Measurement method, structure building method, structure management method and shape acquisition system
A sensor-based method and system for measuring and adjusting steel frame construction accurately addresses the challenges of site obstacles and inaccurate displacement measurements, enhancing precision and efficiency in steel frame construction.
Patent Information
- Application Number
- JP2024125820
- Authority / Receiving Office
- JP · JP
- Patent Type
- Applications
- Current Assignee / Owner
- Priority Date
- 2021-06-28
- Filing Date
- 2024-08-01
- Publication Date
- 2024-12-03
- Estimated Expiration
- 2042-06-21
AI Technical Summary
Existing methods for measuring the accuracy of steel frame construction, such as using three-dimensional surveying devices, face challenges due to obstacles at construction sites, and cannot accurately measure the displacement of steel column heads or the shape of steel columns.
A method and system utilizing a network of sensors attached to multiple points on a steel structure to measure inclination angles, calculate positional information, and determine shape information, enabling accurate measurement of column shapes and displacements without light-based surveying, and adjusting construction jigs for precise erection.
Enables accurate measurement of steel column shapes and displacements, reducing labor requirements and shortening construction times by automating the adjustment of construction jigs, thereby improving the precision and efficiency of steel frame construction.
Smart Images

Figure 2024167213000001_ABST
Abstract
Description
[Technical field]
[0001] The present invention relates to a shape acquisition method, a method for managing an object, construction of a steel frame structure, and a shape acquisition system, and more specifically, to a shape acquisition method suitable when the object is at least a part of a structure (hereinafter also referred to as a building or a structural body) including a steel frame, a method for managing an object and construction of a steel frame structure utilizing the shape acquisition method, and a shape acquisition system suitable when the object is at least a part of a structure. This application claims priority to Japanese Patent Application No. 2021-106519, filed on June 28, 2021, the contents of which are incorporated herein by reference. [Background technology]
[0002] Conventionally, when constructing a building structure, it is necessary to inspect whether the construction materials constituting the pillars, walls, etc. are assembled without tilting or distortion. For example, the measurement of the accuracy of steel frame construction was generally performed using a three-dimensional surveying device that optically measures the position of a target attached to a steel frame pillar. However, since there are obstacles at an actual construction site, it is sometimes difficult to measure using a surveying device that uses light. To improve this inconvenience, a collapse measuring device has been invented that measures the collapse of a steel frame pillar using a collapse measuring device (sensor) that does not use light in order to measure the accuracy of steel frame construction (see, for example, Patent Document 1).
[0003] However, while the device described in Patent Document 1 can measure the tilt of steel columns during the steel frame erection process, it cannot accurately measure the displacement of the column capital of the steel column, nor can it measure the shape of the steel column. [Prior art documents] [Patent documents]
[0004] [Patent Document 1] JP 2018-179533 A Summary of the Invention [Means for solving the problem]
[0005] According to a first aspect of the present invention, a measurement method for acquiring shape information of an object includes acquiring inclination angle information of the object at each of multiple points on the object, the multiple points being at different positions with respect to at least a first direction, acquiring position information of the object at each of the multiple points in a second direction intersecting the first direction based on the acquired inclination angle information, and determining shape information of the object based on the acquired position information. According to a second aspect of the present invention, there is provided a method for building a structure in which a plurality of columns each have a plurality of sections, the method comprising: installing a plurality of lower section columns approximately parallel to a first direction; connecting the lower section columns and the upper section columns of each of the plurality of columns with an erection jig in order to erect a plurality of upper section columns to the plurality of lower section columns, respectively; acquiring inclination angle information of the upper section columns at each of the plurality of points by sensors attached to each of the plurality of upper section columns at different positions at least with respect to the first direction; acquiring position information of the upper section columns at each of the plurality of points with respect to a second direction intersecting with the first direction based on the acquired inclination angle information; determining shape information of the upper section columns based on the acquired position information; and adjusting the erection jig for the plurality of columns approximately in parallel based on the shape information acquired for the plurality of upper section columns. According to a third aspect of the present invention, there is provided a method for managing a structure, comprising the steps of: treating at least a portion of the structure as an object; repeatedly executing the above-described measurement method; and detecting shape change information of the object based on the shape information obtained each time the method is executed. According to a fourth aspect of the present invention, there is provided a shape acquisition system for acquiring shape information of an object, comprising a sensor attached to the object and an analysis device connected to the sensor via a network to acquire inclination angle information of the object, wherein data including the inclination angle information output from the sensor attached to a plurality of points on the object having different positions with respect to at least a first direction is transmitted to the analysis device via the network, and the analysis device acquires position information of the object at each of the plurality of points with respect to a second direction that intersects the first direction based on the inclination angle information, and determines shape information of the object based on the position information. According to a fifth aspect of the present invention, there is provided a shape acquisition method for acquiring shape information of an object, the shape acquisition method including acquiring inclination angle information of the object at a plurality of points using a plurality of sensors attached to the object, and determining the shape information of the object by calculation using the acquired inclination angle information at the plurality of points.
[0006] According to a sixth aspect of the present invention, there is provided a method for managing an object, comprising repeatedly executing the above-mentioned shape acquisition method and monitoring changes over time in the shape of the object based on shape information obtained each time the method is executed.
[0007] According to a seventh aspect of the present invention, there is provided a method for erecting a steel frame structure including multiple columns, the method including the steps of: acquiring shape information of one surface extending in the longitudinal direction of each of the multiple lower section columns using the shape acquisition method according to the first aspect when erecting multiple upper section columns individually on each of multiple lower section columns erected in a predetermined arrangement; determining a first positional deviation amount of the head of each of the multiple lower section columns from a reference in a direction perpendicular to the one surface based on the acquired shape information; and determining a new target plumbing value for each of the multiple upper section columns in consideration of the first positional deviation amount. Here, "plumbing" is a term meaning the degree of perpendicularity of a column, and the target plumbing value means a target value of the degree of perpendicularity of a column, i.e., a target value of an inclination angle.
[0008] According to an eighth aspect of the present invention, there is provided a method for erecting a steel frame structure including multiple section columns, the method including: erecting a plurality of upper section columns individually on each of a plurality of lower section columns erected in a predetermined arrangement, connecting each of the lower section columns and the upper section columns using a plurality of construction jigs, while placing the plurality of upper section columns individually on each of the plurality of lower section columns; acquiring, for each of the plurality of upper section columns, shape information of a first face and a second face that extend in the longitudinal direction and intersect with each other using the shape acquisition method described in claim 4; and automatically adjusting positions of the column heads of the plurality of upper section columns by a control device controlling in parallel a plurality of driving devices individually provided on the plurality of construction jigs based on the acquired shape information of the first face and the second face for each of the plurality of upper section columns.
[0009] According to a ninth aspect of the present invention, there is provided a shape acquisition system for acquiring shape information of an object, comprising an analysis device and a terminal device connected to each other via a wide area network, and a plurality of sensor devices each connected to the terminal device via a communication line and attached to different positions of the object when in use, and outputting sensor data including information on the inclination angle at each attachment position via the communication line, wherein each of the plurality of sensor devices outputs the sensor data based on an external command or at a predetermined timing, the terminal device transmits the sensor data output from each of the plurality of sensor devices to the analysis device via the wide area network, and the analysis device determines shape information of the object by calculation using the inclination angle information included in the plurality of sensor data received via the wide area network, and stores the determined shape information in a storage.
[0010] Here, the communication line and the wide area network may be part of the same network. [Brief description of the drawings]
[0011] [Figure 1]1 is a diagram illustrating an overall configuration of a shape acquisition system according to a first embodiment for implementing a shape acquisition method. [Diagram 2] 2 is a block diagram showing an example of the configuration of the sensor device of FIG. 1. [Diagram 3] FIG. 2 is a perspective view showing a steel-frame building including a large number of steel columns as objects of shape measurement, with some parts omitted. [Figure 4] Part (A) of FIG. 4 is a side view showing the sensor device fixed to a steel column, and part (B) of FIG. 4 is a bottom view showing the sensor device. [Diagram 5] 4 is a flowchart showing a flow of a shape acquisition method according to the present embodiment. [Figure 6] 1 is a diagram showing a pillar selected as a measurement target and three sensor devices attached to the pillar, which are used to explain a shape acquisition method according to the present embodiment. FIG. [Figure 7] 4 is a flowchart showing a processing algorithm executed by a CPU of an arithmetic processing unit of the sensor device. [Figure 8] 13 is a flowchart showing a processing algorithm of an interrupt processing routine executed by a CPU of the server. [Figure 9] 5A and 5B are diagrams for explaining the meaning of an inclination angle outputted from a sensor device. [Figure 10] FIG. 13 is a diagram for explaining a method for calculating the shape of a measurement surface (first surface) of a pillar 1001 on which sensor devices 181 to 183 are attached. [Figure 11] FIG. 13 is a diagram showing an example in which sensor devices are arranged at the same height on two mutually perpendicular faces extending in the longitudinal direction of a pillar. [Figure 12] FIG. 1 is a diagram showing an example of the configuration of a system for carrying out steel frame construction. [Figure 13] FIG. 1 is a diagram for explaining the construction jig, showing the construction jig in a state in which the erection piece 102a of the column 100m and the erection piece 102b of the column 100n are connected. [Figure 14]This is a diagram showing an erection jig attached to an erection piece 102a at the head of a column 100m, and also shows the erection jig in an open state. [Figure 15] 13 is a flowchart showing the process flow for erecting an n-node column. [Figure 16] FIG. 13 is a diagram for explaining a steel beam. [Figure 17] This figure explains the new setting of the target plumbing value of the second node column to offset the positional deviation in the X-axis direction of the capital of the first node column when the second node column is erected on top of the first node column. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0012] First Embodiment A first embodiment will be described below with reference to Fig. 1 to Fig. 11. Here, as an example, a case will be described in which the target object is a steel column 100 constituting a steel building 110 shown in Fig. 3, but the target object is not limited to a steel column. In the following description, as shown in Fig. 3, the vertical direction (gravity direction) is defined as the Z-axis direction, the left-right direction in the plane of Fig. 3 in a plane perpendicular to the Z-axis is defined as the X-axis direction, the direction perpendicular to the Z-axis and the X-axis is defined as the Y-axis direction, and the tilt (rotation) directions around the X-axis, Y-axis, and Z-axis are defined as the θx, θy, and θz directions, respectively.
