System for detecting ahead of tunnel face, receiver and method for detecting ahead of tunnel face
The face forward exploration system addresses the inefficiencies of existing methods by using a geophone in a vibration receiving hole with a holding part for precise elastic wave detection, reducing noise and simplifying installation, thereby improving tunnel exploration accuracy and efficiency.
Patent Information
- Application Number
- JP2021130163
- Authority / Receiving Office
- JP · JP
- Patent Type
- Patents
- Current Assignee / Owner
- Filing Date
- 2021-08-06
- Publication Date
- 2024-10-03
- Estimated Expiration
- 2041-08-06
AI Technical Summary
Existing tunnel construction methods for predicting ground conditions, such as the TSP and TFT methods, face challenges in accuracy and efficiency due to the need for excavation interruptions, complex installation processes, and noise interference from surface waves.
A face forward exploration system using a geophone placed in a vibration receiving hole with a holding part for fixation, allowing elastic wave detection without interruption and reducing noise, and a detector for precise timing, along with a data logger for wireless communication and simplified installation.
Improves the accuracy of analyzing elastic waves from the tunnel face, facilitates easy geophone position adjustment, and reduces the number of required parts and protective equipment, enhancing the efficiency and precision of tunnel exploration.
Smart Images

Figure 0007561100000001 
Figure 0007561100000002 
Figure 0007561100000003
Abstract
Description
[Technical Field]
[0001] The present invention relates to a system for detecting ahead of a tunnel face, a geophone, and a method for detecting ahead of a tunnel face. [Background technology]
[0002] In mountain tunnel construction, it is important to understand in advance the ground conditions, such as fracture zones and seepage zones, which may cause construction problems. To obtain this information, seismic reflection surveys have been used to predict the ground conditions ahead of the tunnel face. Conventional methods for predicting ground conditions ahead of the tunnel face include the TSP (Tunnel Seismic Prediction) method and the TFT (Tunnel Face Tester) method. The TSP method predicts the ground conditions ahead of the tunnel face by sequentially blasting multiple blast holes drilled in the tunnel wall to generate vibrations, receiving and analyzing the waves reflected by fracture zones and other faults with geophones installed in multiple receiving holes. Details of the TSP method are disclosed, for example, in Non-Patent Document 1. The TFT method predicts the ground conditions ahead of the tunnel face by blasting the tunnel face to generate vibrations, receiving and analyzing the waves reflected by fracture zones and other faults with geophones installed in the heads of rock bolts on the tunnel wall. Details of the TFT method are disclosed, for example, in Patent Document 1. [Prior art documents] [Non-patent literature]
[0003] [Non-Patent Document 1] Katsuhisa Yotsuzuka and Shigeru Shinohara, Tunnel Face Prediction System TSP303: Predicting the Presence of Fault Zones, Geological Boundaries, and Springs Ahead of the Tunnel Face Using 3D Analysis of Seismic Reflection Method, Construction Machinery Construction, Vol. 68, No. 5, May 2016 [Patent documents]
[0004] [Patent Document 1] Japanese Patent Application Publication No. 2018-025487 Summary of the Invention [Problem to be solved by the invention]
[0005] In the TSP method, the seismic source is the exploration blast. For this reason, excavation work must be interrupted when conducting exploration ahead of the face. As a result, there is the problem that excavation work is prolonged. Furthermore, in the TSP method, in order to improve the analytical accuracy of the reflected waves, it is necessary to fill the receiving hole with a filler such as mortar and fix the geophone in place. For this reason, even if there is poor ground at the location where the geophone is to be placed, the position cannot be changed, and it becomes necessary to drill the receiving hole again, which creates the problem of taking a long time to install the geophone. On the other hand, the TFT method has the advantage that excavation work does not need to be interrupted because the seismic source is the excavation blast.However, with the TFT method, the receiver is placed at the head of the rock bolt, so the surface waves that travel along the tunnel sidewalls cause increased noise in the reflected waves, making it difficult to improve the accuracy of the analysis. From this perspective, the present invention aims to propose a face-front exploration system, a geophone, and a face-front exploration method that can improve the accuracy of analysis of elastic waves from ahead of the face due to blasting, and that can easily change the position of the geophone. [Means for solving the problem]
