Reinforcement injection structure and ground reinforcement method

The reinforcing injection structure with annular grooves and hose joints simplifies the removal of injection hoses and material from terminal pipes, addressing the complexity and safety issues in tunnel excavation by enabling efficient breaking operations.

JP2024168722APending Publication Date: 2024-12-05KFC LTD
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
JP2023085622
Authority / Receiving Office
JP · JP
Patent Type
Applications
Current Assignee / Owner
Filing Date
2023-05-24
Publication Date
2024-12-05

AI Technical Summary

Technical Problem

The removal of injection hoses and hardened injection material from the terminal reinforcing pipe, which becomes an obstacle during tunnel excavation, is complicated and time-consuming, posing safety risks due to the difficulty in cutting nylon hoses and potential ground loosening.

Method used

A reinforcing injection structure with annular grooves and hose joints allows for easy removal of injection hoses by breaking operations, using either a hose joint that disconnects or an easily cuttable hose portion, eliminating the need for repeated hydraulic breaker application.

Benefits of technology

Facilitates reliable and efficient removal of injection hoses and material, reducing labor intensity and safety risks associated with manual cutting, while preventing ground loosening during tunnel excavation.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 2024168722000001_ABST
    Figure 2024168722000001_ABST
Patent Text Reader

Abstract

To surely remove a corresponding part of an injection hose of an injection material inserted into a long reinforcing pipe when breaking off an end part of the long reinforcing pipe driven into the ground at an annular groove.SOLUTION: A reinforcement injection structure 1 includes a long reinforcing pipe 3 having discharge holes 21 for injection material 103 formed in the peripheral wall, a plurality of reinforcing pipes 2 connected in series and driven into the natural ground 100, and a plurality of injection hoses 4 inserted into the long reinforcing pipe 3 to inject the injection material 103 into the long reinforcing pipe 3. Annular grooves 26d are provided at intervals in the longitudinal direction at an end portion of the long reinforcing pipe 3. A hose joint 43 is provided at the portion of the injection hose 4 arranged at a position corresponding to the annular groove 26d, which connects hose portions 44 constituting the injection hose 4 in series and releases the connection between the hose portions 44 arranged in series when an external force is applied to break the annular groove 26d.SELECTED DRAWING: Figure 3
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to a reinforcement injection structure and a ground reinforcement method used, for example, when an injection pipe is inserted into a long reinforcing pipe in a non-widening long-length pre-supporting method (non-widening AGF method) to inject injection material. [Background technology]

[0002] As a method for reinforcing the ground in front of the tunnel face prior to tunnel excavation, the non-widening AGF method shown in Figures 9 and 10 is known. In the non-widening AGF method, a reinforcing pipe 203 with discharge holes, which is a partial steel pipe with a length of about 3 m with a discharge hole, is driven diagonally from the face 201 along the inner circumference of the nearest support 202 into the ground 200 ahead, and while driving the reinforcing pipe 203, several reinforcing pipes are connected in series to drive a long reinforcing pipe 204 with a length of about 12 m into the ground 200. Then, a plurality of injection hoses 205 (see Figures 11 and 12) are inserted into the long reinforcing pipe 204 to inject the grout material 206 into the reinforcing pipe 203, and the grout material 206 is allowed to permeate the surrounding ground 200 from the discharge holes of the reinforcing pipe 203, forming a consolidated area in the ground 200 with the grout material 206.

[0003] The non-widening AGF method involves driving a long reinforcing pipe 204 diagonally forward from the tunnel face 201 into the ground 200 along the inner circumference of the nearest support structure 202. Therefore, when tunnel excavation advances to the next tunnel face 201, the terminal reinforcing pipe 203a, in other words the terminal portion of the long reinforcing pipe 204, becomes exposed in the tunnel space T, which becomes an obstacle to tunnel excavation in the tunnel excavation direction TD.

[0004] Therefore, in Patent Document 1, a plurality of annular grooves are formed at predetermined intervals in the longitudinal direction on the outer periphery of a steel reinforcing pipe, and this steel reinforcing pipe is cast as a terminal reinforcing pipe, so that the end of the steel reinforcing pipe that is exposed when excavating below the casting position of the steel reinforcing pipe can be easily broken off, preventing the exposed terminal reinforcing pipe from becoming an obstacle to tunnel excavation. [Prior art documents] [Patent documents]

[0005] [Patent Document 1] Patent No. 3882118 Summary of the Invention [Problem to be solved by the invention]

[0006] When the terminal reinforcement tube 203a, which has annular grooves formed with intervals in the longitudinal direction, is broken at the location of the annular groove, the injection hose 205 and hardened injection material 206 are inside the terminal reinforcement tube 203a, and when the terminal reinforcement tube 203a is broken and removed at the location of the annular groove using the blade 207 of the excavation machine, the part of the injection hose 205 inside and the hardened injection material 206 are also removed together.

