Productivity evaluation system

The productivity evaluation system addresses the challenge of evaluating individual productivity in diverse manual production by using a network-connected terminal to record and total points for each process, enabling fair evaluation and load balancing, thereby enhancing overall productivity.

JP2024161706AActive Publication Date: 2024-11-20株式会社P O イノベーション
View PDF 5 Cites 0 Cited by

Patent Information

Application Number
JP2023076633
Authority / Receiving Office
JP · JP
Patent Type
Applications
Current Assignee / Owner
Filing Date
2023-05-08
Publication Date
2024-11-20
Estimated Expiration
2043-05-08

AI Technical Summary

Technical Problem

Existing productivity evaluation systems are inadequate for assessing individual productivity when multiple persons manufacture a wide variety of products in small quantities, as they often rely on equipment operating rates or sales and working hours, which do not account for the varying time and difficulty of manual production processes.

Method used

A productivity evaluation system that includes a management terminal connected to a network, recording and totaling points for each manufacturing process based on standard working time, difficulty, and completion status, allowing for centralized management and relative productivity evaluation of individuals.

Benefits of technology

Enables fair and balanced evaluation of individual productivity by visualizing work time and difficulty levels, facilitating load balancing and motivation through point allocation, and improving overall productivity by assigning skilled personnel to critical tasks.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 2024161706000001_ABST
    Figure 2024161706000001_ABST
Patent Text Reader

Abstract

To provide a productivity evaluation system capable of properly evaluating the productivity of each person in charge even in a case where a plurality of persons produce a variety of products by a small amount each.SOLUTION: A productivity evaluation system is configured to evaluate the productivity of a person who performs a product producing operation. The productivity evaluation system includes a management terminal that is connected to a network and records management information of prescribed items for a product production step and a person in charge thereof, and an input terminal that is connected to the network and that inputs and transmits completion information included in the management information when the person in charge completes the operation of the production step. The management information includes person-in-charge information 38, production step information 42, point information 44, standard work time information 45, and completion information 39. The management terminal generates a total point of a person in charge by summing up points of production steps performed by the person in charge.SELECTED DRAWING: Figure 2
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to a productivity evaluation system for evaluating the productivity of personnel performing the manufacturing work of a product. [Background technology]

[0002] Conventionally, as a method for evaluating the productivity of a person who performs manufacturing work for mass-produced products on a production line, etc., the operation rate of the manufacturing equipment for which the person is in charge is evaluated. The technology shown in Patent Document 1 is known as a productivity evaluation system for evaluating the operation rate of such manufacturing equipment.

[0003] The productivity evaluation system of Patent Document 1 includes a camera installed to photograph the manufacturing site, a position identification unit that identifies the position of a person from the image photographed by the camera, and an evaluation unit that generates an evaluation value for evaluating the availability of manufacturing equipment installed at the manufacturing site based on the position of the person identified by the position identification unit. In detail, the system further includes a person extraction unit that extracts a characteristic image of a person from the image photographed by the camera, the position identification unit identifies the position of the characteristic image of the person extracted by the person extraction unit, and the evaluation unit determines whether or not the characteristic image of a person exists in an area set based on at least one of the installation position and installation direction of the manufacturing equipment, and generates an evaluation value based on the number of people existing in the set area.

[0004] However, while the productivity evaluation system of Patent Document 1 is a means suitable for mass-produced goods manufactured by machine, when a wide variety of products are manufactured in small quantities mainly manually, each worker manufactures different products (parts), and the time and difficulty required for manufacturing differ depending on the product (part), making it difficult to evaluate the productivity of each worker simply by looking at the operating rate of the manufacturing equipment.

[0005] Furthermore, as another technique related to the productivity evaluation system, Patent Document 2 discloses a labor management method and a labor management support device.

[0006] In the technology of Patent Document 2, the productivity evaluation unit of the labor management support device has an actual productivity calculation unit, a standard productivity setting unit, and a productivity comparison data generation unit. The actual productivity calculation unit calculates actual productivity by sales amount from actual working hours (total working hours) and sales results, the standard productivity setting unit sets productivity by sales amount as standard productivity based on past results, and the productivity comparison data generation unit generates display or print data for comparing and evaluating the actual productivity and the standard productivity as a function of sales amount.

