Large blast furnace flat outlet raw material distribution chute
The large blast furnace flat outlet material distribution chute addresses the issue of material scattering by using a chute body with a rectifying section and flat outlet to control the flow direction, achieving precise and uniform raw material distribution.
Patent Information
- Application Number
- JP2024547808
- Authority / Receiving Office
- JP · JP
- Patent Type
- Applications
- Current Assignee / Owner
- Priority Date
- 2021-11-08
- Filing Date
- 2022-08-31
- Publication Date
- 2024-10-18
- Estimated Expiration
- 2042-08-31
AI Technical Summary
Conventional blast furnace raw material distribution chutes experience divergence and confusion in the flow of materials at the outlet, leading to inaccurate distribution, especially in larger furnaces, due to the wide width of the raw material table and centrifugal forces causing scattering.
A large blast furnace flat outlet material distribution chute with a chute body, rectifier, and rectifying section that includes a raw material discharge chamber with a flat outlet, ensuring the raw material flows out in a controlled and dispersed manner to achieve accurate distribution.
The chute design effectively reduces the thickness and area of the raw material layer, minimizing scattering and ensuring uniform distribution, thereby improving the accuracy and efficiency of raw material delivery to the blast furnace.
Smart Images

Figure 2024538438000001_ABST
Abstract
Description
[Technical field]
[0001] This application claims priority to a Chinese patent application filed with the China Patent Office on November 8, 2021, bearing application number 202122720239.4 and entitled "Large blast furnace flat outlet raw material distribution chute", the entire contents of which are incorporated herein by reference.
[0002] The present application relates to the technical field of blast furnace material distribution, and in particular to a large blast furnace flat outlet material distribution chute. [Background technology]
[0003] Blast furnace is the main equipment for steel smelting, and blast furnace raw material distribution chute is the main raw material distribution equipment in blast furnace. Blast furnace raw material distribution chute is installed at the top of blast furnace, and is installed at the bottom of raw material distribution device and connected to raw material distribution device. It rotates at different inclination angles by driving raw material distribution device, and raw materials that fall into blast furnace raw material distribution chute are centrifugally thrown at different angles. The larger the blast furnace, the lower its utilization coefficient is generally. One of the reasons is that the larger the blast furnace, the larger its inner diameter and the larger the outer diameter of raw material distribution. The closer to the outer hull, the wider the width of the raw material table (the width of the concentric ring of raw material at the same angle) thrown out from the blast furnace raw material distribution chute.
[0004] In the prior art blast furnace raw material distribution chute, the raw material platform on the outer hull is wider, so it is difficult to transport coke, sinter, pellets, etc. accurately to the required section of the hull.
[0005] As shown in Figures 1 to 4, the cross section of the outlet of the blast furnace raw material distribution chute in the prior art is a circular arc (U) shape, a square, a trapezoid, an inverted trapezoid, etc. When distributing raw materials by rotation, all of these structures will more or less lead to divergence and confusion of the raw material flow at the outlet, and the raw materials will pile up and climb along the sides due to the action of the rotation eccentric force, so that the thickness of the raw material layer at the outlet will reach 400 mm or more. After the thick raw material layer and the divergent raw material flow are centrifugally thrown, the width of the raw material table at the large diameter raw material distribution surface will become wider. Summary of the Invention [Problem to be solved by the invention]
[0006] In response to the technical problem that the prior art blast furnace raw material distribution chute is prone to divergence and chaos of the raw material flow at the outlet when distributing raw materials, and accurate raw material distribution cannot be effectively achieved, the present application provides a large blast furnace flat outlet raw material distribution chute that effectively avoids the raw material flow from diverging and chaos at the outlet, controls the thickness of the raw material layer at the outlet, and achieves accurate raw material distribution. [Means for solving the problem]
[0007] A large blast furnace flat outlet material distribution chute, a chute body having a feedstock receiving chamber having a feedstock supply end and a feedstock distribution end; a straightening section connected to the chute body and located on a side of the chute body adjacent to the raw material distribution end, A raw material discharge chamber is formed in the flow straightening section so as to pass through the flow straightening section, the raw material discharge chamber has a raw material supply port communicating with the raw material receiving chamber, and the raw material discharge outlet of the raw material discharge chamber is a flat-type raw material discharge outlet.
