System and method for managing work machine

The work machine management system quantifies greenhouse gas emissions by tracking the use of fossil and renewable energy, addressing the environmental impact of large capacity batteries in work machines.

JP2024161821APending Publication Date: 2024-11-20KOMATSU LTD
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
JP2023076884
Authority / Receiving Office
JP · JP
Patent Type
Applications
Current Assignee / Owner
Filing Date
2023-05-08
Publication Date
2024-11-20

AI Technical Summary

Technical Problem

Existing work machines with large capacity batteries emit greenhouse gases due to the use of fossil fuel energy, necessitating a method to quantify the emissions.

Method used

A work machine management system that calculates and tracks the usage of both fossil fuel-generated and renewable energy-based power for charging the battery, enabling the estimation of greenhouse gas emissions.

Benefits of technology

Enables accurate assessment of greenhouse gas emissions from work machines, promoting the use of renewable energy to reduce environmental impact.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 2024161821000001_ABST
    Figure 2024161821000001_ABST
Patent Text Reader

Abstract

To grasp how much a greenhouse gas is discharged by using a work machine having a large capacity battery.SOLUTION: A management system of a work machine includes a processor. The processor calculates a use amount of electric power used for charging a battery of the work machine and stores the use amount in a storage device. The electric power includes one or both of first electric power for discharging a first amount of carbon dioxide to generate a unit amount of electric power and second electric power for discharging a second amount of carbon dioxide smaller than the first amount to generate a unit amount of electric power. The use amount includes a first use amount indicating the use amount of the first electric power used for charging the battery and a second use amount indicating a use amount of the second electric power used for charging the battery.SELECTED DRAWING: Figure 4
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present disclosure relates to a work machine management system and a work machine management method. [Background technology]

[0002] Patent Document 1 discloses a technique for charging a vehicle battery. [Prior art documents] [Patent documents]

[0003] [Patent Document 1] Special Publication No. 2022-510390 Summary of the Invention [Problem to be solved by the invention]

[0004] From the viewpoint of preventing global warming, it is desirable to suppress the emission of greenhouse gases. In order to prevent global warming, in the technical field related to work machines, work machines having large-capacity batteries have been proposed. When the electricity used by a work machine is generated using fossil fuel energy, even if a work machine having a large-capacity battery is used, it may still result in the emission of greenhouse gases. It is necessary to understand the extent to which greenhouse gases are emitted by using a work machine having a large-capacity battery.

[0005] An object of the present disclosure is to determine whether or not the amount of greenhouse gases being emitted is due to the use of a work machine having a large-capacity battery. [Means for solving the problem]

[0006] According to the present disclosure, a work machine management system is provided. The work machine management system includes a processor. The processor calculates the usage amount of electricity used to charge a battery of the work machine and stores the usage amount in a storage device. The electricity used to charge the battery includes one or both of a first electricity that emits a first amount of carbon dioxide to generate a unit amount of electricity and a second electricity that emits a second amount of carbon dioxide less than the first amount to generate the unit amount of electricity. The usage amount of electricity includes a first usage amount indicating the usage amount of the first electricity used to charge the battery and a second usage amount indicating the usage amount of the second electricity used to charge the battery. Effect of the Invention

[0007] According to the present disclosure, it is possible to ascertain the extent to which greenhouse gases are being emitted as a result of using a work machine having a large-capacity battery. [Brief description of the drawings]

[0008] [Figure 1] FIG. 1 is a diagram showing a management system for a work machine according to an embodiment. [Diagram 2] FIG. 2 is a diagram showing a shovel according to the embodiment. [Diagram 3] FIG. 3 is a diagram showing a control system for a shovel according to an embodiment. [Figure 4] FIG. 4 is a diagram showing the relationship between the power station and the charging station according to the embodiment. [Diagram 5] FIG. 5 is a diagram illustrating an example of power generation result data according to the embodiment. [Figure 6] FIG. 6 is a block diagram showing an in-vehicle controller according to the embodiment. [Figure 7] FIG. 7 is a flowchart showing a method for calculating the amount of carbon dioxide emitted by charging the battery according to this embodiment. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0009] Hereinafter, an embodiment of the present disclosure will be described with reference to the drawings, but the present disclosure is not limited to the embodiment. The components of the embodiments described below can be appropriately combined. In addition, some components may not be used.

