Picking system and picking control method

A picking system with separate robotic and manual lanes optimizes workpiece distribution and container management, addressing inefficiencies in mixed loads by leveraging robot capabilities for easy items and worker handling for complex ones, reducing labor and container jams.

JP2024168507AInactive Publication Date: 2024-12-05HITACHI LTD

Patent Information

Application Number
JP2023085244
Authority / Receiving Office
JP · JP
Patent Type
Applications
Current Assignee / Owner
Filing Date
2023-05-24
Publication Date
2024-12-05
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

Existing picking systems using robots face inefficiencies when handling mixed loads of workpieces suitable for robotic and manual picking, leading to increased manual labor and potential container jams due to differing work speeds, and the need for advanced robot technology to handle complex shapes and glossy surfaces.

Method used

A picking system with separate lanes for robotic and manual picking, where robots handle easy-to-grasp workpieces and workers handle difficult ones, with a control method that optimizes lane usage and container management to minimize manual labor and container congestion.

Benefits of technology

The system efficiently reduces labor costs and improves picking efficiency by leveraging robotic capabilities for easy workpieces while allowing workers to handle complex items, minimizing container waiting times and maximizing shipping container utilization.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 2024168507000001_ABST
    Figure 2024168507000001_ABST
Patent Text Reader

Abstract

To provide a picking system which enables efficient manpower saving.SOLUTION: A picking system has: supply lanes 21, 22 in which workpieces to be picked are transported; and a shipping lane 31 in which shipment containers in which the picked workpieces are placed are transported. The supply lanes include: a robot supply lane 21 for transporting the supply containers to a robot area A1 in which a robot performs picking; and a worker supply lane 22 for transporting the supply containers to a worker area A2 in which a worker performs picking. Then, the worker area A2 is disposed at the downstream of the robot area A1 of the shipping lane.SELECTED DRAWING: Figure 1
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to a picking system and a picking control method. [Background technology]

[0002] In recent years, due to labor shortages and rising labor costs, robots are being used to automate the transportation work at logistics warehouses during shipping. For example, the picking work of picking the required amount of workpieces to be shipped from the inventory in a logistics warehouse and placing them in a shipping container is being automated by using picking robots.

[0003] However, picking work by robots cannot replace all work done by humans, and some workpieces (items) are easy for robots to handle and others are difficult. For example, it is difficult for a robot arm to correctly grasp a bag containing liquid such as detergent, or a spray bottle with a complex shape, and they are not suitable for picking work by a robot. Also, even if the shape of a box is fixed, if it is printed with a glossy finish, light may be reflected on the surface of the box during image recognition, making it impossible to correctly recognize the shape of the box, and there is a possibility that the picking work by the robot may not be performed correctly. These problems can be solved by improving the performance of the robots that perform the picking work, but this requires advanced robotics technology, which is undesirable because it complicates the system configuration including the robot and increases costs.

[0004] Patent Document 1 describes a technology in which, when picking work is performed by a robot, a work area for shipping workers is set up in addition to the location where the robot is positioned, and work to be picked by the robot is separated from work to be picked manually by the shipping worker, and the picking is performed in separate lanes. [Prior art documents] [Patent documents]

[0005] [Patent Document 1] Patent Publication No. 2022-1513 Summary of the Invention [Problem to be solved by the invention]

[0006] As described in Patent Document 1, by dividing the work into cases where the robot picks the work and cases where the shipping worker picks the work manually, it becomes possible to handle even work that is difficult for a robot to pick. However, in reality, there are many cases where the workpieces stored in one shipping container are a mixture of workpieces suitable for picking by a robot and workpieces suitable for manual picking. If the work sequence is not set appropriately when considering picking into a shipping container, the amount of manual picking work by shipping workers will increase, resulting in a problem of not being able to improve the efficiency of the work performed by the robot.

[0007] Furthermore, when picking work performed by robots and manual picking work by shipping workers are mixed together, if the differences in work speed for each picking task are not taken into account, shipping containers will end up stuck in the middle of the work lane, resulting in a situation where proper shipping cannot be achieved.

[0008] Furthermore, during actual shipping, after the work is placed in the shipping container, it is necessary to insert the shipping label into the shipping container and close the lid of the container.If work allocation is not decided taking these tasks into consideration, problems may arise in which it is difficult to achieve efficiency.

[0009] In view of these points, the present invention aims to provide a picking system and a picking control method that can efficiently reduce labor. [Means for solving the problem]

[0010] In order to solve the above problems, for example, the configurations described in the claims are adopted. The present application includes multiple means for solving the above problems, but one example is a picking system that has a supply lane along which the work to be picked is transported, and a shipping lane along which the shipping container in which the picked work is placed is transported, and in which at least some of the picking is performed by a robot. The system further includes a robot supply lane that transports the supply container to a robot area where the robot performs picking, and a worker supply lane that transports the supply container to a worker area where the worker performs picking. In addition, the worker area was positioned downstream of the robot area on the shipping lane. Effect of the Invention

[0011] According to the present invention, a picking system can be constructed that can efficiently reduce labor without requiring advanced robotics technology. Problems, configurations and effects other than those described above will become apparent from the following description of the embodiments. [Brief description of the drawings]

