Power supply

The power supply device for electric vehicles addresses the limitation of AC charging by enabling DC charging with multiple voltage standards, reducing weight and cost through a capacitive and inverter-based system that minimizes current pulsations.

JP7559617B2Active Publication Date: 2024-10-02TOYOTA JIDOSHA KK
View PDF 5 Cites 0 Cited by

Patent Information

Application Number
JP2021030613
Authority / Receiving Office
JP · JP
Patent Type
Patents
Current Assignee / Owner
Filing Date
2021-02-26
Publication Date
2024-10-02
Estimated Expiration
2041-02-26

AI Technical Summary

Technical Problem

Existing power conversion devices for electric vehicles are limited to AC charging and do not support DC charging with multiple voltage standards, which is necessary for modern DC chargers with varying voltage classes.

Method used

A power supply device with a storage battery, capacitors, switching elements, and a three-level inverter that can output different voltage values and a control device to manage switching, allowing DC charging across multiple voltage standards while minimizing current pulsations.

Benefits of technology

Enables efficient DC charging of electric vehicle batteries with reduced weight and cost by using a power supply device that supports multiple voltage standards and suppresses current pulsations through controlled switching.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 0007559617000001
    Figure 0007559617000001
  • Figure 0007559617000002
    Figure 0007559617000002
  • Figure 0007559617000003
    Figure 0007559617000003
Patent Text Reader

Abstract

To provide a power supply device that can charge an accumulator battery with a DC charger while being compatible with a plurality of voltage standards.SOLUTION: A power supply device that has an accumulator battery, a capacitor part, a power converter in which a three-level inverter is connected in parallel with the accumulator battery, and a control device, comprises: a first connection terminal connected with a P terminal of a DC charger between second and third switching elements of any one phase among three phases; a second connection terminal connected with an N terminal of the DC charger between second and third switching elements of another one phase; a first diode whose cathode side is connected with a positive electrode side terminal, and whose anode side is connected with cathode sides of diodes for the second and third switching elements of the one phase at the first connection terminal; and a second diode whose anode side is connected with a negative electrode side terminal, and whose cathode side is connected with cathode sides of diodes for the second and third switching elements of the other one phase at the second connection terminal.SELECTED DRAWING: Figure 1
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to a power supply device. [Background technology]

[0002] The power conversion device for electric vehicles disclosed in Patent Document 1 is said to be able to minimize the number of on-board components required to charge the battery using an external AC charger by having the inverter for driving the motor generator serve some of the functions of a charger, thereby reducing the weight and price of the electric vehicle. [Prior art documents] [Patent documents]

[0003] [Patent Document 1] JP 2007-252074 A Summary of the Invention [Problem to be solved by the invention]

[0004] However, the technology disclosed in Patent Document 1 is for AC charging, not for DC charging. In recent years, there are two types of DC chargers used to charge batteries for driving motor generators mounted on electric vehicles, one with a maximum voltage of 400 [V] (150 [kW]) and the other with a maximum voltage of 800 [V] (350 [kW]), and it is desirable for the electric vehicle side to be able to charge the battery in accordance with multiple voltage standards.

[0005] The present invention has been made in consideration of the above-mentioned problems, and has an object to provide a power supply device that is compatible with a plurality of voltage standards and can charge a storage battery using a DC charger. [Means for solving the problem]

[0006] In order to solve the above-mentioned problems and achieve the object, a power supply device according to the present invention is a power supply device comprising: a storage battery; a capacitor section in which a first capacitor and a second capacitor are connected in series between a positive terminal and a negative terminal of the storage battery; a three-level inverter having a first switching element, a second switching element, a third switching element and a fourth switching element, and capable of selectively outputting a voltage of one of three different voltage values ​​to a motor generator by turning on and off the first switching element, the second switching element, the third switching element and the fourth switching element, respectively; a power converter connected in parallel with the storage battery for three phases, U phase, V phase and W phase; and a control device for controlling switching on and off of each switching element of the power converter, a first connection terminal electrically connected to a P terminal of a DC charger between the second switching element and the third switching element in another phase of the U phase, the V phase, or the W phase; a first diode whose cathode side is electrically connected to the positive terminal and whose anode side is electrically connected to the cathode side of a diode included in each of the second switching element and the third switching element in any one of the phases at the first connection terminal; and a second diode whose anode side is electrically connected to the negative terminal and whose anode side is electrically connected to the cathode side of a diode included in each of the second switching element and the third switching element in the other phase at the second connection terminal.

[0007] In addition, in the above, when controlling the on / off switching of each switching element of the power converter so that the first capacitor and the second capacitor are alternately charged with power from a charger, the control device may be configured to correct the switching timing of each switching element based on voltage changes in the first capacitor and the second capacitor.