[0007] However, the labor management method and labor management support device of Patent Document 2 measure productivity based on sales revenue and working hours, and are primarily suited to evaluating productivity in store sales (retail). However, when small quantities of a wide variety of products are manufactured primarily manually, it is still difficult to evaluate the productivity of each individual employee.

[0008] In general conventional technologies, productivity is measured by the number of items produced, which is suitable for evaluating the productivity of each employee when making the same item. However, when making different items, such as small quantities of many different types, productivity cannot be evaluated simply by the number of items produced, and this technology is unsuitable for evaluating productivity when multiple employees manufacture small quantities of many different products. [Prior art documents] [Patent documents]

[0009] [Patent Document 1] JP 2020-95651 A [Patent Document 2] JP 2000-322661 A Summary of the Invention [Problem to be solved by the invention]

[0010] In view of the above, an object of the present invention is to provide a productivity evaluation system that can appropriately evaluate the productivity of each worker even when multiple workers are involved in manufacturing a wide variety of products in small quantities. [Means for solving the problem]

[0011] According to an embodiment of the present invention, there is provided a productivity evaluation system for evaluating the productivity of a person performing a manufacturing operation of a product, comprising: a management terminal connected to a network for recording management information of predetermined items regarding the manufacturing process of the product and the person in charge, and an input terminal connected to the network for inputting and transmitting completion information included in the management information when the person in charge completes the manufacturing process, the management information includes person in charge information indicating the person in charge, manufacturing process information regarding a manufacturing process of the product, point information indicating points determined for each manufacturing process, standard work time information indicating a standard work time for each manufacturing process, and the completion information indicating that the work in the manufacturing process has been completed; The management terminal is characterized in that it tallys up points for the manufacturing processes in which the person in charge has performed work, and generates a total point for the person in charge.

[0012] According to this configuration, the system includes a management terminal connected to the network for recording management information of predetermined items regarding the manufacturing process and the person in charge of the product, and an input terminal connected to the network for inputting and transmitting the completed information included in the management information when the person in charge completes the work of the manufacturing process. The management information includes person information indicating the person in charge, manufacturing process information regarding the manufacturing process of the product, point information indicating the points determined for each manufacturing process, standard work time information indicating the standard work time for each manufacturing process, and completed information indicating that the work of the manufacturing process has been completed, so that the standard work time and difficulty level according to each manufacturing process can be visualized in points even for different types of products. The management terminal tallys up points related to the accumulation of the time of the manufacturing process in which the person in charge performed work to generate the total points of the person in charge, so that the productivity of each person in charge can be appropriately evaluated even when a large variety of products are manufactured in small quantities by multiple people.

[0013] Preferably, the management terminal includes a product master section in which the manufacturing process information, the point information, and the standard work time information of all the products are recorded; a manufacturing process check unit for recording the person in charge information, the point information, and the standard work time information for each manufacturing process of the product; and a person-by-person point tallying section for tallying up points for the manufacturing process in which the person in charge performed the work.

[0014] According to this configuration, the management terminal includes a product master section in which manufacturing process information, point information, and standard work time information of all products are recorded, so that the points and standard work times of the manufacturing processes of all products can be managed in a unified manner, and fair and well-balanced points can be allocated taking into account the work time and difficulty level. Furthermore, the management terminal includes a manufacturing process check section in which the person in charge information, point information, and standard work time information are recorded for each manufacturing process of the product, so that it is possible to plan which person is in charge of each manufacturing process of the product, and to increase the productivity of the product itself by assigning a person with high skills to a process with high difficulty in the series of manufacturing processes of the product. Furthermore, the management terminal includes a person-by-person point tally section in which the points of the manufacturing process in which the person in charge performed the work can be tallied, so that it is possible to compare the people in charge and evaluate their relative productivity, and it is also possible to grasp the workload of each person in charge and add work to the person with a lighter workload, thereby balancing the workload among the people in charge.