[0012] [Figure 1] FIG. 1 is a configuration diagram showing an example of a picking system according to a first embodiment of the present invention. [Diagram 2] 1 is a block diagram showing an example of the configuration of a transport control device of a picking system according to a first embodiment of the present invention. [Diagram 3] 1 is a perspective view showing an example of a lane configuration of a picking system according to a first embodiment of the present invention. FIG. [Figure 4] 5 is a flowchart showing an example of a transport control process of the picking system according to the first embodiment of the present invention. [Diagram 5] FIG. 11 is a configuration diagram showing an example of a picking system according to a second embodiment of the present invention. [Figure 6] 13 is a flowchart showing an example of a transport control process of a picking system according to a second embodiment of the present invention. [Figure 7]FIG. 13 is a configuration diagram showing an example of a picking system according to a third embodiment of the present invention. [Figure 8] FIG. 11 is a perspective view showing an example of a lane configuration of a picking system according to a third embodiment of the present invention. [Figure 9] FIG. 13 is a configuration diagram showing an example of a picking system according to a fourth embodiment of the present invention. [Figure 10] FIG. 11 is a configuration diagram showing details of a picking system according to a fourth embodiment of the present invention. [Figure 11] FIG. 13 is a configuration diagram showing an example of a picking system according to a fifth embodiment of the present invention. [Figure 12] FIG. 13 is a configuration diagram showing an example of a picking system according to a sixth embodiment of the present invention. [Figure 13] FIG. 2 is a perspective view showing an example (example 1) of an auxiliary tool applied to the picking system according to each embodiment of the present invention. [Figure 14] FIG. 11 is a perspective view showing an example (example 2) of an auxiliary tool applied to the picking system according to each embodiment of the present invention. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0013] <First embodiment> A picking system and a picking control method according to a first embodiment of the present invention will be described below with reference to FIGS.

[0014] [Picking system configuration] FIG. 1 is a diagram showing an example of the overall configuration of a picking system according to a first embodiment. The picking system shown in Figure 1 performs picking work to remove work (items) stored in a storage warehouse 12 from supply containers C11, C12, ..., and places the removed work into shipping containers C21, C22, .... The supply lanes for supplying the workpieces from the storage warehouse 12 to the picking work area include a robot supply lane 21 and a worker supply lane 22. The robot supply lane 21 supplies the workpieces from the storage warehouse 12 to the supply containers C11, C12, .... The worker supply lane 22 supplies the workpieces from the storage warehouse 12 to the supply containers C31, C32, ....

[0015] 1, the robot supply lane 21 and the worker supply lane 22 are arranged substantially parallel to each other, and a shipping lane 31 is arranged between the robot supply lane 21 and the worker supply lane 22. In the example of FIG. 1, the shipping lane 31 is also arranged substantially parallel to the robot supply lane 21 and the worker supply lane 22. The shipping lane 31 is supplied with shipping containers C21, C22, ... from the container supply unit 13. Workpieces are supplied to the shipping containers C21, C22, ... on the shipping lane 31 by placing operations in the robot area A1 or the worker area A2.

[0016] A picking robot R1 is placed in the robot area A1. The picking robot R1 picks up the workpieces supplied to the supply containers C11, C12, ... of the robot supply lane 21, and places them in the shipping containers C21, C22, ... of the adjacent shipping lane 31. For example, as shown in FIG. 1, the picking robot R1 picks up one workpiece g1 from the supply container C11. Then, the picking robot R1 moves the picked workpiece g1 to the shipping container C2, and places it in the shipping container C24.

[0017] A worker W is placed in the worker area A2. The worker W performs a placing operation of manually picking up workpieces supplied to the supply containers C31, C32, ... in the worker supply lane 22 and placing them in the shipping containers C21, C22, ... in the adjacent shipping lane 31. A display device 14 is installed in the worker area A2, and instructions regarding the workpieces to be picked and placed are displayed. Since the worker area A2 is located downstream of the shipping lane 31 as viewed from the robot area A1, the picking robot R1 may place a workpiece from the shipping containers C21, C22, . . . in the worker area A2.

[0018] The transportation of each supply container and each shipping container in the robot supply lane 21, the worker supply lane 22, and the shipping lane 31 is carried out under the control of the transportation control device 11. Just before the robot area A1 (upstream side of the lane), a container retention device 15 is installed in the robot supply lane 21, and a container retention device 16 is installed in the shipping lane 31. Just before the worker area A2 (upstream side of the lane), a container retention device 18 is installed in the worker supply lane 22, and a container retention device 17 is installed in the shipping lane 31. The retention operations of these container retention devices 15, 16, 17, 18 are also controlled by the transport control device 11. The transport control device 11 also controls the picking operation of the picking robot R1 and the display on the display device 14 installed in the worker area A2.

[0019] The shipping containers C21, C22,... in which the workpieces are placed are transported to a shipping site (not shown) by the shipping lane 31. The shipping containers C21, C22,... transported to the shipping site have works placed therein from either the robot area A1 or the worker area A2, or both. Note that the workers in the worker area A2 may perform not only the work of picking up the workpieces, but also the work of putting a cover letter or the like in the shipping containers C21, C22,... and the like, and the work of closing the lids of the shipping containers C21, C22,... In the robot area A1 and the worker area A2, the empty supply containers after the workpieces have been picked up are transported to the storage warehouse 12 and collected.

[0020] [Configuration of transport control device] 2 shows an example of the configuration of the transport control device 11. The transport control device 11 is configured, for example, by a computer. That is, the transport control device 11 is composed of a CPU (Central Processing Unit) 81, an interface 82, a communication unit 83, a storage 84, and a memory 90. The CPU 81 executes a program stored in the memory 90 or the storage 84 .

[0021] The memory 90 is configured as, for example, a RAM (Random Access Memory), and stores computer programs and calculation result data, and provides the CPU 81 with a work area necessary for each process. In this embodiment, the CPU 81 executes a program, and a shipping item data acquisition unit 91, a lane control unit 92, a robot control unit 93, and a work instruction unit 94 are configured in a work area in the memory 90.