[0008] This makes it possible to suppress current pulsation caused by a difference in switching timing of the switching elements. Effect of the Invention

[0009] The power supply device according to the present invention has the advantage of being compatible with a plurality of voltage standards and capable of charging a storage battery using a DC charger. [Brief description of the drawings]

[0010] [Figure 1] FIG. 1 is a configuration diagram of a power system according to an embodiment. [Diagram 2] FIG. 2 is a block diagram showing the configuration of the power system according to the embodiment. [Diagram 3] FIG. 3 is a diagram showing the circuit state when the battery is charged by a DC charger in the direct connection mode. [Figure 4] FIG. 4 is a diagram showing the circuit state when charging of the capacitor C1 is on when the battery is charged by a DC charger in the boost mode. [Diagram 5] FIG. 5 is a diagram showing the circuit state when charging of the capacitor C2 is on when the battery is charged by a DC charger in the boost mode. [Figure 6] FIG. 6 is a diagram showing an example of the timing of switching between the charging-on state of the capacitor C1 and the charging-on state of the capacitor C2. [Figure 7] FIG. 7 is a graph showing the battery voltage and the capacitor voltage when feedback control is performed by the charging control unit. [Figure 8] FIG. 8 is a graph showing the battery voltage and the capacitor voltage in the absence of feedback control by the charging control unit. [Figure 9] FIG. 9 is a diagram showing a state in which the amount of duty correction is small. [Figure 10] FIG. 10 is a diagram showing a state in which the amount of duty correction is appropriate. [Figure 11] FIG. 11 is a diagram showing a state in which the amount of duty correction is large. [Figure 12] FIG. 12 is a flowchart showing an example of control of duty correction performed by the ECU in the embodiment. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0011] DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS Hereinafter, an embodiment of a power supply device according to the present invention will be described. Note that the present invention is not limited to the embodiment.

[0012] 1 is a configuration diagram of a power system according to an embodiment. The power system according to the embodiment is applied to electric vehicles capable of running on electricity, such as electric vehicles, hybrid vehicles, plug-in hybrid vehicles (PHVs), and range extended electric vehicles (REEVs).

[0013] The power system according to the embodiment is composed of a power supply device 10, a motor generator 20, a DC charger 30, etc. In the power system according to the embodiment, the power supply device 10 and the motor generator 20 are mounted on the electric vehicle, and the DC charger 30 is provided in an external charging facility or the like installed outside the electric vehicle.

[0014] The power supply device 10 includes a battery 12, a capacitor section 16, a power converter 18, a charging relay device 40, and an ECU (Electronic Control Unit) 60. The power supply device 10 is electrically connected to a motor generator 20.

[0015] The battery 12 is a high-voltage battery that can be charged and discharged. As the battery 12, for example, a lithium ion battery pack, a nickel-metal hydride battery pack, a nickel-cadmium battery, a lead-acid battery, or the like can be used.

[0016] The capacitor unit 16 is composed of a first capacitor C1 and a second capacitor C2, which are connected in series between the positive terminal (positive bus 22) of the battery 12 and the negative terminal (negative bus 24) of the battery 12. The capacitors C1 and C2 are connected to each other at a neutral point NP. That is, the capacitor C1 has one terminal electrically connected to the positive bus 22 and the other terminal electrically connected to the neutral point NP. The capacitor C2 has one terminal electrically connected to the neutral point NP and the other terminal electrically connected to the negative bus 24. Therefore, if the capacitors C1 and C2 are charged and discharged in the same way and always accumulate the same electric charge, the neutral point voltage, which is the voltage between the neutral point NP and the negative bus 24, is clamped to a voltage half the voltage of the battery 12. The neutral point voltage corresponds to a voltage VC2, which is the terminal voltage of the capacitor C2. Also, VC1 in FIG. 1 is the terminal voltage of the capacitor C1. Furthermore, a relay capable of cutting off the power supply between the capacitor unit 16 and the DC charger 30 may be provided between the capacitor unit 16 and the DC charger 30 .

[0017] The power converter 18 is composed of an upper arm to which a positive voltage, which is the voltage between a positive bus 22 and a neutral point NP, is supplied, and a lower arm to which a negative voltage, which is the voltage between the neutral point NP and a negative bus 24, is supplied. In the power converter 18, the upper arm and the lower arm are multiplexed and arranged in series between the positive bus 22 and the negative bus 24, and it is possible to output three-level three-phase AC voltages to the motor generator 20.

[0018] In addition, the power converter 18 has a U-phase arm that outputs a U-phase voltage to the motor generator 20, a V-phase arm that outputs a V-phase voltage to the motor generator 20, and a W-phase arm that outputs a W-phase voltage to the motor generator 20.

[0019] In the U-phase arm, a first switching element SU1, a second switching element SU2, a third switching element SU3, a fourth switching element SU4, and a first diode D1 are electrically connected between a positive bus 22 and a negative bus 24. The first switching element SU1 and the fourth switching element SU4 use an IGBT (Insulated Gate Bipolar Transistor), and a free wheel diode is connected in inverse parallel to the semiconductor element (IGBT). Note that the inverse connection means, for example, that the cathode side of the diode is electrically connected to the collector side of the semiconductor element, and the anode side of the diode is electrically connected to the emitter side of the semiconductor element. The second switching element SU2 and the third switching element SU3 are configured using an n-channel MOSFET (Metal Oxide Semiconductor Field Effect Transistor).

