Control device for power storage equipment, power supply system and program
The control device for power storage equipment adjusts output power to manage SOC errors, ensuring accurate power balance and compliance with market demands, thereby preventing penalties.
Patent Information
- Application Number
- JP2021045871
- Authority / Receiving Office
- JP · JP
- Patent Type
- Patents
- Current Assignee / Owner
- Filing Date
- 2021-03-19
- Publication Date
- 2024-09-25
- Estimated Expiration
- 2041-03-19
AI Technical Summary
The management of state of charge (SOC) errors in power storage equipment leads to inaccuracies in predicting and managing the amount of remaining power, which can result in penalties when participating in electricity markets.
A control device for power storage equipment that adjusts the output power of both power generation and storage equipment to maintain a desired power balance by using a power difference value and residual power amount difference value to set appropriate output command values based on tolerance ranges.
This approach effectively suppresses errors in managing the remaining power in power storage equipment, ensuring compliance with electricity market demands and avoiding penalties.
Smart Images

Figure 0007555863000001 
Figure 0007555863000002 
Figure 0007555863000003
Abstract
Description
[Technical field]
[0001] The present invention relates to a control device for an electricity storage facility, a power supply system, and a program. [Background technology]
[0002] In recent years, with the spread of renewable energy power generation facilities, electricity system reforms necessary for a stable supply of electricity are being carried out around the world. In Japan, a wide-area operation promotion organization was established with the aim of ensuring a stable supply of electricity, minimizing electricity prices, and expanding the options for electricity use and business opportunities for companies. As a result, in addition to the wholesale electricity market, consideration is being given to the establishment of an electricity supply and demand adjustment market and a capacity market. In Europe and the United States, market system designs related to the electricity supply and demand adjustment market are also in place in PJM, the system operator in the United States, National Grid, the transmission operator in the United Kingdom, and Regelleistung, the common reserve market in Germany.
[0003] In order to enter various electricity markets, it is necessary to procure a promised amount of power during the time period required according to the power selling plan (simultaneous and equal amount), and a penalty will occur if the simultaneous and equal amount of power selling plan cannot be observed. In particular, when renewable energy power generation equipment is used, the amount of power generated is affected by the weather, so there is a concern that an error will occur between the predicted amount of power generated and the actual amount of power generated when entering various electricity markets. For example, Patent Document 1 below shows an example of a method for observing the simultaneous and equal amount of power selling plan associated with entering an electricity market and avoiding a penalty due to an error between the planned and actual amount of power sold due to a prediction error in the power sold.
[0004] That is, the abstract of Patent Document 1 below states, "[Problem] To appropriately correct power demand predicted at intermittent timing. [Solution] The power demand prediction device includes an error measurement unit that measures an error in a predicted power demand predicted according to one or more consumer facilities, an error addition unit that calculates an added error by adding up the errors measured according to a segment period in a correction unit period consisting of a predetermined number of consecutive segment periods, and a power demand prediction unit that predicts a predicted power demand for each segment period, and corrects each of the predicted power demand predicted in each segment period at the last predetermined number of times in the correction unit period, based on the added error calculated for the previous segment period, and the error addition unit holds the error measured according to the segment period, and is configured to calculate the added error when the power demand prediction unit performs a correction." [Prior art documents] [Patent documents]
[0005] [Patent Document 1] JP 2017-143734 A Summary of the Invention [Problem to be solved by the invention]
[0006] However, the above-mentioned technology has a problem that when unplanned charging and discharging of the energy storage equipment occurs, the management error of the SOC (State of Charge: remaining power amount) of the energy storage equipment, i.e., the error between the actual SOC and the planned SOC value, becomes large. The present invention has been made in consideration of the above-mentioned circumstances, and has an object to provide a power storage equipment control device, a power supply system, and a program that can suppress management errors in the amount of remaining charge in the power storage equipment. [Means for solving the problem]