[0007] However, the injection hose 205 is usually made of a material that is difficult to break, such as a nylon hose, and when the end reinforcing pipe 203a is broken at the annular groove, it often happens that multiple injection hoses 205 are left hanging from the tunnel face 201, as shown in Figures 11 and 12. Currently, workers take time to remove the dangling injection hoses 205 by repeatedly hitting them with the tool part of a hydraulic breaker, but this removal work is not only extremely cumbersome and time-consuming, but also involves the risk of loosening the natural ground 200 at the tunnel face during the removal work, which is dangerous.

[0008] The present invention has been proposed in consideration of the above-mentioned problems, and aims to provide a reinforcement injection structure and ground reinforcement method which, when breaking the terminal portion of a long reinforcing pipe driven into the ground in an annular groove, enables the corresponding portion of the injection hose for injection material inserted into the long reinforcing pipe to be reliably removed. [Means for solving the problem]

[0009] The reinforcing injection structure of the present invention comprises a long reinforcing pipe having injection material discharge holes formed in the peripheral wall, and a plurality of reinforcing pipes connected in series and driven into the ground, and a plurality of injection hoses inserted into the long reinforcing pipe to inject injection material into the inside of the long reinforcing pipe, wherein annular grooves are formed at the terminal portion of the long reinforcing pipe at intervals in the longitudinal direction, and a hose joint is provided at the position of the required injection hose, which is arranged at a position corresponding to the annular groove, to connect the hose portions constituting the injection hose in series and to disconnect the connection between the series-connected hose portions when an external force is applied to break the annular groove. According to this, when the end portion of the long reinforcing pipe driven into the ground is broken in the annular groove, the hose portion of the injection hose connected by the hose joint can be removed by the breaking operation. That is, when the end portion of the long reinforcing pipe driven into the ground is broken in the annular groove, the corresponding portion of the injection hose of the grouting material inserted into the long reinforcing pipe can also be reliably removed. This eliminates the cumbersome task of workers repeatedly applying the tool part of a hydraulic breaker to the dangling portion of the injection hose, which takes time, and also eliminates the risk of loosening the ground at the face during the removal work.

[0010] The reinforcing injection structure of the present invention comprises a long reinforcing pipe having injection material discharge holes formed in the peripheral wall, with multiple reinforcing pipes connected in series and driven into the ground, and multiple injection hoses inserted into the long reinforcing pipe to inject injection material into the inside of the long reinforcing pipe, wherein annular grooves are provided at intervals in the longitudinal direction at the terminal portion of the long reinforcing pipe, and an easily cut hose portion constituting part of the injection hose is disposed in the region between a first annular groove and a second annular groove which are arranged adjacent to each other in the longitudinal direction of the long reinforcing pipe. According to this, when the end portion of the long reinforcing pipe driven into the natural ground is broken off at the annular groove, the easily cut hose portion constituting part of the injection hose can be cut off by the breaking action. That is, when the end portion of the long reinforcing pipe driven into the natural ground is broken off at the annular groove, the corresponding portion of the injection hose of the grouting material inserted into the long reinforcing pipe can also be reliably removed. This eliminates the cumbersome task of having a worker repeatedly apply the tool part of a hydraulic breaker to the dangling portion of the injection hose, which takes time, and also eliminates the risk of loosening the natural ground at the face during the removal work.

[0011] The ground reinforcement method of the present invention is characterized by comprising a first step of connecting multiple reinforcing pipes in series and driving the long reinforcing pipe into the ground; a second step of inserting multiple injection hoses into the long reinforcing pipe and arranging a hose joint that connects hose portions constituting the injection hoses in series at positions corresponding to annular grooves spaced apart in the longitudinal direction at the terminal portion of the long reinforcing pipe and that disconnects the serially connected hose portions when an external force is applied to break the annular groove; a third step of injecting injection material into the inside of the long reinforcing pipe using the multiple injection hoses and discharging the injection material from discharge holes formed in the peripheral wall of the long reinforcing pipe into the surrounding ground to form a consolidated area in the ground surrounding the long reinforcing pipe; and a fourth step of breaking the terminal portion of the long reinforcing pipe at the annular groove using a tool of an excavation machine and removing the hose portion of the injection hose from the hose joint at a position corresponding to the broken annular groove. According to this, when the end portion of the long reinforcing pipe driven into the ground is broken in the annular groove, the hose portion of the injection hose connected by the hose joint can be removed by the breaking operation. That is, when the end portion of the long reinforcing pipe driven into the ground is broken in the annular groove, the corresponding portion of the injection hose of the grouting material inserted into the long reinforcing pipe can also be reliably removed. This eliminates the cumbersome task of workers repeatedly applying the tool part of a hydraulic breaker to the dangling portion of the injection hose, which takes time, and also eliminates the risk of loosening the ground at the face during the removal work.

