Power control system

The power control system addresses storage battery failure risks by estimating failure states and selecting consumers for power control, ensuring reliable operation and compliance with demand response requests.

JP2024167456AInactive Publication Date: 2024-12-04NTT DOCOMO INC
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
JP2021174708
Authority / Receiving Office
JP · JP
Patent Type
Applications
Current Assignee / Owner
Filing Date
2021-10-26
Publication Date
2024-12-04
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

Existing power control systems do not adequately address the risk of storage battery failure during demand response, leading to potential failures in power control operations.

Method used

A power control system that includes a control unit to estimate storage battery failure states and select consumers for specific power control based on these estimates, allowing for charging/discharging operations to be performed while considering the risk of battery failure.

Benefits of technology

Enables effective power control by selecting consumers capable of performing specific power control while ensuring backup capacity is maintained, preventing failures and ensuring compliance with demand response requests.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 2024167456000001_ABST
    Figure 2024167456000001_ABST
Patent Text Reader

Abstract

To provide a power control system that performs power control for a plurality of consumers while taking into account risks of storage battery failures.SOLUTION: A power control system 1 has a plurality of base stations 20 each located at a plurality of consumers, each including a communication device 70 which is a load, a rectifier 50, and a storage battery 60, and a control unit 2 (or a control unit 2A) which controls the rectifier 50 and the storage battery 60 at each of the plurality of consumers and performs a specified power control using the storage battery 60 at at least a part of the plurality of consumers. At this time, the control unit 2 estimates a state related to the failure of the storage battery 60 at each of the plurality of consumers and selects a consumer to be a target of the specified power control based on the estimated result. Then, at the selected consumer, the specified power control is performed by charging and discharging the storage battery 60.SELECTED DRAWING: Figure 1
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] One aspect of the present disclosure relates to a power control system. [Background technology]

[0002] In recent years, as the proportion of natural energy used by power suppliers has increased, demand response (DR) has been attracting attention as a method for adjusting the power supply and demand from power suppliers to consumers. Since the amount of power generated by natural energy such as solar power generation and wind power generation increases and decreases depending on the weather (solar radiation, wind volume, etc.), a method is adopted to flexibly adjust the power supply and demand by requesting DR from consumers, in which the consumer is requested to save power by specifying the amount of power saving. In response to this, a power control method for responding to DR is being considered for consumers. For example, Patent Document 1 discloses a method for distributing the power limit distribution amount to multiple consumers while taking into account the amount of power stored in storage batteries owned by multiple consumers when responding to DR. [Prior art documents] [Patent documents]

[0003] [Patent Document 1] JP 2018-33273 A Summary of the Invention [Problem to be solved by the invention]

[0004] However, the control when responding to DR is based on the assumption that the consumer's storage battery is operating normally. Since no control has been considered that takes into account the possibility of storage battery failure, no sufficient consideration has been given to methods of dealing with storage battery failure during DR response.

[0005] The present disclosure has been made in consideration of the above, and aims to provide a technology that enables power control at multiple consumers while taking into account the risk of storage battery failure. [Means for solving the problem]

[0006] A power control system according to one aspect of the present disclosure has a plurality of consumers including a load, a rectifier, and a storage battery, and a control unit that controls the rectifier and the storage battery in the plurality of consumers, and performs specific power control using the storage battery in at least some of the plurality of consumers, wherein the control unit estimates a condition related to a failure of the storage battery in each of the plurality of consumers, selects a consumer that is to be subject to the specific power control based on the estimation result, and performs the specific power control by performing charging and discharging operations from the storage battery in the selected consumer.

[0007] In this aspect, when performing specific power control, a state related to a failure of a storage battery is estimated, and a consumer to be subjected to the power control is selected from the multiple consumers based on the estimation result. Then, the specific power control is performed by performing a charging / discharging operation from the storage battery in the selected consumer. Therefore, it is possible to select a consumer to be subjected to the specific power control and perform the power control while taking into consideration the possibility of a failure of the storage battery in the multiple consumers. Effect of the Invention

[0008] According to one aspect of the present disclosure, a technique is provided that is capable of performing power control for multiple consumers while taking into consideration the risk of a storage battery failing. [Brief description of the drawings]

[0009] [Figure 1] FIG. 1 is a diagram illustrating an example of a schematic configuration of a power control system according to an embodiment. [Diagram 2] FIG. 2 is a diagram illustrating an example of an outline of a control unit in the power control system according to the first embodiment. [Diagram 3] FIG. 3 is a diagram illustrating an example of a functional configuration of a control unit in the power control system according to the first embodiment. [Figure 4]FIG. 4 is a flow diagram showing an example of a power control method according to the first embodiment. [Diagram 5] FIG. 5 is a diagram illustrating an example of a functional configuration of a control unit in the power control system according to the second embodiment. [Figure 6] FIG. 6 is a flow diagram showing an example of a power control method according to the second embodiment. [Figure 7] FIG. 7 is a diagram illustrating an example of a hardware configuration of a computer used in the power control system. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0010] Hereinafter, embodiments of the present disclosure will be described in detail with reference to the accompanying drawings. In the description of the drawings, the same elements are given the same reference numerals and duplicated descriptions will be omitted.

[0011] (First embodiment) As shown in FIG. 1, a power control system 1 including the power control system according to the first embodiment includes a server 10 that controls a plurality of (n) base stations 20 (a first base station 201, a second base station 202, a third base station 203, . . . an nth base station 20 n 1, the configuration of the base station 20 will be described with reference to the first base station 201, but the other base stations also have the same configuration.

[0012] Each base station 20 includes a smart meter 30, a Home Energy Management System (hereinafter referred to as "HEMS") 40, a rectifier 50, a storage battery 60 for backing up the commercial power supply in the event of a power outage, and a communication device 70 (hereinafter sometimes referred to as "load") that consumes direct current. AC current from a commercial power supply 90 is input to the rectifier 50 via the smart meter 30 and converted to DC current by the rectifier 50. The converted DC current is supplied to the communication device 70 and the storage battery 60. The HEMS 40 receives commercial power information from the smart meter 30, measured values ​​from sensors (e.g., a current measuring unit and a bus voltage measuring unit) that may be provided in the rectifier 50, and a charging rate (State Of Charge) from the storage battery 60. The HEMS 40 acquires information on the state of charge (hereinafter referred to as "SOC") from the sensor provided in the rectifier 50. Examples of information from the sensor provided in the rectifier 50 include the value of the current flowing to the communication device 70 and the bus voltage value of the bus through which DC current is supplied to the communication device 70. The HEMS 40 also has a function of issuing a command to the rectifier 50 to set a rectifier voltage and causing the rectifier 50 to perform a desired operation. The command to set the rectifier voltage corresponds to a control command related to charging and discharging the storage battery 60.

[0013] Base station 20 may be provided with a current / voltage sensor 80 (see FIG. 2) that measures the current and voltage of the direct current supplied from rectifier 50. The measurement results of current / voltage sensor 80 may be used to understand the operating status of base station 20. This will be described later.

[0014] In each base station 20, the HEMS 40 adjusts the current in the base station 20. The HEMS 40 notifies the server 10 of the power status in the base station 20 in which the HEMS 40 is installed, and adjusts each part in the base station 20 based on an instruction from the server 10. In this way, the server 10 communicates with the HEMS 40 installed in each base station 20 to check the power operation status in each base station 20. Based on a request for power usage adjustment such as a demand response (DR) request to the power control system 1, the server 10 has a function of determining whether each base station 20 can respond based on the power operation status in each base station 20, and based on the result, issuing an instruction to the HEMS 40 installed in each base station 20 to charge and discharge the storage battery in response to the DR request.