[0007] In order to solve the above-mentioned problems, the present invention provides a control device for a power storage equipment, comprising: a power supply system including a power generation equipment that supplies a power generation equipment output power to a power grid and a power storage equipment that supplies a power storage equipment output power that has a positive value or a negative value to the power grid; a power difference value output unit that outputs a power difference value that is a difference between a system output power supplied to the power grid and a planned value of the system output power; a remaining energy amount difference value output unit that outputs a remaining energy amount difference value that is a difference between a remaining energy amount in the power storage equipment and a remaining energy amount management target value that is a target value for the remaining energy amount; and a power storage equipment control unit that supplies an output command value that is a command value for the output power of the power storage equipment to the power storage equipment based on the power difference value and the remaining energy amount difference value. The power storage equipment control unit has a function of setting the output command value to a first level when the remaining energy difference value exceeds a first range, and a function of setting the output command value to a second level lower than the first level when the remaining energy difference value falls below the first range. It is characterized by: Effect of the Invention
[0008] According to the present invention, it is possible to suppress management errors in the amount of remaining electricity in an electricity storage facility. [Brief description of the drawings]
[0009] [Figure 1] FIG. 1 is a block diagram of a power selling system according to a preferred embodiment. [Diagram 2] FIG. 1 is a block diagram showing an example of a power generation facility. [Diagram 3] FIG. 2 is a block diagram showing an example of a power storage facility. [Figure 4] FIG. 2 is a block diagram showing an example of a control device. [Diagram 5] FIG. 4 is a block diagram showing an example of an output adjustment unit. [Figure 6] 4 is a flowchart of an output adjustment amount calculation program. [Figure 7] 5 is an example of a waveform diagram of each part in the first comparative example. [Figure 8] 13 is an example of a waveform diagram of each part in the second comparative example. [Figure 9] 4 is an example of a waveform diagram of each part in the present embodiment. [Figure 10] FIG. 13 is a diagram showing the relationship between a simultaneous and equal amount determination period, a calculation cycle, and a calculation frequency. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0010] [Configuration of the embodiment] FIG. 1 is a block diagram of an electricity selling system 10 (electricity supply system) according to a preferred embodiment. The power selling system 10 includes a power demand unit 12, a power generation facility 13, a power storage facility 14, and a control device 40 (a control device for power storage facility, a computer). The power demand unit 12, the power generation facility 13, and the power storage facility 14 are connected to a power system 80, which is, for example, a three-phase AC power system, via a responsible branch point 82. The power selling system 10 is a system that sells power to the power system 80, and the active power that the power selling system 10 outputs to the power system 80 is referred to as the selling power P S (System Output Power).
[0011] The power demand unit 12 receives power from the responsibility branch point 82. The effective power received by the power demand unit 12 is represented as received power P L The effective power output from the power generation equipment 13 is called the output power P GEN (power generation equipment output power), and the effective power output from the power storage equipment 14 is called output power P BAT (power storage facility output power). When effective power is input to the power storage facility 14 via the responsibility branch point 82, the output power P BAT becomes a negative value. The control device 40 controls the power generation facility 13 and the power storage facility 14. That is, the control device 40 controls the output power P BAT By adjusting the power sold, P S The difference between the target value and the actual value is compensated for.
[0012] FIG. 2 is a block diagram showing an example of the power generation facility 13. 2, the power generation facility 13 includes a solar array 132, a power converter 134, a power controller 136, and an MPPT controller 138. The solar array 132 outputs DC power using a plurality of solar cell modules (not shown). The power converter 134 converts the DC power from the solar array 132 into AC power and outputs it to the power grid 80.
[0013] The power controller 136 controls the input / output power of the power converter 134. For this purpose, the power generation facility 13 includes a voltage sensor, a current sensor (unsigned), etc. as an interface for collecting electrical information of the input / output of the power converter 134. The MPPT controller 138 executes MPPT (Maximum Power Point Tracking) to maximize the output power of the solar array 132. That is, the MPPT controller 138 commands the input current from the solar array 132 to the power converter 134.