[0008] Preferably, The apparatus further includes a forward flow section connected to a side of the straightening section away from the chute main body, a forward flow chamber is opened in the forward flow section, the forward flow chamber is arranged to penetrate the forward flow section from the side close to the straightening section toward the side away from the straightening section, and the raw material discharge outlet of the forward flow chamber is a flat-type raw material discharge outlet.
[0009] Preferably, the rectifying unit is A bottom wall connected to the chute body; a top wall spaced apart from the bottom wall; a side wall connected to the chute body and having both ends connected to the bottom wall and the top wall, Two side walls are arranged, the two side walls being opposed to each other with a gap therebetween; The bottom wall, the top wall and the two side walls collectively define the raw material discharge chamber.
[0010] Preferably, the top wall is provided with an anti-clogging groove penetrating the top wall, and the anti-clogging groove communicates the flat-type raw material discharge port with the raw material distribution end; The surface of the top wall that is enclosed as the anti-clogging groove is inclined toward the center from a direction approaching the bottom wall to a direction away from the bottom wall.
[0011] Preferably, the top wall is provided at an incline, and the thickness of the raw material discharge chamber gradually decreases from the direction of the raw material supply inlet toward the direction of the flat raw material discharge outlet.
[0012] Preferably, the chute body comprises: A bottom wall of the chute; a chute side wall connected to the chute bottom wall, Two of the chute side walls are arranged, the two chute side walls are provided opposite to each other with a gap therebetween, and the two side walls are provided corresponding to the two chute side walls, The chute bottom wall and the two chute side walls collectively define the raw material receiving chamber, and the bottom wall is aligned with the chute bottom wall.
[0013] Preferably, the side walls are aligned with the chute side walls or are angled away from the center from the direction closer to the chute side walls to the direction away from the chute side walls.
[0014] Preferably, The chute further includes a connection member connected to the chute body and located adjacent to the raw material supply end.
[0015] Preferably, the flat-type raw material outlet is a rectangular hole or an oval hole.
[0016] Preferably, The apparatus further includes a forward flow section connected to a side of the straightening section remote from the chute main body, the forward flow section having a forward flow chamber formed therein, the forward flow chamber being arranged to penetrate the forward flow section from the side close to the straightening section toward the side remote from the straightening section, and the cross section of the forward flow chamber being the same as that of the flat-type raw material discharge outlet.
[0017] Preferably, The chute further includes a raw material receiving plate connected to the chute body or the flow straightening unit, At least a portion of the raw material receiving plate is located outside the raw material receiving chamber along a thickness direction of the chute body, The raw material receiving plate receives the raw material that falls from the central pipe, and introduces the raw material into the raw material receiving chamber or the raw material discharging chamber. Effect of the Invention
[0018] Compared with the prior art, the large blast furnace flat outlet raw material distribution chute provided by this application includes a chute body and a straightening part, the chute body is provided with a raw material receiving chamber having a raw material supply end and a raw material distribution end, the straightening part is connected to the chute body and is located on the side of the raw material distribution end, the straightening part is provided with a raw material discharge chamber arranged to pass through the straightening part, the raw material supply port of the raw material discharge chamber is connected to the raw material receiving chamber, and the raw material discharge outlet of the raw material discharge chamber is a flat-type raw material discharge outlet. In this way, during the raw material distribution process of the blast furnace, the raw material in the chute body flows through the straightening section and then flows out and is distributed onto the raw material surface of the blast furnace through the flat raw material discharge outlet, and the straightened raw material flow flows out from the flat raw material discharge outlet. The thickness of the raw material layer away from the raw material distribution chute raw material discharge outlet is made as thin as possible to avoid raw material clogging, thereby effectively avoiding the divergence and confusion of the raw material flow and effectively reducing the area of the scattered raw material flow. The raw material is rotated and distributed, and the width of the raw material surface ring (raw material table) thrown out and dropped onto the raw material surface in the blast furnace is made as narrow as possible, thereby achieving accurate raw material distribution. [Brief description of the drawings]
[0019] In order to more clearly explain the technical solutions in the embodiments of the present application or the prior art, the following briefly introduces the necessary drawings in the embodiments or prior art descriptions. The drawings listed below are only some embodiments of the present application, and those skilled in the art can obtain other drawings based on these drawings on the premise that they do not make any effort worthy of inventive step.