[0012] The ground reinforcement method of the present invention is characterized by comprising a first step of connecting a plurality of reinforcing pipes in series and driving the long reinforcing pipe into the ground; a second step of inserting a plurality of injection hoses into the long reinforcing pipe and arranging a cut-easy hose portion that constitutes part of the injection hose in the area between a first annular groove and the second annular groove that are adjacent to each other and spaced apart in the longitudinal direction at the terminal portion of the long reinforcing pipe; a third step of injecting injection material into the inside of the long reinforcing pipe using the plurality of injection hoses and discharging the injection material from discharge holes formed in the peripheral wall of the long reinforcing pipe into the surrounding ground to form a consolidated area in the ground around the long reinforcing pipe; and a fourth step of breaking the terminal portion of the long reinforcing pipe at the location of the first annular groove that is located closer to the terminal of the long reinforcing pipe than the second annular groove using a tool of an excavation machine, and cutting the cut-easy hose portion at a position corresponding to the first annular groove. According to this, when the end portion of the long reinforcing pipe driven into the natural ground is broken off at the annular groove, the easily cut hose portion constituting part of the injection hose can be cut off by the breaking action. That is, when the end portion of the long reinforcing pipe driven into the natural ground is broken off at the annular groove, the corresponding portion of the injection hose of the grouting material inserted into the long reinforcing pipe can also be reliably removed. This eliminates the cumbersome task of having a worker repeatedly apply the tool part of a hydraulic breaker to the dangling portion of the injection hose, which takes time, and also eliminates the risk of loosening the natural ground at the face during the removal work. Effect of the Invention

[0013] According to the present invention, when the terminal portion of a long reinforcing pipe driven into the ground is broken at the annular groove, the corresponding portion of the injection hose for injection material inserted into the long reinforcing pipe can also be reliably removed. [Brief description of the drawings]

[0014] [Figure 1] FIG. 1 is a longitudinal explanatory diagram showing a non-expansion long-length pre-supporting construction (AGF construction) in which the reinforcing injection structure of the first embodiment of the present invention is used. [Diagram 2]FIG. 2A is a schematic cross-sectional view of the reinforcing injection structure of the first embodiment, and FIG. 2B is an enlarged view of the terminal side of the long reinforcing tube in FIG. [Diagram 3] FIG. 2 is a partially enlarged schematic cross-sectional view of the reinforcing injection structure of the first embodiment. [Figure 4] FIG. 2 is a front view of a long reinforcing pipe in the reinforcing injection structure of the first embodiment. [Diagram 5] 1A is a front view of a leading reinforcing tube that constitutes a long reinforcing tube in the reinforcement injection structure of the first embodiment, FIG. 1B is a front view of a first intermediate reinforcing tube that constitutes the same long reinforcing tube, FIG. 1C is a front view of a second intermediate reinforcing tube that constitutes the same long reinforcing tube, and FIG. 1D is a front view of an end reinforcing tube that constitutes the same long reinforcing tube. [Figure 6] 2A to 2D are schematic process diagrams illustrating the natural ground reinforcement method according to the first embodiment. [Figure 7] 6A is a schematic cross-sectional view of a reinforcing injection structure of a second embodiment, and FIG. 6B is an enlarged view of the end side of a long reinforcing tube in FIG. [Figure 8] FIG. 13 is a front view of a long reinforcing pipe in the reinforcing injection structure of the second embodiment. [Figure 9] An explanatory cross-sectional view showing the arrangement of long reinforcing pipes in non-expansion long-length pre-support work. [Figure 10] A longitudinal cross-sectional view illustrating the fracture of a terminal reinforcement pipe in a long-length pre-support construction without width expansion. [Figure 11] (a) and (b) are diagrams explaining the problem of the injection hose being left hanging from the face. [Figure 12] (a) and (b) are enlarged diagrams illustrating the problem of the injection hose being left hanging from the face. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0015] [Reinforcement injection structure and ground reinforcement method of the first embodiment] A reinforcing injection structure 1 according to a first embodiment of the present invention is provided, for example, in a non-widening long-length pre-supporting work (non-widening AGF work) shown in Fig. 1. In the non-widening long-length pre-supporting work shown in Fig. 1, a plurality of reinforcing pipes 2, which are partial steel pipes of about 3 m each, are cast diagonally forward from the natural ground 100 immediately adjacent to the face 101, so as to form a drilling hole 102 while being connected in series, and the long-length reinforcing pipe 3 is constituted by the plurality of reinforcing pipes 2 connected in series. A solidified region is formed in the natural ground 100 around the long-length reinforcing pipe 3 by hardening of the injection material 103, such as a two-liquid mixture type, which is injected into the inside of the long-length reinforcing pipe 3 and permeates the natural ground 100, and the natural ground 100 around the tunnel space T to be excavated is covered like an umbrella and reinforced (see Fig. 9).

[0016] In the construction of the non-expansion long pre-supporting method, for example, during tunnel excavation, shoring 104 is erected and shotcrete 105 is applied every 1 m or so of excavation, and the long reinforcing pipe 3 is cast, for example, every 9 m or so of excavation. In the construction of the non-expansion long pre-supporting method, the long reinforcing pipe 3 is cast diagonally forward from the natural ground 100 immediately adjacent to the face 101, so that the terminal reinforcing pipe 2d located at the terminal part of the long reinforcing pipe 3 is placed in the natural ground 100 to be excavated in the next and next excavation cycles, and the terminal reinforcing pipe 2d that becomes an obstacle as the tunnel is excavated is broken at the location of the annular groove 26d described below.