[0022] The interface 82 transmits commands from the transport control device 11 to the drive devices of the robot supply lane 21, the worker supply lane 22, and the shipping lane 31, transmits retention commands to the container retention devices 15, 16, 17, and 18, transmits commands to the picking robot R1, and transmits display information to the display device 14. The interface 82 also receives information from a camera (not shown) that monitors the picking operation status in the robot area A1 and the worker area A2.

[0023] The communication unit 83 communicates with a shipping management device (not shown) etc. Through this communication, the transport control device 11 acquires information on the work to be shipped and controls the transport in each lane and the picking work in the robot area A1 and the worker area A2. The storage 84 is composed of a hard disk device or an SSD (Solid State Drive), and stores, for example, information on the work to be shipped (type of item, shipping destination, shipping date and time, etc.).

[0024] Note that configuring the transport control device 11 using a computer equipped with such a CPU is just one example, and for example, some or all of the processing may be configured using hardware such as an FPGA (Field-Programmable Gate Array) or an ASIC (Application Specific Integrated Circuit). Furthermore, data storage and some processing may be performed by a server connected to the transport control device 11 via a network.

[0025] [Configuration of container retention device] FIG. 3 shows an example of the configuration of the container retention devices 15, 16, 17, and 18 installed in the robot supply lane 21, the worker supply lane 22, and the shipping lane 31. Each of the container retention devices 15, 16, 17, and 18 has the same configuration. 3, container retention devices 15, 16, 17, and 18 that function as stoppers that regulate the movement of containers (e.g., container C11) are installed in the middle of each of the lanes 21, 22, and 31. The container retention devices 15, 16, 17, and 18 can select a state in which the movement of the container is regulated or a state in which the movement of the container is not regulated under the control of the transport control device 11. FIG. 3 shows a state in which the container retention devices 15, 16, 17, and 18 are protruded above the lane to restrict the movement of containers.

[0026] 3 is an example, and the container retention devices 15, 16, 17, and 18 may have other configurations. For example, the transport of each container on each of the lanes 21, 22, and 31 may be precisely controlled to function as a stopper that stops the movement of the container upstream of the robot area A1 or the worker area A2.

[0027] [Processing flow by the transport control device] FIG. 4 is a flowchart showing the flow of container transport in each of the lanes 21, 22, and 31 and workpiece picking control by the transport control device 11. First, the transport control device 11 acquires data on the workpiece to be shipped (step S11). Next, the transport control device 11 starts processing each workpiece (step S12) and determines whether the corresponding workpiece can be picked by the robot (step S13). A case where it is determined that picking by a robot is not possible is when it is determined that the work is not suitable for picking by a robot (high possibility of failure) based on the shape of the work, the printing condition on the surface of the box, etc. Such a determination may be made by registering in advance in the transport control device 11 whether picking is possible or not based on the code for each work, but the transport control device 11 may also automatically determine this based on an image of the work captured by a camera in the shipping warehouse.

[0028] When it is determined in step S13 that picking by the robot is possible (YES in step S13), the transport control device 11 registers the corresponding workpiece so as to be transported to the robot supply lane 21 (step S14). Moreover, when it is determined in step S13 that picking by the robot is not possible (NO in step S13), the transport control device 11 registers the corresponding work to be transported to the worker supply lane 22 (step S15). After the registration in steps S14 and S15, the transport control device 11 determines whether or not there is another workpiece, the workpiece acquired in step S11, whose lane is not registered (step S16).

[0029] When it is determined in step S16 that there is another workpiece for which a lane is not registered (YES in step S16), the transport control device 11 returns to step S12 and performs the registration work for the other workpiece. Furthermore, when it is determined in step S16 that there is no other workpiece that is not registered (NO in step S16), the transport control device 11 controls the transport timing of the supply containers containing the works to be sent to the robot supply lane 21 and the worker supply lane 22, and the shipping container to be sent to the shipping lane 31 (step S17). The control of the transport timing here also includes control of retention just before the robot area A1 and the worker area A2 by the container retention devices 15, 16, 17, and 18.

[0030] Furthermore, the transport control device 11 instructs the worker on the display device 14 regarding the work to be picked up, in synchronization with the timing of transport of the supply container to the worker area A2 by the worker supply lane 22 (step S18).

[0031] [Container transportation and picking operations] Next, a specific example of container transport and picking operations performed under the control of the transport control device 11 will be described with reference to FIG. First, each workpiece is separated from the storage warehouse 12 into the robot supply lane 21 and the worker supply lane 22 and transported by a supply container. Then, each supply container stops at the robot area A1 or the worker area A2. In the example of FIG. 1, supply container C11 stops at the robot area A1, and supply container C31 stops at the worker area A2. In addition, the following supply containers C12, C13,... and C32, C33,... are retained by container retention devices 15, 18.

[0032] Meanwhile, empty shipping containers are supplied to the shipping lane 31 from the container supply unit 13, and one shipping container C24 stops in the robot area A1. Here, the picking robot R1 picks up the instructed workpiece g1 from the supply container C11 and places the picked workpiece g1 in the shipping container C24.

[0033] Then, the supply container that has been picked up by the picking robot R1 is returned to the storage warehouse 12 by the supply lane 21. The emptied supply container may not be returned to the storage warehouse 12, but may be discarded or stored in another location. When picking from the supply container C11 is completed, the next supply container C12 that has been retained in the container retention device 15 is supplied to the robot area A1, and this operation is repeated until the picking robot R1 has finished picking all the work.

