Power generation plant data processing apparatus, power generation plant data processing method, and program

The power generation plant data processing device efficiently manages startup sequences by registering device importance and adjusting control targets, addressing inefficiencies in existing power plant startup methods and reducing restart time after failures.

JP2024158766APending Publication Date: 2024-11-08MITSUBISHI HEAVY IND LTD
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
JP2023074274
Authority / Receiving Office
JP · JP
Patent Type
Applications
Current Assignee / Owner
Filing Date
2023-04-28
Publication Date
2024-11-08

AI Technical Summary

Technical Problem

Existing power plant startup methods, such as those described in Patent Document 1, are inefficient for starting up a power plant, particularly due to the lack of suitable control strategies during normal operation.

Method used

A power generation plant data processing device and method that includes an equipment database to register the importance of monitoring in the startup sequence, a start-up sequence control unit to manage equipment according to predetermined control objectives, and units to input device information, update importance levels, and change control targets based on device information and importance levels.

Benefits of technology

This approach enables efficient power plant startup by reducing the time and effort required to restart the plant after failures, by prioritizing inspections and adjusting control targets based on device importance and history.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 2024158766000001_ABST
    Figure 2024158766000001_ABST
Patent Text Reader

Abstract

To efficiently start up a power generation plant.SOLUTION: A power generation plant data processing apparatus is provided with: a device database in which importance levels of a plurality of devices provided in a power generation plant are registered for each device; a start sequence control unit for controlling the device such that each stage of start control satisfies a plurality of control targets in accordance with an order or procedure predetermined by a start sequence; a device information input unit for accepting input of device information representing the device which is assumed to be a cause of the interruption when the start sequence is interrupted when the start sequence is executed; an importance updating unit for updating the importance level registered in the device database based on the device information; and at least one of a work information presenting unit for presenting, for the start sequence, work information representing work to be performed with respect to the next start sequence based on the device information and the importance level, and a control target changing unit for changing the control target based on the device information and the importance level.SELECTED DRAWING: Figure 2
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present disclosure relates to a power plant data processing device, a power plant data processing method, and a program. [Background technology]

[0002] Patent Document 1 describes an example of a method for controlling and analyzing a fault in a thermal power plant using a plant data specification during normal operation of the thermal power plant. In the method described in Patent Document 1, the plant data specification is updated by identifying gaps in controlling one or more control loops in the thermal power plant and repeatedly manipulating at least one set point to meet demand. According to the method described in Patent Document 1, it is said that the plant can be efficiently controlled by periodically updating the plant data specification. [Prior art documents] [Patent documents]

[0003] [Patent Document 1] International Publication No. 2014 / 001864 Summary of the Invention [Problem to be solved by the invention]

[0004] However, the method described in Patent Document 1 updates the set points of the control loop during normal operation, and therefore has a problem in that it is not suitable for efficiently starting up a power plant, for example.

[0005] The present disclosure has been made to solve the above-mentioned problems, and aims to provide a power plant data processing device, a power plant data processing method, and a program that can efficiently start up a power plant. [Means for solving the problem]

[0006] In order to solve the above problems, the power plant data processing device of the present disclosure comprises an equipment database in which the importance of monitoring for each piece of equipment in the startup sequence of the power plant is registered for the equipment; a startup sequence control unit that controls the equipment so as to satisfy multiple control targets at each stage of the startup control of the power plant according to a predetermined order or procedure by the startup sequence; an equipment information input unit that inputs equipment information representing one or more pieces of equipment that are presumed to be the cause of an interruption when a startup sequence is interrupted when the startup sequence is performed after the power plant is stopped; and an importance update unit that updates the importance registered in the equipment database based on the equipment information, and also comprises at least one of a work information presentation unit that presents work information that represents work to be performed in relation to the implementation of the next startup sequence for the startup sequence based on the equipment information and the importance; and a control target change unit that changes the control target based on the equipment information and the importance.

[0007] The power plant data processing method of the present disclosure includes the steps of: using an equipment database in which the importance of monitoring for each piece of equipment in the startup sequence of the power plant is registered, controlling the equipment so that each stage of the startup control of the power plant satisfies multiple control targets in accordance with a predetermined order or procedure by the startup sequence; inputting equipment information that represents one or more pieces of equipment that are presumed to be the cause of an interruption when a startup sequence is interrupted when the startup sequence is performed after the power plant is stopped; and updating the importance registered in the equipment database based on the equipment information, and also includes at least one of the steps of presenting work information that represents information that represents work to be performed in relation to the implementation of the next startup sequence for the startup sequence based on the equipment information and the importance; and changing the control target based on the equipment information and the importance.

