vehicle

By predicting battery energy needs and charging the battery before starting, the invention prevents fuel cell high output operation, enhancing fuel efficiency during vehicle start-up.

JP2024163575AInactive Publication Date: 2024-11-22TOYOTA JIDOSHA KK
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
JP2023079317
Authority / Receiving Office
JP · JP
Patent Type
Applications
Current Assignee / Owner
Filing Date
2023-05-12
Publication Date
2024-11-22
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

When a vehicle starts and accelerates after stopping, insufficient battery charge can lead to the fuel cell operating at a high power output, reducing its efficiency.

Method used

Predicting the battery energy required for the next acceleration using machine learning and charging the battery while stopped to prevent battery depletion, thereby avoiding high output operation of the fuel cell.

Benefits of technology

This approach maintains fuel cell efficiency by preventing high output operation during start-up acceleration, thus improving fuel efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 2024163575000001_ABST
    Figure 2024163575000001_ABST
Patent Text Reader

Abstract

To provide a vehicle that can suppress a deterioration of fuel efficiency.SOLUTION: A vehicle includes: a fuel cell; a battery electrically connected to the fuel cell; a travel motor configured to receive power supply from the fuel cell and the battery; and a control unit configured to control the fuel cell and the battery. During stopping of the vehicle, the control unit can execute processing of estimating battery energy required for next start acceleration of the vehicle based on machine learning or the like. The control unit can execute processing of calculating a target SOC of the battery based on the estimated battery energy. The control unit can execute processing of generating electricity with the fuel cell and charging the battery during stopping of the vehicle until the target SOC is attained. In the estimating processing, the battery energy is estimated at least based on the estimated acceleration and estimated attained vehicle speed to be estimated at the next start acceleration.SELECTED DRAWING: Figure 2
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The technology disclosed in this specification relates to a vehicle. [Background technology]

[0002] Battery assist control is known for vehicles equipped with a fuel cell and a battery. In this control, the battery is charged in advance with power generated by the fuel cell. Then, in a situation where a large amount of power is required transiently (for example, when accelerating from a stopped vehicle to a standstill), power is supplied not only from the fuel cell but also from the battery. Note that Patent Document 1 discloses a related technology. [Prior art documents] [Patent documents]

[0003] [Patent Document 1] Japanese Patent Application Publication No. 7-240212 Summary of the Invention [Problem to be solved by the invention]

[0004] When accelerating from a stop, if the battery is not sufficiently charged, it may not be possible to supply power from the battery. In this case, the fuel cell operates at a high-power operating point in order to supply all the power from the fuel cell. At the high-power operating point, the power generation efficiency of the fuel cell decreases, resulting in a deterioration of fuel economy. [Means for solving the problem]

[0005] According to the configuration of claim 1, while the vehicle is stopped, it is possible to predict the battery energy required for the next start-up acceleration. The battery energy prediction may be performed, for example, using machine learning. Then, while the vehicle is stopped, the battery can be charged based on the predicted battery energy. This makes it possible to prevent a shortage of the charge amount that serves as the resource for battery assist control at the next start-up acceleration. Since it is possible to prevent the fuel cell from operating at a high output operating point during start-up acceleration, it is possible to prevent deterioration of fuel efficiency. [Brief description of the drawings]

[0006] [Figure 1] 1 is a schematic diagram of a vehicle 1. FIG. [Diagram 2] 4 is an operational flowchart of the battery charging control operation of the present specification. [Diagram 3] FIG. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS EXAMPLES

[0007] (Vehicle 1 Configuration) FIG. 1 shows a schematic configuration diagram of a vehicle 1. The vehicle 1 mainly includes a fuel cell 3, a battery 4, a sensor 8, a first converter 7, a power control unit (PCU) 10, a motor 6, a power management ECU 30, and a navigation ECU 40. In FIG. 1, communication paths are indicated by dotted lines. The battery 4 is a secondary battery such as a nickel-metal hydride battery or a lithium-ion battery. The battery 4 is connected to the PCU 10 via a main power supply wiring 5. The fuel cell 3 is a power generation device that extracts electric power by electrochemically reacting hydrogen with air. The fuel cell 3 is electrically connected to the battery 4 and the PCU 10 via the first converter 7. The first converter 7 can boost the voltage of the electric power generated by the fuel cell 3 to a voltage suitable for charging the battery 4.

