Method and system for operating an energy management system - Patents.com

The EMS system addresses the challenge of suboptimal microgrid operation by performing MOO to automatically determine asset operating points, enhancing reliability and flexibility through objective-based optimization.

JP2024538394AActive Publication Date: 2024-10-18HITACHI ENERGY LTD
View PDF 14 Cites 0 Cited by

Patent Information

Application Number
JP2024529404
Authority / Receiving Office
JP · JP
Patent Type
Applications
Current Assignee / Owner
Filing Date
2021-11-17
Publication Date
2024-10-18
Estimated Expiration
2041-11-17

AI Technical Summary

Technical Problem

Existing energy management systems for microgrids face limitations in reliably determining asset operating points due to reliance on local data and human expert input, which can lead to suboptimal operation and a need for tailored adjustments based on specific use cases.

Method used

An energy management system (EMS) that performs multi-objective optimization (MOO) to automatically determine asset operating points using integrated circuits, considering multiple performance indicators and adjusting weights based on objective criteria without human intervention, incorporating historical, current, and predicted data to optimize resource allocation.

Benefits of technology

Enhances the reliability and flexibility of microgrid operations by optimizing asset utilization and reducing reliance on human expertise, ensuring efficient energy management across various scenarios.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 2024538394000001_ABST
    Figure 2024538394000001_ABST
Patent Text Reader

Abstract

A method and system for operating an energy management system (EMS) for a microgrid operates to automatically determine weights with which different objective functions are weighted in a multi-objective optimization performed by the EMS.
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] FIELD OF THEINVENTION Embodiments of the present invention relate to methods, devices and systems for operating an energy management system for a microgrid, and in particular to methods, devices and systems that allow for coordinating the operation of the energy management system. [Background technology]

[0002] 2. Background of the Invention A microgrid is a localized grouping of energy generating assets (such as renewable energy resources and / or generators), loads, and optional energy storage systems. Control strategies for microgrids are becoming increasingly important, partly due to the increasing use of renewable energy sources (RES), energy storage systems (ESS) such as battery energy storage systems (BESS), or other systems with distributed energy generators (DEG). Control techniques for microgrids are described, for example, in IEEE 2030.7-2017.

[0003] The microgrid control system may be a Power Management System (PMS) that can coordinate multiple individually controllable generating assets and discretionary load (DL) assets in a predetermined manner. The Operating Point (OP) of each asset can be calculated in real-time based on locally known values ​​such as the total load, the microgrid configuration, state of charge (SoC), current photovoltaic (PV) and wind availability, other penalty factors, etc. In such cases, the optimization achieved may be limited since the PMS only knows local values ​​and has only past and current time data.

[0004] To further improve the determination of the operating point, the Energy Management System (EMS) can use forecasts to calculate a better optimal OP for each asset. The forecasts may be or include forecast values ​​such as load profiles, photovoltaic and wind availability, weather and cloud forecasts, other penalty factors, etc. Using past, current, and forecast data, the EMS is adapted to calculate the optimal OP for each asset. This may be done over a forecast period.

[0005] The EMS may perform multi-objective optimization (MOO) to determine asset operating points over a forecast period. The weights weighted to various objective functions in the MOO may be set based on expert knowledge. This human involvement may be prone to error. By way of example, the weights in the MOO may be selected by human experts, which may not be appropriate for at least some scenarios. Summary of the Invention [Problem to be solved by the invention]

[0006] overview In view of the above, there remains a need for improved methods, apparatus, systems, and microgrids that allow for reliable determination of asset operating points. There is also a need for methods, apparatus, systems, and microgrids that allow for adjusting the operation of an energy management system (EMS). There is also a need for methods, apparatus, systems, and microgrids that allow for adjusting the operation of an EMS depending on the use case for which the EMS is intended to be used. There is also a need for methods, apparatus, systems, and microgrids that allow for adjusting the operation of an EMS based on objective criteria and without the need for human expert input. [Means for solving the problem]

[0007] According to the invention there is provided a method and a system as set out in the independent claims. The dependent claims define preferred embodiments.

[0008] An embodiment of the present invention provides a method and system for automatically adjusting an energy management system (EMS) for an electric microgrid. The EMS can employ an energy management approach based on numerical optimization that can plan the resource allocation of the microgrid to minimize a composite objective function. The available resources can include the possibility to buy and sell energy from the main grid to which the microgrid is connected, e.g., local dispatchable generators using fossil fuels, renewable energy systems such as wind and solar PV, controllable loads, and energy storage systems such as batteries. The selected objective function considers several performance indicators such as the penalty imposed by the energy exchanged with the main grid, the penalty imposed by shifting the load relative to the nominal consumption profile, and the accumulated wear of the storage system.