[0006] In order to solve the above problem, the present invention is a face front inspection system comprising a blaster that initiates excavation blasting, a detector that detects shot marks that indicate the start timing of the excavation blasting, and a geophone that detects elastic waves generated by the excavation blasting, wherein the geophone is placed in a geophone hole drilled in the tunnel wall surface and comprises a holding part that fixes the geophone to the hole wall of the geophone hole. The present invention also relates to a geophone that detects elastic waves generated by excavation blasting, which is placed in a geophone hole drilled in the wall surface of a tunnel and has a holding part that fixes the geophone to the hole wall of the geophone hole. The present invention also provides a method for detecting ahead of a tunnel face, comprising a first step of placing a geophone in a geophone hole drilled in the tunnel wall surface, a second step of fixing the geophone to the wall of the geophone hole, a third step of operating a blasting machine to start excavation blasting, a fourth step of using a detector to detect a shot mark indicating the start timing of the excavation blasting, and a fifth step of using the geophone to detect elastic waves generated due to the excavation blasting. With this configuration, drilling work does not need to be interrupted because the excavation blast is used as the seismic source. Furthermore, because the geophone is placed in the receiving hole, noise in the elastic waves (including reflected waves from the fracture zone and spring water zone ahead of the drilling face) generated by the excavation blast can be reduced compared to the TFT method. Furthermore, because the holding unit fixes the geophone to the wall of the receiving hole, the sensor of the geophone can be closely attached to the natural ground, reducing noise in the elastic waves detected by the sensor even without the need for fillers such as mortar. This improves the accuracy of the analysis when the analysis device analyzes the elastic waves detected by the geophone. Furthermore, because the holding unit can release the fixation of the geophone from the wall of the receiving hole, even if poor ground is distributed at the geophone's installation location, the geophone can be relocated by removing it, for example. In other words, since no filler such as mortar is used, the installation of the geophone can be completed in a short time. Therefore, the accuracy of the analysis of elastic waves generated by blasting ahead of the drilling face can be improved, and the geophone can be easily relocated. In the TFT method, the geophone is placed in the head of the rock bolt, so protective equipment is required to prevent the geophone from being damaged by flying stones caused by blasting or contact with construction machinery. In other words, the TFT method has the problem of requiring a large number of parts to perform a survey ahead of the face. In contrast, the geophone of the present invention is placed inside the geophone hole, so no protective equipment is required and the number of parts required to perform a survey ahead of the face can be reduced.
[0007] Furthermore, the detector is connected to a blasting main line that connects the explosives used for the excavation blasting and the blasting device, and is arranged between the explosives and the blasting device, and it is preferable that the explosives be arranged at the tunnel face and the blasting device be arranged closer to the tunnel entrance than the receiving hole. This configuration simplifies the construction for realizing blasting for excavation, and also protects the blasting device from flying stones caused by blasting.
[0008] It is also preferable that the apparatus further comprises a data logger connected to the geophone, the data logger comprising a wireless unit that receives the shot mark from the detector by wireless communication. With this configuration, the data logger can use the reception of the shot mark as a trigger to start recording the data generated when the geophone receives elastic waves. In other words, the time from the start of blasting to the reception of elastic waves can be reliably recorded. In addition, because the data logger and detector communicate wirelessly, the relative positions of the data logger and detector can be adjusted as needed depending on the progress of the excavation work.
[0009] It is also preferable that the geophone is equipped with a geophone that detects the elastic waves, and the data logger is equipped with a control unit that opens and closes the holding unit and a recording unit that records data on the elastic waves detected by the geophone. According to this configuration, the configuration for detecting elastic waves can be simplified.
[0010] It is also preferable that the data logger is disposed in the receiving hole. This configuration eliminates the need for protective equipment to protect the data logger from damage caused by flying stones from blasting or contact with construction machinery, thereby reducing the number of parts required for detecting the area ahead of the working face.
[0011] It is also preferable to further include a cable that connects the geophone and the data logger so that they can communicate with each other. With this configuration, after the survey ahead of the tunnel face is completed, the cable can be reeled in and the receiver located deep inside the receiver hole can be easily retrieved.