[0008] The PCU 10 is provided between the fuel cell 3 and the battery 4 and the motor 6. The PCU 10 includes a second converter 16 and an inverter 18. The second converter 16 boosts the voltage of the power supplied from the fuel cell 3 and the battery 4 to a voltage suitable for driving the motor 6 as necessary. The second converter 16 can also step down the voltage of the power generated by the motor 6 to a voltage suitable for charging the battery 4. The inverter 18 converts the DC power supplied from the fuel cell 3 and the battery 4 into three-phase AC power for driving the motor 6. The inverter 18 can also convert the three-phase AC power generated by the motor 6 into DC power for charging the battery 4.

[0009] The power management ECU 30 (hereinafter sometimes abbreviated as ECU 30) is an electronic control circuit that controls the fuel cell 3, the battery 4, the first converter 7, the PCU 10, the motor 6, etc. The power management ECU 30 includes a computer 31 and a storage device 32. The storage device 32 includes, for example, an EEPROM. The storage device 32 stores various programs (e.g., a battery charging control program) and various data (e.g., a relationship map RM). The computer 31 executes the battery charging control program stored in the storage device 32, thereby enabling the ECU 30 to execute the battery charging control shown in FIG. 2.

[0010] Furthermore, the ECU 30 performs control to allocate power supply between the fuel cell 3 and the battery 4 based on the vehicle power Pv(t), which is the power required by the vehicle 1. Specifically, the ECU 30 issues a power generation command to the fuel cell 3 based on the vehicle power Pv(t). Then, the ECU 30 causes the battery 4 to supply the difference power between the vehicle power Pv(t) and the amount of power generated by the fuel cell 3.

[0011] Furthermore, the ECU 30 receives various measurement data from the sensor 8. Examples of the measurement data include an open circuit voltage value and a charge / discharge current value of the battery 4. The ECU 30 can then calculate the SOC (remaining capacity) of the battery 4 based on the measurement data.

[0012] The navigation ECU 40 is connected to the ECU 30 so as to be able to exchange information with the navigation ECU 40. The navigation ECU 40 is electrically connected to a navigation database 41, a travel data storage unit 42, etc. The navigation database 41 stores various data such as map data, route calculation data, image data, and audio data in a storage device such as a semiconductor memory. The travel data storage unit 42 stores various types of travel data.

[0013] (Battery charging control operation) The operation of the battery charging control in this specification will be described with reference to the flowchart in FIG. 2. The flowchart process in FIG. 2 is started in response to the vehicle 1 stopping, and ends when the vehicle starts moving. The flowchart process in FIG. 2 is executed every time the vehicle 1 stops. FIG. 3 shows a schematic explanatory diagram of the process contents. FIG. 3(A) is a graph showing an example of the time change of each of the vehicle speed V(t), the vehicle power Pv(t), and the battery required power Pb(t). The horizontal axis of FIG. 3(A) is time. FIG. 3(B) is an example of a relationship map RM between the vehicle power Pv(t) and the battery required power Pb(t). The relationship map RM can be calculated in advance so that the efficiency of the power supply is maximized for the vehicle. The details of FIG. 3(A) and FIG. 3(B) will be described later.

[0014] 2, a predicted battery energy BE is calculated. The predicted battery energy BE is the energy that needs to be transiently supplied from the battery 4 to the motor 6 during the next start acceleration.

[0015] In step S10, the ECU 30 generates a predicted value of acceleration during acceleration (predicted acceleration PA). Various methods can be used to generate the predicted acceleration PA. For example, a fixed value of average acceleration in the market may be used. In addition, for example, the user's past behavior may be machine-learned and predicted from the vehicle position, date and time, and traffic conditions.

[0016] Furthermore, in step S10, the ECU 30 generates a predicted value of the target vehicle speed (predicted target vehicle speed PS). The target vehicle speed is the speed at which the vehicle travels in a cruising state after the acceleration period ends. Various methods can be used to predict the predicted target vehicle speed PS. For example, the target vehicle speed may be predicted by machine learning the past driving history stored in the driving data storage unit 42. Also, for example, a sign recognition system provided in the navigation ECU 40 may be used to read the road speed limit and predict the target vehicle speed based on the road speed limit.

