Slurry transport equipment and slurry transport method

The dual flow path system in slurry conveyance facilities addresses pipe clogging by continuous slurry circulation, ensuring stable delivery and reducing downtime.

JP7559434B2Active Publication Date: 2024-10-02SUMITOMO METAL MINING CO LTD
View PDF 4 Cites 0 Cited by

Patent Information

Application Number
JP2020145229
Authority / Receiving Office
JP · JP
Patent Type
Patents
Current Assignee / Owner
Filing Date
2020-08-31
Publication Date
2024-10-02
Estimated Expiration
2040-08-31

AI Technical Summary

Technical Problem

Existing slurry transport systems face clogging issues due to solid content settling in pipes when the slurry level fluctuates, leading to unstable delivery and necessitating equipment shutdown for manual clearance, which is economically unfavorable.

Method used

A slurry conveyance facility with a dual flow path system, including a primary and secondary piping configuration, where the secondary path has a lower pressure loss than the primary, allowing continuous slurry circulation and preventing solid content from settling, even when the slurry level varies.

Benefits of technology

Ensures stable slurry delivery by preventing pipe clogging, eliminating the need for equipment shutdown and manual intervention, thus maintaining operational efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 0007559434000001
    Figure 0007559434000001
  • Figure 0007559434000002
    Figure 0007559434000002
  • Figure 0007559434000003
    Figure 0007559434000003
Patent Text Reader

Abstract

To provide a slurry transfer facility and a slurry transfer method capable of preventing a slurry transfer pipe from being blocked by solid content even when a slurry level in the tank fluctuates and enable stable slurry transfer.SOLUTION: It is a slurry transfer facility 10 that sends a slurry from the first tank 11 to the second tank 12 via a first flow path F1. A level meter that measures a liquid level of the slurry is provided at least in the first tank 11, the first flow path F1 is provided with a slurry liquid feed pump P, a connection pipe T0 that connects the first tank 11 and the slurry liquid feed pump P, and a first pipe T1 that connects the slurry liquid feed pump P and the second tank 12, moreover, has a second pipe T2 with an isolation valve V that branches off from the first pipe T1 and returns to the first tank 11, as the second flow path F2, and the isolation valve V can be switched between opening and closing based on the measurement results of the level meter.SELECTED DRAWING: Figure 1
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to slurry delivery, and more particularly to a slurry transport facility and a slurry delivery method for preventing clogging of a slurry delivery pipe. [Background technology]

[0002] Slurry pumping is widely used as a method of transporting solids. For example, processes that concentrate useful metals by concentrating the target components from ores, and processes that leach useful metals using leaching agents such as sulfuric acid, are known as wet processes because they use water as the basic medium. Prior to these processes, the solids are converted into a slurry.

[0003] Such ore slurry is pumped from a slurry supply tank to a hydrocyclone or the like for classification, for example. Pumps, piping, and other pumping equipment are used to transport the slurry between each process. Unlike pumping a single liquid, when pumping a slurry, it is more important to design the pumping equipment based on physical properties such as specific gravity and viscosity. Regarding the pump, if the pump capacity is insufficient, the liquid cannot be pumped at all, while if the pump capacity is too large and the piping diameter is small, the piping may become significantly worn.

[0004] For example, Patent Document 1 describes that in a method for producing an ore slurry from raw ore, an increase in the viscosity of the ore slurry can be suppressed by adding a portion of the oversized particles removed in the crushing and classification stage to the ore slurry concentration stage. [Prior art documents] [Patent documents]

[0005] [Patent Document 1] Patent No. 5257501 Summary of the Invention [Problem to be solved by the invention]

[0006] However, even when a method such as that described in Patent Document 1 is used, the slurry delivery pump must be stopped during periods when the sending side is short of slurry or when the receiving side does not require slurry. If the slurry delivery pump is stopped for a certain period of time or longer, solids will settle in the delivery pipe and cause the pipe to become clogged. When the pipe becomes clogged, the blockage may be cleared by flushing it with water, but if the pipe is clogged with a dense amount of solids, it is necessary to remove the pipe and clear the blockage. Naturally, operations will be stopped during this period, which is uneconomical.