[0034] After completing work in robot area A1, the shipping container is transported to worker area A2. If there are no works to be placed in the shipping container in robot area A1, the shipping container passes through robot area A1 and is transported to worker area A2. Here, if picking work is being carried out on another shipping container in worker area A2, the container will be held in a held state by container holding device 17, and after picking work on the other container in worker area A2 is completed, the shipping container will be immediately transported to worker area A2.

[0035] In the worker area A2, the worker W manually picks the work from the supply container C31 according to instructions on the display device 14, and places the picked work in the shipping container C21. Note that in addition to picking the work, the worker W may also perform tasks such as putting a cover letter or the like into the shipping container and closing the lid of the shipping container.

[0036] Supply containers that have been picked in worker area A2 are returned to storage warehouse 12 via supply lane 22. In this case, too, the empty supply container may be discarded or stored in another location rather than being returned to storage warehouse 12. If there is no work to be put into the shipping container in worker area A2, the shipping container passes through worker area A2 as is. However, if there is work to be done such as putting in a shipping note or putting a lid on, the shipping container must be stopped in worker area A2. When all work is completed in worker area A2, the shipping container is transported via shipping lane 31 to the shipping yard (not shown).

[0037] As described above, according to the picking system of this embodiment, the picking robot only needs to pick the work that is easy to pick, and there is no need for advanced robot technology, so that the labor saving of the picking work can be efficiently implemented. Specifically, by locating the worker area A2 downstream of the robot area A1, the picking work can be efficiently performed in cooperation with the worker area A2. In this case, the worker W can perform various tasks before and after picking the workpieces, such as arranging the workpieces placed by the robot in the shipping container, inserting a shipping label, and closing the lid.

[0038] Furthermore, according to the picking system of this embodiment, the supply lane is divided into the robot supply lane 21 and the worker supply lane 22, so that the supply containers do not get congested in front of each work area, and efficient picking work is possible. Also, the number of personnel required for container supply can be reduced. Furthermore, since picking by the robot is performed by a human downstream, the time required for shipping work of one shipping container can be minimized. In particular, in the case of this embodiment, by accumulating containers just before each area A1, A2, a new supply container can be transported to each area immediately after the robot or worker finishes picking from the supply container, thereby reducing waiting time.

[0039] In addition, when configured as in this embodiment, for example, when a robot is working, the workpiece is preferentially placed in the center of the shipping container, and when a worker is working, the workpiece is placed on the edge of the shipping container, thereby ensuring a high filling rate of the shipping container. This makes it possible to use the capacity of the shipping container without waste.

[0040] <Second embodiment> Next, a picking system and a picking control method according to a second embodiment of the present invention will be described with reference to Figures 5 to 6. In Figures 5 to 6, which explain the second embodiment, the same reference numerals are used for parts corresponding to Figures 1 to 4 described in the first embodiment, and duplicated explanations will be omitted.

[0041] [Picking system configuration] FIG. 5 is a diagram showing an example of the overall configuration of a picking system according to the second embodiment. The picking system shown in FIG. 5 is provided with a failure lane 24 for moving a supply container from a robot supply lane 21 to a worker supply lane 22. This failure lane 24 is provided between the robot supply lane 21 downstream of the robot area A1 and the worker supply lane 22, and the transport control device 11 controls a branch point 25 provided in the robot supply lane 21 so that the supply container from the robot supply lane 21 is transported to the worker supply lane 22. Other configurations of the picking system are the same as those of the picking system shown in Fig. 1. Also, the configuration of the transport control device 11 is the same as that of the transport control device 11 shown in Fig. 2, except for the supply of containers to the failure lane 24.

[0042] [Processing flow by the transport control device] Fig. 6 is a flowchart showing the flow of container transport in each of the lanes 21, 22, 24, and 31 and workpiece picking control executed by the transport control device 11 according to this embodiment. In Fig. 6, the process from obtaining data on the workpiece to be shipped in step S11 to timing control of the shipping container and the supply container in step S17 is the same as the flowchart in Fig. 4 described in the first embodiment.

[0043] In this embodiment, the transport control device 11 judges whether or not there is a failure in the picking operation by the picking robot R1 in the robot area A1 (step S19). This judgment is made by the transport control device 11, for example, based on an image from a camera installed in the robot area A1. Alternatively, the transport control device 11 may obtain information on the picking failure from the picking robot R1.

[0044] When it is determined in step S19 that there is no failure in the picking operation (NO in step S19), the process proceeds to step S18, and the transport control device 11 gives instructions to the worker on the display device 14 regarding the work to be picked, in synchronization with the timing of the transport of the supply container to the worker area A2 by the worker supply lane 22. On the other hand, when it is determined in step S19 that there has been a failure in the picking operation (YES in step S19), the transport control device 11 moves the supply container containing the workpiece for which the picking operation has failed to the worker supply lane 22 via the failure lane 24 (step S20). At this time, an instruction to pick the workpiece from the supply container supplied via the failure lane 24 is added as the picking instruction content to the worker on the display device 14.

[0045] Then, after the container is moved in step S20, the process proceeds to step S18, and the transport control device 11 gives instructions to the worker on the display device 14 regarding the work to be picked, in synchronization with the timing of the transport of the supply container to the worker area A2 via the worker supply lane 22.