[0012] It is also preferable that the geophone further comprises a pushing section for pushing the geophone deep into the geophone hole. With this configuration, the receiver can be easily placed at a deep position in the receiving hole.
[0013] In addition, the excavation blasting is a staged blasting that involves blasting in three or more stages at a predetermined scheduled blasting timing, and it is preferable that the time interval between the first blasting and the second blasting is longer than the time interval between the second blasting and the third blasting. This configuration allows for more time to measure the elastic waves (reflected waves) caused by the first blast. As the distance to the crushed zone or spring water zone ahead of the tunnel face increases, the time it takes for the reflected waves to be observed increases. However, if the time interval between the first and second blasts is made longer than the time interval between the second and third blasts, the reflected waves will be detected by the receiver without being affected by the second blast. This reduces the noise in the reflected waves from the first blast. As a result, the exploration distance ahead of the tunnel face can be increased. [Effects of the Invention]
[0014] According to the present invention, it is possible to improve the accuracy of analyzing elastic waves from in front of the face due to blasting, and to easily change the position of the receiver. [Brief explanation of the drawings]
[0015] [Figure 1] 1 is an overall configuration diagram of a face ahead detection system according to an embodiment of the present invention. [Figure 2] This is a cross-sectional side view of the inside of the geophone. [Figure 3] An explanatory diagram of when the geophone holder is open. [Figure 4] (a) is a side view of the inside cross section of the pushing part, and (b) is a side view of the inside cross section of the base part of the geophone. [Figure 5] FIG. 1 is an explanatory diagram of staged blasting for excavation. [Figure 6] 1 is a flowchart showing the procedure of a method for detecting ahead of a tunnel face according to an embodiment of the present invention. DETAILED DESCRIPTION OF THE INVENTION
[0016] Hereinafter, embodiments of the present invention will be described in detail with reference to the accompanying drawings. Each drawing is merely a schematic illustration to allow a sufficient understanding of the present invention. Therefore, the present invention is not limited to the illustrated examples. In each drawing, common or similar components are designated by the same reference numerals, and redundant explanations thereof will be omitted.
[0017] [composition] 1 is a diagram showing the overall configuration of the tunnel facing inspection system of this embodiment, and is a plan view of the tunnel interior. The tunnel facing inspection system includes a blasting device 1, a detector 2, a geophone 3, and a data logger 4. The blasting device 1 is a device that initiates excavation blasting. Excavation blasting involves detonating explosives (not shown) placed at the tunnel face to break up the natural ground. The blasting device 1 is connected to the explosives by a blasting main line 5. The blasting device 1 is placed closer to the tunnel entrance than a receiving hole 6 drilled into the tunnel wall surface. The detector 2 detects shot marks that indicate the timing for starting excavation blasting. The detector 2 is connected to the data logger 4 wirelessly (e.g., via WiFi (registered trademark)) so that it can communicate with the data logger 4. The detector 2 can transmit the detected shot marks to the data logger 4. The detector 2 is connected to the blasting main line 5 and is placed inside the tunnel between the explosives and the blasting device 1. The geophone 3 detects elastic waves 8 generated by the excavation blast. The geophone 3 is placed in the receiving hole 6. The elastic waves 8 are reflected by the crushed zone 9 in front of the tunnel face, and then reach the geophone 3 through the natural ground. The data logger 4 is a device that records various data. The data logger 4 is communicably connected to the geophone 3 via a cable 7, and can receive data of elastic waves 8 detected by the geophone 3.
[0018] [Geophone details] 2 is a side cross-sectional view of the inside of the geophone 3. The geophone 3 is a roughly rod-shaped body with a diameter smaller than the diameter of the receiving hole 6. The geophone 3 comprises a housing 31, a cap 32, a geophone 33, a holder 34, and a motor 35. The housing 31 is a generally cylindrical body. A holding unit 34 in a closed state and a motor 35 are disposed in a hollow portion of the housing 31. A portion of the side surface of the housing 31 is open, and the holding unit 34 housed inside the housing 31 can be deployed radially outward through the opening. The cap 32 is the head of the geophone 3 and is connected to the tip of the housing 31. The geophone 33 is a sensor (seismometer) that detects elastic waves 8 reflected from the fracture zone 9 by the excavation blast. The geophone 33 is received in the cap 32.
