Management system, maintenance schedule determination method and computer program
The management system uses a trained model to optimize maintenance schedules for analyzers, addressing downtime and failure issues by enhancing efficiency and reducing maintenance burdens.
Patent Information
- Application Number
- JP2021527717
- Authority / Receiving Office
- JP · JP
- Patent Type
- Patents
- Current Assignee / Owner
- Priority Date
- 2019-06-28
- Filing Date
- 2020-06-25
- Publication Date
- 2024-09-18
- Estimated Expiration
- 2040-06-25
AI Technical Summary
Existing analyzers cannot be used during maintenance, necessitating efficient maintenance strategies to minimize downtime and ensure optimal performance.
A management system and method that utilizes a trained model through reinforcement learning to determine maintenance schedules based on component part information, optimizing maintenance efficiency, reducing downtime, and preventing failures.
The system effectively determines maintenance schedules that enhance analyzer availability, reduce maintenance burdens, and minimize failures, ensuring efficient operation and analysis performance.
Smart Images

Figure 0007553442000015 
Figure 0007553442000009 
Figure 0007553442000007
Abstract
Description
[Technical field]
[0001] The present disclosure relates to a management system for managing the maintenance of an analysis system that performs analysis related to vehicles such as automobiles, and a maintenance schedule determination method. and Computer Program To Regarding. [Background technology]
[0002] In order to develop and evaluate a vehicle or a part of a vehicle as a test specimen, analytical equipment is used to analyze the components of exhaust gas emitted by the test specimen. In order to maintain the analytical accuracy of the analytical equipment, periodic adjustment and maintenance such as part replacement are essential.
[0003] Patent Document 1 proposes a test system that allows easy and prioritized display of particularly urgent maintenance management information for all test devices connected to a device management device, thereby enabling reliable maintenance and inspection. The device management device of this test system displays information output from the test devices on a display in an erasable, switchable, or movable manner. The device management device displays three alarm icons, the form of which changes depending on the content of each alarm information, with priority, regardless of the display of this information, for three types of alarm information: sensitivity alarm information indicating a decrease in sensitivity of the test device; accumulated operation time alarm information, which is alarm information related to the accumulated operation time of the test device; and inspection date and time alarm information, which is information indicating the approach or passing of the inspection date and time of the test device. [Prior art documents] [Patent documents]
[0004] [Patent Document 1] JP 2013-245964 A Summary of the Invention [Problem to be solved by the invention]
[0005] Periodic maintenance is essential for analytical instruments. However, since the analytical instruments cannot be used during maintenance, it is desirable to perform the maintenance efficiently.
[0006] The present disclosure has been made in consideration of the above circumstances, and an object of the present disclosure is to provide a management system and a maintenance schedule determination method for determining a maintenance schedule that can realize efficient maintenance of an analytical device. and Computer Program M The purpose is to provide. [Means for solving the problem]
[0007] The management system according to the present disclosure includes an acquisition unit that acquires at least one of information related to a plurality of components of equipment included in each analysis system, the information being warning information that may lead to failure of the components, information related to the sensitivity or performance of the components, or information related to the life expectancy of the components, from a plurality of analysis systems, each of which includes an analysis device that analyzes the performance of a vehicle or a specimen that is part of the vehicle, and an associated device that supports the analysis by the analysis device, and a determination unit that determines a maintenance schedule for the analysis system based on the information acquired by the acquisition unit.
[0008] In addition, in the management system of the present disclosure, the determination unit uses a trained model that has been trained to output an efficient maintenance schedule in response to input of information related to components of equipment included in the analysis system, and inputs the information acquired by the acquisition unit into the trained model to determine a maintenance schedule for the analysis system.
[0009] In addition, in the management system according to the present disclosure, the determination unit determines the maintenance schedule so as to increase the efficiency of analysis performed by the analysis system or the efficiency of maintenance of the analysis system.
[0010] In addition, in the management system according to the present disclosure, the learned model is a model that has undergone reinforcement learning so as to obtain a large reward related to the maintenance schedule.
[0011] In addition, in the management system according to the present disclosure, the learned model is a model learned by reinforcement learning that assigns a high reward when the operating rate of the analysis system is high.
[0012] In addition, in the management system of the present disclosure, the trained model is a model trained by reinforcement learning that assigns high rewards when the burden associated with maintaining the analysis system is low.
[0013] In addition, in the management system according to the present disclosure, the trained model is a model trained by reinforcement learning that assigns a high reward when the frequency of occurrence of malfunctions in the analysis system is low.
[0014] In addition, in the management system of the present disclosure, the trained model outputs maintenance schedules for multiple analysis devices in response to input of information related to components of multiple analysis systems, the acquisition unit acquires information related to the components from the multiple analysis systems, and the determination unit inputs information related to the components of devices included in the multiple analysis systems acquired by the acquisition unit into the trained model to determine maintenance schedules for the multiple analysis systems.
[0015] In addition, the management system according to the present disclosure includes an operation schedule acquisition unit that acquires an operation schedule of the analysis system, and the trained model outputs a maintenance schedule in response to input of information related to the components of the apparatus included in the analysis system and the operation schedule of the analysis system.
[0016] In addition, in the management system of the present disclosure, the associated equipment of the analysis system includes a dynamometer that absorbs the torque generated by the vehicle or the test specimen, and the analysis equipment analyzes the gas emitted from the vehicle or the test specimen.
[0017] In addition, in the management system of the present disclosure, the acquisition unit acquires information from a plurality of analysis systems, and the determination unit includes a first determination unit that determines a maintenance due date for each component based on the information acquired by the acquisition unit, and a second determination unit that determines a maintenance schedule for each analysis system based on the due dates determined by the first determination unit, aligning the maintenance dates for components whose maintenance due dates arrive earlier with the maintenance dates for components whose maintenance due dates arrive later.
[0018] In the management system according to the present disclosure, the second determination unit determines a maintenance schedule that aligns maintenance dates for a plurality of components whose maintenance due dates determined by the first determination unit fall within a predetermined period.
[0019] In addition, the management system according to the present disclosure includes an operation schedule acquisition unit that acquires an operation schedule of the analysis system, and the second determination unit determines a maintenance schedule for the analysis system based on the operation schedule acquired by the operation schedule acquisition unit, avoiding periods during which the analysis system is in operation.
[0020] The management system according to the present disclosure further includes a notification unit that notifies a predetermined terminal device of the maintenance schedule determined by the determination unit.
[0021] In addition, the maintenance schedule determination method of the present disclosure obtains at least one of information related to a plurality of components of the equipment included in each analysis system, the information being warning information that may lead to failure of the components, information related to the sensitivity or performance of the components, or information related to the life expectancy of the components, from a plurality of analysis systems each including an analysis device that analyzes the performance of a vehicle or a specimen that is part of the vehicle, and an associated device that supports the analysis by the analysis device, and determines a maintenance schedule for the analysis system based on the obtained information.
[0022] In addition, the computer program of the present disclosure has a computer acquire at least one of information related to a plurality of components of the equipment included in each analysis system, the information being warning information that may lead to failure of the components, information related to the sensitivity or performance of the components, or information related to the life expectancy of the components, from a plurality of analysis systems, each of which includes an analysis device that analyzes the performance of a vehicle or a test specimen that is part of the vehicle, and an associated device that supports the analysis by the analysis device, and determines a maintenance schedule for the analysis system based on the acquired information.
[0023] In addition, the method for generating a trained model according to the present disclosure accepts as input at least one of warning information that may lead to failure of the components, information related to the sensitivity or performance of the components, or information related to the lifespan of the components, as information related to a plurality of components contained in a plurality of analysis systems including an analysis device that analyzes the performance of a vehicle or a test specimen that is part of the vehicle, and an associated device that supports the analysis by the analysis device, and generates a trained model by performing reinforcement learning on a learning model that outputs a maintenance schedule for the analysis system by giving a reward based on the uptime of the analysis system, the burden related to the maintenance of the analysis system, or the frequency of occurrence of malfunctions in the analysis system.
[0024] In the present disclosure, a maintenance schedule for various components of an analytical device that performs analysis on a vehicle such as an automobile or a test specimen that is a part of the vehicle is determined using a trained model that has been trained in advance. The trained model outputs an efficient maintenance schedule for the analytical device in response to input of information related to the components of the analytical device. The information related to the components of the analytical device may include, for example, warning information that leads to a failure of the components, information related to the sensitivity or performance of the components, or information related to the life expectancy of the components. At least one of these pieces of information is obtained and input into the trained model, and the maintenance schedule output by the trained model is obtained, whereby the maintenance schedule for the analytical device can be determined. By determining a maintenance schedule using an appropriately trained trained model, efficient maintenance of the analytical device can be expected.
[0025] In addition, in the present disclosure, a maintenance schedule is determined so as to increase the efficiency of analysis of a vehicle or a specimen by an analysis device, or to increase the efficiency of maintenance of the analysis device, thereby enabling efficient maintenance of the analysis device.
[0026] In the present disclosure, the trained model is trained in advance to obtain a large reward related to the maintenance schedule, and the trained model can output an efficient maintenance schedule for the analysis device in response to input of information related to the component parts.
[0027] In addition, in the present disclosure, a trained model that outputs a maintenance schedule is generated by performing reinforcement learning that gives a high reward when the operating rate of an analytical device is high. This allows a maintenance schedule to be determined so that the operating rate of the analytical device is high, thereby achieving efficient maintenance.
[0028] In addition, in the present disclosure, a trained model that outputs a maintenance schedule is generated by performing reinforcement learning that gives a high reward when the load (e.g., the number of maintenances, time, or cost) associated with the maintenance of an analytical device is low. This allows a maintenance schedule to be determined so that the load associated with maintenance is low, enabling efficient maintenance to be achieved.
[0029] In addition, in the present disclosure, a trained model that outputs a maintenance schedule is generated by performing reinforcement learning that gives a high reward when the frequency of occurrence of an analysis device malfunction is low. This allows a maintenance schedule to be determined that suppresses occurrence of an analysis device malfunction, enabling efficient use of the analysis device.