[0013] 1 shows a schematic diagram of an overall configuration of a shape acquisition system 10 according to a first embodiment for implementing a shape acquisition method. The shape acquisition system 10 includes a server 12 that also functions as an analysis device, which are connected to each other via a wide area network (hereinafter abbreviated as network) 13 such as the Internet, a field controller 14 and a mobile terminal 16 that also function as terminal devices, and a plurality of sensor devices 18 connected to the field controller 14 via a communication line, for example, a wireless LAN. i (i=1, 2, 3, . . . ) in the configuration shown in FIG. 1. iOf these, three sensor devices 181 to 183 are shown as representatives. The communication lines may all be wireless, or at least some may be wired. Also, it is not necessary to provide the terminal device 14, and multiple sensor devices 18 may be provided. i The output of the above may be provided directly to the server 12 via the network 13. That is, the communication line and the wide area network 13 may be part of the same network. Also, the terminal device may not include the on-site controller, and may be only a mobile PC or a smartphone.
[0014] In this embodiment, a computer generally used for a server is used as the server 12, but a cloud (computer) may also be used. The server 12 includes a CPU, ROM, RAM, HDD, etc. (storage), which are not shown, and the CPU uses, for example, the RAM as a working area to execute various processing algorithms defined by various programs stored in the ROM, HDD, etc. Note that the configuration of the server 12, which also functions as an analysis device, is not limited to that of this embodiment, and may include a plurality of sensor devices 18. i It is sufficient that the analyzer has at least a configuration (or function) capable of calculating and obtaining shape information of the target object (steel column 100) based on the output of the above. Furthermore, the analyzer is not limited to hardware as in the present embodiment, and may be software capable of at least executing a calculation function, for example.
[0015] Furthermore, when the server 12 receives sensor data (including ID) from the on-site controller 14 via the network 13 as described below, it executes the processing of an interrupt processing routine described below to obtain shape information of a part of the target object (measurement target). The processing of the interrupt processing routine will be described in detail later.
[0016] The on-site controller 14 is a computer that is generally used in this embodiment. The on-site controller 14 incorporates a CPU, ROM, RAM, and HDD (not shown) as an example, and the CPU uses, for example, the RAM as a working area to execute a processing algorithm defined by a program stored in the ROM, HDD, etc. The on-site controller 14 is equipped with an operation unit such as a keyboard and a mouse, and a display screen such as a liquid crystal display. In this embodiment, the on-site controller 14 performs data communication between the server 12 and the mobile terminal 16 via the network 13 in response to instructions input via the operation unit by a site supervisor or other manager. The on-site controller 14 also controls a plurality of sensor devices 18 as described below. i When multiple pieces of sensor data are sent from the server 12 via a communication line, the server 12 extracts sensor data about the same object from the multiple pieces of sensor data, bundles them together (for example, by linking them using the same ID), and transmits them to the server 12.
[0017] The mobile terminal 16 is carried by a worker at the construction site. The mobile terminal 16 is a commonly used portable computer, such as a tablet PC. The mobile terminal 16 may also be a smartphone.
[0018] Sensor device 18 i As shown in FIG. 2, each of the sensor devices includes an angle sensor 181, an arithmetic processing unit 182, a wireless communication unit 183, a power supply unit 184 formed of, for example, a battery, and a waterproof housing 185 that houses these components. The supply of power from the power supply unit 185 to each unit of the sensor device can be turned on and off by operating a power switch 186 provided on the housing 185. Note that the communication unit 183 is not limited to being wireless, and at least a part of it may be wired. In addition, the sensor device 18 i It is not always necessary to provide the power switch 186, and the power may be turned on and off by an external operation (such as the server 12 or the on-site controller 14). iis not limited to the configuration of this embodiment, and the angle sensor 181, the communication unit 183, etc. do not have to be integrally configured, and at least the angle sensor 181, i.e., the sensor device 18 i It is sufficient that the on-site controller 14 only has a function of measuring angle information at the installation location of the angle sensor 181. For example, the angle sensor 181 and other units (including the arithmetic processing unit 182, etc.) may be connected by a wireless or wired communication line, and the sensor data from the angle sensor 181 and the power supply to the angle sensor 181 may be performed via the communication line. In this case, it is not necessary to provide another unit for each angle sensor 181, and multiple angle sensors 181 may be connected to the same other unit via the communication line. Also, the function of the other unit may be provided in the on-site controller 14.
[0019] In this embodiment, a 3D MEMS (three-dimensional microelectromechanical system) tilt angle (tilt angle) sensor is used as the angle sensor 181 as an example. The 3D MEMS tilt angle sensor is a precision tilt sensor created using 3D MEMS technology, and is simply referred to as a 3D MEMS sensor below. The power required by the 3D MEMS tilt angle sensor is extremely low, consuming power in the microampere range, making it suitable for wireless applications. The angle sensor 181 uses two MEMS acceleration sensors with symmetrical output characteristics and an ASIC built in, and outputs information on tilt angles (α, β, γ) in three directions (θx direction, θy direction, θz direction), for example. The angle sensor is not limited to a 3D MEMS tilt angle sensor, and other types of three-dimensional tilt angle sensors may be used. In addition, the angle sensor is not limited to a three-dimensional tilt angle sensor, and a two-dimensional tilt angle sensor or a one-dimensional tilt angle sensor may be used depending on the object to be measured. In this case, a two-dimensional tilt angle sensor and a one-dimensional tilt angle sensor may be combined, or a plurality of two-dimensional or one-dimensional tilt angle sensors may be combined.
[0020] The arithmetic processing unit 182 is composed of, for example, a microcontroller (MCU) and has a CPU, a memory device (RAM, ROM), an input / output circuit, and a timer circuit, which are not shown. The arithmetic processing unit 182 executes a processing algorithm defined by a program stored in the ROM. Note that, instead of providing the arithmetic processing unit 182, an ASIC built into the angle sensor 181 may also have the function of the arithmetic processing unit 182.
[0021] Here, the sensor device 18 i An example of a structure for mounting a sensor device 18 fixed to a pillar 100 will be described. i FIG. 4B shows a side view of the sensor device 18. i A bottom view of the same is shown.
[0022] As shown in Fig. 4(A) and Fig. 4(B), a plate-shaped cushion member 188 made of, for example, urethane, silicon, rubber, or felt is attached to the bottom surface of the housing 185. A plurality of recesses (for example, six recesses) are formed in the bottom of the housing 185 facing the cushion member 188, and a permanent magnet 190 is disposed in each recess. i The sensor device 18 is attached to the pillar 100 by the magnetic force of a plurality of permanent magnets 190 via a cushion member 188. This allows the sensor device 18 to be mounted on the pillar 100 without being affected by unevenness of the mounting surface of the pillar 100 caused by rust or the like. i This effectively prevents the occurrence of tilt errors during installation of the sensor device 185. A magnetic shield member 189 is provided near the bottom of the housing 185. The number and shape of the permanent magnets are not particularly limited, and the shape of the recess formed in the bottom of the housing 185 may be any shape that allows the permanent magnets to be placed therein. The cushion member 188 is also provided to the sensor device 185. i Depending on the flatness of the installation surface of the pillar to which the column is attached, it may not necessarily be provided.
[0023] Next, the flow of the shape acquisition method according to this embodiment will be described with reference to the flowchart of FIG.i are attached to a column selected as a measurement target among many columns constituting a steel frame building 110 shown in Fig. 3. In the following, one column 1001 and three sensor devices 181-183 attached to the column 1001 shown in Fig. 6 are appropriately selected and explained. In Fig. 6, the three sensor devices 181-183 are arranged from bottom to top on the +X side surface of the column 1001 (hereinafter also referred to as the first surface or measurement surface).