[0014] FIG. 3 is a block diagram showing an example of the power storage facility 14. As shown in FIG. 3, the power storage facility 14 includes a storage battery 142, a power converter 144, a power controller 146, and a BMU (Battery Management Unit) 148. The power converter 144 converts DC power input / output to / from the storage battery 142, and AC power input / output to / from the power grid 80 in both directions. The power controller 146 converts an output command value P BATref Based on this, the output power P of the power converter 144 BAT Control.
[0015] For this reason, the power storage facility 14 is provided with a voltage sensor, a current sensor (unsigned), etc., as an interface for collecting electrical information on the input and output of the power converter 144. The BMU 148 monitors the internal state of the storage battery 142 and calculates the remaining charge SOC of the storage battery. m Send to the outside.
[0016] FIG. 4 is a block diagram showing an example of the control device 40. As shown in FIG. The control device 40 includes general computer hardware such as a central processing unit (CPU), random access memory (RAM), read only memory (ROM), and solid state drive (SSD), which are not shown, and the SSD stores an operating system (OS), application programs, various data, and the like. The OS and application programs are deployed in the RAM and executed by the CPU. In FIG. 4, the inside of the control device 40 shows functions realized by application programs, etc., as blocks.
[0017] That is, the control device 40 includes a power selling plan calculation unit 43, a SOC management plan unit 44, an output adjustment unit 45, and a setting unit 46. The two units are supplied with power generation forecast information DG and power demand forecast information DD. The power generation forecast information DG is used to calculate the output power P of the power generation facility 13 based on weather forecasts and the like. GEN The power demand forecast information DD is information that predicts the transition of the received power P L This information predicts future trends (see Figure 1).
[0018] The power selling plan calculation unit 43 calculates the power selling target value P Sref The SOC management planning unit 44 calculates the remaining power management target value SOC, which is time-series data, based on the power generation forecast information DG and the power demand forecast information DD. ref Calculate.
[0019] The setting unit 46 sets an SOC management error allowable value X and an electricity selling error allowable value Y. Here, the SOC management error allowable value X is the remaining power amount management target value SOC ref SOC m In other words, the SOC control error tolerance X is the SOC m SOC ref This indicates that it is desirable for the deviation to be within ±X% of the specified value.
[0020] The power selling error tolerance Y is the power selling target value P Sref Power sold to the customer P S Here, the simultaneous and equal amount determination period TD is, for example, 30 minutes. If this average value is the target power selling value P Sref If the error falls outside the range of ±Y%, a penalty will be incurred. In this way, the user can adjust the power selling error allowable value Y in accordance with the regulations on power selling products and the power selling target value by operating the setting unit 46. Furthermore, the user can adjust the SOC management error allowable value X in accordance with the SOC management target accuracy of the power storage facility 14 by operating the setting unit 46.
[0021] The output adjustment unit 45 includes the above-mentioned power selling target value P Sref and the remaining battery management target value SOC ref In addition to the SOC management error tolerance X and the power selling error tolerance Y, the power selling power P S (See Figure 1) and remaining charge SOC m (See Figure 3) and Battery Command P BATref0 The output adjustment unit 45 adjusts the output command value P BATref That is, the output adjustment unit 45 adjusts the output power P of the power storage facility 14 so as to satisfy the simultaneous balance request of the power selling plan. BAT Here, the battery command P BATref0 is the output command value P BATref This is the default value, and unless there are special circumstances, it should be set to "0".