[0015] Preferably, the management information includes completion date information indicating a completion date of the product, which is input when the product has passed a quality check for the product for which all manufacturing processes have been completed, and The manufacturing process check unit records the completion date information, The management terminal counts up the points for the manufacturing processes in which the person in charge worked, for only the products for which the completion date information was entered, and generates a total point for the person in charge.

[0016] According to this configuration, the management information includes completion date information indicating the date of completion of a product that has completed all manufacturing processes and is entered when the product passes quality check. The management terminal tally up the points for the manufacturing processes in which the person in charge worked, for only the products for which completion date information has been entered, to generate a total point for the person in charge, so that the productivity of the person in charge can be evaluated while ensuring the acceptable quality of the manufactured products.

[0017] Preferably, the management terminal is capable of outputting a profile for each person in charge that displays the manufacturing processes in which the person in charge performed work during a specified period, the points for those manufacturing processes, and the total points for the person in charge calculated by adding up these points.

[0018] According to this configuration, the management terminal can output a profile for each person in charge that displays the manufacturing processes in which the person in charge performed work during a specified period, the points for those manufacturing processes, and the total points for the person in charge calculated by adding up these points. This makes it possible to evaluate the productivity of the person in charge over any period of time and analyze which manufacturing processes they are good at and which ones they are not good at.

[0019] Preferably, the management information includes delivery destination information indicating a delivery destination of the product, sales representative information in charge of contacting the delivery destination, and production representative information in charge of production, The management terminal includes a person in charge list section in which the delivery destination information, the sales person information, and the production person information are recorded.

[0020] According to this configuration, the management information includes delivery destination information, sales representative information, and production staff information, and the management terminal is equipped with a staff list section in which the delivery destination information, sales representative information, and production staff information are recorded. Therefore, not only can the production staff be evaluated, but the delivery destinations can also be evaluated by analyzing the number of deliveries to the delivery destinations, and the sales staff who deliver the goods can also be evaluated.

[0021] Preferably, the management information includes correction deadline information indicating a correction deadline when correction is required after the product is completed, The manufacturing process check section records the completion date information.

[0022] According to this configuration, the management information includes correction deadline information indicating the correction deadline when corrections are required after the product is completed, and the manufacturing process check section records the completion date information, so that products that require corrections can be identified and this can be used to evaluate the quality of the products.

[0023] Preferably, the management information includes a coefficient by which a standard operation time of the standard operation time information is multiplied for each manufacturing process, The point of each manufacturing process is a value obtained by multiplying the standard work time of each manufacturing process by the coefficient.

[0024] According to this configuration, the management information has a coefficient by which the standard work time in the standard work time information is multiplied for each manufacturing process. Since the points for each manufacturing process are the standard work time multiplied by the coefficient, it is possible to increase the points for an important manufacturing process for a product that one wishes to focus on by multiplying it by a coefficient of, for example, 1.1. In other words, the standard work time for a manufacturing process can be kept the same while the points can be increased or decreased by the coefficient. This can increase the motivation of the person in charge and lead to increased production of important products. Effect of the Invention

[0025] It is possible to provide a productivity evaluation system that can appropriately evaluate the productivity of each worker even when a large variety of products are manufactured in small quantities by a plurality of workers. [Brief description of the drawings]

[0026] [Figure 1] FIG. 1 is an explanatory diagram of a productivity evaluation system according to the present invention. [Diagram 2] FIG. 4 is an explanatory diagram of a manufacturing process check unit according to the present invention. [Diagram 3] FIG. 2 is an explanatory diagram of a product master section according to the present invention. [Figure 4]FIG. 13 is an explanatory diagram of a point tallying unit for each person in the present invention. [Diagram 5] FIG. 4 is an explanatory diagram of a person in charge list section according to the present invention. [Figure 6] FIG. 4 is an explanatory diagram of a person-by-person profile according to the present invention. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0027] DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS The present invention will be described below with reference to the accompanying drawings, in which: FIG. EXAMPLES

[0028] 1, the productivity evaluation system 10 is a system for evaluating the productivity of a person performing manufacturing work for a product 41a. The product 41a is manufactured through a plurality of manufacturing processes (process 1, process 2, process 3, ..., process n). Here, a medical prosthesis is shown as an example of the product 41a.

