Manufacturing method for prestressed steel girders
By employing steel materials with notched endmost dowels and strategically arranged dowels, the method addresses stress concentration and deformation issues, preventing cracks in prestressed steel girders.
Patent Information
- Application Number
- JP2023089369
- Authority / Receiving Office
- JP · JP
- Patent Type
- Applications
- Current Assignee / Owner
- Filing Date
- 2023-05-31
- Publication Date
- 2024-12-12
AI Technical Summary
Cracks occur in the lower flange concrete of prestressed steel girders during the manufacturing process due to stress concentration and deformation, particularly at the ends, caused by dowels and uneven bearing pressures.
The method involves using steel materials with notches in the center of the endmost dowels on the lower flange and arranging dowels in a specific pattern to distribute stress, including using tapered dowels to reduce strain and uplift deformation.
This approach effectively suppresses stress concentration and deformation, reducing the occurrence of cracks in the lower flange concrete by equalizing compressive strain and minimizing uplift deformation.
Smart Images

Figure 2024171978000001_ABST
Abstract
Description
[Technical field]
[0001] The present invention relates to a method for manufacturing a prestressed steel girder by introducing prestress into a bottom flange concrete, and more particularly to a method for manufacturing a split type prestressed steel girder. [Background technology]
[0002] Prestressed steel girders are manufactured by loading a preflexion on an I-section steel member (a steel member consisting of a vertical web and horizontal upper and lower flanges formed above and below the vertical web) to apply a bending moment, pouring concrete around the lower flange in this state, and then releasing the preflexion after the concrete has hardened to introduce prestress into the lower flange concrete.
[0003] There are several methods for manufacturing prestressed steel girders. In addition to the orthodox method in which the above-mentioned method is carried out on a single piece of steel, a method for manufacturing prestressed steel girders called the "split method" is also known, in which multiple pieces of steel are used, prestress is introduced into the concrete while these steel pieces are connected, and then the pieces are split.
[0004] The manufacturing method for split-type prestressed steel girders was developed to reduce the labor required for on-site construction and to facilitate the transportation and erection of long-span girders, and is carried out in the following steps: First, in the factory, as shown in Figure 10(1), multiple pieces of I-section steel material 11 (three in this example) are lined up in series, adjacent ends are butted together, and they are connected using splice plates 18 to assemble a single steel girder 10.
[0005] The splice plates 18 are arranged not only at the positions shown in the figure (positions for connecting the webs of the steel material 11) but also at the positions for connecting the upper flanges and the lower flanges 14, and are fixed by tightening bolts inserted into the bolt holes. A large number of dowels 21 (slip-stoppers) are arranged on the upper and lower surfaces of the lower flanges 14 of the steel material 11.
[0006] Next, as shown in Fig. 10(2), a pre-flexion is loaded onto the steel girder 10, and a pre-flexion bending moment including the design bending moment is applied to cause bending deformation. In this state, concrete is poured around each bottom flange 14 of the steel material 11 (more specifically, at the positions shown by the dashed lines in Fig. 10(2) so as to cover the top, bottom, and side surfaces of the bottom flanges 14) to form bottom flange concrete 16. Note that concrete is not poured into the connecting portions 17 of the bottom flanges 14 (the portions where the splice plates that connect the bottom flanges 14 are placed and the adjacent portions), and these are left blank.
[0007] When the bottom flange concrete 16 hardens, the pre-flexion load is released, and the bending deformation of the steel girder 10 is returned to its original state, as shown in Figure 10 (3). The release bending moment generated at that time converts the reduction in the tensile force of the bottom flange 14 into compressive force of the concrete via the dowel 21 (see Figure 10 (1)), and prestress is introduced into the bottom flange concrete 16.
[0008] Next, as shown in Fig. 10(4), the splice plates are removed and one steel girder 10 is divided into multiple (three in this example) blocks (divided blocks each consisting of one steel material 11 and bottom flange concrete 16). These divided blocks are then transported to the site and, as shown in Fig. 10(5), are again connected using splice plates 18. Finally, concrete is poured into the connecting parts 17 of the bottom flanges 14 (positions shown by dashed lines in Fig. 10(5)) to fill in the blanks and integrate the series of bottom flange concrete 16 (making them continuous).
