Apparatus, method, and program

By dynamically calculating power supply from storage batteries using real-time SOC information, the method addresses the uncertainty in power trading markets, enabling higher power supply amounts by aligning battery state with target values at the start of trading periods.

JP2024168659AActive Publication Date: 2024-12-05KANSAI TRANSMISSION & DISTRIBUTION INC

Patent Information

Application Number
JP2023085527
Authority / Receiving Office
JP · JP
Patent Type
Applications
Current Assignee / Owner
Filing Date
2023-05-24
Publication Date
2024-12-05
Estimated Expiration
2043-05-24

AI Technical Summary

Technical Problem

In power trading markets, the amount of power that can be supplied from storage batteries is determined based on predicted in-station load and charging plans, leading to low bids due to uncertainty in actual demand, and existing methods do not address how to dynamically adjust bids to reflect real-time battery state of charge (SOC) information.

Method used

A device calculates power supply from storage batteries by acquiring real-time SOC information before a trading period, using reference values based on battery capacity and time information to dynamically adjust bids, ensuring the battery state matches target values at the start of the trading period.

Benefits of technology

This approach allows for increased power supply to power trading markets by reflecting real-time battery conditions, enhancing the amount of power that can be supplied compared to conventional methods that rely on static predictions.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 2024168659000001_ABST
    Figure 2024168659000001_ABST
Patent Text Reader

Abstract

To increase the amount of electricity that can be supplied to an electricity trading market using a storage battery.SOLUTION: A device includes means for calculating a reference value for a specified time period of a storage battery on the basis of SOC-related information of the storage battery acquired by the device at a time before the start of the specified time period among one or more time periods that can constitute a trading period in the electricity trading market, information on specified reference values of the storage battery at the time, upper limit capacity information of the storage battery, and time information related to the timing, and means for calculating the outputtable power of the storage battery for the specified time period on the basis of at least the upper limit output information and upper limit capacity information of the storage battery at the time, and the time information related to the timing.SELECTED DRAWING: Figure 9
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present disclosure relates to a technique for calculating the power of a storage battery, and more particularly to a technique for calculating the power that can be provided from a storage battery for power trading. [Background technology]

[0002] Patent Publication No. 2021-105755 (Patent Document 1) discloses that selling bid data including the available amount of supply and demand adjustment capacity and the time periods during which supply and demand adjustment capacity can be provided is transferred to an electricity trading agreement calculation device from a selling bidder terminal device installed in the office of a supply and demand adjustment capacity provider, which is the selling bidder in the supply and demand adjustment market, for the purpose of agreement. [Prior art documents] [Patent documents]

[0003] [Patent Document 1] Patent Publication No. 2021-105755 Summary of the Invention [Problem to be solved by the invention]

[0004] When supplying the amount of power of supply and demand adjustment capacity to an electricity trading market such as a supply and demand adjustment market by using the charging and discharging of a storage battery, the amount of power that can be supplied is determined based on the in-house load and charging plan predicted in advance, and is then bid on the electricity market. In such an electricity trading market, until the actual supply and demand cross section is reached, which is the time when supply and demand are actually implemented, it is not known how much of the agreed bid amount is required to be supplied by the activation command, so there is a problem that only bids that include the available power can be made low in order to enable recovery charging of the storage battery and to enable continuous bidding. Patent Document 1 describes a method of bidding on a supply and demand adjustment market with the available supply amount calculated in advance, but does not propose a technology to solve this problem.

[0005] The present disclosure has been made in consideration of the above-mentioned problems, and has an object to provide a technique capable of increasing the amount of electricity that can be provided from a storage battery to the electricity trading market. [Means for solving the problem]

[0006] An apparatus according to one aspect of the present disclosure is an apparatus for calculating the power that can be supplied from a storage battery, and includes: a means for calculating a reference value for a specified time period of the storage battery based on SOC-related information of the storage battery acquired by the apparatus at a timing before the start of the specified time period among one or more time periods that can constitute a trading period in an electricity trading market, information on a specified reference value of the storage battery at the specified time, upper limit capacity information of the storage battery, and time information related to the timing; and a means for calculating the supplyable power of the storage battery in the specified time period based on at least the upper limit output information, upper limit capacity information of the storage battery at the above-mentioned time, and the time information related to the timing.

[0007] According to the device according to the above-mentioned aspect, SOC-related information of the storage battery is acquired at a time before the start of actual supply and demand in a specified time period, and a reference value is calculated based on the acquired information. Therefore, a reference value that dynamically reflects SOC-related information acquired in real time of the storage battery immediately before the start of actual supply and demand in the specified time period can be calculated. As a result, the calculation of the supplyable power based on the reference value that reflects the SOC-related information acquired in real time can increase the supplyable power compared to the conventional method of uniformly determining the bid amount (supplyable power) based on a previously planned reference value.

[0008] An apparatus according to another aspect of the present disclosure is an apparatus for calculating the power that can be supplied from a storage battery, and includes: a means for setting a target value of SOC-related information of the storage battery at the time when a specified time period among one or more time periods that can constitute a trading period in an energy trading market, at a first time before the start of the specified time period, and calculating a reference value of the storage battery for the specified time period based on at least the target value of the SOC-related information and upper limit capacity information of the storage battery; and a means for calculating the supplyable power of the storage battery for the specified time period based on at least one of information between the target value of the SOC-related information and the reference value of the storage battery for the specified time period or the upper limit capacity information.

[0009] According to the device according to the above-mentioned other aspect, a target value of the SOC-related information of the storage battery is set at a first time before the start of actual supply and demand in a predetermined time period, a reference value of the storage battery in the predetermined time period is calculated based on the set target value, and the supplyable power using the storage battery in the predetermined time period is calculated. Therefore, a reference value that dynamically reflects the target value of the SOC-related information set in real time for the storage battery immediately before the actual supply and demand in the predetermined time period is reached can be calculated. As a result, the supplyable power can be increased by calculating the supplyable power based on the reference value that reflects the target value of the SOC-related information set in real time, compared to the conventional method of uniformly determining the bid amount based on the already planned reference value.

[0010] In the above disclosure, the device further includes a command unit that outputs a command to control charging and discharging the storage battery, the command including a command to control charging and discharging the storage battery at a second time before the start of the predetermined time period so as to achieve a target value of the SOC-related information at the start of the predetermined time period.

[0011] According to the above disclosure, the charging and discharging of the storage battery can be controlled so that the SOC-related information at the start of a predetermined time period for the storage battery matches the target value of the SOC-related information.

[0012] In the above disclosure, the device further includes a command unit that outputs a command to control charging and discharging the storage battery, the command including a command to control charging and discharging the storage battery using a total value of charging and discharging power based on a plurality of purposes of the storage battery during a time period before the start of the predetermined time period.

[0013] According to the above disclosure, even if the charging and discharging of a storage battery is used for multiple purposes, the charging and discharging can be controlled using the combined value of the charging and discharging power based on the multiple purposes, and SOC-related information at the start of a specified time period for the storage battery can be calculated or a target value can be set.

[0014] In the above disclosure, the device further includes a command unit that outputs a command to control charging and discharging the storage battery, the command including a command to control charging and discharging the storage battery in a predetermined time period using a reference value calculated for the predetermined time period and a total value of charging and discharging power based on multiple purposes of the storage battery.

[0015] According to the above disclosure, even if the charging and discharging of a storage battery is used for multiple purposes, the charging and discharging can be controlled using the combined value of the charging and discharging power based on the multiple purposes and a reference value calculated for a specified time period, so that the storage battery's available power during the specified time period can be made available.

[0016] In the above disclosure, the device further includes a command unit that outputs a command to control charging and discharging of the storage battery. The command includes a command for exchanging a reference value and an available power between the storage battery and a power transmission and distribution facility device including a power system managed by a power transmission and distribution company.

[0017] According to the above disclosure, charging and discharging of the storage battery can be controlled so as to exchange a reference value and an available supply of power between the storage battery and a power transmission and distribution equipment including a power system managed by a power transmission and distribution business operator.

[0018] In the above disclosure, the electricity trading market includes a balancing market, so the above-described device can be applied to electricity trading in the balancing market.

[0019] In the above disclosure, the supply-available power corresponds to adjustment capacity that can be provided to the supply-demand balancing market. Therefore, the supply-available power calculated as described above can be traded as adjustment capacity that can be provided to the supply-demand balancing market.

[0020] In the above disclosure, the device further comprises means for visually outputting information including the reference value calculated for a predetermined time period on a UI screen.

[0021] According to the above disclosure, it is possible to visually provide the user with information on the reference value and the supplyable power calculated for a specific time period.

[0022] A method implemented by a processor according to an aspect of the present disclosure includes the steps of: calculating a reference value for a specified time period of a storage battery among one or more time periods that can constitute a trading period in an energy trading market, based on SOC-related information of the storage battery acquired at a time before the start of the specified time period, information on a specified reference value of the storage battery at the time, and upper limit capacity information of the storage battery; and calculating the outputtable power of the storage battery for the specified time period based on at least upper limit output information and upper limit capacity information of the storage battery at the time, and time information related to the timing.

[0023] A method implemented by a processor according to another aspect of the present disclosure includes the steps of: setting a target value of SOC-related information of a storage battery at a time when a specified time period among one or more time periods that can constitute a trading period in an energy trading market starts, at a first time before the start of the specified time period, and calculating a reference value of the storage battery for the specified time period based on at least the target value of the SOC-related information and upper limit capacity information of the storage battery; and calculating the output power of the storage battery for the specified time period based on at least one of information between the target value of the SOC-related information and the reference value of the storage battery for the specified time period or information of the upper limit capacity information.

[0024] In yet another aspect of the present disclosure, there is provided a program for causing a processor to execute the above-described method. Effect of the Invention

[0025] According to the present disclosure, it is possible to increase the amount of electricity that can be provided to the electricity trading market using storage batteries. [Brief description of the drawings]

[0026] [Figure 1] 1 is a diagram illustrating an example of a control system configuration for a group of distributed power sources according to an embodiment of the present invention. [Diagram 2] 1 is a diagram illustrating a network system according to an embodiment of the present invention. [Diagram 3] 2 is a diagram illustrating a hardware configuration of a server 10. FIG. [Figure 4] 2 is a diagram illustrating a hardware configuration of a higher-level control device 30. FIG. [Diagram 5] FIG. 2 is a diagram illustrating a functional configuration according to the present embodiment. [Figure 6] 1 is a diagram showing a schematic diagram of a concept of calculation of a reference value and an outputtable power according to the present embodiment; [Figure 7] 7 is a diagram for explaining calculation of the reference value Bn+1Ref in FIG. 6. FIG. [Figure 8] 7 is a diagram for explaining the calculation of the supplyable power Bn+1Bid in FIG. 6. FIG. [Figure 9] 7 is a diagram for explaining another example of calculation of the supplyable power Bn+1Bid in FIG. 6. FIG. [Figure 10] FIG. 10 is a diagram illustrating a schematic diagram of a result of a simulation. [Figure 11] FIG. 10 is a diagram illustrating a schematic diagram of a result of a simulation. [Figure 12] 11 is a diagram showing a schematic diagram of calculation of a reference value and an available power supply in a mixed scenario according to the present embodiment; FIG. [Figure 13] FIG. 2 is a diagram illustrating an example of a contract pattern in the supply and demand adjustment market according to the present embodiment. [Figure 14]FIG. 10 is a diagram illustrating another example of a contract pattern in the supply and demand adjustment market according to the present embodiment. [Figure 15] FIG. 2 is a diagram showing a schematic diagram of a relative relationship between a predetermined time period and timing according to the present embodiment. [Figure 16] FIG. 4 is a diagram showing an example of a GUI screen according to the present embodiment. [Figure 17] FIG. 2 is a diagram showing an example of a flowchart of a process according to the present embodiment. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0027] Hereinafter, an embodiment of the present invention will be described with reference to the drawings. In the following description, the same members are denoted by the same reference numerals. Their names and functions are also the same. Therefore, detailed description thereof will not be repeated.