[0009] According to an embodiment, the weights by which different objective functions are multiplied in the composite objective function are automatically determined and used by the EMS.

[0010] According to one aspect of the present invention, a method of operating an EMS for a microgrid is provided. The EMS performs multi-objective optimization (MOO) to determine one or more asset operating points over a forecast period. Performing the MOO determines one or more asset operating points as a function of time over the forecast period that minimizes a composite objective function, which is a weighted sum of several objective functions.

[0011] The method can include using the MOO in EMS field service.

[0012] The method may include using the MOO to take corrective or preventive action in the power system.

[0013] The method may include using the MOO to perform at least one protective function.

[0014] The method may include using the MOO to control the output interface.

[0015] The method may include using the MOO to control an output interface to output an alarm, warning, status information, or other power system related information.

[0016] The method includes automatically determining, by at least one integrated circuit, weights with which certain objective functions are weighted in a composite objective function used by the EMS in the MOO.

[0017] Automatically determining weights with which objective functions are weighted in a composite objective function used by an EMS in a MOO includes using at least one integrated circuit to: determine a set of utopia values, each of the utopia values ​​corresponding to an optimal value of one of several objective functions when optimized independently of the other objective functions; determine a Pareto front of optimal solutions, each of the optimal solutions optimizing a different weighted sum of several objective functions; and determine weights with which the objective functions are weighted based on the Pareto front and the set of utopia values.

[0018] The term "utopian value" refers to the value of one of several optimized objective functions when the optimization is performed independently of the other objective functions included in the composite objective function. Thus, the "utopian value" is the optimal value of only one of the objective functions when optimized ignoring the other objective functions included in the composite objective function. When MOO is performed, the contribution of an objective function to the optimal value of the composite objective function is greater than the utopian value of this objective function, since MOO considers several competing objectives.

[0019] Determining the weights based on the Pareto front and the set of utopia values ​​may include determining a utopia point having coordinates defined by the set of utopia values.

[0020] Determining the weights based on the Pareto front and the set of utopia values ​​may include determining a distance of the utopia point from a point on the Pareto front.

[0021] Determining the weights based on the Pareto front and the set of utopia values ​​may include determining a point on the Pareto front that has a minimum distance from the utopia point.

[0022] The weights with which the objective functions are weighted in the composite objective function may be determined based on weights applied to some of the objective functions when determining the point on the Pareto front that has the minimum distance from the utopia point.

[0023] Determining the utopia value may include determining a first utopia value representing a minimum of a first objective function related to energy generation in a grid to which the microgrid is connected, and determining a second utopia value related to local energy generation in the microgrid.

[0024] A second utopian value related to local energy generation may include emissions effects.

[0025] Determining the weights may include determining a first weight by which a first objective function related to energy generation in a grid to which the microgrid is connected is multiplied in the composite objective function, and a second weight by which a second objective function related to local energy generation in the microgrid is multiplied in the composite objective function.

[0026] Determining the weights may include determining third weights by which a third objective function associated with an energy storage system of the microgrid, in particular a battery energy storage system BESS, is multiplied.

[0027] The second objective function may include emissions effects.

[0028] Determining the utopian value and determining the Pareto front may each involve optimizing under constraints.

[0029] The constraints may include one or more of: power balance of the microgrid, consistency of the load profile, and / or power generation according to a given scenario.

[0030] The constraints may include technical constraints of the microgrid assets.

[0031] The constraints may include the preferences of the microgrid operator.

[0032] Determining the utopia value, determining the Pareto front, and determining the weights may be performed respectively for each of a number of different scenarios.

[0033] The different scenarios may be distinguished from each other with respect to the load and / or generation profile of the microgrid.

[0034] The method may include clustering data obtained for a plurality of microgrids to identify a plurality of use cases.

[0035] The weights used by the EMS may be selected based on the microgrid specifications compared to the use case.

[0036] Automatically determining the weights may be performed for at least one of the use cases, which may be selected based on the microgrid specifications.

[0037] The method may further include running, by the EMS, a MOO to determine one or more asset operating points as a function of time over the forecast period, where the objective function in the MOO depends on the determined weights.