[0017] Then, ECU 30 predicts a vehicle speed profile VP based on the predicted acceleration PA and the predicted final vehicle speed PS. The vehicle speed profile VP is a graph showing the change in vehicle speed V(t) over time. An example of the predicted vehicle speed profile VP is shown in the upper part of FIG. 3(A). Before time t1, vehicle 1 is stopped. At time t1, vehicle 1 starts moving. During an acceleration period AT from time t1 to time t2, vehicle 1 accelerates at predicted acceleration PA. At time t2, vehicle 1 reaches predicted final vehicle speed PS. During a steady driving period ST after time t2, vehicle 1 drives at a constant vehicle speed.

[0018] In step S20, ECU 30 predicts vehicle power profile PP. An example of the predicted vehicle power profile PP is shown in the middle of Fig. 3(A). The vehicle power profile PP is a graph showing the time change of vehicle power Pv(t), which is the electric power required by vehicle 1. The vehicle power profile PP can be predicted using the vehicle speed profile VP predicted in step S10, vehicle weight information, running resistance, etc. Furthermore, the vehicle power profile PP may be predicted more accurately by taking into account inertial force, vehicle power other than running, or by adding drive system loss.

[0019] In step S30, ECU 30 adds potential energy to the vehicle power profile PP predicted in step S20 based on gradient information obtained from the map data in navigation database 41. Specifically, if the road is an uphill slope, the potential energy is added, and if the road is a downhill slope, the potential energy is subtracted.

[0020] In step S35, ECU 30 adds the power consumption of various auxiliary devices (eg, air conditioner) in the vehicle system to the vehicle power profile PP obtained in step S30.

[0021] In step S40, the ECU 30 predicts a battery required power profile BP. An example of the predicted battery required power profile BP is shown in the lower part of Fig. 3(A). The battery required power profile BP is a graph showing a change in the battery required power Pb(t) over time. The battery required power Pb(t) is the amount of output power required of the battery 4.

[0022] A more specific explanation will be given. As shown in region R1 of the relationship map RM in Fig. 3(B), as the vehicle power Pv(t) increases, the battery required power Pb(t) also increases. Then, when the battery required power Pb(t) reaches the battery output upper limit value UL, the battery required power Pb(t) does not increase from the battery output upper limit value UL even if the vehicle power Pv(t) increases.

[0023] Then, using the above-mentioned relationship map RM, the battery required power profile BP can be predicted from the vehicle power profile PP obtained in step S35. The battery required power profile BP shown in the lower part of FIG. 3(A) is zero at time t2 when the predicted final vehicle speed PS is reached. This is because the battery assist control mainly targets transitional situations such as acceleration for assistance. Therefore, in the steady running period ST after time t2, the battery assist amount is predicted to be zero. Even in the steady running period ST, assistance is possible as long as the battery 4 has spare capacity.

[0024] In step S50, the ECU 30 calculates the predicted battery energy BE. Specifically, the ECU 30 integrates the battery required power profile BP predicted in step S40. As a result, the predicted battery energy BE during the acceleration period AT can be calculated, as shown in the hatched area in the lower part of FIG. 3(A).

[0025] In step S60, the ECU 30 judges whether the calculated value of the predicted battery energy BE is equal to or greater than a predetermined threshold value. If the predicted battery energy BE is less than the predetermined threshold value (S60: NO), it is judged that the amount of electric power required for assist from the battery 4 during the next start acceleration is sufficiently small. Therefore, the flow ends. On the other hand, if the predicted battery energy BE is equal to or greater than the predetermined threshold value (S60: YES), the flow proceeds to step S70 and continues.

[0026] In step S70, the ECU 30 calculates a target SOC from the predicted battery energy BE required for the next start acceleration. The target SOC can be calculated, for example, by adding an SOC corresponding to the predicted battery energy BE to the central SOC for normal control.

[0027] In step S80, the ECU 30 determines whether the current SOC is lower than the target SOC. The current SOC is a value indicating the state of charge of the battery 4 at the present time. The current SOC can be calculated by the ECU 30 based on the measurement data of the sensor 8. If the current SOC is equal to or higher than the target SOC (S80: NO), it is determined that the charge amount of the battery 4 will not be insufficient during battery assist control, and the flow ends. On the other hand, if the current SOC is lower than the target SOC (S80: YES), the flow proceeds to step S90.