[0022] FIG. 5 is a block diagram showing an example of the output adjustment unit 45. As shown in FIG. 5, the output adjustment unit 45 includes a difference detection processing unit 451 (power difference value output unit, power difference value output means), a difference detection processing unit 452 (remaining energy amount difference value output unit, remaining energy amount difference value output means), flag calculation units 453 and 454 (power storage equipment control unit, power storage equipment control means), and an output adjustment amount calculation unit 455 (power storage equipment control unit, power storage equipment control means). SFrom the target power sales value P Sref and outputs the subtraction result as the power selling difference value ΔP. m From the remaining battery management target value SOC ref and outputs the subtraction result as the remaining charge difference value ΔSOC.
[0023] The flag calculation unit 453 calculates a flag FLG based on the power selling difference value ΔP and the power selling error allowable value Y. B That is, the flag calculation unit 453 outputs "ΔP<-Y·P Sref / 100" flag FLG B is set to "-1", and "ΔP>Y P Sref / 100" flag FLG B otherwise, the flag FLG B is set to “0”.
[0024] The flag calculation unit 454 calculates a flag FLG based on the remaining charge difference value ΔSOC and the SOC management error allowable value X. A That is, the flag calculation unit 454 outputs "ΔSOC<-X·SOC ref / 100" flag FLG A is set to "-1", and "ΔSOC>X SOC ref / 100" flag FLG A otherwise, the flag FLG A is set to “0”.
[0025] The output adjustment amount calculation unit 455 sets the flag FLG A ,FLG B Based on the output adjustment amount P BATcom The storage battery output calculation unit 456 calculates the output adjustment amount P BATcom and Battery Directive P BATref0 Based on (for example, by adding up) the output command value P BATref Output.
[0026] FIG. 6 is a flowchart of the output adjustment amount calculation program executed by the output adjustment amount calculation unit 455. This program is executed at every predetermined calculation period TP (see FIG. 10). The calculation period TP is a time shorter than the simultaneous equivalent amount judgment period TD, and "n=TD / TP" is called the calculation frequency n. It is preferable that the calculation frequency n is a natural number equal to or greater than "2." For example, if the simultaneous equivalent amount judgment period TD is 30 minutes, the calculation frequency n can be set to "30" and the calculation period TP to 1 minute.
[0027] When the process proceeds to step S2 in FIG. 6, the output adjustment amount calculation unit 455 outputs the flag FLG A ,FLG B Next, when the process proceeds to step S4, the output adjustment amount calculation unit 455 acquires the flag FLG A is "1", that is, the remaining charge SOC m If the answer is "Yes," the process proceeds to step S12, and the output adjustment amount calculation unit 455 calculates the output adjustment amount P BATcom is set to "Y·ΔP / 100". That is, the output power P BAT By making the remaining battery capacity SOC m This state in step S12 is called "Mode A."
[0028] On the other hand, if the determination in step S4 is "No", the process proceeds to step S6, and the output adjustment amount calculation unit 455 sets the flag FLG A is "-1", that is, the remaining charge SOC m If the determination here is "Yes," the process proceeds to step S14, and the output adjustment amount calculation unit 455 calculates the output adjustment amount P BATcom is set to "-Y·ΔP / 100". That is, the output power P BAT By making as small as possible (increasing the charging power as much as possible), the remaining charge SOC m This state in step S14 is called "Mode B."
[0029] Also, the flag FLG Ais "0", that is, the remaining charge SOC m If it is within the allowable range, the result in step S6 is “No”, and the process proceeds to step S8. In step S8, the output adjustment amount calculation unit 455 sets the flag FLG B is "-1", that is, the power sold P S If the answer is "Yes," the process proceeds to step S12, where the output adjustment amount calculation unit 455 calculates the output adjustment amount P BATcom is set to "Y·ΔP / 100" (mode A). That is, the output power P BAT By making it as large as possible, the power sold P S Try to increase.
[0030] On the other hand, if the determination in step S8 is "No", the process proceeds to step S10. In step S10, the output adjustment amount calculation unit 455 sets the flag FLG B is "1", that is, the power to be sold P S If the determination is "Yes," the process proceeds to step S14, where the output adjustment amount calculation unit 455 calculates the output adjustment amount P BATcom is set to "-Y·ΔP / 100" (mode B). That is, the output power P BAT As a result, the power sold P S Attempts to reduce.