[0015] In the above-described power control system 1, each base station 20 corresponds to a so-called consumer facility. The server 10 and the HEMS 40 function as a control unit 2 that controls the operation of power in a plurality of consumers.

[0016] In addition, there are two types of DR requests: a downward DR, which is intended to reduce the amount of power demand, and an upward DR, which is intended to increase the amount of power demand. In response to a downward DR, the base station 20, which is a consumer, may control discharging from the storage battery 60 in order to suppress the power supply from the commercial power source 90. On the other hand, in response to an upward DR, the base station 20, which is a consumer, may control charging to the storage battery 60 in addition to normal power consumption in order to increase the power supply from the commercial power source 90.

[0017] Next, the functions of the server 10 and HEMS 40 that function as the control unit 2 will be described with reference to Figures 2 and 3. In Figures 2 and 3, the functions of the control unit 2 are shown collectively as one, but as described above, the functions of the control unit 2 are distributed and arranged in the server 10 and the HEMS 40. Figure 2 shows the functions of the control unit 2 roughly divided into five parts, and Figure 3 explains the function of each part of the control unit 2 in more detail.

[0018] The control unit 2 includes a charge / discharge control unit 21, a base station selection unit 22, a resource information management unit 23, a status monitoring unit 24, and a battery failure prediction unit 25. These functions are basically provided in the server 10, and some of the functions may be distributed to the HEMS 40.

[0019] The charge / discharge control unit 21 has a function of controlling the voltage of the rectifier 50 in the base station 20 .

[0020] The base station selection unit 22 determines the discharge time or charge time of the base station 20 when responding to a DR based on monitoring resource information (such as capacity information of the storage battery 60) in each base station 20, predicted failure conditions of the storage battery 60, and the like.

[0021] The resource information management unit 23 acquires information such as data on the power receiving point required for a DR response (e.g., B route data of a smart meter), setting data in the rectifier 50 which is data required for calculating the control amount of each base station 20, current and voltage information from the current and voltage sensor 80, and the current capacity of the storage battery 60, and derives the duration during which a response to DR is possible.

[0022] The status monitoring unit 24 has a function of monitoring abnormal status of the storage battery 60 and the rectifier 50. When either the storage battery 60 or the rectifier 50 of the base station 20 is in an abnormal status, the base station 20 is prevented from participating in control related to the DR response. The abnormal status of the rectifier 50 is monitored, for example, by monitoring the measurement results of the current / voltage sensor 80. The abnormal status of the storage battery 60 is monitored, for example, by monitoring the fluctuation in the storage capacity of the storage battery 60.

[0023] The storage battery failure prediction unit 25 has a function of acquiring current, voltage, and temperature data of the storage battery 60, and predicting failure of the storage battery 60 of each base station 20 based on a prediction model established in advance. Information related to current, voltage, and temperature can be acquired from the storage battery 60. Therefore, the storage battery failure prediction unit 25 has a function of determining whether there is a tendency for the storage battery 60 to fail based on this information.

[0024] Next, the functions of the server 10 functioning as the control unit 2 and the HEMS 40 will be described in more detail with reference to FIG.

[0025] The control unit 2 is composed of a DR communication unit 201, a discharge power detection unit 202, a storage battery capacity detection unit 203, a memory unit 204, a duration calculation unit 205, a base station selection unit 206, a charge / discharge decision unit 207, a base station status monitoring unit 208, an alarm acquisition unit 209, a storage battery current / voltage / temperature detection unit 210, and a storage battery failure prediction unit 211.

[0026] The DR communication unit 201 is a device of a power supply business operator or the like, and has a function of communicating with an external device that issues a DR command to the power control system 1. Specifically, the DR communication unit 201 has a function of receiving a DR command from the power supply business operator or the like, and transmits B route data of a smart meter, etc., required for a DR performance report, to the power supply business operator or the like.

[0027] The discharge power detection unit 202 has a function of acquiring the output power from the rectifier 50. The discharge power detection unit 202 may be realized as a function of the HEMS 40, for example.

[0028] The battery capacity detection unit 203 has a function of acquiring the current battery capacity from the storage battery 60. The battery capacity detection unit 203 may be realized as a function of the HEMS 40, for example.

[0029] The storage unit 204 has a function of storing information related to the backup capacity of the storage battery for disasters and the maximum capacity of each storage battery that should be secured by each base station 20. The storage unit 204 may be provided in the HEMS 40 of each base station 20, or may hold information on all base stations 20 under the management of the server 10.

[0030] The duration calculation unit 205 has a function of calculating the duration when charging and discharging from the storage battery 60 of each base station 20 is continued based on a specific time. Although the detailed procedure will be described later, the calculation result by the duration calculation unit 205 is used to determine whether DR control is possible in the base station 20.

[0031] The base station selection unit 206 has a function of selecting a base station group that can participate in the control corresponding to the DR request from the base stations 20 under its management, based on the calculation result of the duration in the duration calculation unit 205 and the base station monitoring result in the base station status monitoring unit 208 described later. A base station that can participate in the control corresponding to the DR request is a base station in which the base station 20 including the storage battery 60 can operate normally and is capable of charging and discharging operations to respond to the DR request. Therefore, the base station selection unit 206 selects a base station group from the above viewpoint.

[0032] The charge / discharge decision unit 207 has a function of deciding to discharge from the storage battery 60 for the base station 20 that performs control in response to a DR request for the base station group selected by the base station selection unit 206, and executing specific control to respond to the DR request.

[0033] The base station status monitoring unit 208 acquires the status of the base station 20 from an alarm acquisition unit 209 described later, and distinguishes between a normal base station 20 and a failed base station 20. The base station status monitoring unit 208 also performs failure prediction based on the failure prediction result of the storage battery 60 in each base station 20 acquired from a storage battery failure prediction unit 211 described later, and distinguishes between a base station 20 in which a failure is predicted and a base station 20 in which a failure is not predicted.

[0034] The alarm acquisition unit 209 has a function of acquiring an alarm issued from the base station 20 under its management. When the base station 20 reaches a state where it is difficult to appropriately perform a predetermined operation, the base station 20 has a function of issuing an alarm from the HEMS 40 or other devices. When the alarm acquisition unit 209 acquires an alarm from the base station 20, it notifies the base station status monitoring unit 208. The base station status monitoring unit 208 treats the base station 20 issuing the alarm as being out of order.

[0035] The battery current / voltage / temperature detection unit 210 has a function of acquiring information related to the current, voltage, and temperature of the storage battery 60 of each base station 20. Acquisition of this information from the storage battery 60 may be performed periodically at a predetermined interval, or may be performed by the battery current / voltage / temperature detection unit 210 making a request to the storage battery 60 to transmit information.

[0036] The storage battery failure prediction unit 211 performs failure prediction of the storage battery 60 based on information related to the current, voltage, and temperature of the storage battery 60 of each base station 20. For failure prediction, a prediction model constructed based on the relationship between the past current, voltage, and temperature related to the storage battery 60 and the trend of failure occurrence (for example, whether or not a failure will occur within several days to several weeks) may be used. For the prediction model, a known machine learning method such as kNN (k-nearest neighbor algorithm) or SVM (Support Vector Machine) may be used. Note that the algorithm used to construct the model is not limited to the above. In addition, when performing failure prediction of the storage battery 60, all of the current, voltage, and temperature may be used, or only a part of them may be used. The storage battery failure prediction unit 211 uses a prediction model prepared in advance to predict the occurrence of a failure of the storage battery 60 from the current, voltage, and temperature of the storage battery 60 of each base station 20. If it is determined that there is a possibility of a failure occurring, the result is notified to the base station status monitoring unit 208.