[0009] When manufacturing a prestressed steel girder using the split method, cracks may occur in the bottom flange concrete 16 when the process of introducing prestress into the bottom flange concrete 16 is carried out.
[0010] At the time of introducing prestress to the bottom flange concrete 16, no concrete is poured in the connecting portion 17 (see FIG. 10(2)), so ends 16a of the bottom flange concrete 16 are formed on both sides of the connecting portion 17, as shown in FIG. 10(3). Then, when the preflexion load is released and the deformation of the steel girder 10 is restored, deformation occurs in which both side edges of the bottom flange 14 bulge in the width direction (perpendicular to the girder axis) due to Poisson's ratio strain. For this reason, the concrete cross section changes suddenly near the end 16a of the bottom flange concrete 16, causing stress concentration, and as a result, tensile stress in the direction perpendicular to the girder axis acts near the end 16a. Such stress concentration and tensile stress near the end 16a are thought to be one of the causes of crack generation.
[0011] Therefore, there is a technology that attempts to prevent the occurrence of cracks by devising a way to prevent the transmission of deformation to the lower flange concrete 16, even if deformation such as bulging of the lower flange 14 in the direction perpendicular to the girder axis occurs when prestress is introduced.More specifically, a filler that can follow the bulging deformation of the lower flange 14 is placed between both side edges of the lower flange 14 and the lower flange concrete 16, thereby avoiding tensile stress acting in the direction perpendicular to the girder axis on the end 16a of the lower flange concrete 16 when prestress is introduced (Patent Document 1). [Prior art documents] [Patent documents]
[0012] [Patent Document 1] JP 2005-248617 A Summary of the Invention [Problem to be solved by the invention]
[0013] However, it is thought that the cause of cracks near the end 16a of the lower flange concrete 16 is not only the bulging deformation of the lower flange 14 in the direction perpendicular to the girder axis, but also the excessive bearing stress acting from the dowel 21 (see Figure 10 (1)) located on the underside of the lower flange 14 at the end-most side (the dowel 21 closest to the end 16a of the lower flange concrete 16) and the occurrence of uplift deformation on the concrete surface due to local bearing stress, etc., which must be considered.
[0014] To explain this in more detail, the largest horizontal shear force acts on the dowel 21 on the extreme end side of the underside of the bottom flange 14 when prestress is introduced into the bottom flange concrete 16. Furthermore, in the area of the bottom flange concrete 16 surrounding the dowel 21 on the extreme end side, stress is concentrated in the center of the concrete cross section.
[0015] Furthermore, in the bottom flange concrete 16, the lower part (lower portion) of the bottom flange 14 has a smaller concrete thickness than the outer left and right parts (side portions) of the bottom flange 14 because the bottom flange 14 extends at the mid-height position of the concrete, and it has a shape like a two-sided support plate supported by the concrete of the left and right sides. For this reason, the center part of the lower part of the bottom flange concrete 16 is more susceptible to warping deformation due to strain than both ends, and because it is eccentrically supported in the direction of peeling off from the bottom flange 14, this part is prone to deformation in which the concrete surface bulges downward.
[0016] In this way, it is believed that the excessive bearing pressure acting from the dowel 21 on the extreme end side causes strain to concentrate in the center of the lower part of the bottom flange concrete 16, resulting in localized strain deformation, which is believed to be one of the further causes of cracks occurring near the end 16a of the bottom flange concrete 16. Therefore, in order to prevent cracks from occurring near the end 16a of the bottom flange concrete 16, the measures described above alone are not sufficient, and it is desirable to take appropriate measures in consideration of phenomena occurring in the area surrounding the dowel 21 on the extreme end side.