[0046] According to this embodiment, a supply container that the picking robot has failed to pick can be handled by a worker without being returned to the warehouse. Note that providing the failure lane 24 as shown in Fig. 5 is just one example, and other configurations may be used to allow the worker to pick up the work in the same way. For example, the worker may temporarily remove the corresponding shipping container from the shipping lane and place it on a nearby table, and when the supply container that the picking robot failed to pick reaches the supply lane, the worker may return the shipping container to the shipping lane and manually pick up the failed work. Alternatively, a side road may be provided on the conveyor that constitutes the lane, and the worker may temporarily stop there.

[0047] According to the embodiment described above, even if the picking robot fails to pick up an item, the worker can quickly deal with the problem by performing subsequent work, thereby improving work efficiency.

[0048] <Third embodiment> Next, a picking system and a picking control method according to a third embodiment of the present invention will be described with reference to FIGS.

[0049] [Picking system configuration] FIG. 7 is a diagram showing an example of the overall configuration of a picking system according to the third embodiment. The picking system shown in FIG. 7 performs the operations of picking and placing workpieces stored in a storage warehouse (not shown) into a shipping container. In this embodiment, the supply lanes for supplying work from the storage warehouse to the picking work area include a first supply lane 113 for robots, a second supply lane 114 for robots, a first supply lane 111 for workers, and a second supply lane 112 for workers. In addition, the shipping lanes include a first shipping lane 121 and a second shipping lane 122.

[0050] These lanes 111, 112, 113, 114, 121, and 122 are arranged substantially parallel to each other, and containers are transported in the same direction in all of them. The first worker supply lane 111 and the second worker supply lane 112 are disposed adjacent to each other. A first shipping lane 121 is arranged at a certain distance from the first worker supply lane 111, and a first robot supply lane 113 is arranged at a certain distance from the first shipping lane 121. Similarly, a second shipping lane 122 is arranged at a certain distance from the second supply lane 112 for workers, and a second supply lane 114 for robots is further arranged at a certain distance from the second shipping lane 122.

[0051] A first robot area A11 is arranged between the first shipping lane 121 and the first supply lane for robots 113, and a first picking robot R11 is prepared in the first robot area A11. The first picking robot R11 picks up a workpiece from the supply containers C41, C42, ... transported by the first supply lane for robots 113, and places the picked workpiece into the shipping containers C81, C82, ... transported by the first shipping lane 121.

[0052] Between the second shipping lane 122 and the second supply lane 114 for robots, a second robot area A12 is arranged, and a second picking robot R12 is prepared in the second robot area A12. The second picking robot R12 picks up works from the supply containers C51, C52, ... transported by the second supply lane 114 for robots, and places the picked works into the shipping containers C91, C92, ... transported by the second shipping lane 122.

[0053] A worker area A13 is arranged between the first shipping lane 121 and the first worker supply lane 111, downstream of the first robot area A11, and between the second shipping lane 122 and the second worker supply lane 112, downstream of the second robot area A12.

[0054] In the worker area A13, worker W11 manually picks work from supply containers C61, C62, ... transported on the first worker supply lane 111 and places the picked work into shipping containers C81, C82, ... transported on the first shipping lane 121. Furthermore, in the worker area A13, worker W11 manually picks work from supply containers C71, C72, ... transported by the second worker supply lane 112 and places the picked work into shipping containers C91, C92, ... transported by the second shipping lane 122. In order to support the work of these workers W11, display devices 102 and 103 for instructing the picking and placing work are placed in the worker area A13.

[0055] In this way, worker W11 may work while standing between the first worker supply lane 111 and the first shipping lane 121, or may work while standing between the second worker supply lane 112 and the second shipping lane 122. For this reason, the worker W11 moves across the first shipping lane 121 and the second shipping lane 122 as needed, performing each task as needed. Normally, the speed at which a worker manually picks a workpiece is much faster than the speed at which a robot can pick a workpiece, so there is a high possibility that a single worker can move between both work locations and perform a task in cooperation with the robot.

[0056] The transport of containers in each of the lanes 111, 112, 113, 114, 121, and 122, the work of each of the picking robots R11 and R12, and the display on the display devices 102 and 103 are executed under the control of a transport control device 101. The transport control device 101 is configured by a computer, for example, similar to the transport control device 11 shown in FIG. In the example of Fig. 7, no container retention device is provided in each lane, but a container retention device may be provided immediately before each of the areas A11, A12, and A13, as in the example of Fig. 1. For example, a container retention device may be provided in the first worker supply lane 111 and the second worker supply lane 112 immediately before the worker area A13. In this case, the container retention device may supply multiple containers (for example, two) at a time so that the worker W11 can pick from multiple containers at the same location, thereby reducing the number of times the worker W11 crosses the lane.

[0057] [Workers crossing lanes] FIG. 8 shows an example of a mechanism for allowing a worker W11 to cross between the first worker supply lane 111 and the second worker supply lane 112. In FIG. Here, as shown in FIG. 8, openable / closable portions 111a, 112a are provided in the middle of the first worker supply lane 111 and the second worker supply lane 112, so that the lanes can be lifted up to allow worker W11 to cross.

[0058] As shown in FIG. 8, worker W11 can cross by lifting the lane, allowing worker W11 to perform the tasks of placing a workpiece into a shipping container in the first shipping lane 121 and placing a workpiece into a shipping container in the second shipping lane 122. Therefore, according to the picking system of this embodiment, picking and placing can be performed efficiently by mixing work by the robot and manual work by the worker, as in the first embodiment. Also, since the worker can work on the two shipping lanes 121 and 122, it is possible to achieve more efficiency and labor saving.

[0059] <Fourth embodiment> Next, a picking system and a picking control method according to a fourth embodiment of the present invention will be described with reference to FIGS.

