Method and device for erecting building materials
The method employs a single lifting device with cargo handling equipment and a deflection device to efficiently unload and erect building materials, addressing the limitations of multiple crane setups and separate unloading processes, ensuring stable construction.
Patent Information
- Application Number
- JP2021046987
- Authority / Receiving Office
- JP · JP
- Patent Type
- Patents
- Current Assignee / Owner
- Filing Date
- 2021-03-22
- Publication Date
- 2024-09-27
- Estimated Expiration
- 2041-03-22
AI Technical Summary
Existing methods for erecting long and heavy building materials in construction require multiple cranes, which may not be feasible in narrow spaces and necessitate continuous crane availability, and involve separate unloading and re-fixing steps.
A method using a single lifting device with cargo handling equipment and a deflection device to connect wires to building materials on a transport vehicle, allowing simultaneous unloading and erection without additional pedestal placement.
Enables efficient unloading and erection of building materials using a single lifting device, eliminating the need for multiple cranes and separate unloading steps, and maintaining a stable posture during erection.
Smart Images

Figure 0007557404000006 
Figure 0007557404000005 
Figure 0007557404000001
Abstract
Description
[Technical field]
[0001] The present invention relates to a method and an apparatus for erecting building materials. [Background technology]
[0002] In the construction of onshore wind power plants and the like, when unloading and erecting long, heavy building materials such as tower components, the standard method is to use two cranes to hoist the building materials from one end and the other end. However, even if two cranes are used to hoist the building materials from one end to the other, there are cases where it is not possible to place two cranes in a narrow construction yard, and there is also the problem that two cranes must be kept on standby throughout the work period. In response to such problems, a method has been proposed in which building materials are erected using only one crane (lifting device) (see, for example, Patent Document 1). In this method, a building material raising device 10 including a first support member 30, a second support member 31, and a mounting stand 20 is used (see the abstract of Patent Document 1). One end 30A of the first support member 30 is rotatably fixed to a fixed member 34. One end 31A of the second support member 31 is rotatably connected to the other end 30B of the first support member 30, and the other end 31B is movable in the horizontal direction. The mounting stand 20 is provided along the upper part of the second support member 31. In this method, a building material 1 is placed on the mounting stand 20 of the building material raising device 10, the upper part of the mounting stand 20 is lifted, and the second support member 31 is rotated around the other end 31B. [Prior art documents] [Patent documents]
[0003] [Patent Document 1] JP 2010-24776 A Summary of the Invention [Problem to be solved by the invention]
[0004] However, the method described in Patent Document 1 requires a separate process of unloading the building materials from a transport vehicle such as a trailer and then placing the unloaded building materials on a predetermined stand. Also, it is necessary to fix one end of the first support member, which requires the work of removing and re-fixing it each time. The present invention aims to solve the above-mentioned problems and to efficiently unload and erect building materials using only one lifting device. [Means for solving the problem]
[0005] In order to solve the above problems, the present invention provides a loading and unloading facility including a main body having a pair of legs and a beam section horizontally extending between the pair of legs, and a loading and unloading means installed on the beam section. and one lifting device; In this method, first, a transport vehicle with building materials loaded on its platform enters between the pair of legs. Next, the tip of a first wire hanging down from the loading means is attached to one end of the building material in the longitudinal direction. The above The tips of the second wires hanging down from the lifting device are connected to the other longitudinal ends of the building materials. Then, the building materials and the platform are separated. Then, the transport vehicle retreats from between the pair of legs. Then, the tips of the second wires are raised by the lifting device to erect the building materials. In this invention, the tip of the first wire of the loading and unloading means is connected to one end of the building material placed on the bed of the transport vehicle, and the tip of the second wire of the lifting device is connected to the other end of the building material, so that the building material can be erected. Therefore, two lifting devices such as cranes are not required as in the past, and only one lifting device is required. In addition, there is no need to provide a separate process for unloading the building materials from the transport vehicle and placing them on a specified stand. In other words, the building materials placed on the bed of the transport vehicle can be unloaded and erected in their current state. Thus, according to the present invention, the unloading and erection of building materials can be efficiently performed using only one lifting device.