[0028] <Terminology> The main terms used in this disclosure will be explained.

[0029] "Adjustment capacity" is the ability to adjust supply and demand that electricity transmission and distribution companies need to adjust the supply and demand balance in their electricity supply areas, and adjustment capacity is procured from the supply and demand adjustment market.

[0030] The procurement of adjustment capacity is called activation, and an "activation command" is a command issued by the electricity transmission and distribution company to the supply and demand procurement market for activation.

[0031] "Aggregation" refers to bundling one or more resources that can provide balancing power, such as storage batteries, and controlling them together for the purpose of energy trading.

[0032] "Aggregator" refers to an entity that performs aggregation. A "block" is a unit time period that can constitute a trading period in the power trading market. A block is a time period that is managed when trading and has a predetermined length. A transaction includes bidding, winning bids, and agreements. In this embodiment, a consumer or a power storage plant makes a selling bid for adjustment capacity (supplyable power (W)), and a power transmission and distribution business operator or the like makes a buying bid for adjustment capacity. When both bids are won in the trading market and an agreement is made between the two parties, a transaction is established. Transaction information handled in such a transaction includes, for example, information on a bid amount from a consumer or a power storage plant indicating power (W) that does not exceed the supplyable power, a winning bid amount indicating power that does not exceed the power indicated by the bid amount, and an agreement amount indicating power that does not exceed the power indicated by the winning bid amount. The transaction information further includes a buying bid amount from a power transmission and distribution business operator as a bid amount, but in the present disclosure, the bid amount mainly indicates a selling bid amount from a consumer or a power storage plant. In addition, in a block, actual supply and demand is carried out for a storage battery, in which charging according to a reference value registered for the block and discharging according to an activation command are performed.

[0033] "Remaining capacity" refers to the dischargeable capacity (Wh: watt-hours) of a storage battery at a given time.

[0034] "SOC (State Of Charge)" is an index that indicates the charging state of a storage battery. The index includes, for example, "remaining capacity."

[0035] "GC (Gate Close)" is the time before the start of actual supply and demand of a block, and corresponds to the deadline for registering the reference value of the block in the market trading server. In this embodiment, the gate close is set to one hour before the start of a block, but is not limited to one hour before the start of a block.

[0036] "Available electricity" refers to the dischargeable capacity (Wh) that can be bid on the supply and demand adjustment market from a storage battery during a certain period of time.

[0037] "SOC related information" is a summary of specific examples of an index (SOC) that indicates the state of charge of a storage battery. The SOC related information includes, for example, a calculated value (%) calculated from the maximum dischargeable capacity (Wh) of the storage battery and the dischargeable capacity (Wh) at a certain point in time, a value indicating only the remaining capacity, which is the dischargeable capacity (Wh) at a certain point in time, and a value calculated by a predetermined calculation using at least two or more parameters or all parameters among a plurality of parameters such as past charge / discharge power (W), charge / discharge current (A: amperes), charge / discharge voltage (V: volts), elapsed time, the number of past charge / discharge cycles, and battery deterioration information of the storage battery.

[0038] The "reference value" is the charging power that is the standard for measuring the discharged power as an adjustment capacity in the supply and demand adjustment market, and indicates the charging power that must be a certain value (W) in a block or a specified time period (e.g., 30 minutes). In addition, the reference value can also include charging power for other uses, such as charging power for energy management.

[0039] "Baseline value plan" refers to the charging plan value (W) based on the base value of the storage battery during the period (block) that is subject to trading in the supply and demand adjustment market.

[0040] The "upper limit capacity information" is information indicating the maximum dischargeable capacity (Wh) of the storage battery, and includes information indicating the maximum remaining capacity or rated capacity (Wh) that can be discharged. It is not limited to this, and may include information indicating the contract output (W) x block time (hours).

[0041] "Upper limit output information" is information indicating the maximum dischargeable power (W) of the storage battery, and includes, but is not limited to, information indicating the maximum dischargeable power or rated output (W), and may include information indicating the contracted output (W) for the block.

[0042] <Disclosed Technology> When charging and discharging electricity in an electricity trading market such as a supply and demand adjustment market using a power source such as a storage battery, the available electricity is calculated in advance based on the battery charging plan, etc., and is bid on the electricity market, etc. In a supply and demand adjustment market, it is necessary to register a reference value plan (energy management plan or charging plan) in advance in the supply and demand adjustment market system, but the value of this reference value plan can be changed immediately before actual supply and demand, for example, up to one hour before (GC: gate close).

[0043] In this disclosure, based on the background of such transactions, a method for calculating the amount of bids (supplyable power) to the supply and demand adjustment market is shown, on the premise that the reference value plan is changed at least one hour before the actual supply and demand. In addition, charging of a power source such as a storage battery is controlled based on the changed reference value. As a result, it is possible to increase the amount of available bids by placing a bid based on controlling a power source such as a storage battery based on a reference value that is changed within an assumed range, rather than placing a bid based on a reference value plan predicted (or assumed) in advance.

[0044] The following describes a mechanism for increasing the amount of power that can be bid on the electricity market, assuming that the base value plan, etc. will be changed immediately before actual supply and demand is reached.

[0045] In the following, the supply and demand balancing market will be described as an example of the electricity market. However, the electricity market is not limited to the supply and demand balancing market, and various markets such as the wholesale electricity market and the capacity market are assumed.

[0046] <System> FIG. 1 is a diagram for explaining an example of a control system configuration for a group of distributed power sources according to this embodiment. The system shown in FIG. 1 is a VPP (Virtual Power Plant) system. The VPP system is a mechanism for bundling a large number of energy resources and controlling these energy resources to function like a single power plant. In this embodiment, a chargeable and dischargeable storage battery 50 provided in a consumer or power storage facility 40 constitutes a "power adjustment resource" that provides adjustment power to the supply and demand adjustment market. The consumer or power storage facility 40 will be referred to as consumer facility 40 below.

[0047] The customer facility 40 includes a lower-level control device 20, a storage battery 50, a PCS (Power Conditioning System) 23, a meter 22, a distribution board 25, equipment 24 such as loads and other power sources, and a gateway 21 for communicating with the upper-level control device 30 and the like. The storage battery 50 is connected to the distribution board 25 via the PCS 23 and the meter 22, and the equipment 24 is also connected to the distribution board 25. In addition, the distribution board 25 is connected to a power system 100 for power transmission and distribution managed by a power transmission and distribution company via a meter 26 located outside the customer facility 40. The meter 22 and 26 are composed of smart meters that measure power. The meter 26 measures the power exchanged between the customer facility 40 and the power system 100, and the meter 22 connected directly above the PCS 23 measures the input and output power of the storage battery 50. The lower-level control device 20 performs various processes such as deriving the amount of power based on the measurement values ​​from the meter 22 and 26.

[0048] PCS 23 controls the start / end of charging and the start / end of discharging of storage battery 50 in accordance with commands from lower-level control device 20. In charging, PCS 23 converts AC power supplied from power system 100 via meter 26, distribution board 25, and meter 22 into DC power. In discharging, PCS 23 converts DC power supplied from storage battery 50 into AC power, and the AC power is output to power system 100 via meter 22, distribution board 25, and meter 26.

[0049] The consumer equipment 40 acquires SOC-related information. Here, the remaining capacity of the storage battery 50 is typically used as the SOC-related information. Focusing on the fact that the voltage or current of the storage battery 50 has a correlation with the remaining capacity of the storage battery 50, a detection circuit (not shown) measures the voltage or current of the storage battery 50 and detects the remaining capacity based on cumulative information of the measured voltage or current and the above correlation. Note that the method of detecting the remaining capacity is not limited to this.

[0050] The system in FIG. 1 includes a market trading server 10A, an intermediate supply server 10B ("intermediate supply" is an abbreviation of "central load dispatching center") and a command server 10C on the power transmission and distribution business side, a higher-level control device 30, and a plurality of customer facilities 40 each having a lower-level control device 20. These devices communicate with each other via a wired or wireless communication network, such as a dedicated line, a closed network, or the Internet. The number of customer facilities 40 included in the system is not limited to a plurality of units, and may be one or more units. In the system, the multiple customer facilities 40 form an aggregation in which power adjustment resources are bundled together. A representative lower-level control device 20 or higher-level control device 30 among the multiple customer facilities 40 serves as an aggregator that manages the adjustment power of the aggregation. Alternatively, the lower-level control device 20 of each customer facility 40 may operate as an aggregator that manages its own adjustment power resource (storage battery 50). In this embodiment, for example, the upper controller 30 communicates with the lower controller 20 of each customer facility 40, so that the multiple customer facilities 40 act as aggregators for aggregations in which power adjustment resources are bundled together.

[0051] The business operator that has the intermediate supply server 10B and the command server 10C is a power transmission and distribution business operator, but the business operator that has the upper control device 30 may be a power generation business operator or a retail electricity business operator, or may be a business operator that combines these functions. The business operator that has the upper control device 30 concludes a VPP service contract with the consumer, etc. that has the consumer equipment 40. The lower control device 20 of each consumer equipment 40 controls the charging and discharging of the storage battery 50 via the upper control device 30.

[0052] In electricity market transactions, for a block, which is a unit time period having a predetermined length to be traded, each market server 10D receives a buy bid for adjustment capacity (e.g., a buy bid from an electricity transmission and distribution business operator) and a sell bid for adjustment capacity from the market transaction server 10A held by the aggregator (e.g., a sell bid based on the adjustment capacity supply amount from a consumer contracted by the aggregator, or a sell bid from a power plant), and matches the two to establish a contract. In order to balance supply and demand in the block, the intermediate supply server 10B and the command server 10C of the electricity transmission and distribution business operator transmit a command to activate adjustment capacity according to the available power supply agreed upon for the block to the power plant and the upper control device 30 of the aggregator.