[0029] The productivity evaluation system 10 comprises a management terminal 20 connected to a network 11 for recording management information of specified items regarding the manufacturing processes (process 1, process 2, process 3, ..., process n) of the product 41a and the personnel (personnel 1, personnel 2, ...), and an input terminal 21 connected to the network 11 for inputting and transmitting completion information, etc., included in the management information when the personnel complete work in the manufacturing process.

[0030] In the embodiment, the input terminal 21 is a so-called notebook computer, but the present invention is not limited to this, and mobile terminals 21a, 21b, 21c, ..., 21n may be used in each manufacturing process. Also, in the embodiment, the management terminal 20 and the input terminal 21 are separate, but the present invention is not limited to this, and the management terminal 20 and the input terminal 21 may be the same.

[0031] As shown in Figures 1 to 6, the management terminal 20 has a manufacturing process check section (manufacturing process checklist) 30 shown in Figure 2, a product master section (product master sheet) 40 shown in Figure 3, a staff member point tally section (staff member point tally sheet, employee point tally sheet) 50 shown in Figure 4, a staff member list section (staff member list sheet) 60 shown in Figure 5, and a staff member profile 70 shown in Figure 6.

[0032] In addition, the manufacturing process check sheet 30, the product master sheet 40, the employee point tally sheet 50, and the person in charge list sheet 60 may be displayed in a switchable manner using tags 31 on the software.

[0033] Next, the manufacturing process check section (manufacturing process check sheet) 30 will be described. As shown in FIG. 2, the management information includes product information 41 indicating the type of product 41a, status information 32 indicating the current status of product 41a by notation such as started or completed, delivery destination information 33 indicating the delivery destination of product 41a, customer information 34 who will be in charge of the delivery destination, completion date information 35 indicating the completion date of product 41a that has completed all manufacturing processes 42a, 42b, 42c and is entered when product 41a passes a quality check, correction deadline information 36 indicating the correction deadline if corrections are required after product 41a is completed, and sales representative information 37 in charge of contacting the delivery destination.

[0034] The management information also includes manufacturing process information 42 regarding each manufacturing process 42a, 42b, 42c of the product 41a, person in charge information 38 indicating the person in charge of production, process name information 43 indicating the process name of each manufacturing process 42a, 42b, 42c, point information 44 indicating the points set for each manufacturing process 42a, 42b, 42c, standard work time information 45 indicating the standard work time for each manufacturing process 42a, 42b, 42c, and completion information 39 indicating that work for the manufacturing processes 42a, 42b, 42c has been completed.

[0035] In this way, in the manufacturing process check section (manufacturing process check sheet) 30, product information 41, status information 32, delivery destination information 33, customer information 34, completion date information 35, correction deadline information 36, sales representative information 37, and manufacturing process information 42 (manufacturing processes 42a, 42b, 42c, ...) are entered for each product, and person in charge information 38, process name information 43, point information 44, standard operating time information 45, and completed information 39 are entered and recorded for each manufacturing process 42a, 42b, 42c (manufacturing process information 42) of product 41a.

[0036] Next, the product master section (product master sheet) 40 will be described. As shown in FIG. 3, the management information includes product information 41, which is the product names of all products 41a, 41b, 41c, ..., manufacturing process information 42 regarding each manufacturing process 42a, 42b, 42c, 42d for each product 41a, 41b, 41c, process name information 43 indicating the process names of each manufacturing process 42a, 42b, 42c, 42d, point information 44 indicating points determined for each manufacturing process 42a, 42b, 42c, 42d, and standard work time information 45 indicating the standard work time for each manufacturing process 42a, 42b, 42c, 42d.