[0030] In addition, in the present disclosure, the trained model outputs maintenance schedules for multiple analytical devices in response to input of information related to components of multiple analytical devices. The trained model is trained, for example, to obtain a large reward related to the maintenance schedules for the multiple analytical devices. By acquiring information from each of the multiple analytical devices and inputting it into the trained model, it is possible to determine maintenance schedules for the components of the multiple analytical devices.
[0031] In addition, in the present disclosure, the trained model further receives an operation schedule of the analytical device as an input and outputs a maintenance schedule according to the operation schedule. As a result, for example, the trained model can determine a maintenance schedule that avoids periods during which the analytical device needs to be operated, thereby achieving efficient maintenance of the analytical device.
[0032] In addition, in the present disclosure, a trained model is generated by performing reinforcement learning on a learning model that receives information related to components of an analytical device as input and outputs a maintenance schedule for the components, and that gives rewards according to the availability of the analytical device, the load related to the maintenance of the analytical device (e.g., the number of maintenance sessions, time, or cost), or the frequency of occurrence of malfunctions in the analytical device, etc. This makes it possible to determine a maintenance schedule that takes into account the availability of the analytical device, the load related to the maintenance, or malfunctions of the analytical device, etc., and thus realizes efficient maintenance.
[0033] In addition, in the present disclosure, at least one of information related to a plurality of components, such as warning information leading to failure of the components, information related to the sensitivity or performance of the components, or information related to the life expectancy of the components, is obtained from a plurality of analytical devices that perform analysis of a vehicle such as an automobile or a specimen that is a part of the vehicle, and a due date for maintenance for each component is determined. Next, based on the due dates for each component, a maintenance schedule is determined for each analytical device, in which the maintenance date for the component whose maintenance due date is earlier is aligned with the maintenance date for the component whose maintenance due date is later. This makes it possible to determine a maintenance schedule for the plurality of analytical devices, taking into consideration the due dates for maintenance of the plurality of components possessed by each analytical device, and efficient maintenance of the plurality of analytical devices can be expected.
[0034] In addition, in the present disclosure, a maintenance schedule is determined that aligns the maintenance dates for a plurality of components whose maintenance due dates fall within a predetermined period, thereby making it possible to prevent the maintenance dates of a plurality of components whose maintenance due dates are far apart from each other more than necessary from being aligned.
[0035] In addition, in the present disclosure, the operation schedule of the analysis device is further obtained, and a maintenance schedule for the analysis device is determined so as to avoid periods during which the analysis device is in operation, thereby making it possible to perform maintenance during periods when the analysis device is not in operation and to reliably operate the analysis device during periods when it is necessary to operate. Effect of the Invention
[0036] According to the present disclosure, it is possible to determine a maintenance schedule that can achieve efficient maintenance of the analysis system. [Brief description of the drawings]
[0037] [Figure 1] 1 is a schematic diagram for explaining an overview of a management system for vehicle testing facility according to an embodiment of the present invention; [Diagram 2] 2 is a block diagram showing a configuration of a management server according to the present embodiment. FIG. [Diagram 3] FIG. 2 is a schematic diagram showing a configuration example of a schedule determination model according to the present embodiment. [Figure 4] FIG. 13 is a schematic diagram showing an example of a display screen of an analysis result by the management server. [Diagram 5] 13 is a schematic diagram showing an example of an alert notification screen by the management server; FIG. [Figure 6] 13 is a schematic diagram showing an example of a deadline notification screen by the management server; FIG. [Figure 7] FIG. 13 is a schematic diagram showing an example of a sensitivity history screen by the management server. [Figure 8] FIG. 13 is a schematic diagram showing an example of a maintenance schedule display screen by the management server. [Figure 9] 13 is a schematic diagram showing another example of a maintenance schedule display screen by the management server. FIG. [Figure 10] 13 is a flowchart showing the procedure of a maintenance schedule determination process performed by the management server according to the present embodiment. [Figure 11] 13 is a flowchart showing a procedure of a learning process for a schedule determination model performed by a management server according to the present embodiment. [Figure 12] FIG. 4 is a schematic diagram showing an example of a maintenance due date for each component part. [Figure 13] FIG. 13 is a schematic diagram showing an example of a maintenance schedule organized for each analytical device. [Figure 14]FIG. 4 is a schematic diagram showing an example of an operation schedule of an analysis device. [Figure 15] FIG. 11 is a schematic diagram showing an example of a maintenance schedule that takes into account an operation schedule. [Figure 16] 13 is a flowchart showing a procedure of a maintenance schedule determination process performed by a management server according to the second embodiment. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0038] Specific examples of the management system for an analytical device according to the embodiment of the present disclosure will be described below with reference to the drawings. Note that the present disclosure is not limited to these examples, but is defined by the claims, and is intended to include all modifications within the meaning and scope equivalent to the claims.
[0039] <System Overview> FIG. 1 is a schematic diagram for explaining the outline of the management system for an analysis device according to the present embodiment. The management system according to the present embodiment is a system for managing a maintenance schedule for an analysis device that analyzes components contained in exhaust gas discharged from a vehicle such as an automobile or a test specimen that is a part of the vehicle. In the illustrated example, for example, a plurality of buildings 1 to 3 are provided in an automobile manufacturing plant or a test site, and a plurality of analysis devices are installed inside each of the buildings 1 to 3. For example, three analysis devices A1 to A3 are installed in the building 1, and each of the analysis devices A1 to A3 operates independently and can individually analyze the exhaust gas of the automobile. Each of the analysis devices A1 to A3 may also include a plurality of analysis units that individually analyze the exhaust gas. This allows each of the analysis devices A1 to A3 to proceed with analysis processing for a plurality of analysis targets simultaneously or in parallel.
[0040] The specimen may be, for example, a vehicle equipped with an internal combustion engine or a part of a vehicle such as an engine, a hybrid vehicle (HV) equipped with an internal combustion engine and an electric motor or a part thereof, an electric vehicle (EV) equipped with an electric motor and a battery or a part thereof, or a fuel cell vehicle (FV) equipped with an electric motor and a fuel cell or a part thereof. The analysis device may not only analyze the components of the exhaust gas emitted from the specimen, but may also analyze the performance of the specimen. For example, the analysis device may analyze the running performance of the specimen, test the performance of tires, brakes, engines, powertrains, etc., and calculate the amount of fuel consumed by the specimen, the amount of electricity consumed by the electric motor (electricity consumption), or the amount of hydrogen consumed by the fuel cell.
[0041] Each of the analysis devices A1 to A3 analyzes exhaust gas from an automobile in cooperation with an automatic driving device (not shown) and dynamometers D1 to D3. The automatic driving device is a device that automatically operates the accelerator, brake, and the like of an automobile. The dynamometers D1 to D3 are devices that absorb torque generated by the engine of an automobile and control the rotation speed and torque of the engine. The dynamometers D1 to D3 provided in the analysis devices A1 to A3 may be any of chassis dynamometers, engine dynamometers, brake dynamometers, and the like. For example, the chassis dynamometer is a device for reproducing the running state of an automobile, and includes a roller type that uses rollers on which the wheels of the automobile are placed, and a coupling type that is coupled to the axle. The automatic driving device and the chassis dynamometer are linked together to make the automobile run in a simulated manner, and the analysis device acquires the exhaust gas emitted from the automobile during running and analyzes its components. However, the automatic driving device is not essential, and instead of the automatic driving device, a person may drive the automobile and perform the analysis. In the present embodiment, the analysis devices A1 to A3 test a vehicle as a specimen using a chassis dynamometer, but are not limited to this. For example, the analysis devices A1 to A3 may test the performance of an engine using an engine dynamometer, or may test the performance of a powertrain using a dynamometer.
[0042] Each of the analytical devices A1 to A3 is provided with a plurality of components that need to be replaced periodically. In this embodiment, a filter and a pump are taken as examples of components that need to be replaced. Each component has a set replacement time, and the components are replaced during maintenance of the analytical devices A1 to A3. However, the components of the analytical devices A1 to A3 are not limited to filters and pumps, and various other components may be provided in the analytical devices A1 to A3. Furthermore, the maintenance of the analytical devices A1 to A3 may include not only replacement of components, but also inspection or adjustment of the components. In the illustrated example, the analytical device A1 is provided with three filters F11 to F13 and three pumps P11 to P13 as components that need to be replaced. The analytical device A2 is provided with three filters F21 to F23 and three pumps P21 to P23. The analytical device A3 is provided with three filters F31 to F33 and three pumps P31 to P33.
[0043] Each of the analytical devices A1 to A3 can transmit and receive information to and from the management server 10 by performing wired or wireless communication. The management server 10 is installed in, for example, a management office separate from the buildings 1 to 3, and is used by a manager who manages an automobile manufacturing plant or a testing center. In this embodiment, the management server 10 acquires and stores various information from each of the analytical devices A1 to A3 installed in each of the buildings 1 to 3. Based on the acquired various information, the management server 10 determines the due date of maintenance (replacement) of the components of each of the analytical devices A1 to A3, and performs a process of determining a maintenance schedule for each of the analytical devices A1 to A3. In addition, the management server 10 may request maintenance to a maintenance company of the analytical devices A1 to A3, for example, according to the determined maintenance schedule.