[0053] The upper control device 30 has a gateway GW for communicating with various servers and a gateway GW for communicating with the lower control device 20 of the consumer equipment 40. The upper control device 30 generates and transmits a control command to the lower control device 20 of each consumer equipment 40 based on an activation command received from the intermediate supply server 10B or the command server 10C. The lower control device 20 controls the discharge of the storage battery 50 according to the control command. Such power discharged from the storage battery 50 is supplied to the power system 100 as adjustment power. This allows the power transmission and distribution business operator to procure adjustment power from power plants and consumers based on the agreement of adjustment power via the supply and demand adjustment market, and as a result, the supply and demand balance can be maintained.

[0054] <Network configuration and device configuration> Fig. 2 is a diagram showing a network system according to the present embodiment. Fig. 2(A) shows a schematic example of a network system for communicating transaction information in an electricity market, and Fig. 2(B) shows a schematic example of a network system for communicating information for supply and demand adjustment including an activation command.

[0055] In the transaction information communication network system of Fig. 2(A), the servers for transactions (market transaction server 10A and each market server 10D) and the upper controller 30 are connected to a wired or wireless network 1A. The upper controller 30 connected to the network 1A communicates with the lower controllers 20 of each consumer facility 40, and also communicates with the server for transactions via the network 1A. Transaction information is transferred between these devices in the format of, for example, a CSV (Comma Separated Values) file.

[0056] In the communication network system of information including activation commands for supply and demand adjustment shown in Fig. 2(B), the server (intermediate supply server 10B or command server 10C) that transmits the activation command and the upper controller 30 are connected to a network 1B, which is a dedicated line. The upper controller 30 connected to the network 1B communicates with the lower controllers 20 of each customer facility 40, and also communicates with the server of the activation command via the network 1B.

[0057] In this embodiment, the upper control device 30 is implemented, for example, in a cloud-based server, but the implementation format is not limited to this. Also, in FIG. 2, the market trading server 10A, the lower control device 20, and the upper control device 30 are shown implemented in a desktop PC (Personal Computer), but the implementation format of these devices is not limited to a desktop PC. For example, the lower control device 20 may be a portable information processing terminal (for example, a laptop PC, a tablet terminal, or a smartphone). In the following description, the market trading server 10A, the intermediate supply server 10B, the command server 10C, and each market server 10D are collectively referred to as the server 10 in the common description.

[0058] 3 is a diagram showing a schematic diagram of a hardware configuration of the server 10. As shown in FIG. 3, the server 10 includes, as main components, a processor 151 such as a CPU (Central Processing Unit) that executes a program, a ROM (Read Only Memory) 152 that stores data in a non-volatile manner, a RAM (Random Access Memory) 153 that includes a working area when the processor 151 executes the program and also includes an area for volatilely storing data generated by the execution of the program or input data, an HDD (Hard Disk Drive) 154 that stores programs and data in a non-volatile manner, a communication IF (Interface) 155, an input device 156 that accepts operations for the server 10, a display 157 that displays information, a power circuit 158, a timer 162, an I / O (Input / Output) section 163 for communicatively connecting an external device, and an R / W (Read / Write) section 160 that reads and writes data from and to a storage medium 161. These components are connected to each other by a data bus.

[0059] The input device 156 and the display 157 may be integrated into a device such as a touch panel 159. The communication IF 155 includes an interface circuit for controlling communication between the network and the server 10.

[0060] The processing in the server 10 is realized by each piece of hardware and software (programs) executed by the processor 151. Such software may be stored in advance in the HDD 154. In addition, the software may be stored in the storage medium 161 and distributed as a program product. In addition, the software may be provided as a downloadable program product by an information provider connected to the Internet. Such software is read from the storage medium 161 by the R / W unit 160 or downloaded via the communication IF 155, and then temporarily stored in the HDD 154. The software is read from the HDD 154 by the processor 151 and stored in the RAM 153 in the form of an executable program. The processor 151 executes the program.

[0061] 4 is a diagram showing a schematic diagram of the hardware configuration of the upper control device 30. As shown in FIG. 4, the upper control device 30 includes, as main components, a processor 171 such as a CPU that executes a program, a ROM 172 that stores data in a non-volatile manner, a RAM 173 that includes a working area when the processor 171 executes the program and also includes an area for volatilely storing data generated by the execution of the program or input data, an HDD 174 that stores programs and data in a non-volatile manner, a communication IF 175, an input device 176 that accepts operations for the upper control device 30, a display 177 that displays information, a power circuit 178, a timer 182, and an R / W unit 180 that reads and writes data from and to a storage medium 181. These components are connected to each other by a data bus.

[0062] The input device 176 and the display 177 may be integrated and provided as a device such as a touch panel 179. The communication IF 175 includes an interface circuit for controlling communication between the upper control device 30 and the GW. The upper control device 30 may be configured without the input device 176 and the display 177. In such a configuration, the upper control device 30 transfers information to an external device via the communication IF 175 and causes the external device to display the information. Such information for display includes display control data from a GUI unit 65, which will be described later. In addition, the upper control device 30 receives operation information for the device from the external device via the communication IF 175. Such an external device may include the lower control device 20.

[0063] The processing in the upper control device 30 is realized by each piece of hardware and software (programs) executed by the processor 171. Such software may be stored in advance in the HDD 174. In addition, the software may be stored in the storage medium 181 and distributed as a program product. In addition, the software may be provided as a downloadable program product by an information provider connected to the Internet. Such software is read from the storage medium 181 by the R / W unit 180 or downloaded via the communication IF 175, and then temporarily stored in the HDD 174. The software is read from the HDD 174 by the processor 171 and stored in the RAM 173 in the form of an executable program. The processor 171 executes the program.

[0064] The HDD 174 includes a system program 190 such as an OS (Operating System), an application program 197 executed under the system program 190, attribute information 194 representing attributes of the storage battery 50, and transaction information 195 related to power trading. The application program 197 includes a trading program for power trading and a control program for controlling charging and discharging of the storage battery 50. The attribute information 194 includes upper limit capacity information, deterioration information, rated capacity, and rated output of the storage battery 50. The transaction information 195 includes information for identifying uncontracted blocks, bidded blocks, and contracted blocks. The transaction information 195 further includes information on the available power and bid amount for the bidded blocks, and information on the successful bid amount and contract amount for the contracted blocks. The transaction information 195 further includes information on the reference value and reference value plan for the blocks.

[0065] Each of the components constituting the server 10 and the upper control device 30 shown in Fig. 3 and Fig. 4 can be provided as a general information processing device. Therefore, it can be said that the essential part of the present invention is software stored in the RAM 153 (173), the HDD 154 (174), and the storage medium 161 (181), or software that can be downloaded via a network. Note that the hardware configuration of the lower control device 20 is similar to the hardware configuration of the upper control device 30 shown in Fig. 4, and therefore the description will not be repeated here.

[0066] Storage medium 161 in FIG. 3 and storage medium 181 in FIG. 4 include volatile or non-volatile storage media, for example, general-purpose semiconductor storage devices such as CF (registered trademark, Compact Flash) and SD (registered trademark, Secure Digital), or magnetic storage media such as a flexible disk, or optical storage media such as a CD-ROM (Compact Disk Read Only Memory).

[0067] <Functional configuration> Fig. 5 is a diagram showing a schematic functional configuration according to the present embodiment. Fig. 5 shows main functions that are realized by the upper control device 30 executing the application program 197. These functions may be implemented in the lower control device 20.

[0068] 5, the upper control device 30 includes a remaining capacity acquisition unit 51, a determination unit 52 that determines the available power, a control command unit 60 that outputs a control command to control charging and discharging of the storage battery 50, a communication control unit 61 that controls communication via the GW, an attribute management unit 62 that manages attribute information 194, a transaction management unit 63 that manages transaction information 195, a schedule management unit 64, and a GUI (Graphical User Interface) unit 65 that provides the upper control device 30 with an interface with the outside. The GUI unit 65 generates display control data for visualizing various information including the transaction information. The display 157 is controlled according to the display control data, so that the information is visually output.

[0069] The determination unit 52 includes a reference value determination unit 53 that determines a reference value of the storage battery 50, a supplyable power determination unit 54 that determines the supplyable power, and an output unit 55 that stores the determined reference value and supplyable power or transfers them for trading. The reference value determination unit 53 includes a first setting unit 531, a second setting unit 532, a comparison unit 533, and an attribute-based determination unit 534, which will be described later.

[0070] The control command unit 60 outputs a control command to the lower-level control device 20 to exchange reference values ​​of power and available power for supply for each block between the storage battery 50 and the power transmission and distribution equipment including the power system 100 managed by the power transmission and distribution business operator, and causes the lower-level control device 20 to charge and discharge the storage battery 50 in accordance with the control command.

[0071] The schedule management unit 64 manages a schedule related to transactions for each block. The schedule includes a schedule related to bidding including a bidding deadline and a schedule including GC for each block. The schedule related to transactions may be managed together with the transaction information 195.

[0072] <Concept of calculating standard values ​​and available power supply> In this embodiment, the upper control device 30 operates as an aggregator, treats the storage batteries 50 of multiple lower control devices 20 as one adjustment power resource, and calculates a reference value and a supplyable power for each block by charging and discharging for the adjustment power resource. The upper control device 30 may also treat the storage batteries 50 of each lower control device 20 as an individual adjustment power resource, and calculate a reference value and a supplyable power for each block for each storage battery 50.

[0073] The concept explained below can be applied to primary control reserve, secondary control reserve (1), secondary control reserve (2), tertiary control reserve (1), tertiary control reserve (2), etc. that can be operated in the supply and demand adjustment market. Note that the names secondary control reserve (1), secondary control reserve (2), tertiary control reserve (1), and tertiary control reserve (2) correspond to the official names of the operation menu of the supply and demand adjustment market, and (1) and (2) in these are represented as circled numbers 1 and circled numbers 2, respectively, in the official names, but in this specification they are represented as (1) and (2) without circled numbers.

[0074] (Time to calculate reference value and available power supply) A case will be described where the supplyable power for a specific block that is the subject of bidding is calculated. In this embodiment, the bid amount for the specific block to the market is determined so as not to exceed the supplyable power, so the supplyable power for the specific block is calculated before the bidding deadline. The bid amount indicates a value equal to or less than the calculated supplyable power. The more the successful bid amount determined by the market side increases with the bid amount as the upper limit, the more the consumer's income increases. Therefore, if there is no other use for the discharged power from the storage battery 50 in the specific block other than the market transaction, the bid amount for the specific block = the supplyable power for the specific block.

[0075] The time T1 at which the reference value for the specified block is calculated is a time before the start of actual supply and demand for the specified block and indicates a time before GC, which is the deadline for registering the reference value for the specified block. The reference value for the specified block is calculated based on the remaining capacity (SOC) at time T1 and the successful bid volume for the block in the time slot including time T1. The block in the time slot including time T1 is a block that precedes the specified block. This successful bid volume indicates the successful bid volume that has already been bid, with the bid volume for the block at time T1 being the maximum. Trading information indicating this successful bid volume is notified to the upper control device 30 from the market trading server 10A.