[0020] The emitter (anode of the freewheel diode) side of the semiconductor element in the first switching element SU1, the drain (anode of the parasitic diode) side of the semiconductor element in the third switching element SU3, and the collector (cathode of the freewheel diode) side of the semiconductor element in the fourth switching element SU4 are electrically connected at a connection point PU1. The source (cathode of the parasitic diode) side of the semiconductor element in the second switching element SU2 and the source (cathode of the parasitic diode) side of the semiconductor element in the third switching element SU3 are electrically connected at a connection point PU2. The drain (anode of the parasitic diode) side of the semiconductor element in the second switching element SU2 is electrically connected between the capacitor C1 and the neutral point PN. The cathode side of the first diode D1 is electrically connected to the positive bus 22 (the positive terminal of the battery 12), and the anode side is electrically connected to the connection point PU2.

[0021] In this configuration, the U-phase arm outputs a U-phase voltage to the motor generator 20 from the connection point PU1.

[0022] In the V-phase arm, a first switching element SV1, a second switching element SV2, a third switching element SV3, a fourth switching element SV4, and a second diode D2 are electrically connected between a positive bus 22 and a negative bus 24. The first switching element SV1 and the fourth switching element SV4 are IGBTs, and a freewheeling diode is connected in inverse parallel to the semiconductor element (IGBT). The second switching element SV2 and the third switching element SV3 are configured using n-channel MOSFETs.

[0023] The emitter (anode of the freewheel diode) side of the semiconductor element in the first switching element SV1, the drain (cathode of the parasitic diode) side of the semiconductor element in the third switching element SV3, and the collector (cathode of the freewheel diode) side of the semiconductor element in the fourth switching element SV4 are electrically connected at a connection point PV1. The source (anode of the parasitic diode) side of the semiconductor element in the second switching element SV2 and the source (anode of the parasitic diode) side of the semiconductor element in the third switching element SV3 are electrically connected at a connection point PV2. The drain (cathode of the parasitic diode) side of the semiconductor element in the second switching element SV2 is electrically connected to the neutral point PN. The cathode side of the second diode D2 is electrically connected to the connection point PU2, and the anode side is electrically connected to the negative bus 24 (the negative terminal of the battery 12).

[0024] In this configuration, in the V-phase arm, a V-phase voltage is output to motor generator 20 from connection point PV1.

[0025] In the W-phase arm, a first switching element SW1, a second switching element SW2, a third switching element SW3, and a fourth switching element SW4 are electrically connected between a positive bus 22 and a negative bus 24. The first switching element SW1 and the fourth switching element SW4 are IGBTs, and a freewheeling diode is connected in inverse parallel to the semiconductor element (IGBT). The second switching element SW2 and the third switching element SW3 are configured using n-channel MOSFETs.

[0026] The emitter (anode of the freewheel diode) side of the semiconductor element in the first switching element SW1, the drain (cathode of the parasitic diode) side of the semiconductor element in the third switching element SW3, and the collector (cathode of the freewheel diode) side of the semiconductor element in the fourth switching element SW4 are electrically connected at a connection point PW1. The source (anode of the parasitic diode) side of the semiconductor element in the second switching element SW2 and the source (anode of the parasitic diode) side of the semiconductor element in the third switching element SW3 are electrically connected at a connection point PW2. The drain (cathode of the parasitic diode) side of the semiconductor element in the second switching element SW2 is electrically connected between the capacitor C2 and the neutral point PN.

[0027] In this configuration, in the W-phase arm, a W-phase voltage is output to motor generator 20 from connection point PW1.

[0028] The motor generator 20 is a rotating electric machine mounted on the electric vehicle, and acts as a motor when the DC voltage output from the battery 12 is converted to a three-phase AC voltage by the power converter 18 and supplied, generating a driving force for running the vehicle. On the other hand, the motor generator 20 acts as a generator when the vehicle is braked, recovering braking energy and outputting it as a three-phase AC voltage. This three-phase AC voltage is then converted to a DC voltage by the power converter 18 and supplied to the battery 12, thereby charging the battery 12.

[0029] The DC charger 30 is an external charger provided outside the vehicle to charge the battery 12. The DC charger 30 has two terminals, a P terminal (positive terminal) 32P and an N terminal (negative terminal) 32N, electrically connected to the power supply device 10 at a charger connection section 50 for electrically connecting a plug (not shown) of the DC charger 30 to a connector (not shown) on the vehicle side. A charging relay device 40 having a charging relay 42P and a charging relay 42N, and a reactor 44P are provided between the charger connection section 50 and the power converter 18.

[0030] 1, the P terminal 32P of the DC charger 30 is electrically connected to a connection point PU2 of the U-phase arm via a charging relay 42P and a reactor 44P. Also, the N terminal 32N of the DC charger 30 is electrically connected to a connection point PV2 of the V-phase arm via a charging relay 42N.

[0031] In the power supply device 10 according to the embodiment, the second connection point (connection points PU2, PV2, PW2) in the three-level inverter of any one of the U-phase arm, V-phase arm, and W-phase arm is electrically connected to the P terminal 32P of the DC charger 30, and the other second connection point in the three-level inverter of the other phase is electrically connected to the N terminal 32N of the DC charger 30. In this case, the second switching element and the third switching element of the phase electrically connected to the P terminal 32P of the DC charger 30 are configured so that the parasitic diode orientation is opposite to that of the second switching element and the third switching element of the remaining two phases. As a result, the second switching element and the third switching element of the phase electrically connected to the P terminal 32P of the DC charger 30 have a parasitic diode in a direction that cuts off the current from the DC charger 30 when the second switching element and the third switching element are in the off state. In addition, the second switching element and the third switching element of the phase electrically connected to the N terminal 32N of the DC charger 30 have a parasitic diode oriented in such a way as to cut off the current flowing into the N terminal 32N of the DC charger 30 when these second switching element and the third switching element are in the off state.