[0007] A ring main system is one of the methods for preventing the settling of solids in the liquid delivery pipe when the slurry delivery pump is stopped. The ring main system is composed of a connection pipe that connects the slurry supply tank and the slurry delivery pump, a slurry circulation system that is connected to the discharge side of the slurry delivery pump and has the slurry supply tank as its discharge destination, and a slurry withdrawal system that is equipped on the slurry circulation pipe and includes a slurry withdrawal pipe and a valve for adjusting the withdrawal amount. Generally, in this ring main system, the slurry circulates in the circulation pipe in an amount several times larger than the amount of the slurry to be withdrawn, and is designed to always maintain a flow rate that does not cause the solids to settle in the pipe. However, this ring main system is not omnipotent, and when the liquid delivery destination generates pressure loss (pressure loss) such as a hydrocyclone, it is necessary to flow the liquid at a suitable liquid delivery pressure on the circulation pipe side in order to secure the flow rate while receiving the pressure loss, which is not technically or economically realistic.

[0008] The present invention has been proposed in consideration of the above-mentioned circumstances, and aims to provide a slurry transport equipment and a slurry transport method that prevent the slurry transport piping from being blocked by solids even when the slurry level in the tank fluctuates, thereby enabling stable slurry transport. [Means for solving the problem]

[0009] The inventors have investigated methods for stopping the slurry delivery pump and preventing solids in the slurry from settling and clogging the delivery piping when the supply of slurry is reduced or intermittently stopped due to fluctuations in the operational load, etc., during the slurry delivery process. They have found a method for preventing clogging due to settling of solids in the slurry delivery piping by not stopping the slurry delivery pump even when the level in the slurry supply tank drops, thereby completing the present invention.

[0010] That is, one aspect of the present invention is a slurry transport facility that transports a slurry from a first tank to a second tank via a first flow path, in which at least the first tank is provided with a level meter that measures the liquid level of the slurry, the first flow path has a slurry delivery pump, a connection pipe that connects the first tank and the slurry delivery pump, and a first pipe that connects the slurry delivery pump and the second tank, and further has, as a second flow path, a second pipe that has a shutoff valve, branches off from the first pipe, and returns to the first tank, The slurry pump continues to pump without stopping. The shutoff valve is designed so that when it is open, the pressure loss when the slurry flows through the first pipe downstream of the branch is greater than the pressure loss when the slurry flows through the second pipe, and the shutoff valve can be switched between open and closed based on the results of measurements taken by a level gauge.

[0011] According to one aspect of the present invention, by designing the pressure loss when the slurry flows through the first pipe downstream of the branch to be greater than the pressure loss when the slurry flows through the second pipe, the flow rate of the slurry is greater through the second flow path when the shut-off valve is opened, and the slurry can be circulated through the second flow path in accordance with fluctuations in the liquid level of the slurry in the first tank.This prevents the slurry delivery pipe from being blocked by solids even if the slurry level in the tank fluctuates, enabling stable slurry delivery.

[0012] In this case, in one aspect of the present invention, the difference between the pressure loss when the slurry flows through the second pipe and the pressure loss when the slurry flows through the first pipe downstream of the branch may be due to the elevation difference between the first pipe and the second pipe.

[0013] By providing a difference in elevation between the first pipe and the second pipe, the pressure loss in the first pipe can be increased, and the flow rate in the second flow path can be increased when the shutoff valve is opened.

[0014] In addition, in one aspect of the present invention, the difference between the pressure loss when the slurry flows through the second pipe and the pressure loss when the slurry flows through the first pipe downstream of the branch may be due to the difference in diameter between the first pipe and the second pipe.

[0015] By changing the diameter of the pipes, the difference in pressure loss between the first pipe and the second pipe can be adjusted.

[0016] In addition, in one aspect of the present invention, the first pipe may have a section in which the flow path flows upstream in the downstream direction after the branching, and the pressure loss in that section may be larger than the pressure loss when the slurry flows through the second pipe.

[0017] By providing an inclined or upward section in the first flow path, the difference in pressure loss between the first pipe and the second pipe can be adjusted and slurry can be prevented from stagnation in the first pipe.

[0018] In one aspect of the present invention, the first pipe may include a hydrocyclone upstream of the second tank.

[0019] Even in an apparatus that generates a large pressure loss in itself, such as a hydrocyclone, stable slurry delivery is possible by applying the slurry transport equipment according to one embodiment of the present invention.

[0020] Another aspect of the present invention is a method for transferring slurry from a first tank to a second tank using the above-mentioned slurry transport equipment, comprising a liquid level abnormality detection step of detecting, as an abnormality, when the liquid level in the first tank falls below a first reference value; a valve switching step of opening a shut-off valve when an abnormality in the liquid level is detected; a liquid level normality detection step of detecting, as a normality, when the liquid level in the first tank becomes equal to or above a second reference value after the valve switching step; and a valve re-switching step of closing the shut-off valve when a normality in the liquid level is detected.