[0044] The management server 10 acquires, from each of the analytical devices A1 to A3, information on the components, such as warning information indicating an event that may lead to a component failure, information on the detection sensitivity or performance of the component, or information on the quality life of the component. The warning information indicating an event that may lead to a failure may include at least one of information such as a warning and its pre-caution information (Alarm / Pre-caution), and pre-notification information (Notification for Quality Check) of the implementation period of performance check. The warning and pre-notification information are both information that notifies the administrator or the like of information on the failure of the component, and as the deterioration of the component progresses, the pre-notification information is output first, and when the deterioration progresses further, a warning is output. The analytical devices A1 to A3 compare values on the performance of components such as filters, pumps, or various analytical units with a predetermined first threshold value, and output pre-notification information when the first threshold value is exceeded. Furthermore, the analytical devices A1 to A3 output a warning when a value on the performance of the component exceeds a second threshold value set to a condition stricter than the first threshold value. The advance notification information of the performance check cycle notifies in advance the cycle for checking the performance of components such as filters, pumps, various analysis units, etc. The analysis devices A1 to A3 output this advance notification information a predetermined period before the cycle is reached.
[0045] The information related to the detection sensitivity or performance of the component parts may include at least one of various information such as information on the change in performance over time (Quality Check), flow rate, total hydrocarbon concentration as background (THC Background), sensitivity of various analyzers, and reactor pressure. The information related to the quality life of the component parts may include at least one of information such as the cumulative operating time (cumulative usage time) of the component parts and its advance notification information (Notification for Hour-Meter), or the number of days remaining until the specified replacement time. However, the above information is merely an example and is not limited to this, and the management server 10 may acquire any other information from the analysis devices A1 to A3.
[0046] In this embodiment, the management server 10 acquires at least information from each of the analytical devices A1 to A3 that can determine the due date of maintenance of the filters and pumps, which are components that require periodic replacement. For example, if an upper limit on the usage time of a component is set, the management server 10 can determine the time of maintenance by acquiring information on the usage time of the component and comparing it with the upper limit. Also, for example, if maintenance is performed in response to performance deterioration of a component, the management server 10 can determine the due date of maintenance by acquiring information indicating the performance of the component and comparing it with a threshold value that is a criterion for judging performance deterioration. Note that these methods of determining the due date of maintenance are merely examples and are not limited to these.
[0047] The management server 10 determines a maintenance schedule for the analytical devices A1-A3 based on information acquired from the analytical devices A1-A3. The management server 10 determines the maintenance schedule, for example, so as to increase the operating rate of the analytical devices A1-A3 as much as possible, to reduce the burden of the number of maintenances, time, and cost associated with the maintenance of the analytical devices A1-A3 as much as possible, or to reduce the frequency of occurrence of defects in the analytical devices A1-A3 as much as possible. In this embodiment, the management server 10 is equipped with AI (Artificial Intelligence) that determines the maintenance schedule for the analytical devices A1-A3, and the AI determines the maintenance schedule based on various information acquired from the analytical devices A1-A3.
[0048] Furthermore, the management server 10 can accept input of information regarding the operation schedules of the analytical devices A1-A3, i.e., the dates on which analyses using the analytical devices A1-A3 will be performed. When an operation schedule is input, the AI of the management server 10 determines a maintenance schedule for the analytical devices A1-A3, avoiding the days or times when the analytical devices A1-A3 need to be operated, and so that the analytical devices A1-A3 are available on these operation days and times. However, it is not essential for the management server 10 to accept input of the operation schedules of the analytical devices A1-A3, and the management server 10 may be configured not to determine the schedule taking into account the operation schedules.
[0049] Furthermore, the management server 10 can display various information acquired from the analytical devices A1-A3 and the maintenance schedule determined by the AI in various formats on a device such as a display. Based on the information displayed by the management server 10, the administrator can grasp the operating status and the presence or absence of abnormalities of the analytical devices A1-A3.
[0050] <Device configuration> 2 is a block diagram showing the configuration of the management server 10 according to this embodiment. The management server 10 according to this embodiment is configured to include a processing unit (processor) 11, a memory unit (storage) 12, a communication unit (transceiver) 13, a display unit (display) 14, and an input unit (input device) 15. The processing unit 11 is configured using an arithmetic processing device such as a CPU (Central Processing Unit), an MPU (Micro-Processing Unit), or a GPU (Graphics Processing Unit). The processing unit 11 reads and executes a server program 12a stored in the memory unit 12, thereby performing a process of acquiring information from the analytical devices A1 to A3, a process of determining a maintenance schedule based on the acquired information, and the like.
[0051] The storage unit 12 is configured using a large-capacity storage device such as a hard disk. The storage unit 12 stores various programs executed by the processing unit 11 and various data required for the processing of the processing unit 11. In this embodiment, the storage unit 12 stores a server program 12a executed by the processing unit 11 and a schedule determination model 12b as a trained model (classifier).
[0052] The communication unit 13 can communicate with various devices via a wired or wireless network. In this embodiment, the communication unit 13 communicates with devices such as a plurality of analysis devices A1 to A3 and dynamometers D1 to D3 provided in a plurality of buildings 1 to 3 via the network. The communication unit 13 transmits data provided by the processing unit 11 to other devices, and provides data received from other devices to the processing unit 11.
[0053] The display unit 14 is configured using a liquid crystal display or the like, and displays various images, characters, and the like. The display unit 14 displays various images based on the processing of the processing unit 11. The input unit 15 is configured using input devices such as a keyboard and a mouse. The input unit 15 may also be configured using a touch sensor provided on the surface of the display unit 14. The input unit 15 accepts various input operations by the user and notifies the processing unit 21 of the contents of the accepted operations.
[0054] The storage unit 12 may be an external storage device connected to the management server 10. The management server 10 may be a multi-computer including a plurality of computers, or may be a virtual machine virtually constructed by software. The management server 10 is not limited to the above configuration, and may include, for example, a reading unit that reads information stored in a portable storage medium, or may be configured to be connected as an external device without including the display unit 14 and the input unit 15.
[0055] The server program 12a may be written in the storage unit 12, for example, during the manufacturing stage of the management server 10. For example, the server program 12a may be distributed by another remote server device or the like and acquired by the management server 10 through communication. For example, the server program 12a may be read by the management server 10 from a recording medium 99 such as a memory card or an optical disk and stored in the storage unit 12. For example, the server program 12a may be read from the recording medium 99 by a writing device and written to the storage unit 12 of the management server 10. The server program 12a may be provided in a form of distribution via a network, or may be provided in a form of being recorded on the recording medium 99.
[0056] The schedule determination model 12b is for realizing the AI of the management server 10, and is a trained model that has undergone reinforcement learning in advance. The trained model performs a predetermined calculation on an input value and outputs the calculation result, and the storage unit 12 stores data such as coefficients of a function that specifies this calculation and thresholds as the schedule determination model 12b. The schedule determination model 12b is a trained model that has been trained to receive information acquired from the analytical devices A1 to A3 as input and output the maintenance schedules of the analytical devices A1 to A3 in response to this input. The processing unit 11 that executes the server program 12a reads the data stored as the schedule determination model 12b, thereby enabling the processing unit 11 to execute a calculation for determining the maintenance schedules of the analytical devices A1 to A3.
[0057] In addition, in the management server 10 according to this embodiment, the processing unit 11 reads out and executes the server program 12a stored in the storage unit 12, whereby the information acquisition unit 11a, the operation schedule acquisition unit 11b, the maintenance schedule determination unit 11c, the display processing unit 11d, the learning processing unit 11e, and the like are realized as software functional blocks. The information acquisition unit 11a communicates with the analytical devices A1 to A3 via the communication unit 13, and performs processing to repeatedly acquire predetermined information from the analytical devices A1 to A3. The information acquisition unit 11a stores and accumulates the acquired information in the storage unit 12.
[0058] The operation schedule acquisition unit 11b performs a process of acquiring the operation schedules of the analysis devices A1 to A3 by accepting an input operation of the operation schedule by the administrator via the input unit 15. However, the management server 10 may be configured not to consider the operation schedule when determining the maintenance schedule, and in this case, the management server 10 may not include the operation schedule acquisition unit 11b. The operation schedule acquisition unit 11b stores the acquired information of the operation schedule in the storage unit 12. Alternatively, in the case where an application program for schedule management is installed in the management server 10, the administrator may input the operation schedules of the analysis devices A1 to A3 using the application program, and the operation schedule acquisition unit 11b may acquire data of the operation schedule from the application program. The operation schedule acquired by the operation schedule acquisition unit 11b is, for example, information such as the analysis device A1 will carry out a car test from 10:00 to 16:00 on April 15th.
[0059] The maintenance schedule determination unit 11c performs a process of determining the maintenance schedules of the analytical devices A1 to A3 to be managed. The maintenance schedule determination unit 11c determines the maintenance schedule by using the schedule determination model 12b stored in the storage unit 12. The maintenance schedule determination unit 11c determines the maintenance schedule so as to increase the efficiency of analysis performed by the analytical devices A1 to A3 or the maintenance efficiency of the analytical devices. The schedule determination model 12b is a trained model that has undergone reinforcement learning in advance so as to receive information that can be acquired from the analytical devices A1 to A3 and the operation schedules of the analytical devices A1 to A3 as inputs and output the maintenance schedules of the analytical devices A1 to A3. The schedule determination model 12b undergoes reinforcement learning so as to output a maintenance schedule that increases the efficiency of analysis performed by the analytical devices A1 to A3 or the maintenance efficiency of the analytical devices. The maintenance schedule determination unit 11c inputs the information acquired by the information acquisition unit 11a and the operation schedule acquired by the operation schedule acquisition unit 11b into the schedule determination model 12b, and acquires the maintenance schedule output by the schedule determination model 12b, thereby determining the maintenance schedule for the analytical equipment A1 to A3.
[0060] The display processing unit 11d performs processing to display various pieces of information on the display unit 14. For example, the display processing unit 11d displays the maintenance schedules of the analytical devices A1 to A3 determined by the maintenance schedule determination unit 11c on the display unit 14. Also, for example, the display processing unit 11d displays various pieces of information related to the analytical devices A1 to A3 acquired by the information acquisition unit 11a on the display unit 14 in various display formats.