[0060] [Picking system configuration] FIG. 9 is a diagram showing an example of the overall configuration of a picking system according to the fourth embodiment. The picking system shown in FIG. 9 performs the operations of picking and placing workpieces stored in a storage warehouse (not shown) into a shipping container.

[0061] In this embodiment, a first supply lane for robot 211, a second supply lane for robot 212, and a supply lane for worker 213 are provided as supply lanes for supplying work from the storage warehouse to the picking work area. In this embodiment, a shipping lane 221 is also provided. The side of the shipping lane 221 where the supply containers are output from the storage warehouse is divided into two shipping lanes 221a and 221b, which merge into one lane at a junction 221c along the way. Downstream of the junction 221c, the containers are transported along a single shipping lane 221d. Supply containers or shipping containers are transported through each of the lanes 211, 212, 213, and 221 under the control of a transport control device 201. The transport control device 201 is configured, for example, by a computer similar to the transport control device 11 shown in FIG.

[0062] The three supply lanes 211, 212, and 213 and the two shipping lanes 221a and 221b are arranged substantially parallel to each other. A first robot area A21 is disposed between the first robot supply lane 211 and one of the shipping lanes 221a. A first picking robot R21 is installed in the first robot area A21. The first picking robot R21 picks up workpieces from the supply containers C111, C112, . . . transported on the first supply lane 211 for robots, and places them in the shipping containers C143, C145, . . . transported on one of the shipping lanes 221a.

[0063] A second robot area A22 is disposed between the second robot supply lane 212 and the other shipping lane 221b. A second picking robot R22 is installed in the second robot area A22. The second picking robot R22 picks up workpieces from the supply containers C121, C122, . . . transported on the second robot supply lane 212, and places them in the shipping containers C144, C146, . . . transported on the other shipping lane 221b.

[0064] The shipping lane 221d after merging is adjacent to the worker supply lane 213, and a worker area A23 is arranged between the shipping lane 221d and the worker supply lane 213. A display device 202 is arranged in the worker area A23, and a worker W21 follows instructions on the display device 202 to pick up workpieces from the supply containers C131, 132, ... transported by the worker supply lane 213, and places them in the shipping containers C141, C142, ... of the shipping lane 221d.

[0065] [Processing when shipping lanes merge] FIG. 10 shows details of the process when two shipping lanes 221a, 221b merge into one lane at a junction 221c. 10, buffers 221e and 221f are provided in the shipping lanes 221a and 221b upstream of the junction 221c. The buffers 221e and 221f can hold multiple shipping containers and control the shipping containers to pass through the junction 221c in a specified order.

[0066] That is, the example of Figure 10 shows a state in which shipping containers C143, C145 transported on one shipping lane 221a are retained in the buffer section 221e, and shipping container C144 transported on the other shipping lane 221b is allowed to pass through the junction point 221c. The retention and passage of such shipping containers at the junction is controlled by the transport control device 201 after calculating the time for each placement to be completed from the operating speed of each picking robot R21, R22 and the number of items picked by each picking robot R21, R22. Here, the transport control device 201 controls the order of shipping containers to be sent to the shipping lane 221d so that workers do not have to wait in the worker area A23.

[0067] By configuring as in this embodiment, the number of lanes in the worker area A23 can be reduced, realizing space saving and cost saving. In addition, workers can perform work without moving, which has the effect of reducing the workload.

[0068] <Fifth embodiment> Next, a picking system and a picking control method according to a fifth embodiment of the present invention will be described with reference to FIG.

[0069] [Picking system configuration] FIG. 11 is a diagram showing an example of the overall configuration of a picking system according to the fifth embodiment. The picking system shown in FIG. 11 performs the operations of picking and placing workpieces stored in a storage warehouse (not shown) into a shipping container.

[0070] In this embodiment, the supply lanes for supplying work from the storage warehouse to the picking work area include a first supply lane for robots 311, a second supply lane for robots 312, and a supply lane for workers 313. These three supply lanes 311, 312, and 313 are arranged almost parallel to each other, and the conveying direction of the supply containers (from top to bottom in the figure) is also the same.

[0071] In this embodiment, the system includes a first shipping lane 321 and a second shipping lane 322. The first shipping lane 321 and the second shipping lane 322 are disposed substantially parallel to each other and perpendicular to the respective supply lanes 311, 312, and 313. The transportation of the supply containers in the respective supply lanes 311, 312, and 313 and the transportation of the shipping containers in the respective shipping lanes 321 and 322 are controlled by a transport control device 301. The transport control device 301 is configured by a computer, for example, similar to the transport control device 11 shown in FIG.

[0072] A first robot area A31 is disposed at the intersection of the first robot supply lane 311 and the first shipping lane 321. A first picking robot R31 is installed in the first robot area A31. The first picking robot R31 picks up work from the supply containers C211, C212, . . . transported on the first robot supply lane 311, and places the work into the shipping containers C241, C242, .

[0073] A second robot area A32 is disposed at the intersection of the second robot supply lane 312 and the second shipping lane 322. A second picking robot R32 is installed in the second robot area A32. The second picking robot R32 picks up workpieces from the supply containers C221, C222, ... transported by the second robot supply lane 312, and places the picked workpieces into the shipping containers C251, C252, ... transported to the second shipping lane 322.

