Refrigeration Cycle Equipment

The refrigeration cycle device addresses compressor overheating by injecting liquid phase refrigerant into the compressor using a solenoid valve and expansion valve, ensuring stable refrigerant flow and avoiding complex piping configurations.

JP7551769B2Active Publication Date: 2024-09-17CARRIER JAPAN CORP
View PDF 6 Cites 0 Cited by

Patent Information

Application Number
JP2022558958
Authority / Receiving Office
JP · JP
Patent Type
Patents
Current Assignee / Owner
Priority Date
2020-10-30
Filing Date
2021-10-06
Publication Date
2024-09-17
Estimated Expiration
2041-10-06

AI Technical Summary

Technical Problem

Refrigeration cycle devices face the risk of compressor overheating due to increased temperature and pressure of discharged refrigerant, which can lead to lubricating oil viscosity decrease and motor damage, and existing solutions complicate piping to avoid a liquid-sealed state in injection flow paths.

Method used

A refrigeration cycle device with an injection flow path that includes a solenoid valve, check valve, and a non-closed expansion valve, allowing liquid phase refrigerant injection into the compressor to cool the gas phase refrigerant, while avoiding a liquid-sealed state through simple piping configurations.

Benefits of technology

Prevents compressor overheating by stabilizing refrigerant flow and reducing the risk of liquid-sealed states, simplifying piping, saving space, and reducing costs and refrigerant leakage.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 0007551769000005
    Figure 0007551769000005
  • Figure 0007551769000006
    Figure 0007551769000006
  • Figure 0007551769000001
    Figure 0007551769000001
Patent Text Reader

Abstract

This refrigeration cycle device is provided with a refrigerant circuit through which a refrigerant circulates, the refrigeration cycle device comprising: a compressor that discharges a gas-phase refrigerant, a heat-source-side heat exchanger; a first expansion valve; a use-side heat exchanger; and an injection channel through which a portion of a liquid-phase refrigerant is distributed and injected into the compressor. In the injection channel, an electromagnetic valve, a check valve, and a second expansion valve are disposed, in that order from the upstream side of the flowing direction of the liquid-phase refrigerant in the injection channel. The second expansion valve enters a stopped state without being fully closed and having an aperture larger than the full closure.
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] An embodiment of the present invention relates to a refrigeration cycle device. [Background technology]

[0002] The refrigeration cycle device includes a compressor, a condenser, an expansion valve, and an evaporator as main components. For example, during heating operation or heating operation, the refrigeration cycle device absorbs heat from the outside air with the evaporator and supplies the heat to the indoor air or hot water with the condenser. At that time, the higher the outside air temperature, the greater the amount of heat absorbed by the evaporator, and the higher the temperature and pressure of the refrigerant drawn into the compressor. If this causes the compressor to overheat, the temperature of the refrigerant discharged from the compressor may rise excessively. Such an increase in the discharge refrigerant temperature may, for example, reduce the viscosity of the lubricating oil that lubricates the compression mechanism of the compressor, causing damage to the motor in the compressor. Therefore, various measures have been taken to prevent such an increase in the discharge refrigerant temperature.

[0003] One example of this is the addition of an injection flow path to the refrigerant circulation path, which introduces a portion of the liquid-phase refrigerant to the compressor. The injection flow path is connected between the condenser and the expansion valve in the circulation path, and includes a check valve, a two-way valve, an expansion valve (injection flow path expansion valve), and the like. By using the injection flow path, a portion of the liquid-phase refrigerant that has passed through the condenser is injected into the cylinder chamber of the compressor, and the gas-phase refrigerant sucked into the compressor is cooled by the liquid-phase refrigerant. This prevents the compressor from overheating.

[0004] Such an injection flow path is controlled to open and close in response to, for example, the outside air temperature. When the injection flow path is opened and then closed, or during a power outage, the liquid-phase refrigerant is sealed in the injection flow path (liquid-sealed state). When the outside air temperature (ambient temperature) rises in the liquid-sealed state, the liquid-phase refrigerant expands in the injection flow path. For example, if the liquid-phase refrigerant expands between the two-way valve and the check valve of the injection flow path, depending on the extent of the expansion, there is a risk of damage to the piping between these valves that are in a liquid-sealed state. For this reason, when an injection flow path is provided, it is necessary to use a piping configuration that does not cause such a liquid-sealed state. [Prior art documents] [Patent documents]

[0005] [Patent Document 1] Patent No. 6514964 Summary of the Invention [Problem to be solved by the invention]

[0006] The present invention has been made based on this, and its object is to provide a refrigeration cycle device equipped with an injection flow path that can avoid a liquid-sealed state with relatively simple piping without complicating the piping. [Means for solving the problem]

[0007] According to the embodiment, the refrigeration cycle device discharges a gas phase refrigerant. Single A compressor, a heat source side heat exchanger, a first expansion valve, a user side heat exchanger, and a part of the liquid phase refrigerant are diverted to the heat source side heat exchanger. Only the liquid phase refrigerant that has been diverted and an injection flow path for injecting the refrigerant into the compressor, and a refrigerant circuit in which the refrigerant circulates. A solenoid valve, a check valve, and a second expansion valve are arranged in the injection flow path in this order from the upstream side in the flow direction of the liquid-phase refrigerant in the injection flow path. The second expansion valve is not fully closed, but is in a stop state in which it remains open by a stop opening degree that is larger than the fully closed state. [Brief description of the drawings]

