Shovel

The excavator's control system addresses arm stoppage issues by generating a boom command to raise the boom when specific conditions are met, ensuring continuous operation by preventing arm stoppage.

JP2024159066APending Publication Date: 2024-11-08SUMITOMO HEAVY IND LTD
View PDF 7 Cites 0 Cited by

Patent Information

Application Number
JP2023074814
Authority / Receiving Office
JP · JP
Patent Type
Applications
Current Assignee / Owner
Filing Date
2023-04-28
Publication Date
2024-11-08

AI Technical Summary

Technical Problem

Conventional excavators face issues where the arm operation can stop due to the arm cylinder's position, boom cylinder's position, bucket contact with the ground, and force direction, leading to operational failures.

Method used

The excavator includes a control system with a controller that generates a boom command value to raise the boom when the arm cylinder pressure exceeds a predetermined value and its speed is below a threshold, preventing arm stoppage by automatically adjusting the boom operation.

Benefits of technology

This solution effectively prevents the arm from stopping, ensuring continuous operation by automatically raising the boom to maintain functionality even when the arm cylinder pressure reaches critical levels.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 2024159066000001_ABST
    Figure 2024159066000001_ABST
Patent Text Reader

Abstract

To prevent such a problem that operation of an arm stops although the operation for opening the arm is performed.SOLUTION: A shovel comprises: an undercarriage; an upper slewing body rotatably mounted on the undercarriage; attachments fitted to the upper slewing body and including a boom, an arm and a bucket; an arm cylinder driving the arm; and a control device which generates a boom-commanding value for raising the boom when the pressure on the rod side of the arm cylinder is higher than a predetermined value and the speed of the arm is lower than a threshold level.SELECTED DRAWING: Figure 1
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to a shovel. [Background technology]

[0002] In conventional excavators, a technique is known for controlling the operation of the bucket cylinder or the boom cylinder so as to adjust the vertical position of the bucket relative to a target construction surface set at a predetermined working portion of the bucket in accordance with the operation of the arm cylinder. [Prior art documents] [Patent documents]

[0003] [Patent Document 1] International Publication No. 2020 / 095935 Summary of the Invention [Problem to be solved by the invention]

[0004] In the conventional technology described above, depending on the positional relationship between the position of the arm cylinder top pin, the position of the boom cylinder top pin, and the position where the bucket contacts the ground, as well as the direction of force at each position, the arm may not open even when an operation to open the arm is being performed.

[0005] In view of the above circumstances, an object of the present invention is to prevent the arm operation from stopping. [Means for solving the problem]

[0006] A shovel according to an embodiment of the present invention comprises a lower running body, an upper rotating body mounted on the lower running body so as to be freely rotatable, an attachment attached to the upper rotating body and including a boom, an arm, and a bucket, an arm cylinder that drives the arm, and a control device that generates a boom command value for raising the boom when the pressure on the rod side of the arm cylinder is greater than a predetermined value and the speed of the arm is equal to or less than a threshold value. Effect of the Invention

[0007] This makes it possible to prevent the arm from stopping. [Brief description of the drawings]

[0008] [Figure 1] FIG. 2 is a top view of the shovel according to the embodiment. [Diagram 2] FIG. 2 is a side view of the shovel according to the present embodiment. [Diagram 3] FIG. 1 is a diagram showing a configuration example of a hydraulic system mounted on a shovel. [Figure 4] FIG. 2 illustrates an example of the configuration of a controller. [Diagram 5] FIG. 2 is a first functional block diagram showing an example of a detailed configuration related to a machine control function of a shovel. [Figure 6] FIG. 2 is a second functional block diagram showing an example of a detailed configuration related to a machine control function of the shovel. [Figure 7] FIG. 1 is a diagram illustrating the state of a shovel. [Figure 8] 4 is a flowchart illustrating the operation of a controller of the shovel. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0009] Hereinafter, an embodiment will be described with reference to the drawings.

[0010] First, an overview of a shovel 100 according to this embodiment will be described with reference to Figs. 1 and 2.

[0011] 1 and 2 are a top view and a side view, respectively, of a shovel 100 according to this embodiment.

[0012] The excavator 100 in this embodiment comprises a lower running body 1, an upper rotating body 3 mounted on the lower running body 1 so as to be freely rotatable via a rotating mechanism 2, a boom 4, an arm 5, and a bucket 6 as an example of an end attachment that constitute an attachment AT, and a cabin 10.

[0013] The lower traveling body 1 includes a pair of left and right crawlers 1C, specifically, a left crawler 1CL and a right crawler 1CR. The lower traveling body 1 causes the excavator 100 to travel by hydraulically driving the left crawler 1CL and the right crawler 1CR by traveling hydraulic motors 2M (traveling hydraulic motors 2ML, 2MR).

[0014] The upper rotating body 3 rotates relative to the lower traveling body 1 by being driven by a swing hydraulic motor 2A.

[0015] The boom 4 is pivotally attached to the front center of the upper rotating body 3 so as to be able to tilt up and down, an arm 5 is pivotally attached to the tip of the boom 4 so as to be able to rotate up and down, and a bucket 6 is pivotally attached to the tip of the arm 5 so as to be able to rotate up and down. The boom 4, arm 5, and bucket 6 are hydraulically driven by a boom cylinder 7, an arm cylinder 8, and a bucket cylinder 9, which serve as hydraulic actuators, respectively.

[0016] The cabin 10 is a cab in which an operator sits, and is mounted on the front left side of the upper rotating body 3.

[0017] In response to operation by an operator in the cabin 10, the shovel 100 operates an actuator (e.g., a hydraulic actuator) to drive operating elements (driven elements) such as the lower running body 1, upper rotating body 3, boom 4, arm 5, and bucket 6.

[0018] Moreover, the shovel 100 may be remotely operated by an operator of a predetermined external device instead of or in addition to being operated by the operator of the cabin 10. The predetermined external device may include, for example, a management device that manages the operating status, etc. of the shovel 100, and a mobile terminal, etc. used by a supervisor, a worker, etc. at the work site.

[0019] The management device may be, for example, a cloud server installed outside the work site of the shovel 100, or may be an edge server or a computer terminal installed at the work site of the shovel 100. In this case, the shovel 100 transmits, for example, image information (captured image) output by an imaging device included in the spatial recognition device 70 described later to the external device.

[0020] Moreover, various information images (e.g., various setting screens, etc.) displayed on the display device D1 of the shovel 100 described later may also be displayed on a display device provided in the external device. This allows the operator to remotely operate the shovel 100 while checking the contents displayed on the display device provided in the external device, for example.

[0021] The shovel 100 may operate actuators and drive operating elements such as the lower running body 1, upper rotating body 3, boom 4, arm 5, and bucket 6 in response to a remote control signal indicating the content of the remote control received from an external device.

