Bath system
A bath system with a shared pump for cleaning and bubble generation operations addresses high manufacturing costs by using a bath circuit with multiple flow paths and switching mechanisms, achieving cost-effectiveness and compactness.
Patent Information
- Application Number
- JP2023085621
- Authority / Receiving Office
- JP · JP
- Patent Type
- Applications
- Current Assignee / Owner
- Filing Date
- 2023-05-24
- Publication Date
- 2024-12-05
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
Bath systems that can perform both bathtub cleaning and fine bubble generation operations tend to have high manufacturing costs due to the need for separate pumps for each function.
A bath system design that shares a single pump for both bathtub cleaning and fine bubble generation operations, utilizing a bath circuit with multiple flow paths and switching mechanisms to separate the functions, allowing for a compact and cost-effective configuration.
The shared pump configuration reduces the number of pumps required, leading to lower manufacturing costs and a more compact design while maintaining the ability to perform both cleaning and bubble generation operations effectively.
Smart Images

Figure 2024168721000001_ABST
Abstract
Description
[Technical field]
[0001] The technology disclosed in this specification relates to a bath system. [Background technology]
[0002] Patent Document 1 discloses a bath system that includes a storage tank that stores hot and cold water supplied from a water supply source and has a backflow prevention mechanism that prevents the stored hot and cold water from flowing back toward the water supply source, a pump that pumps the hot and cold water, a detergent mixing unit that mixes detergent into the hot and cold water, a flow path that runs from the storage tank to a bathtub via the pump and the detergent mixing unit, and a control unit. The control unit is configured to be able to execute a bathtub cleaning operation that operates the pump to mix detergent into the hot and cold water sent from the storage tank using the detergent mixing unit, and to supply the hot and cold water mixed with detergent to the bathtub to clean the bathtub.
[0003] Patent Document 2 discloses a fine-bubble generating device including a pump for pumping hot and cold water, a fine-bubble generating unit for generating fine bubbles in the hot and cold water, and a flow path from a bathtub to the bathtub via the pump and the fine-bubble generating unit. By operating the pump, the fine-bubble generating device can perform a fine-bubble generating operation for circulating the hot and cold water stored in the bathtub to the fine-bubble generating unit and generating fine bubbles in the hot and cold water stored in the bathtub.
[0004] For example, by incorporating the fine bubble generator of Patent Document 2 into the bath system of Patent Document 1, a bath system capable of performing both a bathtub cleaning operation and a fine bubble generating operation can be configured. [Prior art documents] [Patent documents]
[0005] [Patent Document 1] Patent Publication No. 2022-82148 [Patent Document 2] JP 2017-148717 A Summary of the Invention [Problem to be solved by the invention]
[0006] Bath systems capable of both bathtub cleaning and fine bubble generating operations tend to be expensive to manufacture. This specification provides a technology that allows a bath system capable of both bathtub cleaning and fine bubble generating operations to be manufactured at a relatively low cost. [Means for solving the problem]
[0007] In a first aspect of the present technology, a bath system includes a storage tank that stores hot and cold water supplied from a water supply source and has a backflow prevention mechanism that prevents the stored hot and cold water from flowing back toward the water supply source, a pump that pumps the hot and cold water, a detergent mixing unit that mixes detergent into the hot and cold water, a micro-bubble generating unit that generates micro-bubbles in the hot and cold water, a bath circuit connected to a bathtub and in which the storage tank, the pump, the detergent mixing unit, and the micro-bubble generating unit are provided, and a control unit. The bath circuit can be selectively configured, in response to an instruction from the control unit, to have a first flow path from the storage tank to the bathtub via the pump and the detergent mixing unit, and a second flow path from the bathtub to the bathtub via the pump and the micro-bubble generating unit. The control unit is configured to perform a bathtub cleaning operation in which, by configuring the first flow path in the bath circuit and operating the pump, detergent is mixed into the hot and cold water sent from the storage tank by the detergent mixing unit, and the hot and cold water mixed with the detergent is supplied to the bathtub to clean the bathtub, and a fine-bubble generating operation in which, by configuring the second flow path in the bath circuit and operating the pump, the hot and cold water stored in the bathtub is circulated to the fine-bubble generating unit to generate fine bubbles in the hot and cold water stored in the bathtub.
[0008] The bathtub cleaning operation is performed when there is no hot water in the bathtub. On the other hand, the fine bubble generating operation is performed when there is hot water in the bathtub. Therefore, the bathtub cleaning operation and the fine bubble generating operation do not overlap with each other. In consideration of this feature, the above bath system is configured to share a pump between the bathtub cleaning operation and the fine bubble generating operation. With this configuration, the number of pumps provided in the bath system can be reduced compared to a configuration in which a pump driven during the bathtub cleaning operation and a pump driven during the fine bubble generating operation are provided separately. Therefore, a bath system capable of performing both the bathtub cleaning operation and the fine bubble generating operation can be manufactured at a relatively low cost. Furthermore, with the above configuration, a bath system capable of performing both the bathtub cleaning operation and the fine bubble generating operation can be made relatively compact.
[0009] In a second aspect of the present technology, in the first aspect, the bath circuit may further be configured to have a third flow path from the storage tank to the bathtub via the pump and the fine-bubble generating unit. The control unit may be configured to further execute a fine-bubble generating unit cleaning operation in which hot and cold water stored in the storage tank is passed through the fine-bubble generating unit to clean the fine-bubble generating unit by configuring the third flow path in the bath circuit and operating the pump.
[0010] The hot water stored in the bathtub may be contaminated with dirt (e.g., the user's sebum). When the fine-bubble generating operation is performed, the hot water stored in the bathtub is sent to the fine-bubble generating unit. Therefore, dirt may enter the fine-bubble generating unit. According to the above configuration, by performing the fine-bubble generating unit cleaning operation, the fine-bubble generating unit can be cleaned using clean hot water stored in the storage tank. This makes it possible to remove dirt that has entered the fine-bubble generating unit, so that the fine-bubble generating unit can be kept clean. Furthermore, according to the above configuration, a pump is shared between the bathtub cleaning operation, the fine-bubble generating operation, and the fine-bubble generating unit cleaning operation. Therefore, there is no need to provide a separate pump for the fine-bubble generating unit cleaning operation. Therefore, a configuration for performing the fine-bubble generating unit cleaning operation can be incorporated into the bath system at a relatively low cost.
[0011] In a third aspect of the present technology, in the first aspect, the bathtub may be provided with a cleaning nozzle through which hot and cold water flowing through the first flow path is discharged into the bathtub during the bathtub cleaning operation, an inlet through which hot and cold water in the bathtub flows into the second flow path during the fine-bubble generating operation, and an outlet through which hot and cold water flowing through the second flow path during the fine-bubble generating operation flows out into the bathtub. The bath circuit may include a pump path in which the pump is provided, a first switching mechanism provided at the upstream end of the pump path, a second switching mechanism provided at the downstream end of the pump path, a detergent mixing path having one end connected to the cleaning nozzle and the other end connected to the second switching mechanism, a return circulation path having one end connected to the inlet and the other end connected to the first switching mechanism, and a forward circulation path having one end connected to the outlet and the other end connected to the second switching mechanism. The storage tank may be connected to the first switching mechanism. The detergent mixing unit may be provided in the detergent mixing path. The fine bubble generating unit may be provided in any one of the pump path, the circulation forward path, and the circulation return path. The first switching mechanism may be selectively switchable between a tank communication state in which the upstream end of the pump path is communicated with the storage tank and the upstream end of the pump path is not communicated with the other end of the circulation return path, and an inlet communication state in which the upstream end of the pump path is not communicated with the storage tank and the upstream end of the pump path is communicated with the other end of the circulation return path. The second switching mechanism may be selectively switchable between a cleaning nozzle communication state in which the downstream end of the pump path is communicated with the other end of the detergent mixing path and the downstream end of the pump path is not communicated with the other end of the circulation forward path, and an outlet communication state in which the downstream end of the pump path is not communicated with the other end of the detergent mixing path and the downstream end of the pump path is communicated with the other end of the circulation forward path. The control unit may configure the first flow path in the bath circuit by setting the first switching mechanism to the tank communication state and the second switching mechanism to the cleaning nozzle communication state. The control unit may configure the second flow path in the bath circuit by setting the first switching mechanism to the inlet communication state and the second switching mechanism to the outlet communication state.