[0008] The program of the present disclosure causes a computer to perform the following steps: using an equipment database in which the importance of monitoring for each piece of equipment in the startup sequence of the power plant is registered, control the equipment so that each stage of the startup control of the power plant satisfies multiple control targets in accordance with a predetermined order or procedure by the startup sequence; inputting equipment information that represents one or more pieces of equipment that are presumed to be the cause of an interruption of a startup sequence when the startup sequence is interrupted when the startup sequence is performed after the power plant is stopped; and updating the importance registered in the equipment database based on the equipment information; and causing the computer to perform at least one of the following steps: presenting work information that represents work that should be performed before starting the next startup sequence for the startup sequence based on the equipment information and the importance; and changing the control target based on the equipment information and the importance. Effect of the Invention

[0009] According to the power plant data processing device, the power plant data processing method, and the program disclosed herein, the start-up of the power plant can be performed efficiently. [Brief description of the drawings]

[0010] [Figure 1] 1 is a diagram illustrating an example of the configuration of a power generation plant according to an embodiment of the present disclosure. [Diagram 2] FIG. 1 is a diagram illustrating an example of the configuration of a plant overall control device according to an embodiment of the present disclosure. [Diagram 3] 10 is a flowchart illustrating an example of a startup sequence according to an embodiment of the present disclosure. [Figure 4] FIG. 13 is a diagram illustrating a configuration example of a device database according to an embodiment of the present disclosure. [Diagram 5] 4 is a flowchart illustrating an example of the operation of a plant overall control device according to an embodiment of the present disclosure. [Figure 6]4 is a flowchart illustrating an example of the operation of a plant overall control device according to an embodiment of the present disclosure. [Figure 7] FIG. 1 is a schematic block diagram illustrating a configuration of a computer according to at least one embodiment. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0011] Hereinafter, an embodiment of a power plant data processing device, a power plant data processing method, and a program according to the present disclosure will be described with reference to the drawings. FIG. 1 is a diagram showing a configuration example of a power plant according to an embodiment of the present disclosure. FIG. 2 is a diagram showing a configuration example of a plant overall control device according to an embodiment of the present disclosure. FIG. 3 is a flowchart showing an example of a startup sequence according to an embodiment of the present disclosure. FIG. 4 is a diagram showing a configuration example of an equipment database according to an embodiment of the present disclosure. FIGS. 5 and 6 are flowcharts showing an operation example of a plant overall control device according to an embodiment of the present disclosure. FIG. 7 is a schematic block diagram showing a configuration of a computer according to at least one embodiment. Note that in each drawing, the same or corresponding configurations are designated by the same reference numerals and the description is omitted as appropriate.

[0012] A power plant data processing device, power plant data processing method, and program disclosed herein have the feature of efficiently starting up the power plant the next time it is started up, by reducing the time, effort, etc. required for restarting the power plant if the power plant 100 does not reach a power generating state when started up in a specified sequence from a stopped state (not generating power).

[0013] (Power plant configuration) FIG. 1 shows a configuration example of a power plant according to an embodiment of the present disclosure. The power plant 100 shown in FIG. 1 is a gas turbine combined cycle (GTCC) power plant, and includes a gas turbine 10, a heat recovery steam generator 20, a generator 30, a steam turbine 40, an LNG (Liquefied Natural Gas) tank 61, a clutch A 62, a clutch B 63, a condenser 64, steam valves 65 and 66, bypass valves 67 and 68, a transformer 71, a circuit breaker A 72, a power plant control device 80, and a plant general control device 301. The circuit breaker A 72 connects or disconnects the generator 30 and a system (electric power system) 73 via the transformer 71. In this embodiment, in each drawing and the description of each drawing, the "connection" of the circuit breaker A 72 is also expressed as "closed" and the "disconnection" is also expressed as "open". In addition, the "engagement (=transmission)" of the clutch is also expressed as "closed", and the "disconnection (=disconnection)" is also expressed as "open". Moreover, the plant overall control device 301 is one configuration example of the "power plant data processing device" according to the present disclosure.

[0014] The gas turbine 10 includes an air compressor 13, a combustor 12, a turbine 11, and a rotating shaft 14 of the turbine 11 and the air compressor 13. The gas turbine 10 is a prime mover that obtains rotational power by mixing and burning air compressed by the air compressor 13 and natural gas 201 as fuel in the combustor 12, and applying the combustion gas, which is a fluid, to a rotor in the turbine 11 to convert the kinetic energy of the fluid into rotational motion.

[0015] The heat recovery boiler 20 recovers exhaust heat from a gas turbine exhaust gas 202 discharged from the gas turbine 10 to generate steam 205 and 206. The heat recovery boiler 20 also recovers exhaust heat from the gas turbine exhaust gas 202, and after performing desulfurization treatment and the like, exhausts the exhaust gas as a heat recovery boiler exhaust gas 203, which is then discharged into the atmosphere from a chimney or the like (not shown).