[0017] The present invention seeks to solve such problems in the conventional technology, and aims to provide a manufacturing method for prestressed steel girders that can effectively prevent the occurrence of cracks by suppressing strain deformation in the lower flange concrete and reducing the compressive strain difference. [Means for solving the problem]
[0018] The method for manufacturing a prestressed steel girder according to the present invention comprises preparing a plurality of steel members each composed of a vertical web and horizontal upper and lower flanges formed above and below the vertical web, the plurality of dowels being arranged on the underside of the lower flange in a direction along the width direction of the lower flange and in parallel at intervals in the longitudinal direction of the lower flange, arranging the steel members in series and connecting adjacent ends to assemble a single steel girder, loading a preflection on the steel girder to cause bending deformation, pouring concrete around the lower flange of the steel member in this state to form bottom flange concrete in areas other than the connecting parts, and forming a bottom flange concrete. In a method for manufacturing a prestressed steel girder by releasing the pre-flexion load after the cleat has hardened and returning the bending deformation of the steel girder to its original state, thereby introducing prestress into the lower flange concrete, removing the splice plate, dividing a single steel girder into multiple blocks, connecting the blocks after transportation, pouring concrete into the connecting parts of the lower flange, and integrating the lower flange concrete, the method is characterized in that the steel material used has a notch formed in the center of the width direction of the lower flange of the dowel on the farthest end side, which is closest to the end of the lower flange, among the dowels arranged on the underside of the lower flange.
[0019] In this manufacturing method for prestressed steel girders, it is preferable to use a steel material configured so that the outer end of the dowel on the end side is located outside both ends of the dowels in the second and subsequent rows. It is also preferable to use a steel material in which a plurality of headed studs are arranged at intervals in the width direction of the bottom flange in one region or each of a plurality of regions between the dowels arranged on the underside of the bottom flange. Furthermore, it is preferable to use a steel material in which a dowel with a trapezoidal cross section having an upward tapered surface is arranged on the underside of the bottom flange as at least one dowel among the dowel on the end side and the dowels in the second to fifth rows.
[0020] In addition, the steel material for prestressed steel girder according to the present invention is composed of a vertical web and horizontal upper and lower flanges formed above and below the vertical web, and is characterized in that a plurality of dowels are arranged on the underside of the lower flange in a direction along the width direction of the lower flange and in parallel with gaps in the longitudinal direction of the lower flange, and a notch is formed in the center of the width direction of the lower flange of the dowel on the end-most side, which is closest to the end of the lower flange.
[0021] It is preferable that the steel material for the prestressed steel girder is configured so that the outer end of the dowel on the end side is located outside both ends of the dowels in the second and subsequent rows. It is also preferable that a plurality of headed studs are arranged at intervals in the width direction of the bottom flange in one region or in each of a plurality of regions between the dowels arranged on the underside of the bottom flange. It is also preferable that at least one dowel among the dowel on the end side and the dowels in the second to fifth rows has an upwardly tapered surface and a trapezoidal cross section, and is arranged on the underside of the bottom flange. Effect of the Invention
[0022] The manufacturing method of prestressed steel girder of the present invention uses steel material in which a notch is formed in the center of the width direction of the lower flange of the end-most dowel among the dowels arranged on the underside of the lower flange of the steel material, thereby alleviating stress concentration in the center of the lower part of the lower flange concrete, and effectively suppressing strain deformation in this area, thereby effectively avoiding the occurrence of cracks in the lower flange concrete.