[0037] In this way, product information 41 for all products 41a, 41b, 41c, ..., manufacturing process information 42 (manufacturing processes 42a, 42b, 42c, 42d, ...), process name information 43, point information 44, and standard operation time information 45 are input and recorded in the product master section (product master sheet) 40. Note that the number of manufacturing processes is not limited to 6 processes, 7 processes, 8 processes, etc. depending on the product, and any number may be used.

[0038] Next, the person-in-charge point tallying section (person-in-charge point tallying sheet) 50 will be described. As shown in FIG. 4, the management information includes aggregation date information 51 indicating the year and month for aggregation, person in charge information 38 of the persons 38a, 38b, 38c, 38d in charge of production, point total information 52 calculated by summing up the points for each of the persons 38a, 38b, 38c, 38d, process aggregation information 53 which aggregates the corresponding products (product information 41) and manufacturing processes (manufacturing process information 42) for each of the persons 38a, 38b, 38c, 38d, and point information 44 indicating the points for each manufacturing process 42a, 42b, 42c.

[0039] In this manner, the point tallying section for each staff member (point tallying sheet for each staff member) 50 outputs tallying date information 51, staff member information 38, total point information 52, process tallying information 53, product information 41, manufacturing process information 42, and point information 44. In the figure, the point tallying sheet for each staff member 50 is shown as a point tallying sheet for each employee.

[0040] The management information may have a coefficient for multiplying the standard work time of the standard work time information for each manufacturing process, and the points for each manufacturing process may be a value obtained by multiplying the standard work time of each manufacturing process by the coefficient. Since the points for each manufacturing process are a value obtained by multiplying the standard work time of each manufacturing process by the coefficient, it is possible to increase the points for an important manufacturing process of a product that one wishes to focus on by multiplying it by a coefficient of, for example, 1.1. In other words, the standard work time of a manufacturing process can be kept the same, and the points can be increased or decreased by the coefficient. This can increase the motivation of the person in charge and lead to increased production of important products.

[0041] Next, the person in charge list section (person in charge list sheet) 60 will be described. As shown in FIG. 5, the management information includes delivery destination information 33 indicating the delivery destination of products 41a, ..., sales representative information 37 in charge of contacting the delivery destination, and salesperson information 38 indicating the person in charge of production.

[0042] In this manner, in the management terminal 20, the delivery destination information 33, the sales representative information 37, and the representative information 38 are output to the person in charge list section (person in charge list sheet) 60.

[0043] Next, the person-in-charge profile 70 will be described. As shown in FIG. 6, the management information includes person information 38 in charge of production, product information 41 indicating the product name, process name information 43 (production process information 42) indicating the production process carried out, point information 44 indicating the points for each production process, specified date of aggregation information 71 indicating the specified date of the month on which the points were aggregated, and specified date total point information 72 up to the specified date for the person specified in person information 38.

[0044] In this manner, the person-by-person profile 70 outputs the product information 41, the process name information 43 (manufacturing process information 42), the point information 44, the specified tally date information 71, and the specified date total point information 72.

[0045] Next, an example of the input procedure and operation will be described. 1 to 6, in STEP 1, product information 41 for all products 41a, 41b, 41c, ..., manufacturing process information 42 (manufacturing processes 42a, 42b, 42c, 42d, ...), process name information 43, point information 44, and standard work time information 45 are entered into a product master section (product master sheet) 40. The point information 44 and standard work time information 45 for each manufacturing process can be appropriately reviewed in consideration of the actual manufacturing work load, and the values ​​can be adjusted and corrected.

[0046] In STEP 2, product information 41 for products 41a, 41b, 41c, ... to be manufactured is entered into the product master section (product master sheet) 40. At this time, when the section for entering product information 41 is selected, the products entered in the product master section (product master sheet) 40 are automatically displayed in a list (so-called pull-down display), and a product can be selected from the list. Note that the product information 41 may be entered into the product master section (product master sheet) 40 by directly entering characters.

[0047] When product information 41 of products 41a, 41b, 41c, ... to be manufactured is entered into a product master section (product master sheet) 40, manufacturing process information 42 (manufacturing processes 42a, 42b, 42c, 42d, ...), process name information 43, point information 44, and standard operation time information 45 corresponding to the product information 41 are automatically entered into the sheet.