[0037] 3, charge / discharge determination unit 207 corresponds to charge / discharge control unit 21. Moreover, base station selection unit 206 corresponds to base station selection unit 22, and discharge power detection unit 202, storage battery capacity detection unit 203, storage unit 204, and duration calculation unit 205 correspond to resource information management unit 23. Furthermore, base station status monitoring unit 208 corresponds to status monitoring unit 24, and storage battery failure prediction unit 211 corresponds to storage battery failure prediction unit 25. The other functional units correspond to auxiliary functional units for realizing each function of control unit 2 shown in FIG. 2.

[0038] Next, a specific procedure (power control method) of the process performed by the control unit 2 will be described with reference to FIG.

[0039] The DR communication unit 201 starts the following process when it receives a DR command from a power supply company or the like. The DR request includes information that specifies the time period when control is required and the control content (downward DR or upward DR and its control amount) for that time period, such as "request for 3-hour-100kW power saving starting 3 hours from now." First, in step S01, the DR communication unit 11 determines whether the DR request is a downward DR. If it is a downward DR (S01-YES), the following steps S02 to S08 are performed. On the other hand, if it is an upward DR (S01-NO), the following steps S11 to S17 are performed.

[0040] When responding to a lowering DR, a process is performed to control discharging from the storage battery 60. First, in step S02, the discharge power detection unit 202 acquires the output power P (discharge power) from the rectifier 50 in the base station 20. Next, in step S03, the storage battery capacity detection unit 203 acquires the current capacity W of the storage battery 60 from the storage battery 60 of the base station 20.

[0041] Next, in step S04, the duration calculation unit 205 calculates from the storage unit 204 the backup capacity W of the storage battery 60 that the base station should secure. BU This backup capacity is set in consideration of disasters and the like. Furthermore, the duration calculation unit 205 calculates the output power P from the rectifier 50, the current capacity W of the storage battery 60, and the backup capacity W of the storage battery 60 obtained from the memory unit 204. BU The duration T during which the storage battery 60 can be discharged is calculated using the above formula. The duration is calculated as the time required for the capacity of the storage battery 60 to reach the backup capacity when all of the current output power P is supplied from the storage battery 60 to the communication device 70. Therefore, the duration T can be calculated using the following formula. T=(WW BU ) / P

[0042] The calculations in steps S02 to S04 are performed for each base station 20. That is, the duration T is calculated for each base station 20.

[0043] Next, in step S05, the battery current / voltage / temperature detection unit 210 acquires data on the current / voltage / temperature of the storage battery 60 in each base station 20, and the battery failure prediction unit 211 predicts the possibility of failure of the storage battery 60. As a result, if there is a storage battery 60 that is predicted to fail during or near the period in which control is performed in response to a DR request, the battery failure prediction unit 211 notifies the base station status monitoring unit 208 of information on the base station 20 including the storage battery 60.

[0044] Next, in step S06, the base station status monitoring unit 208 checks the status of each base station 20 based on the information acquired from the alarm acquisition unit 209 and the storage battery failure prediction unit 211. At this time, the base station status monitoring unit 208 transmits information identifying each base station 20, that is, a base station 20 estimated to be out of order based on the information from the alarm acquisition unit 209, and a base station 20 estimated to be in danger of failure based on the information from the storage battery failure prediction unit 211, to the base station selection unit 206. This enables the base station selection unit 206 to identify a base station 20 estimated to be operating normally.

[0045] The order of the processes in steps S05 and S06 may be partially changed. For example, a configuration may be adopted in which, after excluding the base station 20 that has issued an alarm, i.e., the base station 20 that is out of order, based on information from the alarm acquisition unit 209, failure prediction of the storage battery 60 is performed only for the base station 20 that has not issued an alarm (not out of order). With such a configuration, the number of base stations 20 that are targets for failure prediction of the storage battery 60 can be reduced. On the other hand, as described in the above steps S05 and S06, the identification of the out-of-order base station 20 based on information from the alarm acquisition unit 209 and the prediction of the occurrence of a failure of the storage battery 60 by the storage battery failure prediction unit 211 may be performed in parallel.

[0046] Next, in step S07, the base station selection unit 206 selects the base station 20 to participate in the control. As a selection criterion, the base station 20 that can sustain discharge control during the time period when DR control is required is identified from the calculation result of the duration T for each base station 20. Furthermore, among these base stations 20, the base station 20 that is experiencing or may experience a failure is excluded from the base stations 20 that can participate in the control. Under this condition, the base station 20 to be controlled is selected in consideration of the output power of each base station 20 so that it can respond to the DR request. In the case of down-DR, if the total amount of power saving possible of the base stations 20 that can perform power saving control exceeds the power amount specified in the DR request, the base station selection unit 206 may select the base station 20 to perform control so that the total amount of power saving is closer to the amount of power saving request. Also, a configuration may be adopted in which power saving is performed preferentially from the base station 20 with the largest current capacity of the storage battery 60. Also, as a method for selecting an appropriate base station 20, an integer programming problem may be set and solved, and specifically, the base station 20 may be selected by solving a knapsack problem. In this way, the method for selecting a base station by the base station selection unit 206 can be set appropriately.

[0047] In step S08, the charge / discharge determination unit 207 transmits a discharge command to each of the target base stations 20. At a predetermined time, each of the base stations 20 performs a discharge operation from the storage battery 60. As shown in step S08, the discharge from the storage battery 60 is performed based on an instruction from the HEMS 40. RF (Example: 45V) to the battery voltage V LIB This is done by setting it lower (e.g. 48V).

[0048] Next, in response to an upward DR, a process for controlling charging from the storage battery 60 is performed, but the basic process procedure is the same as that for a downward DR. First, in step S11, the discharge power detection unit 202 acquires the output power P from the rectifier 50 in the base station 20. The output power P can be treated as charging power to the storage battery 60. Next, in step S12, the storage battery capacity detection unit 203 acquires the current capacity W of the storage battery 60 from the storage battery 60 of the base station 20.

[0049] Furthermore, in step S13, the duration calculation unit 205 reads the maximum capacity W FULL When responding to an increased DR, the storage battery 60 is charged, so the maximum capacity is important. After that, the duration calculation unit 205 calculates the output power P from the rectifier 50, the current capacity W of the storage battery 60, and the maximum capacity W of the storage battery 60 obtained from the memory unit 204. FULL The duration T during which the storage battery 60 can be charged is calculated using the above formula. The duration is calculated as the time required for the storage battery 60 to reach its maximum capacity when the storage battery 60 is charged based on the current output power P. Therefore, the duration T can be calculated using the following formula. T=(W FULL -W) / P

[0050] The calculations in steps S11 to S13 are performed for each base station 20. That is, the duration T is calculated for each base station 20.

[0051] Next, in step S14, the battery current / voltage / temperature detection unit 210 acquires data on the current / voltage / temperature of the storage battery 60 in each base station 20, and the battery failure prediction unit 211 predicts the possibility of failure of the storage battery 60. As a result, if there is a storage battery 60 predicted to fail, the battery failure prediction unit 211 notifies the base station status monitoring unit 208 of information on the base station 20 including that storage battery 60.

[0052] Next, in step S15, the base station status monitoring unit 208 checks the status of each base station 20 based on the information acquired from the alarm acquisition unit 209 and the storage battery failure prediction unit 211. The base station status monitoring unit 208 transmits to the base station selection unit 206 information identifying each base station 20, the base station 20 estimated to be in a failure based on the information from the alarm acquisition unit 209, and the base station 20 predicted to be in a failure based on the information from the storage battery failure prediction unit 211.