[0021] According to another aspect of the present invention, when the liquid level is normal, the slurry is pumped from the first tank to the second tank, and when the liquid level falls below a first reference value, the shutoff valve is opened to circulate the slurry back to the first tank, thereby eliminating the need to stop the pump. Even if the slurry level in the tank fluctuates, this prevents the slurry pump from becoming clogged with solids, enabling stable slurry pumping.

[0022] In this case, in another aspect of the present invention, a second level gauge may be further provided for measuring the liquid level of the slurry in the second tank, and the liquid level of the second tank may also be measured by the second level gauge, and in the liquid level abnormality detection process, it may be detected as an abnormality when the liquid level of the first tank is below a first reference value or the liquid level of the second tank is above a third reference value, and in the liquid level normality detection process, it may be detected as a normality when the liquid level of the first tank is above the second reference value or the liquid level of the second tank is below a fourth reference value.

[0023] By doing so, even if the slurry level in the second tank fluctuates, the slurry delivery pipe can be prevented from being clogged with solids, and stable slurry delivery is possible.

[0024] In another embodiment of the present invention, the density of the solids constituting the slurry may be 2.0 times or more the density of the suspending medium.

[0025] In the case of the above ratio, the solids tend to settle when the slurry is allowed to stand, but by applying the present invention, it is possible to prevent the slurry delivery pipe from being clogged with the solids. Effect of the Invention

[0026] According to the present invention, it is possible to provide a slurry transport equipment and a slurry transport method that prevent the slurry transport piping from being blocked by solids even when the slurry level in the tank fluctuates, thereby enabling stable slurry transport. [Brief description of the drawings]

[0027] [Figure 1] FIG. 1 is a schematic configuration diagram of a slurry transport facility according to an embodiment of the present invention. [Diagram 2] (A) is a schematic diagram showing the liquid level in the first tank, and (B) is a schematic diagram showing the liquid level in the second tank. [Diagram 3] FIG. 2 is a schematic configuration diagram of a slurry transport facility according to one embodiment of the present invention when equipped with a hydrocyclone. [Figure 4] FIG. 1 is a process diagram showing an outline of a process in a slurry delivery method according to one embodiment of the present invention. BEST MODE FOR CARRYING OUT THEINVENTION

[0028] A specific embodiment to which the present invention is applied (hereinafter referred to as "the present embodiment") will be described in detail with reference to the drawings in the following order. Note that the present invention is not limited to the following embodiment, and various modifications can be made without departing from the scope of the present invention. 1. Overview of the Invention 2. Slurry transport equipment 3. Slurry delivery method

[0029] <1. Overview of the Invention> The slurry transport equipment according to one embodiment of the present invention is used as an ore slurry transport equipment in a hydrometallurgical process by a high pressure acid leaching method (HPAL method) of nickel oxide ore, for example. Specifically, the equipment can be applied to various parts of the process as described below.

[0030] For example, there is a process for recovering chromite contained in nickel oxide ore. This process involves separating oversized particles through mechanical operations such as sieving using a mass processing device (specifically, a shakeout machine), turning the separated nickel oxide ore into a slurry, and further separating it using a hydrocyclone or gravity separator to obtain fine-grained goethite, which contains a lot of nickel, and large-grained chromite.

[0031] In the bulk processing of raw nickel oxide ore, the process may stop intermittently or the load may increase or decrease due to the characteristics of the ore (ore that is wet and easily sticks, or ore that is large in size and easily clogs the transport equipment, etc.), and the chromite recovery plant located downstream may also be affected by the previous process, and the need to send slurry may change intermittently. As mentioned above, in the chromite recovery plant, fine-grained goethite and large-grained chromite are separated, and since the density of the large-grained solids in the downstream process of the chromite recovery plant is more than twice the density of the aqueous solution, which is the medium, the solids will immediately settle if the slurry is left to stand. In other words, when the slurry delivery pump is stopped when it is no longer necessary to deliver the slurry, the solids will settle in the delivery pipe after a certain period of time, causing the pipe to become clogged.

[0032] In particular, when the slurry is supplied by a pump to a device such as a hydrocyclone, which generates a large pressure drop in the device itself, the slurry passes through the pump and piping at a pressure greater than the pressure drop, and when the pump is stopped, the solids in the liquid supply piping may settle and clog the liquid supply piping.