[0012] According to the above configuration, it is possible to switch between a state in which the first flow path is formed and a state in which the second flow path is formed by a simple mechanism.
[0013] In a fourth aspect of the present technology, in the third aspect, the fine-bubble generating unit may be provided in either one of the pump path and the circulation outward path. The bath circuit may further be configured to configure a third flow path from the storage tank to the bathtub via the pump and the fine-bubble generating unit by setting the first switching mechanism to the tank communication state and the second switching mechanism to the outlet communication state. The control unit may be further configured to perform a fine-bubble generating unit cleaning operation in which hot and cold water stored in the storage tank is passed through the fine-bubble generating unit to clean the fine-bubble generating unit by configuring the third flow path in the bath circuit and operating the pump.
[0014] The hot water stored in the bathtub may be contaminated with dirt (e.g., the user's sebum). When the fine-bubble generating operation is performed, the hot water stored in the bathtub is supplied to the fine-bubble generating unit. For this reason, it is expected that dirt will accumulate in the fine-bubble generating unit. According to the above configuration, by performing the fine-bubble generating unit cleaning operation, the fine-bubble generating unit can be cleaned using clean hot water stored in the storage tank. This makes it possible to keep the fine-bubble generating unit clean. Furthermore, according to the above configuration, a pump is shared between the bathtub cleaning operation, the fine-bubble generating operation, and the fine-bubble generating unit cleaning operation. Therefore, there is no need to provide a separate pump for the fine-bubble generating unit cleaning operation. Therefore, a configuration for performing the fine-bubble generating unit cleaning operation can be incorporated into the bath system at a relatively low cost. [Brief description of the drawings]
[0015] [Figure 1]A diagram showing a schematic diagram of how a first flow path F1 is configured in a bath system 2 of an embodiment. [Diagram 2] 2 is a diagram showing a schematic configuration of a bathtub adapter 22 provided in a bathtub 20 according to an embodiment of the present invention. FIG. [Diagram 3] A diagram showing a schematic diagram of how a second flow path F2 is configured in a bath system 2 of an embodiment. [Figure 4] A diagram showing a schematic diagram of how a third flow path F3 is configured in a bath system 2 of the embodiment. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0016] (Example) As shown in Fig. 1, the bath system 2 of this embodiment includes a bath circuit 4, a heat source unit 6, a storage tank 8, a shared pump 10, a detergent mixing unit 12, a fine bubble generating unit 14, and a control unit 16. The bath system 2 can heat hot water supplied from a water supply source 18 (e.g., a water supply) and supply the hot water heated to a desired temperature to a faucet (not shown) installed in a kitchen or the like, or to a bathtub 20 installed in a bathroom. The bath system 2 can also reheat the hot water (also called bathtub water) stored in the bathtub 20, and generate fine bubbles in the bathtub water. The bath system 2 can also clean the bathtub 20.
[0017] The bathtub 20 is provided with a bathtub adapter 22, a cleaning nozzle 24, and a drain plug 26. The bathtub adapter 22 is attached to the side wall of the bathtub 20. The bathtub adapter 22 is a necessary tool for supplying hot and cold water to the bathtub 20 and for sucking hot and cold water out of the bathtub 20. The cleaning nozzle 24 is attached to the center of the bottom wall of the bathtub 20. The cleaning nozzle 24 is a tool configured to spray the supplied liquid toward the inner wall of the bathtub 20. The cleaning nozzle 24 is configured to spray the liquid radially when the bathtub 20 is viewed from above, for example. The drain plug 26 is attached to a drain port (not shown) formed in the bottom wall of the bathtub 20. The drain plug 26 opens and closes the drain port. When the drain plug 26 is closed, the drain port is closed, so hot and cold water can be stored in the bathtub 20. When the drain plug 26 is open, the drain port is opened, so hot and cold water stored in the bathtub 20 can be discharged from the drain port. An actuator 28 is attached to the drain plug 26 for opening and closing the drain plug 26. The drain plug 26 can also be opened and closed manually by a user.
[0018] (Bathroom Circuit 4) The bath circuit 4 includes a water supply passage 30, a hot water outlet passage 32, a bath forward passage 34, a bath return passage 36, a water make-up passage 38, a water make-up valve 40, a tank hot water outlet passage 42, a first three-way valve 44, a pump passage 46, a pump passage opening / closing valve 48, a second three-way valve 50, a first detergent mixing passage 52, a check valve 54, a second detergent mixing passage 56, a first circulation forward passage 58, a second circulation forward passage 60, and a circulation return passage 62.
[0019] One end of the water supply passage 30 is connected to the water supply source 18. The other end of the water supply passage 30 is connected to the heat source unit 6. One end of the hot water outlet passage 32 is connected to the heat source unit 6. The other end of the hot water outlet passage 32 is connected to, for example, a faucet (not shown). One end of the bath outgoing passage 34 is connected to the heat source unit 6. The other end of the bath outgoing passage 34 is connected to the bathtub adapter 22. One end of the bath return passage 36 is connected to the bathtub adapter 22. The other end of the bath return passage 36 is connected to the heat source unit 6. One end of the water refill passage 38 is connected to the middle of the hot water outlet passage 32. The other end of the water refill passage 38 is connected to the top of the storage tank 8. A water refill valve 40 is provided in the water refill passage 38. One end of the tank hot water outlet passage 42 is connected to the bottom of the storage tank 8. The other end of the tank hot water outlet passage 42 is connected to a first three-way valve 44. One end of the pump path 46 is connected to the first three-way valve 44. The other end of the pump path 46 is connected to the second three-way valve 50. The pump path opening / closing valve 48 is provided in the pump path 46. The other end of the first detergent mixing path 52 is connected to the second three-way valve 50. One end of the first detergent mixing path 52 is connected to the detergent mixing unit 12. The check valve 54 is provided in the first detergent mixing path 52. The other end of the second detergent mixing path 56 is connected to the detergent mixing unit 12. One end of the second detergent mixing path 56 is connected to the cleaning nozzle 24. The other end of the first circulation outward path 58 is connected to the second three-way valve 50. One end of the first circulation outward path 58 is connected to the fine bubble generating unit 14. The other end of the second circulation outward path 60 is connected to the fine bubble generating unit 14. One end of the second circulation outward path 60 is connected to the bathtub adapter 22. One end of the circulation return path 62 is connected to the bathtub adapter 22. The other end of the return circulation path 62 is connected to the first three-way valve 44 .
[0020] The make-up water valve 40 opens and closes the make-up water passage 38. The make-up water valve 40 is normally closed. The pump passage on-off valve 48 opens and closes the pump passage 46. The pump passage on-off valve 48 is normally closed. The first three-way valve 44 is switchable between a first communication state (see Figures 1 and 4) in which the pump passage 46 and the tank hot water outlet passage 42 are connected and the pump passage 46 and the circulation return passage 62 are not connected, and a second communication state (see Figure 3) in which the pump passage 46 and the tank hot water outlet passage 42 are not connected and the pump passage 46 and the circulation return passage 62 are connected. The second three-way valve 50 is switchable between a third communication state (see FIG. 1) in which the pump path 46 and the first detergent mixing path 52 are communicated with each other and the pump path 46 and the first circulation outward path 58 are not communicated with each other, and a fourth communication state (see FIGS. 3 and 4) in which the pump path 46 and the first detergent mixing path 52 are not communicated with each other and the pump path 46 and the first circulation outward path 58 are communicated with each other. The check valve 54 allows the flow of hot and cold water in the first detergent mixing path 52 from the second three-way valve 50 toward the detergent mixing unit 12 and prohibits the flow of hot and cold water from the detergent mixing unit 12 toward the second three-way valve 50.