[0061] The learning processing unit 11e performs a process of learning (relearning) the schedule determination model 12b. The learning processing unit 11e performs reinforcement learning of the schedule determination model 12b using learning data in which information on the analysis devices A1 to A3 and input information on the operation schedule are associated with rewards for the maintenance schedule determined by the schedule determination model 12b for the input information. The learning processing unit 11e re-learns the schedule determination model 12b, for example, once a month, using information accumulated during the month. The learning processing unit 11e may perform a process of calculating rewards for the maintenance schedule based on the information accumulated during this period. Note that the learning process of the schedule determination model 12b may be performed by another server device, and the management server 10 may only accumulate information used as learning data.
[0062] <Schedule decision model> FIG. 3 is a schematic diagram showing an example of a configuration of the schedule determination model 12b according to the present embodiment. In the present embodiment, the schedule determination model 12b has a neural network structure in which a plurality of neurons are mutually connected. Although a detailed description is omitted because it is an existing technology, a neuron is an element that performs an operation on a plurality of inputs and outputs one value as an operation result. The neuron has information such as a weighting coefficient and a threshold value used in the operation. The learning model of the neural network includes an input layer that receives a plurality of input values, an intermediate layer that performs an operation process on the data received in the input layer, and an output layer that aggregates the operation results of the intermediate layer and outputs a plurality of values. A learning process such as deep learning and reinforcement learning is a process of setting appropriate values for the coefficients and thresholds of each neuron that constitutes a neural network using a large amount of learning data given in advance.
[0063] The schedule determination model 12b according to the present embodiment is a trained model in which reinforcement learning is performed on a neural network learning model, and for example, a reinforcement learning method such as DQN (Deep Q-Network) can be adopted. In the schedule determination model 12b, vector information of a state S is input to an input layer, and vector information corresponding to an action A to be taken for the state S is output from an output layer.
[0064] In this embodiment, the state S input to the schedule determination model 12b includes two types of information: vector information in which information about each component of the analysis devices A1 to A3 is arranged in a predetermined order, and the operation schedule of each of the analysis devices A1 to A3. However, the input to the schedule determination model 12b does not have to include information about the operation schedule. In this case, vector information in which information about each component is arranged in a predetermined order is input to the schedule determination model 12b of this example.
[0065] The information about each component includes the number of days remaining until replacement or inspection, etc., determined by the manufacturer of each component, and the ratio (%) of the sensitivity of each component to the limit value. In this example, sensitivity is used as an index of the criterion for judging the performance deterioration of each component, but information other than sensitivity may be used. The sensitivity ratio of each component is a ratio obtained by dividing a numerical value of an analysis result measured using each component, or a numerical value (sensitivity) output by a sensor that detects the deterioration degree of each component, by a limit value determined by the manufacturer of each component at which replacement or inspection is deemed necessary, and is expressed as a percentage. This is numerical information that can determine whether each component needs replacement or inspection. In the illustrated example, the status S of the input information includes the number of days remaining for filter F11: 20 days and a sensitivity ratio of 80%, the number of days remaining for filter F12: 12 days and a sensitivity ratio of 90%, ..., the number of days remaining for pump 33: 45 days and a sensitivity ratio of 20%. These pieces of information may be information that the information acquiring unit 11a acquires directly from each of the analytical devices A1 to A3, or may be information that is obtained by performing a predetermined calculation or the like on the basis of the acquired information.
[0066] The information on each component input to the schedule determination model 12b shown in this example is merely an example and is not limited thereto. At least one piece of information is adopted as the input information to the schedule determination model 12b from various pieces of information that the management server 10 can acquire from the analytical devices A1 to A3, such as warning information indicating an event that may lead to a breakdown of the component, information related to the detection sensitivity or performance of the component, or information related to the quality life of the component. Which piece of information is adopted is determined in advance depending on, for example, the structure or performance of the analytical devices A1 to A3 and their components.
[0067] The operation schedule of each of the analysis devices A1 to A3 is represented as a bit string of a predetermined length (e.g., 32 bits or 64 bits), and the presence or absence of operation 1 day later, 2 days later, 3 days later, etc. is stored in binary form, 1 (operating) or 0 (not operating), in order from the MSB (Most Significant Bit) side. In the illustrated example, an operation schedule is input indicating that the analysis device A1 will operate 1 day later, 4 days later, and 5 days later, the analysis device A2 will operate 1 day later, 3 days later, 4 days later, and 6 days later, and the analysis device A3 will operate 3 days later and 4 days later. However, the schedule determination model 12b may be configured not to accept input of the operation schedule, but to determine the maintenance schedule based on information on the components.
[0068] The action A output by the schedule determination model 12b is a maintenance schedule for replacement, inspection, etc., of each component of the analysis devices A1 to A3. For example, the maintenance schedule is expressed as a bit string of a predetermined length (e.g., 32 bits or 64 bits, etc.) for each component, and the presence or absence of maintenance 1 day later, 2 days later, 3 days later, etc. is stored in binary form, 1 (maintenance performed) or 0 (maintenance not performed), in order from the MSB (Most Significant Bit) side. In the illustrated example, a maintenance schedule is output in which maintenance is performed for the filters F11 and F12 in 3 days, ..., and maintenance is performed for the pump P33 in 5 days. If it is determined that maintenance of the components is not necessary, the schedule determination model 12b may output a maintenance schedule in which the value of 0 is stored in all of the bit strings.
[0069] The maintenance schedule determination unit 11c of the management server 10 generates information (state S) to be input to the schedule determination model 12b based on the information on the analytical devices A1-A3 acquired by the information acquisition unit 11a and the operation schedules of the analytical devices A1-A3 acquired by the operation schedule acquisition unit 11b. The maintenance schedule determination unit 11c inputs the generated information to the schedule determination model 12b and acquires information (action A) to be output in response to this input. The information output by the schedule determination model 12b is the maintenance schedule of each component of the analytical devices A1-A3. The maintenance schedule determination unit 11c determines the maintenance schedule of each of the analytical devices A1-A3 based on the acquired maintenance schedule of each component.
[0070] The schedule determination model 12b is a trained model that has undergone reinforcement learning in advance to appropriately determine the maintenance schedule of each component of the analytical devices A1 to A3 based on information about each component and the operation schedule of the analytical devices A1 to A3. For example, the schedule determination model 12b determines a maintenance schedule that avoids the input operation schedule and ensures that maintenance is completed on an operation day. For example, the schedule determination model 12b determines a maintenance schedule to increase the operation rate of the analytical devices A1 to A3 as much as possible. For example, the schedule determination model 12b determines a maintenance schedule to reduce the burden of the number of maintenances, time, and cost associated with the maintenance of the analytical devices A1 to A3 as much as possible. For example, the schedule determination model 12b determines a maintenance schedule to reduce the frequency of malfunctions of the analytical devices A1 to A3 as much as possible.
[0071] The schedule determination model 12b is a trained model that has undergone reinforcement learning in the management server 10. The learning processing unit 11e of the management server 10 performs reinforcement learning using training data in which a reward R for a state S and an action A is set. A high reward R for the training data is set for a case in which an excellent action A is performed for the state S. In the present embodiment, the reward R for the training data is set such that the more efficient the maintenance schedule determined as the action A is for the information on the analytical devices A1 to A3 input as the state S, the higher the value is set, and the less efficient the maintenance schedule is, the lower the value is set. Whether or not the maintenance schedule is efficient is determined based on, for example, the operating rate of the analytical devices A1 to A3, the burden associated with the maintenance, or the frequency of occurrence of defects in the analytical devices. This determination may be made by a designer of the present system, or may be made by a device such as the management server 10.
[0072] The learning data may be prepared in advance, or may be prepared by the management server 10 itself based on information accumulated therein. At least in the first learning process, the learning data prepared in advance is used, and the learning data may be prepared based on the results of a simulation using a simulator, for example. In the second and subsequent learning processes (relearning processes), it is preferable to use learning data in which the reward R is set by feeding back the results of maintenance performed according to the maintenance schedule determined by the management server 10. In this case, the management server 10 is provided with a reward calculation unit that calculates the reward R according to the results of the maintenance. The reward calculation unit collects information on the operation results of the analysis devices A1 to A3, for example, for a predetermined period after the maintenance of the analysis devices A1 to A3 is performed. The reward calculation unit collects information such as the cost and time spent on the maintenance of the analysis devices A1 to A3 during a predetermined period, such as one month. Based on the collected information, the reward calculation unit determines the reward R for the learning data such that a high reward R is set for a maintenance schedule with high implementation efficiency or maintenance efficiency.
[0073] In this embodiment, the management server 10 calculates the operation rates, maintenance burdens (number of times, time, cost, etc.), or malfunction occurrence frequencies of the analysis devices A1 to A3, for example, every month based on the information accumulated from the analysis devices A1 to A3, and generates learning data in which the reward R is set according to these calculation results. The generation of the learning data may be performed by the management server 10 or by other means. In this embodiment, the learning processing unit 11e of the management server 10 generates learning data, for example, every month, and updates the schedule determination model 12b stored in the storage unit 12 by performing reinforcement learning of the schedule determination model 12b using the generated learning data. At this time, the learning processing unit 11e generates the learning data so that the higher the operation rates of the analysis devices A1 to A3 are, the higher the reward is given when the maintenance burden of the analysis devices A1 to A3 is low, and the lower the malfunction occurrence frequency is, the higher the reward is given.
[0074] For example, the management server 10 can calculate the reward R by setting the operation rate at 100% when the analytical devices A1 to A3 can be operated without problems for all operation schedules and subtracting the reward R according to the ratio of the operation failure when the analytical devices A1 to A3 cannot be operated for the operation schedule. For example, the management server 10 can calculate the reward R by calculating the total time required for maintenance in one month, and when the total time does not exceed a threshold, the reward R is awarded at the highest value of R=100, and subtracting 10 from the reward every time the total time exceeds the threshold. For example, the management server 10 can calculate the reward R by calculating the total cost required for maintenance in one month, and when the maintenance cost does not exceed a threshold, the reward R is awarded at the highest value of R=100, and subtracting 10 from the reward every time the maintenance cost exceeds the threshold by 100,000 yen. For example, the management server 10 can calculate the reward R by giving the maximum reward R=100 when no malfunction occurs and subtracting 10 from the reward every time a malfunction occurs. Note that these calculation methods of the reward R are only examples, and are not limited to these, and the reward R may be determined by various other methods. In addition, the reward R may be determined by combining the above calculation methods.