[0038] The forecast period may include at least 6 hours, at least 12 hours, at least 18 hours, at least 24 hours, or at least 48 hours.

[0039] The method may further include controlling at least one asset of the microgrid as a function of the determined asset operating point.

[0040] The method may further include providing, by the EMS, the operating point to a power management system (PMS).

[0041] The method may include controlling, by the PMS, controllable assets of the microgrid according to an operating point determined by the EMS.

[0042] According to another aspect, a system for controlling operation of an EMS is provided. The EMS is operative to perform a MOO to determine one or more asset operating points over a forecast period, and the MOO determines one or more asset operating points as a function of time over the forecast period that minimizes a composite objective function that is a weighted sum of several objective functions. The system comprises at least one integrated circuit operative to automatically determine weights by which the objective functions are weighted in the composite objective function used by the EMS in the MOO, and an interface for providing the determined weights to the EMS.

[0043] The system is operable to perform a method according to one embodiment.

[0044] The system may operate to use the MOO to perform corrective or preventive actions in the power system.

[0045] The system is operable to perform at least one protective action using the MOO.

[0046] The system is operable to use the MOO to control the output interface.

[0047] The system may operate using the MOO to control the output interface to output alarms, warnings, status information, or other power system related information.

[0048] A microgrid according to one embodiment comprises a plurality of controllable assets, an EMS operative to perform MOO to determine one or more asset operating points over a forecast period, the MOO determining the one or more asset operating points as a function of time over the forecast period that minimizes a composite objective function, which is a weighted sum of several objective functions, and a system for controlling the operation of the EMS.

[0049] A microgrid may optionally include one or several loads.

[0050] The plurality of controllable assets may include controllable power generation assets and / or controllable loads, such as any controllable load.

[0051] A number of the controllable assets may comprise renewable energy sources.

[0052] The plurality of controllable assets may include any load.

[0053] The plurality of controllable assets may optionally comprise one or several generators and / or one or several energy storage systems (ESS).

[0054] The ESS may comprise a battery ESS (BESS).

[0055] A plurality of controllable assets can form a distributed energy generation system (DEG).

[0056] A microgrid may include additional assets that are not controlled by the EMS.

[0057] The additional assets may be sensed and may have operating parameters that affect at least one of the objective functions in the MOO.

[0058] The microgrid may include a PMS.

[0059] The EMS and / or a separate device communicatively coupled to the EMS may be operable to perform methods according to various embodiments disclosed herein.

[0060] The microgrid may operate using MOO to perform corrective or preventive actions in the power system.

[0061] The microgrid may be operated to perform at least one protective action using the MOO.

[0062] The microgrid may be operated to control the output interface using the MOO.

[0063] The microgrid may be operable to use the MOO to control the output interface to output alarms, warnings, status information, or other power system related information.

[0064] Using the methods and control systems according to the embodiments, various advantages are achieved: The methods and control systems according to the embodiments address the need for improved reliability and repeatability in determining the operational parameters of a microgrid; The methods and control systems according to the embodiments allow for tailoring the operation of the EMS depending on the use case (e.g., the details of the microgrid) in which the EMS is used.

[0065] BRIEF DESCRIPTION OF THE DRAWINGS The subject matter of the present invention will now be explained in more detail with reference to preferred exemplary embodiments illustrated in the accompanying drawings. [Brief description of the drawings]

[0066] [Figure 1] FIG. 1 is a schematic diagram of a microgrid. [Diagram 2] FIG. 1 is a schematic diagram of a microgrid. [Diagram 3] FIG. 1 is a schematic diagram of a microgrid. [Figure 4] Illustrates the operation of a microgrid system. [Diagram 5] 1 is a flow chart of a method. [Figure 6] The Pareto front and utopia points are shown. [Figure 7] 1 is a flow chart of a method. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0067] Detailed Description of the Preferred Embodiments Exemplary embodiments of the present invention are described with reference to the drawings, in which identical or similar reference numbers indicate identical or similar elements. Some embodiments are described in the context of an exemplary charging infrastructure concept and / or an exemplary on-board battery concept, although the embodiments are not limited thereto. Features of the embodiments may be combined with each other unless otherwise specified.