[0006] In the above method, it is preferable to separate the building material from the loading platform by raising the tip of the first wire with the loading and unloading means and raising the tip of the second wire with the lifting device. In this configuration, the building materials can be easily lifted from the ground using the loading means and lifting device, eliminating the need to use a special transport vehicle with a liftable platform. In the method, it is preferable that the building material is erected by lowering the tip of the first wire by the loading and unloading means as the tip of the second wire is raised by the lifting device. With this configuration, it is possible to quickly erect the building materials while maintaining a predetermined distance between the building materials and the beams.
[0007] In the above method, it is preferable that a tip of the first wire is connected to an upper portion of one end in a longitudinal direction of the building material, and a tip of the second wire is connected to a center portion of the other end in the longitudinal direction of the building material. With this configuration, it is possible to erect the building material while maintaining a stable posture without rotating it. The beam portion has an opening through which the first wire is inserted, and the loading means is disposed above the opening. Is In this case, the loading and unloading facility includes a deflection device that contacts a side surface of the first wire with a curved surface when the tip of the first wire moves away from the opening in the short direction of the beam portion in a plan view. Is . When the other end of the building material is lifted using a lifting device to erect the building material, the first wire is pulled in the short direction of the beam and the first wire inserted into the opening is bent, but if it is bent below a certain radius of curvature, the required strength may not be obtained. However, by providing a deflection device, it is possible to bend the first wire while suppressing a decrease in strength.
[0008] The present invention also relates to a building material erection device having a loading and unloading facility including a main body having a pair of legs and a beam section horizontally disposed between the pair of legs, and a loading and unloading means installed on the beam section. The loading and unloading means has a first wire whose tip is connected to one end of the longitudinal direction of the building material. The beam section has an opening through which the first wire is inserted, and the loading and unloading means is disposed above the opening. The loading and unloading facility includes a deflection device that contacts a side surface of the first wire with a curved surface when the tip of the first wire moves away from the opening in the short direction of the beam section in a plan view. Effect of the Invention
[0009] According to the present invention, the use of a single lifting device allows efficient unloading and erection of building materials. [Brief description of the drawings]
[0010] [Figure 1] 1 is a side view showing an outline of a building material erection device according to an embodiment of the present invention. [Diagram 2] 2 is an enlarged schematic view of the loading / unloading facility shown in FIG. 1, seen from the rear. [Diagram 3] FIG. 3 is a side view for explaining a deflection device provided in the loading and unloading facility shown in FIG. 2. [Figure 4] 4 is an enlarged side view showing the periphery of the deflection device shown in FIG. 3. [Diagram 5] FIG. 5 is an enlarged plan view of the deflection device shown in FIG. [Figure 6] 1 is a flowchart showing the contents of a method for erecting building materials according to an embodiment of the present invention. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0011] Hereinafter, an embodiment of the present invention will be described with reference to the drawings. In the drawings shown below, the same or similar components are given the same reference numerals, and duplicated descriptions are omitted. In addition, the size and shape of the components may be deformed or exaggerated to be schematic for the convenience of explanation. FIG. 1 is a side view showing in outline a building material erection device (hereinafter also simply referred to as "erecting device") 100 according to an embodiment of the present invention. FIG. 2 is an enlarged view showing in outline a loading and unloading facility 10 shown in FIG. 1, as seen from the rear. In FIG. 2, the transport vehicle 95 is omitted. FIG. 3 is a side view for explaining a deflection device 60 provided in the loading and unloading facility 10 shown in FIG. 2. In the following, for the sake of convenience of explanation, the up-down, front-rear, left-right directions of the erection device 100 are set to the directions shown in FIG. 1 and FIG. 2. The erection device 100 is a device used when unloading and erecting long, heavy building materials 90, such as the tower components of a wind turbine, and by using the loading and unloading equipment 10, it is possible to use only one lifting device 80, such as a crane.