[0024] As a premise, the server 12 stores data such as design drawings of the steel frame building 110 in a storage device (such as a HDD) through communication between the on-site controller 14 and the server 12 via the network 13. The server also instructs the on-site controller 14 on the conditions that are the premise of the measurement based on the design drawing data. These conditions include the number of sensor devices to be attached to the columns to be measured and their installation positions.
[0025] First, a site manager such as a site supervisor identifies the target pillar and measurement location (also called measurement point or measurement point) via the site controller 14 in response to an instruction from the server, and notifies the site worker of the specified content by e-mail or the like and instructs him / her to prepare for measurement (step S1 in FIG. 5). The instruction content is also displayed on the display screen of the mobile terminal 16. Here, the pillar is specified using the pillar number (001, 002, ......), and the measurement location is specified using the number (01, 02, ......) from the bottom up. Each measurement location is determined so that the distance from the base when the pillar is erected is a predetermined value, for example. In this embodiment, instructions are given to the site worker via the site controller 14, but work instructions may be sent from the server 12 to the mobile terminal 16 carried by the worker via the network 13. In this case, it is preferable that the manager inputs the specified content such as the measurement location into the server 12 in advance.
[0026] After checking the instructions in the email, the workers on-site followed the instructions and installed 100 pillars to be measured. j and a sensor device 18 at the measurement point. iThe sensors 18 are installed one by one. i Here, the initial settings of each sensor device 18 are performed (step S2 in FIG. 5). i It is assumed that each sensor device 18 is calibrated in advance to prevent measurement errors. i The sensor device 18 has been previously set to the required settings so that it can communicate with the on-site controller 14 via a communication line (wireless LAN). However, after the settings are made, the switch 186 is temporarily set to OFF. i Pillar 100 j In this embodiment, the sensor device 18 is attached to the sensor 18 with one touch using magnetic force as described above. i With switch 186 turned ON (on state), pillar 100 j It may also be attached to.
[0027] The above sensor device 18 i The initial setting of the sensor device 18 i The switch 186 of the sensor device 18 is turned on, and the sensor device 18 is displayed via the display operation unit 187. i For example, the identification information (001-01), (001-02), and (001-03) are input to each of the three sensor devices 181, 182, and 183 shown in FIG. 6, and each arithmetic processing unit 182 stores the input identification information in its internal memory (RAM). i The sensor device 18 is in a standby state so that it can measure at any time. i When the switch 186 is installed with the switch 186 in the on state, there is no need to operate the switch 186.
[0028] When the installation and initial settings of all the sensor devices to be used for measurement are completed, the on-site worker notifies a manager such as the site supervisor by email or the like that the instructed measurement preparations are completed (step S3 in FIG. 5).
[0029] Next, the measurement target pillar 100 jThe sensor device is used to obtain information on the tilt angle at each of the measurement points (step S4 in FIG. 5).
[0030] When the acquisition of the inclination angle information at each measurement point of the pillar to be measured (i.e., the pillar as the target object) is completed, the position and shape of the capital of each pillar to be measured is calculated using the acquired inclination angle information (step S5 in FIG. 5). In this embodiment, the two-dimensional shape (shape in the XZ plane) of one surface on which the sensor device is attached is calculated as the shape of the pillar.
[0031] Once calculation of the column shape is complete, based on the calculated shape, the deviation of the column head from the reference (see Z axis in Figure 10) and the point where the deviation from the reference (corresponding to the amount of deflection of the column) is maximum and the amount of deviation are determined (step S6 in Figure 5).
[0032] In this embodiment, steps S4 to S6 are performed by the shape acquisition system 10. Hereinafter, the operation of each component of the shape acquisition system 10 will be described.
[0033] First, the operation of each sensor device used in the process of step S4 will be described with reference to the flowchart of Fig. 7. This flowchart shows a processing algorithm defined by a program executed by the CPU of the arithmetic processing unit 182. For convenience, it is assumed that the processing algorithm shown in the flowchart of Fig. 7 starts when the initial settings of each sensor device described above are completed.
[0034] First, in step S22, the process waits for an instruction to start measurement to be input. The instruction to start measurement is input by the manager via the on-site controller 14. When the manager receives a notification from the worker in step S3 that the measurement preparation is completed, the manager is able to recognize that the measurement preparation is complete. From this point on, the manager can start each sensor device 18 at an appropriate timing. i An instruction to start measurement is input to the on-site controller 14 via the operation unit.
[0035] Then, when an instruction to start measurement is input from the on-site controller 14 via the communication line and the wireless communication unit 183, the process proceeds to step S24. In step S24, the angle sensor 181 is instructed to perform measurement, and information on the tilt angle (at least one axis out of a maximum of three axes) measured by the angle sensor 181 is acquired.
[0036] In the next step S26, an ID (identification code) is assigned to the acquired output information, and the resulting data is transmitted to the on-site controller 14 via the wireless communication unit 183. Here, the ID is a number (code) that is input by an operator during initial setup and is created based on the identification information stored in the RAM. For example, in the sensor devices 181, 182, and 183, numbers (codes) corresponding to the identification information 001-01, 001-02, and 001-03, respectively, are created as IDs.
[0037] When the process of step S26 is completed, the process ends. i goes into a standby state until a command to start the next measurement is input. The above steps S22 to S26 are performed for all the sensor devices 18. i It is held.
[0038] The on-site controller 14 sequentially stores the received sensor data in a predetermined storage area of the RAM. When multiple sensor data are received simultaneously, the on-site controller 14 stores the sensor data simultaneously and in parallel in a predetermined storage area of the RAM by time-sharing processing. Then, the newly stored data is transmitted by the on-site controller 14 to the server 12 via the network 13 when sensor data for three measurement points (top, middle, and bottom) for the same pillar is collected. For example, in the case of pillar 1001, three pieces of data each including IDs corresponding to identification information 001-01, 001-02, and 001-03 are transmitted to the server 12 in a lump.
[0039] When transmitting the data to the server 12, the on-site controller 14 may display the identification data of the pole corresponding to the transmitted data on a display screen.
[0040] Next, the operation of the server used in the processes of steps S5 and S6 will be described with reference to the flowchart of Fig. 8. This flowchart shows a processing algorithm of an interrupt processing routine defined by a program executed by the CPU of the server 12. This interrupt processing routine is executed, for example, every time the acquisition of sensor data sent from the on-site controller 14 is completed. Note that the timing for executing the interrupt processing routine is not limited to this, and it may be executed when the acquisition of sensor data is completed multiple times.
[0041] First, in step S32, the captured sensor data is used to calculate the height of the pillar 100. j Calculate the shape data. Here, an example of a method for calculating the shape of a pillar will be described. As an example, a case where the shape in the XZ plane of the first surface (hereinafter, referred to as the measurement surface Ws) on which the sensor devices 181 to 183 of the pillar 1001 are attached will be briefly described. The reason why the shape in the XZ plane is taken up here is that the pillar 1001 has three sensor devices 181 to 183 arranged in the vertical direction on the measurement surface Ws. i Since the angle sensor 181 is a 3D MEMS sensor, the inclination angle β of the normal vector at each measurement point (measurement point) of the measurement surface Ws shown on the left side of FIG. i 9, the sensor device 18 i The output is the inclination of the object (angle based on the axis in the direction of gravity). Therefore, there is no need to set a reference, as in the case of measurements using conventional three-dimensional surveying instruments.
[0042] 10, if sensor devices 181, 182, 183 are represented by points P1, P2, P3, respectively, and the positions on measurement surface Ws where sensor devices 181, 182, 183 are attached are P1 (X1, Z1), P2 (X2, Z2), P3 (X3, Z3), then the X position X2 of point P2 and the X position X3 of point P3 can be calculated as follows: Note that the origin of the XZ coordinate system is set to the lower end point of measurement surface Ws whose shape is to be determined.
[0043] X2=X1+tan{(β1+β2) / 2}×(Z2-Z1)……(1) X3=X2+tan{(β2+β3) / 2}×(Z3-Z2)……(2)
[0044] 10 (and FIG. 9), in order to make the explanation visually easier to understand, the tilt angle β1 measured by the sensor device 181 in particular is illustrated larger than it actually is. In reality, the tilt angle β1 is a small angle, so the X position X1 of point P1 is X1 ≈ Z1 tan β1 ≈ 0. By substituting this into equation (1), X2 can be calculated from the known values Z2, Z1, β1, and β2, and by further substituting the calculated X2 into equation (2), X3 can be calculated from the known values X2, Z2, Z3, β2, and β3.
[0045] Next, the determined points P1 (X1, Z1), P2 (X2, Z2), and P3 (X3, Z3) are fitted using an appropriate function, thereby making it possible to determine the shape of the measurement surface Ws on the XZ plane.