[0020] [Figure 1] FIG. 1 is a structural schematic diagram of a blast furnace raw material distribution chute in the prior art. [Diagram 2] FIG. 1 is a structural schematic diagram of a blast furnace raw material distribution chute in the prior art. [Diagram 3] FIG. 1 is a structural schematic diagram of a blast furnace raw material distribution chute in the prior art. [Figure 4] FIG. 1 is a structural schematic diagram of a blast furnace raw material distribution chute in the prior art. [Diagram 5]FIG. 1 is a structural schematic diagram of the large blast furnace flat outlet raw material distribution chute provided by Example 1. [Figure 6] FIG. 6 is a structural schematic diagram of one preferred embodiment of the large blast furnace flat outlet material distribution chute in FIG. [Figure 7] FIG. 2 is a structural schematic diagram of the large blast furnace flat outlet raw material distribution chute provided by Example 2. [Figure 8] FIG. 3 is a structural schematic diagram of the large blast furnace flat outlet raw material distribution chute provided by Example 3. [Figure 9] FIG. 4 is a structural schematic diagram of the large blast furnace flat outlet raw material distribution chute provided by Example 4. [Figure 10] FIG. 5 is a structural schematic diagram of the large blast furnace flat outlet raw material distribution chute provided by Example 5. [Figure 11] FIG. 2 is a structural schematic diagram of three different inclination angles of the blast furnace raw material distribution chute in the prior art blast furnace raw material distribution system. [Figure 12] FIG. 11 is a structural schematic diagram of three different inclination angles of the large blast furnace flat outlet raw material distribution chute in the blast furnace raw material distribution system provided in Example 6. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0021] In order to allow those skilled in the art to better understand the technical solution of the present application, the technical solutions in the embodiments of the present application are described below clearly and completely, and the described embodiments are not all the embodiments, but only some of the embodiments of the present application. Based on the embodiments of the present application, on the premise that those skilled in the art do not make any inventive efforts, all other embodiments obtained fall within the protection scope of the present application.
[0022] Herein, when an element is considered to be "fixed" or "mounted" on another element, it may be directly located on the other element or indirectly mounted on the other element, and when an element is described as being "connected" to another element, it may be directly connected to the other element or indirectly connected to the other element.
[0023] Here, the structure, proportions, dimensions, etc. in the drawings in this specification do not limit the feasible conditions of this application, but are merely used in accordance with the disclosure contents of the specification so that those skilled in the art can easily understand and read them. Therefore, on the premise that they do not have a substantial technical meaning and do not affect the effects that can be realized and the purposes that can be achieved by this application, any structural modifications, changes in proportional relationships, or adjustments in dimensions should still fall within the scope that can be covered by the technical contents disclosed in this application.
[0024] The present application provides a large blast furnace flat outlet raw material distribution chute, comprising a chute body and a straightening part, the chute body is provided with a raw material receiving chamber having a raw material supply end and a raw material distribution end, the straightening part is connected to the chute body and located on the side of the raw material distribution end, the straightening part is provided with a raw material discharge chamber that is provided through the straightening part, the raw material discharge chamber has a raw material supply port that communicates with the raw material receiving chamber and a raw material discharge port that is a flat raw material discharge port. The large blast furnace flat outlet raw material distribution chute effectively avoids the raw material flow from diverging and becoming confused at the outlet, and realizes accurate raw material distribution.
[0025] Example 1 5 and 6 are combined. This embodiment provides a large blast furnace flat outlet material distribution chute 100, which is applied to a blast furnace to realize accurate material distribution in the large blast furnace. The large blast furnace flat outlet material distribution chute 100 mainly controls the height difference (thickness) of the outlet material layer and the flow direction of the material layer to reduce the disturbance of the material flow. A large blast furnace is a flat blast furnace having a thickness of 1500m or more. 3 and larger blast furnaces.