[0008] [Figure 1] FIG. 1 is a circuit diagram that illustrates a refrigeration cycle of a refrigeration cycle device (air-cooled heat pump chilling unit) according to an embodiment. [Diagram 2] FIG. 2 is a control flow diagram during opening and closing control of an injection flow path in a refrigeration cycle apparatus (air-cooled heat pump chilling unit) according to the embodiment. [Diagram 3] FIG. 3 is a diagram that illustrates a flow of a portion of a liquid-phase refrigerant in a state in which the injection flow path is opened in a cooling mode of the refrigeration cycle apparatus (air-cooled heat pump chilling unit) according to the embodiment. [Figure 4] FIG. 4 is a diagram that illustrates a flow of a portion of a liquid-phase refrigerant in a state in which the injection flow path is opened in a heating mode of a refrigeration cycle apparatus (air-cooled heat pump chilling unit) according to an embodiment. [Diagram 5] FIG. 5 is a diagram that illustrates a flow of a portion of a liquid-phase refrigerant in a state in which an injection flow path is closed in a refrigeration cycle apparatus (air-cooled heat pump chilling unit) according to an embodiment. [Figure 6] FIG. 6 is a circuit diagram that illustrates a refrigeration cycle of another embodiment of the refrigeration cycle apparatus (air-cooled heat pump chilling unit) according to the embodiment. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0009] Hereinafter, an embodiment of the present invention will be described with reference to the drawings. Fig. 1 is a circuit diagram showing a refrigeration cycle of an air-cooled heat pump chilling unit (hereinafter simply referred to as a chilling unit) 1 according to an embodiment. The chilling unit 1 is an example of a refrigeration cycle device, and can operate in a cooling mode and a heating mode. The refrigeration cycle device is not limited to the chilling unit 1 having a refrigeration cycle as shown in Fig. 1, and may be, for example, an air conditioner or a water-cooled heat source device.

[0010] As shown in FIG. 1, the chilling unit 1 includes a refrigeration cycle unit 2, a water circuit unit 5, a control unit 7, and an operation unit 8. The refrigeration cycle unit 2 is composed of a refrigerant circuit R including, as main elements, a compressor 20, a four-way valve 21, an air heat exchanger section 22, a pair of expansion valves (first expansion valves) 23a, 23b, a receiver 24, a water heat exchanger (use side heat exchanger) 25, and a gas-liquid separator 26. These elements of the refrigerant circuit R are connected via a main pipe 27 through which the refrigerant circulates.

[0011] For example, the compressor 20 is a variable capacity type compressor that discharges a high-temperature, high-pressure gas-phase refrigerant from a discharge port. The discharge port of the compressor 20 is connected to a first port 21a of the four-way valve 21 via a discharge pipe 28. A first temperature sensor (detection unit) T1 that detects the temperature of the high-temperature, high-pressure gas-phase refrigerant and a first pressure sensor P1 that detects the pressure of the high-temperature, high-pressure gas-phase refrigerant discharged from the compressor 20 are provided on the discharge pipe 28.

[0012] The second port 21b of the four-way valve 21 is connected to the air heat exchanger section 22. In the present embodiment, as an example, the air heat exchanger section 22 includes a pair of air heat exchangers 29a, 29b and a fan 30. The air heat exchangers 29a, 29b correspond to heat source side heat exchangers. In the air heat exchanger section 22, the air heat exchangers 29a, 29b form an exhaust passage extending in the vertical direction between the air heat exchangers 29a, 29b and the shielding plate. The fan 30 is supported on the upper end of the air heat exchangers 29a, 29b via a support member so as to be located at an exhaust port opening at the upper end of the exhaust passage.

[0013] In such an air heat exchanger section 22, when the fan 30 is driven, outside air passes through the air heat exchangers 29a and 29b and is drawn into the exhaust passage. The outside air drawn into the exhaust passage is sucked up toward the exhaust port and is discharged from the exhaust port to above the air heat exchanger section 22.

[0014] The inlets of the air heat exchangers 29a, 29b are connected in parallel to the second port 21b of the four-way valve 21. A second temperature sensor T2 for detecting the temperature of the gas-phase refrigerant flowing into the air heat exchangers 29a, 29b is provided near the inlets of the air heat exchangers 29a, 29b. The inlets are inlets through which the refrigerant flows into the air heat exchangers 29a, 29b in a cooling mode described below, and are outlets through which the refrigerant flows out (outlets of the air heat exchangers 29a, 29b) in a heating mode.

[0015] The outlets of the air heat exchangers 29a, 29b are connected to pipes 41a, 41b having the expansion valves 23a, 23b. The pipes 41a, 41b join each other downstream of the expansion valves 23a, 23b and are connected to a single collective pipe 42. The collective pipe 42 is connected to the third port 21c of the four-way valve 21 via the receiver 24 and the water heat exchanger 25. The outlets are outlets through which the refrigerant flows out of the air heat exchangers 29a, 29b in a cooling mode described below, and are inlets through which the refrigerant flows in (the inlets of the air heat exchangers 29a, 29b) in a heating mode.

[0016] The fourth port 21d of the four-way valve 21 is connected to the suction side of the compressor 20 via the gas-liquid separator 26. A third temperature sensor T3 for detecting the temperature of the gas-liquid two-phase refrigerant guided to the gas-liquid separator 26 is provided in a pipe 43 connecting the fourth port 21d of the four-way valve 21 and the inlet of the gas-liquid separator 26.

[0017] Furthermore, a pipe 44 connecting the outlet of the gas-liquid separator 26 and the suction side of the compressor 20 is provided with a second pressure sensor P2 that detects the pressure of the low-temperature, low-pressure gas-phase refrigerant sucked into the compressor 20.

[0018] Furthermore, a pipe 46 is provided between the gas-liquid separator 26 and the four-way valve 21. The pipe 46 connects the inlet of the gas-liquid separator 26 and the first port 21a of the four-way valve 21, and a normally-closed solenoid valve 47 is provided midway along the pipe 46.

[0019] The water heat exchanger 25 includes a refrigerant passage 25a and a water passage 25c. The refrigerant passage 25a is connected to a collecting pipe 42 downstream of the receiver 24 in a cooling mode to be described later, and upstream of the receiver 24 in a heating mode to be described later.