[0053] Next, in step S16, the base station selection unit 206 selects the base station 20 that will participate in the control. As a selection criterion, the base station 20 that can sustain the charge control during the time period when the DR control is required is specified from the calculation result of the duration T for each base station 20. Furthermore, among these base stations 20, the base station 20 that is experiencing or may experience a failure is excluded from the base stations 20 that can participate in the control. Under this condition, the base station 20 to be controlled is selected in consideration of the output power of each base station 20 so that it can respond to the DR request. In the case of an up DR, if the total chargeable amount of the base stations 20 that can perform the charge control exceeds the power amount specified in the DR request, the base station selection unit 206 may select the base station 20 to perform the control so that the total charge amount is closer to the charge request amount. In addition, as in the case of a down DR, the method of selecting the base station by the base station selection unit 206 may be set appropriately.

[0054] In step S17, the charge / discharge determination unit 207 transmits a discharge command to each of the target base stations 20. At a predetermined time, each of the base stations 20 performs a charging operation from the storage battery 60. As shown in step S17, charging of the storage battery 60 is performed based on an instruction from the HEMS 40 by controlling the rectifier voltage V RF (Example: 52V) to the battery voltage V LIB This is done by setting it higher (e.g. 48V).

[0055] Second embodiment Next, a power control system according to a second embodiment will be described.

[0056] In the power control system 1 according to the first embodiment, when performing an operation based on a DR request, the base station 20 estimated to have a possibility of failure is not set as a control target based on the DR request. On the other hand, in order to maximize the reward money obtained by responding to a DR request, it is desirable to increase the number of responses to the DR request by having as many base stations 20 participate in the control for the DR response. Therefore, in the second embodiment, the base station 20 estimated to have a possibility of failure is also set as a control target based on the DR request. In this case, the resources of the base station 20 estimated to have a possibility of failure but which does not actually fail can also be effectively utilized. On the other hand, when a failure actually occurs in a base station 20 estimated to have a possibility of failure, a base station 20 with a surplus is used to correct charging and discharging. With this configuration, the resources of each base station 20 can be effectively utilized while taking into consideration the possibility of failure.

[0057] In order to realize the above configuration, the functions of the server 10 and the control unit 2 of the HEMS 40 are partially different.

[0058] The functions of the server 10 and the HEMS 40 that function as the controller 2A in the power control system 1 according to the second embodiment will be described with reference to Fig. 5. Note that in Fig. 5, the functions of the controller 2A are shown as one, but as described above, the functions of the controller 2A are distributed and arranged in the server 10 and the HEMS 40.

[0059] The control unit 2A includes a DR communication unit 221, a discharge power detection unit 222, a battery capacity detection unit 223, a memory unit 224, a duration calculation unit 225, a base station selection unit 226, a charge / discharge decision unit 227, an alarm acquisition unit 228, a charge / discharge surplus station detection unit 229, a DR schedule management unit 230, a battery current / voltage / temperature detection unit 231, a battery failure prediction unit 232, and a correction unit 233. The functions of the DR communication unit 221, the discharge power detection unit 222, the battery capacity detection unit 223, the memory unit 224, the duration calculation unit 225, the base station selection unit 226, the charge / discharge decision unit 227, the alarm acquisition unit 228, the battery current / voltage / temperature detection unit 231, and the battery failure prediction unit 232 are basically the same as the DR communication unit 201, the discharge power detection unit 202, the battery capacity detection unit 203, the memory unit 204, the duration calculation unit 205, the base station selection unit 206, the charge / discharge decision unit 207, the alarm acquisition unit 209, the battery current / voltage / temperature detection unit 210, and the battery failure prediction unit 211 in the control unit of the first embodiment, so only a brief explanation of the common parts will be given.

[0060] The DR communication unit 221 is a device such as a power supply company, and has a function of communicating with an external device that issues a DR command to the power control system 1.

[0061] The discharge power detection unit 222 has a function of acquiring the output power from the rectifier 50. The storage battery capacity detection unit 223 has a function of acquiring the current storage battery capacity from the storage battery 60. The storage unit 224 has a function of storing information related to the backup capacity of the storage battery for disasters that each base station 20 should secure and the maximum capacity of the storage battery.

[0062] The duration calculation unit 225 has a function of calculating the duration when charging and discharging of the storage battery 60 of each base station 20 is continued, with a specific time as a reference.

[0063] The duration calculation unit 205 has a function of calculating the duration when charging and discharging from the storage battery 60 of each base station 20 is continued based on a specific time. Although the detailed procedure will be described later, the calculation result by the duration calculation unit 205 is used to determine whether DR control is possible in the base station 20.

[0064] The base station selection unit 226 has a function of selecting a base station group that can participate in the control corresponding to the DR request from the base stations 20 under its management, based on the calculation result of the duration by the duration calculation unit 225 and the base station monitoring result by the alarm acquisition unit 228 described later. A base station that can participate in the control corresponding to the DR request is a base station in which the base station 20 including the storage battery 60 is not currently broken (i.e., no alarm has been issued) and is capable of charging and discharging operations to respond to the DR request. Therefore, the base station selection unit 226 selects a base station group from the above perspective.

[0065] The charge / discharge decision unit 227 has a function of deciding to discharge from the storage battery 60 for the base station 20 that performs control in response to a DR request for the base station group selected by the base station selection unit 226, and executing specific control to respond to the DR request.

[0066] The alarm acquisition unit 228 has a function of acquiring an alarm issued from a base station 20 under its control. When the alarm acquisition unit 228 acquires an alarm from a base station 20, the base station 20 is treated as being out of order.

[0067] The charging / discharging surplus station detection unit 229 has a function of detecting base stations (a group of charging / discharging surplus stations) that have the capacity to charge / discharge beyond the response time to the DR request, among the base stations selected by the base station selection unit 226 and that are scheduled to participate in the control corresponding to the DR request.

[0068] The DR schedule management unit 230 has a function of managing information for identifying the base station 20 that performs charging / discharging to respond to the DR request identified by the base station selection unit 226, and information for identifying the group of surplus charging / discharging stations detected by the surplus charging / discharging station detection unit 229. In other words, the DR schedule management unit 230 grasps which base station 20 performs control in response to the DR request during a specific time period of the response time of the DR request, and also grasps which base station 20 has spare capacity for charging / discharging even though it does not perform control in response to the DR request during that time period.

[0069] The storage battery current / voltage / temperature detection unit 231 has a function of acquiring information related to the current / voltage / temperature of the storage battery 60 of each base station 20. The storage battery failure prediction unit 211 performs failure prediction of the storage battery 60 based on the information related to the current / voltage / temperature of the storage battery 60 of each base station 20. The failure prediction can use a method similar to the method described in the first embodiment. For the storage battery 60 determined to have a possibility of failure, the result is notified to the correction unit 233.

[0070] The correction unit 233 refers to the information managed in the DR schedule management unit 230, and when the base station 20 determined to have a possibility of failure is included in the control target corresponding to the DR request, identifies the base station 20 that is not a control target at the time when the base station 20 is to be controlled. Then, when the base station 20 determined to have a possibility of failure actually fails, the correction unit 233 controls the charging / discharging surplus station so as to satisfy the difference from the amount of power requested in the DR request. In other words, when the base station 20 determined to have a possibility of failure actually fails, the correction unit 233 performs charging / discharging control using the charging / discharging surplus station so as not to affect the response to the DR request.

[0071] Next, a specific procedure (power control method) of the process performed by the control unit 2A will be described with reference to FIG.

[0072] The DR communication unit 221 starts the following process when it receives a DR command from a power supply company or the like. First, in step S21, the DR communication unit 11 determines whether the DR request is a downward DR. If it is a downward DR (S21-YES), the following steps S22 to S33 are performed. On the other hand, if it is an upward DR (S21-NO), the following steps S42 to S53 are performed.