[0010] [Overview of the management system] FIG 1 is a diagram showing a management system 1 for a work machine 2 according to an embodiment. The management system 1 manages the work machines 2 that operate at a work site 3. In the embodiment, the work machines 2 are electric work machines that are powered by a battery pack and an electric motor. A plurality of work machines 2 exist at the work site 3. In the example shown in FIG 1, the work machines 2 present at the work site 3 include a shovel 2A, a bulldozer 2B, and a dump truck 2C.

[0011] In the embodiment, no operator boards the work machine 2. The work machine 2 is remotely controlled. A remote control room 4 is installed outside the work machine 2. The remote control room 4 is installed in a remote location from the work site 3. An information terminal 5 and a remote control device 6 for remotely controlling the work machine 2 are each disposed in the remote control room 4. The information terminal 5 and the remote control device 6 each exist outside the work machine 2. The information terminal 5 includes a computer system disposed in the remote control room 4.

[0012] The remote control device 6 is operated by an operator in the remote control room 4. When operated by the operator, the remote control device 6 generates an operation signal for remotely operating the work machine 2. The operation signal generated in the remote control device 6 is input to the information terminal 5. The information terminal 5 generates a remote operation command based on the operation signal from the remote control device 6. The information terminal 5 transmits the remote operation command to the work machine 2 via the communication system 7.

[0013] The work machine 2 operates based on remote operation commands transmitted from an information terminal 5 located outside the work machine 2. At least one of the work machine 2 and the work site 3 is provided with a camera that acquires image data of the work site 3. The image data of the work site 3 is transmitted to the information terminal 5 via a communication system 7 and displayed on a display device of the information terminal 5. The operator can operate the remote operation device 6 while checking the image data of the work site 3.

[0014] The communication system 7 may include a public communication line or a specific communication line. Examples of the communication system 7 include a mobile phone communication network or a satellite communication network. The communication system 7 may include the Internet or a local area network.

[0015] The management system 1 has a management server 8. The management server 8 includes a computer system. The management server 8 can communicate with the work machine 2 via a communication system 7. The management server 8 collects operation data of the work machine 2. The management server 8 outputs control commands to the work machine 2.

[0016] [Work machinery] 2 is a view showing a shovel 2A according to an embodiment from the left front. The shovel 2A has a revolving body 9, a traveling body 10, a work implement 11, and a work implement cylinder 12.

[0017] The rotating body 9 is the vehicle body of the shovel 2A. The running body 10 is a traveling device of the shovel 2A. The running body 10 supports the rotating body 9. The rotating body 9 is supported by the running body 10 so as to be able to rotate. The rotating body 9 is disposed above the running body 10. The running body 10 runs while supporting the rotating body 9. The running body 10 has a pair of tracks 10A. The shovel 2A runs as the tracks 10A rotate.

[0018] The work implement 11 is connected to the front of the rotating structure 9. The work implement 11 includes a boom 11A connected to the front of the rotating structure 9, an arm 11B connected to the boom 11A, and a bucket 11C connected to the arm 11B. The work implement cylinder 12 includes a boom cylinder 12A that operates the boom 11A, an arm cylinder 12B that operates the arm 11B, and a bucket cylinder 12C that operates the bucket 11C.

[0019] [Control System] 3 is a diagram showing a control system 30 of a shovel 2A according to an embodiment. The shovel 2A has the control system 30. The control system 30 has a battery 31, a charging device 32, a DC / DC converter 33, an inverter 34, an electric motor 35, a hydraulic pump 36, a main valve 37, a hydraulic actuator 38, an on-board controller 40, and a communication device 43.