[0046] In the above description, the sensor device 18 i The case where three sensors are arranged vertically on the measurement surface has been described. i It is also conceivable to arrange the sensor devices two-dimensionally on the measurement surface. In particular, when the measurement surface of the object is a three-dimensional curved surface, it is necessary to arrange the sensor devices two-dimensionally on the measurement surface. However, in reality, the sensor devices 18 iSince Ws outputs the inclination angle (three-dimensional inclination angle) of the normal vector of the measurement surface Ws, it is also possible to derive the shape (surface shape) of the measurement surface of the object from the measurement values of the measurement point coordinates and the normal vector. For example, the shape may be calculated by obtaining the height of each measurement point relative to the reference surface by the surface slope of each measurement point and its first-order integral, or the shape of the object may be obtained based on a function obtained by converting a function fitted to data of the inclination distribution obtained from multiple data on the same object obtained by measurement into an integral system. As the fitting function, for example, a differential Zernike function or the like can be used. The shape may be calculated by optimizing the order and coefficient so that the error at each measurement point is minimized for an approximated curved surface expressed by, for example, Fourier series expansion using the coordinates of a finite number of discrete measurement points on the measurement surface of the object. In addition, in the shape acquisition method according to this embodiment, various methods using various functions can be used as long as the shape can be calculated using the inclination angles at multiple measurement points.
[0047] Returning to the explanation of Figure 8, in the next step S34, based on the calculated shape, the deviation of the column head from the reference (here, the Z axis) and the point where the deviation from the reference is maximum and the deviation amount (corresponding to the maximum deflection of the column) are determined.
[0048] Then, in the next step S36, the obtained data (shape, deviation amount of the column head, point of maximum deviation amount and data on that deviation amount) is associated with the column number and stored in storage (such as a HDD), after which the interrupt processing routine is exited.
[0049] In this embodiment, the interrupt processing routine in FIG. 8 is performed at each timing of capturing sensor data of a column (object). That is, for each timing of capturing sensor data for each of all columns (objects) to be measured, calculation of the shape, calculation of the deviation amount of the column head, and maximum deviation amount (corresponding to the maximum deflection amount), as well as storage of the calculation results associated with the column number (number of the object) are repeatedly performed. Therefore, a rewritable data table associated with the number (column number) of the object may be prepared in advance in a predetermined area of the storage, and when the calculation results are stored, the area associated with the number (column number) of the object may be repeatedly overwritten (i.e., the stored contents may be updated). Furthermore, the server device 12 may transmit the latest information stored in the storage as table data associated with the design data to the on-site controller 14 via the network 13 every time a data table is created or updated. In this case, the on-site controller 14 may use the transmitted table data to store it in a storage device such as a RAM or HDD to create or update a database.
[0050] In this case, it is possible to monitor the change in the shape of the object (pillar) over time based on the created and updated database. It is also possible to perform strength calculations based on the shape and calculate the stress generated in the object (pillar).
[0051] When monitoring changes over time over a long period of time, it becomes necessary to supply power (power feeding) to each sensor device. As a countermeasure in this case, for example, power feeding using a MEMS vibration generator, wireless power feeding (non-contact power feeding) that transmits power by utilizing the induced magnetic flux generated between the transmitting and receiving sides using an electromagnetic induction method, power generation by solar power, or wired LAN power feeding using a LAN cable may be used.
[0052] In this embodiment, as shown in FIG. imay be disposed at the same height on two mutually orthogonal faces extending in the longitudinal direction of the pillar 100 (a first face orthogonal to the X-axis and a second face orthogonal to the Y-axis).
[0053] For example, sensor devices 181, 182, and 183 are arranged on a first surface, and sensor devices 184, 185, and 186 are arranged on a second surface. In this case, the shape of the first surface may be calculated based on the outputs of sensor devices 181, 182, and 183, and information on the shape of the second surface may be calculated based on the outputs of sensor devices 184, 185, and 186, respectively, by the interrupt processing routine described above.
[0054] Here, since each sensor device outputs a three-dimensional tilt angle, it is theoretically possible to obtain the shape of the second surface by simply mounting sensor devices 181, 182, and 183 on the first surface, but in reality, a rotation error may occur around the normal line of the mounting surface when the sensor devices are mounted, so if you want to know the shapes of the first surface and the second surface, it is better to mount a sensor device on both surfaces. It is also possible to use the results of measuring the first and second surfaces with an existing surveying instrument as initial values, and continuously measure the variation from that result with a sensor mounted on the first surface to obtain the variation results of the first and second surfaces.
[0055] As described above, according to the shape acquisition method of this embodiment, by performing a predetermined calculation using information on the inclination angles at multiple measurement points of the pillar acquired by multiple sensor devices attached to the pillar, it becomes possible to acquire the shape of a part of the object, for example, the shape of the surface (measurement surface) on which the sensor devices are attached, and further the shape of the pillar and the maximum deviation from the reference surface in the entire measurement area, etc. This makes it possible to obtain the shape of the pillar without using light, making a three-dimensional measuring device that uses light unnecessary, and is not affected by obstacles, etc.
[0056] Furthermore, by repeatedly acquiring the shape of the measurement surface, the shape of the column, the maximum deviation amount, etc., it becomes possible to manage the column (absolute value management and time-dependent change management). In particular, when the shape acquisition method according to this embodiment is implemented using the shape acquisition system 10 according to the above embodiment, it becomes possible to automatically acquire the shape of the measurement surface and in turn the shape of the column, acquire the deviation amount from the standard in the entire measurement area, and manage the column (absolute value management and time-dependent change management), except for the preparation process for measurement. Therefore, the shape acquisition system 10 according to the above embodiment can eliminate manual surveying work for steel frame construction, thereby alleviating the labor shortage and shortening the construction period of steel frame construction.
[0057] In addition, according to the shape acquisition method of this embodiment, the shape of the measurement surface of the steel column can be acquired prior to the start of exterior construction work, which makes it possible to perform adjustments to the exterior panels using jigs in the factory.
[0058] In the above embodiment, each sensor device 18 i Although the above embodiment illustrates a case where identification information is input via a display operation unit at the time of initial setup of each sensor device, the timing and method of inputting identification information to the sensor device (or storing it in RAM (memory)) are not particularly important, but it is preferable that the sensor device used in this embodiment outputs data including the identification code (ID) of the sensor device. Note that in the above embodiment, the identification code (ID) of each sensor device includes the identification code of the object to which the sensor device is attached and the identification code of the attachment position on the object, but it is not necessary that the identification code of the object is included.
[0059] In the above embodiment, the on-site controller (terminal device) 14 controls the plurality of sensor devices 18 iIn the above description, a case has been described in which sensor data about the same object is transmitted in a lump to the server 12 (analysis device) based on the ID included in the multiple sensor data output from the server 12. However, instead of this, a configuration can be adopted in which the analysis device extracts multiple sensor data about the same object from the multiple sensor data received based on the ID included in the sensor data, and obtains shape information of the object by calculation using the tilt angle information included in the multiple sensor data extracted. In this embodiment, the same number of sensor devices are used as the number of multiple measurement points at which tilt angle information is obtained, but it is not necessarily necessary to use the same number. In this case, it is sufficient to obtain tilt angle information at two or more measurement points using one sensor device.
[0060] Second Embodiment In this second embodiment, the construction of a steel frame structure including multiple columns (steel columns) will be described as an example of a method of using the shape acquisition method according to the first embodiment. Here, the same reference numerals will be used for the same or equivalent components as those in the first embodiment described above, and detailed descriptions thereof will be omitted.
[0061] FIG. 12 shows an example of the configuration of a system 10A for carrying out this steel frame construction.
[0062] The system 10A includes a server 12, a field controller 14, a mobile terminal 16, and a plurality of sensor devices 18, all of which are connected to one another via a network 13 such as the Internet. i (i=1, 2, 3, . . . ) and a plurality of driving devices 50 p (p=1, 2, 3, 4 . . . ) in the configuration shown in FIG. 12. i Among them, three sensor devices 181 to 183 are shown as representatives, and a plurality of driving devices 50 p Of these, four driving devices 501 to 504 are shown as representatives. i and a plurality of drive units 50 pEach of the driving devices 50 is connected to the network 13 via a communication line such as a wireless LAN. Note that the communication lines may all be wireless, or at least some of them may be wired. p Each of them is a construction jig 30 described later. p Can be attached individually to (p=1, 2, 3, 4……).
[0063] In the second embodiment, a square pillar having a rectangular cross section is used as the pillar 100. j On the four faces extending in the longitudinal direction of the column, erection pieces 102 (102a, 102b) are respectively protruding from the column head and column base (see Figs. 13 and 14). Each erection piece 102 is perpendicular to each face of the column 100 and extends in the vertical direction. In this second embodiment, for convenience, the erection piece 102 provided on the column head is referred to as erection piece 102a, and the erection piece 102 provided on the column base is referred to as erection piece 102b.