[0026] The large blast furnace flat outlet raw material distribution chute 100 includes a chute body 10 and a straightening part 20, and the chute body 10 has a raw material receiving chamber 11, so that when the large blast furnace flat outlet raw material distribution chute 100 is attached to a central pipe, the raw material receiving chamber 11 can well receive the raw material that falls from the central pipe. Preferably, in this embodiment, the raw material receiving chamber 11 is an open type raw material receiving chamber, i.e., it has a semi-closed structure, and its upper end has an opening, so as to better cooperate with the raw material that falls from the central pipe. The raw material receiving chamber has a raw material supply end 111 and a raw material distribution end 112, wherein the raw material supply end 111 and the raw material distribution end 112 are opposite positional regions in the raw material receiving chamber 11, the raw material supply end 111 may be located at any position required according to actual needs, such as the end or upper side of the chute body 10, as long as it can receive the raw material well, and the raw material distribution end 112 is located at one end through which the raw material travels, so that the raw material can flow from the raw material supply end 111 into the raw material receiving chamber 11 and then flow out from the raw material distribution end 112.
[0027] The straightening section 20 is connected to the chute body 10 and is located on the side of the chute body 10 close to the raw material distribution end 112, the straightening section 20 has a raw material discharge chamber 21 provided to penetrate the straightening section 20, the raw material supply port of the raw material discharge chamber 21 communicates with the raw material receiving chamber 11, so that the raw material flowing out from the raw material distribution end 112 can flow into the raw material discharge chamber 21 accordingly. The raw material discharge port 211 of the raw material discharge chamber 21 is a flat-type raw material discharge port, and the flat-type raw material discharge port is a sealed structure in which all four sides around the raw material discharge port 211 are sealed, so that when the raw material flows out from the raw material discharge port 211, it will not scatter in all directions, and at the same time, the length dimension of the raw material discharge port 211 is greater than the thickness dimension of the raw material discharge port 211, so that the raw material can be effectively prevented from scattering from the upper side.
[0028] Here, the outlet cross section of the blast furnace raw material distribution chute in the prior art is a circular arc (U) shape, a square, a trapezoid, or an inverted trapezoid. In the process of use, in order to meet the needs of raw material distribution and production, the blast furnace raw material distribution chute must have two functions, namely, vertical tilting and rotational movement. When distributing raw materials to the blast furnace during the rotation process, the raw material flow becomes scattered when it enters the blast furnace through the cavity of the blast furnace raw material distribution chute, and the centrifugal force caused by the rotational movement of the blast furnace raw material distribution chute makes the raw material flow more scattered, and the raw material band formed by the raw material flow being distributed on the blast furnace raw material surface becomes wider, which is disadvantageous to accurate process operation.
[0029] In order to realize accurate raw material distribution in a large blast furnace, the height difference (thickness) of the outlet raw material layer and the flow direction of the raw material layer are mainly controlled to reduce the turbulence of the raw material flow. In this embodiment, the raw material discharge port 211 of the rectification unit 20 is installed in a flat structure, thereby realizing the forced control of the height difference (thickness) of the outlet raw material layer and the forced rectification of the outlet raw material flow, and the cross section of the raw material flow is approximately rectangular and flat. The raw material flow is concentrated on the left or right side of the flat outlet (left or right according to the change in the rotation direction of the large blast furnace flat outlet raw material distribution chute 100), and then flows out from the raw material discharge port 211 and distributed to the blast furnace raw material surface, reducing the area of the scattered raw material flow, reducing the width of the raw material band, effectively avoiding the divergence and turbulence of the raw material flow, and achieving accurate raw material distribution. By disposing the straightening part 20 and installing the raw material discharge port 211 in a flat structure, the raw material can be well blocked and guided, effectively preventing the raw material from diverging and flowing out from both the left and right sides and the top of the raw material discharge port, effectively controlling the flow of the raw material flowing into the blast furnace, narrowing the width of the raw material band in the blast furnace, and more accurately distributing the raw material.
