one top-ranked candidate line, determines that one top-ranked candidate line as the dividing line that divides the inside of the outline lines 52, 82.
[0255] The framing plan creation support device 1 is equipped with a framing plan generating means (control unit 16) that generates framing plan data 24 based on division data 23 obtained by dividing the inside of the outlines 52, 82 into divisions by division lines.
[0256] In addition, the floor plan creation support program 18 in this embodiment executes an information acquisition step (step S102) of acquiring at least column information indicating the positions of the columns 51, 81 and exterior wall information indicating the exterior walls from the floor plan data 22, and an exterior line generation step (step S103) of generating exterior lines 52, 82 indicating the contours of each floor in a plan view based on the exterior wall information.
[0257] Furthermore, the framing plan creation support program 18 executes a candidate line extraction step (step S141) of extracting candidate lines for dividing the inside of the outlines 52, 82 into approximately rectangular sections in a plan view based on the positions of the columns 51, 81.
[0258] In addition, the framing plan creation support program 18 executes a narrowing-down step (steps S142 to S145) in which the candidate lines are compared using a comparison condition with a higher priority, and if there are two or more top candidate lines in the comparison result, the top candidate line is compared using a comparison condition with the next highest priority, and if there is only one top candidate line, the single top candidate line is determined to be the dividing line that divides the interior of the outline lines 52, 82.
[0259] The framing plan creation support program 18 then executes a framing plan creating step (step S110) of creating framing plan data 24 based on division data 23 obtained by dividing the interior of the outlines 52, 82 into divisions by division lines.
[0260] In addition, the floor plan creation support method in this embodiment includes an information acquisition process (step S102) in which the information acquisition means (control unit 16) acquires column information indicating the positions of at least the columns 51, 81 and exterior wall information indicating the exterior walls from the floor plan data 22, and an exterior line generation process (step S103) in which the exterior line generation means (control unit 16) generates exterior lines 52, 82 indicating the contours of each floor in a plan view based on the exterior wall information.
[0261] Furthermore, the floor plan creation support method includes a candidate line extraction process (step S141) in which a candidate line extraction means (control unit 16) extracts candidate lines for dividing the inside of the outline lines 52, 82 into approximately rectangular sections when viewed in plan, based on the positions of the columns 51, 81.
[0262] In addition, the floor plan creation support method performs a narrowing down process (steps S142 to S145) in which a narrowing down means (control unit 16) compares candidate lines using a comparison condition with a higher priority, and if there are two or more top candidate lines in the comparison result, the top candidate line is compared using a comparison condition with the next highest priority, and if there is only one top candidate line, the single top candidate line is determined to be the dividing line that divides the inside of the outline lines 52, 82.
[0263] The framing plan creation support method then performs a framing plan generation process (step S110) in which the framing plan generation means (control unit 16) generates framing plan data 24 based on partition data 23 in which the inside of the outlines 52, 82 is partitioned by partition lines.
[0264] According to this configuration, the number of steps required to determine the division lines can be reduced, so that the inside of the outlines 52, 82 can be efficiently divided into divisions to assist in the creation of the framing plan data 24. Specifically, the inside of the outline lines 52, 82 are divided into sections that are approximately rectangular in plan view by the candidate lines extracted by the candidate line extraction means, so that the framing plan creation support device 1 can form structurally stable sections within the outline lines 52, 82.
[0265] The narrowing down means compares such candidate lines using high priority comparison conditions, and if there are two or more top-ranking candidate lines in the comparison results, the top-ranking candidate lines are compared using the next highest priority comparison conditions, so that the framing plan creation support device 1 can reduce the number of candidate lines to be compared each time the comparison conditions are changed to lower priority comparison conditions.
[0266] As a result, the framing plan creation support device 1 can reduce the number of steps required to determine one division line from multiple candidate lines, compared to the case where all of the multiple candidate lines are evaluated and scored. For example, when three candidate lines are scored based on five specified conditions, at least 15 processes are required to determine one dividing line.
[0267] In contrast, when the framing plan creation support device 1 compares three candidate lines using the highest priority comparison condition to obtain one top candidate line, it can determine one division line in one process.
[0268] Therefore, the framing plan creation support device 1, the framing plan creation support program 18, and the framing plan creation support method can reduce the number of steps required to determine the division lines, and can efficiently divide the inside of the outlines 52, 82 into sections to support the creation of the framing plan data 24.
