High torque connection with enhanced break-in performance
The tubular connection with load flank reduction zones addresses galling and damage issues by inducing plastic deformation and compressive stress, enhancing durability and efficiency in drill strings.
Patent Information
- Application Number
- JP2024527757
- Authority / Receiving Office
- JP · JP
- Patent Type
- Applications
- Current Assignee / Owner
- Priority Date
- 2021-11-12
- Filing Date
- 2022-11-11
- Publication Date
- 2024-11-15
AI Technical Summary
Existing tubular connections in drill strings suffer from galling and damage during assembly and disassembly due to inadequate strain hardening of thread flanks, leading to increased costs and downtime in drilling operations.
A tubular connection design with load flank reduction zones that induce plastic deformation and residual compressive stress in the thread flanks, enhancing galling resistance and maintaining equal or greater radial bearing strength than cross-sectional connection strength.
The design prevents excessive plastic deformation and thread failure, ensuring high torsional strength and make-up torque while reducing the risk of catastrophic damage, thus improving drilling efficiency and reducing costs.
Smart Images

Figure 2024542433000001_ABST
Abstract
Description
Detailed Description of the Invention
[0001] CROSS-REFERENCE TO PRIOR APPLICATIONS This application claims priority under the Paris Convention to U.S. Application No. 63 / 264,001, filed November 12, 2021. The entire contents of such prior application are incorporated herein by reference as if set forth herein.
[0002] Field of the Disclosure This application relates generally to tubular members having threaded connections, and more specifically to tubular members having high strength double shoulder threaded connections, such as drill pipes, drill collars, tool joints and downhole tools, utilized in downhole drilling operations.
[0003] 〔background〕 This section is provided as background information to facilitate a better understanding of the various aspects of the present invention. It should be understood that statements in this section of the document are to be read in this light, and not as admissions of prior art.
[0004] In oil and gas drilling, the drill bit is threadedly attached to the end of a drill string that is made up of various subassemblies and tubular members. The drill bit is traditionally attached to a Bottom Hole Assembly (BHA) at the bottom of the drill string. This can include a variety of downhole tools and tubular members such as rotary steerable tools, mud motors, Measurement-While-Drilling (MWD) tools, Logging-While-Drilling (LWD) tools, stabilizers, reamers, jars, shocks, agitators, and multiple drill collar configurations, among other modern drilling technologies. Connected to the BHA is another tubular member configuration that typically includes multiple Heavy Weight Drill Pipes (HWDPs) and drill pipes. These complete the drill string by connecting the drill bit and BHA to the surface, allowing surface rotation, torque, compression, and tension to be applied to the drill string, and therefore to the drill bit, to advance the borehole further. Additionally, the assembled drill string also serves as a conduit for pumping drilling fluids through its sufficiently hollow bore to clean the borehole, provide fluid power to the downhole tools, and cool the heat generated by friction between the drill bit and downhole. It is common for all of these drill string tubular members to be threadedly attached to one another by tubular connections so that the drill string can be sequentially assembled or disassembled by threading or unthreading the tubular members at the surface as the borehole advances further. The most common tubular connection for use in drill strings is the rotary shoulder connection, with most modern variations introducing a secondary torque bearing shoulder on the nose of the pin connector that contacts the rear of the box connector when the pin connector is threaded with the box connector.
[0005] During drilling operations, it is desirable that all of the aforementioned tubular connections between adjacent drill string tubular members have sufficient mechanical and metallurgical performance to withstand the loads (e.g., torsional, tensile, compressive, etc.) imposed on them during drilling operations. In general, the mechanical behavior of standard materials (e.g., steel, aluminum, titanium) utilized to construct tubular connectors reflects the relationship between the material's deformation response to an externally applied load and force. It will be appreciated that the stress-strain behavior of the materials, particularly the metals used to construct the tubular members, will have a significant impact on the performance of the tubular connections. Furthermore, as will be appreciated by those skilled in the art, it is desirable to exploit the stress-strain characteristics of both the macroscopic and microscopic behavior of the material's deformation mechanisms to enhance and improve designs, including tubular connections. As a result, the mechanical behavior of tubular connections under high loads may be desirably enhanced to be strong and more predictable, while reducing undesirable deformation, damage, and fracture.
[0006] Without being limited to this or any other technique or theory, it will be understood that the mechanical behavior of a given material can be ascertained by stress-strain testing. In this method, stress can be defined through the relationship of a load applied perpendicularly to a known cross-section of a specimen, and strain can be defined as the ratio of the change in length of the specimen to the original length of said specimen. Roughly speaking, elastic deformation is a non-permanent deformation in which the loaded specimen returns to its original size and shape when the applied load is removed, and plastic deformation is a permanent deformation in which the loaded specimen does not return to its original size and shape when the applied load is removed. More specifically, macroscopic elastic deformation refers to small changes in interatomic spacing and stretching of interatomic bonds, while plastic deformation refers to the breaking of interatomic bonds and the formation of new interatomic bonds, in which a large number of atoms or molecules move permanently relative to each other.
[0007] Moreover, it is known in the art that crystalline materials such as metals do not have perfect order at the atomic scale, but contain many different imperfections and deviations from crystalline perfection. In particular, many of the metallurgical and mechanical properties of materials are highly sensitive to deviations from a perfectly ordered crystalline structure. These defects are not always detrimental, and often, specific mechanical properties are tailored and shaped by deliberately introducing desired defects in controlled amounts. More specifically, as mentioned above, plastic deformation is a permanent change to a material, which at the microscopic scale corresponds to the net movement of a large number of atoms in response to an applied stress. During this process, interatomic bonds must break and reform around the dislocations. A dislocation is a linear defect in which some of the atoms are displaced. Macroscopically, plastic deformation corresponds to the movement of a large number of dislocations, and the overall ability of a metal to plastically deform depends on the ability of the dislocations to move.
[0008] One important source of these new dislocations are existing dislocations that multiply under load, a property known as dislocation density. More specifically, grain boundaries, as well as internal defects and surface irregularities (e.g., scratches and nicks, etc.) can serve as sites for dislocation formation. The less restricted the movement of dislocations, the more easily the metal deforms and the weaker it behaves. Conversely, strength is related to the ease of plastic deformation, so intentionally inducing plastic deformation by applying compressive forces can restrict and reduce dislocation mobility, thereby increasing the mechanical strength of the material. In simpler terms, a greater mechanical force is required to initiate further plastic deformation, thus improving the performance of the material. Generally, this is known in the art as strain hardening, work hardening, or cold working, which causes metals to gain strength as they are plastically deformed.