[0020] The battery 31 is an internal battery mounted on the work machine 2. The battery 31 includes a secondary battery. In this embodiment, the battery 31 includes a lithium ion battery (LiB).

[0021] The charging device 32 is connected to a charging station 23 provided outside the work machine 2. The charging station 23 charges the battery 31 using a commercial power source. The charging device 32 includes an AC / DC converter. The charging device 32 charges the battery 31 with power supplied from the charging station 23.

[0022] The DC / DC converter 33 boosts the voltage from the battery 31. The DC / DC converter 33 supplies a direct current from the battery 31 to the inverter .

[0023] The inverter converts the direct current from the DC / DC converter 33 into a three-phase alternating current and supplies the three-phase alternating current to the electric motor 35. The electric motor 35 is driven based on the three-phase alternating current supplied from the inverter .

[0024] The electric motor 35 is a power source for the work machine 2. The electric motor 35 is driven based on electric power from the battery 31.

[0025] The hydraulic pump 36 is driven by the electric motor 35. The hydraulic pump 36 discharges hydraulic oil. The hydraulic oil discharged from the hydraulic pump 36 is supplied to a hydraulic actuator 38 via a main valve 37. The hydraulic actuator 38 of the excavator 2A includes the work machine cylinder 12.

[0026] It should be noted that an electric actuator may be provided in the excavator 2A instead of the hydraulic actuator 38. The work machine cylinder 12 may be an electric cylinder. When an electric actuator is provided in the excavator 2A instead of the hydraulic actuator 38, the hydraulic pump 36 and the main valve 37 are omitted.

[0027] The vehicle controller 40 includes a computer system. The communication device 43 is connected to the vehicle controller 40. The communication device 43 communicates with the management server 8 wirelessly.

[0028] [Power generation performance data] FIG. 4 is a diagram showing the relationship between a power plant 20 and a charging station 23 according to an embodiment. Electricity generated in the power plant 20 is supplied to the charging station 23 via a power transmission facility 24. The power transmission facility 24 supplies electric power to a power supply area 25 in which the charging station 23 is located. There are a plurality of power plants 20. There are a plurality of power supply areas 25. In the example shown in FIG. 4, the power plant 20 includes a first power plant 21 and a second power plant 22. The power supply area 25 includes a first area 25A and a second area 25B. When the power supply area 25 is located in Japan, the first area 25A is, for example, the Kanto region, and the second area 25B is, for example, the Tohoku region.

[0029] The charging station 23 charges the battery 31 using power from a commercial power source. The charging station 23 is located in each of the first area 25A and the second area 25B. A work site 3 is located in each of the first area 25A and the second area 25B. The charging station 23 may be located in the work site 3 or outside the work site 3. The work machine 2 operates by consuming power generated in the power plant 20.

[0030] In the embodiment, the consumption by the work machine 2 of the electric power generated at the power plant 20 includes the consumption of the electric power of the battery 31 charged with the electric power generated at the power plant 20. Note that the electric power generated at the power plant 20 may be directly consumed by the work machine 2 without being used to charge the battery 31.

[0031] In the embodiment, the electric power consumed by the work machine 2 includes one or both of a first electric power and a second electric power. The first electric power is electric power that emits a first amount of carbon dioxide to generate a unit amount of electric power. The second electric power is electric power that emits a second amount of carbon dioxide less than the first amount to generate a unit amount of electric power. The unit amount is a predetermined amount. In other words, the amount of carbon dioxide emitted in the generation of the second electric power is less than the amount of carbon dioxide emitted in the generation of the first electric power.

[0032] The first electric power is electric power generated using non-renewable energy. Non-renewable energy is energy generated from resources with finite reserves. Non-renewable energy includes fossil fuel energy such as oil, coal, and natural gas. When the first electric power is generated using non-renewable energy, carbon dioxide is emitted.