[0048] In STEP 3, a manufacturing staff member is assigned to each manufacturing process 42a, 42b, 42c, 42d, . . . (manufacturing process information 42) in the product master section (product master sheet) 40, and staff member information 38 is entered.

[0049] In STEP 4, delivery destination information 33, customer information 34, sales representative information 37, and status information 32 are entered into the product master section (product master sheet) 40. Note that by entering customer information 34, the remaining sales representative information and the person in charge information 37 who will be the production person who will check the product after it is completed may be automatically transcribed from the person in charge list section (person in charge list sheet) 60.

[0050] After each manufacturing process 42a, 42b, 42c, 42d, ... is completed in STEP 5, enter completed information 39 (check the box) for each manufacturing process 42a, 42b, 42c, 42d, ... (manufacturing process information 42) in the product master section (product master sheet) 40.

[0051] In STEP 6, after completion information 39 is entered into all manufacturing processes 42a, 42b, 42c, 42d, ... (manufacturing process information 42) of any product 41a, the quality of the entire product 41a is checked, and if it passes, "completed" is entered into the status information 32. Then, completion date information 35 is automatically entered. Note that completion date information 35 may also be entered manually.

[0052] In STEP 7, calculation processing is performed by inputting the tallying date information 51 into the point tallying section for each person in charge (point tallying sheet for each person in charge) 50 and tallying it, and the person in charge information 38, total point information 52, process tallying information 53, product information 41, manufacturing process information 42, and point information 44 are output. By changing the tallying month in the tallying date information 51, it is possible to output information for a different month, and by entering multiple months as the tallying month, such as February, March, and April, it is also possible to output the total information for those months.

[0053] When the person in charge information 38 is entered into the person-specific profile 70 in STEP 8, product information 41 manufactured by that person up to the input date of the input month, process name information 43 (manufacturing process information 42), point information 44, total point information for a specified month 72, and specified tally date information 71 are calculated and output.

[0054] By changing the date in the tally designated date information 71, the aforementioned designated month total point information 72, etc. on the changed date is calculated and output. Also, by inputting an arbitrary period into the tally designated date information 71, the aforementioned designated month total point information 72, etc. for that period is calculated and output. Furthermore, the designated month total point information 72, etc. up to the input date of the input month and the designated month total point information 72, etc. for an arbitrary period can be calculated and output as a graph (bar graph, line graph, pie chart, etc.).

[0055] In this way, the management terminal 20 counts up the points for the manufacturing processes in which the person in charge worked, and generates the total points for the person in charge. The management terminal 20 also counts up the points for the manufacturing processes in which the person in charge worked, and generates the total points for the person in charge, only for products for which completion date information 35 has been input. The management terminal 20 can also output a person-specific profile 70 that displays the manufacturing processes in which the person in charge worked during a specified period, the points for those manufacturing processes, and the total points for the person in charge, which is the sum of these points.

[0056] Next, the effects of the productivity evaluation system 10 described above will be described. The productivity evaluation system 10 includes a management terminal 20 connected to the network 11 for recording management information of predetermined items regarding the manufacturing process and the person in charge of a product, and an input terminal 21 connected to the network 11 for inputting and transmitting completion information 39 included in the management information when the person in charge completes the work of the manufacturing process. The management information includes person in charge information 38 indicating the person in charge, manufacturing process information 42 regarding the manufacturing process of the product, point information 44 indicating points determined for each manufacturing process, standard work time information 45 indicating the standard work time for each manufacturing process, and completion information 39 indicating that the work of the manufacturing process has been completed, so that the standard work time and difficulty level according to each manufacturing process can be visualized in points even for different types of products. The management terminal 20 tallys up points associated with the accumulation of the time of the manufacturing process in which the person in charge performed work to generate the total points of the person in charge, so that the productivity of each person in charge can be appropriately evaluated even when a large number of products are manufactured by multiple people.