[0012] As shown in Figures 1 and 2, the erection device 100 has a loading and unloading facility 10. The loading and unloading facility 10 has a main body 20 and a loading and unloading means 50. The main body 20 has a pair of left and right legs 30, 30, and a beam 40 that is horizontally disposed between the pair of left and right legs 30, 30. The loading and unloading means 50 is installed on the beam 40. The leg 30 has a base member 31, a pair of support columns 32, 32, and an upper horizontal member 33. The base member 31 extends horizontally in the front-rear direction and is installed on a base surface 97. The support columns 32 extend vertically and are arranged in pairs in the front-rear direction on the base member 31. The upper horizontal member 33 is arranged horizontally in the front-rear direction so as to connect the upper parts of the pair of support columns 32, 32. A lower auxiliary member 34 is arranged diagonally at the corner where the base member 31 and the support columns 32 intersect. The beam portion 40 extends horizontally in the left-right direction and is arranged so as to be horizontally supported on the pair of left and right upper horizontal members 33, 33. The beam portion 40 has a pair of cross beams 41, 41 arranged side by side in the front-rear direction. A structural member such as an H-shaped steel can be used as a member constituting the main body 20. The main body 20 is not limited to the above-mentioned configuration, and may be any type having a so-called gate shape including a pair of legs 30, 30 and a beam 40 extending between them.
[0013] The loading / unloading means 50 has a first wire 51 whose tip is connected to one end 91 in the longitudinal direction of the building material 90. In this case, the loading / unloading means 50 is a jack (such as a Double Twin Jack (product name) manufactured by Ox Jack Co., Ltd.) that can pull back the first wire 51 to raise the tip 52 (hoisting) and send out the first wire 51 to lower the tip 52 (hanging). Note that the loading / unloading means 50 is not limited to this, and may be, for example, a winch or the like. The beam portion 40 has an opening 42 (see FIG. 4) through which the first wire 51 is inserted. The loading / unloading means 50 is disposed above the opening 42. In this embodiment, the opening 42 is formed between a pair of cross beams 41, 41. Note that the beam portion 40 may be formed of a single member, and the opening 42 may be a through hole formed in the center of the beam portion 40 in a plan view.
[0014] 2 and 3, the cargo handling equipment 10 is equipped with a deflection device 60 that comes into contact with a side surface of the first wire 51 with a curved surface when the tip 52 of the first wire 51 leaves the opening 42 in the short direction (here, forward direction) of the beam portion 40 in a plan view. The deflection device 60 is attached to a deflection device receiving member 70. The deflection device receiving member 70 is installed between the left and right supports 32 below the beam portion 40. An upper auxiliary member 35 is arranged diagonally at the corner where the beam portion 40 or the deflection device receiving member 70 intersects with the support 32.
[0015] Fig. 4 is an enlarged side view showing the periphery of the deflection device 60 shown in Fig. 3. Fig. 5 is an enlarged plan view of the deflection device 60 shown in Fig. 4. As shown in FIG. 4 and FIG. 5, the deflection device 60 has a contact portion 61 that contacts the first wire 51 and a support portion 62 that supports the contact portion 61. The support portion 62 is fixed to the rear surface of the deflection device receiving member 70. The rear surface 63 of the contact portion 61 is a part of a cylindrical surface here, but may be another convex curved surface such as an elliptical cylindrical surface. A coating layer having a low friction coefficient such as a fluororesin may be formed on the surface 63 of the contact portion 61. In this way, wear of the first wire 51 can be reduced. In addition, a concave groove (not shown) that guides the first wire 51 may be formed on the surface 63 of the contact portion 61. In this way, the first wire 51 can be stably pulled back and sent out.
[0016] Next, a method for erecting a building material 90 using the erecting device 100 configured in this manner will be described with reference mainly to Figures 1, 2, and 6. Figure 6 is a flowchart showing the contents of a method for erecting a building material according to an embodiment of the present invention. First, a transport vehicle 95 such as a trailer carrying building materials 90 on a loading platform 96 enters between a pair of legs 30, 30 (step S1). The transport vehicle 95 faces forward in Fig. 1, but may face backward. The transport vehicle 95 may have a detached power unit for movement.