[0016] The generator 30 is a synchronous electric machine and includes a coaxial rotating shaft 31 and a rotating shaft 32. The rotating shaft 31 is releasably engaged with the rotating shaft of the gas turbine 10 via a clutch A62. The rotating shaft 32 is releasably engaged with the rotating shaft 44 of the steam turbine 40 via a clutch B63. The clutches A62 and B63 are, for example, wet multi-plate clutches. With both the clutches A62 and B63 engaged, the generator 30 operates as a synchronous generator that converts the power of the gas turbine 10 and the steam turbine 40 into electric power, and supplies active power to the grid 73 with the active power requested by the grid operator as a target. In this embodiment, this operation mode is called active power operation. With both the clutches A62 and B63 disengaged, the generator 30 operates as a synchronous condenser that converts the power of the gas turbine 10 and the steam turbine 40 into electric power, and supplies active power to the grid 73 with the reactive power requested by the grid operator as a target. In this embodiment, this operation mode is called synchronous modified operation. In addition, in the specification or drawings, the gas turbine may be abbreviated as GT, and the steam turbine may be abbreviated as ST.

[0017] The steam turbine 40 includes a low-pressure turbine 41, a high-pressure turbine 42, and rotating shafts 43 and 44 of the low-pressure turbine 41 and the high-pressure turbine 42. The steam turbine 40 utilizes steam 205, 206, etc., generated by the heat recovery steam generator 20. The low-pressure turbine 41 is a prime mover that obtains rotational power by allowing the steam 206 generated by the heat recovery steam generator 20 to flow in through a steam valve 65 and hit the rotor blades. The high-pressure turbine 42 is a prime mover that obtains rotational power by allowing the steam 205 generated by the heat recovery steam generator 20 to flow in through a steam valve 66 and hit the rotor blades.

[0018] The condenser 64 condenses the steam that has passed through the steam turbine 40 and the steam that has passed through the bypass valve 67 or 68. The water condensed in the condenser 64 is returned as feed water 204 to the heat recovery steam generator 20 via a pump or the like.

[0019] The power plant control device 80 can be configured using one or more computers and hardware such as peripheral devices and peripheral circuits of the computers. The power plant control device 80 acquires information such as steam temperature, steam pressure, steam flow rate, shaft rotation speed, feed water flow rate, GT exhaust temperature, clutch state, etc., measured by a plurality of sensors (not shown) installed in the power plant 100, directly or via the plant general control device 301 or other control devices (not shown). The steam temperature is, for example, the temperature of one or more types of steam generated in the heat recovery boiler 20, such as steam 205, 206. The shaft rotation speed is the rotation speed of the rotating shaft 14. The feed water flow rate is the flow rate of the feed water 204. The GT exhaust temperature is the temperature of the exhaust 202 of the gas turbine 10. The clutch state is information indicating the engaged or disengaged state of the clutch A62. The power plant controller 80 also controls devices such as the clutch A 62, the clutch B 63, the steam valves 65 and 66, the bypass valves 67 and 68, the circuit breaker A 72, etc., directly or via the plant overall controller 301 or other controllers (not shown).

[0020] The plant overall control device 301 is, for example, a computer such as a server, and performs overall control of the entire plant including the power plant 100. For example, the plant overall control device 301 receives an active power generation request or a reactive power generation request from the grid operator management device 302, outputs a predetermined instruction to the power plant control device 80, and transmits a response from the power plant control device 80 to the grid operator management device 302.

[0021] The system operator management device 302 is a computer such as a server operated by the system operator of the system 73, and transmits active power generation requests and reactive power generation requests to the plant general control device 301 under the instructions of the system operator, for example.

[0022] (Functional configuration of plant overall control device) As shown in FIG. 2, the plant overall control device 301 shown in FIG. 1 has a functional configuration constituted by a combination of hardware such as a computer and software such as a program executed by the computer, and includes a startup sequence control unit 3011, an equipment database 3012, an equipment information input unit 3013, an importance update unit 3014, a work information presentation unit 3015, and a control target change unit 3016.