[0019] The holding part 34 is a member that fixes the geophone 3 to the hole wall of the geophone hole 6. The holding part 34 includes a block 341, a pair of first arms 342, 342, a second arm 343, and an actuator 344. The block 341, the pair of first arms 342, 342, and the actuator 344 form a parallel link mechanism. The block 341 is a part that comes into contact with the wall of the vibration receiving hole 6 when the holding portion 34 is in the open state. A pair of first arms 342 , 342 connect the block 341 and the actuator 344 . The second arm 343 connects the block 341 to the side surface of the base of the housing 31 . The actuator 344 is driven by the motor 35 to move in the axial direction. When the motor 35 rotates in the forward direction, it moves the actuator 344 in the forward axial direction (from the base of the housing 31 toward the cap 32), and when it rotates in the reverse direction, it moves the actuator 344 in the reverse axial direction (from the cap 32 toward the base of the housing 31). When the actuator 344 is moved in the forward axial direction, the parallel link mechanism unfolds and the holding unit 34 is in an open state (see FIG. 3), and when the actuator 344 is moved in the reverse axial direction, the parallel link mechanism is folded and the holding unit 34 is in a closed state (see FIG. 2). In addition, in Figure 2, an end cap 37 that covers the base of the housing 31 is shown, but when the geophone 3 is in use, the end cap 37 is removed and the cable 7 is connected to the geophone 3.
[0020] [Geophone operation] FIG. 3 is an explanatory diagram of the geophone 3 when the holding part 34 is open. Assume that the geophone 3, with its holding part 34 in a closed state, is placed at a predetermined position in the receiving borehole 6. For example, an operator can use an analyzer to send a control signal to the geophone 3 via the data logger 4. Upon receiving the control signal, the geophone 3 rotates the motor 35 in the forward direction in accordance with the control signal, moving the actuator 344 toward the forward axial direction. Then, via the pair of first arms 342, 342 and second arm 343, the block 341 moves outward in the engagement direction of the housing 31 and abuts against the wall of the receiving borehole 6. Therefore, the geophone 33 is fixed to the wall of the receiving borehole 6, allowing the geophone 33 to be in substantial contact with the natural ground. As a result, noise in the elastic waves 8 detected by the geophone 33 can be reduced. Furthermore, there may be cases where it is desired to change the location of the geophone 3 because poor detection of elastic waves 8 is not possible due to poor ground conditions being distributed at the location of the geophone 3. In this case, for example, an operator uses an analysis device to send a control signal to the geophone 3 via the data logger 4. In response to the control signal, the geophone 3 reverses the motor 35, moving the actuator 344 in the opposite axial direction. This releases the block 341 from contact with the wall of the receiving hole 6 via the first arms 342, 342 and second arm 343, and the block 341 is retracted into the housing 31. As a result, the geophone 3 can be moved and changed to the desired location.
[0021] [Push-in part] In Figure 4, (a) is a side-view internal cross-sectional view of the push-in section, and (b) is a side-view internal cross-sectional view of the base section of the geophone. The push-in section 10 is a cylindrical body that pushes the geophone 3 deep into the receiving hole 6. The push-in section 10 has multiple rod sections 101, multiple joint sections 102, and guide receiving sections 103, 103. The geophone 3 also has guide sections 36, 36 at its base. The rod portion 101 is a cylindrical body that constitutes the main body of the pushing portion 10. The cable 7 can be inserted into the hollow portion of the rod portion 101. The joints 102 connect adjacent rod portions 101. By adding rod portions 101 using the joints 102, the overall length of the pushing portion 10 can be adjusted. The guide receiving portions 103, 103 receive the guide portions 36, 36 of the geophone 3. The guide receiving portions 103, 103 are connected to the tip of the leading rod portion 101, and extend from the tip of the leading rod portion 101 in the axial direction of the pushing portion 10 and opposite the geophone 3. The guide portions 36, 36 of the geophone 3 are needle-shaped bodies that extend from the base of the geophone 3 in the axial direction of the geophone 3 and so as to face the push-in portion 10. By receiving the guide portions 36, 36 in the guide receiving portions 103, 103, the rotational position of the push-in portion 10 around its axis and the rotational position of the geophone 3 around its axis can be aligned.