[0074] Furthermore, a worker area A33 is provided at the intersection of the worker supply lane 313 and the two shipping lanes 321, 322. A display device 302 that issues work instructions based on commands from the transport control device 301 is installed in the worker area A33. Then, a worker W31 manually picks and places works from the supply containers C231, C232,... of the worker supply lane 313 to the shipping containers C241, C242,... of the first shipping lane 321. Furthermore, the worker W31 manually picks and places the work from the supply containers C231, C232, . . . in the worker supply lane 313 to the shipping containers C251, C252, . . . in the second shipping lane 322. In addition, a container retention device may be provided upstream of the worker area A33 to restrict the containers supplied to the worker area A33.

[0075] With the lane configuration described above, it is not necessary to merge the two shipping lanes as in the example of Fig. 9, and it is not necessary to consider the order in which shipping containers are sent through the shipping lanes. In addition, the worker W31 can move less within the worker area A33, which reduces the workload.

[0076] <Sixth embodiment> Next, a picking system and a picking control method according to a sixth embodiment of the present invention will be described with reference to FIG.

[0077] [Picking system configuration] FIG. 12 is a diagram showing an example of the overall configuration of a picking system according to the sixth embodiment. The picking system shown in FIG. 12 performs the operations of picking and placing workpieces stored in a storage warehouse (not shown) into a shipping container.

[0078] In this embodiment, a first supply lane for robots 411, a second supply lane for robots 412, and a supply lane for workers 413 are provided as supply lanes for supplying work from the storage warehouse to the picking work area. These supply lanes 411, 412, and 413 merge into one supply lane 417 at two junction points 414 and 415. A container evacuation section 416 is provided at the junction point 415. The first supply lane for robots 411 and the second supply lane for robots 412 are arranged substantially parallel to each other.

[0079] This embodiment also includes a shipping lane 421. The shipping lane 421 is divided into two shipping lanes 421a and 421b on the side where the supply containers are output from the storage warehouse, and merge into one lane at a merging point 421c along the way. The two shipping lanes 421a and 421b are arranged perpendicular to the first robot supply lane 411 and the second robot supply lane 412. The transportation of the supply containers in the respective supply lanes 411, 412, and 413 and the transportation of the shipping container in the shipping lane 421 are executed under the control of the transport control device 401. The transport control device 401 is configured by a computer, for example, similar to the transport control device 11 shown in FIG.

[0080] The first robot area A41 is disposed at a location where the first robot supply lane 411 and the shipping lane 421a intersect and where the second robot supply lane 412 and the shipping lane 421a intersect. A first picking robot R41 is installed in the first robot area A41. The second robot area A42 is disposed at the intersection of the second robot supply lane 412 and the shipping lane 421b. A second picking robot R42 is installed in the second robot area A42.

[0081] Furthermore, a worker area A43 is disposed in a location where the worker supply lane 413 and the shipping lane 421 are close to each other. The location of this worker area A43 is downstream of each of the robot areas A41 and A42. In the worker area A43, a display device 402 is disposed on which instructions to the worker are displayed under the control of the transport control device 401.

[0082] In the second robot area A42, the second picking robot R42 picks work from supply containers C313, C315, ... transported on the second supply lane 412 for the robot, and places the picked work into shipping containers C335, C337, ... transported on the shipping lane 421b. Then, in the first robot area A41, the first picking robot R41 picks workpieces from the supply containers C312, C314, ... transported on the first supply lane 411 for the robot, and places the picked workpieces into the shipping containers C334, C336, ... transported on the shipping lane 421a.

[0083] Furthermore, in the first robot area A41, when the second picking robot R42 fails to pick, the first picking robot R41 can pick the work that failed to be picked in the second robot area from the supply containers C313, C315, ... transported on the second supply lane 412 for robots, and place it into the shipping containers C334, C336, ... transported on the shipping lane 421a.

[0084] Furthermore, in the worker area A43, workers manually pick work from supply containers C321, C322, ... transported on the worker supply lane 413 and place the picked work into shipping containers C331, C332, ... transported on the shipping lane 421. In addition, in the worker area A43, if there is a workpiece that the picking robots R41, R42 fail to pick, the supply container containing the corresponding workpiece is evacuated to the container evacuation section 416, and the workpiece can then be manually picked from the supply container C311 in the container evacuation section 416, and the picked workpiece can be braced in a shipping container C331 in the shipping lane 421, for example.

[0085] Although not shown, a container retention device is provided in each lane immediately before each of the areas A41, A42, and A43, and the transport control device 401 controls the timing of supplying containers to each of the areas A41, A42, and A43.

[0086] According to the picking system of this embodiment, even if the second picking robot R42 fails to pick a workpiece, the first picking robot R41 can pick the workpiece again, making it possible to pick the workpiece again. Furthermore, if the first picking robot R41 is unable to pick the container, the container can be evacuated to the container evacuation section 416 in the worker area A43 and then picked manually. Therefore, even if picking by the robot fails, congestion of supply containers can be prevented in the supply lane near the worker area A43.

[0087] <Modification> It should be noted that the embodiment examples described so far have been described in detail in order to explain the present invention in an easily understandable manner, and are not necessarily limited to those having all of the configurations described.

[0088] For example, the robot area may be equipped with auxiliary tools to support picking and placing by the picking robot. 13 shows an example of an auxiliary tool. That is, a picking robot R1 is placed between the supply lane 21 and the shipping lane 31, and an auxiliary tool 510 is installed within a range where the arm R1a of the picking robot R1 moves.

[0089] The auxiliary tool 510 has a hole 511 corresponding to the shape of the supply container C11, a flat portion 512 covering the periphery of the hole 511, and a guide portion 513 with an inclined plate through which the placed workpiece enters the shipping container C24. By providing such an auxiliary device 510, it is possible to support the workpiece being placed into the shipping container C24 even if the picked workpiece is dropped along the way.