[0023] Also, when a steel material is used in which the outer end of the dowel on the end side is positioned outboard of both ends of the dowels in the second and subsequent rows, the difference in compressive strain within the width of the bottom flange concrete can be suitably reduced. Furthermore, when a steel material in which a tapered dowel with a trapezoidal cross section is arranged is used as the dowel on the end side (and the dowels in its vicinity), the anchor effect can effectively suppress uplift deformation on the surface of the lower part of the bottom flange concrete, and the occurrence of cracks in the bottom flange concrete can be effectively avoided. [Brief description of the drawings]
[0024] [Figure 1] FIG. 1 is a perspective view, seen from above, of a steel material 11 used in a manufacturing method for a prestressed steel girder according to a first embodiment of the present invention. [Diagram 2] FIG. 2 is a perspective view of the steel material 11 shown in FIG. 1 as viewed from below. [Diagram 3] FIG. 3 is a bottom view of the lower flange 14 in the vicinity of one end of the steel material 11 shown in FIGS. [Figure 4] FIG. 4 is a vertical cross-sectional view of the steel material 11 and the bottom flange concrete 16 shown in FIGS. [Diagram 5] FIG. 5 is a diagram showing another example of the configuration of the dowel 21A on the endmost side. [Figure 6] FIG. 6 is a diagram showing the results of FE analysis performed on a conventional prestressed steel girder and a prestressed steel girder according to the first embodiment of the present invention. [Figure 7] FIG. 7 is a vertical cross-sectional view of a dowel 21C disposed on the lower surface of the lower flange 14 of a steel material used in the second embodiment of the present invention. [Figure 8] FIG. 8 is a diagram showing the results of FE analysis performed on a prestressed steel girder in which a square steel dowel is arranged and a prestressed steel girder in which a tapered dowel 21C is arranged according to the second embodiment of the present invention. [Figure 9]FIG. 9 is a vertical cross-sectional view of a headed stud 21D arranged on the underside of a bottom flange 14 of a steel material used in a third embodiment of the present invention, and a bottom view of the bottom flange 14. [Figure 10] FIG. 10 is a diagram showing a general construction procedure for the manufacturing method of split-type prestressed steel girders. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0025] Hereinafter, an embodiment of the "manufacturing method for prestressed steel girder" of the present invention will be described with reference to the attached drawings. Fig. 1 is a perspective view from above of a steel material 11 used in a first embodiment of the present invention, and Fig. 2 is a perspective view from below. This steel material 11 is configured so that its vertical cross section presents an I-shape, with a vertical web 12 and horizontal upper and lower flanges 13 and 14 formed above and below the vertical web 12, respectively.
[0026] As shown in the figure, a number of bolt holes 15 are formed in the web 12, upper flange 13, and lower flange 14 at both ends of this steel material 11 so that splice plates can be attached to connect it to other steel materials. In addition, a number of dowels 21 (square steel dowels) are fixed to the upper and lower surfaces of the lower flange 14.
[0027] Fig. 3 is a bottom view of the bottom flange 14 near one end of the steel material 11 shown in Fig. 1 and Fig. 2. As shown in the figure, on the underside of the bottom flange 14 near the end, a plurality of dowels 21 are arranged in a direction along the width direction of the bottom flange 14 (direction perpendicular to the girder axis), and are arranged in parallel at intervals in the longitudinal direction of the bottom flange 14 (direction of the girder axis).
[0028] However, among these dowels 21, dowels 21A on the end side (the dowels in the first row closest to end 14a of bottom flange 14) and dowels 21B in the second and subsequent rows have different configurations. Explaining this point in detail, all of dowels 21B in the second and subsequent rows have lengths set to a dimension (490 mm in this embodiment) slightly shorter than the width dimension (550 mm in this embodiment) of bottom flange 14, and both longitudinal ends are positioned so as to be located inward from one side edge 14b and the opposite side edge 14c of bottom flange 14, respectively (located 30 mm inward in this embodiment).
[0029] In contrast, dowels 21A on the extreme end side are configured to be dispersed in the width direction of bottom flange 14. More specifically, two dowels 21A, each having a length dimension (190 mm in this embodiment) that is set shorter than half the width dimension of bottom flange 14, are arranged in series in the width direction, and a cutout 23 of a predetermined size (150 mm in this embodiment) is formed between the two dowels 21A in the center (the center in the width direction of the lower flange).
[0030] The size of the notch 23 (the distance between the two dowels 21A) is preferably within a range of 100 to 300 mm. The dowel 21A on the end side is not limited to being completely divided into two by the central notch 23 as shown in Fig. 3, and may be configured such that the notch 23 is formed by partially cutting one dowel 21A from the lower side to the upper side in the center, as shown in Fig. 5. In this case, however, the height dimension of the notch 23 is preferably at least half the height dimension of the dowel 21A.