[0033] The second electricity is electricity generated using renewable energy. Renewable energy is energy that is always present in nature. Renewable energy includes natural energy such as solar, wind, and hydroelectric power. When the second electricity is generated using renewable energy, no carbon dioxide is emitted.

[0034] In the example shown in FIG. 4, the first power is generated in the first power plant 21. The second power is generated in the second power plant 22. The power transmission facility 24 supplies one or both of the first power from the first power plant 21 and the second power from the second power plant 22 to the charging station 23. The charging station 23 may be supplied with both the first power generated in the first power plant 21 and the second power generated in the second power plant. That is, the charging station 23 is supplied with the first power at a first ratio (A%) and the second power at a second ratio (B%). Each of A and B is a real number between 0 and 100. The sum of A and B is 100. The power used to charge the battery 31 is composed of the first power of A% and the second power of B%. From the viewpoint of preventing global warming, the power used to charge the battery 31 is preferably the second power rather than the first power. From the standpoint of preventing global warming, it is more preferable that the power consumed by the work machine 2 be the second power rather than the first power.

[0035] The power generation performance data related to the power supplied to the charging station 23 is published by the publishing organization 26. An example of the publishing organization 26 is a power transmission company that manages the power plant 20. The publishing organization 26 may be a government organization. The publishing organization 26 publishes the amount of power generated of the first power and the amount of power generated of the second power supplied from the power plant 20 to the power supply area 25.

[0036] FIG. 5 is a diagram showing an example of power generation result data according to the embodiment. The power generation result data includes first power generation result data indicating the power generation result of the first power, and second power generation result data indicating the power generation result of the second power. The first power generation result data represents the result value of the amount of power generated using exhaustible energy for each past time interval. The second power generation result data represents the result value of the amount of power generated using renewable energy for each past time interval. In addition, the first power generation result data represents a first ratio (A%) of the first power, and the second power generation result data represents a second ratio (B%) of the second power.

[0037] As shown in Fig. 5, the actual value of the power generation amount may vary for each time interval. The first ratio and the second ratio may vary for each time interval.

[0038] [In-vehicle controller] FIG. 6 is a block diagram showing an in-vehicle controller 40 according to an embodiment. Each of the management server 8 and the in-vehicle controller 40 includes a computer system. The in-vehicle controller 40 includes a processor 48 such as a CPU (Central Processing Unit), a main memory 49 including a non-volatile memory such as a ROM (Read Only Memory) and a volatile memory such as a RAM (Random Access Memory), a storage 50, and an interface 51 including an input / output circuit. The functions of the in-vehicle controller 40 are stored in the storage 50 as a computer program. The processor 48 reads the computer program from the storage 50, expands it in the main memory 49, and executes processing according to the computer program. The computer program may be distributed to the management server 8 via a network.

[0039] Similarly, the management server 8 includes a processor, a main memory, a storage, and an interface.

[0040] The processor 48 includes a power generation performance data acquisition unit 48A, a usage amount calculation unit 48B, and an emission amount calculation unit 48C.

[0041] The power generation performance data acquiring unit 48A acquires the power generation performance data published by the publishing organization 26. The publishing organization 26 has a distribution server that distributes the power generation performance data. The power generation performance data acquiring unit 48A acquires the power generation performance data published by the publishing organization 26 via the communication system 7.

[0042] The usage amount calculation unit 48B calculates the usage amount of electricity used to charge the battery 31 of the work machine 2. The usage amount of electricity used to charge the battery 31 includes a first usage amount indicating the usage amount of the first electricity used to charge the battery 31, and a second usage amount indicating the usage amount of the second electricity used to charge the battery 31. The usage amount calculation unit 48B calculates the first usage amount indicating the usage amount of the first electricity used to charge the battery 31 of the work machine 2, and the second usage amount indicating the usage amount of the second electricity used to charge the battery 31.