[0068] Embodiments of the present invention can be used to provide improved robustness and adaptability in the control of a microgrid. The operation of the Energy Management System (EMS) can be adjusted by adjusting weights used in a multi-objective optimization (MOO). The adjustment may be performed automatically using at least one integrated circuit. The weights may be determined depending on the use case in which the EMS is deployed. The weights may be determined by:

[0069] 1 illustrates an example microgrid 10 that includes multiple controllable power generation assets 11, 12, 13, 14. The microgrid 10 may further include one or more loads 18 that may include one or more controllable loads 15, 16, 17. The one or more controllable loads 15, 16, 17 may include one or more optional loads. Power generation in the microgrid 10 is controlled by a control system that includes a power management system (PMS) 40 and / or an energy management system (EMS) 50.

[0070] The microgrid 10 may be connected to a macrogrid (also called a main grid). The microgrid 10 may include circuit breakers or other disconnectors for controllably connecting and disconnecting the microgrid from the macrogrid.

[0071] The plurality of controllable power generation assets 11, 12, 13, 14 may include renewable energy sources such as wind turbines shown in Figure 1 or photovoltaic modules 21, 22, 23 shown in Figure 2. The plurality of controllable power generation assets may include gas turbines or other generators operating based on fossil fuels or energy storage systems (ESS).

[0072] The plurality of controllable loads 15, 16, 17 may include any load.

[0073] The multiple controllable power generation assets 31, 32, 33 are generally shown as blocks in FIG. 3, and it is understood that the controllable power generation assets may include wind turbines, photovoltaic modules, other renewable energy sources (RES), fossil fuel consuming generators, or ESS.

[0074] The PMS 40 may control and regulate individual assets, particularly controllable generation assets and / or controllable loads. The PMS 40 may operate to use locally known parameters such as total load, microgrid configuration, state of charge (SoC), current PV and wind availability, or other penalty factors for control purposes. The PMS 40 may also include an optimization engine that optimizes operations based on data available to the PMS 40. This optimization may be limited because the PMS 40 typically only has access to locally available values ​​and past and current time data.

[0075] The EMS 50 may include an optimization system that uses historical and current local data, as well as forecasts, to calculate a better optimal operating point for each asset. Forecasts may be for load profiles, PV and wind availability, weather and cloud forecasts, other penalty factors, etc.

[0076] The EMS 50 may use the measured parameters in performing the MOO to determine the operating point. The measured parameters may include one or more measurements of parameters related to electrical properties of at least one asset of the microgrid and / or parameters related to fluid properties (e.g., transformer insulating fluid, ambient air temperature, ambient air humidity, ambient wind speed, etc.) and / or other parameters (such as average solar radiation, etc.).

[0077] The PMS 40 may use the measured parameters when performing corrective and / or preventive control actions within the microgrid. The measured parameters may include one or more measurements of parameters related to electrical properties of at least one asset of the microgrid and / or parameters related to fluid properties (e.g., transformer insulating fluid, ambient air temperature, ambient air humidity, ambient wind speed, etc.) and / or other parameters (such as average solar radiation, etc.).

[0078] The PMS 40 and / or EMS 50 may be communicatively coupled to a number of sensors 26, 27, collectively referred to as sensors 25, that measure parameters and provide measurements to the PMS 40 and / or EMS 50. The number of sensors 25 may be operable to measure parameters related to assets of the microgrid, components connected to the assets, and / or ambient parameters. The number of sensors 25 may be operable to measure one or more of parameters related to electrical properties of at least one asset of the microgrid, and / or parameters related to fluid properties (e.g., transformer insulating fluid, ambient air temperature, ambient air humidity, ambient wind speed, etc.), and / or other parameters (such as average solar radiation, etc.).

[0079] The EMS 50 may be connected to forecast servers 61a, 61b, 61c via a wide area network 60. The forecast servers may comprise weather forecast servers, energy availability forecast servers, load profile forecast servers, or other forecast servers.