[0076] Under these assumptions, the supplyable power of a given block is calculated at a time before the time T1 before the GC of the given block. This previous time is any time before the bidding deadline for each type of control capacity operated. More specifically, in the case of tertiary control capacity (2), the bidding deadline is a maximum of 24 hours before the given block because of day-ahead bidding, and in the case of primary control capacity to tertiary control capacity (1), the bidding deadline is one week before the given block because of weekly trading. The supplyable power of a given block is calculated at such an arbitrary time before the bidding deadline.

[0077] In this way, the upper control device 30 first calculates the supplyable power for a specified block that is the subject of bidding, submits a bid to the market trading server 10A by the subsequent bidding deadline, then calculates a reference value at time T1, and registers (transfers) the reference value to the market trading server 10A by the subsequent GC.

[0078] FIG. 6 is a diagram showing a concept of calculation of the reference value and the available power supply according to the present embodiment. In FIG. 6, a block B n The length of time T of each block (n=1,2,3,...) is, for example, 3 hours. n The GC of each block B is one hour before the start of the block time slot. n The reference value and available power are calculated. nIn, a smaller value of n indicates a preceding block, and a larger value of n indicates a following block.

[0079] The time T of the block is an arbitrary length of time and is not limited to 3 hours. For example, this concept can be applied even if it is set to 0.5 hours (30 minutes), 1.5 hours (1 hour and 30 minutes), 2 hours, etc. n If time T is 3 hours, block B n+1 The GC of block B n If time T is 30 minutes, block B n+1 The GC of block B n Enter into the block before.

[0080] In Figure 6, block B is the target for calculating the available power supply. n+1 At a given time T1 before the actual supply and demand of block B n+1 Regarding Block B n+1 Standard value B n+1 Block B is based on the assumption that Ref is calculated and controlled (changed). n+1 At any time before the bidding deadline, the available power B n+1 Calculate the predicted value of Bid. In Figure 6, n+1 and the previous block B n is a block that has been sold. Note that time T1 refers to a point in time, but may also include the concept of a relatively short period of time. In FIG. 6, block B n and Block B n+1 For example, blocks B1 and B2 are shown.

[0081] In the upper control device 30, at time T1 (i.e., block B n When N hours have elapsed since the start of the program, the remaining capacity acquisition unit 51 acquires the remaining capacity B n SOC N The reference value determination unit 53 obtains block B n+1 Standard value B n+1 Ref, and the supplyable power determination unit 54 calculates the target predetermined block B n+1At any time before the bid deadline for block B n+1 Available electricity B n+1 Determine (calculate) the bid. This available power B n+1 At the time of Bid calculation, Block B n+1 Standard value B n+1 Ref has not been calculated, but the reference value B at the future time T1 n+1 Assuming that Ref is calculated, the available power B n+1 Calculate the bid. More specifically, the reference value B n+1 Ref and available power B n+1 The bid is calculated according to the following (Equation 1) and (Equation 2).

[0082] B n+1 Ref=(X-(B n SOC N +B n Ref×(TN))) / T(Formula 1) B n+1 Bid=((B n SOC N -(B n Bid-B n Ref) × (TN)) / T) + B n+1 Ref(Formula 2) where T is the time of the block, N is the time elapsed after the block started, and B n SOC N Block B n Remaining capacity at N hours after start, B n Bid:Block B n Available electricity in B n Ref: Block B n X: indicates the rated capacity of the storage battery 50.

[0083] (Standard value B n+1 Decision of Ref) Figure 7 shows the reference value B in Figure 6. n+1 FIG. 7 is a diagram for explaining the calculation of Ref. n Available electricity B n Bid is the successful bid for the block B n As shown in Figure 6, the reference value Bn Ref and successful bid power B n Bid is a predetermined block B at a later time. n+1 Standard value B n+1 By feeding back to the derivation of Ref, the reference value B n+1 In this feedback, the reference value B n+1 Ref is planned for a given time section (previous block B n At time T1 of the predetermined block, the remaining capacity at the end of the predetermined block is set to a reference value B that does not cause a breakdown under any of the scenarios, assuming multiple scenarios that represent the most severe conditions that may cause a breakdown, such as exhaustion or full charging. n+1 Calculate the reference value B n+1 The concept of calculating Ref is shown in FIG.

[0084] In FIG. 7, a predetermined block B n+1 Block B before n At time T1, which is N hours after the start of n+1 Calculate the upper limit (1) and lower limit (2) of the remaining capacity expected at the start of the bidding. The upper limit (1) indicates the remaining capacity when the number of activation commands is 0 during the time (TN) after time T1 and the remaining capacity increases according to the reference value BnRef. The lower limit (2) indicates the remaining capacity when the successful bid power BnRef is 0 during the time (TN) after time T1. n This indicates the remaining capacity that has decreased due to the supply of power in response to the maximum number of bid activation commands received.

[0085] Prescribed Block B n+1 When the remaining capacity at the start indicates the upper limit (1), a certain block B n+1 Even if the execution command is 0 at time T, the specified block B n+1 A reference value B such that the remaining capacity (3) does not reach the upper limit value indicated by the upper limit capacity information of the storage battery 50 at time T. n+1 Ref is calculated, and the predetermined block B n+1 When the remaining capacity at the start indicates the lower limit (2), the specified block B n+1The remaining capacity (4) that is reached at the maximum reference value that can be set for the storage battery 50 at time T is calculated. The route from the upper limit (1) to the remaining capacity (3) shown in FIG. 7 is n+1 This shows a scenario in which the remaining capacity can be fully charged at time T. The route from the lower limit (2) to the remaining capacity (4) is n+1 This shows a scenario in which the remaining capacity may be exhausted at time T. The route from the lower limit (2) to the remaining capacity (4) is n+1 The standard value B that does not collapse even if the bid power is always at the maximum value and an activation command is received n+1 Based on these scenarios, the reference value B is calculated so that neither full charge nor exhaustion occurs. n+1 Ref is determined.

[0086] More specifically, the reference value for the route from the upper limit (1) to the remaining capacity (3) is set by the first setting unit 531 in accordance with the formula group 71 in FIG. 7, and the reference value for the route from the lower limit (2) to the remaining capacity (4) is set by the second setting unit 532 in accordance with the formula group 72 in FIG. 7. The first setting unit 531 sets the upper limit (1) as (upper limit (1)=B n SOC N +B n Ref × (TN)) and calculate the reference value B for the route from upper limit (1) to remaining capacity (3). n+1 Ref(B n+1 Ref=(XB n SOC N ×B n The second setting unit 532 calculates the lower limit (2) according to the formula: (lower limit (2)=B n SOC N -(B n Bid-B n Ref × (TN)) and calculate the reference value B for the route from the lower limit (2) to the remaining capacity (4). n+1 Ref(B n+1 Ref=(X-(B n SOC N -(B n Bid-B n It is calculated according to the formula: Ref) × (TN))) / T).

[0087] The comparison unit 533 performs a comparison process. In the comparison process, the reference value B n+1 Ref and the reference value B of the formula group 72 calculated by the second setting unit 532 n+1 The smaller of the two, the reference value B of formula group 71, is n+1 Ref is compared with the rated output of the storage battery 50, and the smaller one is finally set as the reference value B n+1 The "rated output" indicates the maximum value (W) that the storage battery 50 can output (charge). In this way, the reference value determination unit 53 determines (sets) the predetermined block B n+1 The reference value B is set so that exhaustion or full charge is avoided within the time T of the block and the rated output is not exceeded. n+1 Ref can be determined.

[0088] (Available power B n+1 Bid Determination) Figure 8 shows the available power B in Figure 6. n+1 FIG. 5 is a diagram for explaining the calculation of the bid. n+1 The power α (W) based on the lower limit of the remaining capacity at the start of the block (2) and the power n+1 The reference value B determined for n+1 The remaining capacity that increases according to Ref, i.e., the power β (W) based on the capacity that increases according to the route from the lower limit (1) to the remaining capacity (3), is calculated, and the sum of the calculated power α and β is calculated, and this calculated value (α + β) is called the available power B n+1 Decide (set) the bid.

[0089] More specifically, the supplyable power determination unit 54 determines the supplyable power B n+1 Calculate Bid. Equation 81 is a given block B n+1 Reference value B for the route from upper limit (1) to remaining capacity (3) n+1 The formula for calculating Ref is shown in Equation 82. n SOC N -(B n Bid-Bn Ref × (TN))) / T. This indicates that the n+1 Lower limit of remaining capacity at the start of block (2) (=B n SOC N -(B n Bid-B n This shows that the power β is calculated by dividing the power α and β by the time T of the block. n+1 Indicates that a bid is being calculated.

[0090] In this way, the available power B n+1 Bid is a given block B n+1 The reference value B is determined so as to avoid the upper limit (1) of the remaining capacity at the start of the block, but not the lower limit (2), and to avoid exhaustion or full charge, and not to exceed the rated output. n+1 By calculating as the sum of Ref, a given block B n+1 The available power B that does not cause the battery 50 to run out for a period of time T n+1 You can decide the bid.

[0091] In the above, a method for managing the amount of storage battery 50 installed in at least one consumer facility 40 that can be supplied to an electricity trading market (such as a supply and demand balancing market) is shown. More specifically, the method for managing the amount of storage battery 50 that can be supplied to an electricity trading market (such as a supply and demand balancing market) is shown. More specifically, the method for managing the amount of storage battery 50 that can be supplied to an electricity trading market (such as a supply and demand balancing market) is shown. n+1 In this determination step, the amount of the supply available in block B is determined. n+1 The unit time period immediately before (Block B n ) remaining capacity (B n SOC N ) and Block B from the specified time n+1 The length of time (TN) until the start of block B n Standard value B in n Ref or available power B n Based on the bid, block B n+1 The remaining capacity at the start of actual supply and demand (B n SOCN The upper limit (1) or the lower limit (2) of the battery 50 is determined, and based on the determined remaining capacity, the battery 50 is controlled so that the remaining capacity of the battery 50 does not exceed a predetermined amount (rated capacity X). n+1 Standard value B in n+1 Ref is determined, and based on the determined remaining capacity (α) and reference value (β), block B n+1 The available power (α+β) at

[0092] In determining the remaining capacity, the first setting unit 531 determines the remaining capacity (B n SOC N ) and block B from time T1 n+1 The length of time until the start of the test (TN) and the reference value B n Based on Ref, the second setting unit 532 determines the upper limit (1), and the remaining capacity (B n SOC N ) and the above time length (TN) and the reference value B n Ref and available power B n The comparison unit 533 then performs the above comparison process and determines the reference value B n+1 Set Ref.

[0093] The communication control unit 61 communicates transaction information via the network 1A to which the market transaction server 10A and other transaction devices belong. In this communication, the communication control unit 61 communicates with the block B n+1 The information on the determined reference values ​​for Block B n+1 and a function of transmitting the block B to the transaction device by a predetermined time (GC) before the start of the time period. n+1 a function of transmitting bidding information including a bid amount based on the available power calculated before the bidding deadline for the block B to the trading device by the bidding deadline; n+1 The bidding information has a function of receiving information indicating the successful bid amount (or contract amount) corresponding to the bid amount indicated by the bidding information from the trading device by the start of the bidding.