[0033] Therefore, by applying the slurry transport equipment and slurry delivery method according to one embodiment of the present invention, it is possible to prevent the slurry delivery pipe from being clogged with solids, and to deliver the slurry stably.

[0034] <2. Slurry transport equipment> The configuration of the slurry transport equipment according to one embodiment of the present invention will be specifically described below. Fig. 1 is a schematic diagram of the slurry transport equipment according to one embodiment of the present invention. One embodiment of the present invention is a slurry transport equipment 10 that transports a slurry from a first tank 11 to a second tank 12 via a first flow path F1, in which at least the first tank 11 is equipped with a level meter 13 that measures the liquid level of the slurry. The first flow path F1 has a slurry delivery pump P, a connecting pipe T0 that connects the first tank 11 and the slurry delivery pump P, and a first pipe T1 that connects the slurry delivery pump P and the second tank 12. The first flow path F2 further has a second pipe T2 that branches off from the first pipe T1 and returns to the first tank 11 and is equipped with a shutoff valve V. When the shutoff valve V is open, the pressure loss when the slurry flows through the first pipe T1 downstream of the branch Bs is designed to be greater than the pressure loss when the slurry flows through the second pipe T2, and the shutoff valve V can be switched between open and closed based on the measurement results of the level meter 13.

[0035] With this configuration, the pressure loss when the slurry flows through the first pipe T1 downstream of the branch Bs is greater than the pressure loss when the slurry flows through the second pipe T2. Therefore, when the shutoff valve is opened, the flow rate of the slurry is greater through the second flow path. This allows the slurry to be circulated through the second flow path in accordance with fluctuations in the liquid level of the slurry in the first tank. This prevents the slurry delivery pipe from being blocked by solids even if the slurry level in the tank fluctuates, enabling stable slurry delivery.

[0036] In general, pressure loss refers to the energy lost when a fluid passes through a pipe or the like, and is defined as the difference in total pressure between the inlet and the outlet of the pipe. In one embodiment of the present invention, for the first flow path F1, the energy loss is calculated from the branch point Bs from the first pipe T1 to the downstream end Bg1 of the first pipe T1, and for the second flow path F2, the energy loss is calculated from the branch point Bs from the first pipe T1 to the downstream end Bg2 of the second pipe T2, that is, the energy loss of the second pipe T2 is calculated and compared (see Figs. 1 and 3). The pressure loss can be calculated from the friction coefficient of the pipe, the pipe length, the pipe diameter, the average flow velocity of the fluid, and the like, but in the present invention, the pressure loss is calculated under the condition that the flow rate of the first pipe T1 is equal to the flow rate of the second pipe T2.

[0037] In one embodiment of the present invention, the difference between the pressure loss when the slurry flows through the second pipe and the pressure loss when the slurry flows through the first pipe downstream of the branch may be generated by the height difference between the first pipe and the second pipe. For example, by installing the first pipe at a higher position than the second pipe, the energy lost due to the height can be increased, and the pressure loss through the first pipe can be made larger than the pressure loss through the second pipe.

[0038] In one embodiment of the present invention, the difference between the pressure loss when the slurry flows through the second pipe and the pressure loss when the slurry flows through the first pipe downstream of the branch may be generated by the difference in diameter between the first pipe and the second pipe. For example, by making the diameter of the first pipe smaller (narrower) than the diameter of the second pipe, the pressure loss through the first pipe can be made larger than the pressure loss through the second pipe.

[0039] In one aspect of the present invention, the flow path may include a section in which the flow path is upward in the downstream direction after the branching of the first pipe, and the pressure loss in the upward section may be greater than the pressure loss when the slurry flows through the second pipe. The upward flow path may be formed by providing an inclination in the pipe so that the height gradually increases, or the pipe may be formed so that the pipe rises almost vertically. In this way, the pressure loss due to the first pipe can be relatively increased, and when an abnormality in the liquid level described below is detected and the flow rate to the first flow path is reduced, the slurry remaining in the first pipe can be prevented from stagnating. If there is a section that descends by the same height after the section in which the flow path is upward, the pressure loss of the entire pipe is offset by the upward and downward movements. On the other hand, if the slurry does not reach the top of the pipe, it will not flow beyond that, so in one aspect of the present invention, the pressure loss in the section in which the flow path is upward in the downstream direction after the branching of the first pipe may be greater than the pressure loss when the slurry flows through the second pipe.