[0030] Preferably, the large blast furnace flat outlet material distribution chute 100 further includes a downstream section 310 connected to the side of the straightening section 20 away from the chute body 10, and the downstream section 310 has a downstream chamber 311 that is provided to penetrate the downstream section 310 from the side close to the straightening section 20 toward the side away from the straightening section 20, and the material discharge port of the downstream chamber 311 is a flat-type material discharge port. Specifically, in this embodiment, the cross section of the downstream chamber 311 is the same as the shape of the flat-type material discharge port 211 of the straightening section 20. By disposing the downstream section 310 behind the straightening section 20, the length of the flat closed-type outlet segment is increased, and by disposing the downstream stage 310, the flow of material changes from a chaotic state to a downstream state.
[0031] Here, if only the flow straightening unit 20 is provided, when the raw material is doped with impurities (for example, steel bars of about 200 mm and furnace grate bars of a sintering device are mixed into the raw material), the impurities may get caught on the flat outlet segment of the flow straightening unit 20, causing clogging of the raw material. In this embodiment, the forward flow unit 310 is provided behind the flow straightening unit 20, which effectively reduces the situation of clogging with impurities and ensures normal transport of the raw material.
[0032] Preferably, the flow straightening section 20 includes a bottom wall 22, a top wall 23 and a side wall 24, the bottom wall 22 is connected to the chute body 10, the top wall 23 is spaced from the bottom wall 22, and the side wall 24 is connected to the chute body 10, and both ends of the side wall 24 are connected to the bottom wall 22 and the top wall 23, respectively. Two side walls 24 are arranged, and the two side walls 24 are opposed to each other and spaced from each other, and the bottom wall 23, the top wall 23 and the two side walls 24 together form the raw material discharge chamber 21. This ensures a reliable connection between the flow straightening section 20 and the chute body 10, and the raw material discharge chamber 21 can receive the raw material in the raw material receiving chamber 11 better.
[0033] Preferably, the top wall 23 is inclined, and the thickness of the raw material discharge chamber 21 gradually decreases from the raw material supply port toward the flat raw material discharge port 211. That is, in the raw material discharge chamber 21, the thickness space on the side close to the raw material supply port is larger than the thickness space on the side close to the raw material discharge port 211, so that the raw material discharge chamber 21 can better receive the raw material in the raw material receiving chamber 11, and the transition of the raw material becomes smoother.
[0034] Preferably, the chute body 10 includes a chute bottom wall 12 and a chute side wall 13, the chute side wall 13 is connected to the chute bottom wall 12, and two of the chute side walls 13 are arranged, the two chute side walls 13 are arranged opposite to each other with a space therebetween, and the two side walls 24 are arranged corresponding to the two chute side walls 13. That is, one of the side walls 24 is connected to one of the chute side walls 13 in a corresponding manner, and the other of the side walls 24 is connected to the other of the chute side walls 13 in a corresponding manner. The chute bottom wall 12 and the two chute side walls 13 are collectively enclosed as the raw material receiving chamber 11, and the bottom wall 22 is arranged to match the chute bottom wall 12. The bottom wall 22 being arranged to match the chute bottom wall 12 means that the inner surface of the bottom wall 22 is aligned with the inner surface of the chute bottom wall 12, and the outer surface of the bottom wall 22 is aligned with the outer surface of the chute bottom wall 12. This allows the material to pass through the connection between the bottom wall 22 and the chute bottom wall 12 more smoothly, avoiding material clogging and ensuring the structural strength of the bottom wall 22.
[0035] Preferably, the side wall 24 is provided to match the chute side wall 13. That is, the inner surface of the side wall 24 matches the inner surface of the chute side wall 13, and the outer surface of the side wall 24 matches the outer surface of the chute side wall 13. This allows the material to pass through the connection point between the side wall 24 and the chute side wall 13 more smoothly, avoiding clogging of the material and ensuring the structural strength of the side wall 24.
[0036] Preferably, the large blast furnace flat outlet raw material distribution chute 100 further includes a connecting member 30, which is connected to the chute body 10 and located close to the raw material supply end 111, thus facilitating the connection between the large blast furnace flat outlet raw material distribution chute 100 and the central pipe by the connecting member 30. The connecting member 30 is specifically a connecting ear type structure or a hook type structure, which is connected to the central pipe or the raw material distribution device.