[0031] In addition, the dowel 21A is configured so that its outer end is positioned outboard of both ends of the dowels 21B in the second row and thereafter (in this embodiment, it is configured so that it is positioned 10 mm inward from one side edge 14b of the lower flange 14 and the opposite side edge 14c).
[0032] The manufacturing method of the prestressed steel girder according to this embodiment is characterized in that a manufacturing method of a split-type prestressed steel girder is carried out by using a plurality of the above-described steel materials 11. Specifically, a plurality of steel materials 11 (e.g., three) shown in Fig. 1 to Fig. 3 are prepared, lined up in series, adjacent ends are butted together, and connected using splice plates 18 to assemble one steel girder 10 (see Fig. 10(1)).
[0033] Next, a pre-flexion is loaded onto the steel girder 10, and a pre-flexion bending moment that includes the design bending moment is applied, causing bending deformation (see FIG. 10(2)). In this state, concrete is poured around each bottom flange 14 of the steel material 11 (more specifically, so as to cover the top, bottom and side surfaces of the bottom flanges 14, as shown in FIG. 4) to form bottom flange concrete 16. Reinforcing bars 22 are placed inside the bottom flange concrete 16. No concrete is poured into the connecting portions 17 of the bottom flanges 14 (the portions where the splice plates that connect the bottom flanges 14 are placed, and the adjacent portions), leaving them blank (see FIG. 10(2)).
[0034] When the bottom flange concrete 16 hardens, the pre-flexion load is released to return the bending deformation of the steel girder 10 to its original state (see FIG. 10(3)). The release bending moment generated at that time converts the reduction in the tensile force of the bottom flange 14 into compressive force of the concrete via the dowels 21, and prestress is introduced into the bottom flange concrete 16.
[0035] Next, the splice plates are removed and the single steel girder 10 is divided into multiple blocks (divided blocks each consisting of a single steel material 11 and a bottom flange concrete 16) (see Figure 10 (4)). These divided blocks are then transported to the site and again connected using the splice plates 18. Finally, concrete is poured into the connecting parts 17 of the bottom flanges 14 to fill in the blanks and integrate the series of bottom flange concrete 16 (see Figure 10 (5)).
[0036] When a prestressed steel girder is manufactured by the method according to this embodiment, the following effects can be expected. First, as shown in Fig. 3, among the dowels 21 arranged on the underside of the bottom flange 14 of the steel material 11, the dowels 21A on the end side are configured to be distributed in the width direction of the bottom flange 14 (two dowels 21A are arranged in series in the width direction, and a cutout portion 23 of a predetermined size is formed between the two dowels 21A at the center in the width direction), so that an effect of suppressing strain deformation in the part of the bottom flange concrete 16 below the bottom flange 14 (lower portion 16b) (see Fig. 4) can be obtained.
[0037] More specifically, because the bottom flange 14 extends at the mid-height position of the concrete, the lower portion 16b of the bottom flange concrete 16 has a smaller concrete thickness dimension than the left and right outer portions (side portions 16c) of the bottom flange 14, and is shaped like a two-sided support plate supported by the left and right side portions 16c. For this reason, the center portion of the lower portion 16b is more likely to be deformed by strain than both ends (areas close to the boundary line with the side portions 16c (dotted line shown in Figure 4)).
[0038] In this embodiment, the dowel 21A at the end side, on which excessive bearing pressure acts when prestress is introduced, is configured to be distributed on the support point side of the lower part 16b (the side indicated by the dotted line in Figure 4), thereby alleviating stress concentration at the center of the lower part 16b of the lower flange concrete 16 and effectively suppressing strain deformation in this area.
[0039] Furthermore, if all the dowels 21 on the underside of the lower flange 14 were positioned in the center of the width of the lower flange 14, the strain near the center would be excessive compared to the periphery in the section until the compressive stress of the lower flange concrete 16 becomes uniform in the cross-sectional direction. However, in this embodiment, the outer end of the dowel 21A on the extreme end side is positioned so that it is positioned outer than both ends of the dowels 21B in the second row and thereafter, thereby reducing the difference in compressive strain within the width of the lower flange concrete 16.