[0073] When responding to a lowering DR, a process for controlling discharge from the storage battery 60 is performed. First, in step S22, the discharge power detection unit 222 acquires the output power P (discharge power) from the rectifier 50 in the base station 20. Next, in step S23, the storage battery capacity detection unit 223 acquires the current capacity W of the storage battery 60 from the storage battery 60 of the base station 20. Furthermore, in step S24, the duration calculation unit 225 acquires from the memory unit 224 the backup capacity W of the storage battery 60 that the base station should secure. BU Then, the duration calculation unit 225 obtains the output power P from the rectifier 50, the current capacity W of the storage battery 60, and the backup capacity W of the storage battery 60 obtained from the memory unit 224. BU The duration T during which the battery 60 can be discharged is calculated using the above formula. The duration T can be calculated using the following formula. T=(WW BU ) / P

[0074] The calculations in steps S22 to S24 are performed for each base station 20. That is, the duration T is calculated for each base station 20.

[0075] Next, in step S25, the alarm acquisition unit 228 checks the presence or absence of a failure as the state of each base station 20. That is, the presence or absence of a base station 20 that has issued an alarm is checked, and the base station 20 that has issued an alarm is determined to be faulty. In addition, in step S25, the battery current / voltage / temperature detection unit 231 acquires data on the current / voltage / temperature of the storage battery 60 in each base station 20 as the state of the base station 20, and the storage battery failure prediction unit 232 predicts the possibility of failure of the storage battery 60. As a result, if there is a storage battery 60 that is predicted to fail during or near the period in which control is performed in response to the DR request, the storage battery failure prediction unit 232 notifies the correction unit 233 of information on the base station 20 including the storage battery 60.

[0076] Next, in step S26, the base station selection unit 226 selects a base station 20 to participate in the control. As a selection criterion, a base station 20 that can sustain discharge control during the time period when DR control is required and that is not experiencing any failure is identified. Under these conditions, the base station 20 to be controlled is selected in consideration of the output power of each base station 20 so that the base station 20 can respond to the DR request. In the case of down-DR, if the total amount of power saving possible of the base stations 20 that can perform power saving control exceeds the amount of power specified in the DR request, the base station selection unit 206 may select a base station 20 to perform control from among the candidate base stations 20. Next, in step S27, the charge / discharge surplus station detection unit 229 checks whether there is a discharge surplus station. If there is a discharge surplus station (S27-YES), in step S28, the DR schedule management unit 230 checks whether the base station 20 that may be broken, which was transmitted from the storage battery failure prediction unit 232 to the correction unit 233, has been selected as a target of DR control. At this time, if the base station 20 that may be broken is selected as a target of DR control (S28-YES), in step S29, it is checked whether the discharge surplus station that can discharge is also selected as a target of DR control (whether the discharge operation time periods overlap) during the time period during which the base station 20 that may be broken is selected as a target of DR control. If the discharge surplus station that can discharge is not selected as a target of DR control during the time period during which the base station 20 that may be broken is selected as a target of DR control (S29-NO), in step S30, the correction unit 233 creates a correction schedule. Specifically, the correction unit 233 creates a schedule to be applied when the base station 20 fails, assuming that the discharge surplus station can cover the shortfall in the amount of power saved when the base station 20 fails. Note that if there is no discharge surplus station (S27-NO), if the base station 20 that may fail has not been selected as a target of DR control (S28-NO), or if a discharge surplus station that can discharge is also selected as a target of DR control during the time period when the base station 20 that may fail is selected as a target of DR control (S29-YES), the correction schedule is not created (S30).

[0077] Next, in step S31, the charge / discharge decision unit 227 transmits a discharge command to each of the target base stations 20. In each of the base stations 20, a discharge operation from the storage battery 60 is performed at a predetermined time. As shown in step S31, the discharge from the storage battery 60 is performed based on an instruction from the HEMS 40 by controlling the rectifier voltage V RF (Example: 45V) to the battery voltage V LIB This is done by setting it lower (e.g. 48V).

[0078] During the discharge operation, in step S32, the alarm acquisition unit 228 monitors whether a failure has occurred in the base station 20. At this time, if a failure occurs in the base station 20 where a failure is predicted (S32-YES), the correction unit 233 issues a discharge command to the discharge surplus station (correction station) specified by the correction schedule. As a result, the discharge surplus station also increases the rectifier voltage V RF (Example: 45V) to the battery voltage V LIB (For example, 48 V) is set lower. As a result, the surplus discharge station performs discharge in place of the failed base station 20, and the response operation to the DR request can be continued.

[0079] Next, in response to an upward DR, processing is performed to control charging from the storage battery 60, but the basic processing procedure is the same as that for a downward DR. First, in step S42, the discharge power detection unit 222 acquires the output power P (charging power) from the rectifier 50 in the base station 20. Next, in step S43, the storage battery capacity detection unit 223 acquires the current capacity W of the storage battery 60 from the storage battery 60 of the base station 20. Furthermore, in step S44, the duration calculation unit 205 acquires the maximum capacity W of the storage battery 60 from the memory unit 204. FULL Then, the duration calculation unit 205 obtains the output power P from the rectifier 50, the current capacity W of the storage battery 60, and the maximum capacity W of the storage battery 60 obtained from the memory unit 204. FULLThe duration T during which the storage battery 60 can be charged is calculated using the above formula. The duration is calculated as the time required for the storage battery 60 to reach its maximum capacity when the storage battery 60 is charged based on the current output power P. Therefore, the duration T can be calculated using the following formula. T=(W FULL -W) / P

[0080] The calculations in steps S42 to S44 are performed for each base station 20. That is, the duration T is calculated for each base station 20.

[0081] Next, in step S45, the alarm acquisition unit 228 checks the presence or absence of a failure as the state of each base station 20. That is, the presence or absence of a base station 20 that has issued an alarm is confirmed, and the base station 20 that has issued an alarm is determined to be faulty. In addition, in step S45, the battery current / voltage / temperature detection unit 231 acquires data on the current / voltage / temperature of the storage battery 60 in each base station 20 as the state of the base station 20, and the storage battery failure prediction unit 232 predicts the possibility of failure of the storage battery 60. As a result, if there is a storage battery 60 that is predicted to fail during or near the period in which control is performed in response to the DR request, the storage battery failure prediction unit 232 notifies the correction unit 233 of information on the base station 20 including the storage battery 60.

[0082] Next, in step S46, the base station selection unit 226 selects a base station 20 to participate in the control. As a selection criterion, a base station 20 that can sustain charging control during the time period when DR control is required and that has no malfunctions is identified. Under these conditions, the base station 20 to be controlled is selected in consideration of the output power of each base station 20 so that the base station 20 can respond to the DR request. In the case of downward DR, if the total amount of power saving possible of the base stations 20 that can perform power saving control exceeds the amount of power specified in the DR request, the base station selection unit 206 may select a base station 20 to perform control from among the candidate base stations 20. Next, in step S47, the charge / discharge surplus station detection unit 229 checks whether there is a charge surplus station. If there is a charge surplus station (S47-YES), in step S48, the DR schedule management unit 230 checks whether the base station 20 that may be broken, which was transmitted from the storage battery failure prediction unit 232 to the correction unit 233, has been selected as a target of DR control. At this time, if the base station 20 that may be broken has been selected as a target of DR control (S48-YES), in step S49, it is checked whether the chargeable charge surplus station has also been selected as a target of DR control (whether the charging operation time period overlaps) during the time period during which the base station 20 that may be broken has been selected as a target of DR control. If the chargeable discharge surplus station has not been selected as a target of DR control during the time period during which the base station 20 that may be broken has been selected as a target of DR control (S49-NO), in step S50, the correction unit 233 creates a correction schedule. Specifically, the correction unit 233 creates a schedule to be applied when the base station 20 fails, assuming that the surplus charging station can cover the shortage of the charging amount when the base station 20 fails. Note that if there is no surplus charging station (NO in S47), if the base station 20 that may fail is not selected as a target of DR control (NO in S48), or if a surplus charging station that can be charged is also selected as a target of DR control during the time period when the base station 20 that may fail is selected as a target of DR control (YES in S49), the correction schedule is not created (S50).