[0075] The learning processing unit 11e determines the coefficients and thresholds of each neuron constituting the neural network of the schedule determination model 12b so that the reward R set for the state S and the action A of the learning data is maximized. For example, the DQN algorithm can be adopted for the reinforcement learning performed by the learning processing unit 11e.
[0076] In this embodiment, the schedule determination model 12b is assumed to have been previously trained by reinforcement learning, but the learning method is not limited to reinforcement learning. For example, the schedule determination model 12b may be trained by a learning method such as supervised learning using teacher data in which input values and output values are associated, or unsupervised learning without using teacher data. In the case of performing reinforcement learning, the DQN method is adopted in this embodiment, but the method is not limited to this, and a method other than DQN may be adopted.
[0077] <Information display processing> The management server 10 according to the present embodiment can appropriately process the information acquired from the analysis devices A1 to A3 and display it on the display unit 14. Some examples of display screens are shown below. FIG. 4 is a schematic diagram showing an example of a display screen of the analysis results by the management server 10. The management server 10 can display the analysis results of the components contained in the exhaust gas of the automobile acquired from the analysis devices A1 to A3 in real time during the execution of the test or after the test is completed. In the display screen of the analysis results of this example, a title 101a of "analysis results" indicating that this screen is a display screen of the analysis results is displayed at the top, and below this, labels 101b of the three analysis devices A1 to A3, "analysis device A1", "analysis device A2" and "analysis device A3", are displayed in a horizontal line. Below each label 101b, an area 101c for displaying the analysis results of each of the analysis devices A1 to A3 is provided, and in each area 101c, a set of numerical values indicating the name and content of the components contained in the exhaust gas as the analysis results is displayed in a vertical line. Further, below the analysis result display area 101c, there is provided an area 101d in which icons for operating each of the analysis devices A1 to A3 are arranged. At the bottom of the analysis result display screen, there is provided an area 101e in which icons for setting operations related to the analysis result display screen or switching from this screen to another screen are arranged. The administrator who uses the management server 10 can check and verify the analysis results performed by each of the analysis devices A1 to A3 based on the analysis result display screen.
[0078] FIG. 5 is a schematic diagram showing an example of an alert notification screen by the management server 10. When the management server 10 acquires information on a failure or abnormality from the analytical devices A1 to A3, the management server 10 performs an alert notification on the display unit 14 to notify the administrator of the information. In the alert notification screen of this example, a title 102a of "alert notification" is displayed at the top, indicating that this screen is an alert notification screen. Below the title 102a, a selection area 102b for selecting a target device is provided on the right side, and an alert area 102c for displaying the alert content is provided on the left side. In the selection area 102b, a list of the names of the analytical devices A1 to A3 and the dynamometers D1 to D3 from which the management server 10 acquired information on a failure or abnormality is displayed, and the administrator can select one of the target devices for which the alert content is to be confirmed. In the example shown in the figure, the analytical device A1 is selected, and the selected analytical device A1 is highlighted.
[0079] The alert area 102c displays information about an alert for the selected analytical device A1. The labels "alert" and "unit" are attached to the top of the alert area 102c, the content of the alert is displayed below the "alert" label, and the name of the unit (component) corresponding to the alert content is displayed below the "unit" label. In this example, "cooling fan stopped" is displayed as the content of the alert, and "fan B2" is displayed as the corresponding unit. At the bottom of the alert notification screen, an area 102d is provided in which icons are arranged for setting operations related to the alert notification screen or switching from this screen to another screen. The administrator using the management server 10 can check the presence or absence of a failure or abnormality, etc., for each of the analytical devices A1 to A3, and the contents of the failure or abnormality, etc., based on the alert notification screen.
[0080] FIG. 6 is a schematic diagram showing an example of a deadline notification screen by the management server 10. Based on information acquired from the analysis devices A1 to A3, the management server 10 notifies information on components of the analysis devices A1 to A3 that have exceeded the deadline for replacement or inspection, etc., on the deadline notification screen. In the deadline notification screen of this example, a title 103a of "Deadline Notification" is displayed at the top, indicating that this screen is a deadline notification screen. Below the title 103a, a selection area 103b for selecting a target device is provided on the right side, and a notification area 103c for displaying information on expiration is provided on the left side. In the selection area 103b, a list of the names of the analysis devices A1 to A3 and dynamometers D1 to D3 that have components that have exceeded the deadline is displayed, and the administrator can select one of the target devices to check the notification contents from among them. In the example shown in the figure, the analysis device A1 is selected, and the selected analysis device A1 is highlighted.
[0081] The notification area 103c displays information regarding the expiration of the selected component of the analysis device A1. The labels "Unit" and "Status" are attached to the upper part of the notification area 103c, and the name of the unit (component) that has expired is displayed below the "Unit" label, and the expiration status corresponding to the unit is displayed below the "Status" label. In this example, "Filter F11" is displayed as the unit, and the status is "3 hours past the expiration date." In addition, in this example, "Filter F12" is displayed as the unit, and the status is "3 days left" until the expiration date. At the bottom of the expiration notification screen, an area 103d is provided in which icons are arranged for setting the expiration notification screen or switching from this screen to another screen. The administrator who uses the management server 10 can check whether or not there is any component of each of the analysis devices A1 to A3 that has expired due to replacement or inspection, and to what extent the expiration date has passed, based on the expiration notification screen.
[0082] FIG. 7 is a schematic diagram showing an example of a sensitivity history screen by the management server 10. The management server 10 can display, for example, changes in the sensitivity of the zero point of the analysis unit as the sensitivity of the exhaust gas analysis of the analysis devices A1 to A3. In the sensitivity history screen of this example, a title 104a of "Sensitivity History" is displayed at the top, indicating that this screen is a sensitivity history screen. Below the title 104a, a pull-down menu 104b for selecting the target device is provided on the right side, and a pull-down menu 104c for selecting the gas to be analyzed is provided on the left side. In this example, the unit for analyzing CH4 of the analysis device A1 is selected.
[0083] A graph display area 104d is provided below the two pull-down menus 104b and 104c. In the graph display area 104d, a graph is displayed with the horizontal axis representing time and the vertical axis representing the deviation from the zero point. In this graph, a first threshold value indicated by a dashed line and a second threshold value indicated by a dashed line are displayed. For example, when the deviation from the zero point exceeds the first threshold value, an alert display is performed to prompt maintenance, and when the deviation exceeds the second threshold value, analysis is prohibited. An alert display area 104e is provided below the graph display area 104d, and a message is displayed when the deviation from the zero point exceeds the first or second threshold value. At the bottom of the sensitivity history screen, an area 104f is provided in which icons for setting the sensitivity history screen or switching from this screen to another screen are arranged. The administrator who uses the management server 10 can check the presence or absence of sensitivity degradation of each of the analyzers A1 to A3 based on the sensitivity history screen.
[0084] 8 is a schematic diagram showing an example of a maintenance schedule display screen by the management server 10. The management server 10 displays, on the maintenance schedule display screen, the maintenance schedules of the analytical devices A1 to A3 determined by the maintenance schedule determination unit 11c using the schedule determination model 12b. On the maintenance schedule display screen of this example, a title 105a of "Maintenance Schedule" is displayed at the top, indicating that this screen is the maintenance schedule display screen. A maintenance schedule display area 105b is provided below the title 105a.
[0085] At the top of the maintenance schedule display area 105b, the labels "Date", "Device", and "Component" are displayed in a horizontal line. Below these three labels, the maintenance schedules of the analyzers A1 to A3 are displayed in a list. The maintenance schedule displayed on this screen is a maintenance schedule recommended by the management server 10, and it is up to the administrator to decide whether or not to perform maintenance according to this schedule. In this example, maintenance of the filters F11, F12, and F13 of the analyzer A1 is recommended on March 25, 2019, and maintenance of the pumps P21, P22, and P23 of the analyzer A2 is recommended on the same day. Maintenance of the filters F31, F32, and F33 of the analyzer A3 is also recommended on April 8, 2019. At the bottom of the maintenance schedule display screen, an area 105c is provided in which icons are arranged for performing setting operations related to the maintenance schedule display screen or switching operations from this screen to other screens. An administrator who uses the management server 10 can review the maintenance schedule for each of the analyzers A1 to A3 based on the maintenance schedule display screen.
[0086] FIG. 9 is a schematic diagram showing another example of a maintenance schedule display screen by the management server 10. The management server 10 may display a maintenance schedule display screen shown in FIG. 9 on the display unit 14 instead of the maintenance schedule display screen shown in FIG. 8. In the maintenance schedule display screen shown in FIG. 9, a title 106a of "Maintenance Schedule" indicating that this screen is a maintenance schedule display screen is displayed at the top. Below the title 106a, a tab 106b is provided for switching and displaying multiple maintenance schedule candidates. In this example, the schedule determination model 12b of the management server 10 is assumed to be capable of outputting multiple candidates for the maintenance schedule of the analytical devices A1 to A3. The management server 10 extracts three candidates from the multiple maintenance schedules output by the schedule determination model 12b, for example, according to the high and low evaluation values, and displays the maintenance schedules in association with the tabs of "Candidate 1", "Candidate 2", and "Candidate 3". The administrator can check the corresponding maintenance schedule by selecting one of the tabs 106b.