[0009] For the materials discussed herein, it will be understood that the elastic behavior of a material is manifested as a roughly proportional relationship between stress and strain. This linear relationship, known as Hooke's Law, corresponds to a material property known as Young's Modulus. Because of the permanent change in geometry and therefore to the mechanical performance of the material, it is desirable to ascertain the stress level at which plastic deformation begins. As is known in the art, this property is known as the yield strength of the material (shown in FIG. 1 as σ y The yield strength of a metal is known as the yield strength (denoted as E) and the overall magnitude of the metal's yield strength is an indicator of its resistance to plastic deformation. More specifically, without being limited to this or any other theory, by examining the exemplary engineering stress-strain curve of FIG. 1, it will be appreciated that at a certain strain offset (usually 0.002 (0.2%)), a straight line is constructed parallel to the linear elastic portion of the engineering stress-strain curve, and the stress corresponding to the intersection of this line with the engineering stress-strain curve is conventionally defined as the yield strength of the material. It will be appreciated that this intersection occurs after a small amount of non-linearity has occurred in the graph, indicating that a very small degree of plastic deformation has occurred. The slope of this line corresponds to Young's modulus (denoted as E in FIG. 1). The magnitude of Young's modulus is a measure of the resistance of interatomic bond forces to separation.
[0010] It will be appreciated that when a material is loaded to induce a stress level above the yield strength, a combination of elastic and plastic deformations occur simultaneously. Upon release of the applied load, a portion of the total deformation is restored as elastic strain, while the remaining deformation is permanent plastic deformation. As shown in FIG. 2, during the unloading cycle, the stress-strain curve follows a nearly linear path from the unloading point. The slope of the unloading curve is parallel to the initial elastic portion of the curve, and therefore is substantially the same as Young's modulus. The magnitude of this elastic strain recovered during unloading corresponds to the strain recovery. When the load is reapplied, the curve moves along the same linear portion in the opposite direction to that at unloading, so that the material, and therefore the mechanical performance of the design, can behave elastically, despite the fact that some plastic strain was previously induced. It will be appreciated that under this condition, as shown in FIG. 2, a new effective yield strength exists for the material with residual plastic strain. In this way, plastic strain can be desirably induced in the material to improve the mechanical performance and strength of the design.
[0011] A known method of utilizing strain hardening to strengthen tubular connectors is by cold rolling the threads. However, this approach does not stress the thread flanks. Instead, cold rolling creates residual compressive stresses in the thread root in an attempt to reduce fatigue cracking in the connector. Shot peening may also be performed on pin and box connectors to cold work the thread flanks and sealing surfaces. However, this is typically for materials where anti-friction coatings are not desirable (e.g., non-magnetic steels). Generally, shot peening increases the cost per connector without providing a high degree of strain hardening. The size of the shot peening bead, and therefore the overall strength of the peening, is limited to the smallest features of the thread form, such as the thread root radius.
[0012] A common form of damage to the flanks of a thread form is observed as "tearing" or "cold welding" of the thread flank material during threading or unthreading of a tubular connection. This type of damage is known in the art as "galling" and, without being limited to this or any other theory, is understood to be the result of high static or dynamic contact stresses between materials under predominantly tensile stresses. A common example would be when two newly manufactured box and pin connectors are threadedly assembled and torqued together. Due to the shear nature of the cutting tool used in manufacturing the connector threads, the surfaces of the load flanks of the freshly machined thread form may be under predominantly tensile stresses. Thus, the high stress state of the contacting load flanks of the connection may induce galling between these surfaces, resulting in damage requiring repair or replacement.
[0013] To prevent this damage, several techniques and methods have been developed and employed. The most common technique is the surface coating of the pin and box connector threads. Surface coatings can take many forms, including phosphate, copper, or spray coatings, among others, and are somewhat effective in providing additional resistance to galling and are generally highly desirable. However, the coating does not provide strain hardening, and therefore does not alter the stress state of the thread flanks. Rather, most coatings only serve to temporarily reduce friction within the threads, as they are known to wear off through multiple assembly and disassembly cycles of the tubular connection. It will therefore be appreciated that imparting strain hardening to the thread flanks is desirable to provide a permanent preventative measure against damage.
[0014] An attempt to strain harden the thread flanks is the "Make and Break" technique, in which newly manufactured or repaired tubular connectors are subjected to multiple make-up torque cycles before being placed into service. Because it is known in the art that a single make-up cycle induces little, if any, cold work on the load flanks of the connector, three to five cycles are typically performed with the goal of creating a desired stress state in the thread load flanks where thread flank damage can be reduced or entirely eliminated.
[0015] Make-and-break is advantageous for threaded connectors on newly manufactured drill pipe because the tool joint is usually not yet welded to the pipe body and is therefore easier to handle and thread. However, for repaired or remanufactured tubular members, it is often impractical to perform make-and-break operations in a controlled environment because most manufacturing facilities do not have the equipment or processing capacity required to thread and torque the tubular members at their full length. This necessitates the use of costly third-party services to perform make-and-break. For example, using make-and-break services often increases the price of manufacturing or repairing a single rotary shoulder connector by 100% or more. Alternatively, make-and-break can be performed on the drilling rig during drilling operations while assembling the drill string. This is less desirable because it consumes drilling rig time, which can be orders of magnitude higher than shop time, and further delays drilling operations as each new connector is assembled and disassembled multiple times.
[0016] Therefore, because of the time and costs associated with this practice, make-and-break is often not performed at all on newly manufactured connectors, even when large volumes of tubular members are machined, such as for example, drill string tubular connection conversions, making each new connector in a drill string highly susceptible to damage during start-up.
[0017] In addition, it is known in the art that the make-up torque of a tubular connection is calculated primarily utilizing the cross-sectional area properties of the connection. These cross-sectional properties, and therefore the calculated make-up torque, are greatly affected by the outer and inner diameters of the tubular connectors that comprise the tubular connection and can vary greatly even for a given thread geometry. For example, a DS40 connection with an outer diameter of 5.250 inches and an inner diameter of 2.688 inches will have a smaller make-up torque than a DS40 connection with an outer diameter of 5.250 inches and an inner diameter of 2.437 inches due to differences in cross-sectional strength. However, the radial bearing strength of the tubular connection calculated based on the properties of the thread flanks will remain the same. The amount of force imparted to the thread load flanks during make and break, and therefore the strain hardening, may not be consistent for a given tubular connection whose cross-sectional properties are utilized to calculate the make-up torque.