[0043] The usage amount calculation unit 48B calculates the first usage amount and the second usage amount based on the power generation result data. The usage amount calculation unit 48B can calculate the first usage amount indicating the usage amount of the first power used to charge the battery 31 based on the first power generation result data including the result value of the power generation amount of the first power and the first ratio, and the charging time and charging duration of the battery 31 using the charging station 23. The usage amount calculation unit 48B can calculate the second usage amount indicating the usage amount of the second power used to charge the battery 31 based on the second power generation result data including the result value of the power generation amount of the second power and the second ratio, and the charging time and charging duration of the battery 31 using the charging station 23.

[0044] The usage calculation unit 48B records the calculated first usage and second usage. In the embodiment, the usage calculation unit 48B stores the calculated first usage and second usage in the usage memory unit 50A of the storage 50. In addition, the usage calculation unit 48B transmits the calculated first usage and second usage to the management server 8.

[0045] The emission calculation unit 48C calculates the amount of carbon dioxide emission due to charging the battery 31 based on the specified carbon dioxide emission calculation method and the first and second usage amounts. The amount of carbon dioxide emission includes the carbon dioxide equivalent emission amount of greenhouse gas. The amount of carbon dioxide emission is calculated based on the amount of activity, an emission coefficient, and a global warming potential (GWP). The amount of activity includes the amount of electricity used to charge the battery 31 (the first and second usage amounts). The emission coefficient refers to the amount of carbon dioxide emission per amount of activity.

[0046] Examples of methods for calculating carbon dioxide emissions include Scope 1 (direct emissions), Scope 2 (indirect emissions), and Scope 3 (other emissions).

[0047] The emission amount calculation unit 48C records the calculated emission amount of carbon dioxide. The emission amount calculation unit 48C records the emission amount of carbon dioxide emitted by charging the battery 31. The emission amount calculation unit 48C records the emission amount of carbon dioxide emitted by operating the work machine 2. In an embodiment, the emission amount calculation unit 48C stores the calculated emission amount of carbon dioxide in the emission amount memory unit 50B of the storage 50. In addition, the emission amount calculation unit 48C transmits the calculated emission amount of carbon dioxide to the management server 8.

[0048] [Management method] 7 is a flowchart showing a method for calculating the amount of carbon dioxide emission caused by charging the battery 31 according to this embodiment. The power generation record data acquisition unit 48A acquires power generation record data from the publishing organization 26 (step SA1).

[0049] The usage amount calculation unit 48B calculates a first usage amount indicating the usage amount of the first power used to charge the battery 31, and a second usage amount indicating the usage amount of the second power, based on the power generation result data acquired in step SA1. The usage amount calculation unit 48B calculates the first usage amount based on the first power generation result data including the result value of the power generation amount of the first power and the first ratio, and the charging time and charging duration of the battery 31 using the charging station 23. The usage amount calculation unit 48B calculates the second usage amount based on the second power generation result data including the result value of the power generation amount of the second power and the second ratio, and the charging time and charging duration of the battery 31 using the charging station 23 (step SA2).

[0050] The emission amount calculation unit 48C calculates the amount of carbon dioxide emitted by charging the battery 31 based on the specified carbon dioxide emission calculation method and the first and second usage amounts calculated in step SA2 (step SA3).

[0051] The first and second usage amounts calculated in step SA2 are stored in usage amount storage unit 50A. The carbon dioxide emission amount calculated in step SA3 is stored in emission amount storage unit 50B. The first and second usage amounts calculated in step SA2 are transmitted from the in-vehicle controller 40 to the management server 8 via the communication system 7. The carbon dioxide emission amount calculated in step SA3 is transmitted from the in-vehicle controller 40 to the management server 8 via the communication system 7 (step SA4).

[0052] The management server 8 stores the first and second usage amounts and the carbon dioxide emission amount. The carbon dioxide emission amount stored in the management server 8 may be reported to an administrative agency.