[0020] In addition to these configurations, the refrigerant circuit R includes an injection flow path 6. The injection flow path 6 includes three flow paths (hereinafter referred to as first to third injection flow paths) 6a, 6b, and 6c. The first injection flow path 6a and the second injection flow path 6b are flow paths that branch off from the refrigerant circuit R. The third injection flow path 6c is a flow path where the first injection flow path 6a and the second injection flow path 6b join together.

[0021] The first injection flow path 6a is a flow path for high-pressure liquid-phase refrigerant condensed by heat exchange with outside air passing through the air heat exchangers 29a and 29b. One end of the first injection flow path 6a is connected between the air heat exchanger 29b and the expansion valve 23b. As a result, the first injection flow path 6a branches off from the pipe 41b between the air heat exchanger 29b and the expansion valve 23b, that is, downstream of the air heat exchanger 29b and upstream of the expansion valve 23b in the flow direction of the liquid-phase refrigerant.

[0022] The second injection flow path 6b is a flow path for high-pressure liquid-phase refrigerant that has exchanged heat with water flowing through the water flow path 25c and passed through the water heat exchanger 25. One end of the second injection flow path 6b is connected between the water heat exchanger 25 and the receiver 24. As a result, the second injection flow path 6b branches off from the collecting pipe 42 between the water heat exchanger 25 and the receiver 24, that is, downstream of the water heat exchanger 25 and upstream of the receiver 24 (in other words, the expansion valves 23a, 23b) in the flow direction of the liquid-phase refrigerant.

[0023] The third injection flow passage 6c is a flow passage where the first injection flow passage 6a and the second injection flow passage 6b join together and a high-pressure liquid-phase refrigerant flows. That is, in the flow direction of the liquid-phase refrigerant, the first injection flow passage 6a and the second injection flow passage 6b are arranged on the upstream side and the third injection flow passage 6c is arranged on the downstream side. One end of the third injection flow passage 6c is connected to the other end of the first injection flow passage 6a and the other end of the second injection flow passage 6b, and the other end is connected to the injection port 20a of the compressor 20.

[0024] By providing these injection flow paths 6a, 6b, and 6c, a portion of the liquid-phase refrigerant is injected into a cylinder chamber (not shown) of the compressor 20, and the high-temperature gas-phase refrigerant sucked into the compressor 20 is cooled by this liquid-phase refrigerant, thereby preventing overheating of the compressor 20. In the injection flow path 6, solenoid valves 61a and 61b, check valves 62a and 62b, and an expansion valve (second expansion valve) 60c are arranged in this order from the upstream side in the flow direction of the liquid-phase refrigerant. Here, the operation for injecting liquid-phase refrigerant into the cylinder chamber of the compressor 20 via the injection flow paths 6a, 6b, and 6c to cool the same is referred to as liquid injection operation.

[0025] The first injection flow path 6a is provided with a solenoid valve (hereinafter referred to as a cooling solenoid valve) 61a and a check valve (hereinafter referred to as a cooling check valve) 62a. In the flow direction of the liquid-phase refrigerant in the first injection flow path 6a, the cooling solenoid valve 61a is disposed upstream of the cooling check valve 62a. When the chilling unit 1 is operated in the cooling mode (cooling operation), a part of the liquid-phase refrigerant branches off from the pipe 41b and flows into the first injection flow path 6a as necessary.

[0026] The second injection flow path 6b is provided with a solenoid valve (hereinafter referred to as a heating solenoid valve) 61b and a check valve (hereinafter referred to as a heating check valve) 62b. In the flow direction of the liquid-phase refrigerant in the second injection flow path 6b, the heating solenoid valve 61b is disposed upstream of the heating check valve 62b. When the chilling unit 1 is operated in the heating mode (heating operation), a portion of the liquid-phase refrigerant branches off from the collecting pipe 42 and flows into the second injection flow path 6b as necessary.

[0027] The third injection flow passage 6c is provided with an expansion valve (second expansion valve) 60c. The expansion valve 60c is an electronic valve and is a valve-less valve. The valve-less valve does not close completely, but has a valve structure that stops at an opening degree (hereinafter referred to as a stop opening degree) larger than the full closing state. That is, even if the expansion valve 60c stops, it is maintained in a state where it is opened only by the stop opening degree, and the flow of the liquid-phase refrigerant is not blocked. The high-pressure liquid-phase refrigerant that has passed through the first injection flow passage 6a or the second injection flow passage 6b flows into the third injection flow passage 6c. The high-pressure liquid-phase refrigerant that has flowed into the third injection flow passage 6c is decompressed in the process of passing through the expansion valve 60c, and is injected into the cylinder chamber from the injection port of the compressor 20.

[0028] The water circuit unit 5 is a flow path for water that exchanges heat with the refrigerant in the water heat exchanger 25, and includes, as main elements, a water circulation pump 50, and first to third water pipes 51a, 51b, and 51c.

[0029] The water circulation pump 50 is, for example, a variable capacity type, and the intake port is connected to one end of the first water pipe 51a, and the discharge port is connected to one end of the second water pipe 51b. The other end of the first water pipe 51a is connected to the water outlet of the chilling unit 1 on the utilization device side. The other end of the second water pipe 51b is connected to the inlet of the water flow path 25c of the water heat exchanger 25. The second water pipe 51b is provided with a third pressure sensor P3 for detecting water pressure and a fourth temperature sensor T4 for detecting water temperature. The third water pipe 51c has one end connected to the outlet of the water flow path 25c, and the other end connected to the water inlet of the chilling unit 1 on the utilization device side. The third water pipe 51c is provided with a fourth pressure sensor P4 for detecting water pressure and a fifth temperature sensor T5 for detecting water temperature.