[0018] Furthermore, in most tubular connections, the ratio of radial bearing strength to section strength is disproportionately high, even exceeding 2.0 in some cases. This indicates that even for constant major and minor diameters, the forces applied to the thread load flanks during make-and-break are governed by the cross-sectional properties of the connection. Thus, the forces applied to the thread load flanks during make-up of a tubular connection may be too low to induce sufficient cold work, so that strain hardening of the thread load flanks may not occur at all.
[0019] Traditionally, the goal when developing a new tubular connection design has been to maximize the calculated torque transmission capacity of a given connection's outer and inner diameters. For example, US5908212, US7210710, and US9816646 disclose various tubular connection designs aimed at increasing the twisting capacity and handling characteristics of the tubular connection. However, these inventions do not reveal a method for inducing the desired compressive stresses in the thread load flanks.
[0020] As disclosed in US5492375, it is preferred to yield the pin nose or box counterbore of the tubular connector prior to thread shearing. US5492375 teaches how the length of the connection thread zone may be established. However, no claims are made in the '375 patent about the behavior of thread load flank bearing stress, and the length of the tubular connection thread is correlated with various cross-sectional areas with the goal of achieving an optimal configuration where the thread approaches but does not exceed the shear strength under high torque loads. When changing the outer and inner diameters of the tubular connection design, the thread length must be modified, which has the undesirable side effect that the modified connection may no longer maintain compatibility with all previous variations. In addition, under the teachings of the '375 patent, if the thread length needs to be increased to ensure that thread shearing is less of a concern, the radial bearing strength of the tubular connection may be increased due to the increased load flank area. This action will result in a proportionate reduction in the forces imparted to the thread load flanks during make-and-break or use of the connection, thus reducing strain hardening.
[0021] US10041307 discloses a balanced thread form. US10041307 reveals a thread form that aims to optimize the radial load flank bearing strength with the shear strength of the thread form. However, downhole failure of modern tubular connections due to thread shear is rare, especially for double shoulder connections. High downhole loads are typically caused by high torsional loads that result in cross-sectional yield failure, such as expansion of the primary and / or secondary shoulder, or stretching of the pin and / or box connector. Furthermore, in the case of purely tensile drill string loads, as in simple threaded fasteners, the make-up torque of rotary shoulder connections preloads the primary shoulder with a compressive force that must be overcome to apply a direct shear load to the thread form. In many cases, the drill string itself, and in particular the drill pipe body, has a smaller tensile force capacity than can be applied to a tubular connection to separate the primary shoulder, let alone cause catastrophic shear across the threads. Furthermore, the loads and stresses of the radial load flank bearing strength do not correlate with the cross-sectional area stresses, and thus with the make-up torque or drilling torque in the thread form design. The present invention could be effectively applied to the style of connections disclosed in '307 to further enhance their performance while maintaining compatibility.
[0022] 〔overview〕 A tubular member is provided having a first end with a first threaded connector and a second end with a second threaded connector. The first and second connectors are configured to form a tubular connection with an adjacent tubular member. In a preferred embodiment, the tubular connection is formed from the first connector being a box connector and the second connector being a pin connection. However, it will be understood that other configurations of threaded connectors are possible without departing from the scope of the invention described herein. Additionally, the tubular connection between tubular members includes an outer diameter, a throughbore inner diameter, a nominal pitch diameter, and a longitudinal axis. In one embodiment, the tapered pin connector includes a primary shoulder and a secondary shoulder configured to engage with a primary shoulder and a secondary shoulder of a tapered box connector. Additionally, between the primary shoulder and the secondary shoulder, the pin connector and the box connector each include a zone of multiple external threads and a zone of multiple internal threads. The plurality of thread zones include a plurality of threads tapered with respect to the longitudinal axis. The plurality of threads further include a thread crest, a thread root, at least one load flank extending along a line from the thread root to the thread crest, a stabbing flank extending along a line from the thread root to the thread crest, and at least one load flank reduction zone. The load flank of the pin connector is closer to the primary shoulder and the box load flank is closer to the secondary shoulder. The stabbing flank of the pin connector is closer to the secondary shoulder and the box stabbing flank is closer to the primary shoulder.When the pin connector is threadedly engaged with the box connector, each of the at least one load flank on the pin connector contacts at least one load flank of a corresponding thread on the box connector along a projected radial direction, thereby providing at least one projected load flank radial contact area H, measured in inches. r is formed by the intermeshing load flanks. Along the length of the zone of the threads, this load flank radial contact surface defines a radial bearing strength S rb This corresponds to the amount of force required to induce plastic deformation in the load flanks. This deformation results in a layer of material in the threads on the load flanks that is permanently under compressive stress. The connection has a cross-sectional connection strength S based on the geometry of the threads, the nominal pitch diameter, the primary shoulders, and the secondary shoulders. cs The cross sectional connection strength of the threads is approximately 100% to 110% of the cross sectional connection strength. This represents the amount of force required to induce plastic deformation (or "yield") in the weakest cross sectional area of the connection. This deformation results in permanent stretching, necking, belling, swelling, or compression of the cross sectional geometry of the connection. More specifically, in one embodiment, at least one of the load flank reduction zones is preferably configured such that the radial bearing strength is 100% to 110% of the cross sectional connection strength. When the tubular connection is threadedly assembled and torqued to a desired magnitude, the load flanks of the threads are subjected to approximately the same level of stress as the cross section of the tubular connection. This significantly improves galling resistance by strengthening the load flanks with increased cold work and residual compressive stresses, while ensuring that the bearing strength is always equal to or greater than the cross sectional connection strength, thereby preventing excessive plastic deformation of the thread form.
[0023] As known in the art, the torsional strength and make-up torque of the tubular connection are determined by the cross-sectional strength of the connection. Therefore, by ensuring that the radial bearing strength is equal to or slightly greater than the cross-sectional connection strength of the connection, the threads are protected from failure due to excessive stress. Furthermore, with at least one load flank reduction zone properly configured, as in one preferred embodiment described herein, the shear strength of the tubular connection is maximized, eliminating the concern of catastrophic failure due to shear failure of the threads.
[0024] In a preferred embodiment, the load flank reduction zone includes a limiting flank inset parallel to (starting from) the load flank, a first radius extending between the thread crest and the limiting flank having a first radius of curvature, and a second radius extending from the limiting flank to the load flank having a second radius of curvature. Further, the first radius has a convex first radius of curvature and the second radius has a concave second radius of curvature. When the pin connector is threadedly mated with the box connector, each of the load flanks on the pin connector contacts the load flank of a corresponding thread on the box connector along a projected radial direction, thereby providing at least one projected load flank radial contact surface H r is formed by the intermeshing load flanks, and at least one projected load flank radial contact surface H r is equal to approximately 0.070 inches.