[0040] In addition to the above-mentioned examples, other methods for generating a difference between the pressure loss when the slurry flows through the second pipe and the pressure loss when the slurry flows through the first pipe downstream of the branch include changing the length of the pipe, changing the shape of the pipe so as to change the friction coefficient or the average flow velocity of the fluid in the pipe, or combining these conditions as appropriate.

[0041] In the present invention, the first tank 11 and the second tank 12 are, for example, a slurry storage tank or a thickener. As described later, the first pipe T1 may be provided with a classification device such as a hydrocyclone, as long as a larger pressure loss than that of the second pipe T2 can be generated between the branch Bs with the second flow path F2 and the next equipment. The first tank 11 and the second tank 12 can be provided with, for example, agitators 14 and 16 to prevent the solids from settling in the tanks. The slurry is delivered using a slurry delivery pump P and a slurry transport pipe (connection pipe T0, first pipe T1) connected between the first tank 11 and the second tank 12, which are the first flow path F1.

[0042] The slurry transport equipment 10 according to one embodiment of the present invention further includes, as a second flow path F2, a second pipe T2 that branches off from the first pipe T1 and returns to the first tank 11. The second pipe T2 has a shutoff valve V near the branch point from the first pipe T1, and during normal liquid transfer through the first flow path F1, the shutoff valve V is closed so that the slurry does not flow toward the second pipe T2.

[0043] As described later, for example, when an abnormality occurs in the liquid level of the slurry in the tank, the shutoff valve V is controlled to be opened. In this case, the first flow path has a higher pressure loss than the second flow path, so the slurry does not flow easily, and more of the slurry flows in the second flow path. That is, in this case, the slurry follows a circulation route from the first tank 11 through the second flow path F2 and is returned to the first tank 11 again.

[0044] The opening and closing of the shutoff valve V is preferably automatically controlled by, for example, a control unit (not shown). The control unit acquires information on the liquid level of the slurry from a level gauge 13 provided in the first tank 11, and switches the opening and closing of the valve based on the measurement results. The slurry transport equipment according to one embodiment of the present invention may also be equipped with a flow meter and a pressure gauge, and the control unit may acquire measurement results of the flow rate and pressure of the slurry in addition to the liquid level of the slurry, and control the opening and closing operation of the valve based on this information. The control unit may also control the amount of liquid sent by the pump by controlling the rotation speed of the slurry sending pump P in addition to the opening and closing operation of the valve.

[0045] FIG. 2(A) is a schematic diagram showing the liquid level of the first tank. The first tank 11 is equipped with a level gauge 13 for measuring the liquid level of the slurry in the tank and an agitator 14 for preventing the solids in the tank from settling. In the first tank 11, if the liquid level of the slurry falls below the liquid level LL shown in FIG. 2(A), the slurry delivery pump must be stopped. If the slurry delivery pump stops, the slurry may remain in the piping and the solids may settle. Therefore, in the slurry transport equipment according to one embodiment of the present invention, for example, a first reference value L0 is set above the slurry delivery pump stop line LL. Then, when the liquid level of the slurry in the first tank 11 measured by the level gauge falls below the first reference value L0, a signal is sent from a control unit or the like that monitors the liquid level, and the shutoff valve V is controlled to open.

[0046] By controlling in this way, when the liquid level of the slurry becomes equal to or lower than the first reference value L0, the slurry is circulated through the second flow path F2 to prevent the liquid level of the slurry from dropping below the slurry delivery pump stop line LL, and this eliminates the need to stop the slurry delivery pump, which prevents the slurry delivery pipe from being clogged by solids and enables stable delivery of the slurry. When the slurry is fed through the second flow path F2, the rotation speed of the slurry delivery pump P may be lowered to reduce the amount of delivery. Since the delivery destination is the first tank 11 itself, which is close by, there is little risk of the slurry stalling excessively and the solids settling.

[0047] When the slurry is circulated through the second flow path F2, the liquid level of the slurry in the first tank 11 stops dropping, and the liquid level of the slurry in the first tank 11 rises due to the supply of the slurry from the previous process, so that the shutoff valve V is controlled to close when the liquid level reaches a certain level (for example, the second reference value H0). Alternatively, after switching to the second flow path F2, the first flow path F1 may be controlled to switch to the first flow path F1 after a certain time has elapsed. This allows the slurry to be sent to the second tank 12 through the first flow path F1. Note that, if the output of the slurry sending pump P has been reduced, the pump output is increased to return to the original liquid sending amount.