[0030] The control unit 7 controls the operation of each element of the refrigeration cycle unit 2 and the water circuit unit 5, and controls the operation of the chilling unit 1. The control unit 7 includes a CPU, a memory, a storage device (non-volatile memory), an input / output circuit, a timer, and the like, and controls the operation of each element of the refrigeration cycle unit 2 and the water circuit unit 5, and controls the operation of the chilling unit 1. For example, the control unit 7 acquires various information (data) required for operation control of the chilling unit 1, such as starting and stopping the operation of the chilling unit 1, selecting a cooling operation mode or a heating operation mode, the temperature and pressure of the refrigerant, the water temperature, and the water pressure. By executing a predetermined calculation process according to the acquired information, the control unit 7 controls the operation of each of the above elements, and starts and stops the operation of the chilling unit 1, switches between the cooling operation mode and the heating operation mode, and opens and closes the injection flow path 6. Specifically, the control unit 7 controls each operation, such as starting and stopping the compressor 20, switching the ports of the four-way valve 21, and opening and closing the expansion valves 23a and 23b, the expansion valve 60c, the cooling solenoid valve 61a, and the heating solenoid valve 61b.

[0031] The operation unit 8 includes, for example, an operation panel, switches, buttons, a display, etc., and is connected by wire or wirelessly to the control unit 7. The operation unit 8 is an interface through which a user performs predetermined operations, such as starting the operation of the chilling unit 1, selecting the cooling operation mode or the heating operation mode, and setting the water supply temperature, etc.

[0032] The operation of the chilling unit 1 during operation in the cooling mode and the heating mode will now be described.

[0033] For example, when the chilling unit 1 operates in the cooling mode, the four-way valve 21 switches so that the first port 21a communicates with the second port 21b and the third port 21c communicates with the fourth port 21d, as shown by solid lines in FIG.

[0034] Then, the compressor 20 operates, and high-temperature, high-pressure gas-phase refrigerant is discharged from the compressor 20 to the discharge pipe 28. The high-temperature, high-pressure gas-phase refrigerant discharged from the compressor 20 is guided via the four-way valve 21 to the air heat exchangers 29a and 29b.

[0035] The gas-phase refrigerant guided to the air heat exchangers 29a, 29b exchanges heat with the outside air passing through the air heat exchangers 29a, 29b by the operation of the fan 30, condenses, and changes into a high-pressure liquid-phase refrigerant. The high-pressure liquid-phase refrigerant is reduced in pressure while passing through the expansion valves 23a, 23b, and changes into an intermediate-pressure gas-liquid two-phase refrigerant. The gas-liquid two-phase refrigerant is guided to the water heat exchanger 25 via the receiver 24. The gas-liquid two-phase refrigerant guided to the water heat exchanger 25 exchanges heat with the water flowing through the water flow path 25c. As a result, the water in the water flow path 25c loses its latent heat and becomes cold water. The cold water is supplied to the utilization device side from the third water piping 51c.

[0036] The low-temperature, low-pressure two-phase gas-liquid refrigerant that has passed through water heat exchanger 25 is guided via four-way valve 21 to gas-liquid separator 26, where it is separated into liquid-phase refrigerant and gas-phase refrigerant. The gas-phase refrigerant separated from the liquid-phase refrigerant is sucked into compressor 20, where it becomes high-temperature, high-pressure gas-phase refrigerant again, and is discharged from compressor 20.

[0037] On the other hand, when the chilling unit 1 operates in the heating mode, the four-way valve 21 switches so that the first port 21a communicates with the third port 21c and the second port 21b communicates with the fourth port 21d, as shown by the dashed lines in FIG.

[0038] When operation in the heating mode is started, the high-temperature, high-pressure gas-phase refrigerant compressed by the compressor 20 is guided to the water heat exchanger 25 via the four-way valve 21. The gas-phase refrigerant guided to the water heat exchanger 25 and flowing through the refrigerant flow path 25a exchanges heat with the water flowing through the water flow path 25c. As a result, the water in the water flow path 25c is heated and becomes hot water. The hot water is supplied to the utilization device from the third water piping 51c.

[0039] The high-pressure liquid-phase refrigerant that has passed through the water heat exchanger 25 changes to an intermediate-pressure gas-liquid two-phase refrigerant while passing through the receiver 24 and the expansion valves 23a, 23b, and is led to the air heat exchangers 29a, 29b. The gas-liquid two-phase refrigerant led to the air heat exchangers 29a, 29b exchanges heat with outside air passing through the air heat exchangers 29a, 29b by the operation of the fan 30, evaporates, and changes to a low-temperature, low-pressure gas-liquid two-phase refrigerant.

[0040] The low-temperature, low-pressure two-phase gas-liquid refrigerant that has passed through air heat exchangers 29a, 29b is guided via four-way valve 21 to gas-liquid separator 26, where it is separated into liquid-phase refrigerant and gas-phase refrigerant. The gas-phase refrigerant separated from the liquid-phase refrigerant is sucked into compressor 20, where it becomes high-temperature, high-pressure gas-phase refrigerant again, and is discharged from compressor 20.

[0041] Here, as an example of operation control in the chilling unit 1, operation control focusing on opening and closing control of the injection flow path 6 in the refrigerant circuit R will be described in accordance with the control flow of the control unit 7. Injection of liquid phase refrigerant into the compressor 20 is controlled by opening and closing control of the injection flow path 6. Fig. 2 shows the control flow of the control unit 7 when controlling the opening and closing of the injection flow path 6.

[0042] When the chilling unit 1 has started operating, the control unit 7 controls the opening and closing of the injection flow path 6 as follows. When controlling the opening and closing of the injection flow path 6, the control unit 7 determines the operation mode of the chilling unit 1. As an example of the control flow in FIG. 2, the control unit 7 determines whether the operation mode of the chilling unit 1 is the cooling mode (S101). At that time, the control unit 7 receives a signal indicating the operation mode from, for example, the operation unit 8, and if the received signal is a selection signal for the cooling mode, it determines that the operation mode is the cooling mode, and if the received signal is any other signal, it determines that the operation mode is not the cooling mode.