[0017] 2 to 5, the reinforcement injection structure 1 of the first embodiment has a plurality of reinforcing pipes 2, and the plurality of reinforcing pipes 2 communicating in the longitudinal direction are connected in series to constitute a long reinforcing pipe 3 that is driven into the natural ground 100. In the first embodiment, four reinforcing pipes 2 that constitute the long reinforcing pipe 3 are provided, namely, a leading reinforcing pipe 2a, a first intermediate reinforcing pipe 2b, a second intermediate reinforcing pipe 2c, and an end reinforcing pipe 2d, and the leading reinforcing pipe 2a, the first intermediate reinforcing pipe 2b, the second intermediate reinforcing pipe 2c, and the end reinforcing pipe 2d are arranged in this order from the back side of the perforation in the natural ground 100, connected in series, and driven into the natural ground 100.

[0018] The leading reinforcing pipe 2a is formed so that discharge holes 21 for the grouting material 103 are dotted on the cylindrical peripheral wall, is provided with a drill bit 22a at its tip, and is provided with a male threaded portion 23 at its rear end. The first intermediate reinforcing pipe 2b is formed so that discharge holes 21 for the grouting material 103 are dotted on its cylindrical peripheral wall, is provided with an enlarged diameter portion 24 at its tip that gradually enlarges in diameter towards the tip, is provided with a female threaded portion 25 inside the enlarged diameter portion 24, and is provided with a male threaded portion 23 at its rear end. When constructing the long reinforcing pipe 3, the female threaded portion 25 of the first intermediate reinforcing pipe 2b is screwed into the male threaded portion 23 of the leading reinforcing pipe 2a.

[0019] The second intermediate reinforcing pipe 2c has the same configuration as the first intermediate reinforcing pipe 2b, has discharge holes 21 for the grout material 103 formed so as to be dotted around the cylindrical peripheral wall, has an expanded diameter section 24 at its tip that gradually expands in diameter towards the tip, has a female thread section 25 inside the expanded diameter section 24, and has a male thread section 23 at its rear end. When constructing the long reinforcing pipe 3, the female thread section 25 of the second intermediate reinforcing pipe 2c is screwed into the male thread section 23 of the first intermediate reinforcing pipe 2b.

[0020] The end reinforcing tube 2d is provided at its tip with an expanded diameter section 24 that gradually expands in diameter toward the tip, with a female thread section 25 provided inside the expanded diameter section 24 and a male thread section 23 provided at its rear end. Furthermore, a plurality of annular grooves 26d are formed at intervals in the longitudinal direction on the outside of the peripheral wall of the end reinforcing tube 2d, and in the illustrated example, four annular grooves 26d are formed. Note that the end reinforcing tube 2d in the illustrated example is configured such that no discharge hole 21 for the injection material 103 is formed in the peripheral wall so that the injection material 103 injected into the inside through a through slit 27d (described later) protrudes to the outside of the peripheral wall, but it is also preferable to form the discharge hole 21 in the peripheral wall.

[0021] In addition, in the peripheral wall of the end reinforcing tube 2d in the illustrated example, a through slit 27d is provided in the longitudinal direction for each partition area partitioned in the longitudinal direction by the annular grooves 26d-26d, so as to straddle adjacent annular grooves 26d-26d in the longitudinal direction to facilitate dismantling of the peripheral wall of the partition area, and the through slits 27d are formed so that their circumferential positions are different in adjacent partition areas in the longitudinal direction. When constructing the long reinforcing tube 3, the female threaded portion 25 of the end reinforcing tube 2d is screwed into the male threaded portion 23 of the second intermediate reinforcing tube 2c, and annular grooves 26d are provided at intervals in the longitudinal direction in the terminal portion of the long reinforcing tube 3.

[0022] A plurality of injection hoses 4 for injecting the grouting material 103 are inserted into the long reinforcing pipe 3, and are supported and fixed by caps 5 screwed onto the ends of the long reinforcing pipe 3. In the example of Fig. 2 and Fig. 3, three injection hoses 4 such as nylon hoses are inserted into the long reinforcing pipe 3. A junction pipe 41 is attached to the rear end of each injection hose 4 in this example, and the grouting material 103 consisting of a mixture of the first liquid and the second liquid is supplied from a chemical pump (not shown) to each injection hose 4 via a pressure-resistant hose (not shown) and the junction pipe 41. A mixer 42 for mixing and stirring the mixture is provided at the tip of each injection hose 4, and the mixer 42 promotes the mixing of the first liquid and the second liquid to discharge the grouting material 103 into the inside of the long reinforcing pipe 3.