[0064] As shown in FIG. 13, in the erection, the lower section column (hereinafter referred to as the lower section column) 100 m The erection piece 102a and the lower joint column 100 m 100 Upper section pillars (hereinafter referred to as upper section pillars) n The erection piece 102b is a construction jig 30 p are used to connect to each of the four longitudinal faces of the pillar.
[0065] Construction Jig 30 p 13, the rack includes a main body frame 32 and various bolts provided on the main body frame 32, such as a tilt adjustment bolt 34, a misalignment adjustment bolt 36, a tipping prevention bolt 38, and a fixing bolt 40. In this embodiment, as an example of these bolts, hexagon socket bolts are used.
[0066] The main body frame 32 is a frame member extending in a predetermined direction (vertical direction in FIG. 13) with a hollow portion having a width greater than the thickness of the erection pieces 100a, 100b formed in the center in the width direction.
[0067] The fixing bolt 40 is attached to the construction jig 30 p The fixing bolt 40 is a bolt for mounting the bolt to the erection piece to be able to rotate (swing) up and down. The fixing bolt 40 consists of a head and a shaft, and the shaft has a stepped cylindrical shape with a large diameter part and a small diameter part. The large diameter part is provided on a part of the head side of the shaft, and a threaded part is formed on its outer circumferential surface, and the side opposite the head of the threaded part, i.e., the tip side, is the small diameter part.
[0068] Construction Jig 30 p When attaching the fixing bolt 40 to the erection piece (the erection piece 102a in FIG. 13), the fixing bolt 40 is inserted from the tip side (small diameter part) into the inside of a screw hole formed near the lower end part of one side of the main frame 32, and the screw part is screwed into the screw hole. The small diameter part of the fixing bolt 40 is inserted into a hole formed on the other side of the main frame 32 through a long hole formed in the erection piece 102a. p However, when attached to the erection piece 102a, the tip of the small diameter part is exposed to a predetermined extent outside the main body frame 32. p However, it is attached to the erection piece 102a to be attached in a state in which it can be raised and lowered and rotated around the axis of the fixing bolt 40 (see FIG. 14).
[0069] A boost member 44 is disposed inside the center of the hollow portion of the main frame 32 in the longitudinal direction. The boost member 44 is a lower joint column 100 shown in FIG. m The erection piece 102a and the upper joint column 100 n The erection piece 102b and the erection jig 30 p The connection state by the construction jig 30 pIn the state where the upper and lower joints are attached to the pillars of the upper and lower joints, the lifting member 44 is located in the space between the erection pieces 102b and 102a. The lifting member 44 includes a movable lever 46, one end of which (the lower end in FIG. 13) is supported to be freely rotatable (swingable) on the main body frame 32 via a support pin, and a pressing lever 48, one end of which is connected to the tip of the movable lever 46. The pressing lever 48 is connected to the movable lever 46 so as to be freely rotatable. A through pin is attached to the other end (the upper end in FIG. 13) of the pressing lever 48, which is opposite to the connecting portion. Both ends of the through pin are inserted into guide holes in the vertical direction formed on both side walls of the main body frame 32, and the through pin can move up and down along the guide holes. The lifting member 44 is attached to the main body frame 32 in a V-shaped state. By pressing the connecting portion between the movable lever 46 and the pressing lever 48, the overall shape of the boost member 44 changes (deforms) so that the distance between the upper end and the lower end of the boost member 44 becomes longer.
[0070] A support member 42 having a U-shaped cross section is fixed to the main body frame 32 so as to cover the connection portion between the movable lever 46 and the pressure lever 48. A screw hole is formed on one surface of the support member 42, and the inclination adjustment bolt 34 is screwed into the screw hole.
[0071] The construction jig 30 shown in FIG. p In the state where the upper and lower sections are attached to the columns, by rotating (threading) the inclination adjustment bolt 34 clockwise, the upper section column 100 is moved by the pressing lever 48 of the lifting member 44. n The erection piece 102b is pushed up. As the configuration of the pushing-up member, a configuration using a cam or the like is also possible, and the configuration is not particularly limited.
[0072] In this embodiment, the construction jig 30 p 13. However, even in this case, the tilt adjustment bolt 34 is rotated (screwed) clockwise to deform the push-up member 44, thereby adjusting the tilt of the upper section column 100. n The erection piece 102b is configured to be pushed up.
[0073] The misalignment adjustment bolts 36 are provided in total three, one on each side of the upper half of the main frame 32 in FIG. 13 and one on one side of the lower half of the main frame 32. The misalignment adjustment bolts 36 are screwed into the main frame 32 through screw holes. The two misalignment adjustment bolts 36 in the upper half are rotated clockwise to press the respective tips against both sides of the erection piece 102b of the upper joint column, and press the erection piece 102b in opposite directions. Therefore, when adjusting the misalignment, the two misalignment adjustment bolts 36 need to be rotated in opposite directions. The one misalignment adjustment bolt 36 in the lower half presses one side of the erection piece 102a of the lower joint column by rotating it clockwise.
[0074] As shown in FIG. 13, the construction jig 30 p are attached to the erection pieces 102a and 102b, and the upper and lower columns are connected. Then, the drive unit 50 is connected to the erection pieces 102a and 102b via a support member (not shown). p Construction jig 30 p Specifically, the support member is constructed so that it can be attached to the main body frame 32 in a state where it does not interfere with the operation of the above-mentioned bolts and in a position where relative displacement with respect to the main body frame 32 is unlikely to occur. This support member has a circular opening formed at a position facing the top surface of the head of the inclination adjustment bolt 34, and one end of a hexagonal wrench-shaped member that fits into the hexagonal hole of the inclination adjustment bolt 34 is connected through this opening. The other end of the hexagonal wrench-shaped member is connected to the drive unit 50 via a rotating shaft. p The reduction mechanism is connected to the drive unit 50. p In this embodiment, the driving device 50 is connected to a motor. p The actuator has an MPU (microcomputer for control), and a sensor that measures the amount of rotation of the rotating shaft and a motor are electrically connected to the MPU.
[0075] In this embodiment, the lower joint 100 m and upper section pillar 100 nFour erection jigs 30 are arranged on the four sides of the p Four driving devices 50 are attached to the main body frame 32 via support members (not shown). p are mounted separately. Each drive unit 50 p The MPU is connected to a network 13 via a communication unit.
[0076] In this embodiment, each of the driving devices 50 is driven in accordance with a command value given from an external terminal, for example, a server 12, via a network 13. p Of course, the amount of rotation is controlled by the motor of each drive unit 50. p Since the rotational speed of the motor is measured by a sensor, the amount of rotation of the motor can be accurately controlled, i.e., the inclination adjustment bolt 34 can be adjusted.
[0077] In addition, construction jig 30 p The detailed configuration of a steel column tilt adjustment device having a similar configuration to that described above is disclosed in, for example, Japanese Patent Application Laid-Open No. 2001-355340. p Further detailed explanation will be omitted.
[0078] Next, the construction of steel structures will be explained with a focus on the construction of n (≧2) section steel frames (hereinafter referred to as n section columns where appropriate) according to the flowchart in Fig. 15. Fig. 15 shows the flow of the process for constructing an n section column. The premise for starting the construction of the n section column is that the construction of the (n-1) section column has been completed. Here, the premise is that the lower section column (here, the (n-1) section column) 100 m is assumed to be erected vertically.
[0079] First, in step S102, the upper column (here, the n-th column) 100 n It is lifted by a crane and lowered to the ground. In the next step S104, the lower column 100 m The erection piece 102a of the column head (or the upper column 100 n The erection piece 102b of the column base is attached to the erection jig 30 pThe four erection jigs 30 are attached to the four-sided erection piece 102a. p are respectively assembled (see Figure 14).
[0080] In the next step S106, the upper section column 100 n The crane is used to hoist the assembly jig 30 p At the bottom column 100 m That is, the upper column 100 is temporarily fixed to the n The lower column is 100 m The erection piece 102a of the column head (or the upper column 100 n Four erection jigs 30 attached to the erection piece 102b) of the column base p In the open state (see Figure 14), the upper column 100 n The lower column is 100 m Place it on top of the upper column 100 n The erection piece 102b (or the lower joint 100 m The erection piece 102a) is attached to the four erection jigs 30 p The main frame 32 is wrapped around the upper joint column 100. n Column base and lower section 100 m The four sets of erection pieces 102a, 102b provided on the heads of the columns are connected to each other using four erection jigs 30. p Connect them together with each other.