[0022] When the excavator 100 is remotely operated, the inside of the cabin 10 may be unmanned. In the following description, it is assumed that the operation by the operator includes at least one of the operation of the operation device 26 by the operator of the cabin 10 and the remote operation by the operator of an external device.

[0023] The shovel 100 may automatically operate the actuators regardless of the operation by the operator. This allows the shovel 100 to realize a function of automatically operating at least some of the operating elements such as the lower traveling body 1, the upper rotating body 3, the boom 4, the arm 5, and the bucket 6 (hereinafter, referred to as an "automatic driving function" or a "machine control function").

[0024] The automatic driving function may include a function (so-called "semi-automatic driving function") that automatically operates operation elements (actuators) other than the operation target operation element (actuator) in response to the operator's operation of the operation device 26 or remote operation. The automatic driving function may also include a function (so-called "fully automatic driving function") that automatically operates at least a part of the multiple operation elements (actuators) on the premise that the operator does not operate the operation device 26 or remote operation.

[0025] The machine control function may also include a function to control the operation of the bucket cylinder and boom cylinder so as to adjust the vertical position of the bucket 6 relative to a design plane set at a specified working portion in accordance with the operation of the arm cylinder 8.

[0026] Furthermore, in this embodiment, the operation of the boom 4 is controlled so that the arm 5 operates in accordance with the operation, regardless of the relationship between the position of the arm cylinder top pin 8a, the position of the boom cylinder top pin 7a, and the position where the bucket 6 contacts the ground, or the direction of force at each position.

[0027] Specifically, in this embodiment, when the state of the arm 5 satisfies a predetermined condition, a boom command value is generated for automatically raising the boom 4. Details of the control of the operation of the boom 4 in this embodiment will be described later.

[0028] When the fully automatic driving function is enabled in the shovel 100, the inside of the cabin 10 may be unmanned. The automatic driving function may include a function ("gesture operation function") in which the shovel 100 recognizes gestures of people, such as workers, around the shovel 100 and automatically operates at least a part of a plurality of operating elements (hydraulic actuators) according to the contents of the recognized gesture.

[0029] The semi-automatic driving function, the fully automatic driving function, and the gesture operation function may include a mode in which the operation content of the operation element (hydraulic actuator) that is the target of the automatic driving is automatically determined according to a predefined rule. The semi-automatic driving function, the fully automatic driving function, and the gesture operation function may include a mode in which the excavator 100 autonomously makes various decisions and autonomously determines the operation content of the operation element (hydraulic actuator) that is the target of the automatic driving according to the decision results (so-called "autonomous driving function").

[0030] The control system of the shovel 100 includes a controller 30, a spatial recognition device 70, an orientation detection device 71, an information input device 72, a positioning device 73, a display device D1, an audio output device D2, a boom angle sensor S1, an arm angle sensor S2, a bucket angle sensor S3, a machine body inclination sensor S4, and a turning angular velocity sensor S5.

[0031] The spatial recognition device 70 is configured to recognize objects present in a three-dimensional space around the shovel 100, and measure (calculate) a positional relationship such as a distance from the spatial recognition device 70 or the shovel 100 to the recognized object. The spatial recognition device 70 may include, for example, an ultrasonic sensor, a millimeter wave radar, a monocular camera, a stereo camera, a LIDAR (Light Detecting and Ranging), a distance image sensor, an infrared sensor, and the like.

[0032] In this embodiment, the spatial recognition device 70 includes a forward recognition sensor 70F attached to the front end of the upper surface of the cabin 10, a rear recognition sensor 70B attached to the rear end of the upper surface of the upper rotating body 3, a left recognition sensor 70L attached to the left end of the upper surface of the upper rotating body 3, and a right recognition sensor 70R attached to the right end of the upper surface of the upper rotating body 3. In addition, an upward recognition sensor that recognizes objects present in the space above the upper rotating body 3 may be attached to the excavator 100.

[0033] The orientation detection device 71 detects information regarding the relative relationship between the orientation of the upper rotating body 3 and the orientation of the lower running body 1 (for example, the rotation angle of the upper rotating body 3 with respect to the lower running body 1).

[0034] The orientation detection device 71 may include, for example, a combination of a geomagnetic sensor attached to the lower running body 1 and a geomagnetic sensor attached to the upper rotating body 3. The orientation detection device 71 may also include a combination of a GNSS receiver attached to the lower running body 1 and a GNSS receiver attached to the upper rotating body 3.

[0035] In addition, the orientation detection device 71 may include a rotary encoder, a rotary position sensor, etc. capable of detecting the relative rotation angle of the upper rotating body 3 with respect to the lower running body 1, that is, the above-mentioned rotation angular velocity sensor S5, and may be attached, for example, to a center joint provided in association with the rotation mechanism 2 that realizes relative rotation between the lower running body 1 and the upper rotating body 3.

[0036] Furthermore, the orientation detection device 71 may include a camera attached to the upper rotating body 3. In this case, the orientation detection device 71 detects an image of the lower traveling body 1 included in the input image by applying known image processing to an image (input image) captured by the camera attached to the upper rotating body 3.

[0037] The orientation detection device 71 may use a known image recognition technology to detect an image of the lower traveling body 1, thereby identifying the longitudinal direction of the lower traveling body 1, and derive the angle formed between the direction of the front-rear axis of the upper rotating body 3 and the longitudinal direction of the lower traveling body 1. In this case, the direction of the front-rear axis of the upper rotating body 3 can be derived from the mounting position of the camera. In particular, since the crawler 1C protrudes from the upper rotating body 3, the orientation detection device 71 can identify the longitudinal direction of the lower traveling body 1 by detecting an image of the crawler 1C.

[0038] When the upper rotating body 3 is configured to be rotated by an electric motor instead of the hydraulic rotating motor 2A, the direction detection device 71 may be a resolver.

[0039] The information input device 72 is provided within reach of an operator seated in the cabin 10, accepts various operational inputs by the operator, and outputs a signal corresponding to the operational input to the controller 30. For example, the information input device 72 may include a touch panel mounted on a display of a display device that displays various information images. Furthermore, for example, the information input device 72 may include a button switch, a lever, a toggle, etc., that are provided around the display device D1. Furthermore, the information input device 72 may include a knob switch (for example, a switch NS provided on the left operating lever 26L, etc.) that is provided on the operating device 26. A signal corresponding to the operation content of the information input device 72 is taken into the controller 30.

[0040] The switch NS is, for example, a push button switch provided at the tip of the left operation lever 26L. The operator can operate the left operation lever 26L while pressing the switch NS. The switch NS may also be provided on the right operation lever 26R or at another position within the cabin 10.

[0041] The positioning device 73 measures the position and orientation of the upper rotating body 3. The positioning device 73 is, for example, a Global Navigation Satellite System (GNSS) compass, which detects the position and orientation of the upper rotating body 3, and a detection signal corresponding to the position and orientation of the upper rotating body 3 is input to the controller 30. Furthermore, the function of detecting the orientation of the upper rotating body 3, which is one of the functions of the positioning device 73, may be substituted by a direction sensor attached to the upper rotating body 3.