[0023] The start-up sequence control unit 3011 controls each device of the power plant 100 in cooperation with, for example, the power plant control device 80 by a predetermined start-up sequence, starts the power plant 100 in a stopped state, starts power generation by the generator 30, and supplies power to the grid 73. Note that, in this embodiment, the start-up sequence is a control in which, according to a predetermined order or procedure, each stage A, stage B1, stage B2, stage C, and stage D of the start-up control of the power plant 100 are sequentially performed by setting a plurality of control targets A1, A2, A3, ..., B21, B22, B23, ..., etc., as shown in Fig. 3. Each stage A, stage B1, stage B2, stage C, and stage D is, for example, condensate clean-up, low pressure clean-up, high pressure clean-up, boiler ignition, turbine start-up, etc. The control targets A1, A2, A3, ..., B21, B22, B23, ... are target values ​​for each stage related to, for example, temperature, pressure, flow rate, rotation speed, etc., and it is estimated that a malfunction has occurred when the measurement value of each device does not satisfy a predetermined condition for this target value. Furthermore, each device is, for example, a valve, a pump, a sensor, a thyristor control device, etc., but is not limited thereto. Furthermore, each device may include both main machines such as GT, ST, generator, etc. and auxiliary machines other than the main machines, or may include only auxiliary machines. In this case, the start-up sequence control unit 3011 controls the devices so that each stage of the start-up control of the power plant 100 satisfies multiple control targets according to a sequence or procedure predetermined by the start-up sequence.

[0024] The equipment database 3012 is a database in which the importance of monitoring in the start-up sequence of the power plant 100 is registered for each of the multiple devices included in the power plant 100. The equipment database 3012 includes data that associates, for each device, the device name, system number, stage, control target, operation mode, importance, whether or not a malfunction has occurred, and relaxation of the control target, as shown in FIG. 4 for example. The device name is identification information for each device. The system number is identification information for multiple systems in the power plant 100. Here, the multiple systems in the power plant 100 are, for example, a steam system, an exhaust system, an electrical system, a hydraulic system, a cooling water system, a lubricating oil system, an air supply system, and the like, which are flows of elements that are separated from other systems and transported by pipes or cables. As described above, the stage indicates each stage in the start-up control of the power plant 100, and the control target indicates a target value related to the control of the device in each stage, as described above. The operation mode is an operation mode such as start, stop, load operation, and no-load operation. The example shown in Figure 4 shows a case where the first startup sequence is executed, the startup sequence is not completed, and a malfunction is suspected (or confirmed) in a device with device name BB (hereinafter also referred to as device BB, etc.).

[0025] The importance level is the importance of monitoring in the startup sequence or in the preparation stage of the startup sequence. In this embodiment, as an example, the importance level is set to 5 levels, with importance level 5 being the most important and importance level 1 being the least important. The importance level can be set to be high, for example, when the occurrence of a device malfunction would have a large impact on operations.

[0026] When the importance is high (for example, when the threshold is 4 and the threshold is 4 or higher), for example, it can be set so that a prior inspection or work during startup is always required when starting the power plant 100. The requirement of a prior inspection or work during startup means that an inspection is performed before starting the first startup sequence or work is performed during startup according to the startup sequence. In addition, when the first startup sequence is started but interrupted and not completed, and then the startup sequence is performed again (for the second time), even if no malfunction occurs in the device during the first startup sequence, the same inspection as in the first startup sequence is performed before starting the second startup sequence or work is performed during startup according to the second startup sequence. On the other hand, when the importance is low (for example, when the threshold is 4 and the threshold is less than 4), if no malfunction occurs in the device during the first startup sequence, it can be set so that the same inspection as before the first startup sequence is not performed before starting the second startup sequence, or work is not performed during startup according to the first startup sequence.

[0027] Also, when the importance is low (for example, when the threshold is 2 and the threshold is 2 or less), if there is no problem with the device in the first startup sequence, it is possible to set, for example, that the control target for the device adopted in the first startup sequence is changed to be relaxed in the second startup sequence. Relaxing the control target means, for example, changing the control target so that it is expected to shorten the time to reach the control target by widening the allowable range of target values ​​such as temperature, pressure, flow rate, and rotation speed, or by raising or lowering the upper and lower limits. On the other hand, when the importance is high (for example, when the threshold is 2 and the threshold is greater than 2), it is possible to set that the same normal control target as in the first startup sequence is used in the second startup sequence, even if there is no problem with the device in the first startup sequence.

[0028] The presence or absence of a malfunction is information indicating whether or not a malfunction has occurred in the device during the first startup sequence (or whether or not the occurrence of a malfunction is predicted).

[0029] The relaxed control target is information indicating the control target when the control target related to the device is relaxed. The relaxed control target does not have to be set for all devices.

[0030] The device information input unit 3013 inputs "device information" which is information representing one or more devices presumed to be the cause of interruption when the startup sequence is interrupted when the startup sequence is performed for the first time after the power plant 100 is stopped. The device information input unit 3013 also presumes a device in which a malfunction has occurred based on the measured values ​​of one or more sensors in the power plant 100 via the power plant control device 80, and registers the device in the device database 3012 as a device presumed to be the cause of the interruption. Alternatively, the device information input unit 3013 registers a device specified in response to an input operation by an operator in the device database 3012 as a device presumed to be the cause of the interruption. In this embodiment, the "device information" is information (such as "device name") indicating a device in which "whether or not a malfunction has occurred" is registered as "yes" in the device database 3012. In this case, the device information input unit 3013 inputs device information representing one or more devices presumed to be the cause of the interruption when the startup sequence is interrupted when the startup sequence is performed after the power plant 100 is stopped.