[0028] In step S90, the ECU 30 generates power using the fuel cell 3 and charges the battery 4. The power generation operating point of the fuel cell 3 during charging is set to an operating point at which the fuel cell system efficiency is at its maximum. In other words, the charging power of the battery 4 is a value obtained by subtracting the power consumption of the various auxiliaries of the vehicle 1 from the power generated at the operating point at which the system efficiency is at its maximum.

[0029] In step S100, the ECU 30 determines whether the current SOC has increased to the target SOC. If the current SOC has not reached the target SOC (S100: NO), the process proceeds to step S110, where the ECU 30 determines whether the vehicle 1 has departed. If the vehicle 1 is stopped (S110: NO), the process returns to step S100 and charging continues. On the other hand, if the vehicle 1 has departed (S110: YES), the flow ends.

[0030] If the current SOC has reached the target SOC (S100: YES), the process proceeds to step S120. In step S120, the ECU 30 stops power generation by the fuel cell 3. The ECU 30 also sets a recharge SOC. The recharge SOC has a value lower than the target SOC.

[0031] In step S130, the ECU 30 judges whether the current SOC has dropped to the recharge SOC. If the current SOC has not dropped to the recharge SOC (S130: NO), the process proceeds to step S140, where the ECU 30 judges whether the vehicle 1 has departed. If the vehicle 1 is stopped (S140: NO), the process returns to step S130, where the power generation stop state continues. On the other hand, if the vehicle 1 has departed (S140: YES), the flow ends.

[0032] Furthermore, if the current SOC has fallen to the recharge SOC (S130: YES), the process proceeds to step S130 and recharging is performed. The effect of recharging will now be described. Although there is less power required while the vehicle is stopped compared to when the vehicle is moving, a certain amount of power continues to be consumed by various auxiliary devices (e.g., air conditioner, etc.). Therefore, when the fuel cell 3 enters an intermittent operation state (power generation suspended), power is supplied from the battery 4, causing the SOC to decrease. Therefore, by performing recharging, it is possible to maintain the current SOC at a high level.

[0033] (effect) When the charge amount of the battery 4 is insufficient during start-up acceleration after stopping, there are cases where the battery assist control cannot be performed. In this case, the fuel cell 3 operates at a high-power operating point in order to supply all the power from the fuel cell 3. At the high-power operating point, the power generation efficiency of the fuel cell 3 decreases. In particular, in the high-power region corresponding to the acceleration power, the efficiency decrease is large. As a result, fuel economy deteriorates. Therefore, in the technology of this specification, while the vehicle 1 is stopped, the predicted battery energy BE required at the next start-up acceleration can be predicted (S10-S50). Then, the target SOC can be set so that the charge amount maximizes the expected value of fuel economy (S70). While the vehicle 1 is stopped, it is possible to charge the battery 4 based on the predicted battery energy BE (S90). This makes it possible to prevent the fuel cell 3 from operating at the high-power operating point at the next start-up acceleration, thereby suppressing deterioration of fuel economy.

[0034] (Modification) The prediction of the predicted battery energy BE (S40) may be based on at least the predicted acceleration PA and the predicted final vehicle speed PS. Therefore, vehicle weight information, running resistance, drivetrain loss, gradient information, power consumption of various auxiliary devices, etc. may be omitted in the prediction of the predicted battery energy BE. [Explanation of symbols]

[0035] 1: Vehicle 3: Fuel cell 4: Battery 6: Motor 30: Power management ECU BE: Estimated battery energy PA: Estimated acceleration PS: Estimated final vehicle speed

Claims

[Claim 1] A fuel cell; a battery electrically connected to the fuel cell; a driving motor that receives power from the fuel cell and the battery; A control unit that controls the fuel cell and the battery; Equipped with The control unit is A process of predicting battery energy required for the next start acceleration while the vehicle is stopped; calculating a target SOC of the battery based on the predicted battery energy; a process of generating power using the fuel cell and charging the battery until the target SOC is reached while the vehicle is stopped; It is possible to execute In the prediction process, the battery energy is predicted based on at least a predicted acceleration and a predicted final vehicle speed predicted at the next start acceleration. vehicle.

Citation Information

Patent Citations

  • Hybrid electric power source device

    JP1995240212A