[0042] The display device D1 is provided at a location where it can be easily viewed by an operator seated in the cabin 10, and displays various information images under the control of the controller 30. The display device D1 may be connected to the controller 30 via an in-vehicle communication network such as a Controller Area Network (CAN), or may be connected to the controller 30 via a one-to-one dedicated line.

[0043] The audio output device D2 is provided, for example, in the cabin 10, connected to the controller 30, and outputs audio under the control of the controller 30. The audio output device D2 is, for example, a speaker or a buzzer. The audio output device D2 outputs various information by audio in response to an audio output command from the controller 30.

[0044] The boom angle sensor S1 is attached to the boom 4 and detects the elevation / depression angle of the boom 4 relative to the upper rotating body 3 (hereinafter referred to as the "boom angle"), for example, the angle formed by a straight line connecting the fulcrums at both ends of the boom 4 relative to the rotation plane of the upper rotating body 3 in a side view. The boom angle sensor S1 may include, for example, a rotary encoder, an acceleration sensor, a six-axis sensor, an IMU (Inertial Measurement Unit), etc., and the same applies to the arm angle sensor S2, bucket angle sensor S3, and machine body inclination sensor S4 below. A detection signal corresponding to the boom angle by the boom angle sensor S1 is input to the controller 30.

[0045] The arm angle sensor S2 is attached to the arm 5 and detects the rotation angle of the arm 5 relative to the boom 4 (hereinafter referred to as the “arm angle”), for example, the angle formed by a line connecting the fulcrums at both ends of the arm 5 with respect to a line connecting the fulcrums at both ends of the boom 4 in a side view. A detection signal corresponding to the arm angle by the arm angle sensor S2 is input to the controller 30.

[0046] The bucket angle sensor S3 is attached to the bucket 6 and detects the rotation angle of the bucket 6 with respect to the arm 5 (hereinafter referred to as the “bucket angle”), for example, the angle formed by a line connecting the fulcrum of the bucket 6 and the tip (blade tip) with respect to a line connecting the fulcrums of both ends of the arm 5 in a side view. A detection signal corresponding to the bucket angle by the bucket angle sensor S3 is input to the controller 30.

[0047] The machine body tilt sensor S4 detects the tilt state of the machine body (e.g., the upper rotating body 3) with respect to a horizontal plane. The machine body tilt sensor S4 is attached, for example, to the upper rotating body 3, and detects the tilt angles around two axes in the forward / backward and left / right directions (hereinafter, "fore / aft tilt angle" and "left / right tilt angle") of the shovel 100 (i.e., the upper rotating body 3). The machine body tilt sensor S4 may include, for example, an acceleration sensor, a gyro sensor (angular velocity sensor), a six-axis sensor, an IMU, etc. A detection signal corresponding to the tilt angle (fore / aft tilt angle and left / right tilt angle) by the machine body tilt sensor S4 is input to the controller 30.

[0048] The turning angular velocity sensor S5 is attached to the upper rotating body 3 and outputs detection information related to the turning state of the upper rotating body 3. The turning angular velocity sensor S5 detects, for example, the turning angular velocity and turning angle of the upper rotating body 3. The turning angular velocity sensor S5 includes, for example, a gyro sensor, a resolver, a rotary encoder, etc.

[0049] If the vehicle tilt sensor S4 includes a gyro sensor, a six-axis sensor, an IMU, or the like capable of detecting angular velocities around three axes, the turning state (e.g., turning angular velocity) of the upper rotating body 3 may be detected based on the detection signal of the vehicle tilt sensor S4. In this case, the turning angular velocity sensor S5 may be omitted.

[0050] Next, a configuration example of a hydraulic system mounted on the shovel 100 will be described with reference to Fig. 3. Fig. 3 is a diagram showing a configuration example of a hydraulic system mounted on the shovel. In Fig. 3, mechanical power transmission lines, hydraulic oil lines, pilot lines, and electrical control lines are indicated by double lines, solid lines, dashed lines, and dotted lines, respectively.

[0051] The hydraulic system circulates hydraulic oil from the left main pump 14L driven by the engine 11 to the hydraulic oil tank via the left center bypass line 40L or the left parallel line 42L, and also circulates hydraulic oil from the right main pump 14R driven by the engine 11 to the hydraulic oil tank via the right center bypass line 40R or the right parallel line 42R.

[0052] The left center bypass line 40L is a hydraulic oil line that passes through control valves 171, 173, 175L, and 176L arranged in the control valve unit 17. The right center bypass line 40R is a hydraulic oil line that passes through control valves 172, 174, 175R, and 176R arranged in the control valve unit 17.

[0053] The control valve 171 is a spool valve that switches the flow of hydraulic oil to supply the hydraulic oil discharged by the left main pump 14L to the left traveling hydraulic motor 1L and to discharge the hydraulic oil discharged by the left traveling hydraulic motor 2ML to the hydraulic oil tank.

[0054] The control valve 172 is a spool valve that switches the flow of hydraulic oil to supply the hydraulic oil discharged by the right main pump 14R to the right traveling hydraulic motor 2MR and to discharge the hydraulic oil discharged by the right traveling hydraulic motor 2MR to the hydraulic oil tank.

[0055] The control valve 173 is a spool valve that switches the flow of hydraulic oil to supply the hydraulic oil discharged by the left main pump 14L to the swing hydraulic motor 2A and to discharge the hydraulic oil discharged by the swing hydraulic motor 2A to the hydraulic oil tank.

[0056] The control valve 174 is a spool valve that switches the flow of hydraulic oil to supply the hydraulic oil discharged by the right main pump 14R to the bucket cylinder 9 and to discharge the hydraulic oil in the bucket cylinder 9 to the hydraulic oil tank.

[0057] The control valve 175L is a spool valve that switches the flow of hydraulic oil to supply the hydraulic oil discharged from the left main pump 14L to the boom cylinder 7.

[0058] The control valve 175R is a spool valve that switches the flow of hydraulic oil to supply the hydraulic oil discharged by the right main pump 14R to the boom cylinder 7 and to discharge the hydraulic oil in the boom cylinder 7 to the hydraulic oil tank.

[0059] The control valve 176L is a spool valve that switches the flow of hydraulic oil to supply the hydraulic oil discharged by the left main pump 14L to the arm cylinder 8 and to discharge the hydraulic oil in the arm cylinder 8 to the hydraulic oil tank.

[0060] The control valve 176R is a spool valve that switches the flow of hydraulic oil to supply the hydraulic oil discharged by the right main pump 14R to the arm cylinder 8 and to discharge the hydraulic oil in the arm cylinder 8 to the hydraulic oil tank.