[0031] The importance updating unit 3014 updates the importance registered in the device database 3012 based on the "device information". For example, the importance updating unit 3014 lowers the importance of a device that operated normally in the startup sequence, or raises the importance of a device in which a malfunction has occurred. In this case, the importance updating unit 3014 may raise the importance of other devices that belong to the same system as the device in which the malfunction has occurred, or may raise the importance of other devices related to the device in which the malfunction has occurred by referring to another database (not shown) or the like that records data indicating the relationship between devices. For example, in the example shown in FIG. 4, the importance updating unit 3014 increases the current importance of device BB in which a malfunction has occurred the first time by 1, updating it to 4.

[0032] The work information presentation unit 3015 presents the work information, which is information indicating work to be performed before starting the second startup sequence or during startup according to the second startup sequence, to an operator or the like, based on the "device information" and the importance level, on a predetermined display unit or by printing on a predetermined printer. The work information presentation unit 3015 presents the work information regarding each device included in the "device information" (device in which a malfunction occurred the first time) and the work information regarding each device whose importance level is greater than a predetermined first threshold value (for example, 3 out of 5 levels). For example, in the case of the example shown in FIG. 4, the work information presentation unit 3015 presents the work information regarding device BB in which a malfunction occurred the first time and device DD with an importance level of 4. The work information can include, for example, identification information of the device, arrangement information of the device, connection information with other devices, information indicating disassembly and assembly instructions, information indicating inspection instructions, and the like. In this case, the work information presentation unit 3015 presents the work information, which is information indicating work to be performed regarding the implementation of the next startup sequence for the implemented startup sequence, based on the device information and the importance level. At this time, the work information presenting unit 3015 may present, for example, work information on each device included in the device information (each device with a malfunction) and work information on each device whose importance is greater than a predetermined first threshold. Furthermore, for example, when a startup sequence is being performed, the work information presenting unit 3015 may present, at each stage of the startup sequence, work information for a device corresponding to the stage.

[0033] The control target changing unit 3016 changes the control target based on the "device information" and the importance. The control target changing unit 3016 changes the control target for a device that does not experience a malfunction in the first startup sequence and has an importance level lower than a predetermined second threshold (e.g., 3 out of 5 levels) so as to be relaxed. For example, in the case of the example shown in FIG. 4, the control target changing unit 3016 changes the control target for device ZZ that does not experience a malfunction in the first startup sequence and has an importance level of 2 to the control target registered for the relaxation of control targets. In this case, the control target changing unit 3016 changes the control target for a device that does not experience a malfunction in the startup sequence performed before the next startup sequence and has an importance level lower than a predetermined second threshold so as to be relaxed.

[0034] (Example of operation of plant general control device) An operation example of the plant overall control device 301 will be described with reference to Fig. 5 and Fig. 6. The flowchart shown in Fig. 5 shows the process up to startup according to the startup sequence, which is executed under the control of the processor 91 (described in detail later). In step S11, the startup sequence control unit 3011 starts the process of starting up the power plant 100 after receiving an instruction from the operator. In step S12, the startup sequence control unit 3011 acquires information on the control target of the equipment at each stage and the relaxation of the control target from the equipment database 3012. In step S13, when the startup sequence control unit 3011 detects a control operation completion signal or an operation start permission signal for the next stage before the stage currently being processed, it acquires work information corresponding to the stage currently being processed from the equipment database 3012. In step S14, the work information presentation unit 3015 presents the work information acquired in step S13. In presenting the work information, in the first startup sequence, work information on all devices is presented, but as described above, in the second startup sequence, for example, devices in which a malfunction occurred in the first startup sequence and / or devices whose importance meets a predetermined condition are presented. In step S15, the startup sequence control unit 3011 acquires information on the control target and the relaxation of the control target corresponding to the stage currently being processed from the information on the control target and the relaxation of the control target of the device acquired in step S12. If the acquired information does not include information on the relaxation of the control target, the device is controlled using the information on the control target, and if the acquired information includes information on the relaxation of the control target, the device is controlled using the information on the relaxation of the control target. In step S16, when the startup sequence is interrupted, the device information input unit 3013 registers device information on the device estimated to be the cause of the interruption in the device database 3012 (registers "yes" in the "whether or not a malfunction has occurred" field). In step S17, if the startup sequence control unit 3011 determines that the startup sequence has ended, it terminates this processing, and if it determines that the startup sequence has not ended, it proceeds to step S13 and continues processing for the next stage.