[0040] The fact that such effects can be expected in the present invention has been confirmed by the results of an analysis (see FIG. 6) conducted on a conventional prestressed steel girder and the prestressed steel girder of the present embodiment.
[0041] More specifically, Figure 6(1) is a diagram showing the results of an FE analysis of the amount of uplift deformation of the lower part of the bottom flange concrete for a conventional prestressed steel girder (a divided block of a prestressed steel girder manufactured using steel material in which a dowel having the same shape as the dowel 21B on the second row and thereafter shown in Figure 3 is also arranged at the very end), and Figure 6(2) is a diagram showing the results of an FE analysis of a prestressed steel girder of this embodiment (a divided block of a prestressed steel girder manufactured using steel material 11 in which the dowel 21A at the very end side is distributed on the support point side of the concrete as shown in Figure 3).
[0042] In these figures, the intensity of the color indicates the magnitude of the deformation, with areas with greater deformation being displayed in darker colors. It can be seen that in the prestressed steel girder of this embodiment shown in Figure 6(2), the uplift deformation of the lower part of the bottom flange concrete is clearly suppressed compared to the conventional prestressed steel girder shown in Figure 6(1).
[0043] In the above first embodiment, steel material 11 is used in which a dowel 21 (square steel dowel) with a square cross section having equal height and width dimensions is arranged on the lower flange 14, but it is also possible to use steel material in which a dowel 21C (tapered dowel) with a trapezoidal cross section having an upward tapered surface as shown in Figure 7 is arranged on the underside of the lower flange 14 (second embodiment).
[0044] In conventional prestressed steel girders manufactured using the split method, in the lower part of the bottom flange concrete, where the compressive stress of the concrete is not uniform, there is a large difference in the amount of strain caused by compression between the part close to the concrete surface and the part near the dowel, and the effect of eccentric bearing pressure in the thickness direction of the concrete by the dowel is large. This eccentric bearing pressure causes localized uplift deformation on the concrete surface.
[0045] In this embodiment, in a section where the compressive stress is not uniform (for example, the section from dowel 21A on the end side to dowel 21B in the fifth row shown in FIG. 3 among the dowels 21 on the underside of the bottom flange 14), a steel material with tapered dowels 21C (dowels with a trapezoidal cross section) as shown in FIG. 7 is used instead of square steel dowels (dowels with a square cross section). In this case, the anchor effect of the tapered dowel 21C can effectively suppress uplift deformation on the surface of the lower part 16b of the bottom flange concrete 16.
[0046] Furthermore, this effect has been confirmed by the results of an analysis conducted on a prestressed steel girder with square steel dowels and a prestressed steel girder with tapered dowels 21C (see Figure 8).
[0047] More specifically, Fig. 8(1) is a diagram showing the results of an FE analysis of the stress distribution in the axis-perpendicular direction of the concrete surface due to the uplift deformation of the lower part of the bottom flange concrete for a prestressed steel girder with a square steel dowel, and Fig. 8(2) is a diagram showing the results of an FE analysis for a prestressed steel girder of this embodiment with a tapered dowel 21C. It can be seen that in the prestressed steel girder of this embodiment shown in Fig. 8(2), the tensile stress due to the uplift deformation of the lower part of the bottom flange concrete is clearly suppressed compared to the conventional prestressed steel girder shown in Fig. 8(1).
[0048] Furthermore, at least one of the dowels 21A at the end side and the dowels 21B in the second to fifth rows shown in Figure 3 may be a tapered dowel 21C as shown in Figure 7, and the others may be square steel dowels, and further, the square steel dowels and the tapered dowels 21C may be arranged alternately.