[0080] The EMS 50 may perform an optimization procedure to determine optimal operating points for a number of controllable assets, particularly the controllable generating assets and / or the controllable loads of the microgrid 10. The EMS 50 may perform MOO, which may include determining operating points as a function of time over a forecast period (e.g., 24 hours), which is represented by a composite objective function

[0081]

number

[0082] Objective function J jmay depend not only on the operating point, but also on measured and / or other parameters, which may be obtained, for example, via a user interface. The optimization is then performed using the operating point as the variable over which the optimization is performed, assuming that the optimization is performed over the measured parameters. For illustration purposes, let us assume that slowly changing measurements, such as operating characteristics (e.g., wear) of a power transformer and / or a common coupling point, are used to determine the objective function J. j may be taken into consideration in one or more of the following:

[0083] Using past, present and future (projected) data, the EMS calculates the best or optimal operating point for each asset, which may be in the form of power set points (e.g., for generators, ESS, etc.) or power limits (for PV, wind turbines, etc.) or load power set points (e.g., for any load). This set of operating points is "optimal" in that it results in an improved metric. Examples of improved metrics include, but are not limited to, reduced fossil fuel usage, reduced CO2 emissions, reduced maintenance time, and reduced downtime. The composite objective function in equation (1) is a weighted sum of metric values ​​indicative of such objectives.

[0084] A system 60, which may be separate or integral to the system in which EMS 50 is implemented, determines weights w that are multiplied with the objective functions to determine a composite objective function J. i The computing system 60 may comprise, or be communicatively coupled to, a database 63 that includes historical data representing EMS use cases and operational scenarios. The computing system 60 may be operable to set weights w by which the objective function is multiplied for at least one use case similar to the use case in which the EMS 50 is deployed. i to determine a composite objective function J.

[0085] This means that (i) (all weights w i (subject to the constraint that the sum of w is equal to 1) i(ii) the Pareto front of the optimal solutions obtained for equation (1) for the optimization problem of various parameterizations of the objective function J j This may be done automatically based on a utopia point calculated by individually optimizing two, more than two, or all of the above.

[0086] The term "utopia point" refers to a point in the operating point space where one of the objective functions is optimal (e.g., minimum) when optimized separately from the other objective functions included in the composite objective function.

[0087] Determining a "utopia point" for the objective function can include determining an operating point as a function of time over a forecast period (e.g., 24 hours), which determines the operating point for the objective function.

[0088]

number

[0089] The value of an objective function is also referred to as a utopian value when it is optimized (e.g., minimized) independently of other objective functions. The term utopian value refers to the value of one of several optimized objective functions when the optimization is performed independently of the other objective functions included in the composite objective function. Thus, the utopian value is the optimal value of only one of the objective functions when optimized ignoring the other objective functions included in the composite objective function. When MOO is performed, the contribution of an objective function to the optimal value of the composite objective function is greater than the utopian value of this objective function, since MOO considers several competing objectives.

[0090] Determining the set of utopia values ​​and / or utopia points may include determining a first utopia value and / or a first utopia point at which an objective function related to energy transfer to and / or from the main grid (such as a penalty imposed when energy is supplied from the main grid to the microgrid) is minimal. Determining the set of utopia values ​​and / or utopia points may include determining a second utopia value and / or a second utopia point at which an objective function related to power generation in the microgrid (such as a penalty imposed if fossil fuels have to be used in the microgrid for power generation, which may include a penalty for carbon dioxide emissions) is minimal. Determining the set of utopia values ​​and / or utopia points may include determining a third utopia value and / or a third utopia point at which an objective function related to wear of the ESS (such as a penalty imposed on the charging and discharging process of the BESS, causing wear) is minimal.

[0091] The system 60 includes one or several integrated circuits 61. The integrated circuits 61 may be implemented as a processor, a microprocessor, a controller, a microcontroller, an application specific integrated circuit (ASIC), a field-programmable gate array (FPGA), or a combination thereof.

[0092] One or more integrated circuits 61 may be configured to execute optimizer 62 using appropriate hardware, firmware, and / or software. (i) Objective function J j several times to determine the utopia point calculated by individually optimizing two, three or more of the following: (ii) (all weights w i (subject to the constraint that the sum of w is equal to 1) iThe optimizer 62 may be configured to be run several times to determine the Pareto front of optimal solutions obtained to equation (1) for various parameterizations of the optimization problem of .times. ...

[0093] Optimization can identify operating points at which the individual objective functions (for determining the utopia point) or the composite objective function (for generating the Pareto front) are optimal (typically minimal), respectively. Optimization can then be performed by finding these minima of the objective functions (for determining the utopia point) or the composite objective function (for generating the Pareto front), as well as the weights w for the various points on the Pareto front. i We can identify parameterizations of

[0094] The optimization may be performed under constraints. The constraints may include one or more of the power balance of the microgrid, the consistency of the load profile, and / or the generation according to a given scenario. The constraints may include technical constraints of the microgrid assets. The constraints may include microgrid operator preferences, which may be input via a user interface.