[0053] [effect] As described above, according to the embodiment, the processor 48 calculates the usage amount of the first power and the usage amount of the second power used to charge the battery 31 of the work machine 2. Carbon dioxide is emitted when the first power is generated, and no carbon dioxide is emitted when the second power is generated. By calculating the usage amounts of the first power and the second power used to charge the battery 31, or the ratio between the first power and the second power used to charge the battery 31, it is possible to grasp how much greenhouse gas is being emitted by using the work machine 2 having the battery 31.

[0054] [Other embodiments] In the above embodiment, the first power usage amount and the second power usage amount used to charge the battery 31 of the shovel 2A are calculated. The first power usage amount and the second power usage amount used to charge the battery 31 of the bulldozer 2B may be calculated. The first power usage amount and the second power usage amount used to charge the battery 31 of the dump truck 2C may be calculated. [Explanation of symbols]

[0055] 1...management system, 2...work machine, 2A...shovel, 2B...bulldozer, 2C...dump truck, 3...work site, 4...remote control room, 5...information terminal, 6...remote control device, 7...communication system, 8...management server, 9...rotating body, 10...traveling body, 10A...track, 11...work machine, 11A...boom, 11B...arm, 11C...bucket, 12...work machine cylinder, 12A...boom cylinder, 12B...arm cylinder, 12C...bucket cylinder, 20...power plant, 21...first power plant, 22...second power plant, 23...charging station, 24...power transmission equipment, 25... Electricity supply area, 25A...first area, 25B...second area, 26...disclosure agency, 30...control system, 31...battery, 32...charging device, 33...DC / DC converter, 34...inverter, 35...electric motor, 36...hydraulic pump, 37...main valve, 38...hydraulic actuator, 40...on-board controller, 43...communication device, 48...processor, 48A...power generation performance data acquisition unit, 48B...usage calculation unit, 48C...emissions calculation unit, 49...main memory, 50...storage, 50A...usage memory unit, 50B...emissions memory unit, 51...interface.

Claims

1. A processor is provided. The processor, Calculating the amount of electricity used to charge the battery of the work machine; storing the usage amount in a storage device; The electricity includes one or both of a first electricity that discharges a first amount of carbon dioxide to generate a unit amount of electricity, and a second electricity that discharges a second amount of carbon dioxide less than the first amount to generate the unit amount of electricity, the usage amount includes a first usage amount indicating a usage amount of the first power used to charge the battery, and a second usage amount indicating a usage amount of the second power used to charge the battery; Work machine management system.

2. The first electric power is generated by utilizing non-renewable energy, The second power is generated using renewable energy. A work machine management system according to claim 1.

3. The processor, Acquire power generation result data including first power generation result data representing a result value of the amount of power generated by using the exhaustible energy for each time interval, and second power generation result data representing a result value of the amount of power generated by using the renewable energy for each time interval, calculating the first usage amount and the second usage amount based on the power generation result data; A work machine management system according to claim 2.

4. The processor, Calculating an amount of carbon dioxide emission caused by charging the battery based on a designated method for calculating an amount of carbon dioxide emission and the first usage amount and the second usage amount; storing the carbon dioxide emission amount in the storage device; A work machine management system according to claim 3.

5. Calculating an amount of power used to charge a battery of the work machine; and recording said usage. The electricity includes one or both of a first electricity that discharges a first amount of carbon dioxide to generate a unit amount of electricity, and a second electricity that discharges a second amount of carbon dioxide less than the first amount to generate the unit amount of electricity, the usage amount includes a first usage amount indicating a usage amount of the first power used to charge the battery, and a second usage amount indicating a usage amount of the second power used to charge the battery; How to manage work machinery.

Citation Information

Patent Citations

  • Method for optimized management of charging of a fleet of electric vehicles - Patent Application 20070122967

    JP2022510390A