[0032] In this way, in the power supply device 10 according to the embodiment, the second connection point in the three-level inverter of any one of the U-phase arm, V-phase arm, and W-phase arm, for example, the connection point PU2 of the U-phase arm in FIG. 1, is used as a first connection terminal electrically connected to the P terminal 32P of the DC charger 30. Also, the other second connection point in the three-level inverter of the other of the U-phase arm, V-phase arm, and W-phase arm, for example, the connection point PV2 of the V-phase arm in FIG. 1, is used as a second connection terminal electrically connected to the N terminal 32N of the DC charger 30. This allows the DC voltage (charger voltage V chg ) to charge the battery 12. Furthermore, in the power supply device 10 according to the embodiment, existing terminals (connection points PU2, PV2, etc.) that electrically connect the motor generator 20 and the power converter 18 are used as a first connection terminal and a second connection terminal for electrically connecting the P terminal 32P and the N terminal 32N of the DC charger 30 to the power converter 18, so there is no need to process the power converter 18 or add internal wiring in order to electrically connect the DC charger 30, making it possible to reduce costs.

[0033] Fig. 2 is a block diagram showing the configuration of the power system according to the embodiment. The ECU 60 is an electronic control unit that controls the operation of the power supply device 10 and other components. The ECU 60 includes a charging control unit 62 and a gate signal generating unit 64. In Fig. 2, "VB" is the battery voltage, and "VH" is the charging voltage.

[0034] The charging control unit 62 receives various signals such as a charging power command signal output from a system control unit (not shown), a voltage phase signal output from a voltmeter (not shown) provided in the power converter 18, signals of voltages VC1 and VC2 of the capacitors C1 and C2 output from a voltmeter (not shown) provided in the capacitor unit 16, and a charger information signal output from the DC charger 30. The charging control unit 62 also outputs, for example, a duty calculated based on the charging power command signal, the voltage phase signal, and the signals of voltages VC1 and VC2 to the gate signal generating unit 64. The gate signal generating unit 64 generates a gate signal for switching on and off each switching element of the power converter 18, and outputs the generated gate signal to each switching element.

[0035] In the power supply device 10 according to the embodiment, when the battery 12 is charged by the DC charger 30, the charger voltage V chg The first charging mode is a direct connection mode that is applied when the maximum voltage of the battery is equal to or higher than the battery voltage VB, and the second charging mode is a direct connection mode that is applied when the maximum voltage of the charger voltage V chg and a boost mode, which is a second charging mode applied when the maximum voltage of the DC charger 30 is lower than the battery voltage VB. In the direct connection mode, the battery 12 is charged without boosting the power from the DC charger 30. In the boost mode, the power from the DC charger 30 is boosted to charge the battery 12. Note that in the power supply device 10 according to the embodiment, the battery 12 is charged in both the direct connection mode and the boost mode without flowing current from the DC charger 30 to the motor generator 20. Therefore, since the motor generator 20 does not rotate during charging in the direct connection mode and the boost mode, there is no need to provide a relay that can cut off the power supply between the power supply device 10 and the motor generator 20, and it is possible to reduce the cost and size of the power supply device 10.

[0036] The charging control unit 62 controls the charger voltage V of the DC charger 30 based on the charger information signal from the DC charger 30. chg The maximum voltage of the battery VB is compared with the charger voltage V of the DC charger 30. chgWhen the maximum voltage of is equal to or higher than the battery voltage VB, the battery 12 is charged by the DC charger 30 in the direct connection mode. chg If the maximum voltage of is lower than the battery voltage VB, the battery 12 is charged by the DC charger 30 in the boost mode.

[0037] In addition, the selection between the direct connection mode and the boost mode may be performed, for example, by an operator such as a driver operating a switch provided on the electric vehicle equipped with the power supply device 10 based on the specifications (maximum voltage) of the DC charger 30.

[0038] 3 is a diagram showing the circuit state when the battery 12 is charged by the DC charger 30 in the direct connection mode. In FIG. 3, the charger voltage V chg The maximum voltage of is 800 [V], and the battery voltage VB is 800 [V]. In addition, in Fig. 3, the switching elements that are in the on state are circled.

[0039] 3, when the battery 12 is charged by the DC charger 30 in the direct connection mode, first, the ECU 60 switches the first switching element SU1 and the third switching element SU3 of the U-phase arm and the third switching element SV3 and the fourth switching element SV4 of the V-phase arm from off to on, and keeps the other switching elements off. Next, the ECU 60 switches the charging relays 42P, 42N of the charging relay device 40 from off to on, and supplies a DC voltage from the DC charger 30 to the battery 12 via the power converter 18, thereby charging the battery 12.

[0040] The first switching element SU1 and the fourth switching element SV4 may be turned off because current flows through their respective freewheel diodes. This causes all switching elements of the power converter 18 to be in the off state, eliminating the need to perform a switching operation to switch each switching element of the power converter 18 between on and off, improving charging efficiency and reducing the need to add an inverter element or cooling mechanism for charging. On the other hand, by turning on the first switching element SU1 and the fourth switching element SV4, it is possible to ensure durability when a current flows through the first switching element SU1 and the fourth switching element SV4.