[0061] The left parallel conduit 42L is a hydraulic oil line that runs parallel to the left center bypass conduit 40L. The left parallel conduit 42L can supply hydraulic oil to a downstream control valve when the flow of hydraulic oil through the left center bypass conduit 40L is restricted or blocked by any of the control valves 171, 173, 175L.

[0062] The right parallel conduit 42R is a hydraulic oil line that runs parallel to the right center bypass conduit 40R. The right parallel conduit 42R can supply hydraulic oil to a downstream control valve when the flow of hydraulic oil through the right center bypass conduit 40R is restricted or blocked by any of the control valves 172, 174, 175R.

[0063] The left regulator 13L is configured to be able to control the discharge amount of the left main pump 14L. In this embodiment, the left regulator 13L controls the discharge amount of the left main pump 14L, for example, by adjusting the swash plate tilt angle of the left main pump 14L in accordance with the discharge pressure of the left main pump 14L.

[0064] The right regulator 13R is configured to be able to control the discharge amount of the right main pump 14R. In this embodiment, the right regulator 13R controls the discharge amount of the right main pump 14R, for example, by adjusting the swash plate tilt angle of the right main pump 14R in accordance with the discharge pressure of the right main pump 14R.

[0065] The left regulator 13L reduces the discharge volume by adjusting the swash plate tilt angle of the left main pump 14L in response to an increase in the discharge pressure of the left main pump 14L, for example. The same applies to the right regulator 13R. This is to prevent the pump absorption horsepower, which is expressed as the product of the discharge pressure and the discharge volume, from exceeding the output horsepower of the engine 11. The pump absorption horsepower is the sum of the absorption horsepower of the left main pump 14L and the absorption horsepower of the right main pump 14R.

[0066] The left discharge pressure sensor 28L is an example of a discharge pressure sensor 28, and detects the discharge pressure of the left main pump 14L and outputs the detected value to the controller 30. The same applies to the right discharge pressure sensor 28R.

[0067] The pressure sensor S10 is a pressure sensor for detecting the pressure on the rod side of the arm cylinder 8. The pressure detected by the pressure sensor S10 is used in the process described later.

[0068] Here, the negative control employed in the hydraulic system of FIG. 3 will be described.

[0069] A left throttle 18L is disposed in the left center bypass pipe 40L between the most downstream control valve 176L and the hydraulic oil tank. The flow of hydraulic oil discharged by the left main pump 14L is restricted by the left throttle 18L. The left throttle 18L generates a control pressure for controlling the left regulator 13L. The left control pressure sensor 19L is a sensor for detecting the control pressure, and outputs the detected value to the controller 30.

[0070] A right throttle 18R is disposed in the right center bypass pipe 40R between the most downstream control valve 176R and the hydraulic oil tank. The flow of hydraulic oil discharged by the right main pump 14R is restricted by the right throttle 18R. The right throttle 18R generates a control pressure for controlling the right regulator 13R. The right control pressure sensor 19R is a sensor for detecting the control pressure, and outputs the detected value to the controller 30.

[0071] The controller 30 controls the discharge rate of the left main pump 14L by adjusting the swash plate tilt angle of the left main pump 14L in response to the control pressure. The controller 30 decreases the discharge rate of the left main pump 14L as the control pressure increases, and increases the discharge rate of the left main pump 14L as the control pressure decreases. The discharge rate of the right main pump 14R is controlled in a similar manner.

[0072] Specifically, as shown in FIG. 3, when the excavator 100 is in a standby state in which none of the hydraulic actuators are being operated, the hydraulic oil discharged by the left main pump 14L passes through the left center bypass pipe 40L and reaches the left throttle 18L.

[0073] The flow of hydraulic oil discharged from the left main pump 14L increases the control pressure generated upstream of the left throttle 18L. As a result, the controller 30 reduces the discharge amount of the left main pump 14L to the allowable minimum discharge amount, thereby suppressing the pressure loss (pumping loss) that occurs when the discharged hydraulic oil passes through the left center bypass pipe 40L.

[0074] On the other hand, when any of the hydraulic actuators is operated, the hydraulic oil discharged from the left main pump 14L flows into the hydraulic actuator to be operated via the control valve corresponding to the hydraulic actuator to be operated. Then, the flow of the hydraulic oil discharged from the left main pump 14L reduces or eliminates the amount of hydraulic oil reaching the left throttle 18L, lowering the control pressure generated upstream of the left throttle 18L.

[0075] As a result, the controller 30 increases the discharge rate of the left main pump 14L to circulate sufficient hydraulic oil to the hydraulic actuator to be operated, and ensures the drive of the hydraulic actuator to be operated. The same applies to the hydraulic oil discharged by the right main pump 14R.

[0076] 3 can suppress unnecessary energy consumption in each of the left main pump 14L and the right main pump 14R in the standby state. The unnecessary energy consumption includes pumping loss caused in the left center bypass line 40L by the hydraulic oil discharged from the left main pump 14L, and pumping loss caused in the right center bypass line 40R by the hydraulic oil discharged from the right main pump 14R.

[0077] Furthermore, when the hydraulic actuators are operated, the hydraulic system in FIG. 3 can supply necessary and sufficient hydraulic oil from each of the left main pump 14L and the right main pump 14R to the hydraulic actuators to be operated.

[0078] Next, a configuration for automatically operating the actuator will be described. The boom operation lever 26A is an example of an electric operation lever serving as the operation device 26, and is used to operate the boom 4.

[0079] The boom operation lever 26A detects the operation direction and operation amount, and outputs the detected operation direction and operation amount as operation data (electrical signal) to the controller 30. During manual control, when the boom operation lever 26A is operated in the boom raising direction, the controller 30 controls the opening degree of the proportional valve 31AL in accordance with the operation amount of the boom operation lever 26A.

[0080] As a result, the hydraulic oil discharged by the pilot pump 15 is used to apply a pilot pressure corresponding to the amount of operation of the boom operation lever 26A to the right pilot port of the control valve 175L and the left pilot port of the control valve 175R.

[0081] Furthermore, during manual control, when the boom operation lever 26A is operated in the boom lowering direction, the controller 30 controls the opening of the proportional valve 31AR in accordance with the amount of operation of the boom operation lever 26A. As a result, the hydraulic oil discharged by the pilot pump 15 is used to apply a pilot pressure corresponding to the amount of operation of the boom operation lever 26A to the right pilot port of the control valve 175R.

[0082] The proportional valves 31AL and 31AR constitute a boom proportional valve 31A, which is an example of the proportional valve 31 as a solenoid valve. The proportional valve 31AL operates in response to a current command adjusted by the controller 30.

[0083] The controller 30 adjusts the pilot pressure by the hydraulic oil introduced from the pilot pump 15 via the proportional valve 31AL to the right pilot port of the control valve 175L and the left pilot port of the control valve 175R.