[0031] On the other hand, the flag FLG A ,FLG B If both are "0", that is, the remaining charge SOC m and power sold P S If both are within the allowable range, the result in step S10 is “No”, and the process proceeds to step S16. BATcom is set to "0". That is, the battery command P BATref0 (See Fig. 5) is the output command value P BATrefThe state of step S16 is called "Mode C." With the above, the processing of this routine ends.
[0032] [Comparative Example] First Comparative Example Next, in order to clarify the operation and effects of this embodiment, various comparative examples will be described. First, the first comparative example has a hardware configuration similar to that of the above-described embodiment, but does not perform output adjustment by the power storage facility 14. Specifically, the output adjustment amount P BATcom (See Fig. 5) is always set to "0", and the output command value P BATref Battery Directive P BATref0 This is so that it is always equal to
[0033] FIG. 7 is an example of a waveform diagram of each part in the first comparative example. As described above, in this comparative example, the output adjustment amount P BATcom is always "0". Also, the output adjustment amount P BATcom is always "0", the remaining charge difference value ΔSOC is also always "0". In this comparative example, the output power P GEN The difference between the predicted value and the actual value of the received power P L The difference between the predicted value and the actual value of is directly reflected in the power selling difference value ΔP. As a result, the average value of the power selling difference value ΔP during the simultaneous balancing determination period TD is set to the power selling target value P Sref There are frequent cases where the range of ±Y percent is exceeded, resulting in penalties.
[0034] Second Comparative Example Next, a second comparative example will be described. The second comparative example also has the same hardware configuration as the above-described embodiment, but the output power P of the power storage facility 14 is adjusted so that the power selling difference value ΔP is always set to “0”. BAT This sets the following. 8 is an example of a waveform diagram of each part in Comparative Example 2. The dashed lines in Fig. 8 are waveforms in Comparative Example 1 shown in Fig. 7.
[0035] As described above, in this comparative example, the power selling difference value ΔP is always "0". GEN The difference between the predicted value and the actual value of the received power P L The difference between the predicted value and the actual value is the output adjustment amount P BATcom is directly reflected in the power selling difference value ΔP. As a result, the fluctuation of the remaining power difference value ΔSOC becomes large. The fact that the fluctuation of the remaining power difference value ΔSOC becomes large means that a power storage facility 14 capable of responding to the fluctuation is required, which causes a problem that the power storage facility 14 becomes large and expensive.
[0036] [Operation of the embodiment] 9 is an example of a waveform diagram of each part in this embodiment. In FIG. 9, the solid line indicates the waveform according to this embodiment, and the dashed line indicates the waveform according to the first comparative example shown in FIG. In FIG. 9, before time t1, the power selling difference value ΔP is within ±Y percent, and the remaining power difference value ΔSOC is within ±X percent. As a result, the flag FLG A ,FLG B Then, in the output adjustment amount calculation program (FIG. 6), the process proceeds to step S16 via steps S2, S4, S6, S8, and S10. In step S16, mode C is selected, and the output adjustment amount calculation unit 455 calculates the output adjustment amount P BATcom Set to "0".
[0037] Next, at time t1, when the power selling difference value ΔP exceeds Y percent, the flag FLG B becomes "1". As a result, in the output adjustment amount calculation program (FIG. 6), the process proceeds to step S12 via steps S2, S4, S6, and S8. In step S12, mode A is selected, and the output adjustment amount calculation unit 455 calculates the output adjustment amount P BATcom Set "Y ΔP / 100".
[0038] Next, at time t2, when the remaining charge difference value ΔSOC exceeds X percent, the flag FLG Abecomes "1". As a result, in the output adjustment amount calculation program (FIG. 6), the process proceeds to step S12 via steps S2, S4, S6, and S8. In step S12, mode A continues to be selected, and the output adjustment amount calculation unit 455 calculates the output adjustment amount P BATcom Set "Y ΔP / 100".