[0043] When the operation mode is the cooling mode, the control unit 7 operates the chilling unit 1 in the cooling mode (S102). In this case, the control unit 7 controls the operation of the four-way valve 21 to communicate the first port 21a with the second port 21b and to communicate the third port 21c with the fourth port 21d, and operates the compressor 20.

[0044] Next, the control unit 7 judges whether or not the injection flow path 6 is opened (S103). The opening condition is a condition for judging whether or not the injection flow path 6 is opened. Here, the opening condition is judged according to whether or not the temperature (Td) of the refrigerant discharged from the compressor 20 is equal to or lower than a predetermined temperature (T0). The temperature of the refrigerant discharged from the compressor 20 (hereinafter referred to as the discharge refrigerant temperature Td) is the temperature of the refrigerant detected by the first temperature sensor T1. The predetermined temperature (hereinafter referred to as the reference temperature T0) is a threshold for judging whether or not the discharge refrigerant temperature Td has risen excessively, or more simply, whether or not the compressor 20 is in an overheated state. The value of the reference temperature T0 is predefined according to, for example, the performance of the compressor 20, and is stored in the storage device of the control unit 7, and is read into the memory as a parameter when the opening condition is judged. In the present embodiment, as an example, the value of the reference temperature T0 is assumed to be about 100°C, but is not limited to such a value. Furthermore, the reference temperature T0 may be a fixed value, or may be a variable value that varies depending on, for example, a set water supply temperature.

[0045] In determining whether the opening condition exists, the control unit 7 obtains a detection value of the discharged refrigerant temperature Td from the first temperature sensor T1 and compares the obtained value with a reference temperature T0. If the discharged refrigerant temperature Td exceeds the reference temperature T0 (Td>T0), the control unit 7 determines that the opening condition exists, and if the discharged refrigerant temperature Td is equal to or lower than the reference temperature T0 (Td≦T0), the control unit 7 determines that the opening condition does not exist.

[0046] When the opening condition is not satisfied (Td≦T0), the control unit 7 closes the injection flow path 6. In this case, the control unit 7 closes the cooling solenoid valve 61a of the first injection flow path 6a and closes the heating solenoid valve 61b of the second injection flow path 6b (S104). For example, when the cooling solenoid valve 61a or the heating solenoid valve 61b is open, the control unit 7 closes the valve. On the other hand, when the cooling solenoid valve 61a and the heating solenoid valve 61b are closed, the control unit 7 maintains this state. In addition, the control unit 7 stops the expansion valve 60c (S104). For example, when the expansion valve 60c is not stopped, the control unit 7 stops the expansion valve 60c. On the other hand, when the expansion valve 60c is stopped, the control unit 7 maintains this state.

[0047] On the other hand, when the opening condition is satisfied (Td>T0), the control unit 7 opens the injection flow path 6. In this case, the control unit 7 opens the cooling solenoid valve 61a of the first injection flow path 6a and closes the heating solenoid valve 61b of the second injection flow path 6b (S105). For example, when the cooling solenoid valve 61a is closed, the control unit 7 opens it. On the other hand, when the cooling solenoid valve 61a is open, the control unit 7 maintains this state. Also, when the heating solenoid valve 61b is closed, the control unit 7 maintains this state, and when it is open, the control unit 7 closes it. Then, the control unit 7 opens the expansion valve 60c (sets it to an open state) (S105). For example, when the expansion valve 60c is in a stopped state, the control unit 7 opens it. On the other hand, when the expansion valve 60c is open, the control unit 7 maintains this state. The control unit 7 appropriately adjusts the opening degree of the expansion valve 60c.

[0048] 3 shows a state in which the injection flow passage 6 is thus opened in the cooling mode. In this case, as shown by the outline arrows in FIG. 3, a part of the liquid-phase refrigerant is diverted from the pipe 41b, passes through the first injection flow passage 6a, and is injected into the cylinder chamber (not shown) of the compressor 20 through the third injection flow passage 6c.

[0049] Furthermore, if it is determined in S101 that the operation mode is not the cooling mode, the control unit 7 determines whether the operation mode of the chilling unit 1 is the heating mode (S106). At that time, the control unit 7 receives a signal indicating the operation mode from, for example, the operation unit 8, and if the received signal is a selection signal for the heating mode, it determines that the operation mode is the heating mode, and if the received signal is any other signal, it determines that the operation mode is not the heating mode.

[0050] If the operation mode is the heating mode, the control unit 7 operates the chilling unit 1 in the heating mode (S107). In this case, the control unit 7 controls the operation of the four-way valve 21 to communicate the first port 21a with the third port 21c and to communicate the second port 21b with the fourth port 21d, and operates the compressor 20.

[0051] Next, the control unit 7 determines whether or not the opening condition exists (S108). In determining whether or not the opening condition exists, the control unit 7 obtains the detection value of the discharged refrigerant temperature Td from the first temperature sensor T1, and compares the obtained value with the reference temperature T0.

[0052] When the opening condition is not satisfied (Td≦T0), the control unit 7 closes the injection flow path 6. In this case, the control unit 7 closes the cooling solenoid valve 61a of the first injection flow path 6a and closes the heating solenoid valve 61b of the second injection flow path 6b (S104). The control unit 7 also stops the expansion valve 60c (S104). The control by the control unit 7 in this case is the same as when the operation mode is the cooling mode.

[0053] On the other hand, when the opening condition is satisfied (Td>T0), the control unit 7 opens the injection flow path 6. In this case, the control unit 7 closes the cooling solenoid valve 61a of the first injection flow path 6a and opens the heating solenoid valve 61b of the second injection flow path 6b (S109). For example, when the heating solenoid valve 61b is closed, the control unit 7 opens it. On the other hand, when the heating solenoid valve 61b is open, the control unit 7 maintains this state. Also, when the cooling solenoid valve 61a is closed, the control unit 7 maintains this state, and when it is open, the control unit 7 closes it. Furthermore, the control unit 7 opens the expansion valve 60c (sets it to an open state) (S109). The control of the control unit 7 in this case is the same as when the operation mode is the cooling mode. Also in this case, the control unit 7 appropriately adjusts the opening degree of the expansion valve 60c.