[0017] Next, the worker connects the first wire 51 and the second wire 81 to the building material 90 (step S2). Specifically, the worker connects the tip 52 of the first wire 51 hanging down from the loading / unloading means 50 to one end 91 in the longitudinal direction of the building material 90. Here, the tip 52 of the first wire 51 is connected to an upper portion 93 of one end 91 in the longitudinal direction of the building material 90 placed on the loading platform 96 via a predetermined jig (not shown). In addition, the worker connects the tip 82 of the second wire 81 hanging down from a lifting device 80 such as a crane to the other end 92 in the longitudinal direction of the building material 90. Here, the tip 82 of the second wire 81 is bifurcated and is connected to a center portion 94 of the other end 92 in the longitudinal direction of the building material 90 via a predetermined jig (not shown) attached to each tip. The center 94 of the other end 92 is the center in the height direction and the left-right direction of the other end 92 when the building material 90 is laid on its side, and is the hanging position where the building material 90 faces vertically due to its own weight when the building material 90 is lifted by the second wire 81. When the second wire 81 has only one tip 82, it is preferable to connect it to the upper part of the other end 92 in the longitudinal direction of the building material 90.
[0018] Next, the building material 90 and the loading platform 96 are separated (step S3). Specifically, the loading means 50 raises the tip 52 of the first wire 51, and the lifting device 80 raises the tip 82 of the second wire 81, thereby lifting the building material 90 from the loading platform 96. Here, rewinding (winding up) the second wire 81 is preferable from the viewpoint of ensuring stable operation, since the tip 82 of the second wire 81 can be raised straight up. Note that, if the loading platform 96 of the transport vehicle 95 can be raised and lowered, the loading platform 96 may be lowered to separate the building material 90 and the loading platform 96. Next, the transport vehicle 95 with its loading platform 96 now empty retreats from between the pair of legs 30, 30 (step S4).
[0019] Next, the lifting device 80 raises the tip 82 of the second wire 81, thereby erecting the building material 90 (step S5). Here, the tip 82 of the second wire 81 is raised by unwinding the second wire 81 or by raising the tip of the boom 83 of the lifting device 80 upward (see the dashed line in FIG. 1). In this case, it is preferable to erect the building material 90 by lowering the tip 52 of the first wire 51 by the loading and unloading means 50 as the lifting device 80 raises the tip 82 of the second wire 81 (see the dashed line in FIG. 1).
[0020] As described above, in the method for erecting a building material according to this embodiment, first, a transport vehicle 95 with a building material 90 loaded on a loading platform 96 enters between a pair of legs 30, 30. Next, a tip 52 of a first wire 51 hanging down from a loading means 50 is connected to one end 91 in the longitudinal direction of the building material 90, and a tip 82 of a second wire 81 hanging down from a lifting device 80 is connected to the other end 92 in the longitudinal direction of the building material 90. Next, the building material 90 and the loading platform 96 are separated. Next, the transport vehicle 95 retreats from between the pair of legs 30, 30. Then, the lifting device 80 raises the tip 82 of the second wire 81 to erect the building material 90. In this embodiment, the tip 52 of the first wire 51 of the loading / unloading means 50 is connected to one end 91 of the building material 90, and the tip 82 of the second wire 81 of the lifting device 80 is connected to the other end 92 of the building material 90, so that the building material 90 can be erected. Therefore, two lifting devices 80 such as cranes are not required as in the past, and only one lifting device 80 is required. In addition, there is no need to provide a separate process for unloading the building material 90 from the transport vehicle 95 and placing it on a specified stand. In other words, the building material 90 placed on the loading platform 96 of the transport vehicle 95 can be unloaded and erected in its current state. In this manner, according to this embodiment, the unloading and erection of the building materials 90 can be efficiently performed using only one lifting device 80.
[0021] In this embodiment, the loading / unloading means 50 raises the tip 52 of the first wire 51, and the lifting device 80 raises the tip 82 of the second wire 81, thereby separating the building material 90 from the loading platform 96. In this configuration, the loading / unloading means 50 and the lifting device 80 can easily lift the building material 90 from the ground, so there is no need to use a special transport vehicle that can raise and lower the loading platform 96. In this embodiment, the lifting device 80 raises the tip 82 of the second wire 81, while the loading / unloading means 50 lowers the tip 52 of the first wire 51, thereby erecting the building material 90. In this configuration, the building material 90 can be erected quickly while maintaining a predetermined distance between the building material 90 and the beam 40.