[0035] The flowchart shown in FIG. 6 shows the process of relaxing the control target, which is executed under the control of the processor 91 (described in detail later). In step S21, the importance update unit 3014 updates the importance registered in the equipment database 3012 based on the equipment information. In step S22, when the control target is changed based on the equipment information and the importance, the control target change unit 3016 registers information about the control target in the relaxation of the control target in the equipment database 3012, and when the control target is not changed based on the equipment information and the importance, it registers "none" (or "no registration") in the relaxation of the control target in the equipment database 3012, and ends the process shown in FIG. 6. The process shown in FIG. 6 may be started after detecting that the start-up sequence has been interrupted, may be started at the timing when the process of step S16 is completed (i.e., the process is started at each stage), or may be started based on an instruction from an operator when the first start-up sequence is interrupted.

[0036] Furthermore, the processing of step S16 in FIG. 5 may not be performed according to the flowchart shown in FIG. 5, and when the first startup sequence is interrupted, the device information input unit 3013 may register device information of the device specified in response to the operator's input operation in the device database 3012 as a device presumed to be the cause of the interruption, as described above. In this case, after the operator registers the device information, it is also possible to continue with the processing shown in FIG. 6. In this embodiment, the first startup sequence and the second startup sequence have been used as examples, but it goes without saying that the present invention can also apply to the xth startup sequence and the xth next startup sequence, rather than being limited to the first and second startup sequences.

[0037] (Actions, Effects, Modifications, etc.) According to the power plant data processing device, power plant data processing method, and program of this embodiment, work information is presented, which is information indicating work that should be done before starting the next startup sequence based on equipment information and importance, and the control target is changed based on the equipment information and importance, so that the next startup of the power plant can be performed efficiently. Furthermore, by displaying specific work information in this manner, for example, if the lubricating oil pump is successfully started in the first startup sequence, in the second startup sequence, after it is confirmed that the lubricating oil pump start signal has been turned ON, if the oil temperature of the bearing to which the lubricating oil is supplied is normal, it will be protected by the interlock function of the local control system, thereby eliminating the need to check the status of the lubricating oil pump, which is necessary during the startup sequence. Furthermore, by displaying specific work information in this manner, for example, if there is no abnormality in the signal deviation of the air pressure control operating terminal of the control air pump in the first startup sequence, then in the second startup sequence, after confirming that the start signal of the control air pump has turned ON, if the discharge air pressure is normal, it is possible to eliminate the need to check the status of the control air pump. Therefore, even during the course of the start-up sequence, monitoring, work, and the like that would normally be performed can be omitted, making it possible to efficiently start up the power plant 100.

[0038] The importance of monitoring can be set arbitrarily depending on the type of plant use. For example, in a plant that uses both power generation and steam supply, the importance of equipment may change depending on the importance of power generation and supplied steam. In the former, the main purpose is power generation, and the equipment and systems related to power generation are of high importance. In the latter, the main purpose is steam supply, and the equipment and systems located in the air supply system are of relatively high importance.

[0039] In addition, the importance of the device that matches the malfunctioning system can be increased, and the monitoring importance of the normally operating device that operates before the malfunctioning device in the startup sequence can be lowered at the next startup. Also, the device with a higher importance than the malfunctioning device can be presented with work information.

[0040] The work information presentation unit 3015 may present information on malfunction-occurring equipment (disassembly instructions, connection points, etc.) and specific abnormal parts, disassembly and assembly instructions, and jig / tool ​​information required for recovery, based on connection and arrangement information on auxiliary equipment, main valves, main piping, etc., from 3D and P&ID (Piping and Instruments Diagram) information of the plant. The work information presentation unit 3015 may also present malfunction history of the target part and delivery date and price information for the previous replacement. The work information presentation unit 3015 may present, in P&ID-CAD (Computer Aided Design), information on the sensor number, installation position, and connection system information with the equipment (equipment position, connection dimensions, connection pressure / temperature, sensor installation position information, etc.) in a line diagram, and malfunction occurrence history information. The malfunction occurrence history may have a function of sharing information with other plants using the same product. The work information presentation unit 3015 may utilize the equipment 3D-CAD information based on the disassembly and assembly instructions, disassemble the equipment components in advance, and present the carry-in / carry-out route to the equipment installation location, the hanging procedure, and the 3D information of the disassembly / reassembly procedure. For the hanging procedure, priority information may be added to the disassembly part CAD in advance.

[0041] According to the present embodiment, the above functions make it possible to shorten the restart time after a startup failure. Furthermore, if an equipment malfunction occurs during plant startup, it is possible to present information necessary to support shortening the recovery time after repairing the equipment.