[0041] Furthermore, during charging in the direct connection mode, the on and off states of the switching elements of power converter 18 are fixed, making it possible to reduce switching loss.

[0042] Fig. 4 is a diagram showing a circuit state in which the charging of capacitor C1 is on when the battery 12 is charged by the DC charger 30 in the boost mode. Fig. 5 is a diagram showing a circuit state in which the charging of capacitor C2 is on when the battery 12 is charged by the DC charger 30 in the boost mode. In Figs. 4 and 5, the switching elements that are in the on state are circled. Fig. 6 is a diagram showing an example of the timing of switching between the charging of capacitor C1 and the charging of capacitor C2.

[0043] In this embodiment, as shown in Fig. 4, in the boost mode, a state in which a current flows from the DC charger 30 to the capacitor C1 to charge the capacitor C1 is referred to as a "state in which the charging of the capacitor C1 is on." Also, in this embodiment, as shown in Fig. 5, in the boost mode, a state in which a current flows from the DC charger 30 to the capacitor C2 to charge the capacitor C2 is referred to as a "state in which the charging of the capacitor C2 is on."

[0044] In the boost mode, the charging control unit 62 performs feedback control (PI control) so that the voltages VC1 and VC2 of the capacitors C1 and C2 are equal. In this feedback control (PI control), the duty when the charging of the capacitor C1 is on and the charging of the capacitor C2 is on, as shown by the rectangular pulse in FIG. 6, is calculated using the following formula (1). Note that "T" in FIG. 6 is the carrier period. In FIG. 6, the high level of the rectangular pulse means that the charging of the capacitor C1 is on, and the low level of the rectangular pulse means that the charging of the capacitor C2 is on. In FIG. 6, the "duty" is the duty on the capacitor C1 side, and is a value greater than 0 and less than 1.

[0045] Capacitor C1 side duty = Kp(VC2-VC1)+Ki∫(VC2-VC1)dt (1)

[0046] In the above formula (1), "Kp" is a proportional gain, and "Ki" is an integral gain.

[0047] The duty information calculated in this manner is output from the charge control unit 62 to the gate signal generation unit 64.

[0048] During boost mode, the gate signal generating unit 64 generates a gate signal for switching each switching element of the power converter 18 on and off based on the duty, the carrier period T, etc., so that the charging of the capacitor C1 is on or the charging of the capacitor C2 is on, and outputs the generated gate signal to each switching element.

[0049] When the battery 12 is charged by the DC charger 30 in the boost mode, first, the voltages VC1 and VC2 of the capacitors C1 and C2 are charged by the power from the battery 12, respectively, to 400 [V], which is half the battery voltage VB (800 [V]). chg The charger voltage VB of the DC charger 30 is set to 400 [V], which is half the battery voltage VB (800 [V]).chg It may be a little higher than 1 / 2 of the battery voltage VB.

[0050] Then, for example, as shown in FIG. 4, the charging of the capacitor C1 is turned on. That is, the ECU 60 switches the first switching element SU1 and the third switching element SU3 in the U-phase arm and the second switching element SV2 in the V-phase arm from off to on, and turns the other switching elements off. As a result, the current output from the P terminal 32P of the DC charger 30 to the connection point PU2 of the U-phase arm passes through the third switching element SU3 and the first switching element SU1 of the U-phase arm, the capacitor C1, and the second switching element SV2 of the V-phase arm, and is input from the connection point PV2 of the V-phase arm to the N terminal 32N of the DC charger 30. As a result, when the charging of the capacitor C1 is on, the capacitor C1 is charged by the power from the DC charger 30, and the voltage VC1 becomes high. Then, the charging of the capacitor C1 by the DC charger 30 is performed until the charging voltage VH (voltage VC1+voltage VC2) becomes a predetermined voltage higher than the battery voltage VB. The predetermined voltage is, for example, a voltage higher than 800 [V]. Then, when the charging control unit 62 determines, based on the values ​​of the voltages VC1, VC2 output from the voltmeter provided in the capacitor unit 16, that the sum of the voltages VC1, VC2 exceeds 800 [V], it terminates the charging of the capacitor C1 by the DC charger 30.

[0051] The first switching element SU1 may be turned off because a current flows through the freewheel diode. On the other hand, by turning on the first switching element SU1, it is possible to ensure the durability of the first switching element SU1 when a current flows through it.

[0052] Next, as shown in Fig. 5, the charging of the capacitor C1 is switched from the ON state to the ON state of the charging of the capacitor C2. That is, the ECU 60 switches the second switching element SU2 in the U-phase arm and the third switching element SV2 and the fourth switching element SV4 in the V-phase arm from OFF to ON, and turns the other switching elements OFF. As a result, in a state in which the charging voltage VH is higher than the battery voltage VB, the charging of the capacitor C1 by the DC charger 30 is stopped, and the power stored in the capacitor C1 is discharged and input to the battery 12, thereby charging the battery 12.