[0083] Next, in step S51, the charge / discharge determination unit 227 transmits a charge command to each of the target base stations 20. At a predetermined time, each of the base stations 20 performs a charging operation from the storage battery 60. Regarding charging from the storage battery 60, the rectifier voltage V RF (Example: 52V) to the battery voltage V LIB This is done by setting it higher (e.g. 48V).

[0084] During the charging operation, in step S52, the alarm acquisition unit 228 monitors whether a failure has occurred in the base station 20. At this time, if a failure occurs in the base station 20 where a failure is predicted (S52-YES), the correction unit 233 issues a charging command to the excess charging station (correction station) specified by the correction schedule. As a result, the excess charging station also increases the rectifier voltage V RF (Example: 52V) to the battery voltage V LIB (For example, 48 V) is set higher. As a result, the station with excess charging performs charging in place of the base station 20 in which a failure has occurred, and thus it is possible to continue the response operation to the DR request.

[0085] (action) The power control system 1 described above has a plurality of base stations 20 which are a plurality of consumers including a communication device 70 as a load, a rectifier 50, and a storage battery 60, and a control unit 2 (or control unit 2A) which controls the rectifier 50 and the storage battery 60 in the plurality of consumers, and performs specific power control using the storage battery 60 in at least some of the plurality of consumers. At this time, the control unit 2 estimates a state related to a failure of the storage battery 60 in each of the plurality of consumers, and selects a consumer to be subject to the specific power control based on the estimation result. Then, the specific power control is performed in the selected consumer by performing a charging / discharging operation from the storage battery 60.

[0086] In the power control system 1, when performing specific power control, a state related to a failure of the storage battery 60 is estimated, and a consumer to be subjected to power control is selected from among multiple consumers based on the estimation result. Then, the selected consumer performs a charging / discharging operation from the storage battery, thereby performing specific power control. Therefore, it is possible to select a consumer to be subjected to specific power control while considering the possibility that the storage battery 60 in the multiple consumers may fail, and perform power control. When a charging / discharging operation from the storage battery 60 is required when performing power control, if the storage battery 60 fails, there is a possibility that the desired operation cannot be performed. Furthermore, there is a possibility that the storage battery 60 fails after the power control is started. Therefore, by estimating a state related to a failure of the storage battery 60 as described above and using this information, it is possible to prevent a case in which the desired operation cannot be performed due to a failure occurring in the storage battery 60.

[0087] The control unit 2 may acquire output power information of the rectifier 50 and current capacity information of the storage battery 60 in each of the multiple consumers, and select a target consumer based on this information.

[0088] The above configuration makes it possible to respond to specific power control, and also makes it possible to appropriately select consumers that meet the conditions.

[0089] The control unit 2 may select, as a target consumer, a consumer that is capable of specific power control after securing backup capacity in the storage battery 60 among each of a plurality of consumers, and perform a discharging operation from the storage battery 60 in the selected consumer as the specific power control.

[0090] When a discharge operation from the storage battery 60 is performed as a specific power control, a consumer that can handle the power control is selected on the condition that backup capacity is secured, thereby preventing the discharge operation from the storage battery 60 as a power control from resulting in discharging exceeding the backup capacity.

[0091] The control unit 2 may select, as a target consumer, a consumer capable of specific power control within a range not exceeding the maximum capacity of the storage battery 60 among each of a plurality of consumers, and perform a charging operation on the storage battery 60 in the selected consumer as the specific power control.

[0092] When a charging operation to the storage battery 60 is performed as a specific power control, charging exceeding the maximum capacity is basically impossible. Therefore, by adopting a configuration in which a consumer that can handle the power control is selected in consideration of the maximum capacity, the charging operation to the storage battery 60 can be appropriately performed as the power control.

[0093] The control unit 2 may be configured not to select a consumer having a faulty storage battery 60 as a consumer to be subject to specific power control.

[0094] With the above configuration, charging / discharging operations using a faulty storage battery 60 are prevented.

[0095] The control unit 2 may be configured not to select a consumer having a storage battery 60 in which a failure is predicted to occur as a consumer to be subject to the specific power control.

[0096] The above configuration can prevent the storage battery 60 from breaking down while a specific power control is being performed, preventing the desired power control from being performed.

[0097] The control unit 2 may select a consumer having a storage battery 60 predicted to fail as a consumer to be subject to the specific power control, and may select a consumer capable of performing similar power control separately from the specific power control as a surplus consumer. In this case, when a failure occurs in the storage battery 60 predicted to fail during the specific power control, a charging / discharging operation related to the specific power control may be performed in the storage battery 60 of the surplus consumer instead of the consumer having the failed storage battery 60.

[0098] As described above, if a consumer having a storage battery 60 predicted to fail can be selected as a consumer subject to the specific power control, the options for consumers subject to the specific power control will be expanded, and it is considered that more power control can be performed. On the other hand, if the storage battery 60 predicted to fail breaks down during power control, the storage battery 60 of the surplus consumer is configured to perform charging and discharging operations instead, so that the specific power control can be performed appropriately even if the storage battery 60 breaks down as predicted.

[0099] The specific power control may be power control for responding to a demand response request. In the case of power control for responding to a demand response request, if the specific power control cannot be completed due to a failure of the storage battery 60 or the like, this leads to a decrease in incentive. Therefore, by having the above configuration so that the specific power control can be completed, it is possible to more appropriately respond to a demand response request.

[0100] The specific power control is not limited to a response to a demand response request. For example, the specific power control may be a power control to respond to a request for saving electricity at a consumer due to a reason such as an inability to appropriately supply electricity from the commercial power source 90, or a power control to respond to a request for charging and discharging for the purpose of smoothing electricity demand.

[0101] The power control system 1 also relates to a technical field of direct current power control technology for wireless base stations.

[0102] As another aspect of the above-mentioned power control system 1 and power control method, there is a distributed power supply system (including a rectifier and a storage battery) and a power control method as described below.

[0103] [Item 1] A distributed power system equipped with a rectifier and a storage battery, characterized in that the system has a control unit that monitors and controls the rectifier and the storage battery for each base station, and responds to demand response by selecting a base station to participate in the control, taking into account the behavior of the storage battery.

[0104] [Item 2] A power control method for the distributed power supply system of item 1, characterized in that the charge / discharge amount of the storage battery is adjusted by adjusting the output voltage of the rectifier.

[0105] [Item 3] A distributed power supply system according to item 1, characterized in that a backup capacity is secured in the event of a disaster by calculating the amount of response possible to a demand response for each base station from rectifier information and storage battery information.

[0106] [Item 4] A power control method for the distributed power supply system according to item 1, characterized in that a failure of a storage battery is predicted based on storage battery information of a base station, and whether or not a response to a demand response of the base station is possible is determined.

[0107] [Item 5] A distributed power supply system equipped with a rectifier and a storage battery, further comprising a control unit that monitors and controls the rectifier and the storage battery for each base station, and when an unforeseen event occurs at a base station where a failure is predicted based on a failure prediction for the storage battery, the distributed power supply system prepares for a shortage of requested power at a base station with sufficient capacity in advance.