[0057] Furthermore, the management terminal 20 includes a product master section 40 in which manufacturing process information 42, point information 44, and standard work time information 45 of all products are recorded, so that the points and standard work times of all products can be managed in a centralized manner, and fair and well-balanced points can be allocated taking into account work time and difficulty. Furthermore, the management terminal 20 includes a manufacturing process check section 30 in which the person in charge information 38, point information 44, and standard work time information 45 are recorded for each product manufacturing process, so that it is possible to plan which person is in charge of each product manufacturing process, and to increase the productivity of the product itself by assigning a highly skilled person to a highly difficult process in a series of product manufacturing processes. Furthermore, the management terminal 20 includes a person-by-person point tally section 70 in which the points of the manufacturing process in which the person in charge performed the work can be tallied, so that it is possible to compare the people in charge to evaluate their relative productivity, and it is also possible to grasp the workload of each person in charge and add work to the person with a lighter workload, thereby balancing the workload among the people in charge.

[0058] Furthermore, the management information includes completion date information 35, which indicates the date of completion of a product that has completed all manufacturing processes and is entered when the product passes quality check. Since the management terminal 20 calculates the total points of a person in charge by tallying up the points of the manufacturing processes in which the person in charge worked, only for the products for which completion date information 35 has been entered, the productivity of the person in charge can be evaluated while ensuring the acceptable quality of the manufactured products.

[0059] Furthermore, the management terminal 20 can output an individual worker profile 70 that displays the manufacturing processes in which the worker performed work during a specified period, the points for those manufacturing processes, and the total points for the worker calculated by adding up these points. This makes it possible to evaluate the productivity of the worker for any period of time and analyze which manufacturing processes the worker was good at and which were not.

[0060] Furthermore, the management information includes delivery destination information 33, sales representative information 37, and production staff information 37, and the management terminal 20 is provided with a staff list section 60 in which the delivery destination information 33, sales representative information 37, and production staff information 38 are recorded, so that not only can the production staff be evaluated, but also the delivery destinations can be evaluated by analyzing the number of deliveries to the delivery destinations, and the sales staff who deliver the goods can be evaluated.

[0061] Furthermore, the management information includes correction deadline information 36 indicating the correction deadline when correction is required after the product is completed, and the manufacturing process check section records completion date information 35, so that products that require correction can be identified and this can be used to evaluate the quality of the products.

[0062] Furthermore, since the points for each manufacturing process are calculated by multiplying the standard work time of the process by a coefficient, it is possible to increase the points of an important manufacturing process for a product that you want to focus on by multiplying it by a coefficient of, for example, 1.1. In other words, you can increase or decrease the points by the coefficient while keeping the standard work time of the manufacturing process the same. This can increase the motivation of the people in charge and lead to increased production of important products.

[0063] In the embodiment, the management terminal 20 and the input terminal 21 (21a, 21b, 21c, . . . , 21n) may be a desktop computer, a tablet, a smartphone, or the like, and may be of any type as long as they are capable of inputting, viewing, storing data, performing calculations, etc. Also, in the embodiment, the management terminal 20 and the input terminal 21 (21a, 21b, 21c, . . . , 21n) are connected to the network 11 by wire, but this is not limiting and they may be connected wirelessly.

[0064] The management terminal 20 and the input terminal 21 may be configured to input information by logging in to the system using an ID and a password, etc. In the embodiment, some items are configured to select from options entered in advance when inputting management information, but the present invention is not limited to this and may be configured to input characters. The products 41a, 41b, 41c, etc. may not only refer to completed products, but also to repair work (maintenance work) and the like, which may be defined as products and input.

[0065] The management information may be recorded in a database, and data may be acquired from the database for each sheet, such as the manufacturing process check sheet 30. The coefficient multiplied by the standard work time may have a function to automatically correct the coefficient to a larger value if the time from when the person in charge starts working on the manufacturing process to when they input the completed information is longer than a predetermined time, as compared with the time measurement function of the management terminal 20.