[0054] Fig. 4 shows a state in which the injection flow passage 6 is thus opened in the heating mode. In this case, as shown by the outline arrows in Fig. 4, a part of the liquid-phase refrigerant is diverted from the collecting pipe 42, passes through the second injection flow passage 6b, and is injected into the cylinder chamber (not shown) of the compressor 20 through the third injection flow passage 6c.

[0055] Then, when the injection flow path 6 is closed in S104, the control unit 7 determines the operation stop condition of the chilling unit 1 (S110). When the injection flow path 6 is opened in S105 or S109, the control unit 7 determines the operation stop condition of the chilling unit 1 (S110). The operation stop condition is a condition for determining whether or not to stop the operation of the chilling unit 1, and is determined, for example, based on whether or not the control unit 7 has received a signal indicating that the operation of the chilling unit 1 is stopped. The signal indicating the operation stop is transmitted, for example, when the operation stop is selected on the operation unit 8.

[0056] If the operation stop condition is not met, the control unit 7 determines whether or not the operation mode of the chilling unit 1 is the cooling mode (S101), and selectively repeats the subsequent processes (S102 to S109) depending on the determination result. On the other hand, if the operation stop condition is met, the control unit 7 stops the operation of the chilling unit 1 (S111).

[0057] That is, while the chilling unit 1 is in operation, a series of opening and closing controls of the injection flow path 6 is repeated. Then, when the operation of the chilling unit 1 is stopped, the series of opening and closing controls of the injection flow path 6 also ends.

[0058] Note that even if it is determined in S106 that the operation mode is not the heating mode, the control unit 7 stops the operation of the chilling unit 1. In this case, it is assumed that the chilling unit 1 is not operating in either the cooling mode or the heating mode (e.g., an error state), and the operation of the chilling unit 1 is stopped in preparation for an unexpected event. In addition to or instead of stopping the operation, the control unit 7 may execute a predetermined abnormality process. For example, it is possible to thoroughly inform the user of the error state by turning on (blinking) a warning light, sounding a warning sound, displaying a warning message, etc.

[0059] As described above, according to this embodiment, it is possible to avoid a liquid-sealed state in the injection flow path 6. That is, even when the injection flow path 6 is in a closed state, the liquid-phase refrigerant in the injection flow path 6 can be caused to flow as follows.

[0060] Fig. 5 shows a state in which the injection flow path 6 is closed in this manner. For example, when the injection flow path 6 is opened and then closed, the liquid-phase refrigerant that has flowed into the injection flow path 6 remains in the target flow path X, as shown in Fig. 5. The target flow path X is a flow path in the injection flow path 6 that is defined by the cooling check valve 62a of the first injection flow path 6a, the heating check valve 62b of the second injection flow path 6b, and the expansion valve 60c of the third injection flow path 6c.

[0061] Here, as described above, even when the expansion valve 60c is in a stopped state, it is opened only to the stop opening degree. Therefore, the liquid-phase refrigerant in the target flow path X is in a state in which it can flow through the expansion valve 60c toward the cylinder chamber (not shown) of the compressor 20, as shown by the outlined arrow in FIG. 5. That is, the liquid-phase refrigerant only temporarily stays in the target flow path X, and is not blocked in the target flow path X. Therefore, when the injection flow path 6 is closed after being opened, it is possible to prevent the liquid-phase refrigerant that has flowed into the injection flow path 6 from being in a liquid-sealed state.

[0062] The injection flow path 6 is branched into a first injection flow path 6a that injects a portion of the liquid-phase refrigerant into the compressor 20 when the chilling unit 1 is operating in the cooling mode, and a second injection flow path 6b that injects a portion of the liquid-phase refrigerant into the compressor 20 when the chilling unit 1 is operating in the heating mode. Therefore, regardless of whether the chilling unit 1 is operating in the cooling mode or the heating mode, a liquid-sealed state of the liquid-phase refrigerant in the target flow path X of the injection flow path 6 can be avoided.

[0063] In addition, such a liquid-sealed state is avoided in the same way even in a power outage. In a power outage, the power supply to each element of the chilling unit 1 is cut off. Therefore, in a power outage, in the injection flow passage 6, the cooling solenoid valve 61a and the heating solenoid valve 61b are closed, and the expansion valve 60c is stopped. Therefore, even in a power outage, the liquid-phase refrigerant that has flowed into the injection flow passage 6 may remain in the target flow passage X. However, even in this case, the expansion valve 60c remains open only to the stop opening degree, so that the liquid-phase refrigerant that has remained in the target flow passage X is in a state in which it can flow through the expansion valve 60c toward the cylinder chamber (not shown) of the compressor 20 as shown in FIG. 5. Therefore, even in a power outage, the liquid-phase refrigerant that has flowed into the injection flow passage 6 can be prevented from becoming a liquid-sealed state.

[0064] That is, according to this embodiment, it is possible to avoid liquid sealing of the liquid-phase refrigerant in the target flow path X by simply providing the injection flow path 6, without providing a bypass flow path or the like in the injection flow path 6 to avoid a liquid-sealed state. Therefore, it is possible to avoid liquid sealing of the liquid-phase refrigerant in the target flow path X even with relatively simple piping without complicating the piping. Furthermore, by using a relatively simple piping, it is possible to save space in the injection flow path 6. In addition, by using a relatively simple piping, it is possible to reduce costs and the risk of refrigerant leakage due to vibration.