[0084] The proportional valve 31AR operates according to a current command adjusted by the controller 30. The controller 30 adjusts the pilot pressure by the hydraulic oil introduced from the pilot pump 15 to the right pilot port of the control valve 175R via the proportional valve 31AR. The proportional valves 31AL and 31AR can adjust the pilot pressure so that the control valves 175L and 175R can be stopped at any valve position.

[0085] With this configuration, during automatic excavation control, the controller 30 can supply the hydraulic oil discharged by the pilot pump 15 to the right pilot port of the control valve 175L and the left pilot port of the control valve 175R via the proportional valve 31AL, regardless of the boom raising operation by the operator. In other words, the controller 30 can automatically raise the boom 4.

[0086] Furthermore, the controller 30 can supply the hydraulic oil discharged by the pilot pump 15 to the right pilot port of the control valve 175R via the proportional valve 31AR, regardless of the boom lowering operation by the operator. That is, the controller 30 can automatically lower the boom 4.

[0087] The arm operating lever 26B is another example of an electric operating lever serving as the operating device 26, and is used to operate the arm 5. The arm operating lever 26B detects the operating direction and amount of operation, and outputs the detected operating direction and amount of operation to the controller 30 as operation data (electrical signal).

[0088] During manual control, when the arm operating lever 26B is operated in the arm opening direction, the controller 30 controls the opening degree of the proportional valve 31BR according to the amount of operation of the arm operating lever 26B. As a result, the hydraulic oil discharged by the pilot pump 15 is used to apply pilot pressure according to the amount of operation of the arm operating lever 26B to the left pilot port of the control valve 176L and the right pilot port of the control valve 176R.

[0089] Furthermore, during manual control, when the arm operating lever 26B is operated in the arm closing direction, the controller 30 controls the opening degree of the proportional valve 31BL in accordance with the amount of operation of the arm operating lever 26B. As a result, the hydraulic oil discharged by the pilot pump 15 is used to apply a pilot pressure in accordance with the amount of operation of the arm operating lever 26B to the right pilot port of the control valve 176L and the left pilot port of the control valve 176R.

[0090] The proportional valves 31BL and 31BR constitute an arm proportional valve 31B, which is an example of the proportional valve 31. The proportional valve 31BL operates in response to a current command adjusted by the controller 30. The controller 30 adjusts the pilot pressure by the hydraulic oil introduced from the pilot pump 15 via the proportional valve 31BL to the right pilot port of the control valve 176L and the left pilot port of the control valve 176R.

[0091] The proportional valve 31BR operates according to a current command adjusted by the controller 30. The controller 30 adjusts the pilot pressure by the hydraulic oil introduced from the pilot pump 15 to the left pilot port of the control valve 176L and the right pilot port of the control valve 176R via the proportional valve 31BR. The proportional valves 31BL, 31BR can adjust the pilot pressure so that the control valves 176L, 176R can be stopped at any valve position.

[0092] With this configuration, the controller 30 can supply the hydraulic oil discharged by the pilot pump 15 to the right pilot port of the control valve 176L and the left pilot port of the control valve 176R via the proportional valve 31BL, regardless of the arm closing operation by the operator. In other words, the controller 30 can automatically close the arm 5.

[0093] Furthermore, the controller 30 can supply the hydraulic oil discharged by the pilot pump 15 to the left pilot port of the control valve 176L and the right pilot port of the control valve 176R via the proportional valve 31BR, regardless of the arm opening operation by the operator. In other words, the controller 30 can automatically open the arm 5.

[0094] As a result, in the automatic excavation control, the arm cylinder 8 and the boom cylinder 7 automatically operate in accordance with the amount of operation of the arm operating lever 26B, thereby executing speed control or position control of the working part.

[0095] The excavator 100 may be equipped with a configuration for automatically rotating the upper rotating body 3 left and right, a configuration for automatically opening and closing the bucket 6, and a configuration for automatically moving the lower traveling body 1 forward and backward.

[0096] In this case, the hydraulic system portion relating to the swing hydraulic motor 2A, the hydraulic system portion relating to the operation of the bucket cylinder 9, the hydraulic system portion relating to the operation of the left-side traveling hydraulic motor 1L, and the hydraulic system portion relating to the operation of the right-side traveling hydraulic motor 1R may be configured in the same manner as the hydraulic system portion relating to the operation of the boom cylinder 7, etc.

[0097] Next, a configuration example of the controller 30 will be described with reference to Fig. 4. Fig. 4 is a diagram showing a configuration example of the controller.

[0098] In FIG. 4, the controller 30 is configured to receive signals output from at least one of the attitude detection device, the operation device 26, the spatial recognition device 70, the orientation detection device 71, the information input device 72, the positioning device 73, and the switch NS, perform various calculations, and output control commands to at least one of the proportional valve 31, the display device D1, and the audio output device D2, etc.

[0099] The attitude detection device includes a boom angle sensor S1, an arm angle sensor S2, a bucket angle sensor S3, a machine body inclination sensor S4, and a turning angular velocity sensor S5.

[0100] The controller 30 has a position calculation unit 30A, a trajectory acquisition unit 30B, and an automatic control unit 30C as functional elements. Each functional element may be configured with hardware or software. The position calculation unit 30A, the trajectory acquisition unit 30B, and the automatic control unit 30C are shown separately for convenience of explanation, but they do not need to be physically separated, and may be configured entirely or partially with a common software component or hardware component.

[0101] The position calculation unit 30A is configured to calculate the position of the positioning target. In this embodiment, the position calculation unit 30A calculates a coordinate point of a predetermined part of the attachment in a reference coordinate system. The predetermined part is, for example, the tip of the bucket 6.

[0102] Specifically, the tip of the claw of the bucket 6 is the tip of the central claw among the multiple claws attached to the tip of the bucket 6. However, the tip of the claw of the bucket 6 may be the tip of the leftmost claw among the multiple claws attached to the tip of the bucket 6, or the tip of the rightmost claw among the multiple claws attached to the tip of the bucket 6.

[0103] The origin of the reference coordinate system is, for example, the intersection of the rotation axis and the ground contact surface of the shovel 100. The reference coordinate system is, for example, an XYZ Cartesian coordinate system and has an X axis parallel to the front-rear axis of the shovel 100, a Y axis parallel to the left-right axis of the shovel 100, and a Z axis parallel to the rotation axis of the shovel 100. The position calculation unit 30A calculates the coordinate point of the tip of the bucket 6 from, for example, the respective rotation angles of the boom 4, the arm 5, and the bucket 6.

[0104] The position calculation unit 30A may calculate the coordinate point of the tip of the claw at the left end and the coordinate point of the tip of the claw at the right end, in addition to the coordinate point of the tip of the claw at the center. In this case, the position calculation unit 30A may use the output of the machine body tilt sensor S4.

[0105] The trajectory acquisition unit 30B is configured to acquire a target trajectory, which is a trajectory that a predetermined portion of the attachment follows when the shovel 100 is autonomously operated. In this embodiment, the trajectory acquisition unit 30B acquires a target trajectory that is used when the automatic control unit 30C autonomously operates the shovel 100.