[0022] As shown in Figure 4(b), assume that the geophone 3 is placed in a predetermined position (out of reach of a worker) in the receiving hole 6 with the cable 7 connected to the base of the geophone 3. When the worker wants to push the geophone 3 deep into the receiving hole 6, he or she inserts the cable 7 into the hollow part of the pushing part 10 and receives the guide parts 36, 36 in the guide receiving parts 103, 103. The worker then pushes the pushing part 10 deep into the receiving hole 6, thereby pushing the geophone 3 deep into the receiving hole 6 and placing the geophone 3 in the desired position.
[0023] [Data Logger 4 Details] Returning to Fig. 1, the data logger 4 includes a wireless unit (not shown) and a recording unit (not shown). The wireless unit is a functional unit that receives shot marks from the detector 2 via wireless communication. The recording unit is a functional unit that records data of the elastic waves 8 detected by the geophone 33. As shown in Figure 1, the data logger 4 is positioned at the entrance of the seismic borehole 6. The data logger 4 has a cylindrical shape with a diameter that is approximately the same as or smaller than the diameter of the seismic borehole 6. The data logger 4 also has a disk-shaped flange with a diameter larger than the main body of the data logger 4. Meanwhile, a recess (enlarged diameter portion) with a diameter larger than the diameter of the seismic borehole 6 is formed at the entrance of the seismic borehole 6. When a worker places the data logger 4 at the entrance of the seismic borehole 6, the flange of the data logger 4 is received in the recess at the entrance of the seismic borehole 6 and is engaged with the flat surface of the recess. The worker can secure the flange to the recess with screws or the like, thereby fixing the data logger 4 to the entrance of the seismic borehole 6. Furthermore, by making the depth of the recess greater than the thickness of the flange, the entire data logger 4 can be positioned inside the tunnel perimeter wall rather than on the surface of the tunnel perimeter wall. As a result, the possibility of flying stones from excavation blasts colliding with the data logger 4 is greatly reduced.
[0024] [cable] As shown in Figure 1, a cable 7 connects the data logger 4 and the geophone 3. When the exploration ahead of the tunnel face is completed, the worker removes the data logger 4 from the entrance of the geophone hole 6. Next, the worker can pull in the cable 7 and easily retrieve the geophone 3 located deep inside the geophone hole 6.
[0025] [Excavation blasting] The excavation blasting of this embodiment can be, for example, staged blasting, in which blasting is performed in three stages at predetermined scheduled blasting timings. The number of stages is not limited to three, and may be four or more stages. FIG. 5 is an explanatory diagram of staged blasting in excavation blasting. A virtual point P and circles Q1 to Q3 are prepared on the tunnel cross section shown in FIG. 5. The circles Q1 to Q3 are concentric circles centered at point P. The radius of circle Q2 is twice that of circle Q1. The radius of circle Q3 is three times that of circle Q1. Explosives are placed at point P. Point P serves as the exploration source. One or more explosives are placed on the circumference of each of the circles Q1 to Q3. The explosives placed at point P and on the circumference of each of the circles Q1 to Q3 are aligned in a straight line. Therefore, the explosives placed at point P and the explosives placed on each of the circles Q1 to Q3 are aligned at equal intervals. When the blasting device 1 is activated and excavation blasting begins, the explosive at point P connected to the blasting main line 5 is detonated, followed by the explosive at circle Q1, the explosive at circle Q2, and the explosive at circle Q3. The explosives at point P and the explosives at circles Q1 to Q3 are spaced equally apart, so the blasting intervals for each explosive are the same. If the blasting timing of the explosive at point P is set to 0 ms, for example, the blasting timing of the explosive at circle Q1 will be 250 ms later, the blasting timing of the explosive at circle Q2 will be 500 ms later, and the blasting timing of the explosive at circle Q3 will be 750 ms later. The receiver 3 detects elastic waves 8 0 ms, 250 ms, 500 ms, and 750 ms after the blasting timing.