[0095] As explained in more detail below, IC61 is a function of the objective function J i The weights w are weighted in the composite objective function used by EMS50 in MOO. i determining a set of utopia values, each of which corresponds to an optimal value of one of the objective functions when optimized independently of the other objective functions; determining a Pareto front of optimal solutions, each of which optimizes a different weighted sum of the objective functions; and optimizing the objective function J based on the Pareto fronts and the set of utopia values. i The weight w is used to weight i and

[0096] Distance-based techniques can be used to identify the point on the Pareto front that is closest to the utopia value.

[0097] Weight w i may be provided to the EMS 50 for use in performing MOO. The EMS 50 may perform MOO to minimize a composite objective function according to equation (1), and the weights w i is determined by the system 60. The optimization performed by the EMS 50 may depend on measurements captured by multiple sensors 25.

[0098] FIG. 4 is a schematic block diagram illustrating the operation of the microgrid control system.

[0099] The system 60 uses the weights w i This is done automatically based on the use case for which the EMS50 is deployed.

[0100] System 60 is weighted w i to the EMS 50. The weights may be transferred via a wired or wireless interface. i can be adjusted during the commissioning of the microgrid. i can be regulated during field operation of the EMS 50 of the microgrid.

[0101] EMS50 is weighted w i Receive the provided weight w i MOO is performed on a composite objective function where several objective functions are weighted by. The results of the MOO include asset operating points. The EMS 50 provides the asset operating points to the PMS 40. This may be done in a look-ahead manner and over a forecast period including, for example, 6 hours or more, 12 hours or more, 24 hours or more, 48 hours or more.

[0102] The forecast period has a particular granularity, and the forecast period includes an integer number of smaller time intervals, which may be the repeat interval of data sampling (e.g., from a measurement device) and / or the repeat interval of calculations by the EMS 50 or PMS 40.

[0103] The PMS 40 controls the assets of the microgrid according to the received operating points.

[0104] System 60, EMS 50 and / or PMS 40 may be implemented on the same hardware system.

[0105] 5 is a flow chart of the method 70. The method 70 may be performed automatically by the system 60.

[0106] In step 71, the load and generation profile may be retrieved from a database. The database may include historical and / or synthetic profiles. The retrieved load and generation profile may depend on the microgrid specifications, i.e., the use case for which the EMS 50 is deployed.

[0107] In step 72, the objective function J when individually optimized is i Several optimizations under constraints are performed to determine the utopia value that corresponds to the minimum value of the objective function J i may, but need not be, determined for each of the objective functions. By way of illustration, it may be known that the optimal value of an objective function related to local power generation in the microgrid may be zero (corresponding to the case where no fossil fuels are consumed locally in the microgrid), etc. In such a case, the optimization routine for determining the utopia value may be limited to objective functions (such as the penalty for transferring energy from the main grid to the microgrid) that are known to have a non-zero minimum value.

[0108] In step 73, the Pareto front of optimal solutions is calculated, which is iThe calculation of the Pareto front may include, for example, determining values ​​of the composite objective function according to equation (1) for different parameterizations of w i The Pareto front calculation may be performed for at least two independently variable weights w1 and w2, which may be multiplicative weighting coefficients applied to an objective function related to the energy transfer between the main grid and local generation in the microgrid, respectively. Then, a third weight w3, related to ESS wear, may be w3=1-w1-w2 due to the fact that the sum of the weights is constrained to be equal to 1.

[0109] In step 74, weights are selected for use in the MOO performed by EMS 50 based on both the Pareto front and the utopia values. Determining the weights based on the set of Pareto front and utopia values ​​may include determining a distance of the utopia point from a point on the Pareto front. Determining the weights based on the set of Pareto front and utopia values ​​may include determining a point on the Pareto front that has a minimum distance from the utopia point. The weights with which the objective functions are weighted in the composite objective function may be determined based on weights applied to several objective functions when determining a point on the Pareto front that has a minimum distance from the utopia point.