[0048] In the slurry conveying equipment 10 according to an embodiment of the present invention, the valve may be opened or closed depending on the liquid level of the second tank 12. FIG. 2(B) is a schematic diagram showing the liquid level of the second tank. In the second tank 12, when the liquid level of the slurry reaches or exceeds the liquid level HH shown in FIG. 2(B), the slurry liquid delivery pump must be stopped (to prevent overflow or damage to the lid). Therefore, for example, a third reference value H1 is set below the slurry liquid delivery pump stop line HH. When the liquid level of the slurry in the second tank 12 is equal to or higher than the third reference value H1 by the second level gauge 15, a signal is sent from a control unit or the like that monitors the liquid level, and the shutoff valve V is controlled to open. In this controlled state, the slurry in the second tank 12 decreases as it is sent to the next process, and when the liquid level of the slurry reaches a certain level (for example, the fourth reference value L1), the shutoff valve V is controlled to close.

[0049] The slurry conveying equipment 20 according to one embodiment of the present invention can be preferably applied to the slurry transfer via the hydrocyclone 30. FIG. 3 is a schematic diagram of the slurry conveying equipment according to one embodiment of the present invention when the equipment is equipped with a hydrocyclone. A hydrocyclone is a device that classifies the solid particles (ore) according to their particle size or the like by the difference in centrifugal force generated by sending a suspension solution (slurry) containing solid particles (ore) in the circumferential direction of the hydrocyclone at high pressure (high speed). When sending the slurry to the hydrocyclone, it is necessary to send the slurry at a high pressure of about 100 kPa to 200 kPa, so once the slurry sending pump is stopped, it takes time and effort to restart the pump and return to a high pressure state. In one aspect of the present invention, the slurry can be circulated by providing a path for circulating the slurry, and there is no need to stop the pump, so even when high pressure liquid transfer such as with the hydrocyclone 30 is required, it is possible to reduce losses due to equipment stoppage and stably send the slurry.

[0050] <3. Slurry delivery method> Next, a method for transferring a slurry according to one embodiment of the present invention will be described. FIG. 4 is a process diagram showing an outline of a process in the method for transferring a slurry according to one embodiment of the present invention. One aspect of the present invention is a method for transferring a slurry from a first tank 11 to a second tank 12 using the above-mentioned slurry transfer equipment 10, and includes a liquid level abnormality detection step S1 for detecting that the liquid level of the first tank 11 is equal to or lower than a first reference value L0 as an abnormality, a valve switching step S2 for opening a shutoff valve V when an abnormality in the liquid level is detected, a liquid level normality detection step S3 for detecting that the liquid level of the first tank 11 is equal to or higher than a second reference value H0 after the valve switching step S2 as normality, and a valve re-switching step S4 for closing the shutoff valve V when a normality in the liquid level is detected.

[0051] In this way, when the liquid level is normal, the slurry is sent from the first tank to the second tank, and when the liquid level falls below the first reference value, the shutoff valve is opened to circulate the slurry back to the first tank, making it unnecessary to stop the liquid sending pump, and preventing the slurry sending pipe from being clogged by solids even if the slurry level in the tank fluctuates, thereby enabling stable slurry sending. Each process will be described below.

[0052] The liquid level abnormality detection step S1 is a step of detecting that the liquid level in the first tank 11 has fallen below a first reference value L0. If the liquid level of the slurry in the first tank 11 falls below a line LL shown in Fig. 2(A), the slurry delivery pump must be stopped, so the first reference value L0 is set above the slurry delivery pump stop line LL. When the liquid level of the slurry measured by the level gauge falls below the first reference value L0, the control unit or the like monitoring the liquid level performs the valve switching step S2, which will be described next.

[0053] In the valve switching step S2, when an abnormality in the liquid level is detected, the shutoff valve V is opened. The shutoff valve is preferably opened and closed automatically by a control unit upon receiving information on the liquid level of the slurry from a level gauge, for example. By opening the shutoff valve V, more of the slurry flows through the second flow path, and the slurry is returned to the first tank 11 through the second flow path F2 and circulated. At this time, the slurry delivery pump P may be controlled to lower the delivery flow rate. By performing the valve switching step S2, it is not necessary to stop the slurry delivery pump even when an abnormality in the liquid level is detected, so that the slurry delivery pipe is prevented from being clogged by solids, and stable slurry delivery is possible.