[0094] The communication control unit 61 also has a function of receiving an activation command according to the contract information via the network 1B to which the intermediate supply server 10B and the command server 10C belong, and a function of transmitting a command to the lower control device 20 to control charging and discharging of the storage battery 50. This control command includes a control command based on the received activation command.

[0095] (Other examples of calculations of available electricity) Figure 9 shows the available power B in Figure 6. n+1 FIG. 11 is a diagram illustrating another example of calculation of the bid. n+1 Bid is expressed as equation 92(B n+1 It can also be calculated according to Bid=(X-BnBid×(TN)) / T). n+1 The polynomial in formula 81 is substituted into formula 83 in FIG. 8 for calculating the bid, and the formula after substitution is rearranged.

[0096] The lower limit (2) of the graph in Figure 9 is Block B n The upper limit (1) indicates the remaining capacity if the activation command for the successful bid amount (contract amount) continues to be output during the time (TN) after time T1 of the contract. Since the upper limit (1) indicates the remaining capacity if the activation command is not output during that time, if the bid amount = successful bid amount, the difference between (upper limit (1) - lower limit (2)) is (B n Considering the rated capacity X of the storage battery 50, the following block B n+1 The power that can be bid (supplied power) is calculated by subtracting the above difference from the maximum capacity (rated capacity X) of the storage battery 50 and dividing the result by the time T of the block, as shown in Equation 92.

[0097] In this way, the block B n+1 The available power of Block B n+1 The above difference, which indicates the real-time charging / discharging status of the storage battery 50 immediately before the actual supply and demand is reached, can be dynamically reflected and calculated, for example, by the above difference, which indicates the status when discharging is performed in response to an activation command.

[0098] (Simulation results) 10 and 11 are diagrams showing the results of the simulation. The inventors prepared a program (e.g., application program 197) for calculation according to the above-mentioned arithmetic formula, and in the simulation, the following items were input to the computer as the specifications of the storage battery 50: rated capacity 10000 (kWh), rated output 3333 (kW), time N (1.5 hours) corresponding to the predetermined time T1, and block B n For each block (n=1,2,...20), we set the unit time T=3 (Hours) as a variable, and had the computer execute the program based on the set variables. The result was the calculated reference value B n+1 Ref and available power B n+1 Bids are shown in the graphs of Figures 10 and 11, respectively.

[0099] 11, in a section 111 including blocks B1 to B5 immediately after the initialization, the available power B n It was found that it is possible to set a large bid. This knowledge includes the knowledge that in section 111, there are discrete blocks with high market trading prices, and if you want to concentrate your bids on those blocks, it is effective to insert initialization. In addition, in the subsequent blocks B9 to B 20 In the section 112 including the above, when it is assumed that all consecutive blocks are traded, the convergence value of the feedback control is the available power B n It was discovered that by bidding as a bid, it is possible to operate the storage battery 50 while avoiding breakdowns such as exhaustion and full charging.

[0100] The specifications are not limited to the above example. More specifically, any value that can be bid and agreed upon may be used. For example, the rated capacity is 50 (MWh), the rated output is 10 (MW), the time N (1.0 Hour) corresponding to the predetermined time T1, and the block B n A similar simulation can be performed even if the unit time is T=2 (Hours).

[0101] (Calculation of reference value and available electricity supply taking into account attributes) The above mentioned standard value (B nRef, B n+1 Ref, etc.) or the available power (B n Bid, B n+1 At least one of the options (bid, etc.) may be determined by the attribute-based determination unit 534 based on an attribute value related to charging and discharging of the storage battery 50.

[0102] More specifically, the charging efficiency and discharging efficiency depend on attributes unique to the storage battery 50. When charging or discharging the storage battery 50, due to charging and discharging losses, the amount of discharge cannot be equal to the amount of charge. In this embodiment, the attribute-based determination unit 534 can determine the reference value and the supplyable power taking into account such characteristics unique to the storage battery 50.

[0103] More specifically, the attribute management unit 62 acquires the values ​​of charging efficiency and discharging efficiency for each power adjustment resource (only an individual storage battery 50 in the case of independent utilization, and multiple bundled storage batteries 50 in the case of aggregation), and sets the acquired values ​​in the attribute information 194. The reference value determination unit 53 adds a parameter (coefficient, etc.) of the charging and discharging efficiency of the attribute information 194 to the above-mentioned calculation formula by the attribute base determination unit 534, and calculates the reference value of each block according to the formula.

[0104] Since such charge / discharge efficiency changes depending on deterioration over time, the surrounding temperature, etc., the attribute management unit 62 acquires the actual values ​​of the charge amount and the discharge amount using the detection value (voltage or current) of the detection circuit of the storage battery 50, and updates (manages) the attribute information 194 so that the value is the latest using the acquired charge / discharge efficiency. Note that the method of acquiring the charge / discharge efficiency is not limited to the calculation method based on the detection value of the detection circuit, and other methods may be used.

[0105] Similarly to the reference value, the supplyable power determination unit 54 can also add a parameter (coefficient, etc.) of the charge / discharge efficiency of the attribute information 194 to the above-mentioned calculation formula to calculate the supplyable power of each block according to the formula.

[0106] <Scenario in which contracted and uncontracted blocks coexist> The scenario described above was a base scenario in which bidding and awards were conducted for all chronologically consecutive blocks.

[0107] In this embodiment, unlike the basic scenario, n ) it is also possible to use the storage battery 50 for another purpose without bidding in the supply and demand adjustment market. In this embodiment, even in a scenario in which unbidden / unsuccessful blocks and bidded / successful blocks randomly intersect (hereinafter referred to as a mixed scenario), it is possible to calculate a reference value and available power (bid amount) that can avoid depletion and full charge for a specific block in the same manner as in the basic scenario by setting the remaining capacity of the storage battery 50 at the end time of the unbidden / unsuccessful block (the start time of the next bidded / successful specific block).

[0108] FIG. 12 is a diagram showing a schematic diagram of calculation of the reference value and the available power supply in the mixed scenario according to the present embodiment. In FIG. 12, the current uncontracted block B n Future transaction block B for which transaction has been completed n+1 When switching to Contract Block B n+1 The reference value of uncontracted block B n The calculation is performed on the assumption that the remaining capacity of the storage battery 50 at the end of the time period can be known in advance. For the sake of explanation, n=0 is set here, and the uncontracted block B n Block B0 and the next execution block B n+1 is called block B1.

[0109] The reference value determination unit 53 and the supplyable power determination unit 54 determine in advance the remaining capacity B0SOC3 of the storage battery 50 at the end time TS of the time period of the immediately preceding uncontracted block B0, and calculate the reference value B1Ref and supplyable power B1Bid of the block B1 based on equations 81 and 83 of the basic scenario to which the remaining capacity B0SOC3 is applied.

[0110] In this calculation, B in Equation 81 and Equation 82 n SOC NThe term is replaced by the determined B0SOC3, and B in Eqs. 81 and 82 is n Ref and B n The reference value of block B1 is calculated by the formula 122(B n+1 Ref=(XB n SOC N The available power of block B1 is calculated by Equation 123(B n+1 Bid=((B n SOC N ) / T)+B n+1 Ref)=(X / T)).

[0111] In the mixed scenario, available power B n Bid(B n+1 The reference value B0SOC3) will be the same at the end time TS in FIG. 12 regardless of the value of the remaining capacity B0SOC3. This is shown by the fact that formula 123 is a calculation formula that does not require the value of the remaining capacity B0SOC3. n+1 At the timing of calculating Ref (the same timing as time T1 shown in FIG. 6), assuming that the remaining capacity B0SOC3 at the end time TS can be determined, the available power B n+1 A bid can be calculated, and the calculated value of available power can be used as an upper limit and a bid can be made by the deadline.

[0112] (Determining target values ​​for SOC-related information) The remaining capacity B0SOC3 determined in advance in the above-described mixed scenario is an example of a target value of the SOC-related information.

[0113] The target value of the SOC-related information is the target value of the SOC-related information at "the time TS when the time slot of the specified block starts" = "the end time TS of the block immediately preceding the specified block (the block in which time T1 exists)". Such a target value is, for example, any value within the range of minimum % to maximum % that can be set as the remaining capacity, or any value within the range of minimum Wh to maximum Wh as the SOC-related information. The remaining capacity may be managed in %, or may be converted into the amount of power Wh of the SOC-related information by multiplying the % value by the rated capacity of the storage battery 50 and managed. In this way, the target value of the SOC-related information of the mixed scenario (remaining capacity B0SOC3) is a value that is uniquely set in advance and is managed, for example, as the attribute information 194.

[0114] <Types of supply and demand adjustment markets and bidding patterns> Calculation of various set values ​​(reference value and available power) according to the type and bidding pattern of the supply and demand adjustment market will be described with reference to FIG. 13 and FIG. 14. In FIG. 13 and FIG. 14, even when the resources to be used are handled as a list pattern bundling a plurality of resources, the settings shown in FIG. 13 and FIG. 14 can be basically applied in the same manner. In the consumer list pattern, consumer-side resources of m consumers 1 to m are registered. Each consumer acquires in advance the rated capacity (X=300 kWh) and maximum output (X / H=100 kW, where H is the available discharge time of the battery 50) of the storage battery 50. However, when the resource is used in combination with the consumer-side usage purpose, it is necessary to acquire in advance the available capacity (X=240 kWh) and maximum output (X / H=80 kW), which are the output that can be provided to the aggregator. The total of multiple consumers (m units) was the battery capacity or available capacity (X = 60 MWh) and maximum output (X / H = 20 MW).

[0115] In the present disclosure, the magnitude relationship between the available supply amount, bid amount, successful bid amount, and command amount (power amount indicated by the activation command) is available supply amount≧bid amount≧successful bid amount≧command amount. Furthermore, before bidding, the upper control device 30 calculates the available supply amount and determines the bid amount with the available supply amount as the upper limit. After bidding, the market trading server 10A or the like determines the successful bid amount with the bid amount as the upper limit, and the upper control device 30 receives a notification of the successful bid amount from the market trading server 10A. After the bid is successful, the upper control device 30 receives a command amount with the successful bid amount as the upper limit from the intermediate supply server 10B or the command server 10C. At the reference value calculation timing, the successful bid amount has been determined, so the reference value is calculated based on the successful bid amount.

[0116] Fig. 13 is a diagram showing a typical example of a contract pattern in the supply and demand adjustment market according to the present embodiment. In Fig. 13, the weekly market products in the supply and demand adjustment market, that is, the primary adjustment reserve, the secondary adjustment reserve (1), the secondary adjustment reserve (2), the tertiary adjustment reserve (1), and the composite contract product bundling these (in the composite product, the tertiary adjustment reserve (2) procured the day before can also be treated as a weekly market product) are bidding for 8 blocks per day, 56 blocks per week, with each block having a unit of 3 hours, from 14:00 on Monday of the previous week to 14:00 on Tuesday of the same week (the following day), and the contract for the next week is made at 15:00 on the same day (Tuesday).