[0110] FIG. 6 shows the Pareto front 80 and the utopia points 81. The utopia points 81 are the various individual objective functions J that are determined by the utopia values. iBy way of illustration, one of the coordinates of the utopia point 81 may be a first utopia value that represents a minimum value of a first objective function related to energy generation in the grid to which the microgrid is connected when the first objective function is minimized independently of the other objective functions (but subject to constraints such as power balance and other technical constraints). Another one of the coordinates of the utopia point 81 may be a second utopia value that represents a minimum value of a second objective function related to local energy generation in the microgrid when the second objective function is minimized independently of the other objective functions (but subject to constraints such as power balance and other technical constraints). Yet another one of the coordinates of the utopia point 81 may be a third utopia value that represents a minimum value of a third objective function related to ESS wear when the third objective function is minimized independently of the other objective functions (but subject to constraints such as power balance and other technical constraints). A second utopian value associated with local energy generation may include emissions effects, for example the penalty imposed on fossil fuel consumption, which is becoming increasingly undesirable.

[0111] A point 82 on the Pareto front 80 is determined based on both the Pareto front 80 and the Utopia point 81. For purposes of illustration, the point 82 may be determined to be the point on the Pareto front 80 that has a minimum distance (computed according to an appropriate distance metric, such as L1, L2, etc.) from the Utopia point.

[0112] The weight w is used to determine the point 82 on the Pareto front that is closest to the utopia point. i may be identified as the weight used by EMS 50 in the MOO.

[0113] The weights w used by EMS50 in MOO i Other techniques may be used to determine . For illustrative purposes, a balanced or regularized selection may be made.

[0114] The use cases and / or scenarios used by system 60 to determine the weights used by EMS 50 in MOO may be generated from historical and / or synthetic data in a systematic manner. Figure 7 is an exemplary flow chart of a technique in which clustering and classification are applied.

[0115] 7 is a flow chart of the method 90. The method 90 may be performed automatically by the system 60.

[0116] In step 91, data is retrieved from database 62. The data may include historical use cases and / or operating scenarios. The data may include synthetic use cases and / or operating scenarios. To illustrate, machine learning (ML) techniques may be used to generate a synthetic load and / or generation profile for a microgrid. The ML model used to generate the synthetic load and / or generation profile may have an input layer that receives historical operating scenarios. The ML model may have one or several hidden layers. The ML model may have an output layer that outputs the synthetic load and / or generation profile.

[0117] Clustering and classification may be performed to identify similar use cases and / or load and generation profiles in step 92. Clustering may include k-means clustering or other clustering techniques.

[0118] In step 93, a use case is selected. If it is already known for which EMS 50 weights should be determined, the use case may be selected based on an intended deployment scenario of the EMS 50. By way of example, a use case may be selected that has the same or similar type of renewable energy resource as the microgrid in which the EMS 50 is deployed, or has similar average power generation and / or load values.

[0119] In steps 71-74, weights are determined. This can be done as described with reference to Figure 5. The particular use case selected determines the load and / or generation profile and constraints that are imposed when determining the utopia value and the Pareto front.

[0120] Validation may be performed in step 94. Validation may include, for example, a simulation in which the MOO when run using the determined weights is checked against historical data known to represent a valid control strategy.

[0121] Steps 93, 71-74, and 94 may be repeated. For example, if several similar use cases are available, weights may be determined for several use cases. The set of weights that evaluates to be better than others in the validation at step 94 may be deployed to the EMS 50. Alternatively or additionally, sets of weights may be proactively generated for various use cases, either during commissioning or in field use, and stored for deployment to the EMS 50.

[0122] Various advantages are associated with the method and system according to the embodiments. For example, the method and system allow for adjusting parameters of the MOO performed by the EMS, which may be done automatically and based on objective criteria. Commissioning and / or reconfiguration of the EMS is facilitated.

[0123] Although the present invention has been described in detail in the drawings and the foregoing description, such description should be considered as descriptive or exemplary, and not restrictive. Variations to the disclosed embodiments can be understood and effected by those skilled in the art from a study of the drawings, the disclosure, and the appended claims, and by practicing the claimed invention. In the claims, the word "comprising" does not exclude other elements or steps, and the indefinite articles "a" or "an" do not exclude a plurality. The mere fact that certain elements or steps are recited in separate claims does not indicate that combinations of these elements or steps cannot be advantageously used, and in particular, any further meaningful combination of claims should be considered as disclosed, in addition to the actual claim dependencies.

Claims

1. 1. A method of operating an energy management system (EMS) for a microgrid, comprising: the EMS performs a multi-objective optimization (MOO) to determine one or more asset operating points over a forecast period, performing the MOO to determine the one or more asset operating points as a function of time over the forecast period that minimizes a composite objective function, the composite objective function being a weighted sum of several objective functions; The method includes automatically determining, by at least one integrated circuit, weights by which the several objective functions are weighted in the composite objective function used by the EMS in the MOO.