[0106] Specifically, the trajectory acquisition unit 30B derives the target trajectory based on data related to the design surface stored in the non-volatile storage device. The trajectory acquisition unit 30B may derive the target trajectory based on information related to the topography around the shovel 100 recognized by the spatial recognition device 70. Alternatively, the trajectory acquisition unit 30B may derive information related to the past trajectory of the tip of the bucket 6 from the past output of the attitude detection device stored in the volatile storage device, and derive the target trajectory based on the information. Alternatively, the trajectory acquisition unit 30B may derive the target trajectory based on the current position of a predetermined portion of the attachment and data related to the design surface.

[0107] The automatic control unit 30C is configured to autonomously operate the shovel 100. In this embodiment, when a predetermined start condition is satisfied, the automatic control unit 30C is configured to move a predetermined portion of the attachment along the target trajectory acquired by the trajectory acquisition unit 30B. Specifically, when the operating device 26 is operated with the switch NS pressed, the automatic control unit 30C autonomously operates the shovel 100 so that the predetermined portion moves along the target trajectory.

[0108] In this embodiment, the automatic control unit 30C is configured to autonomously operate the actuator to assist the operator in manually operating the shovel.

[0109] For example, when an operator manually performs an arm closing operation or an arm opening operation while pressing the switch NS, the automatic control unit 30C may autonomously extend and retract at least one of the boom cylinder 7, the arm cylinder 8, and the bucket cylinder 9 so that the target trajectory coincides with the position of the tip of the bucket 6. In this case, the operator can close the arm 5 or open the arm while aligning the tip of the bucket 6 with the target trajectory simply by operating the left operating lever 26L, for example, in the arm closing direction or arm opening direction.

[0110] In this embodiment, the automatic control unit 30C can autonomously operate each actuator by individually adjusting the pilot pressure acting on the control valve corresponding to each actuator by giving a control command (current command) to the proportional valve 31. For example, at least one of the boom cylinder 7 and the bucket cylinder 9 can be operated regardless of whether the right operating lever 26R is tilted or not.

[0111] Next, the machine control function of the shovel 100 will be described with reference to Fig. 5 and Fig. 6. Fig. 5 is a first functional block diagram showing an example of a detailed configuration related to the machine control function of the shovel. Fig. 6 is a second functional block diagram showing an example of a detailed configuration related to the machine control function of the shovel.

[0112] The controller 30 includes, as functional units related to the machine control function, an operation content acquisition unit 3001, a target construction surface acquisition unit 3002, a target trajectory setting unit 3003, a current position calculation unit 3004, a target position calculation unit 3005, an operation command generation unit 3006, a pilot command generation unit 3007, an attitude angle calculation unit 3008, and an arm state determination unit 3009. For example, when the switch NS is pressed, these functional units repeatedly execute the operations described below for each predetermined control period.

[0113] The operation content acquisition unit 3001 acquires operation content related to the operation of the arm 5 at the left operation lever 26L (i.e., tilting operation in the forward and backward directions) based on an electric signal captured from the arm operation lever 26B. For example, the operation content acquisition unit 3001 acquires (calculates) the operation direction (whether it is an arm opening operation or an arm closing operation) and the operation amount as the operation content.

[0114] The target construction surface acquisition unit 3002 acquires data on the design surface (target construction surface) from, for example, an internal memory or a predetermined external storage device.

[0115] The target trajectory setting unit 3003 sets information on a target trajectory of the control reference of the bucket 6 for moving the tip of the attachment AT, i.e., the control reference of the bucket 6, along the design surface based on data on the design surface. For example, the target trajectory setting unit 3003 may set the inclination angle in the front-to-rear direction of the design surface with respect to the body (upper rotating body 3) of the shovel 100 as the information on the target trajectory.

[0116] The current position calculation unit 3004 calculates a control reference position (current position) of the bucket 6. Specifically, the control reference position of the bucket 6 may be calculated based on a boom angle β1, an arm angle β2, and a bucket angle β3 calculated by a posture angle calculation unit 3008, which will be described later.

[0117] The target position calculation unit 3005 calculates a target position of the control reference of the bucket 6 based on the operation details (operation direction and operation amount) related to the operation of the arm 5 at the left operating lever 26L, information related to the set target trajectory, and the current position of the control reference of the bucket 6. The target position is a position on the design surface (in other words, the target trajectory) that should be reached in the current control cycle when it is assumed that the arm 5 operates according to the operation direction and operation amount of the arm 5 at the left operating lever 26L. The target position calculation unit 3005 may calculate the target position of the control reference of the bucket 6 using, for example, a map, an arithmetic expression, or the like stored in advance in a non-volatile internal memory or the like.

[0118] The operation command generating unit 3006 generates a command value β related to the operation of the boom 4 (hereinafter, “boom command value”) based on the target position of the control reference of the bucket 6. 1r , a command value for the operation of the arm 5 (hereinafter, “arm command value”) β 2r , and a command value for the operation of bucket 6 ("bucket command value") β 3r Generate.

[0119] For example, the boom command value β 1r , arm command value β 2r , and the bucket command value β 3r are the boom angle, the arm angle, and the bucket angle, respectively, when the control standard for the bucket 6 achieves the target position. The motion command generating unit 3006 includes a master command value generating unit 3006A and a slave command value generating unit 3006B.

[0120] The boom command value, arm command value, and bucket command value may be angular velocities and angular accelerations of the boom 4, arm 5, and bucket 6 required for the control standard of the bucket 6 to realize a target position.

[0121] The master command value generating unit 3006A generates a command value (hereinafter, "master command value") regarding the operation of an operating element (hereinafter, "master element") that operates in response to a forward / rearward operation input of the left operating lever 26L among the operating elements (boom 4, arm 5, and bucket 6) that constitute the attachment AT.

[0122] In this embodiment, the master element is the arm 5, and the master command value generation unit 3006A generates an arm command value β 2r and outputs it to the arm pilot command generator 3007B, which will be described later.

[0123] Specifically, the master command value generating unit 3006A generates an arm command value β 2r For example, the master command value generating unit 3006A generates the arm command value β 2r Based on a predetermined map or conversion formula that specifies the relationship between the arm command value β 2r may be generated and output.

[0124] The arm command value β output by the master command value generation unit 3006A is 2r When is “0”, the arm 5 moves according to the operation of the operator on the operation device 26 regarding the arm 5, without being controlled by the controller 30.

[0125] Also, the master command value generating unit 3006A may be omitted. As described above, the pilot pressure corresponding to the content of the forward / backward operation of the left operating lever 26L acts on the pilot ports of the control valves 176L, 176R corresponding to the arm cylinder 8 that drives the arm 5 via the shuttle valves 32AL, 32AR.