[0023] The mixers 42 disposed at the tip of each injection hose 4 are disposed at different positions in the longitudinal direction of the long reinforcing pipe 3. The injection material 103 injected from the mixers 42 disposed at different positions in the longitudinal direction of the long reinforcing pipe 3 is discharged into the inside of the long reinforcing pipe 3, and is discharged from the discharge holes 21 formed in the peripheral wall of the long reinforcing pipe 3 into the natural ground 100 around the long reinforcing pipe 3 and penetrates therein, and as the injection material 103 hardens, a consolidated region is formed in the natural ground 100 around the long reinforcing pipe 3.

[0024] A hose joint 43 is provided at a portion of the long reinforcing pipe 3 where a required injection hose 4 is arranged, which is arranged in a position corresponding to the annular groove 26d of the end reinforcing pipe 2d, in other words the annular groove 26d at the end portion of the long reinforcing pipe 3, and the hose joint 43 connects in series the cylindrical hose portions 44 that constitute the injection hose 4. The hose joint 43 connects the hose portions 44 to each other, and is configured so that the connection between the hose portion 44 and the hose joint 43 is released by an external force for breaking the annular groove 26d of the end reinforcing pipe 2d, and a straight hose joint is preferably used.

[0025] When performing a natural ground reinforcement method in which the reinforcing injection structure 1 of the first embodiment is installed in the natural ground 100, for example, similarly to a normal non-widening long-length pre-receiving method (non-widening AGF method), a leading reinforcing pipe 2a, a first intermediate reinforcing pipe 2b, a second intermediate reinforcing pipe 2c, and an end reinforcing pipe 2d corresponding to multiple reinforcing pipes 2 are cast in series from the natural ground 100 immediately adjacent to the face 101 diagonally forward to form a perforation 102, and a long reinforcing pipe 3 composed of multiple reinforcing pipes 2 is cast into the natural ground 100 (see Fig. 6(a), Fig. 1, Fig. 4). Reference numeral 105p in Fig. 6(a) denotes the first shotcrete, and reference numeral 105q denotes the second shotcrete.

[0026] After the long reinforcing pipe 3 is cast, the drilling rod (not shown) is pulled out of the long reinforcing pipe 3, multiple injection hoses 4 are inserted into the long reinforcing pipe 3, and caps 5 supporting the injection hoses 4 are screwed onto the ends of the long reinforcing pipe 3 (see Fig. 6(a), Fig. 2, and Fig. 3). The long reinforcing pipe 3 and injection hose 4 in Fig. 6(a) are shown diagrammatically, and in reality, the long reinforcing pipe 3 and end reinforcing pipe 2d and injection hose 4 are provided as shown in Fig. 3, and by inserting the injection hose 4 into the long reinforcing pipe 3, a hose joint 43 is arranged at the position of the injection hose 4 that is located at a position corresponding to the annular groove 26d at the end portion of the long reinforcing pipe 3.

[0027] Then, the injection material 103 is injected into the inside of the long reinforcing pipe 3 using multiple injection hoses 4, and the injection material 103 is discharged into the surrounding ground 100 from discharge holes 21 formed in the peripheral wall of the long reinforcing pipe 3, forming a solidified area in the ground 100 around the long reinforcing pipe 3 due to hardening of the injection material 103 (see Figure 6(a), Figure 1 and Figure 3).

[0028] After the injection of the grout material 103, the end portion of the long reinforcing pipe 3 is broken at the annular groove 26d by chipping or hitting with a tool of the excavation machine, for example, a tool such as the shovel blade of a backhoe or a chisel of a hydraulic breaker. In other words, the end reinforcing pipe 2d constituting the long reinforcing pipe 3 is broken at the annular groove 26d, and the hose portion 44 of the injection hose 4, which is disposed at a position corresponding to the broken annular groove 26d, is removed from the hose joint 43 by this breaking operation (see FIG. 6(b) and FIGS. 1 to 3). Furthermore, as the tunnel excavation progresses, a similar breaking operation is performed in the annular groove 26d located further back of the cast long reinforcing pipe 3, and the hose portion 44 is removed from the hose joint 43 in accordance with the breaking operation (see FIGS. 6(c) and 6(d)).

[0029] According to the reinforcement injection structure 1 and natural ground reinforcement method of the first embodiment, when the terminal portion of the long reinforcing pipe 3 driven into the natural ground 100 is broken at the annular groove 26d, the hose portion 44 of the injection hose 4 connected by the hose joint 43 can be removed by a breaking operation. That is, when the terminal portion of the long reinforcing pipe 3 driven into the natural ground 100 is broken at the annular groove 26d, the corresponding portion of the injection hose 4 of the injection material 103 inserted into the long reinforcing pipe 3 can also be reliably removed. This eliminates the need for a worker to repeatedly apply the tool portion of a hydraulic breaker to the dangling portion of the injection hose, which is time-consuming, and also eliminates the risk of loosening the natural ground 100 at the face portion during the removal work.