[0087] In the maintenance schedule display screen, a maintenance schedule display area 106c is provided below the tab 106b. The maintenance schedule display area 106c displays the candidate maintenance schedule selected in the tab 106b. In addition, at the top of the maintenance schedule display area 106c, labels such as "date", "equipment", "component", "deadline", and "sensitivity" are displayed in a horizontal line. Below these five labels, the maintenance schedules of the analytical devices A1 to A3 are displayed in a list. The "date", "equipment", and "component" are the same as those in the maintenance schedule display screen shown in FIG. 8, but the maintenance schedule display screen shown in FIG. 9 displays information on "deadline" and "sensitivity" for each component individually. For the "deadline" label, information on the number of days remaining until the component's deadline is displayed for the determined maintenance date. For the "sensitivity" label, information on the ratio (%) of the sensitivity limit value for the component is displayed, and this information is calculated based on the sensitivity predicted for the maintenance date.
[0088] In this example, maintenance of filters F11, F12, and F13 of analyzer A1 is recommended on March 25, 2019. On March 25, which is the maintenance date, filter F11 has 3 days remaining until its due date, and its sensitivity is predicted to reach 80%. Filter F12 has 1 day remaining until its due date, and its sensitivity is predicted to reach 95%. Filter F13 has 7 days remaining until its due date, and its sensitivity is predicted to reach 70%. In this example, maintenance of pumps P21, P22, and P23 of analyzer A2 is recommended on March 25, 2019. On March 25, which is the maintenance date, pump P21 has 1 day remaining until its due date, and its sensitivity is predicted to reach 95%. Pump P22 has 1 day remaining until its due date, and its sensitivity is predicted to reach 90%. Pump P23 has 6 days remaining until its due date, and its sensitivity is predicted to reach 75%.
[0089] At the bottom of the maintenance schedule display screen, there is provided an area 106d in which icons are arranged for performing setting operations related to the maintenance schedule display screen or switching operations from this screen to other screens, etc. By performing a selection operation on the tab 106b, the administrator using the management server 10 can switch between and display a plurality of candidates for the maintenance schedule and consider the maintenance schedule for each of the analyzers A1 to A3.
[0090] 4 to 9 are merely examples, and are not limited to these. The management server 10 may display on the display unit 14 various screens that notify various information, in addition to the screens shown as examples.
[0091] <Flowchart> 10 is a flow chart showing the procedure of the maintenance schedule determination process performed by the management server 10 according to this embodiment. The information acquisition unit 11a of the processing unit 11 of the management server 10 according to this embodiment communicates with the analysis devices A1 to A3 via the communication unit 13 and acquires predetermined information about the components of the analysis devices A1 to A3 (step S1). The information acquired at this time is information that can determine the due date of maintenance for each component, and can be, for example, information indicating the deadline for replacement of the component, or the sensitivity or deterioration degree of the component.
[0092] Furthermore, the operation schedule acquisition unit 11b of the processing unit 11 acquires information on the operation schedule determined for the analytical devices A1 to A3 (step S2). At this time, the operation schedule acquisition unit 11b may acquire the operation schedule by reading out data on the operation schedule input in advance, or may acquire the operation schedule input by the administrator via the input unit 15. However, the management server 10 does not need to determine the maintenance schedule taking the operation schedule into consideration, and in this case, the acquisition of the operation schedule in step S2 of this flowchart does not need to be performed. The acquisition of the operation schedule and the determination of the maintenance schedule taking the operation schedule into consideration are not required processes performed by the management server 10, but may be optional processes.
[0093] Next, the maintenance schedule determination unit 11c of the processing unit 11 reads out the schedule determination model 12b stored in the storage unit 12 (step S3). The maintenance schedule determination unit 11c generates information to be input to the schedule determination model 12b based on the information acquired in step S1 and the operation schedule acquired in step S2, and inputs the generated information to the schedule determination model 12b (step S4). At this time, the maintenance schedule determination unit 11c generates input information in the format shown as state S in FIG. 3 based on the acquired information and the operation schedule.
[0094] Next, the maintenance schedule determination unit 11c acquires information output by the schedule determination model 12b (step S5). The information output from the schedule determination model 12b is information in the format shown as action A in Fig. 3, and indicates the maintenance schedule for the components of the analysis devices A1 to A3. The display processing unit 11d of the processing unit 11 displays the maintenance schedule acquired in step S5 on the display unit 14 in the display mode shown in Fig. 8 (step S6), and ends the process.
[0095] FIG. 11 is a flowchart showing the procedure of the learning process of the schedule determination model 12b performed by the management server 10 according to the present embodiment. The information acquisition unit 11a of the processing unit 11 of the management server 10 according to the present embodiment periodically acquires information from the analysis devices A1 to A3 (step S21). The information acquisition unit 11a stores the acquired information in the storage unit 12 (step S22). The management server 10 re-learns the schedule determination model 12b at a predetermined timing, for example, once a month. The processing unit 11 judges whether or not it is time to re-learn the schedule determination model 12b (step S23). If it is not time to re-learn (S23: NO), the processing unit 11 returns the process to step S21 and repeatedly acquires and stores the information of the analysis devices A1 to A3.
[0096] When the time for re-learning has come (S23: YES), the learning processing unit 11e of the processing unit 11 reads out information on the analysis devices A1 to A3 stored and accumulated in the storage unit 12 since the previous learning process was performed (step S24). The learning processing unit 11e determines the reward R for the state Q and the action A based on the information read out in step S24, and generates learning data that is a set of these (step S25). The learning processing unit 11e reads out the schedule determination model 12b stored in the storage unit 12 (step S26). The learning processing unit 11e performs a learning process of reinforcement learning on the schedule determination model 12b read out in step S26 using the learning data generated in step S25 (step S27). The learning processing unit 11e stores the schedule determination model 12b that has completed the reinforcement learning in the storage unit 12 (step S28), and ends the process.
[0097] <Summary> In the management system for the analytical device according to the present embodiment having the above configuration, the management server 10 determines the maintenance schedule for various components of the analytical devices A1 to A3 that perform analysis on a vehicle such as an automobile or a specimen that is a part of the vehicle, using the schedule determination model 12b that has been trained in advance. The schedule determination model 12b is a trained model that has been trained in advance to receive information related to the components of the analytical devices A1 to A3 as an input and output the maintenance schedule for the components. The schedule determination model 12b is also trained in advance so that a large amount of reward related to the maintenance schedule can be obtained. The management server 10 can determine the maintenance schedule for the components by acquiring information related to the components from the analytical devices A1 to A3 and inputting the acquired information to the schedule determination model 12b. By determining the maintenance schedule using the schedule determination model 12b that has been appropriately trained by reinforcement learning or the like, efficient maintenance of the analytical devices A1 to A3 can be expected.
[0098] In this embodiment, the management server 10 acquires at least one piece of information related to the components of the analysis devices A1 to A3, such as warning information that may lead to failure, information related to the sensitivity or performance of the components, or information related to the lifespan of the components, etc. This makes it possible to accurately determine whether or not maintenance is required for the components of the analysis devices A1 to A3.
[0099] In this embodiment, the schedule determination model 12b receives information related to components of the multiple analytical devices A1 to A3 as an input, and outputs a maintenance schedule for the components of the multiple analytical devices A1 to A3. By acquiring information from each of the multiple analytical devices A1 to A3 and inputting the information to the schedule determination model 12b, the management server 10 can determine a maintenance schedule for the components of the multiple analytical devices A1 to A3.
[0100] In this embodiment, a schedule determination model 12b that determines a maintenance schedule is generated by performing reinforcement learning that gives a high reward when the operating rate of the analytical devices A1 to A3 is high. This allows a maintenance schedule to be determined so that the operating rates of the analytical devices A1 to A3 are high, thereby achieving efficient maintenance.
[0101] In this embodiment, a schedule determination model 12b that determines a maintenance schedule is generated by performing reinforcement learning that gives a high reward when the load (for example, the number of maintenance times, time, or cost) related to the maintenance of the analytical devices is low. This allows a maintenance schedule to be determined so that the load related to the maintenance of the analytical devices A1 to A3 is low, thereby achieving efficient maintenance.
[0102] In this embodiment, a schedule determination model 12b that determines a maintenance schedule is generated by performing reinforcement learning that gives a high reward when the frequency of occurrence of malfunctions in the analysis devices A1 to A3 is low. This allows a maintenance schedule to be determined that suppresses occurrence of malfunctions in the analysis devices A1 to A3, and allows the analysis devices A1 to A3 to be used efficiently.
[0103] In this embodiment, the schedule determination model 12b further receives the operation schedules of the analytical devices A1 to A3 as an input, and determines a maintenance schedule according to the operation schedules. As a result, for example, the schedule determination model 12b can determine a maintenance schedule that avoids periods during which the analytical devices A1 to A3 need to be operated, thereby achieving efficient maintenance of the analytical devices A1 to A3.
[0104] In this embodiment, a learned schedule determination model 12b is generated by performing reinforcement learning in which a learning model that receives information related to the components of the analytical devices A1 to A3 as an input and outputs a maintenance schedule for the components is given a reward according to the availability of the analytical devices A1 to A3, the load related to the maintenance of the analytical devices A1 to A3, or the frequency of occurrence of malfunctions of the analytical devices A1 to A3, etc. This allows the schedule determination model 12b to determine a maintenance schedule that takes into account the availability of the analytical devices A1 to A3, the load related to the maintenance, or malfunctions of the analytical devices A1 to A3, etc., and thus allows efficient maintenance to be realized.
[0105] In this embodiment, the analytical devices to be managed by the management server 10 are three, namely, the analytical devices A1 to A3, but this is not limited thereto, and the number of analytical devices to be managed may be two or less, or four or more. The screen displays shown in Figs. 4 to 9 are merely examples, and the management server 10 may display any screen. Although filters and pumps are given as components of the analytical devices A1 to A3, the components may be any other components. Maintenance of the components of the analytical devices A1 to A3 is not limited to replacement, and may include adjustment, calibration, and other tasks.