[0126] The slave command value generating unit 3006B generates a command value (hereinafter, "slave command value") regarding the operation of the slave element, which operates to move the control reference of the bucket 6 along the design surface in accordance with (synchronization with) the operation of the master element (arm 5) among the operating elements that make up the attachment AT.

[0127] In this embodiment, the slave elements are the boom 4 and the bucket 6, and the slave command value generating unit 3006B generates a boom command value β 1r and bucket command value β 3rand output them to a boom pilot command generator 3007A and a bucket pilot command generator 3007C, which will be described later.

[0128] Specifically, the slave command value generating unit 3006B generates an arm command value β 2r At least one of the boom 4 and the bucket 6 operates in accordance with (synchronization with) the operation of the arm 5 corresponding to the boom command value β 1r and bucket command value β 3r Generate.

[0129] This enables the controller 30 to move the control reference for the bucket 6 along the design surface by operating the boom 4 and bucket 6 of the attachment AT in accordance with (i.e., synchronized with) the movement of the arm 5 corresponding to the operation of the arm 5 at the left operating lever 26L.

[0130] In other words, the arm 5 (arm cylinder 8) operates in response to an operation input to the left operating lever 26L, and the movement of the boom 4 (boom cylinder 7) and bucket 6 (bucket cylinder 9) is controlled in accordance with the movement of the arm 5 (arm cylinder 8) so that the tip of the attachment AT, such as the tip of the bucket 6, moves along the design surface.

[0131] The pilot command generating unit 3007 generates a boom command value β 1r , arm command value β 2r , and the bucket command value β 3r The pilot command generating unit 3007 generates command values ​​for pilot pressures (hereinafter, "pilot pressure command values") to be applied to the control valves 174 to 176 in order to realize the boom angle, arm angle, and bucket angle corresponding to the above values. The pilot command generating unit 3007 includes a boom pilot command generating unit 3007A, an arm pilot command generating unit 3007B, and a bucket pilot command generating unit 3007C.

[0132] The boom pilot command generating unit 3007A generates a boom command value β1r and a current boom angle calculated (measured) value by a boom angle calculation unit 3008A described later, the boom pilot command generation unit 3007A generates a pilot pressure command value to be applied to the control valves 175L, 175R corresponding to the boom cylinder 7 that drives the boom 4. Then, the boom pilot command generation unit 3007A outputs a control current corresponding to the generated pilot pressure command value to the proportional valves 31BL, 31BR.

[0133] As a result, as described above, the pilot pressure corresponding to the pilot pressure command value output from the proportional valves 31BL, 31BR acts on the corresponding pilot ports of the control valves 175L, 175R via the shuttle valves 32BL, 32BR. Then, the boom cylinder 7 is operated by the action of the control valves 175L, 175R, and the boom command value β 1r The boom 4 operates to achieve a boom angle corresponding to the above.

[0134] The arm pilot command generating unit 3007B generates an arm command value β 2r and the current arm angle calculated (measured) value by an arm angle calculation unit 3008B described later, a pilot pressure command value to be applied to the control valves 176L, 176R corresponding to the arm cylinder 8 that drives the arm 5 is generated.

[0135] Then, the arm pilot command generating unit 3007B outputs a control current corresponding to the generated pilot pressure command value to the proportional valves 31AL, 31AR. As a result, as described above, the pilot pressure corresponding to the pilot pressure command value output from the proportional valves 31AL, 31AR acts on the corresponding pilot ports of the control valves 176L, 176R via the shuttle valves 32AL, 32AR. Then, the arm cylinder 8 is operated by the action of the control valves 176L, 176R, and the arm command value β 2r The arm 5 operates to achieve an arm angle corresponding to the above.

[0136] The bucket pilot command generating unit 3007C generates a bucket command value β 3rand the current bucket angle calculated (measured) value by a bucket angle calculation unit 3008C described later, a pilot pressure command value to be applied to a control valve 174 corresponding to a bucket cylinder 9 that drives the bucket 6 is generated.

[0137] Then, the bucket pilot command generating unit 3007C outputs a control current corresponding to the generated pilot pressure command value to the proportional valve. As a result, as described above, the pilot pressure corresponding to the pilot pressure command value output from the proportional valve acts on the corresponding pilot port of the control valve 174 via the shuttle valve. Then, the bucket cylinder 9 is operated by the action of the control valve 174, and the bucket command value β 3r The bucket 6 operates to realize a bucket angle corresponding to the above.

[0138] The attitude angle calculation unit 3008 calculates (measures) the (current) boom angle β1, arm angle β2, and bucket angle β3 based on the detection signals of the boom angle sensor S1, the arm angle sensor S2, and the bucket angle sensor S3. The attitude angle calculation unit 3008 includes a boom angle calculation unit 3008A, an arm angle calculation unit 3008B, and a bucket angle calculation unit 3008C.

[0139] The boom angle calculation unit 3008A calculates (measures) the boom angle β1 based on the detection signal received from the boom angle sensor S1.

[0140] The arm angle calculation unit 3008B calculates (measures) the arm angle β2 based on the detection signal received from the arm angle sensor S2.

[0141] The bucket angle calculation unit 3008C calculates (measures) the bucket angle β3 based on the detection signal acquired from the bucket angle sensor S3.

[0142] A detection signal indicating the pressure β4 on the rod side of the arm cylinder 8 detected by the pressure sensor S10 is input to the arm state determination unit 3009. The arm state determination unit 3009 in this embodiment determines whether or not the state of the arm 5 satisfies a predetermined condition.

[0143] Then, when it is determined that the state of the arm 5 satisfies a predetermined condition, the arm state determination unit 3009 causes the slave command value generation unit 3006B to generate a boom command value for raising the boom 4.

[0144] The predetermined condition in this embodiment is that the pressure β4 on the rod side of the arm cylinder 8 is greater than a predetermined value, and the movement of the arm 5 is stopped (the speed of the arm 5 is equal to or less than a threshold value).

[0145] In this embodiment, when the state of the arm 5 satisfies a predetermined condition, a boom command value for raising the boom 4 is generated, and the boom 4 is automatically raised by the controller 30, thereby preventing the operation of the arm 5 from stopping.

[0146] A case where the operation of the arm 5 stops during execution of the machine control function will be described below with reference to Fig. 7. Fig. 7 is a diagram for explaining the state of the shovel.

[0147] 7(A) to 7(C) show a case where the design surface G1 is set below the ground surface G2.

[0148] 7(A) shows a case where the back surface of the bucket 6 does not come into contact with the ground when an operation to open the arm 5 is performed by the operator. In this case, when an operation to open the arm 5 is performed, the controller 30 generates a boom command value related to the operation of the boom 4, which is the slave element, in accordance with the operation of the arm 5.