[0030] [Second embodiment of reinforcement injection structure and ground reinforcement method] The reinforcing injection structure 1m of the second embodiment according to the present invention is also provided in, for example, a non-widening long-length pre-supporting construction (non-widening AGF construction) shown in Fig. 1. The reinforcing injection structure 1m of the second embodiment also has a plurality of reinforcing pipes 2, as shown in Figs. 7 and 8, and a long reinforcing pipe 3m is configured by connecting a plurality of reinforcing pipes 2 communicating in the longitudinal direction in series and driving the long reinforcing pipe 3m into the natural ground 100. In the second embodiment, four reinforcing pipes 2 constituting the long reinforcing pipe 3m are provided, namely, a leading reinforcing pipe 2a, a first intermediate reinforcing pipe 2b, a second intermediate reinforcing pipe 2c, and a terminal reinforcing pipe 2e, and the leading reinforcing pipe 2a, the first intermediate reinforcing pipe 2b, the second intermediate reinforcing pipe 2c, and the terminal reinforcing pipe 2e are arranged in order from the deep side of the drilling hole in the natural ground 100, connected in series, and driven into the natural ground 100.

[0031] The leading reinforcing tube 2a, the first intermediate reinforcing tube 2b, and the second intermediate reinforcing tube 2c that constitute the long reinforcing tube 3m are identical to the leading reinforcing tube 2a, the first intermediate reinforcing tube 2b, and the second intermediate reinforcing tube 2c that constitute the long reinforcing tube 3 in the first embodiment, and differ from the long reinforcing tube 3 only in that the terminal reinforcing tube is formed by the terminal reinforcing tube 2e.

[0032] The terminal reinforcing pipe 2e is provided at its tip with an expanded diameter section 24 which gradually expands in diameter towards the tip, with a female thread section 25 provided inside the expanded diameter section 24 and a male thread section 23 provided at its rear end. A plurality of annular grooves 26e are formed at intervals in the longitudinal direction on the outside of the peripheral wall of the terminal reinforcing pipe 2e, with four annular grooves 26e formed in the illustrated example, and discharge holes 21 for the grouting material 103 are formed so as to be dotted around the cylindrical peripheral wall. When constructing the long reinforcing pipe 3m, the female thread section 25 of the terminal reinforcing pipe 2e is screwed into the male thread section 23 of the second intermediate reinforcing pipe 2c, and annular grooves 26e are provided at intervals in the longitudinal direction in the terminal portion of the long reinforcing pipe 3m.

[0033] In the long reinforcing pipe 3m, as in the long reinforcing pipe 3 of the first embodiment, a plurality of injection hoses 4m for injecting the injection material 103 are inserted, and are supported and fixed by a cap 5 screwed to the end of the long reinforcing pipe 3m, and for example, three injection hoses 4m such as nylon hoses are inserted into the long reinforcing pipe 3m. As in the first embodiment, a junction pipe 41 is attached to the rear end of each injection hose 4m (see FIG. 3), and the injection material 103 consisting of a mixture of the first liquid and the second liquid is supplied from a chemical liquid pump to each injection hose 4m via the pressure-resistant hose and the junction pipe 41. A mixer 42 for mixing and stirring the mixture is provided at the tip of each injection hose 4m, and the mixer 42 promotes the mixing of the first liquid and the second liquid to discharge the injection material 103 into the inside of the long reinforcing pipe 3m.

[0034] The mixers 42 disposed at the tip of each injection hose 4m are disposed at different positions in the longitudinal direction of the long reinforcing pipe 3m, as in the first embodiment. The injection material 103 injected from the mixers 42 disposed at different positions in the longitudinal direction of the long reinforcing pipe 3m is discharged into the inside of the long reinforcing pipe 3m, and is discharged from the discharge holes 21 formed in the peripheral wall of the long reinforcing pipe 3m into the natural ground 100 around the long reinforcing pipe 3m and penetrates therein, and as the injection material 103 hardens, a solidified region is formed in the natural ground 100 around the long reinforcing pipe 3m.

[0035] In the longitudinal direction of the long reinforcing pipe 3m, in the region between the first annular groove 26e arranged at the innermost side of the drilling 102 and the annular groove 26e arranged next to the innermost annular groove 26e and arranged at the second innermost side of the hole, an easily cuttable hose portion 45m constituting a part of each of the two injection hoses 4m is arranged. In addition, in the longitudinal direction of the long reinforcing pipe 3m, in the region between the annular groove 26e arranged at the second innermost side of the drilling 102 and the annular groove 26e arranged next to the annular groove 26e arranged at the second innermost side of the hole and arranged at the third innermost side of the hole, an easily cuttable hose portion 45m constituting a part of each of the three injection hoses 4m is arranged. The easily cuttable hose portion 45m is formed of a material that can be cut by a tool of an excavation machine, such as a shovel blade of a shovel or a chisel of a hydraulic breaker, and is preferably formed of a hard resin pipe such as a hard PVC pipe.

[0036] The easily cuttable hose portion 45m provided so as to correspond in series to the region between the first annular groove 26e located at the deepest side of the hole and the second-deepest annular groove 26, and the region between the second-deepest annular groove 26e and the third-deepest annular groove 26, is connected to the hose portion 44 located on the deepest side of the hole and to the hose portion 44 located on the terminal side by a hose joint 46m consisting of, for example, a socket and a hose nipple. The easily cuttable hose portion 45m provided so as to correspond in series only to the region between the second-deepest annular groove 26e and the third-deepest annular groove 26 is connected to the hose portion 44 located on the terminal side by a similar hose joint 46m.