[0054] In the normal liquid level detection step S3, it is detected that the liquid level in the first tank 11 is equal to or higher than the second reference value H0. In the valve switching step S2, the liquid level in the first tank has already stopped dropping by circulating the slurry through the first tank through the second flow path. Then, the liquid level in the first tank gradually rises due to the supply of slurry from the previous step, and when it reaches or exceeds the second reference value H0, it is determined that the state in which liquid needs to be sent to the second tank 12 has been restored. At this time, the control unit or the like performs the valve re-switching step S4 described below. The position of the second reference value H0 is not particularly limited as long as it is above the first reference value L0 and below the top surface of the first tank. It is also possible to make the second reference value H0 equal to the first reference value L0, but this would result in frequent switching of the shutoff valve V.

[0055] In the valve re-switching step S4, when the liquid level is detected to be normal, the shutoff valve V is closed. By closing the shutoff valve V, the slurry is once again sent from the first tank to the second tank. If the output of the slurry sending pump P was reduced in the valve switching step S2, the output of the pump is returned to its original state.

[0056] In addition, in the method for feeding a slurry according to an embodiment of the present invention, the valve may be opened and closed depending on the liquid level of the second tank 12. In this case, as described above, the third reference value H1 may be set below the slurry feeding pump stop line HH, and when the liquid level becomes equal to or higher than the third reference value H1, the reception of the slurry may be stopped, and when the liquid level drops to equal to or lower than the fourth reference value L1, the reception of the slurry may be resumed. The position of the third reference value H1 is not particularly limited as long as it is above the fourth reference value L1 and below the slurry feeding pump stop line HH (for example, the top surface of the second tank 12). It is also possible to make the third reference value H1 equal to the fourth reference value L1, but this would result in frequent opening and closing of the shutoff valve V.

[0057] In the present invention, the terms "abnormal" and "normal" are used in a different sense from the common everyday terms. "Abnormal" in the present invention means a situation in which the amount of slurry held in the first tank 11 is small or the amount of slurry held in the second tank 12 is large, i.e., a situation in which there is excessive liquid transfer between the two tanks. "Normal" in the present invention means a situation in which the amount of slurry held in the first tank 11 is appropriate, a situation in which the amount of slurry held in the first tank 11 is large, a situation in which the amount of slurry held in the second tank 12 is appropriate, or a situation in which the amount of slurry held in the second tank 12 is small, i.e., a situation in which there is insufficient liquid transfer between the two tanks or a situation in which liquid transfer is possible. Even if other conditions of the held slurry (such as the temperature inside the tank) show unfavorable values, this does not affect the judgment of "abnormal" and "normal" in the present invention.

[0058] In addition, in the method for delivering a slurry according to one embodiment of the present invention, the density of the solids constituting the slurry may be 2.0 times or more the density of the medium in which they are suspended. As explained in the example of recovering chromite contained in nickel oxide ore, if the density ratio between the solids with large particle size and the aqueous solution as the medium is 2.0 or more, the solids are likely to precipitate when the slurry is allowed to stand, but by applying the present invention, it is possible to prevent the slurry delivery pipe from being clogged by the solids. EXAMPLES

[0059] The present invention will be described in more detail with reference to the following examples, but the present invention is not limited to these examples in any way.

[0060] Example 1 In the equipment for pumping slurry shown in Fig. 2 and Fig. 3, 45% of the particles constituting the solid content have a particle size of 45 μm or less, and the specific gravity of the solid content is 2.5 g / cm 3 The aqueous slurry was fed from the slurry feed tank to the tank for the next step via a hydrocyclone.

[0061] The load of the previous process of the slurry supply tank decreased, and the amount of slurry supplied to the slurry supply tank decreased, so that the slurry level in the slurry supply tank dropped to the reference value L0. At this time, the rotation speed of the slurry delivery pump decreased, and the shutoff valve on the second pipe was opened, so that the slurry self-circulated to the slurry supply tank through the second pipe. During the self-circulation of the slurry, the slurry level in the slurry supply tank rose to H0, the shutoff valve on the second pipe was closed, and the rotation speed of the slurry delivery pump was adjusted so that the pressure gauge installed at the inlet of the hydrocyclone reached the set value (210 kPaG), and the supply of the slurry to the hydrocyclone was resumed. Five minutes later, the slurry level in the slurry supply tank dropped to L0, but the slurry was self-circulated by the above-mentioned mechanism, and when the slurry level in the slurry supply tank rose to H0, the supply of the slurry to the hydrocyclone at the set supply pressure was resumed by the same mechanism as above. During this time, no clogging of the piping due to settling of solids in the slurry occurred, and no equipment shutdown was required to remove the clogging.