[0081] In the next step S108, the alignment of the columns is adjusted. m Capitals and upper columns of 100 n This refers to the misalignment of the upper section column 100 in the horizontal plane with the column base. n While hanging it with a crane, the upper column 100 n The lower column is 100 m When the upper and lower columns are placed on top of the lower column, the lower column is 100mm wide so that the upper and lower columns appear to be one column. m Upper section column 100 n The X-axis and Y-axis positions of the four construction jigs 30 p The rotation direction and amount of each of the misalignment adjustment bolts 36 are adjusted, for example, by visually checking.m The erection piece 102a and the upper joint column 100 n The erection piece 102b is positioned on a substantially vertical line on each of the four sides. m The erection piece 102a and the upper joint column 100 n The lower joint 100 is arranged so that the erection piece 102b is positioned on a substantially vertical line on each of the four sides. m Upper section column 100 n The misalignment in the X-axis and Y-axis directions of the four construction jigs 30 p It can also be said that this is a matter of adjusting the direction and amount of rotation of each of the plurality of misalignment adjustment bolts 36.
[0082] After that, the crane is released (step S110). If the weight of the pillar is lighter than a predetermined value, it is also possible to release the crane before carrying out the misalignment adjustment.
[0083] In the next step S112, the inclination of the pillars is adjusted. In this embodiment, the inclination adjustment is performed by the server 12 and the four erection jigs 30. p A drive unit 50 attached to each of p This is done automatically by the MPU.
[0084] This will be described in more detail. As an example, six sensor devices 18 are arranged in a similar manner to the pole 100 shown in FIG. i Upper section pillar 100 with n The following describes how to adjust the inclination of the image forming apparatus.
[0085] The server 12 is connected to the upper column 100 n Six sensor devices attached to 18 i The six sensors 18 are then instructed to start measuring. i Acquire sensor data from. Next, the server 12 n Three sensor devices 18 attached to the first surface of i Based on the sensor data output from the upper section 100, nThe server 12 also obtains shape information of the first surface of the upper section 100. n Three sensor devices 18 attached to the second surface of i Based on the sensor data output from the upper section 100, n Here, the shape information of the second surface of each sensor device 18 is obtained. i ID and sensor device 18 included in the sensor data i The relationship between the pole to which the sensor is attached and the attachment position (i.e., the measurement point of the sensor device) is managed by the server 12.
[0086] Sensor device 18 i The sensor device 18 is attached to the pole 100 before or after the pole 100 is erected, and a mark is provided at the attachment position, and the position of the mark is determined by the server 12 based on the design information. i The information on which position on which pillar the sensor device 18 is to be attached (or where the sensor device 18 has been attached) is stored in the same manner as in the first embodiment. i The worker in charge of installing the sensor device 18 i Alternatively, the sensor device 18 may be initialized and the information input during the initialization may be included in the sensor data as ID information. i At the shipping stage, sensor device 18 i The information on the pole number and the mounting position may be input in advance to the calculation processing unit 182 and stored in memory, and the information on the pole number and the mounting position may be displayed on the screen of the display operation unit 187.
[0087] Next, the server 12 n Based on the shape information of the first and second surfaces, the upper section column 100 n The amount of positional deviation (Δx, Δy) in the X-axis direction and the Y-axis direction from the reference of the head of the column is calculated, and the four erection jigs 30 are adjusted so that the amount of positional deviation is almost zero (or falls within a predetermined tolerance). p Using the above, the upper section column 100 n This adjustment is performed by the server 12 adjusting the positional deviation (Δx, Δy) of the upper joint column 100. nThe control command values of the motors are then input to the four drive units 50 so that the tilt angles are offset. p By giving each MPU, four construction jigs30 p In this embodiment, the rotation of the four erection jigs 30 is controlled in parallel. p Since the rotation of the inclination adjustment bolts 34 of the four erection jigs 30 can be controlled in parallel, it is not necessary to operate the four erection jigs 30 by multiple people working together as in the past. p Compared with the case where the rotation adjustment of each inclination adjustment bolt 34 is performed one by one in sequence, n The tilt angle can be adjusted quickly and accurately.
[0088] In the next step S114, the construction jig 30 p Using the upper column 100 n and lower column 100 m This is done by using four erection jigs 30 p This is done by provisionally tightening (lightly tightening) the fixing bolts 40 and the tip-over prevention bolts 38 provided on the seat using a special tool. The above-mentioned processes from step S102 to S114 are performed on a plurality of upper section columns (n section columns) 100 n These will be carried out sequentially (or partially in parallel).
[0089] FIG. 16 shows multiple upper section columns (n section columns) 100 n 16 shows the state where the processing up to step S114 has been completed, with some parts omitted. Also, in FIG. 16, the construction jig is not shown.
[0090] In the next step S116, beam insertion and re-measurement after beam insertion are performed. Here, beam insertion generally refers to arranging a steel beam between two columns and connecting both ends of the steel beam to the two columns. In this embodiment, as shown in FIG. 16, a beam 200 is used as a steel beam (steel beam) for a beam, which has a pair of beam end members 200a located at both ends of the steel beam and joined to the column 100, and a beam central member 200b (a part indicated by a two-dot chain line in FIG. 16) whose one end and the other end are joined to the pair of beam end members 200a. Therefore, in this embodiment, beam insertion means arranging a central member 200b between two beam end members 200a joined to two columns 100, respectively, and connecting the central member 200b to each of the beam end members 200a on both sides with a beam joint. However, due to manufacturing errors that inevitably exist in the steel beams, the horizontal force acting on the columns 100 connected to both ends of the steel beams during beam insertion can cause the inclination angle of the columns 100 to change from before the beams are inserted. To check for this change, it is necessary to remeasure the inclination angle after the beams are inserted.
[0091] Returning to the description of FIG. 15, in the next step S118, readjustment after the beam insertion is carried out as necessary based on the result of the remeasurement. Readjustment after the beam insertion may include adjustment of the misalignment of the columns and adjustment of the column tilt. As described above, adjustment of the misalignment of the columns is carried out by adjusting the four erection jigs 30. p The amount and direction of rotation of each of the misalignment adjustment bolts 36 are adjusted visually. On the other hand, the adjustment of the column inclination is performed automatically. Specifically, the server 12 and the four erection jigs 30 used to connect the upper and lower columns are p A drive unit 50 attached to each of p Similarly to step S112, the MPU of the plurality of upper joint columns 100 to be adjusted is n This automatically performs the adjustment on the multiple upper joint columns 100 to be adjusted. n is adjusted so that the tilt error is near zero (or within a predefined tolerance) at one time.
[0092] In the next step S120, the beam joints and the column joints are finally tightened. The beam joints are finally tightened by tightening the high-strength bolts of the beam joints, and the column joints are finally tightened by tightening the four erection jigs 30. p This is done by fully tightening the fall prevention bolts 38 and the fixing bolts 40 (and the misalignment adjustment bolts 36, if necessary). After this final tightening, the upper section column 100 n The inclination angle of the column is measured, and it is confirmed that the inclination error is within a predetermined tolerance. Here, the tolerance is different from the specification value (a positional deviation of the column head of a steel frame with a length of 10 m is within 10 mm), and a value smaller than the specification value and larger than zero is set. Here, at the stage of the above-mentioned readjustment (step S118), the inclination error is automatically adjusted to be almost zero (or to fall within a predetermined tolerance), so that the inclination error of the column is usually within the tolerance.
[0093] After a certain time has elapsed, the upper column 100 n The lower column is 100 m After welding, the four erection jigs are removed (step S122). After that, the erection piece is cut. n In order to check that the inclination angle of the upper section column 100 is within the allowable value, n Since it has been confirmed in step S120 that the inclination error is within the allowable range, the inclination angle of the upper section column 100 is usually measured. n The inclination error of the upper section column 100 is within the allowable value. However, since a considerable amount of time passes between the end of final tightening and the start of welding, n There may be cases where the inclination error, in other words the amount of misalignment of the column head, is not within the allowable value. In such a case, since welding is already completed, it is no longer possible to make readjustments, but the measurement results of the inclination angle can be effectively used in subsequent processes. For example, based on the measurement results of the inclination angle, it is possible to set an offset to the plumbing target value (of the column head position) of the upper section column (here, the (n+1) section column) to cancel the (influence of) the inclination error.
[0094] The explanation so far is for the lower section 100m The above was done on the assumption that the columns were erected vertically. m Even if the lower column is vertical at the end of the installation, m 100m from the end of erection n Before the erection of the upper section pillar 100 begins, a certain amount of time will pass. n When construction begins, the lower column is 100mm. m may not be vertical.
[0095] Therefore, the lower joint columns 100 are arranged in a predetermined manner. m 100 upper columns on each n When installing the sensors individually, i Using multiple lower joints 100 m Shape information of a first surface and a second surface that extend in the respective longitudinal directions and intersect with each other (for example, perpendicular to each other) is acquired, and a plurality of lower joint columns 100 are formed based on the acquired shape information. m A first positional deviation amount of each of the column heads from the reference in a direction perpendicular to the first surface (Y-axis direction) and a second positional deviation amount of each of the column heads from the reference in a direction perpendicular to the second surface (X-axis direction) are calculated, and the first positional deviation amount and the second positional deviation amount are taken into consideration to calculate the positional deviation amount of each of the upper column heads. n In this case, for example, the target plumbing value of the upper section column can be newly determined so that the first positional deviation amount and the second positional deviation amount are offset.