[0065] Furthermore, by providing a cooling check valve 62a in the first injection flow path 6a and a heating check valve 62b in the second injection flow path 6b, one of the solenoid valves 61a, 61b can be closed and the other opened to perform liquid injection operation. In this case, the check valves 62a, 62b prevent backflow of the liquid-phase refrigerant in the injection flow paths 6a, 6b due to a malfunction of the solenoid valves 61a, 61b, etc., and a stable liquid injection operation can be performed, thereby stabilizing the refrigeration cycle operation.

[0066] In particular, solenoid valves 61a, 61b used as two-way valves may experience backflow when pressure is applied in the opposite direction to the predetermined forward flow path depending on the shape and quality of the solenoid valve. However, by providing check valves 62a, 62b downstream of each solenoid valve 61a, 61b, it is possible to perform liquid injection operation in one of the injection flow paths 6a, 6b, while preventing backflow due to a pressure difference generated in the other injection flow path connected in parallel to the one flow path, thereby enabling stable refrigeration cycle operation.

[0067] In other words, the liquid injection operation and the refrigeration cycle operation can be stably performed by controlling the flow of the forward pressure with the solenoid valves 61a and 61b and the flow of the reverse pressure with the check valves 62a and 62b. Furthermore, even if the liquid injection operation is stopped and restarted, the operation can be performed relatively stably.

[0068] In the above-described embodiment, the refrigeration cycle unit 2 of the chilling unit 1 is configured to include a single refrigerant circuit R, but the refrigerant circuit may include multiple systems. 6 shows an example of the configuration of a chilling unit 10 (refrigeration cycle unit 2) equipped with four refrigerant circuits RA, RB, RC, and RD as another embodiment of the present invention. The first refrigerant circuit RA, the second refrigerant circuit RB, the third refrigerant circuit RC, and the fourth refrigerant circuit RD are each configured in the same manner as the above-mentioned refrigerant circuit R, and each includes elements common to the refrigerant circuit R.

[0069] In the example shown in FIG. 6, the water heat exchanger 25 includes a first refrigerant flow path 25a, a second refrigerant flow path 25b, and a water flow path 25c. The first refrigerant flow path 25a of the water heat exchanger 25 is connected to the collecting pipe 42 of the first refrigerant circuit RA downstream of the receiver 24 in the cooling mode and upstream of the receiver 24 in the heating mode. The second refrigerant flow path 25b of the water heat exchanger 25 is connected to the collecting pipe 42 of the second refrigerant circuit RB. That is, the first refrigerant circuit RA and the second refrigerant circuit RB are connected in parallel to one water heat exchanger 25 and share the water heat exchanger 25. Similarly, the third refrigerant circuit RC and the fourth refrigerant circuit RD are connected in parallel to one water heat exchanger 25 and share the water heat exchanger 25. In this way, the refrigeration cycle unit 2 of the chilling unit 10 includes two water heat exchangers 25.

[0070] The water circuit unit 5 includes, as main components, a water circulation pump 50, and first to fourth water pipes 51a, 51b, 51c, and 51d. The first water pipe 51 a connects between a water outlet on the utilization device side of the chilling unit 10 and a suction port of the water circulation pump 50 . The second water piping 51b connects the discharge port of the water circulation pump 50 to the water flow paths 25c of the water heat exchangers 25 of the first refrigerant circuit RA and the second refrigerant circuit RB. The second water piping 51b is provided with a third pressure sensor P3 for detecting the water pressure and a fourth temperature sensor T4 for detecting the water temperature.

[0071] The third water piping 51c connects in series between the water flow paths 25c of the water heat exchangers 25 of the first refrigerant circuit RA and the second refrigerant circuit RB and the water flow paths 25c of the water heat exchangers 25 of the third refrigerant circuit RC and the fourth refrigerant circuit RD. The third water piping 51c is provided with a fifth temperature sensor T5 that detects the water temperature. The fourth water pipe 51d connects the water flow paths 25c of the water heat exchangers 25 of the third refrigerant circuit RC and the fourth refrigerant circuit RD to the water inlets of the utilization equipment side of the chilling unit 10. The fourth water pipe 51d is provided with a fourth pressure sensor P4 for detecting the water pressure and a sixth temperature sensor T6 for detecting the water temperature.

[0072] 6, the control unit 7 controls the operation of each element of the refrigeration cycle unit 2 and the water circuit unit 5, and controls the operation of the chilling unit 10. The operation unit 8 is connected to the control unit 7 by wire or wirelessly, and is used to perform operations such as starting the operation of the chilling unit 10, selecting the cooling operation mode or the heating operation mode, and setting the water supply temperature.

[0073] When the chilling unit 10 operates in the cooling mode, the four-way valve 21 switches so that the first port 21a of the first to fourth refrigerant circuits RA, RB, RC, and RD communicates with the second port 21b and the third port 21c communicates with the fourth port 21d, as shown by solid lines in Fig. 6. Subsequent control is the same as when the chilling unit 1 operates in the cooling mode. In this case, in the cooling mode, the water chilled in the water heat exchanger 25 shared by the first refrigerant circuit RA and the second refrigerant circuit RB is cooled again by heat exchange with the gas-liquid two-phase refrigerant flowing in the first refrigerant flow path 25a and the second refrigerant flow path 25b of the other water heat exchanger 25 while passing through the water flow path 25c of the other water heat exchanger 25 shared by the third refrigerant circuit RC and the fourth refrigerant circuit RD. The chilled water chilled in two stages is supplied to the utilization device from the fourth water pipe 51d.

[0074] On the other hand, when the chilling unit 10 operates in the heating mode, the four-way valve 21 switches so that the first port 21a of the first to fourth refrigerant circuits RA, RB, RC, and RD communicates with the third port 21c and the second port 21b communicates with the fourth port 21d, as shown by the dashed lines in Fig. 6. The subsequent control is the same as when the chilling unit 1 operates in the heating mode. In the heating mode, the water heated in the water heat exchanger 25 shared by the first refrigerant circuit RA and the second refrigerant circuit RB is heated again by heat exchange with the gas-liquid two-phase refrigerant flowing in the first refrigerant flow path 25a and the second refrigerant flow path 25b of the other water heat exchanger 25 while passing through the water flow path 25c of the other water heat exchanger 25 shared by the third refrigerant circuit RC and the fourth refrigerant circuit RD. The hot water heated in two stages is supplied to the utilization device from the fourth water pipe 51d.