[0062] From the above results, it was found that by applying the slurry transport equipment and slurry delivery method according to one embodiment of the present invention, clogging of the slurry delivery piping due to settling of solids can be avoided, and slurry delivery can be resumed without performing any special work to remove the blockage.

[0063] Although one embodiment and examples of the present invention have been described in detail above, it will be readily apparent to those skilled in the art that many modifications are possible without substantially departing from the novel features and effects of the present invention. Therefore, all such modifications are intended to be included within the scope of the present invention.

[0064] For example, a term described at least once in the specification or drawings together with a different term having a broader or similar meaning can be replaced with the different term anywhere in the specification or drawings. In addition, the configurations of the slurry transport equipment and the slurry delivery method are not limited to those described in the embodiment and examples of the present invention, and various modifications are possible. [Explanation of symbols]

[0065] 10,20 Slurry transport equipment, 11,21 First tank, 12,22 Second tank, 13 Level gauge, 14,16 Agitator, 15 Second level gauge, 23 Pressure gauge, 30 Hydrocyclone, P Slurry delivery pump, V Shutoff valve, T0 Connecting pipe, T1 First pipe, T2 Second pipe, F1 First flow path, F2 Second flow path, Bs Branch from first pipe, Bg1 Downstream end of first pipe, Bg2 Downstream end of second pipe, LL,HH Slurry delivery pump stop line, L0 First reference value, H0 Second reference value, H1 Third reference value, L1 Fourth reference value

Claims

1. A slurry conveying apparatus for conveying a slurry from a first tank to a second tank through a first flow path, comprising: At least the first tank is provided with a level meter for measuring the liquid level of the slurry, the first flow path includes a slurry delivery pump, a connection pipe connecting the first tank and the slurry delivery pump, and a first pipe connecting the slurry delivery pump and the second tank; Further, a second flow path includes a second pipe that is provided with a shutoff valve and branches off from the first pipe to return to the first tank, The slurry delivery pump continues to deliver the slurry without stopping. When the shutoff valve is opened, the pressure loss when the slurry flows through the first pipe downstream of the branch is designed to be larger than the pressure loss when the slurry flows through the second pipe, The slurry transport facility is characterized in that the shutoff valve can be switched between open and closed states based on the measurement results of the level meter.

2. 2. The slurry transport equipment according to claim 1, wherein a difference between a pressure loss when the slurry flows through the second pipe and a pressure loss when the slurry flows through the first pipe downstream of the branch is due to a difference in elevation between the first pipe and the second pipe.

3. 3. The slurry transport equipment according to claim 1, wherein a difference between a pressure loss when the slurry flows through the second pipe and a pressure loss when the slurry flows through the first pipe downstream of the branch is due to a difference in diameter between the first pipe and the second pipe.

4. 4. The slurry transport equipment according to claim 1, further comprising a section in which the flow path of the first pipe is upstream in the downstream direction after the branching, and the pressure loss in the section is greater than the pressure loss when the slurry flows through the second pipe.

5. 5. The slurry transport facility according to claim 1, wherein the first piping is provided with a hydrocyclone upstream of the second tank.

6. A method for transferring a slurry from a first tank to a second tank using the slurry transfer equipment according to any one of claims 1 to 5, comprising: a liquid level abnormality detection step of detecting, as an abnormality, that the liquid level in the first tank is equal to or lower than a first reference value; a valve switching step of opening the shutoff valve when an abnormality in the liquid level is detected; a liquid level normality detection step of detecting, as a normal state, that the liquid level in the first tank is equal to or higher than a second reference value after the valve switching step; a valve re-switching step of closing the shutoff valve when the normality of the liquid level is detected; A method for delivering a slurry, comprising the steps of:

7. Further, a second level meter is provided for measuring a liquid level of the slurry in the second tank, The liquid level of the second tank is also measured by the second level gauge; In the liquid level abnormality detection step, it is detected as an abnormality that the liquid level of the first tank is equal to or lower than a first reference value or that the liquid level of the second tank is equal to or higher than a third reference value; The method for delivering a slurry according to claim 6, characterized in that in the liquid level normality detection process, the liquid level in the first tank is detected as normal when it is equal to or higher than a second reference value, or when the liquid level in the second tank is equal to or lower than a fourth reference value.

8. 8. The method for delivering a slurry according to claim 6, wherein the density of the solid content constituting the slurry is at least 2.0 times the density of the medium in which the solid content is suspended.

Citation Information

Patent Citations

  • Flowwrate controlling system