[0049] Also, instead of arranging the tapered dowel 21C shown in FIG. 7, the headed stud 21D as shown in FIG. 9(1) can be combined with the square steel dowel (dowels 21A, 21B) and arranged alternately, for example, as shown in FIG. 9(2) (third embodiment). In this case, it is preferable to arrange a plurality of headed studs 21D (for example, about 3 to 4) at intervals in the width direction of the bottom flange 14 in one or more regions among the regions between the square steel dowels (dowels 21A, 21B) (the region between the dowel 21A on the most end side and the dowel in the second row, and each region between the adjacent dowels 21B in the second to fifth rows). In this case, too, the effect of suppressing the uplift deformation on the surface of the lower part 16b of the bottom flange concrete 16 can be expected, similar to the case where the tapered dowel 21C is arranged. [Explanation of symbols]
[0050] 10: Steel girder, 11: Steel material, 12: Web, 13: Top flange, 14: Lower flange, 14a: end, 14b,14c: Side edge, 15: Bolt holes, 16: Bottom flange concrete, 16a: end, 16b: Lower part, 16c: Side, 17: Connection part, 18: Attachment plate, 21, 21A-21C: Zibel, 21D: Headed stud, 22: Reinforcement, 23: Notch,
Claims
1. A plurality of steel members are prepared, each of which is composed of a vertical web and horizontal upper and lower flanges formed above and below the vertical web, and each of which has a plurality of dowels arranged on the lower surface of the lower flange in a direction along the width direction of the lower flange and in parallel at intervals in the longitudinal direction of the lower flange; These steel members are then lined up in a series and adjacent ends are joined to assemble a single steel girder. A pre-reflection is applied to the steel girder to cause bending deformation. In this state, concrete is poured around the bottom flange of the steel material to form bottom flange concrete in areas other than the joints. After the bottom flange concrete hardens, the pre-flection load is released to restore the bending deformation of the steel girder, thereby introducing prestress into the bottom flange concrete. The splice plates are removed and a single steel girder is divided into multiple blocks. In a method for manufacturing a prestressed steel girder by connecting blocks after transportation, pouring concrete into the connecting portion of the bottom flange, and integrating the bottom flange concrete, A manufacturing method for prestressed steel girder, characterized in that the steel material used is a steel material in which a notch is formed in the center of the width direction of the lower flange of the dowel on the outermost side, which is located closest to the end of the lower flange, among the dowels arranged on the underside of the lower flange.
2. 2. A method for manufacturing a prestressed steel girder as described in claim 1, characterized in that a steel material is used that is configured so that the outer end of the dowel on the end side is located outer than both ends of the dowels in the second row and thereafter.
3. 3. A manufacturing method for prestressed steel girder according to claim 1 or claim 2, characterized in that a steel material is used in which a plurality of headed studs are arranged at intervals in the width direction of the lower flange in one area or in each of a plurality of areas between a plurality of dowels arranged on the underside of the lower flange.
4. 3. The method for manufacturing a prestressed steel girder according to claim 1 or 2, characterized in that a steel material having a trapezoidal cross section with an upward tapered surface and disposed on the underside of the bottom flange is used as at least one of the dowels on the end-most side and the dowels in the second to fifth rows.
5. The vertical web is formed with horizontal upper and lower flanges formed above and below the vertical web, A plurality of dowels are arranged on the lower surface of the lower flange in a direction along the width direction of the lower flange and in parallel at intervals in the longitudinal direction of the lower flange; A steel material for prestressing steel girders, characterized in that a notch is formed in the center of the width direction of the lower flange of the dowel on the end side, which is located closest to the end of the lower flange.
6. The steel material for prestressing steel girders according to claim 5, characterized in that the outer end of the dowel on the end side is configured to be located outer than both ends of the dowels in the second row and thereafter.
7. 7. A steel material for prestressed steel girders as described in claim 5 or claim 6, characterized in that a plurality of headed studs are arranged at intervals in the width direction of the lower flange in one region or in each of a plurality of regions between the plurality of dowels arranged on the underside of the lower flange.
8. 7. The steel material for a prestressed steel girder according to claim 5 or claim 6, characterized in that at least one of the dowels on the end-most side and the dowels in the second to fifth rows is a dowel having an upwardly tapered surface and a trapezoidal cross section, which is disposed on the underside of the bottom flange.
Citation Information
Patent Citations
Production method of prestressing steel girder
JP2005248617A