2. The automatically determining the weights by which the objective functions are weighted in the composite objective function used by the EMS in the MOO includes using the at least one integrated circuit to: determining a set of utopia values, each of the utopia values ​​corresponding to an optimal value of one of the several objective functions when optimized independently of other objective functions; determining a Pareto front of optimal solutions, each of the optimal solutions optimizing a different weighted sum of the number of objective functions; determining weights by which the objective function is weighted based on the Pareto front and the set of utopian values; The method of claim 1 , comprising:

3. The method of claim 2 , wherein determining the weights based on the Pareto front and the set of utopia values ​​comprises determining a utopia point having coordinates defined by the set of utopia values.

4. The method of claim 3 , wherein determining the weights based on the Pareto front and the set of utopia values ​​comprises determining a distance of the utopia points from a point on the Pareto front.

5. The method of claim 3 or 4, wherein determining the weights based on the Pareto front and the set of utopia values ​​comprises determining a point on the Pareto front that has a minimum distance from the utopia point.

6. 6. The method of claim 5, wherein the weights by which the objective functions are weighted in the composite objective function are determined based on weights applied to the several objective functions when determining the point on the Pareto front that has the minimum distance from the Utopia point.

7. The method of any one of claims 2 to 6, wherein determining the utopia value comprises determining a first utopia value representing a minimum of a first objective function related to energy generation in a grid to which the microgrid is connected, and determining a second utopia value related to local energy generation in the microgrid, optionally the second utopia value related to local energy generation including an emission effect.

8. 8. The method according to claim 2, wherein determining the weights comprises determining a first weight by which a first objective function related to energy generation in a grid to which the microgrid is connected is multiplied in the composite objective function, a second weight by which a second objective function related to local energy generation in the microgrid is multiplied in the composite objective function, and optionally a third weight by which a third objective function related to an energy storage system of the microgrid, in particular a battery energy storage system (BESS), optionally the second objective function including an emission effect.

9. The method according to any one of claims 2 to 8, wherein determining the utopian value and determining the Pareto front each comprise performing optimization under constraints, optionally the constraints comprise one or more of: power balance, load profile consistency, and / or power generation of the microgrid according to a given scenario.

10. The method according to any one of claims 2 to 9, wherein determining the utopia value, determining the Pareto front and determining the weights are respectively performed for each of a plurality of different scenarios, optionally the different scenarios being distinguished from one another with respect to a load and / or generation profile of the microgrid.

11. and further comprising clustering the acquired data for the plurality of microgrids to identify a plurality of use cases. and automatically determining the weights is performed for at least one of the use cases.

10. A method according to any one of the preceding claims.

12. executing, by the EMS, the MOO to determine the one or more asset operating points as a function of time over the forecast period, the objective function in the MOO being dependent on the determined weights, and optionally, the forecast period comprising at least 24 hours; 10. A method according to any one of the preceding claims.

13. providing, by the EMS, the one or more asset operating points to a power management system (PMS); and optionally controlling, by the PMS, controllable assets of the microgrid according to the operating point determined by the EMS.

10. A method according to any one of the preceding claims.

14. 1. A system for controlling operation of an energy management system (EMS), the EMS being operative to perform a multi-objective optimization (MOO) to determine one or more asset operating points over a forecast period, the MOO determining the one or more asset operating points as a function of time over the forecast period that minimizes a composite objective function that is a weighted sum of several objective functions, the system comprising: at least one integrated circuit operative to automatically determine weights by which the objective functions are weighted in the composite objective function used by the EMS in the MOO; and an interface for providing the determined weights to the EMS.

15. A microgrid comprising: A plurality of controllable assets; an energy management system (EMS), the EMS operative to perform a multi-objective optimization (MOO) to determine one or more asset operating points over a forecast period, the MOO determining the one or more asset operating points as a function of time over the forecast period that minimizes a composite objective function that is a weighted sum of several objective functions; A microgrid comprising the system of claim 14.

Citation Information

Patent Citations

  • Multi-objective optimization method for micro-grid dynamic energy management

    CN113420931A

  • Power system controller

    JP1995250431A

  • Multipurpose optimization design support device, method, and program

    JP2009169557A

  • Prediction control method and prediction control system

    JP2010152767A

  • Evaluation support method, information processor, and program

    JP2014059804A