[0026] While the above description concerns normal staged blasting, this embodiment introduces staged blasting. In the example of Figure 5, the staged blasting is performed 500 ms later on the circumference of circle Q1, 750 ms later on the circumference of circle Q2, and 1000 ms later on the circumference of circle Q3. Therefore, there is no blasting 250 ms later, and the receiver 3 detects elastic waves 8 0 ms, 500 ms, and 750 ms after the blasting timing. By skipping stages, it is possible to gain 500 ms of measurement time for the elastic waves 8 (reflected waves) caused by the blasting of the explosive at point P. As the distance to the fracture zone 9 and water spring zone ahead of the tunnel face increases, the time it takes for reflected waves to be observed increases. However, by omitting the explosive blast at circle Q1 and ensuring a measurement time of 500 ms (silent interval), the elastic wave 8 from the explosive blast at point P is detected by the receiver 3 without being affected by the explosive blast at circle Q2. This reduces the noise in the elastic wave 8 from the explosive blast at point P. As a result, the exploration distance ahead of the tunnel face can be increased. Specifically, while the exploration distance was around 100 to 150 meters with conventional staged blasting, it was confirmed that the exploration distance could be extended to around 400 meters with skipped staged blasting.
[0027] A more common method of step-by-step blasting is to make the time interval between the first and second blasts longer than the time interval between the second and third blasts. This configuration allows for more time to measure the elastic waves (reflected waves) caused by the first blast. As the distance to the fracture zone or water spring ahead of the tunnel face increases, the time it takes to observe the reflected waves increases. However, if the time interval between the first and second blasts is longer than the time interval between the second and third blasts, the reflected waves will be detected by the geophone without being affected by the second blast. This reduces the noise in the reflected waves caused by the first blast. As a result, the exploration distance ahead of the tunnel face can be increased.
[0028] [Operation] The method of detecting ahead of the tunnel face carried out by the system for detecting ahead of the tunnel face will now be described. Fig. 6 is a flowchart showing the procedure of the method for detecting ahead of the tunnel face of this embodiment. First, a worker places the geophone 3 in the receiving hole 6 (step S1). The worker can use the pushing part 10 to push the geophone 3 deep into the receiving hole 6. This allows the position of the geophone 3 within the receiving hole 6 to be set appropriately. The geophone 3 is connected to the data logger 4 by a cable 7. Next, a worker operates the analysis device to fix the geophone 3 to the receiving hole 6 (step S2). Specifically, the analysis device transmits a control signal to the geophone 3 via the data logger 4. Upon receiving the control signal, the geophone 3 abuts the block 341 of the holding unit 34 against the hole wall of the receiving hole 6. If it is necessary to change the position of the geophone 3 due to poor ground conditions or the like, the worker operates the analysis device to release the fixing of the holding unit 34 and move it to the desired position, and then abuts the block 341 of the holding unit 34 against the hole wall of the receiving hole 6 again, thereby fixing the geophone 3 to the receiving hole 6. Next, a worker places the data logger 4 in the seismic receiving hole 6 (step S3).
[0029] Next, a worker operates the blasting machine 1 to start excavation blasting (step S4). The excavation blasting explodes explosives placed at the tunnel face, generating elastic waves 8. The elastic waves 8 are reflected by the fracture zone 9 and then reach the seismic receiving hole 6 through the natural ground. Next, in response to the operation of the blasting machine 1, the detector 2 detects the shot marks (step S5). The detector 2 transmits the detected shot marks to the data logger 4. Thus, the data logger 4 can know the start timing of the excavation blasting and can identify the detection timing of the elastic wave 8 by the geophone 3. Next, the geophone 3 detects the elastic waves 8 reflected by the fracture zone 9 (step S6). Specifically, by fixing the geophone 3 with the holding part 34, the geophone 33, which is in substantial contact with the natural ground, can detect the elastic waves 8. The geophone 3 transmits data of the detected elastic waves 8 to the data logger 4 via the cable 7. Next, the data logger 4 records the data of the elastic waves 8 received from the geophone 3. For example, the data logger 4 can associate each piece of detected elastic wave 8 data with the detection timing of the elastic waves 8, which is determined from the start timing of the excavation blasting. Note that, for example, the data logger 4 can record the data of the elastic waves 8 in a built-in recording medium. A worker can remove the recording medium from the data logger 4 and connect the recording medium to an analysis device, which can then acquire the data of the elastic waves 8 and perform a predetermined analysis. This completes the method for detecting ahead of the working face.