[0149] Specifically, until the tip of the bucket 6 reaches the design surface G1, the controller 30 generates a boom command value (boom lowering command) for lowering the boom 4 in order to bring the tip of the bucket 6 closer to the design surface G1 in response to the operation of opening the arm 5. Then, when the tip of the bucket 6 reaches the design surface G1, the controller 30 generates a boom command value (boom raising command) for raising the boom 4 in order to move the tip of the bucket 6 along the design surface G1.

[0150] By this control, the excavator 100 can open the arm 5 and move the tip of the bucket 6 along the design surface G1.

[0151] The example in FIG. 7(B) shows a case where the back surface of the bucket 6 comes into contact with the ground G2 when the operator performs an operation to open the arm 5.

[0152] In this case as well, the controller 30 generates a boom command value (boom lowering command) for lowering the boom 4 in response to an operation for opening the arm 5.

[0153] Here, when the arm 5 abuts against the ground surface G2, as shown in FIG. 7(B), the back surface of the bucket 6 is pressed against the ground surface G2 without reaching the design surface G1, and the pressure on the rod side of the arm cylinder 8 increases.

[0154] Then, when the pressure on the rod side of the arm cylinder 8 exceeds a predetermined allowable pressure (relief pressure), oil is discharged from the relief valve in the shovel 100, and the arm 5 cannot be opened. Although the relief valve is not shown, it may be provided, for example, downstream of the right main pump 14R.

[0155] Therefore, in this embodiment, a boom command value is generated to automatically raise the boom 4 before the arm 5 reaches the state shown in Figure 7 (B), and by raising the boom 4, the arm 5 can be opened.

[0156] Specifically, the controller 30 determines whether or not the state of the arm 5 satisfies a predetermined condition. The predetermined condition is that the pressure on the rod side of the arm cylinder 8 is greater than a predetermined value, and the arm 5 is not moving. The predetermined value is a value indicating a pressure lower than the relief pressure. Then, when it is determined that the state of the arm 5 satisfies the predetermined condition, the controller 30 generates a boom command value for automatically raising the boom 4, and controls the boom 4.

[0157] In this embodiment, by controlling the operation of the boom 4 in this manner, even if the design surface G1 is set below the ground surface G2, it becomes possible to automatically raise the boom 4 and open the arm 5 before the pressure on the rod side of the arm cylinder 8 reaches the relief pressure. In other words, the controller 30 of this embodiment can automatically raise the boom 4 and open the arm 5 just before oil is discharged from the relief valve.

[0158] FIG. 7(C) shows a state in which the boom 4 has risen from a state in which the back surface of the bucket 6 has contacted the ground G2, and the arm 5 can be opened.

[0159] In the example of Fig. 7(C), a boom-up command is generated when the back surface of the bucket 6 is in contact with the ground surface G2, so the boom 4 rises. At this time, the pressure on the rod side of the arm cylinder 8 has not reached the relief pressure, so the arm 5 can be opened.

[0160] 8 is a flowchart explaining the operation of the shovel controller. In the shovel 100 of this embodiment, the controller 30 determines whether or not the speed of the arm 5 is equal to or lower than a threshold value (step S801). In other words, the controller 30 determines whether or not the operation of the arm 5 has stopped. Whether or not the operation of the arm 5 has stopped is determined based on a detection signal captured from the arm angle sensor S2, etc.

[0161] In step S801, if the operation of the arm 5 has not stopped, the shovel 100 waits.

[0162] In step S801, when the operation of the arm 5 is stopped, the shovel 100 determines, by the controller 30, whether or not the pressure on the rod side of the arm cylinder 8 has exceeded a predetermined value (step S802).

[0163] The pressure on the rod side of the arm cylinder 8 is detected by a pressure sensor S10. The predetermined value is a value lower than the relief pressure.

[0164] In step S802, if the pressure on the rod side of the arm cylinder 8 is equal to or lower than the predetermined value, the controller 30 returns to step S801.

[0165] In step S802, when the pressure on the rod side of the arm cylinder 8 exceeds a predetermined value, the controller 30 generates a boom command value for raising the boom 4, and raises the boom 4 (step S803).

[0166] 8, it is determined whether the movement of the arm 5 has stopped and then whether the pressure on the rod side of the arm cylinder 8 has exceeded a predetermined value, but the order of determination is not limited to this. The controller 30 may determine whether the pressure on the rod side of the arm cylinder 8 has exceeded a predetermined value and, if it has exceeded the predetermined value, determine whether the movement of the arm 5 has stopped, or the controller 30 may perform these two determinations in parallel.

[0167] In addition, in this embodiment, the case where the design surface is set below the ground surface has been described, but the position of the design surface is not limited to below the ground surface. This embodiment may be applied to a case where, in the operation of opening the arm 5, there is a surface against which the back surface of the bucket 6 comes into contact before the tip of the bucket 6 reaches the design surface.

[0168] In this embodiment, a different predetermined value may be set for the pressure on the bottom side of the arm cylinder 8, and when the pressure on the bottom side of the arm cylinder 8 is greater than the different predetermined value and the arm 5 is not operating, the arm 5 cannot be closed, and control similar to that shown in FIG. 8 may be performed.

[0169] Although the preferred embodiments of the present invention have been described in detail above, the present invention is not limited to the above-described embodiments, and various modifications and substitutions can be made to the above-described embodiments without departing from the scope of the present invention. [Explanation of symbols]

[0170] 26 Operating device 30 Controller 70 Spatial recognition device 100 Shovel 3001 Operation content acquisition section 3006 Operation command generation section 3009 Arm state determination unit

Claims

1. A lower running body; An upper rotating body that is rotatably mounted on the lower traveling body; An attachment attached to the upper rotating body and including a boom, an arm, and a bucket; an arm cylinder that drives the arm; a control device that generates a boom command value for raising the boom when the pressure on the rod side of the arm cylinder is greater than a predetermined value and the speed of the arm is equal to or less than a threshold value.

2. The shovel according to claim 1 , wherein the control of the boom by the control device is performed immediately before oil is discharged from a relief valve.

3. A machine control function is provided for automatically operating at least a part of the operating elements of the lower traveling body, the upper rotating body, and the attachment, The shovel according to claim 1 or 2, wherein the control of the boom by the control device is performed during execution of the machine control function.

4. a bucket cylinder for driving the bucket; The control device includes: The shovel according to claim 1 , wherein the operation of the bucket cylinder is controlled so as to adjust a vertical position of a control reference set for a predetermined working portion of the bucket with respect to a design surface in accordance with the operation of the arm cylinder.

5. A boom cylinder that drives the boom, The control device includes: The shovel according to claim 1 , wherein the operation of the boom cylinder is controlled so as to adjust a vertical position of a control reference set for a predetermined working portion of the bucket relative to a design surface in accordance with the operation of the arm cylinder.

Citation Information

Patent Citations

  • Work machine

    JP2017210816A

  • Work machine

    JP2020159049A

  • Shovel

    JP2021021199A

  • Revolving construction machine

    JP2021195733A

  • Work machinery

    JP2022090088A