[0096] Here, as an example, 100 m 2 columns on top 100 n When erecting a column, the column length is 100 m The two-section column 100 is used to offset the amount of misalignment of the column head in the X-axis direction. n The new setting of the target value for construction investment will be explained with reference to Figure 17.
[0097] The lower section is the 1st section column 100 m Three sensor devices 18 attached to the first surface 100a of the i100 per column calculated using sensor data from m From the shape of the first surface 100a of the first column 100 m Assume that the amount of positional deviation in the X-axis direction of the column head is +Δx (see FIG. 17). In reality, this Δx is smaller than the specification value, so in the case of a steel column with a length of 10 m, it is a value smaller than 10 mm. m , 2-section column 100 n The bent shape is illustrated in a significantly exaggerated manner for the sake of convenience.
[0098] 1 section pillar 100 m and 2nd section pillar 100 n If the length of each is L, then +Δx / L=tanθy holds as shown in Figure 17, and this can be rewritten as +Δx=L·tanθy. Therefore, to offset this, -Δx=L·tan(-θy) is set as n The target position of the head of the column in the X-axis direction is set anew.
[0099] The above mentioned 2-section column 100 n As is clear from FIG. 17, the new target position of the column head in the X-axis direction is n This substantially (resultingly) coincides with the target value of the inclination (tilt angle) of the sensor device 18 being (-θy). Here, the clockwise direction of θy is positive. i The inclination angle β of the first face of the column at each measurement point is measured i Rather, it refers to the overall tilt of the pillar around the Y axis (the tilt of the straight line connecting the bottom and top ends of the first face of the pillar relative to the Z axis in the XZ plane).
[0100] Therefore, 1st column (lower column) 100 m From the shape of the first surface, the column is 100 m The column head position (positional deviation) in the X-axis direction is calculated, and the inclination θy is calculated from this column head position (positional deviation). The inclination angle (-θy) that offsets this inclination θy is set to 100° from the 2nd column (upper column). nIf the target value of the plumbing (target value of the inclination angle) is newly set, the result will be the 2-section column 100 that offsets the above-mentioned position deviation amount +Δx=L tanθy. n This means that a new target position for the head of the column in the X-axis direction has been set.
[0101] 1 section pillar 100 m The two-section column 100 is used to offset the amount of misalignment of the column head in the Y-axis direction. n The new target value for the vertical load can be set in the same manner as above. m There may be a case where the amount of misalignment of the column head in either the X-axis direction or the Y-axis direction is zero. In such a case, the amount of misalignment of the column head in either the X-axis direction or the Y-axis direction is zero. n A new target plumbing value (new target slope angle) may be set.
[0102] In addition, by using the above-mentioned method of automatically adjusting the inclination adjustment bolt 34, m The newly set second joint column (upper joint column) 100 is used to offset the positional deviation in the X-axis and Y-axis directions. n The two joint columns 100 are placed at the target positions in the X-axis and Y-axis directions. n In order to realize the positioning of the column heads, the server 12 is used to fix the upper and lower columns. p Four drives 50 mounted on each p For the MPU, 100 per column m In this case, the control command values of the motors are given so that the positional deviation of the column heads is offset. m Similarly, 2-section column 100 n Sensor device 18 i When the sensor device 18 is installed, the server 12 i Based on the information on the inclination angle measured using n The shape of the first and second faces and the position of the column capital in the X-axis and Y-axis directions may be calculated, and the inclination adjustment bolt 34 may be automatically adjusted so that the difference between the calculated positions and the target positions is eliminated. mand 2nd section pillar 100 n However, the deformation does not necessarily occur in the same way, so by making such adjustments, the 2-joint column 100 n This allows the head of the column to be positioned more reliably at the target position.
[0103] In the above second embodiment, a square column has been described as an example of the type of steel column, but a circular column may also be used. Furthermore, a steel column may be formed by combining H-shaped steel or I-shaped steel in a cross shape.
[0104] In the second embodiment, the sensor device 18 i Based on the shape or position information of the column obtained from the output data (sensor data), the position of the column head in the XY plane (column inclination) is calculated using four erection jigs 30 p (i.e., four erection jigs 30 p The rotation of each of the tilt adjustment bolts 34 is automatically adjusted. In addition, the sensor device 18 detects the misalignment of the pillars. i The driving device 50 may automatically adjust the position of the pillar based on the position information of the pillar obtained from the output data. p The shape and structure of the support member (not shown) on which the drive unit 50 is mounted is changed to a shape and structure that allows the mounting of an adjustment device that can adjust the rotation direction and amount of the misalignment adjustment bolt 36, or p Alternatively, a separate support member may be provided from the support member on which the adjustment device is mounted, and the adjustment device may be mounted on the separate support member. In any case, by configuring the adjustment device to be controlled by the server 12, automatic adjustment of the misalignment of the columns is also possible.
[0105] In the above first embodiment, a steel column is taken as an object, and the shape calculation and the management of the maximum deviation amount (corresponding to the maximum deflection amount) and the management of the change over time are described. However, the shape acquisition method and the shape acquisition system according to the above first embodiment (hereinafter, abbreviated as the method and the system according to the above first embodiment) can be applied to the management of steel frames other than steel columns (absolute value management and change over time management) as well as other construction process management. In the above first embodiment, the sensor device is fixed to the steel column using a magnet (magnetic force), but other fixing means may be used instead of or together with the magnet. For example, if the object is a member that can obtain sufficient strength by screwing, such as metal, the sensor device may be fixed to the object using a screw (including a bolt) instead of or together with the magnet. In addition, depending on the material of the object, the sensor device may be fixed to the object using an adhesive. Furthermore, the object is not limited to the above embodiment (steel columns of buildings, etc.), but may be other infrastructure, for example, bridges, dams, tunnels (including structures such as inner walls and jet fans installed in tunnels), highways, overpasses, plants (including tanks, etc.), indoor facilities (indoor pools, gymnasiums, halls), etc., or may be wind turbine blades for wind power generation, aircraft fuselages, wings or propellers, bodies (particularly the leading cars) of high-speed trains (such as bullet trains), railroad rails, ships (for example, hulls, screws), etc. In addition to these, the object may be vehicles (automobiles including F1 cars, airplanes, trains, ships, etc.), underwater vehicles (submarines, deep-sea exploration vessels, etc.), space-related objects (spacecraft, re-entry vehicles, etc.), flying objects (rockets, missiles, satellites, etc.), power plants (hydroelectric, thermal, natural gas, atomic, etc.), etc.
[0106] Examples of construction process management to which the method and system according to the first embodiment can be suitably applied include pile driving management (absolute value management, time-dependent change management) and earth retaining management (time-dependent change management). Here, piles refer to structures that serve as the foundation during construction, and earth retaining refers to walls that hold back the surrounding soil and sand when digging holes to create underground structures.
[0107] The method and system according to the first embodiment can also be applied to infrastructure management. For example, they can be suitably applied to bridge maintenance (change over time management), bridge construction management (absolute value management), dam wall maintenance (change over time management), tunnel maintenance (change over time management), and plant / gas tank maintenance (change over time management). In addition, the method and system according to the above embodiment can also be applied to various types of deformation analysis. For example, they can be suitably applied to deformation analysis (change over time) of ship bottoms, deformation analysis (change over time) of wind power generation blades, deformation analysis (change over time) of unmanned aerial vehicle wings, and deformation analysis (change over time) of railway rails.
[0108] When the method and system according to the first embodiment are applied to bridge maintenance, for example, a plurality of sensor devices are arranged on a bridge, and changes in three-dimensional shape from the initial state are constantly monitored, and when an indicator of the change in shape (for example, the inclination angle or maximum deviation amount output by the sensor device) exceeds a threshold, for example, an alarm is issued from the server 12 to the on-site controller 14. In this way, the manager of the on-site controller 14 can quickly recognize the occurrence and location of an abnormality, eliminating the need for regular inspections by workers and enabling efficient inspections to be realized.
[0109] In addition, the administrator of the server 12 is not particularly limited as long as the administrator of the server 12 shares design data of a structure including an object (a pillar in the above embodiment) on which the sensor device is installed with the administrator of the on-site controller 14. For example, the server 12 may be under the management of a user of the sensor device, such as a construction company, or may be under the management of a supplying company (manufacturer, supplier, etc.) of the sensor device. The server may also be a cloud. When the server 12 is under the management of a supplying company of the sensor device, the supplying company leases (or rents) the sensor device to the user and provides optimal information such as the installation position of the sensor device determined based on the purpose of use acquired in advance. The supplying company receives data acquired by the user with the sensor device based on the information, performs a predetermined analysis (including shape calculation) using the data, and provides information on the analysis result to the user. Then, the supplying company receives a fee from the user for leasing (or renting) the sensor device and providing the information. Such a business method (business model) can also be realized. In this case, instead of the analysis and the provision of the analysis result, application software (application program) for analysis processing may be leased together with the sensor device. [Explanation of symbols]
[0110] 10...shape acquisition system, 12...server, 13...wide area network, 14...on-site controller, 16...mobile terminal, 181-183...sensor device, 100...steel column, 110...steel building, 181...angle sensor, 182...arithmetic processing unit, 183...wireless communication unit, 184...power supply unit, 185...housing, 187...display operation unit, 188...cushion member, 190...permanent magnet.