[0039] In the example of FIG. 9, the remaining charge difference value ΔSOC exceeds X percent during the period from time t2 to t20, so the flag FLG A The value of the power selling difference value ΔP (i.e., the flag FLG B Regardless of the value of the output adjustment amount P BATcom Keep it set to "Y ΔP / 100".
[0040] When the remaining charge difference value ΔSOC is again within the range of ±X percent at time t20, the flag FLG A becomes "0". Flag FLG A is "0", the output adjustment amount calculation unit 455 resets the flag FLG B In the illustrated example, the mode is selected based on the value of flag FLG from time t20 to t22 and from time t24 onward. B is "0", the output adjustment amount calculation unit 455 selects mode C, and the output adjustment amount P BATcom In addition, during the period from time t22 to t24, the flag FLG B is "-1", the output adjustment amount calculation unit 455 selects mode B, and the output adjustment amount P BATcom Set "-Y ΔP / 100".
[0041] FIG. 10 is a diagram showing the relationship between the simultaneous and equal amount determination period TD, the calculation cycle TP, and the calculation frequency n. In Fig. 10, periods TD1 to TDm are all simultaneous equivalence determination periods TD, and as shown in the figure, the simultaneous equivalence determination periods TD are set continuously. Each simultaneous equivalence determination period TD is divided into n calculation periods TP. For example, period TD1 is divided into calculation periods TP1 to TPn. Here, for example, if the simultaneous equivalence determination period TD is 30 minutes, it is preferable that the calculation frequency n>6 and the calculation period TP is 5 minutes or less. Each calculation period TP has an error detection period TE, an output adjustment amount calculation period TF, and a control period TG.
[0042] The error detection period TE is a period during which the difference detection processing units 451, 452 (see FIG. 5) calculate and output the power selling difference value ΔP and the remaining power difference value ΔSOC. The output adjustment amount calculation period TF is a period during which the flag calculation units 453, 454, the output adjustment amount calculation unit 455, and the storage battery output calculation unit 456 calculate and output the output command value P BATref The control period TG is a period during which the power storage equipment 14 (see FIG. 1) calculates and outputs the output command value P BATref The output power P BAT In this way, by repeating the calculation period TP at a cycle shorter than the simultaneous balancing judgment period TD, the electric power to be sold P S This can meet the simultaneous and equal demands.
[0043] [Effects of the embodiment] As described above, according to the preferred embodiment, the power storage equipment control device (40) supplies the power generation equipment output power (P GEN ) to the power generation facility 13 and the power storage facility output power (P BAT ), and the power supply system (10) including the power storage facility 14 that supplies the system output power (P S ) and system output power (P S ) planned value (P Sref ) and a power difference value output unit (451) for outputting a power difference value (ΔP) which is the difference between the remaining power SOC m and remaining battery capacity SOC m The target value for remaining battery power (SOC ref) and a remaining power difference value output unit (452) that outputs a remaining power difference value ΔSOC, which is the difference between the power difference value (ΔP) and the remaining power difference value ΔSOC. BAT ) is the output command value P BATref and a power storage equipment control unit (453, 454, 455) that supplies the power storage equipment 14 with the above-mentioned.
[0044] In this way, the power storage equipment control units (453, 454, 455) control the power storage equipment output power (P BAT ) is the output command value P BATref to the power storage facility 14, it is possible to suppress management errors in the amount of remaining power in the power storage facility 14.