[0108] [Item 6] Item 5. A distributed power supply system according to claim 5, wherein the output voltage of the rectifier is adjusted to control the amount of charge and discharge of the storage battery.

[0109] [Item 7] Item 5. A distributed power supply system according to the present invention, characterized in that a backup capacity is secured in the event of a disaster by calculating the amount of response possible to a demand response for each base station from rectifier information and storage battery information.

[0110] [Item 8] Item 6. A distributed power supply system according to item 5, characterized in that a power control method is provided for predicting a failure of a storage battery during a demand response activation time from storage battery information of a base station.

[0111] [Item 9] Item 5. A distributed power supply system, characterized in that, for a base station that is expected to be charged or discharged excessively beyond its activation time, a power control method is performed by referring to the charge / discharge schedule of the base station, and charging or discharging the base station when a failure of the storage battery of the base station that is predicted to fail occurs.

[0112] (others) The block diagrams used to explain the above embodiments show functional blocks. These functional blocks (components) are realized by any combination of at least one of hardware and software. The method of realizing each functional block is not particularly limited. That is, each functional block may be realized by using one device that is physically or logically combined, or may be realized by using two or more devices that are physically or logically separated and directly or indirectly connected (for example, by wire, wirelessly, etc.). The functional blocks may be realized by combining the one device or the multiple devices with software.

[0113] Functions include, but are not limited to, judgment, determination, judgment, calculation, computation, processing, derivation, investigation, search, confirmation, reception, transmission, output, access, resolution, selection, selection, establishment, comparison, assumption, expectation, consideration, broadcasting, notifying, communicating, forwarding, configuring, reconfiguring, allocation, mapping, assignment, etc. For example, a functional block (component) that performs the function of transmission is called a transmitting unit or a transmitter. In either case, as described above, there is no particular limitation on the method of realization.

[0114] For example, the power control system 1 according to an embodiment of the present disclosure may function as a computer that performs processing of the power control method of the present disclosure. Fig. 7 is a diagram showing an example of a hardware configuration of the power control system 1 according to an embodiment of the present disclosure. The above-mentioned power control system 1 may be physically configured as a computer device including a processor C1, a memory C2, a storage C3, a communication device C4, an input device C5, an output device C6, a bus C7, and the like.

[0115] In the following description, the term "apparatus" may be interpreted as a circuit, a device, a unit, etc. The hardware configuration of the control unit 2, 2A (server 10, HEMS 40) may be configured to include one or more of the devices shown in FIG. 7, or may be configured to exclude some of the devices.

[0116] Each function in the control unit 2, 2A (server 10, HEMS 40) is realized by loading a specified software (program) onto hardware such as the processor C1 and memory C2, causing the processor C1 to perform calculations, control communication via the communication device C4, and control at least one of the reading and writing of data in the memory C2 and storage C3.

[0117] The processor C1, for example, operates an operating system to control the entire computer. The processor C1 may be configured with a central processing unit (CPU) including an interface with peripheral devices, a control device, an arithmetic unit, a register, etc. For example, each unit included in the above-mentioned control units 2 and 2A may be realized by the processor C1.

[0118] Moreover, the processor C1 reads out programs (program codes), software modules, data, etc. from at least one of the storage C3 and the communication device C4 into the memory C2, and executes various processes according to these. As the programs, those that cause a computer to execute at least a part of the operations described in the above-mentioned embodiments are used. For example, each unit included in the above-mentioned control units 2, 2A may be realized by a control program stored in the memory C2 and operated in the processor C1. Although the above-mentioned various processes have been described as being executed by one processor C1, they may be executed simultaneously or sequentially by two or more processors C1. The processor C1 may be implemented by one or more chips. The programs may be transmitted from a network via a telecommunication line.

[0119] The memory C2 is a computer-readable recording medium, and may be configured by at least one of, for example, a Read Only Memory (ROM), an Erasable Programmable ROM (EPROM), an Electrically Erasable Programmable ROM (EEPROM), a Random Access Memory (RAM), etc. The memory C2 may be called a register, a cache, a main memory (primary storage device), etc. The memory C2 can store a program (program code), software modules, etc. that are executable to implement the wireless communication method according to one embodiment of the present disclosure.

[0120] Storage C3 is a computer-readable recording medium, and may be composed of at least one of an optical disk such as a CD-ROM (Compact Disc ROM), a hard disk drive, a flexible disk, a magneto-optical disk (e.g., a compact disk, a digital versatile disk, a Blu-ray (registered trademark) disk), a smart card, a flash memory (e.g., a card, a stick, a key drive), a floppy (registered trademark) disk, a magnetic strip, etc. Storage C3 may be called an auxiliary storage device. The above-mentioned storage medium may be, for example, a database, a server, or other suitable medium including at least one of memory C2 and storage C3.

[0121] The communication device C4 is hardware (transmission and reception device) for performing communication between computers via at least one of a wired network and a wireless network, and is also called, for example, a network device, a network controller, a network card, a communication module, etc. The communication device C4 may be configured to include a high-frequency switch, a duplexer, a filter, a frequency synthesizer, etc., in order to realize at least one of Frequency Division Duplex (FDD) and Time Division Duplex (TDD). For example, each unit included in the above-mentioned control unit 2, 2A may be realized by the communication device C4. Also, for example, the DR communication unit 11 may be implemented such that the receiving function and the transmitting function are physically or logically separated.

[0122] The input device C5 is an input device (e.g., a keyboard, a mouse, a microphone, a switch, a button, a sensor, etc.) that accepts input from the outside. The output device C6 is an output device (e.g., a display, a speaker, an LED lamp, etc.) that outputs to the outside. The input device C5 and the output device C6 may be integrated into one (e.g., a touch panel).

[0123] In addition, each device such as the processor C1 and the memory C2 is connected by a bus C7 for communicating information. The bus C7 may be configured using a single bus, or may be configured using different buses between each device.

[0124] Furthermore, the above-mentioned control units 2 and 2A may be configured to include hardware such as a microprocessor, a digital signal processor (DSP), an application specific integrated circuit (ASIC), a programmable logic device (PLD), a field programmable gate array (FPGA), etc., and some or all of the functional blocks may be realized by the hardware. For example, the processor C1 may be implemented using at least one of these pieces of hardware.

[0125] Notification of information is not limited to the aspects / embodiments described in this disclosure and may be performed using other methods.

[0126] The order of the steps, sequences, flow charts, etc. of each aspect / embodiment described in this disclosure may be changed unless inconsistent. For example, the methods described in this disclosure present elements of various steps using an example order, and are not limited to the particular order presented.

[0127] The input and output information may be stored in a specific location (e.g., memory) or may be managed using a management table. The input and output information may be overwritten, updated, or added to. The output information may be deleted. The input information may be transmitted to another device.

[0128] The determination may be based on a value represented by a single bit (0 or 1), a Boolean value (true or false), or a numerical comparison (e.g., comparison with a predetermined value).

[0129] Each aspect / embodiment described in this disclosure may be used alone, in combination, or switched according to execution. In addition, notification of specific information (e.g., notification that "X is the case") is not limited to being done explicitly, but may be done implicitly (e.g., not notifying the specific information).

[0130] Although the present disclosure has been described in detail above, it is clear to those skilled in the art that the present disclosure is not limited to the embodiments described in the present disclosure. The present disclosure can be implemented in modified and altered forms without departing from the spirit and scope of the present disclosure as defined by the claims. Therefore, the description of the present disclosure is intended to be illustrative and does not have any limiting meaning on the present disclosure.

[0131] Software shall be construed broadly to mean instructions, instruction sets, code, code segments, program code, programs, subprograms, software modules, applications, software applications, software packages, routines, subroutines, objects, executable files, threads of execution, procedures, functions, etc., whether referred to as software, firmware, middleware, microcode, hardware description language, or otherwise.