[0021] The common pump 10 is provided in the pump path 46. The common pump 10 pumps the hot and cold water flowing in the pump path 46 in a direction from the first three-way valve 44 toward the second three-way valve 50. The common pump 10 is installed, for example, between the outer wall of the bathtub 20 and a bathtub apron (not shown).
[0022] (Configuration of heat source unit 6) The heat source unit 6 includes a first heat source unit 64, a second heat source unit 66, a heat source water supply passage 68, a heat source hot water outlet passage 70, a heat source bath return passage 72, a heat source bath outward passage 74, a bypass passage 76, a bypass servo 78, a hot water supply passage 80, a hot water filling valve 82, and a reheating pump 84. The heat source unit 6 is installed, for example, outdoors.
[0023] One end of the heat source water supply passage 68 is connected to the water supply passage 30. The other end of the heat source water supply passage 68 is connected to the first heat source unit 64. One end of the heat source hot water outlet passage 70 is connected to the first heat source unit 64. The other end of the heat source hot water outlet passage 70 is connected to the hot water outlet passage 32. The first heat source unit 64 heats hot water, for example, by burning gas. The first heat source unit 64 heats the water flowing in from the heat source water supply passage 68 and sends the heated hot water to the heat source hot water outlet passage 70.
[0024] One end of the bypass passage 76 is connected to the heat source water supply passage 68. The other end of the bypass passage 76 is connected to the heat source hot water outlet passage 70. The bypass servo 78 is provided at a point where the bypass passage 76 connects to the heat source water supply passage 68. The bypass servo 78 can adjust the ratio of the flow rate of hot water flowing from the heat source water supply passage 68 to the heat source hot water outlet passage 70 via the first heat source unit 64 and the flow rate of hot water flowing from the heat source water supply passage 68 to the heat source hot water outlet passage 70 via the bypass passage 76 by adjusting the opening degree of the built-in valve body. By adjusting the opening degree of the bypass servo 78, the high-temperature hot water flowing from the first heat source unit 64 and the low-temperature hot water flowing from the bypass passage 76 are mixed at a desired ratio in the heat source hot water outlet passage 70 downstream of the point where the bypass passage 76 is connected, and hot water adjusted to a desired temperature is supplied.
[0025] One end of the molten metal pouring path 80 is connected to the heat source molten metal outlet path 70 downstream of the point where the bypass path 76 connects to the heat source molten metal outlet path 70. The other end of the molten metal pouring path 80 is connected to the heat source bath return path 72. A molten metal filling valve 82 is provided in the molten metal pouring path 80 and opens and closes the molten metal pouring path 80. The molten metal filling valve 82 is normally closed.
[0026] One end of the heat source bath return path 72 is connected to the bath return path 36. The other end of the heat source bath return path 72 is connected to the second heat source unit 66. One end of the heat source bath outward path 74 is connected to the second heat source unit 66. The other end of the heat source bath outward path 74 is connected to the bath outward path 34. The second heat source unit 66 heats hot water, for example, by burning gas. The second heat source unit 66 heats the hot water flowing in from the heat source bath return path 72 and sends the heated hot water to the heat source bath outward path 74.
[0027] The reheating pump 84 is provided in the heat source bath return path 72 between the point where the hot water supply path 80 connects to the heat source bath return path 72 and the second heat source unit 66. The reheating pump 84 pumps the hot water flowing in the heat source bath return path 72 toward the second heat source unit 66.
[0028] (Configuration of storage tank 8) The storage tank 8 is installed, for example, between the outer wall of the bathtub 20 and the bathtub apron (not shown). The storage tank 8 is provided with an overflow passage 86. One end of the overflow passage 86 is connected to the storage tank 8. The other end of the overflow passage 86 is connected to a predetermined drainage point (for example, a sewer). The point where one end of the overflow passage 86 connects to the storage tank 8 is located at a lower position than the point where the other end of the water supply passage 38 connects to the storage tank 8, and is located at a higher position than the point where one end of the tank hot water outlet passage 42 connects to the storage tank 8. When the hot water stored in the storage tank 8 reaches the height of the point where one end of the overflow passage 86 connects, the hot water is discharged to the drainage point through the overflow passage 86. Therefore, the water level in the storage tank 8 is maintained below the height of the point where one end of the overflow passage 86 connects. As a result, the hot water stored in the storage tank 8 is prevented from flowing back toward the water supply passage 38 (i.e., the water supply source 18). In addition, the storage tank 8 is provided with a water level sensor (not shown) capable of detecting the water level in the storage tank 8.
[0029] (Configuration of detergent mixing unit 12) Detergent mixing unit 12 includes a detergent tank 88, a detergent inlet passage 90, a detergent valve 92, and a mixer 94. Detergent tank 88 stores liquid detergent for cleaning bathtub 20. Detergent mixing unit 12 is installed, for example, between the outer wall of bathtub 20 and a bathtub apron (not shown).
[0030] One end of the detergent introduction passage 90 is connected to the bottom of the detergent tank 88. The other end of the detergent introduction passage 90 is connected to a mixer 94. A detergent valve 92 is provided in the detergent introduction passage 90 and opens and closes the detergent introduction passage 90. The detergent valve 92 is normally closed. The mixer 94 is provided between the first detergent mixing passage 52 and the second detergent mixing passage 56. The mixer 94 has a venturi (not shown). When hot and cold water flows inside the mixer 94 with the detergent valve 92 open, negative pressure is generated inside the mixer 94. Due to this negative pressure, the detergent stored in the detergent tank 88 is sucked into the mixer 94 through the detergent introduction passage 90. Then, inside the mixer 94, hot and cold water mixed with the detergent (also called cleaning liquid) is generated.
[0031] (Configuration of the microbubble generating unit 14) The fine bubble generating unit 14 includes a pressurized tank 96, a tank inlet passage 98, a tank outlet passage 100, a pressurizing pump 102, a tank opening / closing valve 104, an air introduction passage 106, an air introduction valve 108, and an air introduction pump 110. The fine bubble generating unit 14 is installed, for example, between the outer wall of the bathtub 20 and a bathtub apron (not shown).
[0032] The pressurized tank 96 can store hot water therein. A low water level electrode 112 and a high water level electrode 114 for detecting the water level in the pressurized tank 96 are provided inside the pressurized tank 96. The low water level electrode 112 detects the water level by coming into contact with the surface of the hot water stored in the pressurized tank 96. The high water level electrode 114 detects the water level by coming into contact with the surface of the hot water stored in the pressurized tank 96. The water level detected by the low water level electrode 112 (hereinafter also referred to as the lower limit water level) is lower than the water level detected by the high water level electrode 114 (hereinafter also referred to as the upper limit water level). The pressurized tank 96 is used to pressurize and dissolve air in the hot water.
[0033] One end of the tank inlet passage 98 is connected to the first circulation outward passage 58. The other end of the tank inlet passage 98 is connected to the upper part of the pressurized tank 96. The pressurized pump 102 is provided in the tank inlet passage 98. The pressurized pump 102 pressure-feeds the hot and cold water flowing in the tank inlet passage 98 toward the pressurized tank 96.