[0030] After completing the survey ahead of the tunnel face, the worker removes the data logger 4 from the seismic receiving hole 6. The worker can also easily remove the geophone 3 by pulling in the cable 7 connected to the data logger 4.
[0031] According to this embodiment, the excavation work does not need to be interrupted because the excavation blast is used as the seismic source. Furthermore, because the geophone 3 is placed in the receiving hole 6, noise in the elastic waves 8 (including reflected waves from the fracture zone ahead of the excavation face, the spring zone, etc.) generated by the excavation blast can be reduced compared to the TFT method. Furthermore, because the holding unit 34 fixes the geophone 3 to the wall of the receiving hole 6, the sensor (geophone 33) of the geophone 3 can be closely attached to the natural ground, reducing noise in the elastic waves detected by the sensor even without the need for conventional fillers such as mortar. This improves the accuracy of the analysis performed by the analyzer of the elastic waves 8 detected by the geophone 3. Furthermore, because the holding unit 34 can release the fixation of the geophone 3 from the wall of the receiving hole 6, even if poor natural ground is present at the location where the geophone 3 is to be installed, the geophone 3 can be removed and relocated. In other words, because conventional fillers such as mortar are not used, installation of the geophone 3 can be completed in a short time. Therefore, the accuracy of analyzing the elastic waves 8 from in front of the tunnel face due to blasting can be improved, and the position of the receiver 3 can be easily changed. Furthermore, since the receiver 3 is placed inside the receiver hole 6, the protective equipment that was essential in the conventional TFT method is no longer necessary, and the number of parts required for detecting the area ahead of the tunnel face can be reduced.
[0032] Furthermore, the data logger 4 can use the reception of the shot mark as a trigger to start recording the data generated when the geophone 3 receives the elastic waves 8. In other words, it can reliably record the time from the start of blasting to the reception of the elastic waves 8. Furthermore, because the data logger 4 and the detector 2 communicate wirelessly, the relative positions of the data logger 4 and the detector 2 can be adjusted as needed depending on the progress of the excavation work. Furthermore, since the data logger 4 is placed in the receiving hole 6, similar to the receiver 3, no protective equipment is required, and the number of parts required for detecting the area ahead of the face can be reduced.
[0033] [Variations] (a) The detector 2 and the data logger 4 may be connected to each other via wires, rather than wirelessly, so that they can communicate with each other. (b): Instead of using a cable 7, the data logger 4 and the geophone 3 may be connected wirelessly so that they can communicate with each other, and the data logger 4 may receive elastic wave 8 data from the geophone 3 wirelessly. (c): Multiple receiving holes 6 can be prepared, and a receiver 3 and a data logger 4 can be placed in each receiving hole 6. In addition, multiple receivers 3 can be placed in the receiving hole 6. In addition, the drilling direction of the receiving hole 6 does not have to be perpendicular to the extension direction of the tunnel. (d): When blasting in stages, the number of stages to be skipped and the number of times can be set appropriately. (e) The data logger 4 may have a built-in storage unit without a removable recording medium. In this case, the analyzer and the data logger 4 are connected to each other via wire or wirelessly so that they can communicate with each other, and the data logger 4 can transmit data on the elastic waves 8 to the analyzer.