[0037] When performing the ground reinforcement method in which the reinforcing injection structure 1m of the second embodiment is installed in the ground 100, the same procedure as in the first embodiment is used except that a terminal reinforcement pipe 2e is used. The leading reinforcement pipe 2a, the first intermediate reinforcing pipe 2b, the second intermediate reinforcing pipe 2c and the terminal reinforcement pipe 2e, which correspond to multiple reinforcing pipes 2, are driven diagonally forward from the ground 100 just near the face 101 while connecting them in series to form a perforation 102, and a long reinforcing pipe 3m composed of multiple reinforcing pipes 2 is driven into the ground 100 (see Figures 6(a), 1 and 8).

[0038] After the long reinforcing pipe 3m is cast, the drilling rod is pulled out of the long reinforcing pipe 3m, the multiple injection hoses 4m are inserted into the long reinforcing pipe 3m, and the caps 5 supporting the injection hoses 4m are screwed onto the ends of the long reinforcing pipe 3m (see Fig. 6(a) and Fig. 7). By inserting the injection hoses 4m into the long reinforcing pipe 3m, for example, easily cuttable hose portions 45m constituting a part of each of the two injection hoses 4m are disposed in the region between the annular groove 26e on the deepest side of the drilling hole 102 and the annular groove 26e adjacent thereto that is disposed second deepest in the hole, and easily cuttable hose portions 45m constituting a part of each of the three injection hoses 4m are disposed in the region between the annular groove 26e on the second deepest side of the hole and the annular groove 26e adjacent thereto that is disposed third deepest in the hole.

[0039] Then, the injection material 103 is injected into the inside of the long reinforcing pipe 3m using multiple injection hoses 4, and the injection material 103 is discharged into the surrounding ground 100 from discharge holes 21 formed in the peripheral wall of the long reinforcing pipe 3m, forming a solidified area in the ground 100 around the long reinforcing pipe 3m due to hardening of the injection material 103 (see Figure 6(a), Figure 1 and Figure 7).

[0040] After the injection of the injection material 103, the terminal portion of the long reinforcing pipe 3m is broken at the location of the third annular groove 26e, which is located closer to the terminal of the long reinforcing pipe 3m than the first annular groove 26e and the second annular groove 26e, by chipping, hitting, etc. with a tool of the excavation machine, such as the shovel blade of a backhoe or the chisel of a hydraulic breaker. In other words, the terminal reinforcing pipe 2e that constitutes the long reinforcing pipe 3m is broken at the location of the third annular groove 26e, and the easy-to-cut hose portion 45m of the injection hose 4m, which is located at a position corresponding to the third annular groove 26e, is cut by the tool of the excavation machine (see Figures 6(b), 1 and 7).

[0041] Furthermore, as the tunnel excavation progresses, the end portion of the long reinforcing pipe 3m is broken at the location of the second annular groove 26e, which is located closer to the end of the long reinforcing pipe 3m than the first annular groove 26e, by chipping, hitting, etc. with the tools of the excavation machine, and the easily cut hose portion 45m of the injection hose 4m, which is located at a position corresponding to the second annular groove 26e, is cut with a tool of the excavation machine, such as the shovel blade of a backhoe or the chisel of a hydraulic breaker (see Figures 6(c) and 7). Next, the end portion of the long reinforcing pipe 3m is broken at the location of the first annular groove 26e, and the easily cut hose portion 45m of the injection hose 4m, which is located at the position corresponding to the first annular groove 26e, is cut with the tools of the excavation machine (see Figures 6(d) and 7).

[0042] According to the reinforcement injection structure 1m and the natural ground reinforcement method of the second embodiment, when the terminal portion of the long reinforcing pipe 3m driven into the natural ground 100 is broken in the annular groove 26e, the easily cut hose portion 45m constituting a part of the injection hose 4m can be cut by the breaking operation. That is, when the terminal portion of the long reinforcing pipe 3m driven into the natural ground 100 is broken in the annular groove 26e, the corresponding portion of the injection hose 4m of the injection material 103 inserted into the long reinforcing pipe 3m can also be reliably removed. This eliminates the need for a worker to repeatedly apply the tool portion of a hydraulic breaker to the dangling portion of the injection hose, which takes time, and also eliminates the risk of loosening the natural ground 100 at the face portion during the removal work.

[0043] [Scope of the invention disclosed herein] The invention disclosed in this specification includes, in addition to each invention, embodiment, and example listed as the invention, those specified by changing partial contents of these to other contents disclosed in this specification, or those specified by adding other contents disclosed in this specification to these contents, or those specified by deleting partial contents of these to the extent that partial action and effect can be obtained, and forming a higher-level concept. The invention disclosed in this specification also includes the following contents and further modified examples described below.