[0025] In an alternative embodiment, the load flank reduction zone includes a limiting flank inset parallel to the load flank, a first radius extending between the thread root and the limiting flank having a first radius of curvature, and a second radius extending from the limiting flank to the load flank having a second radius of curvature. Further, the first radius has a convex first radius of curvature and the second radius has a concave second radius of curvature. When the pin connector is threadedly mated with the box connector, each of the load flanks on the pin connector contacts the load flank of a corresponding thread on the box connector along a projected radial direction, thereby providing at least one projected load flank radial contact surface H r is formed by the intermeshing load flanks, and at least one projected load flank radial contact surface H r is equal to approximately 0.070 inches.
[0026] Also provided is a method for forming a tubular connector on a tubular member for threadably connecting a tapered pin connector with a tapered box connector, the tubular connection having an outer diameter, an inner through hole diameter, a nominal pitch diameter, and a longitudinal axis. In one embodiment, the method includes the steps of (a) forming a box connector on an end of a first tubular member, the box connector including an outer diameter, an inner through hole diameter, a box primary shoulder, a box secondary shoulder, and a plurality of internal thread zones having a nominal pitch diameter, the primary shoulder, the secondary shoulder, the nominal pitch diameter, and the plurality of threads providing a cross-sectional connection strength S cs Additionally, the method includes (b) forming a plurality of threads in a region between the box primary shoulder and the box secondary shoulder, the plurality of threads including a thread crest, a thread root, a load flank, and a stabbing flank, such that when the box connector is threadedly engaged with a pin connector, each of the plurality of threads on the box connector contacts a corresponding thread on the pin connector along a projected radial direction, thereby forming a projected load flank radial contact area H, measured in inches. rThe method further includes (c) forming at least one load flank reduction zone on a plurality of the load flanks of a plurality of the box connector threads, such that when the box connector is threadedly mated with a pin connector, the at least one load flank reduction zone reduces the projected load flank radial contact surface H r ' is reduced and at least one projected load flank radial contact surface H r More specifically, in one embodiment, at least one of the load flank reduction zones is preferably configured such that, when the box connector is threadedly engaged with the pin connector, the radial bearing strength is 100% to 110% of the cross-sectional connection strength.
[0027] BRIEF DESCRIPTION OF THE DRAWINGS These and other configurations will become more apparent from the following description taken in conjunction with the following drawings, in which reference numerals designate like parts. The drawings are for illustrative purposes only, are not necessarily to scale, and are in no way intended to limit the scope of the invention to the particular embodiments illustrated. For purposes of clarity and conciseness, certain aspects discussed herein may be illustrated on an exaggerated scale or in simplified schematic form in which some details of conventional elements are omitted.
[0028] Figure 1 is an example of an engineering stress-strain curve.
[0029] FIG. 2 is an example of an engineering stress-strain curve showing a loading curve and an unloading curve.
[0030] FIG. 3 is a perspective view of one embodiment of a tubular member having a tubular connector.
[0031] FIG. 4 is a partial cross-sectional perspective view of a tubular member having a tubular connector.
[0032] FIG. 5 is a quarter cross-sectional side view of a threaded pin connector.
[0033] FIG. 6 is a cross-sectional side view of a threaded box connector.
[0034] FIG. 7 is a partial cross-sectional perspective view of an unthreaded tubular connection.
[0035] FIG. 8 is a cross-sectional side view of a threaded tubular connection.
[0036] FIG. 9 is an enlarged cross-sectional view of a portion of a pin connector according to the prior art.
[0037] FIG. 10 is an enlarged cross-sectional view of a portion of a threaded prior art connector.
[0038] FIG. 11 is an enlarged cross-sectional view of a portion of a pin connector having a preferred embodiment of a load flank reduction zone.
[0039] FIG. 12 is an enlarged cross-sectional view of a portion of a tubular connection formed by a pin connector and a box connector, both having a preferred embodiment of a load flank reduction zone.
[0040] FIG. 13 is a series of enlarged cross-sectional views showing a portion of a pin connector having a preferred embodiment of a load flank reduction zone before, during, and after the application of an external load, with exaggerated atomic interactions.
[0041] FIG. 14 is an enlarged cross-sectional view of a portion of a pin connector having an alternative embodiment of a load flank reduction zone formed adjacent the thread root.
[0042] FIG. 15 is an enlarged cross-sectional view of a portion of a pin connector having an alternative embodiment of a load flank reduction zone groove.
[0043] FIG. 16 is an enlarged cross-sectional view of a portion of a tubular connection formed by a pin connector and a box connector, both having an alternative embodiment of a load flank reduction zone.
[0044] FIG. 17 is an enlarged cross-sectional view of a portion of a pin connector having an alternative embodiment of two load flank reduction zone grooves.
[0045] FIG. 18 is an enlarged cross-sectional view of a portion of a pin connector having an alternative embodiment of multiple load flank reduction zone grooves.
[0046] FIG. 19 is a block diagram of a method for manufacturing a tubular connector according to principles and embodiments discussed herein.
[0047] DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS The units of measurement used herein and the methods of describing the interaction of thread load flanks are not intended to limit the scope of the invention and should be interpreted in the broadest possible sense. The terms "pin connector" and "box connector" should be interpreted equivalently to "male connector" and "female connector", respectively, as known in the art. Thus, a pin connector or male connector includes a zone at one end of a tubular member having a threaded outer surface. Similarly, a box connection end or female connection end includes a zone at one end of a tubular member having a threaded inner surface.
[0048] 3 and 4, a tubular member 10 is shown having upper and lower ends 12 and 14 and a longitudinal axis 16. A threaded connector is disposed at each end to allow connection of the tubular member 10 to additional axially adjacent tubular members. For example, as shown, the tubular member 10 has a box connector 152 disposed at the upper end 12 and a pin connector 102 disposed at the lower end 14 to allow threaded connection of additional tubular members 10 thereto, thereby forming the tubular connection 100 shown in FIG. 8 thereafter. This may be performed in succession to assemble a drill string. However, it should be understood that the tubular member 10 may have any combination of box connectors 152 or pin connectors 102 at either or both of the upper end 12 or lower end 14 without departing from the scope of the invention described herein. Further details of the tubular connection 100, as well as the pin connectors 102 and box connectors 152, are provided below.
[0049] 5, a side view of the pin connector 102 is shown in quarter section. The pin connector 102 has an outer diameter 120 and a throughbore inner diameter 122 and is comprised of a primary shoulder 104 and a secondary shoulder 106 with a zone 108 of external threads between the two shoulders. The zone of external threads is comprised of a fully formed plurality of threads 110, which will be described in further detail below. The pin connector 102 has a cross-sectional area 130 substantially determined by the pin connector threads 110, the nominal pitch diameter 54 and the inner diameter 122. Additionally, the pin connector 102 has a nose cross-sectional area 132 formed by the outer diameter 124 and the inner diameter 122 of the pin nose.