[0022] In this embodiment, the tip 52 of the first wire 51 is connected to an upper portion 93 of one end 91 in the longitudinal direction of the building material 90, and the tip 82 of the second wire 81 is connected to a central portion 94 of the other end 92 in the longitudinal direction of the building material 90. With this configuration, the building material 90 can be erected while maintaining a stable posture without rotating.
[0023] In this embodiment, the beam 40 has an opening 42 through which the first wire 51 is inserted, and the loading / unloading means 50 is disposed above the opening 42. The loading / unloading facility 10 includes a deflection device 60 that contacts the side of the first wire 51 with a curved surface when the tip 52 of the first wire 51 moves away from the opening 42 in the short-side direction of the beam 40 in a plan view. When the other end 92 of the building material 90 is lifted using the lifting device 80 when erecting the building material 90, the first wire 51 is pulled in the short-side direction of the beam 40, and the first wire 51 inserted in the opening 42 is bent. However, if the first wire 51 is bent to a predetermined curvature radius or less, the required strength may not be obtained. However, by including the deflection device 60, the first wire 51 can be bent while suppressing a decrease in strength.
[0024] Although the embodiment of the present invention has been described above, the present invention is not limited to the above embodiment, and can be appropriately modified without departing from the spirit of the present invention. For example, the deflection device 60 may be a pulley. Alternatively, instead of including the deflection device 60, the loading / unloading equipment 10 may have the loading / unloading means 50 installed at an angle so that the payout direction of the first wire 51 is inclined with respect to the vertical direction. In this case, the loading / unloading means 50 itself may be installed at an angle, or the loading / unloading means 50 may be installed at an angle together with the beam 40 or the pair of supports 32, 32. Alternatively, the loading / unloading means 50 may be fixed to a shaft extending along the left-right direction and configured to be rotatable around the central axis of the shaft. In the above embodiment, the tower member of a wind turbine is used as an example of the building material 90 to be unloaded and erected, but the present invention is not limited to this. The present invention can also be applied to the unloading and erection of other building materials such as long and heavy steel columns. [Explanation of symbols]
[0025] 10 Cargo handling equipment 20 Main body 30 Legs 40 Beam section 42 Opening 50 Means of loading and unloading 51 First Wire 52 Tip 60 Deflector 80 Lifting equipment 81 Second Wire 82 Tip 90 Building materials 91 one end 92 Other end 93 Top 94 Central part 95 Transport Vehicles 96 Cargo Bed 100 Erection Device
Claims
1. A method for erecting building materials using a loading and unloading facility including a main body having a pair of legs and a beam section horizontally extending between the pair of legs, and a loading and unloading means installed on the beam section, A transport vehicle carrying building materials on a loading platform enters between the pair of legs, A tip of a first wire hanging down from the loading and unloading means is connected to one end of the building material in the longitudinal direction, and a tip of a second wire hanging down from a lifting device is connected to the other end of the building material in the longitudinal direction, The building material and the loading platform are separated from each other, The transport vehicle retreats from between the pair of legs, The tip of the second wire is raised by the lifting device to erect the building material; the beam portion has an opening through which the first wire is inserted, The loading means is disposed above the opening, the loading and unloading equipment includes a deflection device that contacts a side surface of the first wire with a curved surface when a tip of the first wire moves away from the opening in a short direction of the beam portion in a plan view; A method for erecting building materials, comprising:
2. The loading and unloading equipment includes a main body having a pair of legs and a beam portion extending between the pair of legs, and a loading and unloading means installed on the beam portion, The loading / unloading means has a first wire whose tip is connected to one end of the building material in the longitudinal direction, the beam portion has an opening through which the first wire is inserted, The loading means is disposed above the opening, the loading and unloading equipment includes a deflection device that contacts a side surface of the first wire with a curved surface when a tip of the first wire moves away from the opening in a short direction of the beam portion in a plan view; A device for erecting building materials, comprising:
Citation Information
Patent Citations
Wire rope protective device
JP1994305677A
Movable suspended block device for constructing steel frame pillar, and steel frame pillar construction method using this device
JP1994330634A
Heavy object attitude changing device
JP1997077500A
Panel suspending method
JP2006144234A
Device for erecting building material and method for erecting building material
JP2010024776A