[0053] Also, when the charging of the capacitor C2 is on, the current output from the P terminal 32P of the DC charger 30 to the connection point PU2 of the U-phase arm passes through the second switching element SU2 in the U-phase arm, the capacitor C2, and the fourth switching element SV4 and the third switching element SV3 in the V-phase arm, and is input from the connection point PV2 of the V-phase arm to the N terminal 32N of the DC charger 30. As a result, when the charging of the capacitor C2 is on, the capacitor C2 is charged by the power from the DC charger 30, and the voltage VC2 becomes high. Then, the charging of the capacitor C2 by the DC charger 30 is performed until the charging voltage VH reaches a predetermined voltage higher than the battery voltage VB. The predetermined voltage is, for example, a voltage higher than 800 [V]. Then, when the charging control unit 62 determines that the sum of the voltages VC1 and VC2 exceeds 800 [V] based on the values ​​of the voltages VC1 and VC2 output from the voltmeter provided in the capacitor unit 16, the charging control unit 62 ends the charging of the capacitor C2 by the DC charger 30.

[0054] The fourth switching element SV4 may be turned off because a current flows through the freewheel diode. On the other hand, by turning on the fourth switching element SV4, it is possible to ensure the durability of the fourth switching element SV4 when a current flows through it.

[0055] Next, the charging of the capacitor C2 is switched from the ON state to the charging of the capacitor C1. As a result, in a state in which the charging voltage VH is higher than the battery voltage VB, the charging of the capacitor C2 by the DC charger 30 is stopped, and the power stored in the capacitor C2 is discharged and input to the battery 12, thereby charging the battery 12.

[0056] Here, in the power supply device 10 according to the embodiment, when the ECU 60 controls the on / off switching of each switching element of the power converter 18 so that the capacitors C1 and C2 are alternately charged with power from the DC charger 30 in the boost mode, the ECU 60 corrects the switching timing of each switching element based on the voltage changes of the capacitors C1 and C2. As a result, the power supply device 10 according to the embodiment can suppress current pulsation caused by the all-off or all-on state of each switching element of the power converter 18 being generated due to a difference in the on / off switching timing of each switching element of the power converter 18 in the boost mode.

[0057] Fig. 7 is a graph showing the battery voltage and the capacitor voltage when there is feedback control by the charging control unit 62 in the boost mode. Fig. 8 is a graph showing the battery voltage and the capacitor voltage when there is no feedback control by the charging control unit 62 in the boost mode.

[0058] In this embodiment, the charging control unit 62 performs feedback control so that the voltages VC1 and VC2 are equalized in the boost mode. As shown in Fig. 7, by performing feedback control by the charging control unit 62 in the boost mode, the voltages VC1 and VC2 when the capacitors C1 and C2 are charged can be equalized. On the other hand, as shown in Fig. 8, by not performing feedback control by the charging control unit 62 in the boost mode, a voltage difference occurs between the voltages VC1 and VC2 when the capacitors C1 and C2 are charged, and the voltages VC1 and VC2 cannot be equalized.

[0059] In this embodiment, the duty correction unit 63 corrects the duty by feedback control in order to mitigate the effect on the charging operation of the dead time set for the purpose of preventing a power supply short circuit when the inverter switch state is changed. The state is divided into three states: (1) a state in which the duty correction amount is small, (2) a state in which the duty correction amount is appropriate, and (3) a state in which the duty correction amount is large, and control is performed so as to converge to the state (2).

[0060] Fig. 9 is a diagram showing a state where the duty correction amount is small. The state where the duty correction amount shown in Fig. 9 is small is a state where there is a period where the dead time when all switching elements are off in the charger P terminal connection phase (U phase) and the dead time when all switching elements are off in the charger N terminal connection phase (V phase) overlap. In this period where the dead times of two phases (U phase and V phase) overlap, the charger current is greatly reduced.

[0061] Here, when the duty correction amount is small, the dead times of the two phases (U phase and V phase) overlap, causing a sudden drop in the charger current. Therefore, immediately after the dead times of the two phases (U phase and V phase) overlap, the increase in voltage VC1 or voltage VC2 becomes small, so the waveform of voltage VC1 or voltage VC2 always increases by drawing a downward arc. When the duty correction amount is small, for example, voltage VC2 T Voltage VC2 from the time of sampling peak The increase in voltage VC2 up to the sampling time is ΔVC2 = VC2 peak -VC2 T The same can be said for the increase amount ΔVC1 of the voltage VC1 when the duty correction amount is small, and "VC2" can be read as "VC1".

[0062] When the amount of duty correction is small, the duty correction unit 63 corrects the duty so that the on-timing of the switching element SU2 of the charger P terminal connection phase (U phase) is advanced and the off-timing of the switching element SU2 of the charger N terminal connection phase (V phase) is delayed in order to reduce the period during which the dead times of the two phases (U phase and V phase) overlap.

[0063] Fig. 10 is a diagram showing a state where the duty correction amount is appropriate. The state where the duty correction amount shown in Fig. 10 is appropriate is a state where there is no period where the dead time where all switching elements are turned off in the charger P terminal connection phase (U phase) and the dead time where all switching elements are turned off in the charger N terminal connection phase (V phase) overlap due to duty correction.