[0117] Business operators such as consumers bidding in the supply and demand adjustment market have decided to bid for each of blocks 1 to 56 constituting the bidding period as shown in Fig. 13. In the bidding (successful bid or contract) pattern in Fig. 13, various setting values ​​according to the bidding situation at each of timings TM1 to TM4 are determined (calculated) as follows according to the calculation formula described above.

[0118] (Calculation of various setting values ​​for timing TM1) When bidding on the supply and demand adjustment market consecutively from a block that was awarded in the period before the bidding period (T = 3 hours), the amount of the awarded block (supplyable power B nBased on the Bid amount (available power B n+1 The bid amount is (100-20×(3-1.5))÷3=23MW. Such a bid amount can be determined arbitrarily, with the calculated available power as the maximum value. For example, if the available power is 23MW and 5MW is to be used for another purpose, the bid amount will be 18MW.

[0119] The case of m=1 will be described. After the bidding for block number 1, the upper control device 30 receives / inputs the successful bid amount (20 MW as the contract amount) from the market trading server 10A, etc. In the block immediately before the successful bid block, the remaining capacity (B n SOC N Based on this, the standard value for the next block (B n+1 Ref) is calculated as (100-50-20×(3-1.5))÷3=6.66…(MW), but when bidding in integer units of 1MW or more, there is a possibility that there will be a shortage after the decimal point, so the standard value is set on an upward sloping scale so that the average is 6.66…(MW) and the total of the standard values ​​over three hours is 20(MW). An example of an upward sloping scale would be 6(MW) in the first hour, 7(MW) in the second hour, and 7(MW) in the third hour.

[0120] When bidding on the supply and demand adjustment market consecutively from a block that was awarded in the period before the bidding period, the amount of the awarded block immediately before (the available power B n Based on the Bid=12MW, the calculation timing of the reference value (N=1.5 hours), and the maximum output capacity of the resource (X=60MWh), the available power in the next block number 1 (available power B n+1 The bid amount is calculated as (60-12×(3-1.5))÷3=14 MW. The upper control device 30 can arbitrarily determine the bid amount with the supplyable power as the upper limit. For example, the bid amount can be 14 MW, which is the total supplyable power.

[0121] The upper control device 30 receives / inputs information on the successful bid amount (10 (MW) as the contract result) from the market trading server 10A etc. after the bidding. In the block immediately before the successful bid block, the remaining capacity of the resource (B n SOC N Based on this, the standard value for the next block (B n+1 Ref) is set as (60-30-10×(3-1.5))÷3=5MW. If there is a decimal point, set it so that it increases in each time unit so that it increases to the right.

[0122] (Calculation of various setting values ​​for timing TM2 and TM4) In the case of m=1, when bidding for any consecutive blocks, for example, blocks 5 to 10 (T=3 hours) in the bidding period in Figure 13, in the supply and demand adjustment market, the bid amount for the sixth block (available power B n Based on the Bid=20MW, the calculation timing of the reference value (N=1.5 hours), and the maximum output capacity of the resource (rated capacity of storage battery 50 X=100MWh), the available power in the next 7th block (available power B n+1 The bid amount is calculated as (100-20×(3-1.5))÷3=23 MW. The upper control device 30 arbitrarily determines the bid amount with the supplyable power as the upper limit. For example, the entire supplyable power of 23 MW can be determined as the bid amount.

[0123] After the bidding, the successful bid amount (20 MW as the contract result) is received / input from the market trading server 10A. In the sixth block, the remaining capacity of the resource at the reference value calculation timing (N=1.5 hours) (B n SOC N Based on the standard value (B = 50MWh) in the next seventh block, n+1Ref) is calculated as (100-50-20×(3-1.5))÷3=6.66… (MW), however, when bidding in integer units of 1 MW or more, there is a possibility that there will be a shortage after the decimal point, so an upward sloping setting is implemented, similar to timing TM1, so that the average is 6.66… (MW) and the total of the reference values ​​over the 3 hours is 20 (MW).

[0124] The following describes the case where multiple consumers (m) are gathered. In the case where consumers bid on the supply and demand adjustment market for any consecutive blocks within the bidding period, for example, the fifth block to the tenth block (T = 3 hours), the bid amount for the sixth block (available power B n Based on the Bid=12 (MW), the reference value calculation timing (N=1.5 hours), and the maximum output capacity of the resource (the rated capacity of the storage battery X=60 (MWh), the available power for the next 7th block (available power B n+1 The bid amount is calculated as (60-12×(3-1.5))÷3=14 (MW). The upper control device 30 arbitrarily determines the bid amount with the supplyable power as the upper limit. For example, the upper control device 30 determines the entire supplyable power of 14 MW as the bid amount.

[0125] After bidding, the successful bid amount (10 (MW) as the contract result) is received / input from the market trading server 10A. In the sixth block, the remaining capacity of the resource at the reference value calculation timing (N=1.5 hours) (B n SOC N Based on this, the standard value (B n+1 Ref) is set as (60-30-10×(3-1.5))÷3=5(MW). If there is a decimal point, a right-sloping setting is implemented and the value is set to increase in each time unit.

[0126] (Calculation of various setting values ​​for timing TM3) In the case of m=1, in the case of any consecutive blocks during the bidding period, for example, the fourth block is not bid on the supply-demand balancing market, but the fifth block to the tenth block (T=3 hours) are bid on the supply-demand balancing market. In this case, regardless of the use of the resources in the fourth block, the remaining capacity of the resources (B n SOC N = 70 (MWh))

[0127] Based on the calculation timing of the reference value (N = 1.5 hours) and the maximum output capacity of the resource (rated capacity of storage battery 50 X = 100 (MWh)), the available power in the fifth block (available power B n+1 The bid amount is calculated as 100÷3=33 (MW). The upper control device 30 arbitrarily determines the bid amount with the supplyable power as the upper limit. For example, the upper control device 30 determines the entire supplyable power of 33 MW as the bid amount.

[0128] After bidding, the successful bid amount (20 (MW) as the contract result) is received / input from the market trading server 10A. The remaining capacity of the resource at the end of the fourth block (B n SOC N Based on the standard value (B = 70 (MWh)) in the next 5th block, n+1 Ref) is calculated as (100-70)÷3=10(MW). However, when bidding in whole units of 1(MW) or more, there is a possibility that the decimal point will be insufficient, so the average is set to 10(MW) and the reference value (B Ref) is calculated in 3 hours. n+1 The total of the power consumption, Ref, and R is set to 30 (MW).

[0129] In the case of gathering multiple (m) consumers, if consumers do not bid in the supply-demand balancing market for any consecutive blocks during the bidding period, for example, the fourth block, but bid in the supply-demand balancing market for the fifth to tenth blocks (T = 3 hours), the remaining capacity of the resource at the end of the fourth block (i.e., the start time of the fifth block) will be calculated as follows: n SOC N Based on the calculation timing of the reference value (N = 1.5 hours) and the maximum output capacity of the resource (the rated capacity of the storage battery 50, X = 60 (MWh)), the available power in the next 5th block (available power B n+1 The bid amount is calculated as 60÷3=20 (MW). The upper control device 30 arbitrarily determines the bid amount with the supplyable power as the upper limit. For example, the entire supplyable power of 20 MW is determined as the bid amount.

[0130] After bidding, the successful bid amount (10 (MW) as the contract result) is received / input from the market trading server 10A. The remaining capacity of the resource at the end of the fourth block (B n SOC N Based on the standard value (B = 50 (MWh)) in the next 5th block, n+1 Ref) is set as (60-50)÷3=3.33…(MW). If there is a decimal point remaining, the value is set to 3 (MW) for the first hour, 3 (MW) for the second hour, and 4 (MW) for the third hour.

[0131] <Other examples of supply and demand adjustment market types and bidding patterns> In the tertiary adjustment capacity of the supply and demand adjustment market (2), bids are made in blocks of 3 hours, 8 blocks per day, from 12:00 noon the previous day until 14:00 on the same day, and the contract for the next day is concluded at 15:00 on the same day. However, even if the unit time of these blocks is changed from 3 hours to 30 minutes, etc., it can be handled in the same way.

[0132] Businesses bidding in the supply and demand adjustment market made agreements for each of blocks 1 to 8 as shown in Fig. 14. Fig. 14 is a diagram showing a schematic diagram of another example of an agreement pattern in the supply and demand adjustment market according to the present embodiment. Fig. 14 shows a bidding period including blocks 1 to 8 as a trading period. In the bidding (successful bid or agreement) pattern in Fig. 14, various setting values ​​according to the bidding situation at each of timings TM5 to TM8 are determined (calculated) as follows according to the calculation formula described above.

[0133] (Calculation of various setting values ​​for timing TM5 and TM7) In the case of m=1, at this timing, the amount of the previously sold block (available power B n Based on the Bid=20MW, the reference value calculation timing (N=1.5 hours), and the maximum output capacity of the resource (rated capacity of storage battery 50 X=100 (MWh)), the available power in the first block (available power B n+1 Bid) is calculated as (100-20×(3-1.5))÷3=23 (MW). The upper control device 30 arbitrarily determines the bid amount with the supplyable power as the upper limit. For example, the entire supplyable power of 23 MW is determined as the bid amount.

[0134] After bidding, the successful bid amount (20 (MW) as the contract result) is received / input from the market trading server 10A. In the block immediately before the successful bid block, the remaining capacity of the resource at the time of calculation of the reference value (N=1.5 hours) (B n SOC N Based on this, the standard value for the next block (B n+1 Ref) is calculated as (100-50-20×(3-1.5))÷3=6.66…(MW), but when bidding in whole units of 1MW or more, there is a possibility that there will be a shortage after the decimal point, so the average is set to 6.66…(MW) and the reference value is set to an upward sloping value so that the total for the three hours is 20(MW). For example, the first hour is 6(MW), the second hour 7(MW), and the third hour 7(MW).

[0135] When multiple (m) consumers are gathered, if they bid for tertiary control capacity (1) consecutively from a block (T = 3 hours) that was awarded in the period before the bidding period, the amount of the awarded block (supplyable power B n Based on the Bid=12 (MW), the calculation timing of the reference value (N=1.5 hours), and the maximum output capacity of the resource (rated capacity of storage battery 50 X=60 (MWh)), the available power in the next block (first block) (available power B n The bid amount is set as (60-12×(3-1.5))÷3=14 (MW). The upper control device 30 arbitrarily determines the bid amount with the supplyable power as the upper limit. For example, the entire supplyable power of 14 MW is determined as the bid amount.

[0136] After the bidding, the upper controller 30 receives / inputs the successful bid amount (10 (MW) as the contract result) from the market trading server 10A. In the block immediately before the successful bid block, the remaining capacity of the resource (B n SOC N Based on =30 (MWh), the standard value for the next block (B n+1 Ref) is set as (60-30-10×(3-1.5))÷3=5(MW). If there is a decimal point, the reference value is set to increase in each time unit.

[0137] (Calculation of various setting values ​​for timing TM6) In the case of m=1, when bidding for any consecutive blocks within the bidding period, for example, the fifth block to the seventh block (T=3 hours) in succession for tertiary control capacity (2), the bid amount for the sixth block (available power B n Based on the bid amount (available power B n+1Bid) is set as (100-20×(3-1.5))÷3=23 (MW). Note that decimal points are rounded down. The upper control device 30 arbitrarily determines the bid amount with the supplyable power as the upper limit. For example, the entire supplyable power of 23 MW is determined as the bid amount.

[0138] After bidding, the successful bid amount (20 (MW) as the contract result) is received / input from the market trading server 10A. In the sixth block, the remaining capacity of the resource at the reference value calculation timing (N=1.5 hours) (B n SOC N Based on the standard value (B = 50MWh) in the next seventh block, n+1 Ref) is calculated as (100-50-20×(3-1.5))÷3=6.66…(MW), but when bidding in whole units of 1MW or more, there is a possibility that there will be a shortage after the decimal point, so the average is set to 6.66…(MW) and the reference value is set to an upward trend so that the total for the three hours is 20(MW). For example, 6(MW) in the first hour, 7(MW) in the second hour, and 7(MW) in the third hour.

[0139] The total of multiple consumers (m) was the battery capacity or available capacity (X = 60 MWh) and maximum output (X / H = 20 MW). In this case, when bidding for tertiary control capacity (2) for any consecutive blocks during the bidding period, for example, the fifth block to the seventh block (T = 3 hours), the bid amount for the sixth block (available power B n Based on the Bid=12 (MW), the calculation timing of the reference value (N=1.5 hours), and the maximum output capacity of the resource (rated capacity of storage battery 50 X=60 (MWh)), the available power for the next 7th block (available power B n+1 The bid amount is set as (60-12×(3-1.5))÷3=14 (MW). The upper control device 30 arbitrarily determines the bid amount with the supplyable power as the upper limit. For example, the entire supplyable power of 14 MW is determined as the bid amount.

[0140] After bidding, the successful bid amount (10 (MW) as the contract result) is received / input from the market trading server 10A. In the sixth block, the remaining capacity of the resource at the reference value calculation timing (N=1.5 hours) (BnSOC N Based on the standard value (B = 30 (MWh)) in the next seventh block, n+1 Ref) is set as (60-30-10×(3-1.5))÷3=5(MW). If there is a decimal point remaining, the value is set to increase to the right.

[0141] (Calculation of various setting values ​​for timing TM8) In the case of m=1, at timing TM8, in the case of any consecutive blocks during the bidding period, for example, the fourth block is not bid into the supply and demand adjustment market, but the fifth block to the tenth block (T=3 hours) are bid into the tertiary control capacity (2), regardless of the purpose for which the fourth block is used, the remaining capacity of the resource (B n SOC N = 70 (MWh))

[0142] Based on the calculation timing of the reference value (N = 1.5 hours) and the maximum output capacity of the resource (rated capacity of storage battery 50 X = 100 (MWh)), the available power in the fifth block (available power B n+1 The bid amount is calculated as 100÷3=33 (MW). The upper control device 30 arbitrarily determines the bid amount with the supplyable power as the upper limit. For example, the upper control device 30 determines the entire supplyable power of 33 MW as the bid amount.

[0143] After the bidding, the upper controller 30 receives / inputs the successful bid amount (20 (MW) as the contract result) from the market trading server 10A. n SOC N Based on =70 (MWh), the standard value (B n+1The reference value (Ref) is calculated as (100-70)÷3=10 (MW), however, when bidding in integer units of 1 MW or more, there is a possibility that there will be a shortage after the decimal point, so the average is 10 (MW) and the reference value is set on an upward sloping scale so that the total for the three hours is 30 (MW).

[0144] The above has been described for one (m=1) consumer, but the total of multiple (m) consumers is the storage battery capacity or available capacity (X=60 (MWh), maximum output (X / H=20 (MW)). In this case, in any consecutive blocks during the bidding period, for example, the fourth block is not bid in the supply and demand adjustment market, but the fifth block to the tenth block (T=3 hours) are consecutively bid for the tertiary adjustment capacity (2), regardless of the purpose for which the storage battery 50 is used in the fourth block, the remaining capacity of the resource (B n SOC N = 50MWh).

[0145] Based on the calculation timing of the reference value (N = 1.5 hours) and the maximum output capacity of the resource (rated capacity of storage battery 50 X = 60 (MWh)), the available power in the next 5th block (available power B n+1 The bid amount is calculated as 60÷3=20 (MW). The upper control device 30 arbitrarily determines the bid amount with the supplyable power as the upper limit. For example, the entire supplyable power of 20 MW is determined as the bid amount.

[0146] After bidding, the successful bid amount (10 (MW) as the contract result) is received / input from the market trading server 10A. The remaining capacity of the resource at the end of the fourth block (B n SOC N Based on the standard value (B = 50MWh) in the next 5th block, n+1 Ref) is set to the value of (60-50)÷3=3.33...(MW). If there is a decimal point remaining, the value is set to an upward gradation, for example, the reference value is set to 3 (MW) for the first hour, 3 (MW) for the second hour, 4 (MW) for the third hour, etc.

[0147] In Figures 13 and 14, if the resource being used (supply and demand adjustment resource) is a single generator, one resource is registered in the supply and demand adjustment market system. However, the settings in Figures 13 and 14 can be applied in the same way even if there are second or subsequent resources. In addition, the calculated values ​​in the settings in Figures 13 and 14 are basically rounded down to the nearest integer.

[0148] 13 and 14, the bidding business operators (including aggregation coordinators and specified wholesale supply businesses) conduct bidding for each block for one individual generator (including storage battery 50 that can be bid on by itself) or one set of list patterns under their umbrella (including generator list patterns, negative-positive list patterns, and consumer list patterns, which aggregate and bid for two or more power sources (supply and demand adjustment resources) that cannot be bid on by themselves). Consumer list patterns can be read as generator list patterns and negative-positive list patterns.

[0149] In Figures 13 and 14, utilization of resources other than the supply and demand adjustment market is assumed to include arbitrage through electricity trading in the wholesale electricity market (spot market or hourly market), imbalance avoidance, output suppression avoidance, peak cutting / peak shifting of distributed energy resources (DER) and demand, etc., response to activation command power sources, utilization of resources in the capacity market, etc., but is not limited to these, and shows the general use of resources (storage battery 50) as a multi-use.

[0150] <Relative relationship between designated time period and timing> FIG. 15 is a diagram showing a schematic diagram of a relative relationship between a predetermined time period and timing according to the present embodiment. n+1 ) and the time period immediately before (Block B n ) are all blocks where bidding (contracts) have been completed. The current time TT1 is the time period where actual supply and demand is in effect (Block B nIn FIG. 15A, at a time TT1 before the start of a predetermined time period, the upper control device 30 acquires SOC-related information (for example, remaining capacity B n SOC N ) and information on the predetermined reference value of the storage battery 50 at time TT1 (B n Ref, the upper limit capacity information of the storage battery 50 (rated capacity X, etc.), and time information (TN) related to the timing are used to calculate a reference value (B n+1 Calculate the value of Ref.

[0151] The upper control device 30 also determines the time information (TN) after the time TT1 in advance, and calculates the available power B according to the formula 92 before the bidding deadline. n+1 Calculate the bid.

[0152] FIG. 15B shows a block diagram in which the upper control device 30 determines whether a predetermined time period 1 (block B n+1 This shows the case where the reference value for the current block and block B is calculated. n+1 The upper control device 30 also determines the time information (TN) after the time TT2 in advance, and calculates the available power B n+1 FIG. 15C shows that the upper controller 30 calculates the bid for the next predetermined time slot 1 (block B n+1 The upper control device 30 also determines the time information (TN) after the time TT3 in advance, and calculates the reference value for the available power B according to the formula 92 before the bidding deadline. n+1 Calculate the Bid. For these cases, the calculation shown in Figure 12 can be applied.

[0153] More specifically, the upper control device 30 n+1At a first time (time TT2 or TT3) before the start of the predetermined time period 1, the target value of the SOC-related information of the storage battery 50 at the start of the predetermined time period 1 (for example, the remaining capacity B n SOC N ) is set, and a reference value (B n+1 Ref), and the available power (B n+1 The upper control device 30 has a function of calculating the available power (B n+1 Bid) is calculated based on the target value of SOC-related information (e.g., remaining capacity B n SOC N etc.) and the reference value of the storage battery in a given time period 1 (B n+1 Based on one of the information on the maximum capacity (rated capacity X, etc.) and the information on the maximum capacity (rated capacity X, etc.), the available power (B n+1 Calculate the bid.

[0154] Furthermore, at a second time before the start of the predetermined time slot 1, the control command unit 60 of the upper control device 30 outputs a control command to control charging / discharging of the storage battery 50 so that the remaining capacity becomes the target value of the SOC-related information at the start of the predetermined time slot 1. For example, the control command unit 60 receives the remaining capacity detected for the storage battery 50 from the lower control device 20, compares the received remaining capacity with a target value, determines a control amount (charging / discharging power) that makes them coincident, and outputs a control command to instruct charging / discharging with the determined control amount. Such a control amount is determined, for example, by using feedback control.

[0155] In addition, the control command unit 60 calculates a total value of the charging and discharging power of the storage battery 50 based on multiple purposes during the time period before the start of the specified time period 1, and uses the calculated total value to output a control command to control charging and discharging so that the storage battery 50 does not become depleted or fully charged.

[0156] In addition, the control command unit 60 calculates the reference value (B n+1 Ref) and the total value of the charging and discharging power of the storage battery 50 based on a plurality of purposes, a control command is output to control charging and discharging so that the storage battery 50 does not become depleted or fully charged.

[0157] The multiple purposes described above are purposes for using the storage battery 50, and include, for example, the purpose of charging and discharging the storage battery 50 to exchange power with the equipment 24, such as the load and other power sources in FIG. 1. Further purposes of use include the exchange of power for markets other than the supply and demand adjustment market and various contracts. For example, when a contract is made in the wholesale electricity market, when a bid is made as a power source for initiating a capacity market command, and when a contract for utilizing surplus capacity is concluded with a local general electricity transmission and distribution company, the storage battery 50 is used by discharging the storage battery 50 to provide power, or by reducing the amount of charge, etc. The multiple purposes are not limited to these, and may include other purposes.

[0158] The lower-level control device 20 measures the power discharged from the storage battery 50 for each of the multiple usage purposes of the storage battery 50, and transfers the measured power information to the upper-level control device 30. The upper-level control device 30 can calculate a total value of the charging and discharging power based on the multiple purposes from the power for each usage purpose received from the lower-level control device 20. For example, the control command unit 60 calculates the difference between the total value (kWh) and the rated capacity X, and determines the charging and discharging power (kW) by, for example, feedback control so that the difference becomes constant (target), and outputs a command to charge and discharge the determined power.