[0034] One end of the tank outflow path 100 is connected to the bottom of the pressurized tank 96. The other end of the tank outflow path 100 is connected to the second circulation outward path 60. The tank on-off valve 104 is provided in the tank outflow path 100 and opens and closes the tank outflow path 100. The tank on-off valve 104 is normally closed.
[0035] One end of the air introduction path 106 is connected to the pressurized tank 96. An air introduction pump 110 is provided at the other end of the air introduction path 106. An air introduction valve 108 is provided midway through the air introduction path 106. The air introduction valve 108 opens and closes the air introduction path 106. The air introduction valve 108 is normally closed. The air introduction pump 110 takes in air from the atmosphere and sends the taken in air to the pressurized tank 96 via the air introduction path 106.
[0036] (Configuration of bathtub adapter 22) As shown in FIG. 2, the bathtub adapter 22 includes a first inlet 116, a first inlet 118, a second inlet 120, a second inlet 122, a first outlet 124, a first outlet 126, a second outlet 128, a second outlet 130, four check valves 132, 134, 136, 138, and a fine bubble generating nozzle 140. One end of the first inlet 116 is connected to the inside of the bathtub 20 via the first inlet 118. The other end of the first inlet 116 is connected to the return circulation path 62. The check valve 132 is provided in the first inlet 116. The check valve 132 allows hot water to flow from the first inlet 118 to the return circulation path 62 and prohibits hot water from flowing from the return circulation path 62 to the first inlet 118. One end of the second inflow path 120 communicates with the inside of the bathtub 20 via the second inlet 122. The other end of the second inflow path 120 is connected to the bath return path 36. The check valve 134 is provided in the second inflow path 120. The check valve 134 allows hot water to flow from the second inlet 122 to the bath return path 36, and prohibits hot water from flowing from the bath return path 36 to the second inlet 122. One end of the first outflow path 124 communicates with the inside of the bathtub 20 via the first outlet 126. The other end of the first outflow path 124 is connected to the second circulation outward path 60. The check valve 136 is provided in the first outflow path 124. The check valve 136 allows hot water to flow from the second circulation outward path 60 to the first outlet 126, and prohibits hot water from flowing from the first outlet 126 to the second circulation outward path 60. The fine bubble generating nozzle 140 is provided in the first outflow passage 124 between the check valve 136 and the first outlet 126. The fine bubble generating nozzle 140 is equipped with a venturi (not shown) and reduces the pressure of the hot water passing through the fine bubble generating nozzle 140. One end of the second outflow passage 128 communicates with the inside of the bathtub 20 via the second outlet 130. The other end of the second outflow passage 128 is connected to the bath outflow passage 34. The check valve 138 is provided in the second outflow passage 128. The check valve 138 allows the flow of hot water from the bath outflow passage 34 toward the second outlet 130 and prohibits the flow of hot water from the second outlet 130 toward the bath outflow passage 34.
[0037] (Configuration of control unit 16) The control unit 16 shown in Fig. 1 includes a CPU, a ROM, a RAM, etc. The control unit 16 is configured to be able to execute various operations (bath water filling operation, reheating operation, bathtub cleaning operation, fine bubble generating operation, and fine bubble generating unit cleaning operation) described below by controlling the operation of each part of the bath system 2. The control unit 16 is also configured to be able to communicate with a remote control 160 that can be operated by the user. The user can instruct the start and end of various operations and change various settings via the remote control 160. The various settings referred to here include, for example, the set temperature and set water volume for the bath water filling operation and the set temperature for the reheating operation.
[0038] (Bath filling operation) The water filling operation is started, for example, when the user instructs the start of the water filling operation on the remote control 160. Alternatively, the water filling operation is started when the start time of the water filling operation set by the user on the remote control 160 arrives. When the water filling operation is started, the control unit 16 operates the actuator 28 to close the drain plug 26, except when the drain plug 26 is already closed. After that, the control unit 16 opens the water filling valve 82 and starts heating by the first heat source unit 64. As a result, hot water adjusted to the set temperature for the water filling operation flows from the heat source hot water outlet path 70 through the hot water supply path 80 into the heat source bath return path 72. Here, in the heat source bath return path 72, the flow from the point where the hot water supply path 80 is connected to the second heat source unit 66 is permitted, but the flow from the point where the hot water supply path 80 is connected to the bath return path 36 is prohibited by the check valve 134 of the bathtub adapter 22 (see FIG. 2). Therefore, the hot water flowing from the hot water supply passage 80 into the heat source bath return passage 72 flows into the bathtub 20 via the second heat source unit 66, the heat source bath outward passage 74, the bath outward passage 34, the second outlet passage 128 (see FIG. 2) and the second outlet port 130 (see FIG. 2) of the bathtub adapter 22. The control unit 16 waits until the accumulated water volume detected by a water volume sensor (not shown) provided in the hot water supply passage 80, for example, reaches the set water volume for the bath filling operation. The accumulated water volume here means the accumulated water volume detected by the water volume sensor after the bath filling operation has started. When the accumulated water volume reaches the set water volume, the control unit 16 closes the bath filling valve 82 and stops heating the hot water by the first heat source unit 64. The control unit 16 then stops the bath filling operation.
[0039] (Reheating operation) The reheating operation is started, for example, when the user instructs the start of the reheating operation on the remote control 160. When the reheating operation is started, the control unit 16 operates the reheating pump 84 and starts heating the hot water by the second heat source unit 66. As a result, the hot water in the bathtub 20 is sent to the second heat source unit 66 via the second inlet 122 (see FIG. 2) and second inlet passage 120 (see FIG. 2) of the bathtub adapter 22, the bath return passage 36, and the heat source bath return passage 72. The hot water heated by the second heat source unit 66 is returned to the bathtub 20 via the heat source bath outward passage 74, the bath outward passage 34, the second outward passage 128 (see FIG. 2) and second outflow port 130 (see FIG. 2) of the bathtub adapter 22. When the temperature detected by, for example, a temperature sensor (not shown) provided in the heat source bath return line 72 becomes equal to or higher than the set temperature for the reheating operation, the control unit 16 stops the reheating pump 84 and terminates the heating of hot water by the second heat source unit 66. After that, the control unit 16 terminates the reheating operation.
[0040] (Bathtub cleaning operation) The bathtub cleaning operation is started, for example, when the user issues an instruction to start the bathtub cleaning operation via the remote control 160. When the bathtub cleaning operation is started, the control unit 16 sets the first three-way valve 44 to the first communication state and the second three-way valve 50 to the third communication state (see FIG. 1). In this state, a flow path is formed from the storage tank 8 through the tank outlet path 42, the pump path 46, the first detergent mixing path 52, the detergent mixing unit 12, and the second detergent mixing path 56 to the cleaning nozzle 24. In this embodiment, this flow path is also referred to as the "first flow path F1." The first flow path F1 is opened when the pump path opening / closing valve 48 is opened, and is closed when the pump path opening / closing valve 48 is closed.
[0041] The bathtub cleaning operation includes a preparation step, a preliminary cleaning step, a cleaning liquid spraying step, and a rinsing step.
[0042] (preparation process) The preparation process is started when the bathtub cleaning operation starts. When the preparation process starts, the control unit 16 operates the actuator 28 to open the drain plug 26, except when the drain plug 26 is already open. The control unit 16 then waits until the bathtub 20 is empty (for example, waits for 10 minutes). When the bathtub 20 is empty, the control unit 16 closes the pump path opening / closing valve 48, except when the pump path opening / closing valve 48 is already closed. In addition, the control unit 16 opens the water supply valve 40 and starts heating by the first heat source unit 64. As a result, hot water adjusted to a predetermined temperature flows from the heat source hot water outlet path 70 through the water supply path 38 into the storage tank 8. At this time, hot water is stored in the storage tank 8, so the water level in the storage tank 8 rises. The control unit 16 waits until the water level detected by a water level sensor (not shown) provided in the storage tank 8 reaches a predetermined water level. When the water level detected by the water level sensor reaches a predetermined water level, the control unit 16 closes the water make-up valve 40 and terminates the heating of hot water by the first heat source unit 64. Thereafter, the control unit 16 terminates the preparation process.