[0064] Here, when the duty correction amount is appropriate, the charger current is almost constant, and the waveform of the increase in voltage VC1 or voltage VC2 becomes linear. T Voltage VC2 from the time of sampling peak The increase in voltage VC2 up to the sampling time is ΔVC2 = (1 / C2) × (I chg / 2) × duty × half carrier cycle. The same applies to the increase in voltage VC1 when the duty correction amount is small, so just read "VC2" as "VC1".

[0065] When the duty correction unit 63 performs the duty correction in a state where the duty correction amount is appropriate, the duty correction unit 63 continues to use the previous value as the duty correction value.

[0066] Fig. 11 is a diagram showing a state in which the duty correction amount is large. The state in which the duty correction amount shown in Fig. 11 is large is a state in which the duty correction amount is larger than an appropriate value, and there is a period in which the ON period of the switching element SU2 in the phase connected to the charger P terminal (U phase) and the ON period of the switching element SV2 in the phase connected to the charger N terminal (V phase) overlap. If there is a period in which the switching elements S2 (switching elements SU2 and SV2) of two phases (U phase and V phase) are simultaneously ON, a short circuit occurs between the PN terminals of the DC charger 30, and the current increases significantly.

[0067] Therefore, when the duty correction amount is large, the duty correction unit 63 modifies the duty correction amount so as to delay the on-timing of the switching element SU2 of the phase connected to the charger P terminal and to advance the off-timing of the switching element SV2 of the phase connected to the charger N terminal, in order to bring the duty correction amount shown in Figure 10 closer to the appropriate state.

[0068] FIG. 12 is a flowchart showing an example of the control of the duty correction performed by the ECU 60 in the embodiment.

[0069] First, in step S1, the ECU 60 samples the voltages VC1 and VC2 at the control cycle timing. The control cycle timing means the control cycle of the ECU 60 that performs this control, and recalculation is performed at each designed time. The values ​​of the voltages VC1 and VC2 sampled at the control cycle timing are designated as voltages VC1T and VC2T. Next, in step S2, the ECU 60 calculates the charger current I chg At this time, the sampled voltages VC1 and VC2 are calculated based on the peak timing of the voltage VC1. peak ,VC2 peak Let us assume that.

[0070] Next, in step S3, the ECU 60 peak -VC1 T Here, the voltage VC1 alternately increases and decreases, and the voltage VC1peak is the charger current I chg becomes the maximum voltage VC1. And the charger current I chg When the voltage VC1 is at its maximum value, the voltage VC1 is at its maximum or minimum value. peak and the voltage VC1 sampled at the control cycle timing T By comparing the voltage VC1 with the voltage VC2, it is possible to determine whether the voltage VC1 is increasing or decreasing, and to take appropriate action accordingly. T and voltage VC2 peak The same applies to.

[0071] ECU60 is VC1 peak -VC1 T If it is determined that the relationship of VC1 > 0 is satisfied (Yes in step S3), then in step S4, peak -VC1 T >(1 / C1)×(I chg It is judged whether the relationship of (1 / 2) × duty × half carrier period is satisfied. Note that C1 is the capacitance of the capacitor C1.

[0072] Here, "VC1 peak -VC1 T " represents the increase in voltage VC1 when the duty correction amount is small, and "(1 / C1) × (I chg / 2) × duty × half carrier cycle" represents the increase in voltage VC1 when the duty correction amount is appropriate. And, VC1 peak -VC1 T >(1 / C1)×(I chg By satisfying the relationship of (1 / 2)×duty×half carrier cycle, it is determined that the duty correction amount is small, and it can be determined that processing should be performed to increase the duty correction amount.

[0073] ECU60 is VC1 peak -VC1 T >(1 / C1)×(I chgWhen it is determined that the relationship of (1 / 2)×duty×half carrier cycle is satisfied (Yes in step S4), in step S5, the duty is corrected so as to advance the on-timing of the switching element SU2 of the charger P terminal connection phase (U phase) and delay the on-timing of the switching element SV2 of the charger N terminal connection phase (V phase). After that, the ECU 60 proceeds to the process of step S14.

[0074] In step S4, the ECU 60 peak -VC1 T >(1 / C1)×(I chg If it is determined that the relationship of VC1 / 2)×duty×carrier half cycle is not satisfied (No in step S4), then in step S6, peak -VC1 T <(1 / C1)×(I chg The ECU 60 determines whether the relationship of VC1 / 2) × duty × carrier half cycle is satisfied. peak -VC1 T <(1 / C1)×(I chg When it is determined that the relationship of (V / 2)×duty×half carrier cycle is satisfied (Yes in step S6), in step S7, the duty is corrected so that the ON timing of the switching element SU2 of the charger P terminal connection phase (U phase) is delayed and the OFF timing of the switching element SV2 of the charger N terminal connection phase (V phase) is advanced. After that, the ECU 60 proceeds to the process of step S14. peak -VC1 T <(1 / C1)×(I chg If it is determined that the relationship of (1 / 2)×duty×half carrier cycle is not satisfied (No in step S6), the ECU 60 holds the previous value as the duty correction value. After that, the ECU 60 proceeds to the process of step S14.

[0075] In step S3, the ECU 60 peak -VC1 T If it is determined that the relationship of VC2 > 0 is not satisfied (No in step S3), then in step S9, peak -VC2 T >(1 / C2)×(Ichg It is determined whether the relationship of (1 / 2) × duty × half carrier period is satisfied. Note that C2 is the capacitance of the capacitor C2.