[0090] 14 shows another example of an auxiliary tool that supports picking and placing by a picking robot. The auxiliary tool 610 in this example includes a push-out part 611 adjacent to the supply lane 21, and the picking robot R1 places the work picked up from the supply container C11 on a surface 612 of the push-out part 611. In the push-out unit 611, the movable unit 613 pushes the object (workpiece) on the surface 612 to the guide unit 615 via the connecting unit 614, and the object is placed in the shipping container C24. The movable unit 613 may push out the workpiece one by one, or may push out a plurality of workpieces at once.

[0091] By providing such an auxiliary tool 610, the distance that the arm R1a of the picking robot R1 moves during picking and placing can be minimized, and throughput can be increased. Also, even if the picking robot R1 drops a workpiece during workpiece transport, there is a high possibility that the workpiece will fall onto the auxiliary tool 610, and damage to the picking robot R1 and the conveyors that make up each lane can be suppressed.

[0092] In addition, in each of the above-described embodiment examples, if the picking robot fails to pick an item once, a human worker takes over the task, but the picking robot may be configured to perform picking multiple times but be determined to have failed if it is unsuccessful.

[0093] For example, the lane arrangements shown in the drawings are merely examples, and other lane arrangements may be used. In addition, in the configuration diagram of the transport control device 11 shown in Figure 2, only the control lines and information lines that are considered necessary for explanation are shown, and not all control lines and information lines in the product are necessarily shown. In reality, it can be considered that almost all components are connected to each other. [Explanation of symbols]

[0094] 11...transport control device, 12...storage warehouse, 13...container supply unit, 14...display device, 15, 16, 17, 18...container retention device, 21...supply lane for robot, 22...supply lane for worker, 24...failure lane, 25...branch point, 31...shipping lane, 81...CPU, 82...interface, 83...communication unit, 84...storage, 90...memory, 91...shipping item data acquisition unit, 92...lane control unit, 93...robot control unit, 94...work instruction unit, 101...transport control device, 102...display device, 111...first supply lane for worker Supply lane, 111a...openable / closable portion, 112...second supply lane for worker, 113...first supply lane for robot, 114...second supply lane for robot, 121...first shipping lane, 122...second shipping lane, 201...transport control device, 202...display device, 211...first supply lane for robot, 212...second supply lane for robot, 213...supply lane for worker, 221, 221a, 221b, 221d...shipping lane, 221c...junction, 221e...buffer section, 301...transport control device, 302...display device, 311... First supply lane for robot, 312...second supply lane for robot, 313...supply lane for worker, 321...first shipping lane, 322...second shipping lane, 401...transport control device, 402...display device, 411...first supply lane for robot, 412...second supply lane for robot, 413...supply lane for worker, 414, 415...junction point, 416...container evacuation section, 417...supply lane, 421, 421a, 421b...shipping lane, 421c...junction point, 510...auxiliary tool, 511...hole, 512...flat surface, 513...guide portion, 610...auxiliary tool, 611...push-out portion, 612...surface, 613...movable portion, 614...connection portion, 615...guide portion, A1...robot area, A2...worker area, A11...first robot area, A12...second robot area, A13...worker area, A21...first robot area, A22...second robot area, A23...worker area, A31...first robot area, A32...second robot area, A33...worker area, A41...first robot area, A42...second robot area, A43...worker area

Claims

1. A picking system having a supply lane along which a workpiece to be picked is transported in a supply container and a shipping lane along which a shipping container in which the picked workpiece is placed is transported, and at least a part of the picking is performed by a robot; a robot supply lane that transports the supply container to a robot area where the robot picks up the supply container; a worker supply lane for transporting the supply container to a worker area where a worker performs picking; The worker area is disposed downstream of the robot area on the shipping lane. Picking system.

2. a transport control device that controls the robot supply lane and the worker supply lane and controls the shipping lane, The transport control device performs control to hold the shipping container or the supply container in the shipping lane, the robot supply lane, and the worker supply lane in front of each area in accordance with the work picking operation in the robot area and the worker picking operation in the worker area. The picking system according to claim 1 .

3. A failure lane is provided for transporting the supply container containing the workpiece that has been unsuccessfully picked up by the robot one or more times to the vicinity of the worker area when the robot unsuccessfully picks up the workpiece. The picking system according to claim 2 .

4. a display device that instructs a worker in the worker area to pick up the work based on an instruction from the transport control device, The instruction on the display device is corrected in conjunction with the transport of the supply container to the vicinity of the worker area by the failure lane. The picking system according to claim 3.

5. A plurality of the robot areas are arranged upstream of the worker area, and each robot area has an individual robot performing picking. The picking system according to claim 1 .

6. An auxiliary tool for supporting the robot in transporting the workpiece to the shipping container is installed in the robot area. The picking system according to claim 1 .

7. The auxiliary tool includes a movable part that moves the work to a shipping lane. The picking system according to claim 6.

8. A picking control method applied to a picking system having a supply lane along which a workpiece to be picked is transported by a supply container, and a shipping lane along which a shipping container containing the picked workpiece is transported, a robot supply lane that transports the supply container to a robot area where the robot picks up the supply container; a worker supply lane for transporting the supply container to a worker area where a worker picks up the items; Furthermore, the worker area is disposed downstream of the robot area of ​​the shipping lane, When the picking of the work by the robot arranged in the robot area is controlled, an instruction to pick up the work by a worker in the worker area is issued. Picking control method.

Citation Information

Patent Citations

  • Handling system and control method

    JP2022001513A

Cited By

  • Robot box filling machine

    CN119370399A