[0043] (Pre-cleaning process) The control unit 16 starts the preliminary washing process in response to the completion of the preparation process. When the preliminary washing process starts, the control unit 16 opens the pump path opening / closing valve 48 and operates the common pump 10. This causes the hot and cold water stored in the storage tank 8 to be sent to the washing nozzle 24 via the first flow path F1. The hot and cold water sent to the washing nozzle 24 is sprayed from the washing nozzle 24. When the elapsed time from the start of the preliminary washing process reaches a predetermined time (e.g., 40 seconds), the control unit 16 stops the common pump 10 and closes the pump path opening / closing valve 48. The control unit 16 then ends the preliminary washing process. In the preliminary washing process, dirt adhering to the inner wall of the bathtub 20 is simply washed away by the hot and cold water.
[0044] (Cleaning liquid injection process) When the time elapsed since the end of the preliminary washing process reaches a predetermined time (e.g., 30 seconds), the control unit 16 starts the washing liquid spraying process. When the washing liquid spraying process starts, the control unit 16 opens the pump path opening / closing valve 48 and the detergent valve 92 and operates the common pump 10. As a result, hot and cold water stored in the storage tank 8 is sent to the washing nozzle 24 via the first flow path F1. In the washing liquid spraying process, the detergent is mixed with the hot and cold water in the detergent mixing unit 12, so that the washing liquid is sprayed from the washing nozzle 24. When the time elapsed since the start of the washing liquid spraying process reaches a predetermined time (e.g., 3 seconds), the control unit 16 stops the common pump 10 and closes the pump path opening / closing valve 48 and the detergent valve 92. Thereafter, the control unit 16 waits until a predetermined waiting time (e.g., 40 seconds) has passed. The control unit 16 repeats the spraying of the washing liquid from the washing nozzle 24 and the subsequent waiting a predetermined number of times, and then ends the washing liquid spraying process. In the cleaning liquid spraying step, the cleaning liquid is sprayed onto the inner wall of the bathtub 20. The reason why a waiting time is provided in the cleaning liquid spraying step is to allow the cleaning liquid to penetrate into the dirt adhering to the inner wall of the bathtub 20.
[0045] (Rinsing process) When the cleaning liquid spraying process is completed, the control unit 16 starts the rinsing process. When the rinsing process is completed, the control unit 16 opens the pump path opening / closing valve 48 and operates the shared pump 10. This causes the hot and cold water stored in the storage tank 8 to be sent to the cleaning nozzle 24 via the first flow path F1. The hot and cold water sent to the cleaning nozzle 24 is sprayed from the cleaning nozzle 24. When the elapsed time from the start of the rinsing process reaches a predetermined time (e.g., 90 seconds), the control unit 16 stops the shared pump 10 and closes the pump path opening / closing valve 48. The control unit 16 then ends the rinsing process. In the rinsing process, dirt adhering to the inner wall of the bathtub 20 is washed away by the hot and cold water together with the cleaning liquid. When the rinsing process is completed, the bathtub cleaning operation also ends.
[0046] If the control unit 16 determines that there is a shortage of hot water in the storage tank 8 during the execution of the preliminary cleaning process, the cleaning liquid injection process, and the rinsing process, it may open the water replenishment valve 40 and start heating using the first heat source unit 64 to replenish hot water to the storage tank 8.
[0047] (Fine bubble generation operation) The microbubble generating operation is started when the user instructs the start of the microbubble generating operation on the remote control 160 while hot water is stored in the bathtub 20. Alternatively, the microbubble generating operation is started in response to the end of the bath water filling operation. When the microbubble generating operation is started, the control unit 16 sets the first three-way valve 44 to the second communication state and the second three-way valve 50 to the fourth communication state (see FIG. 3). In this state, a flow path is formed that returns from the bathtub 20 to the bathtub 20 via the first inlet 118 (see FIG. 2) and the first inlet 116 (see FIG. 2) of the bathtub adapter 22, the circulation return path 62, the pump path 46, the first circulation outward path 58, the tank inlet path 98, the pressurized tank 96, the tank outward path 100, the second circulation outward path 60, the first outward path 124 (see FIG. 2) and the first outlet 126 (see FIG. 2) of the bathtub adapter 22. In this embodiment, this flow path is also referred to as the “second flow path F2.” The second flow path F2 is opened when the pump path on-off valve 48 and the tank on-off valve 104 are opened, and is closed when the pump path on-off valve 48 or the tank on-off valve 104 is closed.
[0048] The fine bubble generating operation includes an air introduction step and a pressurized dissolution step.
[0049] (Air introduction process) The air introduction process is started at the start of the fine bubble generating operation and after the pressurized dissolution process is completed. When the air introduction process is started, the control unit 16 opens the pump path opening / closing valve 48, the tank opening / closing valve 104, and the air introduction valve 108, and operates the common pump 10 and the air introduction pump 110. As a result, the bath water is circulated between the bathtub 20 and the second flow path F2, and air is introduced into the pressurized tank 96. In the air introduction process, the amount of air introduced into the pressurized tank 96 is greater than the amount of air dissolved in the hot water in the pressurized tank 96, so the water level in the pressurized tank 96 drops. When the water level in the pressurized tank 96 falls below the lower limit water level, the control unit 16 closes the air introduction valve 108 and stops the air introduction pump 110. After that, the control unit 16 ends the air introduction process. When the air introduction process ends, the pump path opening / closing valve 48 and the tank opening / closing valve 104 remain open, and the common pump 10 remains operating.
[0050] (Pressure dissolution process) The pressurized dissolving process is started after the air introduction process is completed. When the pressurized dissolving process is started, the control unit 16 operates the pressurized pump 102. This circulates the bath water between the bathtub 20 and the second flow path F2, and promotes the pressurized dissolution of air in the hot water in the pressurized tank 96. In the pressurized dissolving process, since air is not introduced into the pressurized tank 96, the amount of air in the pressurized tank 96 decreases as air dissolves in the hot water in the pressurized tank 96. This causes the water level in the pressurized tank 96 to rise. When the water level in the pressurized tank 96 reaches or exceeds the upper water level, the control unit 16 stops the pressurized pump 102 and ends the pressurized dissolving process. When the pressurized dissolving process is completed, the pump path opening / closing valve 48 and the tank opening / closing valve 104 remain open, and the common pump 10 remains operating.
[0051] During the microbubble generating operation, the bath water is circulated between the bathtub 20 and the second flow path F2. In the process of circulating the bath water between the bathtub 20 and the second flow path F2 (particularly the pressurizing process), air is pressurized and dissolved in the water in the pressurized tank 96. The water in which the air is pressurized and dissolved passes through the microbubble generating nozzle 140 (see FIG. 2) provided in the bathtub adapter 22 and is then supplied to the bathtub 20. When the water in which the air is pressurized and dissolved passes through the microbubble generating nozzle 140, the water is depressurized to below atmospheric pressure, so that the air pressurized and dissolved in the water appears as microbubbles. Therefore, during the microbubble generating operation, the water containing microbubbles is supplied to the bathtub 20. The amount of microbubbles supplied to the bathtub 20 (i.e., the amount of microbubbles generated) is greater during the pressurized dissolution process than during the air introduction process. This is because the pressure on the hot water is higher during the pressurized dissolution process than during the air introduction process, and therefore the amount of air dissolved under pressure in the hot water is also greater.