[0045] In addition, the power storage equipment control unit (453, 454, 455) increases the output command value P BATref to the first level (Y·ΔP / 100) (S4, S12), and when the residual battery difference value ΔSOC falls below the first range (±X percent), the output command value P BATref to a second level (-Y·ΔP / 100) lower than the first level (Y·ΔP / 100) (S6, S14), and when the remaining charge difference value ΔSOC is within the first range (±X percent) and the power difference value (ΔP) exceeds the second range (±Y percent), the output command value P BATref to a second level (-Y·ΔP / 100) (S10, S14), and when the remaining charge difference value ΔSOC is within the first range (±X percent) and the power difference value (ΔP) falls below the second range (±Y percent), the output command value P BATref to a first level (Y·ΔP / 100) (S8, S12), and when the remaining charge difference value ΔSOC is within a first range (±X percent) and the power difference value (ΔP) is within a second range (±Y percent), the output command value P BATref It is more preferable that the control unit 100 has a function (S10, S16) of setting the level to a third level (0) lower than the first level (Y·ΔP / 100) and higher than the second level (-Y·ΔP / 100).
[0046] In this way, the output command value P is adjusted according to whether the remaining charge difference value ΔSOC is within the first range (±X percent) and whether the power difference value (ΔP) is within the second range (±Y percent). BATref can be set appropriately.
[0047] Moreover, it is more preferable that the power storage equipment control device (40) further includes a setting unit 46 that sets the first range (±X percent). This makes it possible to set an appropriate first range (±X percent) in accordance with the SOC management target accuracy of the power storage equipment 14.
[0048] Moreover, it is more preferable that the setting unit 46 further includes a function for setting the second range (±Y percent). This makes it possible to set an appropriate second range (±Y percent) according to the regulations on electric power selling products and the target electric power selling value.
[0049] In addition, the power storage equipment control unit (453, 454, 455) controls the output command value P BATref It is more preferable to have a function to update the output command value P with sufficient frequency for a general simultaneous and equal amount determination period TD. BATref can be updated.
[0050] [Variations] The present invention is not limited to the above-mentioned embodiment, and various modifications are possible. The above-mentioned embodiment is exemplified to explain the present invention in an easy-to-understand manner, and is not necessarily limited to those having all the configurations described. In addition, other configurations may be added to the configuration of the above-mentioned embodiment, and it is also possible to replace a part of the configuration with another configuration. In addition, the control lines and information lines shown in the figure show those that are considered necessary for explanation, and do not necessarily show all the control lines and information lines necessary on the product. In reality, it may be considered that almost all the configurations are connected to each other. Possible modifications of the above-mentioned embodiment are, for example, as follows.
[0051] (1) In the above embodiment, the power selling system 10 sells power. However, the present invention is not limited to a system that buys and sells power. As long as the system supplies power to the power grid 80, the present invention can be applied.
[0052] (2) In the above embodiment, the storage battery 142 is used as the power storage equipment 14. However, a flywheel or the like may be used as the power storage equipment 14 instead of the storage battery 142.
[0053] (3) Since the hardware of the control device 40 in the above embodiment can be realized by a general-purpose computer, the flowchart shown in FIG. 6 and other programs for executing the various processes described above may be stored on a storage medium or distributed via a transmission path.
[0054] (4) In the above embodiment, the process shown in FIG. 6 and the other processes described above have been described as software-based processes using a program. However, some or all of the processes may be replaced with hardware-based processes using an ASIC (Application Specific Integrated Circuit) or an FPGA (Field Programmable Gate Array), etc.