[0037] Preferably, the flat-type raw material outlet 211 is an oval hole, that is, it has an oval structure, and the four sides around the flat-type raw material outlet 211 are rounded corners through which the arc transitions.
[0038] The width of the raw material distribution port of the large blast furnace flat outlet raw material distribution chute 100 provided in this embodiment is significantly narrower and more uniform, which realizes accurate raw material distribution, improves the raw material distribution situation and the charging ratio situation in the blast furnace, improves output, and reduces energy consumption.
[0039] Here, in the large blast furnace flat outlet raw material distribution chute 100 provided in this embodiment, baffle plates are not directly arranged on both sides of the chute body 10, but the straightening part 20 is separately arranged on the rear side of the chute body 10, so that the straightening part 20 has a certain storage and cushioning effect, and prevents raw materials from falling directly onto the baffle plate, bouncing off, and scattering, which makes it difficult for the raw materials to fall into the large blast furnace flat outlet raw material distribution chute. Also, the flat-type raw material discharge port 211 can effectively control the height (thickness) difference of the raw material flow.
[0040] Here, the larger the blast furnace, the lower its utilization coefficient, and one of the reasons for this is that the larger the blast furnace, the larger its inner diameter, the larger the diameter of the raw material distribution, and the closer to the outer hull, the wider the width of the raw material table (the width of the concentric rings of raw materials at the same angle) thrown divergently from the blast furnace raw material distribution chute. In the conventional large blast furnace flat outlet raw material distribution chute, the wider the raw material table, the more difficult it is to accurately transport coke, sinter, pellets, etc. to the required section. Therefore, in order to achieve accurate raw material distribution in a large blast furnace, the height difference (thickness) of the outlet raw material layer and the flow direction of the raw material layer are mainly controlled to reduce the disruption of the raw material flow.
[0041] Preferably, the large blast furnace flat outlet raw material distribution chute 100 is mainly 1500m 3 The large blast furnace flat outlet raw material distribution chute 100 has an overall length of 2500 mm or more, and the thickness of the flat raw material discharge outlet 211 is controlled to be between 200 to 400 mm. More preferably, the thickness of the flat raw material discharge outlet 211 is controlled to be between 300 to 350 mm, thereby enabling accurate raw material distribution to the large blast furnace.
[0042] Preferably, in one embodiment, the large blast furnace flat outlet material distribution chute 100 is divided into a first straight segment, a second straight segment and a floating segment along its length, the second straight segment is provided on the raw material discharge side of the first straight segment and its arrangement direction is inclined upward with respect to the first straight segment, the floating segment is provided on the raw material discharge side of the second straight segment and its arrangement direction is inclined upward with respect to the second straight segment, so that the large blast furnace flat outlet material distribution chute 100 can distribute the raw materials farther when distributing the raw materials, and the diameter of the blast furnace body is designed to be larger, and a small amount of raw materials is piled up locally at the drop point, which exerts a buffering effect.
[0043] Example 2 7, the present embodiment provides a large blast furnace flat outlet material distribution chute 200, which is basically the same as the large blast furnace flat outlet material distribution chute 100 in the first embodiment, except for the following points: In this embodiment, the flat-type raw material outlet 210 is a rectangular hole.
[0044] Example 3 8, the present embodiment provides a large blast furnace flat outlet material distribution chute 400, which is basically the same as the large blast furnace flat outlet material distribution chute 100 in the first embodiment, except for the following points: In this embodiment, the straightening unit 410 is different from that in the first embodiment. Specifically, the side wall 430 on one side of the straightening unit 410 is inclined away from the center from the direction approaching the chute side wall 420 to the direction away from the chute side wall 420, thereby widening the straightening unit 410, making the material receiving chamber in the straightening unit 410 work well, and increasing the volume of the material receiving chamber to prevent the material from piling up and to increase the range of material distribution. Of course, in other embodiments, the side walls 430 on both sides of the straightening unit 410 can be inclined according to actual needs.
[0045] Example 4 9, the present embodiment provides a large blast furnace flat outlet material distribution chute 500, which is basically the same as the large blast furnace flat outlet material distribution chute 100 in the first embodiment, except for the following differences: In this embodiment, the flow straightening unit 510 is different from that in the second embodiment. Specifically, a clogging prevention groove 530 is formed in the top wall 520 of the flow straightening unit 510 so as to penetrate the top wall 520, and the clogging prevention groove 530 communicates with the flat-type raw material discharge port 540 and the raw material distribution end 550. In this manner, the clogging prevention groove 530 prevents the raw material from clogging in the flow straightening unit 510, and the raw material flows more smoothly. A surface 570 of the top wall 520 surrounded by the clogging prevention groove 530 is inclined toward the center from the direction approaching the bottom wall 560 toward the direction away from the bottom wall 560. Thus, when the large blast furnace flat outlet raw material distribution chute 500 distributes raw materials along the forward inclination angle, the surface 570 exerts a certain guiding effect on the raw materials in the anti-clogging groove 530, guides the raw materials to the raw material discharge chamber, and ensures accurate raw material distribution.
[0046] Example 5 10, the present embodiment provides a large blast furnace flat outlet material distribution chute 600, which is basically the same as the large blast furnace flat outlet material distribution chute 500 in the fourth embodiment, except for the following: In this embodiment, the large blast furnace flat outlet raw material distribution chute 600 further includes a raw material receiving plate 610, which is connected to the chute body 620 or the straightening part 630, and at least a part of the raw material receiving plate 610 is located outside the raw material receiving chamber 640 along the thickness direction (X direction in FIG. 10) of the chute body 620, i.e., protrudes from the chute body 620. The raw material receiving plate 610 receives raw material that has fallen from the central pipe and introduces the raw material into the raw material receiving chamber 640 or the raw material discharging chamber 650. Thus, when the large blast furnace flat outlet raw material distribution chute 600 is installed along an angle perpendicular to the central pipe, the raw material that has fallen can be smoothly received by the raw material receiving plate 610 and introduced into the raw material receiving chamber 640 or the raw material discharging chamber 650, thereby realizing accurate raw material distribution. Specifically, the raw material receiving plate 610 is inclined relative to the side wall of the chute body 620, and the portion of the raw material receiving plate 610 located outside the chute body 620 is open, which can better receive the raw material and prevent sputtering of the raw material.
[0047] Example 6 11 and 12 are combined together. This embodiment provides a blast furnace raw material distribution system 1000, which includes a central pipe 700 and a large blast furnace flat outlet raw material distribution chute attached to the central pipe, and the large blast furnace flat outlet raw material distribution chute of this embodiment adopts the large blast furnace flat outlet raw material distribution chute 600 of embodiment 5.
[0048] Here, in the prior art, the large blast furnace flat outlet raw material distribution chute is not provided with a raw material receiving plate, so that the raw materials falling from the central pipe become slightly dispersed during the up and down tilting process. When the large blast furnace flat outlet raw material distribution chute is tilted to approximately vertical, some of the raw materials do not pass through the large blast furnace flat outlet raw material distribution chute and fall directly into the blast furnace, which is disadvantageous to accurate process operation.
[0049] In this embodiment, the blast furnace raw material distribution system 1000 uses the large blast furnace flat outlet raw material distribution chute 600, which allows the raw material receiving plate 610 to better receive the raw material falling from the central pipe 700, thereby achieving more accurate raw material distribution.
[0050] Compared with the prior art, the large blast furnace flat outlet raw material distribution chute provided by this application includes a chute body and a straightening part, the chute body is provided with a raw material receiving chamber having a raw material supply end and a raw material distribution end, the straightening part is connected to the chute body and is located on the side of the raw material distribution end, the straightening part is provided with a raw material discharge chamber arranged to pass through the straightening part, the raw material supply port of the raw material discharge chamber is connected to the raw material receiving chamber, and the raw material discharge port is a flat-type raw material discharge port. In this way, during the raw material distribution process of the blast furnace, the raw material in the chute body flows through the straightening section and then flows out and is distributed onto the raw material surface of the blast furnace through the flat raw material discharge outlet. The straightened raw material flow flows out from the flat raw material discharge outlet, so the thickness of the raw material layer away from the raw material distribution chute raw material discharge outlet is made as thin as possible to avoid raw material clogging, effectively avoiding the divergence and confusion of the raw material flow, effectively reducing the area of the scattered raw material flow, and distributing the raw material by rotating, thereby narrowing the width of the raw material surface ring (raw material table) thrown out and dropped onto the raw material surface in the blast furnace as much as possible, thereby achieving accurate raw material distribution.
[0051] The above description is only an embodiment of the present application, whereby those skilled in the art can make improvements without departing from the creative concept of the present application, all of which belong to the protection scope of the present application.
Claims
1. A large blast furnace flat outlet material distribution chute, a chute body having a feedstock receiving chamber having a feedstock supply end and a feedstock distribution end; a straightening section connected to the chute body and located on a side of the chute body adjacent to the raw material distribution end, A large blast furnace flat outlet raw material distribution chute characterized in that a raw material discharge chamber is opened in the straightening section so as to penetrate the straightening section, a raw material supply port of the raw material discharge chamber is connected to the raw material receiving chamber, and a raw material discharge port of the raw material discharge chamber is a flat type raw material discharge port.
2. 2. The large blast furnace flat outlet raw material distribution chute according to claim 1, further comprising a downstream section connected to a side of the straightening section away from the chute body, a downstream chamber being opened in the downstream section, the downstream chamber being arranged to penetrate the downstream section from a side close to the straightening section toward a side away from the straightening section, and a raw material discharge outlet of the downstream chamber being a flat-type raw material discharge outlet.
3. The rectifying unit includes: A bottom wall connected to the chute body; a top wall spaced apart from the bottom wall; a side wall connected to the chute body, the side wall having both ends connected to the bottom wall and the top wall, Two side walls are arranged, the two side walls being opposed to each other with a gap therebetween; The large-scale blast furnace flat outlet material distribution chute according to claim 1, wherein the bottom wall, the top wall and the two side walls are collectively enclosed as the material discharge chamber.
4. a clogging prevention groove is formed in the top wall so as to penetrate the top wall, and the clogging prevention groove communicates the flat-type raw material discharge port with the raw material distribution end; The large blast furnace flat outlet raw material distribution chute according to claim 3, characterized in that the surface of the top wall surrounded by the anti-clogging groove is inclined toward the center from a direction approaching the bottom wall to a direction away from the bottom wall.
5. The top wall is provided at an incline, The large blast furnace flat outlet raw material distribution chute according to claim 3, characterized in that the thickness of the raw material discharge chamber gradually decreases from the direction of the raw material supply port toward the direction of the flat-type raw material discharge port.
6. The chute body includes: A bottom wall of the chute; a chute side wall connected to the chute bottom wall, two chute side walls are arranged, the two chute side walls are provided opposite to each other with a gap therebetween, and the two side walls are provided corresponding to the two chute side walls; The large-scale blast furnace flat outlet raw material distribution chute according to claim 5, characterized in that the chute bottom wall and the two chute side walls are collectively enclosed as the raw material receiving chamber, and the bottom wall is aligned with the chute bottom wall.
7. The large blast furnace flat outlet material distribution chute according to claim 6, characterized in that the side walls are aligned with the chute side walls, or the side walls are inclined away from the center from a direction close to the chute side walls to a direction away from the chute side walls.
8. 2. The large-scale blast furnace flat outlet material distribution chute according to claim 1, further comprising a connecting member connected to the chute body and located adjacent to the material supply end.
9. The large blast furnace flat outlet raw material distribution chute according to any one of claims 1 to 8, characterized in that the flat-type raw material discharge port is a rectangular hole or an oval hole.
10. The chute further includes a raw material receiving plate connected to the chute body or the flow straightening unit, At least a portion of the raw material receiving plate is located outside the raw material receiving chamber along a thickness direction of the chute body, The large-scale blast furnace flat outlet raw material distribution chute according to claim 9, characterized in that the raw material receiving plate receives the raw material that has fallen from the central pipe and introduces the raw material into the raw material receiving chamber or the raw material discharging chamber.
Citation Information
Patent Citations
Blast furnace distributing chute
CN210367751U
Material distribution chute for blast furnace top blanking equipment
CN212833851U
Rotary chute for blast furnace
JP2000234110A
Distribution Shot
JP2013532775A