[0052] When the number of times the air introduction process and the pressurized dissolution process are performed reaches a predetermined number of repetitions (for example, 5 times), the control unit 16 stops the common pump 10, the air introduction pump 110, and the pressurizing pump 102, and closes the pump path opening / closing valve 48, the tank opening / closing valve 104, and the air introduction valve 108. Thereafter, the control unit 16 ends the fine bubble generating operation.
[0053] (Fine bubble generating unit cleaning operation) The fine-bubble generating unit cleaning operation is started in response to the end of the fine-bubble generating operation. Alternatively, the fine-bubble generating unit cleaning operation is started when the user instructs the start of the fine-bubble generating unit cleaning operation with the remote control 160. When the fine-bubble generating unit cleaning operation is started, the control unit 16 sets the first three-way valve 44 to the first communication state and the second three-way valve 50 to the fourth communication state (see FIG. 4). In this state, a flow path is formed from the storage tank 8 through the tank outlet path 42, the pump path 46, the first circulation forward path 58, the tank inlet path 98, the pressurized tank 96, the tank outlet path 100, the second circulation forward path 60, the first outlet path 124 (see FIG. 2) and the first outlet 126 (see FIG. 2) of the bathtub adapter 22 to the bathtub 20. In this embodiment, this flow path is also called the "third flow path F3". The third flow path F3 is opened when the pump path on-off valve 48 and the tank on-off valve 104 are opened, and is closed when the pump path on-off valve 48 or the tank on-off valve 104 is closed.
[0054] The fine bubble generating unit cleaning operation includes a hot water storage process and a cleaning process.
[0055] (Hot water storage process) The hot water storage process is started when the fine bubble generating unit cleaning operation starts. When the hot water storage process is started, the control unit 16 closes the pump path opening / closing valve 48, except when the pump path opening / closing valve 48 is already closed. The control unit 16 also opens the water supply valve 40 and starts heating by the first heat source unit 64. As a result, hot water adjusted to a predetermined temperature flows from the heat source hot water outlet path 70 through the water supply path 38 into the storage tank 8. At this time, the hot water is stored in the storage tank 8, so the water level in the storage tank 8 rises. The control unit 16 waits until the water level detected by a water level sensor (not shown) provided in the storage tank 8 reaches a predetermined water level. When the water level detected by the water level sensor reaches the predetermined water level, the control unit 16 closes the water supply valve 40 and ends the heating of the hot water by the first heat source unit 64. After that, the control unit 16 ends the hot water storage process.
[0056] (Cleaning process) The control unit 16 starts the cleaning process in response to the end of the hot water storage process. When the cleaning process starts, the control unit 16 opens the tank opening / closing valve 104, except when the tank opening / closing valve 104 is already open. The control unit 16 also opens the pump path opening / closing valve 48 and operates the shared pump 10. As a result, the hot water stored in the storage tank 8 is sent to the bathtub 20 via the third flow path F3. In this process, the clean hot water stored in the storage tank 8 passes through the fine bubble generating unit 14 and is then discharged into the bathtub 20. As a result, dirt (e.g., the user's sebum) present on the fine bubble generating unit 14 is removed. When the elapsed time from the start of the cleaning process reaches a predetermined time (e.g., 30 seconds), the control unit 16 stops the shared pump 10 and closes the pump path opening / closing valve 48 and the tank opening / closing valve 104. Thereafter, the control unit 16 ends the cleaning process. When the cleaning process ends, the cleaning operation of the fine bubble generating unit also ends.
[0057] If the control unit 16 determines that hot water is running low in the storage tank 8 during the cleaning process, it may open the water replenishment valve 40 and start heating using the first heat source unit 64 to replenish hot water to the storage tank 8.
[0058] (Modification) A gas other than air (for example, carbon dioxide, hydrogen, or oxygen) may be introduced into the pressurized tank 96. This allows the gas other than air to be supplied to the bathtub 20 as fine bubbles.
[0059] The bath circuit 4 does not have to be equipped with a pump path opening / closing valve 48.
[0060] The control unit 16 does not have to be configured to be able to execute the fine-bubble generating unit cleaning operation.
[0061] For example, when the bathtub cleaning operation starts, the bathtub 20 may already be empty and a sufficient amount of hot and cold water may be stored in the storage tank 8. In this case, the control unit 16 may execute the preliminary cleaning process without executing the preparation process when the bathtub cleaning operation starts. Alternatively, the control unit 16 may execute the cleaning liquid spraying process without executing the preparation process and the preliminary cleaning process when the bathtub cleaning operation starts.
[0062] For example, at the start of the fine-bubble generating unit cleaning operation, a sufficient amount of hot water may be stored in the storage tank 8. In this case, the control unit 16 may execute the cleaning process without executing the hot water storage process at the start of the fine-bubble generating unit cleaning operation.
[0063] The location of the fine bubble generating unit 14 in the bath circuit 4 may be changed as appropriate. For example, the fine bubble generating unit 14 may be provided in a portion of the pump path 46 upstream of the shared pump 10. Alternatively, the fine bubble generating unit 14 may be provided in the middle of the return circulation path 62. In this way, when the shared pump 10 is provided downstream of the fine bubble generating unit 14, air in the atmosphere can be drawn into the pressurized tank 96 via the air introduction path 106 only by the operation of the shared pump 10, even if the air introduction pump 110 is not operated, during the air introduction step of the fine bubble generation operation. In other words, the air introduction pump 110 is not required.
[0064] The micro-bubble generating unit 14 is a pressure dissolution type that pressurizes and dissolves gas in a liquid, and then precipitates the gas dissolved in the liquid as micro-bubbles. The micro-bubble generating unit 14 may be replaced with a unit that generates micro-bubbles by a method other than the pressure dissolution method. For example, the micro-bubble generating unit 14 may be replaced with a shear type that generates a swirling flow and breaks down the bubbles into fine bubbles by the swirling flow to generate micro-bubbles.
[0065] The first three-way valve 44 may be replaced with another mechanism having the same function as the first three-way valve 44. For example, the first three-way valve 44 may be replaced with a mechanism including an on-off valve for opening and closing the downstream end of the tank discharge passage 42 and an on-off valve for opening and closing the downstream end of the circulation return passage 62. This mechanism can reproduce the first communication state of the first three-way valve 44 by opening the downstream end of the tank discharge passage 42 and closing the downstream end of the circulation return passage 62. Also, the second communication state of the first three-way valve 44 can be reproduced by closing the downstream end of the tank discharge passage 42 and opening the downstream end of the circulation return passage 62.
[0066] The second three-way valve 50 may be replaced with another mechanism having the same function as the second three-way valve 50. For example, the second three-way valve 50 may be replaced with a mechanism including an on-off valve for opening and closing the upstream end of the first detergent mixing channel 52 and an on-off valve for opening and closing the upstream end of the first circulation outward channel 58. This mechanism can reproduce the third communication state of the second three-way valve 50 by opening the upstream end of the first detergent mixing channel 52 and closing the upstream end of the first circulation outward channel 58. Also, the fourth communication state of the second three-way valve 50 can be reproduced by closing the upstream end of the first detergent mixing channel 52 and opening the upstream end of the first circulation outward channel 58.
[0067] The pressurizing pump 102 is operated in the pressurizing dissolving process of the fine bubble generating operation, and is configured to further pressurize the hot water pressurized by the common pump 10. In other words, the pressurizing pump 102 is provided to supplement the pressurizing capacity of the common pump 10. However, if the pressurizing capacity required in the pressurizing dissolving process can be exhibited by the common pump 10 alone, it can be said that the pressurizing pump 102 is not necessary. In this case, the fine bubble generating unit 14 does not need to be equipped with the pressurizing pump 102.
[0068] The control unit 16 may operate the pressure pump 102 instead of the common pump 10 during the air introduction step of the fine bubble generating operation.