[0044] For example, the hose joint of the present invention may be any suitable configuration other than the straight hose joint of the preferred example described above, as long as the hose parts constituting the injection hose are connected in series and the connection is released by pulling the hose parts in the longitudinal direction of the injection hose. The easily cuttable hose part of the present invention may be any suitable configuration as long as it is applicable to other than the hard resin pipe of the preferred example described above. The present invention may also be applied to auxiliary construction methods other than the non-widening long length pre-receiving construction method (non-widening AGF construction method), for example, to the mirror reinforcement construction method. [Industrial Applicability]

[0045] The present invention can be used, for example, when inserting an injection pipe into a long reinforcing pipe in a non-widening long-length pre-supporting method (non-widening AGF method) to inject injection material. [Explanation of symbols]

[0046] 1, 1m...Reinforcement injection structure 2...Reinforcement pipe 2a...Front reinforcing pipe 2b...First intermediate reinforcing pipe 2c...Second intermediate reinforcing pipe 2d, 2e...End reinforcing pipe 21...Discharge hole 22a...Drilling bit 23...Male threaded portion 24...Expansion portion 25...Female threaded portion 26d, 26e...Annular groove 27d...Through slit 3, 3m...Long reinforcing pipe 4, 4m...Injection hose 41...Merge pipe 42...Mixer 43...Hose joint 44...Hose portion 45m...Easily cuttable hose portion 46m...Hose coupling 5...Cap 100...Natural ground 101...Cutting face 102...Drilling 103...Injection material 104...Support 105...Sprayed concrete 105p...Primary sprayed concrete 105q...Secondary sprayed concrete 200...Natural ground 201...Cutting face 202... Support 203... Reinforcement pipe 203a... Terminal reinforcement pipe 204... Long reinforcement pipe 205... Injection hose 206... Injection material 207... Excavation machine blade T... Tunnel space TD... Tunnel excavation direction

Claims

1. A long reinforcing pipe having a discharge hole for the injection material formed in a peripheral wall, the reinforcing pipe being connected in series and driven into the ground; a plurality of injection hoses that are inserted into the long reinforcing pipe and that inject an injection material into the long reinforcing pipe; The long reinforcing tube has an end portion provided with annular grooves spaced apart in the longitudinal direction, A reinforced injection structure characterized in that a hose joint is provided at the required injection hose placement portion located at a position corresponding to the annular groove, which connects the hose portions constituting the injection hose in series and disconnects the connection between the serially connected hose portions when an external force is applied to break the annular groove.

2. A long reinforcing pipe having a discharge hole for the injection material formed in a peripheral wall, the reinforcing pipe being connected in series and driven into the ground; a plurality of injection hoses that are inserted into the long reinforcing pipe and that inject an injection material into the long reinforcing pipe; The long reinforcing tube has an end portion provided with annular grooves spaced apart in the longitudinal direction, A reinforcing injection structure characterized in that an easily cut hose portion constituting part of the injection hose is arranged in the area between the first annular groove and the second annular groove which are arranged adjacent to each other in the longitudinal direction of the long reinforcing pipe.

3. A first step of connecting a plurality of reinforcing pipes in series and driving the long reinforcing pipes into the ground; a second step of inserting a plurality of injection hoses into the long reinforcing pipe, and arranging a hose joint at a position corresponding to annular grooves provided at intervals in the longitudinal direction at an end portion of the long reinforcing pipe, the hose joint connecting the hose portions constituting the injection hoses in series, and disengaging the series-connected hose portions from each other when an external force is applied to break the annular groove; a third step of injecting an injection material into the interior of the long reinforcing pipe using the multiple injection hoses and discharging the injection material into the surrounding natural ground from discharge holes formed in the peripheral wall of the long reinforcing pipe to form a consolidated region in the surrounding natural ground of the long reinforcing pipe; and a fourth step of breaking an end portion of the long reinforcing pipe at the annular groove using a tool of an excavation machine, and removing the hose portion of the injection hose from the hose joint at a position corresponding to the broken annular groove.

4. A first step of connecting a plurality of reinforcing pipes in series and driving the long reinforcing pipes into the ground; a second step of inserting a plurality of injection hoses into the long reinforcing pipe, and disposing an easily cuttable hose portion constituting a part of the injection hose in a region between a first annular groove and the second annular groove that are adjacently provided at a longitudinal interval in an end portion of the long reinforcing pipe; a third step of injecting an injection material into the interior of the long reinforcing pipe using the multiple injection hoses and discharging the injection material from discharge holes formed in a peripheral wall of the long reinforcing pipe into a surrounding natural ground to form a consolidated region in the natural ground around the long reinforcing pipe; and a fourth step of using a tool of an excavation machine to break off an end portion of the long reinforcing pipe at the location of the first annular groove, which is located closer to the end of the long reinforcing pipe than the second annular groove, and cutting the easily cut hose portion at a position corresponding to the first annular groove.

Citation Information

Patent Citations

  • Steel pipes for ground reinforcement and tunnel excavation methods using the same

    JP3882118B2