[0050] 6, a side view of the box connector 152 is shown in full cross section. The box connector 152 has an outer diameter 170 and a throughbore inner diameter 172 and is comprised of a primary shoulder 154 and a secondary shoulder 156 with a zone of internal threads 158 between the two shoulders. The zone of internal threads is comprised of a fully formed plurality of threads 160, which will be described in further detail below. The box connector 152 has a counterbore cross-sectional area 180 defined by the outer diameter 170 and a counterbore inner diameter 174. Additionally, the box connector 152 has a cross-sectional area 182 defined by the outer diameter 170 and the inner diameter 172.
[0051] FIG. 7 shows the pin connector 102 and the box connector 152 in isometric view aligned with one another on the longitudinal axis 16 before they are threaded together to form the tubular connection 100. In the embodiment shown in FIGS. 7 and 8, the outer diameter 120 and the inner diameter 122 of the pin connector are substantially the same as the outer diameter 170 and the inner diameter 172 of the box connector, respectively. However, those skilled in the art will appreciate that the outer diameter 120 and the outer diameter 170 of the connectors may differ from one another without departing from the principles disclosed herein. Similarly, the inner diameter 122 and the inner diameter 172 of the connection may differ from one another without departing from the principles disclosed herein. It is important to note that it is the fully formed pin threads 110 and the fully formed box threads 160 that need to remain compatible with one another to ensure that the tubular connection 100 remains threadable.
[0052] 8, one embodiment of a tubular connection 100 is shown. The pin connector 102 shown in FIG. 5 and the box connector 152 shown in FIG. 6 are threadedly engaged. Without being limited to this or any other theory, the cross sectional strength S of the tubular connection 100 is csIt will be appreciated by those skilled in the art that may be calculated according to the following formula:
[0053]
number
[0054] Here, Y s is the yield strength of the material making up the tubular connection 100 (in pounds per square inch (psi)), and A N is the cross-sectional area of the pin nose (unit: square inches), A PIN is the cross-sectional area of the pin at the last engaged thread (in square inches), and A CB is the cross-sectional area of the box counterbore in square inches.
[0055] 9, 11, 13-15, and 17-18, close-up views of various embodiments of the fully formed pin threads 110 are shown. It should be understood that the fully formed threads 160 on the box connector 152 may be formed to be substantially the same as the pin connector threads 110, except that the box connector threads 160 would be formed to be laterally and longitudinally inverted relative to the illustrated pin threads. Because this description of the fully formed pin connector threads 110 is sufficient to describe the equivalent fully formed box connector threads 160, a separate detailed description of the fully formed box connector threads 160 is omitted herein for the sake of brevity.
[0056] 9 and 10, close-up views of the fully formed pin threads 110' and the fully formed box threads 160' are shown in a configuration that may be typical of prior art thread embodiments. One of ordinary skill in the art will appreciate that each pin thread 110' has the following features: a crest 200, a root 202, a load flank 204, and a stabbing flank 206. As shown in FIG. 10, when the connection 100' is mated, each of the load flanks 204 of the pin threads 110' contacts the load flank of the corresponding box thread 160' along a projected radial direction, thereby forming a radial contact surface H r ' is formed by the intermeshing load flanks. For example, in the prior art, H r ' is equal to 0.082 inches.
[0057] Without being limited to this or any other theory, the radial bearing strength S of the tubular connection 100 rb It will be appreciated by those skilled in the art that may be calculated according to the following formula:
[0058]
number
[0059] Here, Y s is the yield strength of the material making up the tubular connection 100 in pounds per square inch (psi), D is the average diameter of the pin threads 110 and box threads 160 of the tubular connection 100 in inches, L is the length of the zone of engaged threads between the pin connector 102 and the box connector 152 in inches, TPI is the thread density of the tubular connection 100 in threads per inch, and H r is the total radial contact area (in inches). H r It will be understood by those skilled in the art that may be a single measurement of a single radial contact surface, or may be the sum of multiple radial contact surfaces, without departing from the concepts disclosed herein.
[0060] 11, there is shown an enlarged view of the fully formed pin threads 110 of the tubular connection 100 on a preferred embodiment of the tubular member 10. Each thread 110 has a crest 200, a root 202, a load flank 204, and a stabbing flank 206 feature. Additionally, each thread includes a load flank reducing zone 220 that acts to reduce the load flank contact area between the pin connector threads 110 and the box connector threads 160 when the pin connector 102 is threadedly engaged with the box connector 152. Similarly, while not specifically shown, one skilled in the art will appreciate that the load flank reducing zone 220 may be included on the box connector threads 160 as an alternative to the pin connector threads 110. In a preferred embodiment, the load flank reducing zone 220 is included on the box connector threads 160 and the pin connector threads 110. It will be appreciated that it is not a requirement of the present invention that the pin connector threads 110 be the exact mirror image of the box connector threads 160, merely that at least one of the pin connector threads 110 or the box connector threads 160 feature a load reduction zone 220. In a more specific embodiment, at least one load reduction zone 220 reduces the radial bearing strength S of the tubular connection 100 by rb is the cross-sectional connection strength S cs It is configured to be 100% to 110% of the above.
[0061] With continued reference to the embodiment shown in FIG. 11 , the load relief zone 220 includes a limiting flank 222 inset from the load flank 204 by an inset distance 224 and a concave radius R extending from the load flank 204 to the limiting flank 222. 204-222 and a radius R of the convex surface extending from the limiting flank 222 to the crest 200. 222-200 In particular, in a preferred embodiment, the radius R 204-222 and radius R 222-200and the plug distance 224 of the limiting flank 222 is approximately 0.002 to 0.010 inches. More specifically, the plug distance 224 is approximately 0.005 inches and the radius R 204-222 and radius R 222-200 is equal to 0.015 inches. However, the value of the insertion distance 224, as well as the radius R 204-222 and radius R 222-200 It should be understood that the value of may range widely in other embodiments without departing from the principles disclosed herein. Further details regarding the load reduction zone 220 and the resulting interaction of the pin connector threads 110 with the box connector threads 160 are provided below.
[0062] With reference to the preferred embodiment of FIG. 12, when the tubular connection 100 is threaded as shown, each of the load flanks 204 of the pin connector threads 110 contacts a corresponding load flank of the box connector threads 160 along a projected radial direction, thereby forming a radial contact surface H r are formed by the intermeshing load flanks. More specifically, in this preferred embodiment, H r is equal to 0.070 inches.