[0069] In the air introduction step of the fine bubble generating operation, the control unit 16 may not operate either the common pump 10 or the pressurizing pump 102. In this case, the air sent from the air introduction pump 110 toward the pressurized tank 96 may push the hot water in the pressurized tank 96 into the bathtub 20 via the tank outlet passage 100, the second circulation outward passage 60, the first outlet passage 124 of the bathtub adapter 22, and the first outlet port 126.
[0070] The adapter for connecting the bath outward path 34 and the bath return path 36 to the bathtub 20 and the adapter for connecting the second circulation outward path 60 and the circulation return path 62 to the bathtub 20 may be provided separately from each other.
[0071] (Features of the embodiment) As described above, in one or more embodiments, the bath system 2 includes a storage tank 8 that stores hot and cold water supplied from a water supply source 18 and has an overflow path 86 (an example of a backflow prevention mechanism) that prevents the stored hot and cold water from flowing back toward the water supply source 18, a shared pump 10 that pumps hot and cold water, a detergent mixing unit 12 that mixes detergent into the hot and cold water, a fine-bubble generating unit 14 that generates fine bubbles in the hot and cold water, a bath circuit 4 that is connected to a bathtub 20 and in which the storage tank 8, the shared pump 10, the detergent mixing unit 12, and the fine-bubble generating unit 14 are provided, and a control unit 16. Depending on an instruction from the control unit 16, the bath circuit 4 can selectively be configured to have a first flow path F1 that runs from the storage tank 8 to the bathtub 20 via the shared pump 10 and the detergent mixing unit 12, and a second flow path F2 that runs from the bathtub 20 back to the bathtub 20 via the shared pump 10 and the fine-bubble generating unit 14. The control unit 16 is configured to be able to perform a bathtub cleaning operation in which hot and cold water sent from the storage tank 8 is mixed with detergent by the detergent mixing unit 12 and the hot and cold water mixed with detergent is supplied to the bathtub 20 to clean the bathtub 20 by configuring a first flow path F1 in the bath circuit 4 and operating the shared pump 10, and a fine-bubble generating operation in which the hot and cold water stored in the bathtub 20 is circulated to the fine-bubble generating unit 14 to generate fine bubbles in the hot and cold water stored in the bathtub 20 by configuring a second flow path F2 in the bath circuit 4 and operating the shared pump 10.
[0072] The bathtub cleaning operation is performed when no hot water is stored in the bathtub 20. On the other hand, the fine bubble generating operation is performed when hot water is stored in the bathtub 20. Therefore, the bathtub cleaning operation and the fine bubble generating operation do not overlap with each other. In consideration of this feature, the bath system 2 is configured to share the common pump 10 between the bathtub cleaning operation and the fine bubble generating operation. With this configuration, the number of pumps provided in the bath system 2 can be reduced compared to a configuration in which a pump driven during the bathtub cleaning operation and a pump driven during the fine bubble generating operation are provided separately. Therefore, the bath system 2 capable of performing both the bathtub cleaning operation and the fine bubble generating operation can be manufactured at a relatively low cost. Furthermore, with the above configuration, the bath system 2 capable of performing both the bathtub cleaning operation and the fine bubble generating operation can be made relatively compact.
[0073] In one or more embodiments, the bath circuit 4 can further be configured with a third flow path F3 leading from the storage tank 8 to the bathtub 20 via the shared pump 10 and the fine-bubble generating unit 14. The control unit 16 is configured to be capable of performing a fine-bubble generating unit cleaning operation in which hot and cold water stored in the storage tank 8 is passed through the fine-bubble generating unit 14 to clean the fine-bubble generating unit 14 by configuring the third flow path F3 in the bath circuit 4 and then operating the shared pump 10.
[0074] The hot water stored in the bathtub 20 may be contaminated with dirt (e.g., the user's sebum). When the fine-bubble generating operation is performed, the hot water stored in the bathtub 20 is sent to the fine-bubble generating unit 14. Therefore, dirt may enter the fine-bubble generating unit 14. According to the above configuration, by performing the fine-bubble generating unit cleaning operation, the fine-bubble generating unit 14 can be cleaned using clean hot water stored in the storage tank 8. This makes it possible to remove dirt that has entered the fine-bubble generating unit 14, so that the fine-bubble generating unit 14 can be kept clean. Furthermore, according to the above configuration, the shared pump 10 is shared between the bathtub cleaning operation, the fine-bubble generating operation, and the fine-bubble generating unit cleaning operation. Therefore, it is not necessary to provide a separate pump for the fine-bubble generating unit cleaning operation. Therefore, the configuration for performing the fine-bubble generating unit cleaning operation can be incorporated into the bath system 2 at a relatively low cost.
[0075] In one or more embodiments, the bathtub 20 is provided with a cleaning nozzle 24 through which hot and cold water flowing through the first flow path F1 is discharged into the interior of the bathtub 20 during bathtub cleaning operation, a first inlet 118 (an example of an inlet) through which hot and cold water inside the bathtub 20 flows into the second flow path F2 during fine-bubble generating operation, and a first outlet 126 (an example of an outlet) through which hot and cold water flowing through the second flow path F2 flows out into the interior of the bathtub 20 during fine-bubble generating operation. The bath circuit 4 includes a pump path 46 in which a common pump 10 is provided, a first three-way valve 44 (an example of a first switching mechanism) provided at the upstream end of the pump path 46, a second three-way valve 50 (an example of a second switching mechanism) provided at the downstream end of the pump path 46, detergent mixing paths 52, 56 having one end connected to the washing nozzle 24 and the other end connected to the second three-way valve 50, a circulation return path 62 having one end connected to the first inlet 118 and the other end connected to the first three-way valve 44, and circulation forward paths 58, 60 having one end connected to the first outlet 126 and the other end connected to the second three-way valve 50. The storage tank 8 is connected to the first three-way valve 44. The detergent mixing unit 12 is provided in the detergent mixing paths 52, 56. The fine bubble generating unit 14 is provided in the circulation forward paths 58, 60 (an example of any one of the pump path, the circulation forward path, and the circulation return path). The first three-way valve 44 is selectively switchable between a first communication state (an example of a tank communication state) in which the upstream end of the pump path 46 is connected to the storage tank 8 and the upstream end of the pump path 46 is not connected to the other end of the circulation return path 62, and a second communication state (an example of an inlet communication state) in which the upstream end of the pump path 46 is not connected to the storage tank 8 and the upstream end of the pump path 46 is connected to the other end of the circulation return path 62. The second three-way valve 50 can be selectively switched between a third communication state (an example of a cleaning nozzle communication state) in which the downstream end of the pump path 46 is communicated with the other ends of the detergent mixing paths 52, 56 and the downstream end of the pump path 46 is not communicated with the other ends of the circulation paths 58, 60, and a fourth communication state (an example of an outlet communication state) in which the downstream end of the pump path 46 is not communicated with the other ends of the detergent mixing paths 52, 56 and the downstream end of the pump path 46 is communicated with the other ends of the circulation paths 58, 60. The control unit 16 sets the first three-way valve 44 in the first communication state and the second three-way valve 50 in the third communication state, thereby forming the first flow path F1 in the bath circuit 4.The control unit 16 sets the first three-way valve 44 in the second communication state and the second three-way valve 50 in the fourth communication state, thereby forming the second flow path F2 in the bath circuit 4.
[0076] According to the above configuration, it is possible to switch between a state in which the first flow path F1 is formed and a state in which the second flow path F2 is formed by a simple mechanism.