[0034] (f): It is also possible to realize a technology that appropriately combines the various technologies described in this embodiment. (g) The software described in this embodiment can be realized as hardware, and vice versa. (h) In addition, the hardware, software, flowcharts, etc. may be modified as appropriate within the scope of the present invention. [Explanation of symbols]
[0035] 1 Explosive Device 2. Detector 3 geophone 4 Data logger 5 Blasting Bus Line 6 Receiving hole 7 Cable 8 Elastic Waves 9. Fracture Zone 10 Push-in section 101 Rod part 102 Joint 103 Guide receiving part 31 Case 32 Cap 33 Geophone 34 Holding part 341 blocks 342 First Arm 343 Second Arm 344 Actuator 35 motor 36 Guide section 37 End cap
Claims
1. a blaster that initiates blasting for excavation; A detector for detecting a shot mark indicating the start timing of the excavation blast; A receiver for detecting elastic waves generated due to the excavation blasting, The receiver is disposed in a receiving hole drilled in the tunnel peripheral wall surface, and includes a holding part for fixing the receiver to the hole wall of the receiving hole, The holding portion is a block that comes into contact with a wall of the vibration receiving hole when the holding portion is in an open state; An actuator that is movable in the axial direction of the receiver, which is a substantially rod-shaped body; a pair of first arms connecting the block and the actuator; A face ahead detection system comprising the block and a second arm connecting the base side of the receiver housing.
2. The detector is connected to a blasting main line connecting the explosives used in the excavation blasting and the blasting device, and is disposed between the explosives and the blasting device, The explosive is disposed at a tunnel face; 2. The system for detecting ahead of a tunnel face according to claim 1, wherein the blasting device is arranged closer to the tunnel entrance than the receiving hole.
3. Further comprising a data logger connected to the geophone; The data logger comprises: The face ahead detection system according to claim 1 or 2, further comprising a wireless unit that receives the shot marks from the detector by wireless communication.
4. The receiver is A geophone is provided to detect the elastic wave. The data logger comprises: A control unit that opens and closes the holding unit; The face ahead detection system according to claim 3, further comprising a recording unit for recording data of the elastic waves detected by the geophone.
5. The face ahead detection system according to claim 3 or claim 4, wherein the data logger is arranged in the receiving hole.
6. The face ahead detection system according to any one of claims 3 to 5, further comprising a cable communicatively connecting the receiver and the data logger.
7. A face front inspection system as described in any one of claims 1 to 6, further comprising a pushing section for pushing the receiver deep into the receiving hole.
8. A receiver for detecting elastic waves generated by excavation blasting, The tunnel wall is provided with a receiving hole formed in the wall of the tunnel and a holding portion is provided for fixing the receiving device to the wall of the receiving hole. The holding portion is a block that comes into contact with a wall of the vibration receiving hole when the holding portion is in an open state; An actuator that is movable in the axial direction of the receiver, which is a substantially rod-shaped body; a pair of first arms connecting the block and the actuator; A geophone comprising the block and a second arm connecting the base side of the geophone housing.
9. A first step of arranging a receiver in a receiver hole drilled in a tunnel wall surface; A second step of fixing the receiver to a wall of the receiving hole; A third step of operating the blaster to start excavation blasting; A fourth step in which a detector detects a shot mark indicating the start timing of the excavation blast; A fifth step in which the receiver detects elastic waves generated due to the excavation blast, In the second step, A method for detecting ahead of a face, comprising: a block; an actuator movable in the axial direction of the receiver which is a roughly rod-shaped body; a pair of first arms connecting the block and the actuator; and a second arm connecting the block and the side of the base of the receiver housing; and when a holding section is in the open state, the block abuts against the hole wall of the receiver hole.
10. The excavation blasting is a staged blasting that blasts in three or more stages at a predetermined scheduled blasting timing, 10. The method for prospecting ahead of a tunnel face according to claim 9, wherein the time interval between the first blast and the second blast is made longer than the time interval between the second blast and the third blast.
Citation Information
Patent Citations
Geological probing method in front of tunnel working face
JP2002139574A
Detecting device of geological state
JP2003020891A
Method for geological exploration during tunnel excavation and tunnel geological exploration apparatus
JP2011043409A
Elastic wave probe method for tunnel, and elastic wave probe system for tunnel using the same
JP2018025487A
Sensing-acquisition-wireless transmission integrated microseismic monitoring system and method
US20200284934A1