[0106] <Embodiment 2> The management server 10 according to the second embodiment does not determine a schedule using the schedule determination model 12b, but determines a schedule according to a predetermined rule. The management server 10 according to the second embodiment does not include the schedule determination model 12b in the storage unit 12 and the learning processing unit 11e in the processing unit 11 in the block diagram shown in Fig. 2. Hereinafter, a method for determining a maintenance schedule by the maintenance schedule determination unit 11c of the management server 10 according to the second embodiment will be described.
[0107] The maintenance schedule determination unit 11c of the management server 10 according to the second embodiment determines the due date of maintenance for each of the components of the analysis devices A1 to A3 based on the information on the analysis devices A1 to A3 acquired by the information acquisition unit 11a. At this time, if an upper limit of the usage time is set for the component, the maintenance schedule determination unit 11c can determine the due date of maintenance by acquiring information on the usage time of the component and comparing it with the upper limit. Also, if maintenance is performed in response to deterioration of the performance of the component, the maintenance schedule determination unit 11c can determine the due date of maintenance by acquiring information such as sensitivity indicating the performance of the component and comparing it with a threshold value that is a criterion for judging the deterioration of performance. Note that these methods of determining the due date of maintenance are merely examples and are not limited thereto.
[0108] 12 is a schematic diagram showing an example of a maintenance due date for each component. In the illustrated example, the maintenance due date for the filter F11 of the analyzer A1 and the filter F22 of the analyzer A2 is determined to be April 1, 2019. In addition, the maintenance due date for the filter F21 of the analyzer A2 is determined to be April 8, 2019, and the maintenance due date for the filter F31 of the analyzer A3 is determined to be April 15, 2019. The maintenance due date for the pump P31 of the analyzer A3 is determined to be April 22, 2019, the maintenance due date for the pump P11 of the analyzer A1 is determined to be April 29, 2019, and the maintenance due date for the pump P33 of the analyzer A3 is determined to be May 6, 2019. The maintenance due date for filter F33 of analytical device A3 is determined to be May 13, 2019, and the maintenance due date for pump P12 of analytical device A1 is determined to be May 20, 2019.
[0109] Next, the maintenance schedule determination unit 11c consolidates the maintenance dates of components whose maintenance due dates are within a predetermined period (for example, two months) according to the component whose maintenance due date is the earliest so that the maintenance dates are the same for each of the analytical devices A1 to A3. FIG. 13 is a schematic diagram showing an example of a maintenance schedule consolidated for each analytical device, and shows an example in which a maintenance schedule for each of the analytical devices A1 to A3 is determined based on the maintenance due dates shown in FIG. 12. According to FIG. 12, the filter F11 has the earliest maintenance due date among the components of the analytical device A1. Therefore, the maintenance schedule determination unit 11c determines the maintenance date of the filter F11 and the pumps P11 and P12 of the analytical device A1 to be April 1, 2019 so that the pumps P11 and P12, which are components whose maintenance due dates will be reached within two months from April 1, 2019, which is the maintenance due date of the filter F11, will be maintained on the same day as the filter F11.
[0110] Similarly, since the filter F22 has the earliest maintenance due date among the components of the analysis device A2, the maintenance schedule determination unit 11c determines the maintenance dates for the filters F21 and F22 of the analysis device A2 to be April 1, 2019, so that the filter F21, a component whose maintenance due date will be reached within two months from April 1, 2019, which is the maintenance due date of the filter F22, will be maintained on the same day as the filter F22. Similarly, since the filter F31 has the earliest maintenance due date among the components of the analysis device A3, the maintenance schedule determination unit 11c determines the maintenance dates for the filters F31, F33 and the pumps P31 and P33 of the analysis device A3 to be April 15, 2019, so that the filter F33 and the pumps P31 and P33, which are components whose maintenance due date will be reached within two months from April 15, 2019, which is the maintenance due date of the filter F31, will be maintained on the same day as the filter F31.
[0111] Next, the maintenance schedule determination unit 11c adjusts the maintenance schedule based on the operation schedule of the analysis devices A1 to A3 acquired by the operation schedule acquisition unit 11b. Fig. 14 is a schematic diagram showing an example of the operation schedule of the analysis devices A1 to A3. In this example, it is scheduled to operate the analysis device A3 on March 25, 2019, operate the analysis devices A1 and A2 on April 1, 2019, operate the analysis devices A1 and A2 on April 8, 2019, and operate the analysis device A3 on April 15, 2019.
[0112] FIG. 15 is a schematic diagram showing an example of a maintenance schedule taking into consideration an operation schedule. Since it is necessary to operate the analyzers A1 and A2 on April 1, 2019, the maintenance schedule determination unit 11c changes the maintenance of the analyzers A1 and A2 on April 1, 2019 to March 25, 2019, which is earlier than this date. Similarly, since it is necessary to operate the analyzer A3 on April 15, 2019, the maintenance schedule determination unit 11c changes the maintenance of the analyzer A3 on April 15, 2019 to April 8, 2019, which is earlier than this date. In this example, for maintenance that overlaps with the operation schedule, a new maintenance date is set to one week before, with a margin, but a new maintenance date may be set to one day before.
[0113] The management server 10 according to the second embodiment does not need to adjust the maintenance schedule in consideration of the operation schedule. In this case, the maintenance schedule shown in FIG. 13 is displayed as the maintenance schedule determined by the management server 10.
[0114] FIG. 16 is a flowchart showing the procedure of the maintenance schedule determination process performed by the management server 10 according to the second embodiment. The information acquisition unit 11a of the processing unit 11 of the management server 10 according to the second embodiment communicates with the analysis devices A1 to A3 through the communication unit 13 to acquire predetermined information about the components of the analysis devices A1 to A3 (step S41). The information acquired at this time is information that can determine the due date of maintenance for each component, and can be, for example, information indicating the deadline for replacing the component, or the sensitivity or deterioration degree of the component. The maintenance schedule determination unit 11c of the processing unit 11 determines the due date of maintenance for each component of the analysis devices A1 to A3 based on the acquired various information (step S42). The maintenance schedule determination unit 11c consolidates the maintenance dates for a plurality of components whose maintenance due dates are within a predetermined period for each of the analysis devices A1 to A3, according to the component with the earliest maintenance due date (step S43).
[0115] Next, the operation schedule acquisition unit 11b of the processing unit 11 acquires information on the operation schedule determined for the analytical devices A1 to A3 (step S44). The maintenance schedule determination unit 11c changes the maintenance schedule of the analytical devices A1 to A3 based on the acquired operation schedule so as to avoid the operation days of the analytical devices A1 to A3 (step S45), and ends the process. Note that the management server 10 does not need to perform the process of acquiring information on the operation schedule in step S44 of this flowchart and the process of changing the maintenance schedule based on the operation schedule in step S45. In this case, the management server 10 may end the maintenance schedule determination process after completing the process of step S43, and outputs the maintenance schedule that summarizes the maintenance dates of the multiple components in step S43 as the processing result. The determination of the maintenance schedule by the management server 10 according to the second embodiment in consideration of the operation schedule is an optional process.
[0116] The management server 10 according to the second embodiment configured as above acquires information on a plurality of components from a plurality of analysis devices A1-A3 that perform analysis on an automobile, and determines a maintenance due date for each component. The management server 10 determines a maintenance schedule for each of the analysis devices A1-A3 based on the determined maintenance due dates for each component. This allows the management server 10 to determine a maintenance schedule for the plurality of analysis devices A1-A3, taking into consideration the maintenance due dates for the plurality of components of each of the analysis devices A1-A3, and efficient maintenance of the plurality of analysis devices A1-A3 can be expected.
[0117] Furthermore, the management server 10 according to the second embodiment acquires the operation schedules of the analytical devices A1 to A3 and determines the maintenance schedules for the analytical devices A1 to A3, avoiding the operation days of the analytical devices A1 to A3. This allows maintenance to be performed during periods when the analytical devices A1 to A3 are not operating, and ensures that the analytical devices A1 to A3 operate during periods when they need to be operated.
[0118] 12 to 15 in the second embodiment are merely examples and are not limited to these. In addition, the management server 10 according to the second embodiment compiles the maintenance schedule for each of the analytical devices A1 to A3, but is not limited to this and may compile the maintenance schedule for each of the buildings 1 to 3, for example.
[0119] Other configurations of the management system according to the second embodiment are similar to those of the management system according to the first embodiment, so the same reference numerals are used for the same parts and detailed description will be omitted.
[0120] <Embodiment 3> The management system according to the third embodiment notifies the administrator by transmitting information about the maintenance schedule determined by the management server 10 to a terminal device of a predetermined administrator. The terminal device may be various information processing devices such as a smartphone, a tablet terminal device, or a PC (personal computer). The management server 10 can notify the portable terminal device by using wireless communication such as a mobile phone communication network or a wireless LAN (Local Area Network).
[0121] The management server 10 stores in a database, for example, identification information of the terminal device of the manager who is to be notified, or information such as the manager's email address or telephone number. The notification destination may be one person or multiple people. The notification destination may be different for each analytical device or building, etc. After determining the schedule, the management server 10 notifies the manager, etc. by transmitting information about the determined maintenance schedule to the notification destination registered in the database.
[0122] In addition to the maintenance schedule, the management server 10 may also notify a terminal device of an administrator, etc., for example, when an abnormality is detected in the analysis device or when the time to replace a component part of the analysis device is approaching.
[0123] Other configurations of the management system according to the third embodiment are similar to those of the management system according to the first embodiment, so the same reference numerals are used for the same parts and detailed description will be omitted.
[0124] <Fourth embodiment> In the above-mentioned embodiments 1 to 3, a management system for managing the maintenance schedule of an analytical device has been described. However, the objects managed by the management system may include not only the analytical device but also various peripheral devices used together with the analytical device and various related devices that assist in analysis by the analytical device.