[0076] Here, "VC2 peak -VC2 T " represents the increase in voltage VC2 when the duty correction amount is small, and "(1 / C2) × (I chg / 2) × duty × half carrier cycle" represents the increase in voltage VC2 when the duty correction amount is appropriate. And, VC2 peak -VC2 T >(1 / C2)×(I chg By satisfying the relationship of (1 / 2)×duty×half carrier cycle, it is determined that the duty correction amount is small, and it can be determined that processing should be performed to increase the duty correction amount.

[0077] ECU60 is VC2 peak -VC2 T >(1 / C2)×(I chg When it is determined that the relationship of (1 / 2)×duty×half carrier cycle is satisfied (Yes in step S9), in step S10, the duty is corrected so as to advance the ON timing of the switching element SU2 of the charger P terminal connection phase (U phase) and delay the OFF timing of the switching element SV2 of the charger N terminal connection phase (V phase). After that, the ECU 60 proceeds to the process of step S14.

[0078] In step S9, the ECU 60 peak -VC2 T >(1 / C2)×(I chg If it is determined that the relationship of VC2 / 2)×duty×carrier half cycle is not satisfied (No in step S9), then in step S11, peak -VC2 T <(1 / C2) × (I chg / 2) × duty × carrier half cycle. peak -VC2 T <(1 / C2) × (I chgWhen it is determined that the relationship of (1 / 2)×duty×half carrier cycle is satisfied (Yes in step S11), in step S12, the duty is corrected so that the ON timing of the switching element SU2 of the charger P terminal connection phase (U phase) is delayed and the OFF timing of the switching element SV2 of the charger N terminal connection phase (V phase) is advanced. After that, the ECU 60 proceeds to the process of step S14. peak -VC2 T <(1 / C2) × (I chg When it is determined that the relationship of (1 / 2)×duty×half carrier cycle is not satisfied (No in step S11), the ECU 60 holds the previous value as the duty correction value. After that, the ECU 60 proceeds to the process of step S14.

[0079] In step S14, the ECU 60 determines whether charging has ended. If the ECU 60 determines that charging has not ended (No in step S14), the ECU 60 proceeds to step S1 and repeats a series of controls. On the other hand, if the ECU 60 determines that charging has ended (Yes in step S14), the ECU 60 ends the series of controls.

[0080] As described above, in the power supply device 10 according to the embodiment, the ECU 60 (duty correction unit 63) performs duty correction as shown in FIG. 12, thereby making it possible to suppress current pulsation caused by a mismatch in the timing of switching on and off of each switching element of the power converter 18 in the boost mode, which would otherwise occur when each switching element of the power converter 18 is in the all-off state or all-on state. [Explanation of symbols]

[0081] 10 Power supply 12 Battery 16 Capacitor section 18 Power Converter 20 Motor generator 22 Positive busbar 24 negative bus 30 DC charger 32N N terminal 32P P terminal 40 Charging relay device 42N, 42P Charging relay 44P Reactor 50 Charger connector 60 ECU 62 Charging control unit 63 Duty correction section 64 Gate signal generator C1, C2 capacitors D1 First diode D2 Second diode SU1, SV1, SW1 Switching elements SU2, SV2, SW2 switching elements SU3, SV3, SW3 switching elements SU4, SV4, SW4 switching elements

Claims

1. A storage battery, a capacitor section in which a first capacitor and a second capacitor are connected in series between a positive terminal and a negative terminal of the storage battery; a power converter including a three-level inverter having a first switching element, a second switching element, a third switching element, and a fourth switching element, the three-level inverter being capable of selectively outputting a voltage of one of three different voltage values ​​to a motor generator by turning on and off the first switching element, the second switching element, the third switching element, and the fourth switching element, respectively, and the three-level inverter being connected in parallel with the storage battery for three phases, i.e., a U-phase, a V-phase, and a W-phase; A control device that controls switching on and off of each switching element of the power converter; A power supply device comprising: a first connection terminal electrically connected to a P terminal of a DC charger between the second switching element and the third switching element in any one of the U phase, the V phase, and the W phase; a second connection terminal electrically connected to an N terminal of the DC charger between the second switching element and the third switching element in the other phase among the U phase, the V phase, and the W phase; a first diode, the cathode side of which is electrically connected to the positive terminal, and the anode side of which is electrically connected to the cathode side of a diode included in each of the second switching element and the third switching element in any one of the phases via the first connection terminal; a second diode, the anode side of which is electrically connected to the negative terminal, and the cathode side of which is electrically connected to the cathode side of a diode included in each of the second switching element and the third switching element in the other one phase via the second connection terminal; A power supply device comprising:

2. 2. The power supply device according to claim 1, wherein when controlling the on-off switching of each switching element of the power converter so that the first capacitor and the second capacitor are alternately charged with power from a charger, the control device corrects the switching timing of each switching element based on voltage changes of the first capacitor and the second capacitor.

Citation Information

Patent Citations

  • Power conversion device

    JP2007252074A

  • Method for operating inverter device, and inverter device

    JP2014107931A

  • Charging system for electric vehicle and method for controlling charging of electric vehicle

    JP2016525327A

  • Electric power conversion system

    JP2017184309A

  • Inverter with charging capability

    WO2016207969A1