Claims
1. A measurement method for acquiring shape information of an object, comprising the steps of: acquiring tilt angle information of the object at each of a plurality of points by sensors attached to the object at different positions in at least a first direction; acquiring position information of the object with respect to a second direction intersecting the first direction at each of the plurality of points based on the acquired tilt angle information; and determining shape information of the object based on the acquired position information.
2. 2. The measurement method according to claim 1, In acquiring the position information of the object in the second direction, the position information of the plurality of points in the first direction is used.
3. 3. The measurement method according to claim 2, the object includes a pillar disposed substantially parallel to the first direction, Shape information of one face of the pillar that intersects with the second direction is obtained, The shape information includes inclination information of the one surface with respect to the first direction.
4. 2. The measurement method according to claim 1, the object has a surface that intersects with the second direction, In order to obtain shape information of the one surface, the sensors are attached to the plurality of points set on the one surface, respectively.
5. The measurement method according to claim 4, The object includes a pillar that is installed substantially parallel to the first direction, and shape information of one face of the pillar that intersects with the second direction is obtained.
6. 6. The measurement method according to claim 5, In order to obtain shape information of another face of the pillar that intersects with the one face, second inclination angle information of the another face is obtained at each of the multiple second points by sensors attached to the other face at different positions with respect to the first direction, and position information of the another face with respect to a third direction that intersects with the first and second directions is obtained based on the second inclination angle information.
7. 2. The measurement method according to claim 1, In acquiring the tilt angle information, a plurality of the sensors are attached to the plurality of points, respectively.
8. 2. The measurement method according to claim 1, the object has a surface that intersects with the second direction, The sensors are arranged two-dimensionally on the one surface, As the shape information, the surface shape of the one surface is obtained.
9. The measurement method according to any one of claims 1 to 8, The sensor measures the tilt angle information with respect to the first direction.
10. 10. The measurement method according to claim 9, The first direction is the direction of gravity.
11. The measurement method according to any one of claims 1 to 8, The sensor is connected to a server or cloud via a communication network, and the shape information is obtained by the server or cloud.
12. The measurement method according to any one of claims 1 to 8, The target object includes at least one of a structure including a building, a bridge, an overpass, a road, a tunnel, a dam, a wind turbine, an aircraft, a railway, and a ship.
13. 1. A method of constructing a structure, comprising: The method includes determining shape information of the object by using the measurement method according to any one of claims 1 to 8, with at least a part of the structure being the object.
14. 14. The method of claim 13, Installing a plurality of columns constituting the structure substantially parallel to a first direction; The method further includes attaching sensors to each of the plurality of pillars at a plurality of points that are at different positions with respect to at least the first direction in order to obtain the shape information using the plurality of pillars as the target object.
15. 15. The method of claim 14, Each of the plurality of columns has a plurality of sections, The shape information is obtained for each of a plurality of lower columns that are installed substantially parallel to the first direction by the measurement method; A plurality of upper section columns are erected on the plurality of lower section columns, respectively, based on the shape information obtained for the plurality of lower section columns.
16. 16. The method of claim 15, When erecting the plurality of upper section columns onto the plurality of lower section columns, The plurality of lower section columns and the plurality of upper section columns are connected by construction jigs, the shape information is obtained by the measurement method for each of the upper section columns connected to the lower section columns; Based on the shape information obtained for the plurality of upper section columns, the construction jigs are adjusted for the plurality of columns approximately in parallel.
17. 17. The method of claim 16, The erection jig adjusts the inclination of at least the upper section column.
18. A method for managing a structure, comprising: Repeatedly executing the measurement method according to any one of claims 1 to 8, with at least a part of the structure as a target; Detecting shape change information of the object based on the shape information obtained each time the method is executed.
19. 20. The management method according to claim 18, The shape change information is detected during maintenance or construction of the structure.
20. 20. The management method according to claim 19, When an abnormality in the shape change information is detected, an alarm is issued.
21. 21. The management method according to claim 20, The sensor attached to the object is connected to a server or a cloud via a communication network; The server or cloud detects an abnormality in the shape change information and issues the alarm.
22. A method for constructing a structure in which a plurality of columns each have a plurality of sections, comprising the steps of: Installing a plurality of lower section columns each substantially parallel to a first direction; In order to erect a plurality of upper section columns onto the plurality of lower section columns, respectively, connecting the lower section columns and the upper section columns to each of the plurality of columns with an erection jig; acquiring tilt angle information of the upper section columns at each of the plurality of points by sensors attached to the plurality of upper section columns at different positions with respect to at least the first direction; acquiring position information of the upper section pillar with respect to a second direction intersecting with the first direction at each of the plurality of points based on the acquired tilt angle information; determining shape information of the upper section pillar based on the acquired position information; and adjusting the construction jigs for the plurality of columns substantially in parallel based on shape information obtained for the plurality of upper section columns.
23. 23. The construction method of claim 22, In order to obtain the shape information on one surface of the upper section pillar that intersects with the second direction and on another surface of the upper section pillar that intersects with the one surface, the sensors are attached to the multiple points on the one surface and the other surface, respectively.
24. 24. The construction method according to claim 22 or 23, In order to adjust at least the tilt of each of the plurality of upper section columns, the position of the column head of the upper section column is moved by the construction jig.
25. A shape acquisition system for acquiring shape information of an object, comprising: a sensor attached to the object to obtain tilt angle information of the object; an analysis device connected to the sensor via a network, Data including the tilt angle information output from sensors attached to a plurality of points of the object, the positions of which differ with respect to at least a first direction, is transmitted to the analysis device via the network; The analysis device acquires position information of the object with respect to a second direction that intersects the first direction at each of the multiple points based on the inclination angle information, and calculates shape information of the object based on the position information.
26. 26. The shape acquisition system according to claim 25, The analysis device uses position information of the plurality of points in the first direction to obtain position information of the object in the second direction.
27. 27. The shape acquisition system according to claim 26, the object includes a pillar disposed substantially parallel to the first direction, Shape information of one face of the pillar that intersects with the second direction is obtained, The shape information includes inclination information of the one surface with respect to the first direction.
28. 26. The shape acquisition system according to claim 25, the object has a surface that intersects with the second direction, In order to obtain shape information of the one surface, the sensors are attached to the plurality of points set on the one surface, respectively.
29. 29. The shape acquisition system according to claim 28, The object includes a pillar that is installed substantially parallel to the first direction, and shape information of one face of the pillar that intersects with the second direction is obtained.
30. 30. The shape acquisition system according to claim 29, In order to obtain shape information of another face of the pillar intersecting with the one face, the sensor is attached to a plurality of second points at different positions in the first direction on the other face, and data including second inclination angle information of the other face at each of the plurality of second points is transmitted to the analysis device via the network; The analysis device obtains position information of the another surface in a third direction intersecting the first and second directions based on the second tilt angle information, and also obtains the shape information of the another surface.
31. 26. The shape acquisition system according to claim 25, a plurality of the sensors are attached to the plurality of points to obtain the tilt angle information; The sensor is two-dimensionally arranged on one surface of the object intersecting the second direction and including the plurality of points, The analysis device determines the surface shape of the one surface as the shape information.
32. In the shape acquisition system according to any one of claims 25 to 31, The sensor measures the tilt angle information with respect to the first direction.
33. 33. The shape acquisition system according to claim 32, The first direction is the direction of gravity.
34. In the shape acquisition system according to any one of claims 25 to 31, The analysis device is capable of storing the determined shape information in a storage device, and is also capable of outputting the information to a terminal device connected to the network.
35. In the shape acquisition system according to any one of claims 25 to 31, a plurality of the sensors are attached to the plurality of points to obtain the tilt angle information; The data includes IDs for identifying the plurality of sensors.
36. 36. The shape acquisition system according to claim 35, The ID includes identification information for the sensor and location information for the points at which the sensor is attached on the object.
37. 37. The shape acquisition system according to claim 36, The sensor acquires the tilt angle information of the plurality of objects, The ID includes identification information of the plurality of objects.
Citation Information
Patent Citations
Perpendicularity measuring apparatus
JP1989233313A
Member erecting method, member erecting program, and recording medium in which the method and the program are recorded
JP2005155285A
Inclination correction confirming apparatus for core material element
JP2013194369A
Inclination measurement device, measurement method of accuracy of steel column election using same, calibration method of inclination measurement device, and inclination measurement processing program
JP2018179533A
Inclination measuring device for h-beam erection
JP3031823U
Cited By
Three-dimensional measurement system utilizing a one-dimensional sensor and method for controlling the same
KR102985144B1