[0132] Additionally, software, instructions, information, etc. may be transmitted or received over a transmission medium. For example, if the software is transmitted from a website, server, or other remote source using wired and / or wireless technologies (such as coaxial cable, fiber optic cable, twisted pair, Digital Subscriber Line (DSL)), and / or wireless technologies (such as infrared, microwave, etc.), then these wired and / or wireless technologies are included within the definition of transmission media.

[0133] The information, signals, etc. described in this disclosure may be represented using any of a variety of different technologies. For example, the data, instructions, commands, information, signals, bits, symbols, chips, etc. that may be referred to throughout the above description may be represented by voltages, currents, electromagnetic waves, magnetic fields or magnetic particles, optical fields or photons, or any combination thereof.

[0134] In addition, terms explained in this disclosure and terms necessary for understanding this disclosure may be replaced with terms having the same or similar meanings.

[0135] As used in this disclosure, the terms "system" and "network" are used interchangeably.

[0136] In addition, the information, parameters, etc. described in the present disclosure may be represented using absolute values, may be represented using relative values ​​from a predetermined value, or may be represented using other corresponding information. For example, a radio resource may be indicated by an index.

[0137] The names used for the above-mentioned parameters are not limiting in any way. Furthermore, the formulas etc. using these parameters may differ from those explicitly disclosed in this disclosure. The various information elements may be identified by any suitable names, and the various names assigned to these various information elements are not limiting in any way.

[0138] In this disclosure, terms such as "base station (BS)", "radio base station", "fixed station", "NodeB", "eNodeB (eNB)", "gNodeB (gNB)", "access point", "transmission point", "reception point", "transmission / reception point", "cell", "sector", "cell group", "carrier", "component carrier", etc. may be used interchangeably. A base station may also be referred to by terms such as a macro cell, a small cell, a femto cell, a pico cell, etc.

[0139] As used in this disclosure, the terms "determining" and "determining" may encompass a wide variety of actions. "Determining" and "determining" may include, for example, judging, calculating, computing, processing, deriving, investigating, looking up, search, inquiry (e.g., searching in a table, database, or other data structure), ascertaining, and the like. "Determining" and "determining" may also include receiving (e.g., receiving information), transmitting (e.g., sending information), input, output, accessing (e.g., accessing data in a memory), and the like. In addition, "judgment" and "decision" can include considering resolving, selecting, choosing, establishing, comparing, etc., to be a "judgment" or "decision." In other words, "judgment" and "decision" can include considering some action to be a "judgment" or "decision." In addition, "judgment" can be interpreted as "assuming," "expecting," "considering," etc.

[0140] The terms "connected," "coupled," or any variation thereof, refer to any direct or indirect connection or coupling between two or more elements, and may include the presence of one or more intermediate elements between two elements that are "connected" or "coupled" to each other. The coupling or connection between elements may be physical, logical, or a combination thereof. For example, "connected" may be read as "access." As used in this disclosure, two elements may be considered to be "connected" or "coupled" to each other using at least one of one or more wires, cables, and printed electrical connections, as well as electromagnetic energy having wavelengths in the radio frequency range, microwave range, and optical (both visible and invisible) range, as some non-limiting and non-exhaustive examples.

[0141] As used in this disclosure, the phrase "based on" does not mean "based only on," unless expressly stated otherwise. In other words, the phrase "based on" means both "based only on" and "based at least on."

[0142] Any reference to an element using a designation such as "first," "second," etc., as used in this disclosure does not generally limit the quantity or order of those elements. These designations may be used in this disclosure as a convenient method of distinguishing between two or more elements. Thus, a reference to a first and a second element does not imply that only two elements may be employed or that the first element must precede the second element in some way.

[0143] The "means" in the configuration of each of the above devices may be replaced with "part," "circuit," "device," etc.

[0144] When the terms "include," "including," and variations thereof are used in this disclosure, these terms are intended to be inclusive, similar to the term "comprising." Further, when used in this disclosure, the term "or" is not intended to be an exclusive or.

[0145] In this disclosure, where articles have been added due to translation, such as, for example, a, an, and the in English, the disclosure may include that the nouns following these articles are in the plural form.

[0146] In the present disclosure, the term "A and B are different" may mean "A and B are different from each other." The term may also mean "A and B are each different from C." Terms such as "separate" and "coupled" may also be interpreted in the same way as "different." [Explanation of symbols]

[0147] 1...power control system, 2, 2A...control unit, 10...server, 20...base station, 21...charge / discharge control unit, 22...base station selection unit, 23...resource information management unit, 24...status monitoring unit, 25...battery failure prediction unit, 30...smart meter, 40...HEMS, 50...rectifier, 60...battery, 70...communication device, 80...voltage sensor, 90...commercial power source, 201...DR communication unit, 202...discharge power detection unit, 203...battery capacity detection unit, 204...storage unit, 205...duration calculation unit, 206...base station Selection unit, 207...charge / discharge decision unit, 208...base station status monitoring unit, 209...alarm acquisition unit, 210...temperature detection unit, 211...battery failure prediction unit, 221...DR communication unit, 222...discharge power detection unit, 223...battery capacity detection unit, 224...memory unit, 225...duration calculation unit, 226...base station selection unit, 227...charge / discharge decision unit, 228...alarm acquisition unit, 229...charge / discharge surplus station detection unit, 230...DR schedule management unit, 231...temperature detection unit, 232...battery failure prediction unit, 233...correction unit.

Claims

1. A plurality of consumers including loads, rectifiers, and storage batteries; a control unit that controls the rectifiers and the storage batteries in the plurality of consumers, A power control system that performs specific power control using the storage battery in at least a portion of the plurality of consumers, The control unit estimates a condition related to a failure of the storage battery at each of the multiple consumers, selects a consumer that is to be subject to the specific power control based on the estimation result, and performs the specific power control by performing charging and discharging operations from the storage battery at the selected consumer.

2. The power control system according to claim 1 , wherein the control unit acquires output power information of the rectifier and current capacity information of the storage battery in each of the plurality of consumers, and selects a target consumer based on this information.

3. The power control system of claim 1 or 2, wherein the control unit selects, as a target consumer, a consumer in each of the plurality of consumers that is capable of the specific power control after securing backup capacity in the storage battery, and performs a discharging operation from the storage battery in the selected consumer as the specific power control.

4. The power control system of claim 1 or 2, wherein the control unit selects, for each of the plurality of consumers, a consumer capable of the specific power control within a range not exceeding the maximum capacity of the storage battery as a target consumer, and performs a charging operation on the storage battery at the selected consumer as the specific power control.

5. The power control system according to any one of claims 1 to 4, wherein the control unit does not select a consumer having a faulty storage battery as a consumer to be subject to the specific power control.

6. The power control system according to any one of claims 1 to 5, wherein the control unit does not select a consumer having a storage battery that is predicted to fail as a consumer to be subject to the specific power control.

7. The control unit is Selecting consumers having a storage battery that is predicted to fail as consumers that are subject to the specific power control, and selecting consumers that are capable of performing similar power control in addition to the specific power control as surplus consumers; A power control system according to any one of claims 1 to 5, wherein, when a failure occurs in a storage battery in which the failure is predicted while the specific power control is being performed, a charging / discharging operation related to the specific power control is performed in a storage battery of the surplus consumer instead of in a consumer having a failed storage battery.

8. The power control system according to any one of claims 1 to 7, wherein the specific power control is power control for responding to a demand response request.

Citation Information

Patent Citations

  • Power management system, power management method, aggregator system, user power management system, and program

    JP2018033273A