[0077] In one or more embodiments, the fine-bubble generating unit 14 is provided in the circulation outward paths 58, 60 (one example of the pump path and the circulation outward path). The bath circuit 4 can further configure a third flow path F3 from the storage tank 8 to the bathtub 20 via the shared pump 10 and the fine-bubble generating unit 14 by setting the first three-way valve 44 in the first communication state and the second three-way valve 50 in the fourth communication state. The control unit 16 is configured to be capable of performing a fine-bubble generating unit cleaning operation in which hot and cold water stored in the storage tank 8 is passed through the fine-bubble generating unit 14 to clean the fine-bubble generating unit 14 by configuring the third flow path F3 in the bath circuit 4 and then operating the shared pump 10.
[0078] The hot water stored in the bathtub 20 may be contaminated with dirt (e.g., the user's sebum). When the fine-bubble generating operation is performed, the hot water stored in the bathtub 20 is supplied to the fine-bubble generating unit 14. Therefore, it is expected that dirt will accumulate in the fine-bubble generating unit 14. According to the above configuration, by performing the fine-bubble generating unit cleaning operation, the fine-bubble generating unit 14 can be cleaned using clean hot water stored in the storage tank 8. This allows the fine-bubble generating unit 14 to be kept clean. Furthermore, according to the above configuration, the shared pump 10 is shared between the bathtub cleaning operation, the fine-bubble generating operation, and the fine-bubble generating unit cleaning operation. Therefore, it is not necessary to provide a separate pump for the fine-bubble generating unit cleaning operation. Therefore, the configuration for performing the fine-bubble generating unit cleaning operation can be incorporated into the bath system 2 at a relatively low cost.
[0079] The technical elements described in this specification or drawings exert technical utility alone or in various combinations, and are not limited to the combinations described in the claims at the time of filing. In addition, the technologies illustrated in this specification or drawings can achieve multiple objectives simultaneously, and achieving one of those objectives is itself technically useful. [Explanation of symbols]
[0080] 2: bath system, 4: bath circuit, 6: heat source unit, 8: storage tank, 10: shared pump, 12: detergent mixing unit, 14: fine bubble generating unit, 16: control unit, 18: water supply source, 20: bathtub, 22: bathtub adapter, 24: cleaning nozzle, 26: drain plug, 28: actuator, 30: water supply path, 32: water outlet path, 34: bath outward path, 36: bath return path, 38: water replenishment path, 40: water replenishment Valve, 42: tank outlet hot water passage, 44: first three-way valve, 46: pump passage, 48: pump passage on-off valve, 50: second three-way valve, 52: first detergent mixing passage, 54: check valve, 56: second detergent mixing passage, 58: first circulation outward passage, 60: second circulation outward passage, 62: circulation return passage, 64: first heat source unit, 66: second heat source unit, 68: heat source water supply passage, 70: heat source outlet hot water passage, 72: heat source bath return passage, 74: heat source bath outward passage, 76: bypass passage, 78: bypass servo, 80: molten metal filling passage, 82: molten metal filling valve, 84: reheating pump, 86: overflow passage, 88: detergent tank, 90: detergent introduction passage, 92: detergent valve, 94: mixer, 96: pressurized tank, 98: tank inlet passage, 100: tank outlet passage, 102: pressurized pump, 104: tank opening / closing valve, 106: air introduction passage, 108: air introduction valve, 110: air introduction pump, 112: low water level Electrode, 114: high water level electrode, 160: remote control, 116: first inlet, 118: first inlet, 120: second inlet, 122: second inlet, 124: first outlet, 126: first outlet, 128: second outlet, 130: second outlet, 132: check valve, 134: check valve, 136: check valve, 138: check valve, 140: fine bubble generating nozzle, F1: first flow path, F2: second flow path, F3: third flow path
Claims
1. A storage tank that stores hot water supplied from a water supply source and has a backflow prevention mechanism that prevents the stored hot water from flowing back toward the water supply source; A pump that pumps hot and cold water; A detergent mixing unit that mixes detergent into hot water; A microbubble generating unit that generates microbubbles in hot water; a bath circuit connected to a bathtub and including the storage tank, the pump, the detergent mixing unit, and the fine bubble generating unit; A control unit, The bath circuit can selectively be configured, in response to an instruction from the control unit, to have a first flow path leading from the storage tank to the bathtub via the pump and the detergent mixing unit, and a second flow path leading from the bathtub to the bathtub via the pump and the fine bubble generating unit, The control unit a bathtub cleaning operation in which the first flow path is formed in the bath circuit and the pump is operated to mix the hot and cold water sent from the storage tank with the detergent by the detergent mixing unit, and the hot and cold water mixed with the detergent is supplied to the bathtub to clean the bathtub; The bath system is configured to be capable of performing a fine-bubble generating operation in which, by configuring the second flow path in the bath circuit and operating the pump, the hot water stored in the bathtub is circulated to the fine-bubble generating unit to generate fine bubbles in the hot water stored in the bathtub.
2. The bath circuit may further include a third flow path extending from the storage tank to the bathtub via the pump and the fine bubble generating unit, The bath system of claim 1, wherein the control unit is further configured to be able to execute a fine-bubble generating unit cleaning operation in which hot and cold water stored in the storage tank is passed through the fine-bubble generating unit to clean the fine-bubble generating unit by configuring the third flow path in the bath circuit and operating the pump.
3. The bathtub is provided with a cleaning nozzle through which hot and cold water flowing through the first flow path is discharged into the bathtub during the bathtub cleaning operation, an inlet through which hot and cold water inside the bathtub flows into the second flow path during the fine-bubble generating operation, and an outlet through which hot and cold water flowing through the second flow path flows out into the bathtub during the fine-bubble generating operation, The bath circuit is a pump passage in which the pump is provided; A first switching mechanism provided at an upstream end of the pump path; A second switching mechanism provided at a downstream end of the pump path; a detergent mixing passage having one end connected to the cleaning nozzle and the other end connected to the second switching mechanism; a return circulation path having one end connected to the inlet and the other end connected to the first switching mechanism; a circulation path having one end connected to the outlet and the other end connected to the second switching mechanism, The storage tank is connected to the first switching mechanism, The detergent mixing unit is provided in the detergent mixing path, The fine bubble generating unit is provided in any one of the pump path, the outward circulation path, and the return circulation path, the first switching mechanism is selectively switchable between a tank communication state in which the upstream end of the pump path is communicated with the storage tank and the upstream end of the pump path is not communicated with the other end of the circulation return path, and an inlet communication state in which the upstream end of the pump path is not communicated with the storage tank and the upstream end of the pump path is communicated with the other end of the circulation return path, the second switching mechanism is selectively switchable between a cleaning nozzle communication state in which the downstream end of the pump path and the other end of the detergent mixing path are communicated with each other and the downstream end of the pump path and the other end of the circulation outward path are not communicated with each other and an outlet communication state in which the downstream end of the pump path and the other end of the detergent mixing path are not communicated with each other and the downstream end of the pump path and the other end of the circulation outward path are communicated with each other, the control unit configures the first flow path in the bath circuit by setting the first switching mechanism to the tank communication state and the second switching mechanism to the cleaning nozzle communication state; A bath system as claimed in claim 1, wherein the control unit configures the second flow path in the bath circuit by setting the first switching mechanism to the inlet connection state and the second switching mechanism to the outlet connection state.
4. The fine bubble generating unit is provided in either the pump path or the circulation path, The bath circuit can further configure a third flow path from the storage tank to the bathtub via the pump and the fine bubble generating unit by setting the first switching mechanism to the tank communication state and the second switching mechanism to the outlet communication state, The bath system of claim 3, wherein the control unit is further configured to be able to execute a fine-bubble generating unit cleaning operation in which hot and cold water stored in the storage tank is passed through the fine-bubble generating unit to clean the fine-bubble generating unit by configuring the third flow path in the bath circuit and operating the pump.
Citation Information
Patent Citations
Fine bubble generator, bathtub having the same, and additive liquid feed device for use therein
JP2017148717A
Bathtub washing device
JP2022082148A