[0063] 13, a series of enlarged and exaggerated views of the fully formed multiple pin connector threads 110 of the tubular connection 100 are shown with exaggerated internal atomic spacing. Without being limited to this or any other theory, when the tubular connection 100 is threaded, the multiple pin connector threads 110 are loaded on the load flanks 204 as shown in FIG. 13b. Due to the presence of a preferred embodiment of the load relief zone 220, the load flank 204 may undergo strain hardening (illustrated by deformation and dislocation of atoms) thereby forming new interatomic bonds. It will be appreciated that upon removal of the load, a small amount of plastic deformation occurs in the load flank 204 due to the presence of the load relief zone 220 and the increased interatomic bonds. However, it will be appreciated that the macroscopic geometry and properties (e.g., shear strength) of the multiple pin connector threads 110 do not appreciably change and that the multiple pin connector threads 110 maintain compatibility with the mating box connector threads 160.
[0064] 14, a fully formed multiple pin connector thread 110 of a tubular connection 100 is shown in an expanded view having an alternative embodiment of a load reduction zone 220. The load flank reduction zone 220 includes a limiting flank 222 that is inset from the load flank 204 by an inset distance 224 and a concave radius R that extends from the thread root 202 to the limiting flank 222. 202-220 and a radius R of the convex surface extending from the limiting flank 222 to the load flank 204. 220-204 In particular, in a preferred embodiment, the radius R 202-220 and radius R 220-204 are equal to 0.030 inches and 0.015 inches, respectively, and the plug-in distance 224 of the limiting flank 222 is approximately 0.002 to 0.010 inches. More specifically, the plug-in distance 224 is equal to 0.005 inches. However, the value of the plug-in distance 224, as well as the radius R 204-222 and radius R 222-200 It should be understood that the value of can range widely in other embodiments without departing from the principles disclosed herein.
[0065] 15, a fully formed plurality of pin connector threads 110 of a tubular connection 100 is shown in an enlarged view having an alternative embodiment of a load reduction zone 220. The load flank reduction zone 220 is comprised of a limiting flank 222 that is inset from the load flank 204 by an inset distance 224 such that the load flank 204 diverges into a first load flank 204a that is closer to the thread crest 200 and a second load crest 204b that is closer to the thread root 202. As a result, FIG. 16 illustrates that when the tubular connection 100 is threaded, each of the load flanks 204a and 204b of the pin connector thread 110 contacts at least one load flank of a corresponding box connector thread 160 along a projected radial direction, thereby providing at least two radial contact surfaces H r1 and H r2 is formed by intermeshing load flanks. H r1 and H r2 The sum of these gives a total radial contact surface H equivalent to that disclosed in the preferred embodiment above. r As will be appreciated by those skilled in the art, the load relief zone 220 further extends from the second load flank 204b to a limiting flank 222 and defines a convex radius R 220 Specifically, in this embodiment, the plug-in distance 224 of the limiting flank 220 is approximately 0.002 to 0.010 inches. More specifically, the plug-in distance 224 is equal to 0.005 inches and has a radius R 220 is equal to 0.010 inches. However, the value of the insertion distance 224 and the radius R 220 It should be understood that the value of may range widely in other embodiments without departing from the principles disclosed herein. One skilled in the art will appreciate that it is undesirable to place the load reduction zone 220 in a location that compromises the shear strength of the pin connector threads 110 or box connector threads 160.
[0066] 19, a method 300 for manufacturing a tubular connector is shown. Initially, the method 300 includes forming a pin connector (e.g., pin connector 102) or a box connector (e.g., box connector 152) on one end of a first tubular member (e.g., tubular member 10) at block 305. When the tubular connection (e.g., tubular connection 100) is threaded, each of the threads of the tubular connector (e.g., pin connector threads 110' or box connector threads 160') contacts the load flanks of the mating connector to form a projected load flank radial contact surface H r ', the tubular connection has a corresponding cross-sectional connection strength S cs and radial bearing strength S rb A plurality of threads (e.g., a plurality of pin connector threads 110', or a plurality of box connector threads 160') are formed on the threaded connector so as to have a projected load flank radial contact surface H r ' is H r and the multiple threads have a reduced radial bearing strength S along the length of the multiple thread zone. rb At least one load flank reducing zone (e.g., load flank reducing zone 220) is formed on the plurality of threads (e.g., pin connector threads 110' or box connector threads 160') such that the plurality of threads (e.g., pin connector threads 110' or box connector threads 160') are formed into a fully formed plurality of threads having a radial bearing strength S of the tubular connection 100. In a more specific embodiment, the at least one load flank reducing zone 220 reduces the radial bearing strength S of the tubular connection 100 by a factor of 10. rb is the cross-sectional connection strength S cs It is configured to be 100% to 110% of the above.
[0067] While some figures specifically show at least one load reduction zone formed on the pin connector threads 110 or the box connector threads 160, those skilled in the art will understand that this is for consistency and simplicity of illustration and that such load reduction zones 220 may be formed on the pin connector threads 110, the box connector threads 160, or on both the intermeshing pin connector threads 110 and the box connector threads 160 without departing from the scope of the principles disclosed herein. When the tubular connection 100 is threadedly assembled, the radial bearing strength S of the tubular connection 100 is rb is reduced, and in a preferred embodiment, the cross-sectional connection strength S cs It will be further understood by one skilled in the art that there can be any combination of load flank reducing zones 220 (e.g., the further embodiments shown in Figures 16 and 17, or combinations of load flank reducing zones discussed herein), provided that at least one load flank reducing zone 220 is configured such that the load flank reducing zone 220 is 100%-110% of the load flank reducing zone 220.
[0068] Any use of terms herein describing interactions between elements is not intended to limit such interactions to direct interactions between the elements in question, but may also include indirect interactions between the elements, for example, via secondary or intermediate structures, unless specifically stated otherwise. Furthermore, unless expressly stated otherwise, steps in a method or method claim may be performed in any order. The use of identifiers (a), (b), (c), etc. preceding steps in describing a method should not be construed as specifying a particular order for the steps, but rather is used for clarity and conciseness when subsequently referring to such steps.