[0042] In addition, according to the present embodiment, the following effects can be achieved to reduce missed power generation opportunities. If an auxiliary malfunction occurs, unplanned downtime can be shortened by disassembly / restoration support. The average work proficiency level of repair personnel can be improved by auxiliary restoration procedure support.

[0043] (Other embodiments) Although the embodiment of the present disclosure has been described above in detail with reference to the drawings, the specific configuration is not limited to this embodiment, and design changes and the like are also included within the scope of the gist of the present disclosure. Note that, although the above embodiment is a single-shaft gas turbine combined cycle power plant in which a gas turbine and a steam turbine are connected on the same shaft, a multi-shaft configuration may also be used. In addition, the power plant may be a power plant that utilizes natural energy, such as solar heat. In addition, while the embodiment of the present disclosure has been described with the focus on the startup sequence, the present disclosure may also be directed to a shutdown sequence for stopping the power plant 100 in an activated state by controlling each piece of equipment in the power plant 100 in cooperation with the power plant control device 80, for example. Moreover, either the task information presentation unit 3015 or the control target change unit 3016 may be omitted.

[0044] (Computer Configuration) FIG. 7 is a schematic block diagram illustrating a computer configuration according to at least one embodiment. The computer 90 comprises a processor 91, a main memory 92, a storage 93, and an interface 94. The above-mentioned plant overall control device 301 is implemented in a computer 90. The operations of each of the above-mentioned processing units are stored in the form of a program in a storage 93. The processor 91 reads the program from the storage 93, loads it in the main memory 92, and executes the above-mentioned processing in accordance with the program. The processor 91 also secures storage areas in the main memory 92 corresponding to each of the above-mentioned storage units in accordance with the program.

[0045] The program may be for realizing a part of the functions to be performed by the computer 90. For example, the program may be for realizing the functions by combining with other programs already stored in the storage or by combining with other programs implemented in other devices. In another embodiment, the computer may include a custom LSI (Large Scale Integrated Circuit) such as a PLD (Programmable Logic Device) in addition to or instead of the above configuration. Examples of PLDs include PAL (Programmable Array Logic), GAL (Generic Array Logic), CPLD (Complex Programmable Logic Device), and FPGA (Field Programmable Gate Array). In this case, some or all of the functions to be realized by the processor may be realized by the integrated circuit.

[0046] Examples of the storage 93 include a hard disk drive (HDD), a solid state drive (SSD), a magnetic disk, a magneto-optical disk, a compact disc read only memory (CD-ROM), a digital versatile disc read only memory (DVD-ROM), and a semiconductor memory. The storage 93 may be an internal medium directly connected to the bus of the computer 90, or an external medium connected to the computer 90 via an interface 94 or a communication line. In addition, when the program is distributed to the computer 90 via a communication line, the computer 90 that receives the program may load the program into the main memory 92 and execute the above-mentioned process. In at least one embodiment, the storage 93 is a non-transitory tangible storage medium.

[0047] <Additional Notes> The plant overall control device 301 (power plant data processing device) described in this embodiment can be understood, for example, as follows.

[0048] (1) A power plant data processing device (plant overall control device 301) according to a first embodiment includes an equipment database 3012 in which the importance of monitoring of a plurality of equipment included in a power plant 100 in a startup sequence of the power plant is registered for each of the equipment, a startup sequence control unit 3011 that controls the equipment so as to satisfy a plurality of control targets at each stage of startup control of the power plant according to a sequence or procedure predetermined by the startup sequence, an equipment information input unit 3013 that inputs equipment information that is information representing one or more of the equipment that is presumed to be the cause of an interruption when a startup sequence is interrupted when the startup sequence is performed after the power plant is stopped, an importance update unit 3014 that updates the importance registered in the equipment database based on the equipment information, and at least one of a work information presentation unit 3015 that presents work information that is information representing work to be performed regarding the execution of the next startup sequence for the startup sequence based on the equipment information and the importance, and a control target change unit 3016 that changes the control target based on the equipment information and the importance. According to this embodiment and the following embodiments, the startup of the power plant can be efficiently performed.

[0049] (2) A power plant data processing device (plant overall control device 301) according to a second aspect is the power plant data processing device of (1), in which the work information presentation unit presents work information on each of the devices included in the device information and work information on each of the devices whose importance is greater than a predetermined first threshold. According to this aspect, it is possible to present work information on a device estimated to be the cause of the interruption and work information on a device whose monitoring importance is relatively high.

[0050] (3) A power plant data processing device (plant overall control device 301) according to a third aspect is the power plant data processing device according to (1) or (2), wherein the control target changing unit changes the control target so as to relax the control target for the device for which no malfunction occurred in the start-up sequence performed before the next start-up sequence and the importance is less than a predetermined second threshold. According to this aspect, it is possible to relax the control target for the device for which no malfunction occurred in the first start-up sequence and the importance is less than a predetermined second threshold.