[0066] In other words, the present invention is not limited to the examples as long as the functions and effects of the present invention are achieved. [Industrial Applicability]

[0067] The present invention is suitable for a productivity evaluation system that evaluates the productivity of personnel performing product manufacturing operations. [Explanation of symbols]

[0068] 10...Productivity evaluation system, 11...Network, 20...Management terminal, 21, 21a, 21b, 21c, 21n...Input terminal, 30...Manufacturing process check section (manufacturing process check sheet), 32...Status information, 33...Delivery destination information, 34...Customer information, 35...Completion date information, 36...Correction deadline information, 37...Salesperson information, 38...Manufacturing person information, 39...Completed information, 40...Product master section (product master sheet), 41...Product information, 41a, 41b, 4 1c...product, 42...manufacturing process information, 42a, 42b, 42c, 42d...manufacturing process, ...43...process name information, 44...point information, 45...standard operating time information, 50...point calculation section by person in charge (point calculation sheet by person in charge, point calculation sheet by employee), 51...calculation year and month information, 52...total point information, 53...process calculation information, 60...person in charge list section (person in charge list sheet), 70...profile by person in charge, 71...calculation specified date information, 72...total point information for specified date.

Claims

1. A productivity evaluation system for evaluating the productivity of a person performing manufacturing work for a product, a management terminal connected to a network for recording management information of predetermined items regarding the manufacturing process of the product and the person in charge, and an input terminal connected to the network for inputting and transmitting completion information included in the management information when the person in charge completes the manufacturing process, The management information includes person in charge information indicating the person in charge, manufacturing process information regarding a manufacturing process of the product, point information indicating points determined for each manufacturing process, standard work time information indicating a standard work time for each manufacturing process, and the completion information indicating that the work in the manufacturing process has been completed; The productivity evaluation system is characterized in that the management terminal calculates a total point for the person in charge by tallying up points for the manufacturing processes in which the person in charge has performed work.

2. The productivity evaluation system according to claim 1, The management terminal has a product master section in which the manufacturing process information, the point information, and the standard work time information of all the products are recorded; a manufacturing process check unit for recording the person in charge information, the point information, and the standard work time information for each manufacturing process of the product; and a person-by-person point tallying section for tallying up points for the manufacturing process in which the person in charge performed the work.

3. The productivity evaluation system according to claim 1 or 2, The management information includes completion date information indicating a completion date of the product, which is input when the product has passed a quality check for the product for which all manufacturing processes have been completed, and The manufacturing process check unit records the completion date information, The productivity evaluation system is characterized in that the management terminal tallyes up the points for the manufacturing processes in which the person in charge worked, only for the products for which the completion date information has been entered, and generates a total point for the person in charge.

4. The productivity evaluation system according to claim 1 or 2, A productivity evaluation system characterized in that the management terminal is capable of outputting a profile for each employee that displays the manufacturing processes in which the employee performed work during a specified period, the points for those manufacturing processes, and the total points for the employee, which is the sum of these points.

5. The productivity evaluation system according to claim 1 or 2, The management information includes delivery destination information indicating a delivery destination of the product, sales representative information in charge of contacting the delivery destination, and production representative information in charge of production, A productivity evaluation system, wherein the management terminal comprises a person in charge list section for recording the delivery destination information, the sales person information, and the person in charge of production information.

6. The productivity evaluation system according to claim 1 or 2, the management information includes correction deadline information indicating a correction deadline when correction is required after the product is completed, The productivity evaluation system is characterized in that the completion date information is recorded in the manufacturing process check section.

7. The productivity evaluation system according to claim 1 or 2, the management information includes a coefficient by which the standard work time of the standard work time information is multiplied for each manufacturing process, A productivity evaluation system, wherein the point for each manufacturing process is a value obtained by multiplying the standard work time for each manufacturing process by the coefficient.

Citation Information

Patent Citations

  • Device and method for estimating operation

    JP1998240808A

  • Labor managing method and labor management supporting device

    JP2000322661A

  • Productivity management device, productivity management method, productivity management program, and recording medium

    JP2006309305A

  • Productivity management method and productivity management device

    JP2010244151A

  • Productivity evaluation system, productivity evaluation device, productivity evaluation method, and program

    JP2020095651A