[0069] It will be apparent that modifications may be made to the exemplary embodiments while remaining within the scope of the present invention, and therefore the scope of the following claims should not be limited by the preferred embodiments described in the above examples and drawings, but should be accorded the broadest interpretation consistent with the entire specification. [Brief description of the drawings]
[0070] [Figure 1] This is an example of an engineering stress-strain curve. [Diagram 2] 1 is an example of an engineering stress-strain curve showing a loading and unloading curve. [Diagram 3] FIG. 2 is a perspective view of one embodiment of a tubular member having a tubular connector. [Figure 4] FIG. 2 is a partial cross-sectional perspective view of a tubular member having a tubular connector. [Diagram 5] FIG. 2 is a quarter cross-sectional side view of a threaded pin connector. [Figure 6] FIG. 1 is a cross-sectional side view of a threaded box connector. [Figure 7] FIG. 2 is a partial cross-sectional perspective view of an unthreaded tubular connection. [Figure 8] FIG. 2 is a cross-sectional side view of a threaded tubular connection. [Figure 9] FIG. 1 is an enlarged cross-sectional view of a portion of a pin connector according to the prior art. [Figure 10] FIG. 2 is an enlarged cross-sectional view of a portion of a threaded prior art connector. [Figure 11] FIG. 2 is an enlarged cross-sectional view of a portion of a pin connector having a preferred embodiment of a load flank reduction zone; [Figure 12] FIG. 1 is an enlarged cross-sectional view of a portion of a tubular connection formed by a pin connector and a box connector, both having a preferred embodiment of a load flank reduction zone; [Figure 13]1A-1C are a series of enlarged cross-sectional views of a portion of a pin connector having a preferred embodiment of a load flank reduction zone before, during, and after application of an external load, with exaggerated atomic interactions; [Figure 14] FIG. 13 is an enlarged cross-sectional view of a portion of a pin connector having an alternative embodiment of a load flank reduction zone formed near the thread root. [Figure 15] FIG. 13 is an enlarged cross-sectional view of a portion of a pin connector having an alternative embodiment of a load flank reduction zone groove. [Figure 16] FIG. 13 is an enlarged cross-sectional view of a portion of a tubular connection formed by a pin connector and a box connector, both having an alternative embodiment of a load flank reduction zone. [Figure 17] FIG. 13 is an enlarged cross-sectional view of a portion of a pin connector having an alternative embodiment of two load flank reduction zone grooves. [Figure 18] FIG. 13 is an enlarged cross-sectional view of a portion of a pin connector having an alternative embodiment of multiple load flank reduction zone grooves. [Figure 19] FIG. 1 is a block diagram of a method for manufacturing a tubular connector according to principles and embodiments discussed herein.
Claims
1. A tubular member, a box connector disposed on a first end of the tubular member; the box connector being adapted to receive a corresponding pin connector provided on another tubular member; the box connector includes a nominal pitch diameter, a longitudinal axis, a primary shoulder, a secondary shoulder, and a plurality of internal thread zones; the zone of internal threads includes a plurality of threads tapered with respect to the longitudinal axis; the plurality of threads include a thread crest, a thread root, at least one load flank, a stabbing flank, and at least one load flank reduction zone; the box connector being adapted to threadably mate with a corresponding pin connector on another tubular member to form a tubular connection; Each of the at least one load flank on the box connector contacts at least one load flank of a corresponding thread on the corresponding pin connector along a projected radial direction, whereby at least one load flank projected radial contact surface Hr is formed by the intermeshing load flanks; At least one said load flank reducing zone reduces the radial bearing strength of said tubular connection.
2. A tubular member, a pin connector disposed on a first end of the tubular member; the pin connector being adapted to be received in a corresponding box connector provided on another tubular member; the pin connector includes a nominal pitch diameter, a longitudinal axis, a primary shoulder, a secondary shoulder, and a plurality of external thread zones; the zone of external threads includes a plurality of threads tapered with respect to the longitudinal axis; the plurality of threads include a thread crest, a thread root, at least one load flank, a stabbing flank, and at least one load flank reduction zone; the pin connector is adapted to be threadedly engaged with a corresponding box connector on another tubular member to form a tubular connection; Each of the at least one load flank on the pin connector contacts at least one load flank of a corresponding thread on the corresponding box connector along a projected radial direction, thereby forming at least one projected load flank radial contact surface H r are formed by the intermeshing load flanks, At least one said load flank reducing zone reduces the radial bearing strength of said tubular connection.
3. The load flank reduction zone comprises: a limiting flank inserted parallel to the load flank; a first radius extending between the thread crest and the limiting flank having a first radius of curvature; a second radius extending from the limiting flank to the load flank having a second radius of curvature; Including, the first radius has a convex radius of curvature; The tubular member of claim 1 or 2, wherein the second radius has a concave radius of curvature.
4. 4. The tubular member of claim 3, wherein said limiting flank is recessed 0.002 to 0.010 inches from said load flank.
5. 5. The tubular member of claim 4, wherein said first radius of curvature of said convex surface is 0.015 inches and said second radius of curvature of said concave surface is 0.015 inches.
6. The load flank reduction zone comprises: a limiting flank inserted parallel to the load flank; a first radius extending between the thread root and the limiting flank having a first radius of curvature; a second radius extending from the limiting flank to the load flank having a second radius of curvature; Including, the first radius has a concave radius of curvature; The tubular member of claim 1 or 2, wherein the second radius has a concave radius of curvature.
7. 7. The tubular member of claim 6, wherein said limiting flank is recessed 0.002 to 0.010 inches from said load flank.
8. 5. The tubular member of claim 4, wherein said first radius of curvature of said concave surface is 0.030 inches and said second radius of curvature of said concave surface is 0.015 inches.
9. The load flank reduction zone comprises: at least one limiting flank inset parallel to the load flank; a radius extending between the load flank and the limiting flank having a concave radius of curvature; The tubular member of claim 1 or 2, comprising:
10. 10. The tubular member of claim 9, wherein the limiting flank is recessed 0.002 to 0.010 inches from the load flank.
11. 11. The tubular member of claim 10, wherein the radius of curvature of the concave surface is 0.010 inches.
12. When a connection is made between tubular members, the projected load flank radial contact surface H of the tubular connection r The tubular member of any one of claims 1 to 11, wherein is equal to about 0.070 inches.
13. When a connection is made between tubular members, the primary shoulders, the secondary shoulders, the average diameter, and the threads of the tubular connection define a cross-sectional connection strength S cs Corresponding to, At least one of the projected load flank radial contact surfaces H r is the radial bearing strength S along the entire length of said zone of the plurality of threads. rb Corresponding to, At least one of the load flank reducing zones has a relationship [0010] A tubular member according to any one of claims 1 to 12, wherein the projected load flank radial contact area is varied such that:
14. 14. A tubular member according to any one of claims 1 to 13, wherein when threaded and torqued, the material directly adjacent the load flank of the thread has a strain hardened metal grain structure oriented parallel to the load flank.