[0051] (4) A power plant data processing device (plant overall control device 301) according to a fourth aspect is a power plant data processing device of (1) or (2), wherein the work information presentation unit, when performing a startup sequence, can present work information for the equipment corresponding to each stage of the startup sequence.

[0052] (5) A power plant data processing device (plant overall control device 301) according to a fifth aspect is a power plant data processing device of (3), wherein the work information presentation unit, when performing a startup sequence, can present work information for the equipment corresponding to each stage of the startup sequence.

[0053] (6) A power plant data processing device (plant overall control device 301) according to a sixth aspect is a power plant data processing device of (1) to (5), and the startup sequence can indicate control in which multiple control targets are set and each stage of the shutdown control of the power plant is progressed sequentially according to a predetermined order or procedure. [Explanation of symbols]

[0054] 100...power plant, 10...gas turbine, 20...heat recovery boiler, 30...generator, 40...steam turbine, 62...clutch A, 63...clutch B, 72...circuit breaker A, 73...system, 80...power plant control device, 301...plant overall control device, 3011...start-up sequence control unit, 3012...equipment database, 3013...equipment information input unit, 3014...importance update unit, 3015...work information presentation unit, 3016...control target change unit

Claims

1. an equipment database in which the importance of monitoring a plurality of equipment included in a power plant in a startup sequence of the power plant is registered for each of the equipment; a startup sequence control unit that controls the devices so as to satisfy a plurality of control targets at each stage of startup control of the power plant according to a predetermined order or procedure by the startup sequence; a device information input unit that inputs device information representing one or more devices presumed to be the cause of an interruption of a startup sequence when the startup sequence is interrupted after the power plant is shut down; an importance update unit that updates the importance registered in the device database based on the device information; In addition to providing a task information presentation unit that presents task information representing a task to be performed in relation to the execution of a next startup sequence based on the device information and the importance; a control target changing unit that changes the control target based on the device information and the importance; Equipped with at least one of Power plant data processing equipment.

2. When the power plant data processing device includes the work information presentation unit, The work information presentation unit presents work information related to each of the devices included in the device information and work information related to each of the devices whose importance is greater than a predetermined first threshold. The power plant data processing apparatus according to claim 1 .

3. When the power plant data processing device includes the control target changing unit, The control target changing unit changes the control target for the device for which no malfunction occurs in a startup sequence performed before the next startup sequence and for which the importance is smaller than a predetermined second threshold value so as to be relaxed. The power plant data processing device according to claim 1 or 2.

4. When the power plant data processing device includes the work information presentation unit, The work information presentation unit presents work information for the device corresponding to each stage of the startup sequence during the startup sequence. The power plant data processing device according to claim 1 or 2.

5. When the power plant data processing device includes the work information presentation unit, The work information presentation unit presents work information for the device corresponding to each stage of the startup sequence during the startup sequence. The power plant data processing apparatus according to claim 3 .

6. The start-up sequence refers to a control in which each stage of the shutdown control of the power plant is sequentially performed by setting a plurality of control targets according to a predetermined order or procedure. The power plant data processing apparatus according to claim 1 .

7. Using an equipment database in which the importance of monitoring a plurality of equipment included in the power plant in the startup sequence of the power plant is registered for each of the equipment, controlling the equipment so as to satisfy a plurality of control targets at each stage of startup control of the power plant according to a predetermined order or procedure by the startup sequence; inputting device information representing one or more devices presumed to be the cause of the interruption of a startup sequence when the startup sequence is interrupted in a case where the startup sequence is performed after the power plant is shut down; updating the importance registered in the device database based on the device information; Including, presenting task information representing a task to be performed regarding the execution of a next startup sequence for the startup sequence based on the device information and the importance; changing the control target based on the device information and the importance; Includes at least one of A power plant data processing method comprising:

8. Using an equipment database in which the importance of monitoring a plurality of equipment included in the power plant in the startup sequence of the power plant is registered for each of the equipment, The startup sequence includes controlling the equipment so as to satisfy a plurality of control targets at each stage of startup control of the power plant according to a predetermined order or procedure; inputting device information representing one or more devices presumed to be the cause of the interruption of a startup sequence when the startup sequence is interrupted in a case where the startup sequence is performed after the power plant is shut down; updating the importance registered in the device database based on the device information; and causing a computer to execute the above. presenting task information representing a task to be performed regarding the execution of a next startup sequence for the startup sequence based on the device information and the importance; changing the control target based on the device information and the importance; A program for causing the computer to execute at least one of the above.