[0269] In addition, since plot data 23 is generated in which plots are divided into approximately rectangular plots in plan view by the above-mentioned plot lines, the framing plan creation support device 1, the framing plan creation support program 18, and the framing plan creation support method can generate framing plan data 24 that shows a wooden house in which cubic structural units are connected. Therefore, the framing plan creation support device 1, the framing plan creation support program 18, and the framing plan creation support method can facilitate the construction of a structurally stable wooden house.
[0270] In addition, the floor plan creation support device 1 is equipped with a completion determination means (control unit 16) that causes a candidate line extraction means and a narrowing down means to divide the area surrounded by the dividing lines when the area surrounded by the dividing lines does not satisfy a specified determination condition, and completes the division of the area surrounded by the dividing lines when the area surrounded by the dividing lines satisfies the determination condition.
[0271] According to this configuration, the area surrounded by the dividing lines can be prevented from being divided into excessively small areas, thereby preventing the generation of floor plan data 24 in which beam members are excessively arranged.
[0272] Furthermore, since the determination condition is that the size of the section surrounded by the dividing lines is equal to or smaller than a predetermined size (the short side is 4 squares or less and the long side is 5 squares or less), the floor plan creation support device 1 can prevent the section surrounded by the dividing lines from being divided into smaller sections of undesirable size.
[0273] In addition, the floor plan creation support device 1 is equipped with an upper layer reflection means (control unit 16) that generates a new outline line in which part of the outline line generated by the outline line generating means is replaced with the outline line or roof area line RL of the floor directly above when part of the outline line generated by the outline line generating means is located inside the outline line of the floor directly above or inside the roof area line RL that indicates the contour of the roof directly above. The floor plan generating means is configured to generate floor plan data 24 corresponding to the second floor or higher based on the section data 23 of the floor immediately below.
[0274] For example, when a portion 82a of the outline 82 generated by the outline generating means is located inside the roof area line RL that indicates the contour of the roof directly above, the upper layer reflection means (control unit 16) generates a new outline 82 in which the portion 82a of the outline 82 is replaced with the roof area line RL.
[0275] According to this configuration, floor plan data corresponding to the second floor or higher is generated based on section data that reflects the outline line or roof area line RL of the floor directly above, making it easy to generate floor plan data that includes the placement of girder beams and overhanging beams that support the overhangs and eaves.
[0276] As a result, the floor plan creation support device 1 can improve user convenience, for example, by eliminating the need for the user to modify the floor plan data 24 to add girder beams or overhanging beams to support the overhanging portions or eaves.
[0277] In addition, the floor plan creation support device 1 is equipped with an upper floor reflection means (control unit 16) that, when a portion 82b of the outline line 82 on the floor directly above is located inside the outline line 52 generated by the outline line generating means, determines the portion 82b of the outline line 82 on the floor directly above as a dividing line that divides the inside of the outline line 52. The floor plan generating means is configured to generate floor plan data 24 corresponding to the second floor or higher based on the section data 23 of the floor immediately below.
[0278] With this configuration, a roughly rectangular section in plan view that takes into account the exterior wall of the second floor can be formed within the outline 52, so that even if the floor area of the second floor is smaller than the floor area of the first floor, floor plan data 24B that reflects the beam members supporting the exterior wall of the second floor can be easily generated. As a result, the framing plan creation support device 1 makes it unnecessary for the user to modify the framing plan data 24 to add beam members, thereby improving user convenience.
[0279] In addition, the floor plan creation support device 1 is equipped with an extension line extraction means (control unit 16) that, when a partition that is approximately L-shaped in plan view is inside the outline lines 52, 82, extracts an extension line extending the outline line 52, 82 or partition line that passes through a corner of the approximately L-shaped partition in plan view to the outline line 52, 82 or partition line that faces the corner. The narrowing-down means is configured to compare the extension lines as candidate lines under a comparison condition.
[0280] For example, when the outline 52 on the first floor includes a section that is approximately L-shaped when viewed in plan, the extension line extraction means extracts extension lines (candidate lines 53, 54) of the outline 52 connecting the column 51 facing the corner in the extension direction of the outline 52 and the column 51 at the corner. In this case, the narrowing-down means is configured to compare the extension lines (candidate lines 53, 54) as candidate lines using the comparison conditions.
[0281] Furthermore, when the second floor outline 82 includes a section that is approximately L-shaped in plan view, the extension line extraction means extracts an extension line extending from the corner column 81 toward the outline 82 on the X coordinate X3, and an extension line (candidate line 83) extending from the corner column 81 toward the outline 82 on the Y coordinate Y11. In this case, the narrowing-down means is configured to determine the extension line (candidate line 83) as the demarcation line.
[0282] According to this configuration, the inside of the outlines 52, 82 can be reliably divided into structurally stable substantially rectangular sections in plan view, rather than substantially L-shaped sections in plan view. At this time, the extension lines are compared under comparative conditions to determine the division lines, so that the framing plan creation support device 1 can efficiently divide the divisions that are approximately L-shaped in plan view. In addition, the framing plan creation support device 1 can save the user the trouble of dividing a substantially L-shaped section in plan view, thereby improving user convenience.
[0283] In addition, since the device is equipped with an exclusion setting means (control unit 16) that sets an exclusion range S that excludes the extraction of candidate lines by the candidate line extraction means, the floor plan creation support device 1 can prevent candidate lines from being extracted across, for example, staircase portions or open-air portions in the floor plan data 22. This allows the framing plan creation support device 1 to prevent the generation of framing plan data 24 in which beam members are arranged in a staircase portion or an open void portion.
[0284] The information acquiring means is configured to acquire staircase information indicating a staircase and atrium information indicating an atrium from the floor plan data 22. The exclusion setting means is configured to set an exclusion range S based on the staircase information and the atrium information.
[0285] According to this configuration, the exclusion area S can be automatically set based on the floor plan data 22. As a result, the floor plan creation support device 1 can eliminate the need for the user to set the exclusion area S, thereby improving user convenience.
[0286] The comparison conditions are preset in descending order of priority, with condition (1) being the condition with the highest priority. Conditions (1) to (7) are set in descending order of priority.
[0287] Furthermore, for condition (1), the higher the percentage of columns located at the ends of the candidate line, for condition (2), the higher the percentage of fixed interior walls on the candidate line, and for condition (3), if there is a floor directly above, the higher the percentage of fixed interior walls of the floor directly above on the candidate line, the higher the ranking.
[0288] Furthermore, condition (4) states that, if there is a floor directly above or below, the higher the percentage of columns located at both ends of the candidate line that match columns on the floor directly above or below, the higher the ranking; and condition (5) states that, if there is a floor directly above or below, the higher the percentage of fixed interior walls on the candidate line that match fixed interior walls on the floor directly below or above, the higher the ranking.
[0289] Condition (6) prioritizes candidate lines that are approximately parallel to the short sides of the section surrounded by the dividing lines, and condition (7) prioritizes candidate lines that are closest to the center of the section surrounded by the dividing lines. According to this configuration, the candidate lines extracted by the candidate line extracting means can be efficiently narrowed down.
[0290] Furthermore, since the proportion of columns located on both ends of the candidate line is given high priority, the floor plan creation support device 1 can turn a roughly rectangular area in plan view separated by the candidate line into a more structurally stable area.
[0291] In addition, since the next highest priority condition is the proportion of interior walls on the candidate line, the floor plan creation support device 1 can generate partition data 23 in which partition lines are preferentially placed at the positions of interior walls.
[0292] As a result, the framing plan creation support device 1 can place beam members along the position of the inner wall, so that columns and braces can be easily added to the inside of the inner wall later. For example, even if a column is not located at one end of the division line, the framing plan creation support device 1 can easily add a column to a position corresponding to one end of the division line.
[0293] In the configuration of the present invention and the correspondence with the above-mentioned embodiment, The framing plan of this invention corresponds to the framing plan data 24 of the embodiment, Similarly, The information acquisition means, the external line generation means, the candidate line extraction means, the narrowing down means, the floor plan generation means, the completion determination means, the upper floor reflection means, the upper floor reflection means, the extension line extraction means, and the exclusion setting means correspond to the control unit 16. If the size of the block is less than the specified size, the short side is 4 blocks or less and the long side is 5 blocks or less. The extension lines correspond to the candidate lines 53 and 54. The information acquisition step and the information acquisition process correspond to step S102, The outline generation step and the outline generation process correspond to step S103. The candidate line extraction step and the candidate line extraction process correspond to step S141. The narrowing down step and the narrowing down process correspond to steps S142 to S145. The framing plan generation step and the framing plan generation process correspond to step S110, The present invention is not limited to the configurations of the above-described embodiments, and many other embodiments can be obtained.
[0294] For example, in the above-described embodiment, a two-story wooden house was used, but this is not limited to this, and the building may be a single-story or two-or-more-story wooden building such as a wooden store, a wooden office or workshop, or a wooden warehouse. In step S104 of FIG. 3, the exclusion range S is set based on the floor plan data 22. However, the invention is not limited to this, and the exclusion range S may be set by accepting an operation by the user.
[0295] Furthermore, the comparison conditions for comparing the candidate lines are the above-mentioned conditions (1) to (7), but are not limited to these and may be any appropriate number. Furthermore, the contents of the comparison condition are not limited to those described above, and may be any appropriate comparison condition that narrows down the candidate lines to one.
[0296] In addition, the proportion of the fixed inner wall is defined as the proportion of the number of divisions of the part data to the number of divisions of the candidate line, but this is not limited to this, and it may be, for example, the proportion of the length of the inner wall to the length of the candidate line.
[0297] In addition, the size of the section divided by the dividing line must be 4 squares or less on the short side and 5 squares or less on the long side, but this is not limited to the above, and the size may be an appropriate size or a condition other than the size of the section may be a condition for determination. Furthermore, there may be multiple determination conditions.
[0298] Furthermore, the timing for correcting the outlines 52, 82 based on the roof contour is not limited to the timing in the above-described embodiment, and may be any appropriate timing as long as the inside of the outlines 52, 82 is divided into sections. Furthermore, the timing of the upper floor reflection process in step S105 in FIG. 3 is not limited to the timing in the above-described embodiment, and may be any appropriate timing as long as the insides of the outlines 52 and 82 are divided into sections.
[0299] In addition, in the demarcation line generation process of step S108 in Figure 3, if there is no demarcation line inside the outline lines 52, 82, a candidate line connecting two pillars located on the outline lines 52, 82 may be preferentially extracted, and the candidate line may be compared under comparison conditions to determine the demarcation line.
[0300] In this case, a demarcation line is determined from a candidate line connecting two pillars located on the outline lines 52, 82, and then a candidate line that divides the sections divided by the demarcation lines is extracted, and the candidate lines are compared under comparison conditions to determine the demarcation lines.
[0301] According to this configuration, the outline lines 52, 82 can be divided into relatively large sections, and then the large sections can be further divided into smaller sections, so that the floor plan creation support device 1 can reliably generate large sections that are structurally stable and have an approximately rectangular shape when viewed from above.
[0302] Furthermore, in step S110 of FIG. 10, the generation of the floor plan data 24 is not limited to the process of the above-described embodiment, and any appropriate process may be used as long as the floor plan data 24 is generated using the block data 23.
[0303] In addition, the building materials database 3a acquired from the server 3 is stored in the memory unit 15 of the floor plan creation support device 1 as the building materials database 19, and when generating the floor plan data 24, it is generated by referring to the building materials database 19 stored in the memory unit 15, but this is not limited to this.
[0304] For example, the building materials database 19 may not be stored in the storage unit 15 of the floor plan creation support device 1, and the building materials database 3a of the server 3 may be referenced each time floor plan data 24 is generated. [Explanation of symbols]
[0305] 1...Floor plan creation support device 16...Control section 18...Plan creation support program 22…Floor plan data 23...Plot data 24…Floor plan data 51,81…Pillar 52,82…Outline 53~70…Candidate line 83~94…Candidate line RL…Roof area line S…Exclusion range
Claims
1. A floor plan creation support device that supports the creation of floor plans based on floor plan data showing floor plans in wooden buildings, An information acquisition means for acquiring at least pillar information indicating the positions of pillars and exterior wall information indicating exterior walls from the floor plan data; an outline generating means for generating an outline showing an outline of the floor plan based on the exterior wall information; a candidate line extraction means for extracting candidate lines for dividing the inside of the outline into substantially rectangular sections in a plan view based on the positions of the pillars; a narrowing-down means for comparing the candidate lines using a comparison condition with a higher priority, and if there are two or more top-ranked candidate lines in the comparison result, comparing the top-ranked candidate line using the comparison condition with a next higher priority, and if there is only one top-ranked candidate line, determining the single top-ranked candidate line as a demarcation line that divides the inside of the outline line; and a floorplan generating means for generating the floorplan based on partition data obtained by dividing the interior of the outline by the partition lines. A device to assist in creating floor plans.
2. The system further includes a completion determination means for causing the candidate line extraction means and the narrowing down means to perform division of the section surrounded by the demarcation lines when the section surrounded by the demarcation lines does not satisfy a predetermined determination condition, and for completing division of the section surrounded by the demarcation lines when the section surrounded by the demarcation lines satisfies the determination condition. The framing plan creation support device according to claim 1.
3. The determining condition is: The size of the section enclosed by the section lines is equal to or smaller than a predetermined size. The framing plan creation support device according to claim 2.
4. The outline generating means is configured to generate the outline of each floor of the wooden building having two or more floors, When a part of the outline generated by the outline generating means is located inside the outline of the immediately above floor or inside a roof area line indicating the outline of the immediately above roof, an upper floor reflection means is provided for generating a new outline by replacing a part of the outline with the outline or roof area line of the immediately above floor, The framing plan generating means includes: The floor plan corresponding to the second floor or higher is generated based on the section data of the floor immediately below. The framing plan creation support device according to claim 1.
5. The outline generating means is configured to generate the outline of each floor of the wooden building having two or more floors, When a part of the outline of the immediately upper floor is located inside the outline generated by the outline generating means, an upper floor reflection means is provided for determining the part of the outline of the immediately upper floor as the dividing line that divides the inside of the outline, The framing plan generating means includes: The floor plan corresponding to the second floor or higher is generated based on the section data of the floor immediately below. The framing plan creation support device according to claim 1.
6. When a substantially L-shaped section in plan view is inside the outline, an extension line extraction means is provided for extracting an extension line extending from the outline or the section line passing through a bend point of the substantially L-shaped section in plan view to the outline or the section line opposite the bend point; The narrowing down means is The extension line is compared with the candidate line under the comparison condition. The framing plan creation support device according to claim 1.
7. The method further includes: providing an exclusion setting means for setting an exclusion range that excludes the extraction of the candidate line by the candidate line extraction means; The framing plan creation support device according to claim 1.
8. The information acquisition means includes: A configuration in which staircase information indicating a staircase and atrium information indicating an atrium are acquired from the floor plan data, The exclusion setting means includes: The exclusion range is set based on the staircase information and the atrium information. The framing plan creation support device according to claim 7.
9. The comparison condition is The highest priority condition is set as condition (1), and conditions (1) to (7) are set in order of priority. The condition (1) is that the higher the ratio of the pillars located at the end of the candidate line, the higher the rank. Condition (2) is that the higher the ratio of the fixed inner wall on the candidate line, the higher the rank. Condition (3) is that if there is a floor directly above, the higher the proportion of the fixed interior wall of the floor directly above on the candidate line, the higher the ranking. Condition (4) is that if there is a floor directly above or directly below, the higher the percentage of columns at both ends of the candidate line that match the columns of the floor directly above or the floor directly below, the higher the ranking. Condition (5) is that, if there is a floor directly above or below, the higher the rate at which the fixed interior walls on the candidate line match the fixed interior walls on the floor directly below or above, the higher the ranking will be. Condition (6) is that the candidate line that is approximately parallel to the short side of the section enclosed by the section line is ranked higher; The condition (7) is that the candidate line that is closest to the center of the section enclosed by the section line is ranked higher. The framing plan creation support device according to claim 1.
10. A floor plan creation support program for supporting the creation of floor plans based on floor plan data showing floor plans in wooden buildings, An information acquisition step of acquiring at least pillar information indicating the positions of pillars and exterior wall information indicating exterior walls from the floor plan data; a contour line generating step of generating a contour line indicating an outline of the floor plan based on the exterior wall information; a candidate line extraction step of extracting candidate lines for dividing the inside of the outline into substantially rectangular sections in a plan view based on positions of the pillars; a narrowing-down step of comparing the candidate lines using a comparison condition with a higher priority, and if there are two or more top candidate lines in the comparison result, comparing the top candidate line using the comparison condition with a next higher priority, and if there is only one top candidate line, determining that one top candidate line as a dividing line that divides the inside of the outline; and generating the framing plan based on partition data obtained by dividing the inside of the outline by the partition lines. A program to assist in creating floor plans.
11. A method for supporting the creation of floor plans based on floor plan data showing floor plans in wooden buildings, comprising: An information acquisition step in which information acquisition means acquires at least pillar information indicating the positions of pillars and exterior wall information indicating exterior walls from the floor plan data; a contour line generating step in which a contour line indicating an outline of the floor plan is generated based on the exterior wall information by a contour line generating means; a candidate line extraction step in which a candidate line extraction means extracts candidate lines for dividing the inside of the outline into substantially rectangular sections in a plan view based on the positions of the pillars; a narrowing down process in which a narrowing down means compares the candidate lines using a comparison condition with a high priority, and if there are two or more top candidate lines in the comparison result, compares the top candidate line using the comparison condition with a next highest priority, and if there is only one top candidate line, determines that one top candidate line is the demarcation line that divides the inside of the outline line; and a framing plan generating step in which a framing plan generating means generates the framing plan based on division data obtained by dividing the inside of the outline by the division lines. A method to assist in creating floor plans.
Citation Information
Patent Citations
Generator for video signal
JP1981054164A
Cited By
Floor plan restoration system, floor plan restoration program, and floor plan restoration method
JP7868732B1