[0159] <Monitor output> FIG. 16 is a diagram showing an example of a GUI screen according to the present embodiment. The GUI unit 65 generates display control data for visualizing information including the reference value and the available power determined for each block. FIG. 16 shows an example of a screen to be displayed on a display according to such display control data. Objects constituting the screen include a window W1 of a graph showing the change over time of the charge / discharge power of the storage battery 50, a window W2 of a graph showing the change over time of the charge / discharge power amount of the storage battery 50, a window W3 of a graph showing the change over time of the SOC (remaining capacity) of the storage battery 50, an object TM of a performance time showing the time when the power was measured, an object CT showing the current time, and objects 91 to 96. The windows W2 and W3 display graphs on a common time axis, so that the user can visually recognize the change in the charge / discharge power amount of the storage battery 50 and the change in the SOC (remaining capacity) in association with each other on the same time axis.

[0160] Object 93 indicates the time period of the next block (15:00-18:00) and the time period of the current block (9:00-12:00). The time 9:20 indicated by the current time CT falls within the current block. Objects 94 and 95 indicate the contracted output (a value equal to or less than the available power) and the reference value for the current block and the next block, respectively. Object 91 indicates a command value based on a received activation command, and object 92 indicates the actual value of the power provided by discharging the storage battery 50 in response to the activation command. Window W1 indicates a situation in which the fluctuation of the actual value up to time TM has converged within the upper and lower penalty limits. The VPP reserved output and reserved capacity indicated by object 96 can be read as the rated output and rated capacity when there is one storage battery 50 to be monitored.

[0161] As described above, each time the upper control device 30 determines that the current time has reached time T1, which is before the GC immediately before the actual supply and demand of the block, it calculates a reference value for that block. As a result, the object 95 on the screen is updated to indicate the calculated reference value for each block each time time T1 is reached. Each time the value of the object 95 is updated, the display mode may be changed in a predetermined manner, such as blinking. By changing the display mode in this way, it is notified (notified) that a reference value has been calculated for each block.

[0162] <Flowchart> 17 is a diagram showing an example of a flowchart of processing according to this embodiment. The processing according to this flowchart is realized by the processor 171 of the upper control device 30 executing the application program 197. With reference to the flowchart, a case of bidding for consecutive blocks in the basic scenario described above will be described.

[0163] Fig. 17(A) is a flow chart for calculating the supplyable power for a specific block that is the target of a bid among consecutive blocks. In Fig. 17(A), processor 171 determines whether it is time to calculate the supplyable power for a specific block that is the target of a bid among consecutive blocks (step S20). Processor 171 may, for example, compare the bidding schedule indicated by transaction information 195 with the time measured by timer 182, and determine whether the time has been reached for the specific block based on the comparison result.

[0164] When processor 171 determines that the calculation time has not yet arrived (NO in step S20), it repeats step S20, but when it determines that the calculation time has arrived (YES in step S20), it proceeds to step S21. Note that this determined time is a time prior to the bidding deadline for the given block.

[0165] The processor 171 acquires the time information (T and N) (step S21), and proceeds to step S22. Such time information is included in the transaction information 195, for example.

[0166] The processor 171 calculates the supplyable power for the predetermined block (step S22). More specifically, the processor 171 acquires the value of the rated capacity X from the attribute information 194 (step S23), and acquires the reference value of the block immediately before the predetermined block from, for example, the transaction information 195 (step S24). The processor 171 calculates the supplyable power for the predetermined block according to the formula 92 based on the information acquired in steps S21, S23, and S24 (step S25).

[0167] Fig. 17B is a flow chart for calculating a reference value for a specific block that is the target of a bid among consecutive blocks. In Fig. 17B, processor 171 determines whether it is time to calculate a reference value for the specific block that is the target of a bid (step S30). Processor 171 may, for example, compare the GC time (more specifically, time T1) for the specific block indicated by transaction information 195 with the time measured by timer 182, and determine whether it is time to calculate a reference value for the specific block based on the comparison result.

[0168] If processor 171 determines that the calculation time has not yet arrived (NO in step S30), it repeats step S30, but if it determines that the calculation time has arrived (YES in step S30), it proceeds to step S31.

[0169] The processor 171 acquires parameters for calculation (step S31). The parameters are the block time T, the elapsed time N, the remaining capacity B n SOC N , the reference value BnRef of the previous block, and the rated capacity X. Such information is obtained from the attribute information 194 and the transaction information 195.

[0170] Processor 171 applies the above parameter values ​​to (Equation 1) for a given block, and performs a calculation according to (Equation 1) to calculate a reference value (step S32).

[0171] The upper control device 30 stores the supplyable power and the reference value calculated for a specified block as transaction information 195, and transfers information on the bid volume based on the supplyable power to the market trading server 10A by the bidding deadline, and also transfers the information on the reference value to the market trading server 10A by GC in order to register the information on the reference value.

[0172] In FIG. 17, the processing of the basic scenario in which the blocks to be bid are consecutive has been described, but the processing of FIG. 17 can be similarly applied to the mixed scenario described above.

[0173] The functions of the upper controller 30 shown in this embodiment may be installed in the lower controller 20, and the processing of the upper controller 30 may be performed by the lower controller 20.

[0174] <Advantages> In the past, when charging and discharging electricity using a power source (such as a storage battery) based on the assumption of an agreement for each menu in the electricity market, such as the supply and demand adjustment market, a technology was proposed to determine the bidding amount based on a reference value plan using predictions of SOC-related information.

[0175] In contrast, in the present embodiment, SOC-related information such as remaining capacity immediately before the actual supply and demand of a specific block is reached (or a target value of SOC-related information) is acquired, and a reference value for the specific block is determined based on the acquired information. Therefore, for a specific block, it is possible to determine a reference value that dynamically reflects the real-time charging and discharging status of the storage battery 50 immediately before the actual supply and demand of the specific block is reached, for example, the status in which discharging is performed in response to an activation command. Then, by assuming the reference value determined by this method, it is possible to calculate the maximum available power that can be bid for the specific block. This makes it possible to increase the amount of bid (available power) for the specific block compared to the conventional method of determining the amount of bid based on a reference value plan using predictions of SOC-related information. In addition, it is possible to bid for each block of consecutive blocks.

[0176] The embodiments disclosed herein should be considered to be illustrative and not restrictive in all respects. The scope of the present invention is defined by the claims, not by the description of the embodiments described above, and is intended to include all modifications within the meaning and scope of the claims. [Explanation of symbols]

[0177] 1A, 1B network, 10 server, 10A market transaction server, 10B intermediate supply server, 10C command server, 10D market server, 20 lower control device, 21 gateway, 22, 26 measuring instrument, 24 equipment, 25 distribution board, 30 upper control device, 40 consumer equipment, 50 storage battery, 51 remaining capacity acquisition unit, 52 determination unit, 53 reference value determination unit, 54 supplyable power determination unit, 55 output unit, 60 control command unit, 61 communication control unit, 62 attribute management unit, 63 transaction management unit, 73 comparison processing, 91, 92, 93, 94, 95, 96, TM, CT object, 100 power system, 111, 112 section, 151, 171 processor, 153, 173 RAM, 156, 176 input device, 157, 177 Display, 158, 178 Power supply circuit, 159, 179 Touch panel, 161, 181 Storage medium, 162, 182 Timer, 172 ROM, 194 Attribute information, 195 Transaction information, 197 Application program, 531 First setting unit, 532 Second setting unit, 533 Comparison unit, 534 Attribute-based determination unit, W1, W2 Windows.

Claims

1. An apparatus for calculating available power from a storage battery, a means for calculating a reference value of the storage battery for a specified time period among one or more time periods that can constitute a trading period in the energy trading market, based on SOC-related information of the storage battery acquired by the device at a timing before the start of the specified time period, information on a specified reference value of the storage battery at the time, upper limit capacity information of the storage battery, and time information related to the timing; The device comprises: a means for calculating the outputtable power of the storage battery during the specified time period based on at least upper limit output information of the storage battery at the time, the upper limit capacity information, and time information related to the timing.

2. An apparatus for calculating available power from a storage battery, a means for setting, for a predetermined time period among one or more time periods that can constitute a trading period in an energy trading market, a target value of SOC-related information of a storage battery at a time when the predetermined time period starts, at a first time before the start of the predetermined time period, and calculating a reference value of the storage battery for the predetermined time period based on at least the target value of the SOC-related information and upper limit capacity information of the storage battery; The device includes: a means for calculating the output power of the storage battery in the specified time period based on at least one of information between the target value of the SOC-related information and a reference value of the storage battery in the specified time period, or the upper limit capacity information.

3. A command unit that outputs a command to control charging and discharging the storage battery, The device according to claim 2 , wherein the command includes a command to control charging and discharging of the storage battery at a second time before the start of the specified time period so as to achieve a target value of the SOC-related information at the time the specified time period starts.

4. A command unit that outputs a command to control charging and discharging the storage battery, The command includes a command to control charging and discharging of the storage battery using a total value of charging and discharging power based on a plurality of purposes of the storage battery during a time period before the start of the specified time period. The device according to any one of claims 1 to 3.

5. A command unit that outputs a command to control charging and discharging the storage battery, The device according to any one of claims 1 to 3, wherein the command includes a command to control charging and discharging of the storage battery during the specified time period using the reference value calculated for the specified time period and a combined value of charging and discharging power based on multiple purposes of the storage battery.

6. A command unit that outputs a command to control charging and discharging the storage battery, The instruction: The device according to any one of claims 1 to 3, including a command for exchanging the reference value and the available power between the storage battery and a power transmission and distribution equipment device including a power system managed by a power transmission and distribution business operator.

7. The apparatus according to any one of claims 1 to 3, wherein the electricity trading market includes a balancing market.

8. The apparatus of claim 7 , wherein the available power corresponds to balancing power available for supply to the balancing market.

9. The device according to claim 1, further comprising: a means for visually outputting information including the reference value calculated for the predetermined time period on a UI screen.

10. 1. A processor-implemented method comprising: calculating a reference value of the storage battery for a predetermined time period among one or more time periods that can constitute a trading period in the energy trading market, based on SOC-related information of the storage battery acquired at a time before the start of the predetermined time period, information of a predetermined reference value of the storage battery at the time, and upper limit capacity information of the storage battery; A method comprising a step of calculating the output power of the storage battery during the specified time period based on at least upper limit output information of the storage battery at the time, the upper limit capacity information, and time information related to the timing.

11. 1. A processor-implemented method comprising: a step of setting a target value of SOC-related information of a storage battery at a time when a predetermined time period among one or more time periods that can constitute a trading period in an energy trading market starts, at a first time before the start of the predetermined time period, and calculating a reference value of the storage battery for the predetermined time period based on at least the target value of the SOC-related information and upper limit capacity information of the storage battery; A method comprising a step of calculating the output power of the storage battery in the specified time period based on at least one of information between the target value of the SOC-related information and a reference value of the storage battery in the specified time period, or information of the upper limit capacity information.

12. A program for causing a processor to execute the method according to claim 10 or 11.

Citation Information

Patent Citations

  • Power trade system and method thereof

    JP2019205304A

  • Power management method and power management system

    JP2020089087A

  • Power transaction contract calculation device and power transaction contract calculation method

    JP2021105755A

Cited By

  • Power control system, power control method, and power control program

    JP7774764B1

  • Apparatus, method, and program

    JP7896208B1