[0125] The vehicle test facility management system according to the fourth embodiment manages a maintenance schedule for an analysis system including an analysis device and vehicle test facilities (related devices) such as an automatic driving device and a dynamometer used together with the analysis device. There may be a plurality of analysis systems to be managed. The management server 10 according to the fourth embodiment acquires information about components from the analysis device included in the analysis system, and also acquires information about components from the automatic driving device and vehicle test facilities such as a dynamometer. The management server 10 acquires, as information about components, from the vehicle test facilities such as the automatic driving device and the dynamometer, for example, warning information indicating an event that may lead to a failure of the components, information about the detection sensitivity or performance of the components, or information about the quality life of the components. The management server 10 also acquires information from the vehicle test facilities such as the automatic driving device and the dynamometer that allows the determination of the due date of maintenance for components that require, for example, periodic replacement.
[0126] Based on the acquired information, the management server 10 can determine whether there is an abnormality in the analysis system including the automatic driving device and vehicle test equipment such as a dynamometer, and can determine when to replace components of these devices included in the analysis system. The management server 10 can provide notifications regarding the automatic driving device and vehicle test equipment such as a dynamometer, for example, on the alert notification screen shown in Fig. 5 or the deadline notification screen shown in Fig. 6.
[0127] Furthermore, the management server 10 according to the fourth embodiment determines a maintenance schedule for the analysis system including the analysis device and vehicle testing equipment such as an automatic driving device and a dynamometer, based on the acquired information. The management server 10 determines the maintenance schedule so as to maximize the availability of the analysis system, to reduce the burden of the number of maintenances, time, and cost associated with the analysis system, or to reduce the frequency of occurrence of defects in the analysis system. The method of determining the maintenance schedule by the management server 10 may be either the method using the schedule determination model 12b described in the first embodiment, or the method of determining the schedule according to the predetermined rules described in the second embodiment.
[0128] The management server 10 displays the determined maintenance schedule for the analysis system on a maintenance schedule display screen shown in, for example, Fig. 8 or 9. On the maintenance schedule display screen, the management server 10 displays the maintenance schedule for the analysis device, the maintenance schedule for the automatic driving device, and the maintenance schedule for the dynamometer, etc.
[0129] Other configurations of the management system according to the fourth embodiment are similar to those of the management system according to the first embodiment, so the same reference numerals are used for the same parts and detailed description will be omitted.
[0130] The embodiments disclosed herein are illustrative in all respects and should not be considered as limiting. The scope of the present disclosure is defined by the claims, not by the above meaning, and is intended to include all modifications within the scope and meaning equivalent to the claims. [Explanation of symbols]
[0131] Buildings 1-3 10 Management Server 11 Processing section 11a Information acquisition section (acquisition section) 11b Operation Schedule Acquisition Section 11c Maintenance schedule determination unit (determination unit) 11d Display processing section 11e Learning processing section 12 Storage section 12a Server Programs (Computer Programs) 12b Scheduling decision model (trained model) 13. Communications Department 14 Display section 15 Input section 99 Recording media A1~A3 Analyzer F11~F13, F21~F23, F31~F33 Filters (components) P11~P13, P21~P23, P31~P33 Pump (components)
Claims
1. an acquisition unit that acquires, from a plurality of analysis systems each including an analysis device that analyzes the performance of a vehicle or a specimen that is a part of the vehicle, and an associated device that supports the analysis by the analysis device, at least one of warning information that may lead to failure of the component, information related to the sensitivity or performance of the component, or information related to the life expectancy of the component, as information related to a plurality of components of the device included in each analysis system; an operation schedule acquisition unit that acquires operation schedules of a plurality of analysis systems; A storage unit that stores a trained model that has learned a correspondence between information related to components of devices included in a plurality of analysis systems, operation schedules of the plurality of analysis systems, and an efficient maintenance schedule; a determination unit that inputs information about components of devices included in the multiple analysis systems acquired by the acquisition unit and operation schedules of the multiple analysis systems acquired by the operation schedule acquisition unit into the trained model, and determines an efficient maintenance schedule for the multiple analysis systems; A management system comprising:
2. The management system according to claim 1 , wherein the determination unit determines the maintenance schedule so as to increase efficiency in performing analysis by the analysis system or efficiency in maintaining the analysis system.
3. The trained model is a model that has undergone reinforcement learning to obtain a large number of rewards related to the maintenance schedule. The management system according to claim 1 or 2.
4. The trained model is a model trained by reinforcement learning that assigns a high reward when the operating rate of the analysis system is high. The management system according to any one of claims 1 to 3.
5. The trained model is a model trained by reinforcement learning that assigns a high reward when the burden of maintenance of the analysis system is low. The management system according to any one of claims 1 to 4.
6. The trained model is a model trained by reinforcement learning that gives a high reward when the occurrence frequency of a malfunction of the analysis system is low. The management system according to any one of claims 1 to 5.
7. The associated device of the analysis system includes a dynamometer that absorbs torque generated by the vehicle or the test specimen; The management system according to claim 1 , wherein the analysis device analyzes gases emitted from the vehicle or the test specimen.
8. An acquisition unit that acquires, from a plurality of analysis systems each including an analysis device that analyzes the performance of a vehicle or a test specimen that is a part of the vehicle, and an associated device that supports the analysis by the analysis device, at least one of information related to a plurality of components possessed by the device included in each analysis system, the information including warning information that may lead to failure of the components, information related to the sensitivity or performance of the components, or information related to the expiration date of the components; an operation schedule acquisition unit that acquires operation schedules of a plurality of analysis systems; a first determination unit that determines a due date of maintenance for each of the components based on the information acquired by the acquisition unit; a second determination unit that determines, based on the operation schedule acquired by the operation schedule acquisition unit, a maintenance schedule for each of the analysis systems, such that the maintenance date of a component part whose maintenance due date arrives earlier is aligned with the maintenance date of a component part whose maintenance due date arrives later, while avoiding a period during which the analysis system is in operation, based on the due date determined by the first determination unit; A management system comprising:
9. The management system according to claim 8 , wherein the second determination unit determines a maintenance schedule that aligns maintenance dates for a plurality of components whose maintenance due dates determined by the first determination unit fall within a predetermined period.
10. A notification unit that notifies a predetermined terminal device of the determined maintenance schedule. The management system according to any one of claims 1 to 9.
11. Based on the determined maintenance schedule, the date of maintenance, the device to be maintained, and the component parts to be maintained are displayed in association with each other. The management system according to any one of claims 1 to 10.
12. The trained model outputs information indicating whether or not daily maintenance is performed for a plurality of components over a plurality of days as the maintenance schedule. The management system according to any one of claims 1 to 7.
13. An information processing device comprising: From a plurality of analysis systems each including an analysis device for analyzing the performance of a vehicle or a specimen that is a part of the vehicle, and an associated device for supporting the analysis by the analysis device, at least one of warning information leading to a failure of the component, information related to the sensitivity or performance of the component, or information related to the life expectancy of the component is obtained as information related to a plurality of components of the device included in each analysis system; Obtain operation schedules for multiple analysis systems, A trained model that has learned correspondence between information related to components of devices included in a plurality of analysis systems and operation schedules of the plurality of analysis systems and an efficient maintenance schedule is stored in a storage unit; Inputting information about components of devices included in the multiple analytical systems and operation schedules of the multiple analytical systems into the trained model to determine an efficient maintenance schedule for the multiple analytical systems; How maintenance schedules are determined.
14. An information processing device comprising: From a plurality of analysis systems each including an analysis device for analyzing the performance of a vehicle or a specimen that is a part of the vehicle, and an associated device for supporting the analysis by the analysis device, at least one of warning information leading to a failure of the component, information related to the sensitivity or performance of the component, or information related to the life expectancy of the component is obtained as information related to a plurality of components of the device included in each analysis system; Obtain operation schedules for multiple analysis systems, determining a due date for maintenance for each of the components based on the acquired information; determining, based on the acquired operation schedule, a maintenance schedule for each of the plurality of analytical systems, which avoids periods during which the analytical systems are in operation and, based on the determined due dates, aligns the maintenance dates of components whose maintenance due dates are due earlier with the maintenance dates of components whose maintenance due dates are due later; How maintenance schedules are determined.
15. A computer having a memory unit storing a trained model that has learned a correspondence between information relating to components of devices included in a plurality of analytical systems and operation schedules of the plurality of analytical systems, and an efficient maintenance schedule, From a plurality of analysis systems each including an analysis device for analyzing the performance of a vehicle or a specimen that is a part of the vehicle, and an associated device for supporting the analysis by the analysis device, at least one of warning information leading to a failure of the component, information related to the sensitivity or performance of the component, or information related to the life expectancy of the component is obtained as information related to a plurality of components of the device included in each analysis system; Obtain operation schedules for multiple analysis systems, Inputting information about components of devices included in the acquired multiple analytical systems and operation schedules of the acquired multiple analytical systems into the trained model, and determining an efficient maintenance schedule for the multiple analytical systems. A computer program that executes a process.
16. A computer comprising: From a plurality of analysis systems each including an analysis device for analyzing the performance of a vehicle or a specimen that is a part of the vehicle, and an associated device for supporting the analysis by the analysis device, at least one of warning information leading to a failure of the component, information related to the sensitivity or performance of the component, or information related to the life expectancy of the component is obtained as information related to a plurality of components of the device included in each analysis system; Obtain operation schedules for multiple analysis systems, determining a due date for maintenance for each of the components based on the acquired information; Based on the acquired operation schedule, a maintenance schedule is determined for each of the analytical systems, avoiding the period during which the analytical systems are in operation and based on the determined due date, such that the maintenance date of a component part whose maintenance due date arrives earlier is aligned with the maintenance date of a component part whose maintenance due date arrives later. A computer program that executes a process.
Citation Information
Patent Citations
Maintenance management system and image forming apparatus
JP2008310579A
Test system
JP2013245964A
Plan creation device and plan creation method related to employment of energy demand facility
JP2018036679A
Maintenance work scheduling system, maintenance work scheduling method and program
JP2018147385A
Planning device, method of creating operation planning, hydrogen manufacturing method, and program
WO2019059321A1