[0055] (5) The various processes executed in the above-described embodiments may be executed by a server computer via a network (not shown), and the various data stored in the above-described embodiments may also be stored in the server computer. [Explanation of symbols]
[0056] 10. Power sales system (power supply system) 13 Power generation facilities 14 Energy storage facilities 40 Control devices (computers, control devices for power storage equipment) 46 Setting section 80 Power system 451 Difference detection processing unit (power difference value output unit, power difference value output means) 452 Difference detection processing unit (remaining power difference value output unit, remaining power difference value output means) 453, 454 Flag calculation unit (electricity storage equipment control unit, electricity storage equipment control means) 455 Output adjustment amount calculation unit (storage equipment control unit, storage equipment control means) P S Power sold (system output power) ΔSOC remaining charge difference value P BAT Output power (power storage equipment output power) P GEN Output power (power generation equipment output power) SOC m Remaining battery P BATref Output command value
Claims
1. A power supply system including a power generation facility that supplies a power generation facility output power to a power grid and a power storage facility that supplies a power storage facility output power that has a positive value or a negative value to the power grid, the power supply system including: a power difference value output unit that outputs a power difference value that is a difference between a system output power supplied to the power grid and a planned value of the system output power; a remaining energy difference value output unit that outputs a remaining energy difference value that is a difference between a remaining energy amount in the energy storage facility and a remaining energy management target value that is a target value for the remaining energy amount; a power storage equipment control unit that supplies an output command value that is a command value for the power storage equipment output power to the power storage equipment based on the power difference value and the remaining power amount difference value, The power storage equipment control unit is a function of setting the output command value to a first level when the remaining power amount difference value exceeds a first range; and a function of setting the output command value to a second level lower than the first level when the remaining power amount difference value falls below the first range. A control device for a power storage facility.
2. The power storage equipment control unit further a function of setting the output command value to the second level when the remaining energy difference value is within the first range and the power difference value exceeds a second range; a function of setting the output command value to the first level when the remaining energy difference value is within the first range and the power difference value is below the second range; and a function of setting the output command value to a third level that is lower than the first level and higher than the second level when the remaining energy difference value is within the first range and the power difference value is within the second range. The control device for an electric storage facility according to claim 1 .
3. The device further includes a setting unit that sets the first range. The control device for an electric storage facility according to claim 2 .
4. The setting unit further has a function of setting the second range. The control device for an electric storage facility according to claim 3 .
5. The power storage equipment control unit has a function of updating the output command value at a cycle of 5 minutes or less. The control device for an electric storage facility according to claim 1 .
6. A power generation facility that supplies power generation facility output power to the power grid; a power storage facility that supplies a power storage facility output power having a positive value or a negative value to the power grid; a power difference value output unit that outputs a power difference value that is a difference between a system output power supplied to the power grid and a planned value of the system output power; a remaining energy difference value output unit that outputs a remaining energy difference value that is a difference between a remaining energy amount in the energy storage facility and a remaining energy management target value that is a target value for the remaining energy amount; a power storage equipment control unit that supplies an output command value that is a command value for the power storage equipment output power to the power storage equipment based on the power difference value and the remaining power amount difference value, The power storage equipment control unit is a function of setting the output command value to a first level when the remaining power amount difference value exceeds a first range; and a function of setting the output command value to a second level lower than the first level when the remaining power amount difference value falls below the first range.
1. A power supply system comprising:
7. Computer, a power supply system including a power generation facility that supplies a power generation facility output power to a power grid and a power storage facility that supplies a power storage facility output power that has a positive value or a negative value to the power grid, the power supply system comprising: a power difference value output means that outputs a power difference value that is a difference between a system output power supplied to the power grid and a planned value of the system output power; a remaining energy difference value output means for outputting a remaining energy difference value which is a difference between the remaining energy amount in the power storage facility and a remaining energy management target value which is a target value of the remaining energy amount; a power storage equipment control means for supplying an output command value, which is a command value for the output power of the power storage equipment, to the power storage equipment based on the power difference value and the remaining energy difference value; A program for causing the device to function as a The storage equipment control means a function of setting the output command value to a first level when the remaining power amount difference value exceeds a first range; and a function of setting the output command value to a second level lower than the first level when the remaining power amount difference value falls below the first range. A program characterized by:
Citation Information
Patent Citations
Wind farm control method and control device
JP2015080359A
Power variation controller and power variation control method for renewable energy power generation device
JP2017118738A
Demand power prediction device, demand power prediction method, and program
JP2017143734A
Control device, control method and computer program
JP2018152943A
Power control device, method, and power generating system
JP2018160993A