[0075] Furthermore, the first to fourth refrigerant circuits RA, RB, RC, RD each have an injection flow path 6 (a first injection flow path 6a, a second injection flow path 6b, and a third injection flow path 6c) equivalent to that of the chilling unit 1. In each injection flow path 6, like the chilling unit 1, a cooling solenoid valve 61a, a cooling check valve 62a, a heating solenoid valve 61b, a heating check valve 62b, and an expansion valve 60c are disposed.

[0076] Therefore, in the chilling unit 10, for example, without providing a bypass flow path in the injection flow path 6 to avoid a liquid-sealed state, the liquid-phase refrigerant can be prevented from being sealed in the target flow paths XA, XB, XC, and XD simply by providing the injection flow path 6.

[0077] Although the embodiments of the present invention have been described above, these embodiments are presented as examples and are not intended to limit the scope of the invention. These novel embodiments can be implemented in various other forms, and various omissions, substitutions, and modifications can be made without departing from the spirit of the invention. These embodiments and their modifications are included in the scope and spirit of the invention, and are included in the scope of the invention and its equivalents described in the claims. [Explanation of symbols]

[0078] 1,10...refrigeration cycle device (air-cooled heat pump chilling unit), 2...refrigeration cycle unit, 5...water circuit unit, 6...bypass flow path (injection flow path), 6a...first injection flow path, 6b...second injection flow path, 6c...third injection flow path, 7...control unit, 8...operation unit, 20...compressor, 21...four-way valve, 22...air heat exchanger unit, 23a, 23b...expansion valve (first expansion valve), 24...receiver, 25...water heat exchanger, 25a, 25b...refrigerant flow path, 25c...water flow path, 26...gas-liquid separator, 27...main piping, 28...discharge piping, 29a, 29b...air heat exchanger, 30...fan, 41a, 41b...piping, 42... Collecting piping, 43, 44, 46...piping, 47...solenoid valve, 60c...expansion valve (second expansion valve), 61a...solenoid valve (cooling solenoid valve), 61b...solenoid valve (heating solenoid valve), 62a...check valve (cooling check valve), 62b...check valve (heating check valve), R, RA, RB, RC, RD...refrigerant circuit, T1...first temperature sensor, X, XA, XB, XC, XD...target flow path.

Claims

1. The refrigerant circuit includes a single compressor that discharges a gas-phase refrigerant, a heat source-side heat exchanger, a first expansion valve, a user-side heat exchanger, and an injection flow path that divides a portion of the liquid-phase refrigerant and injects only the divided liquid-phase refrigerant into the compressor, and the refrigerant circulates through the refrigerant. a solenoid valve, a check valve, and a second expansion valve are disposed in the injection flow path in this order from an upstream side in a flow direction of the liquid-phase refrigerant in the injection flow path, The second expansion valve is not fully closed, but is in a stopped state where it is kept open by a stop opening degree that is larger than the fully closed state. Refrigeration cycle equipment.

2. the injection flow path includes a first injection flow path and a second injection flow path which respectively branch off the refrigerant circuit, and a third injection flow path where the first injection flow path and the second injection flow path join together; the first injection flow path branches off from the refrigerant circuit between the heat source side heat exchanger and the first expansion valve, and during a cooling operation in which the heat source side heat exchanger functions as a condenser and the utilization side heat exchanger functions as an evaporator, diverts a portion of the liquid phase refrigerant that has passed through the heat source side heat exchanger, The second injection flow path branches off from the refrigerant circuit between the use-side heat exchanger and the first expansion valve, and diverts a portion of the liquid-phase refrigerant that has passed through the use-side heat exchanger during a heating operation in which the heat source-side heat exchanger functions as an evaporator and the use-side heat exchanger functions as a condenser. The refrigeration cycle device according to claim 1.

3. a cooling solenoid valve and a cooling check valve are disposed in the first injection flow path in this order from an upstream side in a flow direction of the liquid-phase refrigerant in the first injection flow path, a heating solenoid valve and a heating check valve are disposed in the second injection flow path in this order from an upstream side in a flow direction of the liquid-phase refrigerant in the second injection flow path, The second expansion valve is disposed in the third injection passage. The refrigeration cycle device according to claim 2.

4. A detection unit that detects the temperature of the gas phase refrigerant discharged from the compressor; A control unit that controls operations of the compressor, the first expansion valve, the solenoid valve, and the second expansion valve, The control unit is During the cooling operation, when the temperature of the gas-phase refrigerant detected by the detection unit exceeds a predetermined temperature, the cooling solenoid valve is opened, the heating solenoid valve is closed, and the second expansion valve is opened. During the heating operation, when the temperature of the gas-phase refrigerant detected by the detection unit exceeds a predetermined temperature, the cooling solenoid valve is closed, the heating solenoid valve is opened, and the second expansion valve is opened; During the cooling operation and the heating operation, when the temperature of the gas-phase refrigerant detected by the detection unit is equal to or lower than a predetermined temperature, the cooling solenoid valve is closed, the heating solenoid valve is closed, and the second expansion valve is brought into the stopped state. The refrigeration cycle device according to claim 3.

Citation Information

Patent Citations

  • Air-cooled heat pump type freezing cycle having reversible expansion valve

    JP1992161760A

  • Freezer

    JP1998038389A

  • Refrigeration and air conditioning device

    JP2010078165A

  • Heat pump cycle device

    JP2011075178A

  • Refrigerating device

    JP2011179783A