15. A tubular connection between a pin connector and a box connector, comprising: the pin connector is adapted to be threadedly engaged with the box connector; Each of the plurality of connectors has an outer diameter, a through hole inner diameter, a nominal pitch diameter, and a longitudinal axis; The connection portion is a tapered pin connector including a pin primary shoulder, a pin secondary shoulder, and a plurality of externally threaded zones; a tapered box connector including a box primary shoulder, a box secondary shoulder, and a plurality of internally threaded zones; Including, the plurality of thread zones include a plurality of threads tapered with respect to the longitudinal axis; the plurality of threads include a thread crest, a thread root, at least one load flank, a stabbing flank, and at least one load flank reduction zone; each of the at least one load flank on the pin connector contacts at least one load flank of a corresponding thread on the box connector along a projected radial direction, whereby at least one projected load flank radial contact surface is defined by the intermeshing load flanks; A tubular connection, wherein at least one said load flank reducing zone reduces the radial bearing strength of said tubular connection.
16. The plurality of primary shoulders, the plurality of secondary shoulders, the average diameter, and the plurality of threads define a cross-sectional connection strength S cs Corresponding to, At least one of the projected load flank radial contact surfaces has a radial bearing strength S along the entire length of the zone of the plurality of threads. rb Corresponding to, At least one of the load flank reducing zones has a relationship [0025] 16. The tubular connection of claim 15, wherein the projected load flank radial contact area is varied such that:
17. 1. A method for manufacturing a box connector on a tubular member, comprising: the box connector adapted to receive a corresponding pin connector on another tubular member having an outer diameter, an inner bore diameter, and a longitudinal axis; a) forming a box connector on an end of the first tubular member; wherein the box connector includes an outer diameter, a throughbore inner diameter, a box primary shoulder, a box secondary shoulder, and a plurality of internal thread zones having a nominal pitch diameter; When the box connector is threadedly mated with a corresponding pin connector, the primary shoulder, the secondary shoulder, the nominal pitch diameter, and the plurality of threads define a cross-sectional connection strength S cs Forming b) forming a plurality of threads in an area between the box primary shoulder and the box secondary shoulder; wherein the plurality of threads include a crest, a root, a load flank, and a stabbing flank; When the box connector is screwed into the corresponding pin connector, each of the plurality of threads on the box connector contacts a corresponding thread on the corresponding pin connector along a projected radial direction, thereby providing a radial bearing strength S of the tubular connection. rb ' corresponding to the projected load flank radial contact surface H r ' is formed by said intermeshing load flanks; c) forming at least one load flank reduced zone on a plurality of said load flanks of a plurality of said box connector threads; wherein, when the box connector is threadedly engaged with a corresponding pin connector, the radial bearing strength S of the tubular connection is increased by at least one of the load flank reduction zones. rb ' is S rb The projected load flank radial contact surface H r ' is H r is reduced to 16. A method for manufacturing a box connector on a tubular member, comprising:
18. 1. A method for manufacturing a pin connector on a tubular member, comprising: the pin connector being adapted to be received in a corresponding box connector provided on another tubular member having an outer diameter, an inner bore diameter, and a longitudinal axis; a) forming a pin connector on an end of the first tubular member; wherein the pin connector includes a plurality of external thread zones having an outer diameter, a throughbore inner diameter, a pin primary shoulder, a pin secondary shoulder, and a nominal pitch diameter; When the pin connector is threadedly mated with a corresponding box connector, the primary shoulder, the secondary shoulder, the nominal pitch diameter, and the plurality of threads define a cross-sectional connection strength S cs Forming b) forming a plurality of threads in a region between the pin primary shoulder and the pin secondary shoulder; wherein the plurality of threads include a crest, a root, a load flank, and a stabbing flank; When the pin connector is screwed into the corresponding box connector, each of the threads on the pin connector contacts a corresponding thread on the corresponding box connector along a projected radial direction, thereby providing a radial bearing strength S of the tubular connection. rb ' corresponding to the projected load flank radial contact surface H r ' is formed by said intermeshing load flanks; c) forming at least one load flank reduced zone on a plurality of said load flanks of a plurality of said pin connector threads; wherein, when the pin connector is threadedly engaged with a corresponding box connector, the radial bearing strength S of the tubular connection is increased by at least one of the load flank reduction zones. rb ' is S rb The projected load flank radial contact surface H r ' is H r is reduced to 16. A method for manufacturing a pin connector on a tubular member, comprising:
19. The load flank reducing zone of step (c) comprises: forming a limiting flank inserted parallel to the load flank, a first radius extending between the crest and the limiting flank having a first radius of curvature, and a second radius extending from the limiting flank to the load flank having a second radius of curvature. Further comprising: the first radius has a convex first radius of curvature; 19. The method of claim 17 or 18, wherein the second radius comprises a concave second radius of curvature.
20. 20. The method of claim 19, wherein the limiting flank is recessed 0.002 to 0.010 inches from the load flank.
21. 21. The method of claim 20, wherein the first radius of curvature of the convex surface is 0.015 inches and the second radius of curvature of the concave surface is 0.015 inches.
22. The load flank reducing zone of step (c) comprises: forming a limiting flank inserted parallel to the load flank, a first radius extending between the thread root and the limiting flank having a first radius of curvature, and a second radius extending from the limiting flank to the load flank having a second radius of curvature. Further comprising: the first radius has a concave first radius of curvature; The method of claim 17 or 18, wherein the second radius has a concave radius of curvature.
23. 23. The method of claim 22, wherein the limiting flank is recessed 0.002 to 0.010 inches from the load flank.
24. 24. The method of claim 23, wherein the first radius of curvature of the concave surface is 0.030 inches and the second radius of curvature of the concave surface is 0.015 inches.
25. The load flank reducing zone of step (c) comprises: forming a limiting flank inset parallel to the load flank, and a radius extending between the load flank and the limiting flank having a concave radius of curvature.
19. The method of claim 17 or 18, further comprising:
26. 26. The method of claim 25, wherein the limiting flank is recessed 0.002 to 0.010 inches from the load flank.
27. 27. The method of claim 26, wherein the radius of curvature of the concave surface is 0.010 inches.
28. Step (c) is forming a load relief zone; Here, the projected load flank radial contact surface H r is equal to approximately 0.070 inches, The method of any one of claims 17 to 27, further comprising:
29. When the connector is threadedly mated with a mating connector, a tubular connection is formed, whereby at least one of the load flank reduction zones is in a relationship [0030] The method according to any one of claims 17 to 28, wherein the tubular connection is altered such that:
