The method simplifies risk assessment by grouping basic events with similar risk impact through random probability setting and importance calculations, enhancing the efficiency and precision of risk evaluations in complex systems.

JP7561638B2Active Publication Date: 2024-10-04MITSUBISHI HEAVY IND LTD
View PDF 5 Cites 0 Cited by

Patent Information

Application Number
JP2021007114
Authority / Receiving Office
JP · JP
Patent Type
Patents
Current Assignee / Owner
Filing Date
2021-01-20
Publication Date
2024-10-04
Estimated Expiration
2041-01-20

AI Technical Summary

Technical Problem

Existing risk assessment methods for systems with numerous equipment, such as nuclear power plants, face inefficiencies in analyzing and grouping basic events that significantly impact risk, requiring extensive effort to calculate probabilities and countermeasures.

Method used

A method and device that utilize random probability setting, RAW value calculation, grouping, and FV importance calculation to identify and prioritize basic events with significant risk impact, simplifying the fault tree analysis by grouping events with similar risk effects.

Benefits of technology

Efficiently identifies and prioritizes risk-important equipment groups, enabling precise risk assessment and targeted countermeasures by simplifying the fault tree model, reducing computational effort and improving the accuracy of risk evaluations.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 0007561638000001
    Figure 0007561638000001
  • Figure 0007561638000002
    Figure 0007561638000002
  • Figure 0007561638000003
    Figure 0007561638000003
Patent Text Reader

Abstract

To provide a method for identifying a base event or a device group having a great impact on risk.SOLUTION: A risk impact evaluation method comprises the steps of: randomly setting a failure probability for each of base events constituting a fault tree; calculating a RAW value per base event on the basis of the fault tree and the set probability; grouping base events whose RAW values are within a predetermined range; and calculating a FV importance per group of the grouped base events.SELECTED DRAWING: Figure 1
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present disclosure relates to a risk impact assessment method, a risk impact assessment device, and a program for identifying equipment that is significant in terms of risk. [Background technology]

[0002] Risk assessment may be performed by modeling top events that can occur due to combinations of equipment failures using a fault tree (FT). When a system that includes a large number of pieces of equipment, such as a nuclear plant, is modeled using FT, many combinations of equipment failures that lead to top events are generated. The combination of base events (such as equipment failures) that cause top events defined in FT is called a cutset. It requires a great deal of effort to analyze (detailed analysis) the probability that equipment failures included in each cutset will occur simultaneously for all of the many cutsets generated, and to consider measures on the facility side to prevent equipment failures from occurring simultaneously.

[0003] Patent Document 1 describes a risk assessment method in which risk items are classified into multiple groups based on their importance and relevance, and a risk assessment value for each group is calculated. The method of Patent Document 1 enables risk assessment that reflects the influencing relationships between risk items. [Prior art documents] [Patent documents]

[0004] [Patent Document 1] JP 2005-190402 A Summary of the Invention [Problem to be solved by the invention]

[0005] When there are many base events, if it is possible to extract the base events or groups of base events that have a large impact on risk, detailed analysis and consideration of countermeasures can be performed efficiently. There is a need for a method to identify base events that are effective for risk assessment from among a huge number of base events.

[0006] The present disclosure provides a risk impact assessment method, a risk impact assessment device, and a program that can solve the above problems. [Means for solving the problem]

[0007] The risk impact assessment method of the present disclosure includes: A computer-implemented method for risk impact assessment, comprising: A step of randomly setting a probability of failure for each of the basic events constituting the fault tree; By the computer, calculating a RAW value for each of the base events based on the fault tree and the probability; By the computer, a step of grouping the base events whose RAW values ​​are within a predetermined range; By the computer, A step of calculating FV importance for each group. In the step of calculating a RAW value for each base event, RAWi is the RAW value of the base event i constituting the fault tree, P(TOP / i=1) is the occurrence probability of a top event when the occurrence probability of the base event i in the fault tree becomes 1, and P(TOP) is the occurrence probability of the top event in the fault tree. In the step of calculating the FV importance, FVi is the FV importance of the group i, Pi(TOP) is the difference between the occurrence probability of the top event in the case where none of the base events belonging to the group i occur and P(TOP), and the FV value is calculated by FVi=Pi(TOP)÷P(TOP).

[0008] The risk impact assessment device disclosed herein includes a probability setting unit that randomly sets a probability of failure for each of base events constituting a fault tree, a RAW value calculation unit that calculates a RAW value for each of the base events based on the fault tree and the probability, a grouping unit that groups the base events whose RAW values ​​are within a predetermined range, and an FV importance calculation unit that calculates an FV importance for each of the grouped groups. The RAW value calculation unit calculates the RAW value by RAWi = P(TOP / i = 1) ÷ P(TOP), where RAW value of the base event i constituting the fault tree is RAWi, P(TOP / i = 1) is the occurrence probability of a top event when the occurrence probability of the base event i in the fault tree becomes 1, and P(TOP) is the occurrence probability of the top event in the fault tree. In the step of calculating the FV importance, FVi is calculated by FVi = Pi(TOP) ÷ P(TOP), where Pi(TOP) is the difference between the occurrence probability of the top event in the case where none of the base events belonging to the group i occur.

[0009] The program of the present disclosure includes a step of causing a computer to randomly set a probability of failure for each of base events constituting a fault tree, a step of calculating a RAW value for each of the base events based on the fault tree and the probability, a step of grouping the base events whose RAW values ​​are within a predetermined range, and a step of calculating an FV importance for each of the grouped groups. wherein in the step of calculating a RAW value for each base event, RAWi is defined as the RAW value of the base event i constituting the fault tree, P(TOP / i=1) is defined as the occurrence probability of a top event when the occurrence probability of the base event i in the fault tree becomes 1, and P(TOP) is defined as the occurrence probability of the top event in the fault tree, and the step of calculating an FV importance is defined as FVi is defined as the FV importance of the group i, and Pi(TOP) is defined as the difference between the occurrence probability of the top event in the case where none of the base events belonging to the group i occurs and P(TOP), and the step of calculating an FV value is defined as FVi=Pi(TOP)÷P(TOP); Execute the command. Effect of the Invention

[0010] According to the above-mentioned risk impact assessment method, risk impact assessment device, and program, it is possible to identify equipment and base events that are significant in terms of risk. [Brief description of the drawings]

[0011] [Figure 1] 1 is a block diagram showing an example of a risk influence assessment device according to an embodiment. FIG. [Figure 2A] FIG. 1 is a diagram illustrating an example of a fault tree. [Figure 2B] FIG. 2B shows a cut set for the fault tree of FIG. 2A. [Diagram 3] 11A to 11C are diagrams illustrating the setting of probabilities for base events and the calculation of RAW values ​​according to an embodiment. [Figure 4A] FIG. 11 is a diagram illustrating grouping according to an embodiment. [Figure 4B] FIG. 13 is a diagram showing an example of a risk assessment model using groups according to an embodiment. [Diagram 5] FIG. 11 is a diagram illustrating an example of a grouping process according to the embodiment. [Figure 6] FIG. 11 is a diagram illustrating an example of a group integration process according to the embodiment. [Figure 7] 11 is a flowchart illustrating an example of a risk impact assessment process according to the embodiment. [Figure 8] FIG. 2 is a diagram illustrating an example of a hardware configuration of a risk effect assessment apparatus according to an embodiment. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0012] <Embodiment> The risk influence assessment method of the present disclosure will be described below with reference to FIGS. (composition) FIG. 1 is a block diagram showing an example of a risk influence assessment device according to an embodiment. The risk impact assessment device 10 includes an FT information acquisition unit 11, a probability setting unit 12, a RAW value calculation unit 13, a grouping unit 14, an FV importance calculation unit 15, a group selection unit 16, an output unit 17, and a memory unit 18.

[0013] The FT information acquisition unit 11 acquires information on the FT (fault tree). The FT is a risk assessment model that expresses the relationship of the combination of basic events that cause a top event by a tree structure. The top event is, for example, a serious accident event in a nuclear power plant. The basic events are individual accident events that lead to the top event, such as failure to start a pump, failure to open a check valve, and a fire in a component in a control panel. Here, reference is made to Fig. 2A and Fig. 2B. An example of the FT is shown in Fig. 2A. In the FT of Fig. 2A, the basic event A1 is a failure of equipment A, the basic event B1 is a failure of equipment B, the basic event C1 is a failure of equipment C, and the basic event D1 is a failure of equipment D. The FT of Fig. 2A shows that a top event occurs when the basic event A1 and any of the basic events B1 and C1 occur simultaneously, or when the basic event D1 and any of the basic events B1 and C1 occur simultaneously. Fig. 2B shows a cut set of the FT of Fig. 2A. A cut set is a combination of one or more base events that cause a top event. In this example, there are four cut sets: (1) a combination of base events A1 and B1, (2) a combination of base events A1 and C1, (3) a combination of base events D1 and B1, and (4) a combination of base events D1 and C1. For example, in the case of cut set (1), when base events A1 and B1 occur simultaneously, a top event TE occurs. The FT information acquisition unit 11 acquires structural information of the FT as exemplified in FIG. 2A as information of the FT. This structural information includes information that defines a tree structure, such as the fact that base events B1 and C1 are connected by an OR gate in the FT, and base events A1, B1, and C1 are connected by an AND gate. In addition, the FT information acquisition unit 11 acquires the occurrence probability (actual occurrence probability) of base events A1 to D1 as information of the FT. The occurrence probability of base events A1 to D1 is set in advance based on the analysis results of an engineer with knowledge, etc. The following description will be given taking the FT illustrated in FIG. 2A as an example.

[0014] The probability setting unit 12 randomly sets a probability for each of the base events A1 to D1 of the FT acquired by the FT information acquisition unit 11. Generally, in PRA (probabilistic risk assessment) and the like, risk assessment is performed based on the actual occurrence probability of the cut set. The actual occurrence probability of the cut set is often set based on the actual value of the occurrence probability of the base events constituting the cut set and the failure rate of the equipment related to the base events. For this reason, for example, when equipment A and equipment D are of the same type, the occurrence probability of the base event A1 and the base event D1 is often set to approximately the same value. In contrast, the probability setting unit 12 sets a probability of an arbitrary value for each cut set, for example, by generating random numbers, regardless of the contents of the base events constituting the cut set. Here, FIG. 3 is referred to. The upper part of the table 100 shown in FIG. 3 shows the failure probabilities of the equipment A to D. The failure probabilities of the equipment A to D are the occurrence probabilities of the base events A1 to D1, respectively. The probability setting unit 12 generates random numbers to calculate the failure probabilities of the equipment A to D. For example, the probability setting unit 12 calculates a random number "2.10E-05" and sets it as the failure probability of device A, and calculates a random number "7.40E-06" and sets it as the failure probability of device B. If the generated random number is an excessively low value (if the random number is equal to or less than a threshold value) so that cut sets including each base event are not cut off, the probability setting unit 12 generates a random number again and sets the value as the failure probability of the device (probability of occurrence of the base event).

[0015] The RAW value calculation unit 13 calculates the RAW values ​​(Risk Achievement Worth) of the base events A1 to D1. The RAW value is also called risk increase value, and can be calculated by the following formula (1). RAWi=P(TOP / i=1)÷P(TOP)...(1) Here, P(TOP) represents the unavailability of the system (probability of the occurrence of a top event). Also, P(TOP / i=1) represents the unavailability of the system when the failure probability of element i becomes 1 (i.e., when element i fails). RAWi is an index indicating the increase in the unavailability of the system when element i of the system fails. Element i is, for example, any of the devices A to D. RAWi represents the increase in risk when element i fails, so it is effective in grasping the impact of risk mitigation of the device. The RAW value calculation unit 13 calculates the RAW value when each device fails for each of the devices A to D. The lower part of the table in FIG. 3 shows the RAW value when it is assumed that the devices A to D fail with the probability in the upper part of the table in FIG. 3 in the FT in FIG. 2A. For example, in the calculation of the RAW value of the base event A1, P(TOP / i=1) is the probability that device B or device C fails from the structure of the FT in FIG. 2A. Furthermore, P(TOP) is the probability that any of the devices A to D will fail. The RAW value calculation unit 13 uses the probabilities randomly set by the probability setting unit 12 for the base events A1 to D1 to calculate the RAW value "3.52E+04" of the base event A1 according to FT and formula (1). Similarly, the RAW value calculation unit 13 calculates the RAW values ​​of the base events B1 to D1. As shown in the lower part of table 100, the RAW values ​​of the base events B1 to D1 are "3.52E+04", "1.76E+03", and "1.76E+03", respectively.

[0016] Based on the RAW values ​​calculated by the RAW value calculation unit 13, the grouping unit 14 groups the base events A1 to D1 into groups with close RAW values. In the case of the table 100 in FIG. 3, the grouping unit 14 groups the base events A1 and D1 into the same group because their RAW values ​​match at "3.52E+04". In addition, the grouping unit 14 groups the base events B1 and C1 into the same group because their RAW values ​​match at "1.76E+03". The result of grouping by the grouping unit 14 is shown in FIG. 4A. For convenience, the group of base events A1 and D1 is group 1, and the group of base events B1 and C1 is group 2. By grouping the base events, the original FT can be rewritten with a simpler structure. FIG. 4B shows a simple FT in which the FT in FIG. 2A is rewritten using the groups 1 and 2 in this example. According to the FT in Figure 4B, it can be easily understood that a summit event will occur if an equipment failure in group 1 (failure of either equipment A or D) and an equipment failure in group 2 (failure of either equipment B or C) occur simultaneously.

[0017] For example, in the case of FT in FIG. 2A, theoretically, even if the probability setting unit 12 sets the probability for each base event completely randomly, the RAW values ​​of the base events A1 and D1 will match, and the RAW values ​​of the base events B1 and C1 will match. However, due to the influence of random numbers, there is a possibility that errors will occur in the RAW values ​​of the base events A1 and D1 and the RAW values ​​of the base events B1 and C1. In addition, due to the influence of random numbers, there is a possibility that the RAW values ​​of base events that should belong to another group will be close by chance. Therefore, in this embodiment, the probability setting unit 12 attempts to calculate the probability for one base event multiple times, and the RAW value calculation unit 13 calculates the RAW value for each of the multiple probabilities. In other words, multiple RAW values ​​are calculated for one base event. The grouping unit 14 groups base events whose RAW values ​​are close each time into the same group based on the multiple RAW values, for example.

[0018] An example of grouping processing is shown in FIG. 5. INST_001, 002, CABLE_001, 002, 100, 101, 102, 200, 201, 202, 310, 311, 312, and VALVE_100, 200 in table 101 in FIG. 5 are base events. In the example in FIG. 5, the setting of the probability and the calculation of the RAW value based on the probability are executed five times for each base event. For example, in the first trial, the RAW values ​​of INST_001 and CABLE_001 match, the RAW values ​​of INST_002 and CABLE_002 match, the RAW values ​​of VALVE_100 and CABLE_100, 101, 102 match, and the RAW values ​​of VALVE_200 and CABLE_200, 201, 202 match. The grouping unit 14 groups these into one provisional group, respectively. The groups are called provisional groups G1, G2, G3, and G4, in that order. For example, if the above basic events are classified into provisional groups G1, G2, G3, and G4 in the same manner through five times, the grouping unit 14 finally sets each of these as one group. The groups are called groups G_001, G_002, G_003, and G_004, in that order.

[0019] Also, in the first and fifth trials, the RAW value of CABLE_301 is different from the others, and the RAW values ​​of CABLE_310, 311, and 312 match. As a result, the grouping unit 14 classifies, for example, CABLE_301 into a provisional group G5 and CABLE_310, 311, and 312 into a provisional group G6. In the second trial, the RAW values ​​of CABLE_301, 310, 311, and 312 match. The grouping unit 14 classifies CABLE_301, 310, 311, and 312 into a provisional group G5. Finally, the grouping unit 14 sets CABLE_310, 311, and 312, whose RAW values ​​match over the five trials, as one group G_006, and sets CABLE_301 as one group G_005.

[0020] Logically, the RAW values ​​of base events that have similar effects on risk are the same. However, when there are a huge number of base events, it is costly to analyze the structure of the FT and group the base events. In contrast, in this embodiment, base events with similar RAW values ​​are grouped together using RAW values ​​calculated based on the occurrence probability of the randomly set base events. This makes it possible to group a large number of base events that have similar effects on risk by simple calculation without analyzing the FT structure. In addition, by randomly setting the probability of the base event, for example, different arbitrary probabilities are set for failures of the same type of equipment, and the RAW value is calculated based on the value. This makes it possible to group together items that can be treated similarly in terms of risk impact in terms of the structure of the fault tree, regardless of the type of equipment.

[0021] The FV importance calculation unit 15 calculates FV (Fussell-Vesely) importance for each group created by the grouping unit 14. The FV importance can be calculated by the following formula (2). FVi = Pi(TOP) ÷ P(TOP) (2) Here, P(TOP) represents the unavailability of the system, and Pi(TOP) represents the difference between the unavailability of the system when the probability of failure of element i becomes 0 (i.e., when element i is not broken) and the unavailability of the system (=P(TOP)). The FV importance indicates the proportion of the probability of a top event occurring that is caused by the failure of element i, and an element i with a high FV importance has a greater impact on risk than an element i with a low FV importance. The FV importance is used to grasp the effectiveness of measures taken by devices in the system. In addition, the FV importance calculation unit 15 does not calculate the FV importance for devices A to D, but calculates the FV importance for all devices grouped by the grouping unit 14. For example, the FV importance calculation unit 15 calculates the FV importance for group 1 by taking the difference between the unavailability of the system and P(TOP) when both devices A and D are not broken as Pi(TOP) in formula (2). That is, the FV importance calculation unit 15 calculates the degree of risk reduction when both devices A and D are not broken (when neither of the base events A1 and D1 occurs) using formula (2) compared to the other case. Unlike the grouping process, the FV importance calculation unit 15 calculates the FV importance of group 1 based on the actual failure rates of devices A and D (the actual occurrence probability of base events A1 and D1). For example, the FV importance calculation unit 15 calculates the FV importance of group 1 based on the actual occurrence probability of each base event included in the FT information acquired by the FT information acquisition unit 11. Similarly, the FV importance calculation unit 15 calculates the degree of risk reduction (FV importance) for group 2 when both devices B and C are not broken. If the calculated FV importance is not a significant value, the FV importance calculation unit 15 merges the groups and calculates the FV importance for the larger group after the merger. An example of merging groups will be described with reference to FIG. 6.

[0022] Table 102 in FIG. 6 shows the FV importance calculated for each group G_001-006 created by the grouping process described in FIG. 5. The FV importance of G_003 is "1.19E-01", the FV importance of G_004 is "2.22E-16", and the FV importance of the other groups is 0. For example, the FV importance calculation unit 15 compares the FV importance of each group with a predetermined threshold, and if the calculated FV importance is equal to or less than the threshold, it determines that a significant value has not been obtained, integrates the groups, and calculates the FV importance of the integrated group in the same manner. An example of the integrated group and FV importance is shown in Table 103 in FIG. 6. For example, the FV importance calculation unit 15 creates all patterns of combinations of two of the groups G_001-006, and calculates the FV importance for each of them. The FV importance calculation unit 15 compares all the FV importance including the integrated group with the threshold to determine whether a significant value has been obtained. For example, the FV importance calculation unit 15 compares the FV importance of group G_003+G_004, "6.87E-01", with the threshold. It is assumed that all of the FV importances shown in Table 103 are below the threshold. Then, the FV importance calculation unit 15 further integrates the groups and calculates the FV importance again. For example, the FV importance calculation unit 15 may create all combinations of groups that have already been created, as in the previous example, and calculate the FV importance. Alternatively, since the amount of calculation increases as the number of groups increases, the integration of groups may be performed by focusing on the components of groups with high FV importance (for example, the components of group G_003+G_004 with the highest FV importance are G_003 and G_004). For example, the components of a predetermined number of groups with the highest FV importance may be combined, or the components of groups with FV importance values ​​equal to or greater than a predetermined value may be combined. Table 104 shows an example of calculating FV importance by additionally combining components of the top-ranked groups. For example, the FV importance calculation unit 15 calculates the degree of risk reduction (FV importance) for the integrated group G_003+G_004+G_001 in the case where there are no equipment failures in this group. The FV importance calculation unit 15 continues integrating groups and calculating FV importance until a significant value is obtained.

[0023] The group selection unit 16 sorts the groups in descending order of FV importance value and selects the top-ranked groups. Groups with large FV importance values ​​are groups of base events that have a large impact on risk (are important in terms of risk). The group selection unit 16 may select a predetermined number of groups in descending order of FV importance, or may select groups whose FV importance is equal to or greater than a predetermined threshold. In the example of FIG. 4A, the group selection unit 16 selects, for example, groups 1 and 2. In the case of table 104 of FIG. 6, the group selection unit 16 selects, for example, the top two groups.

[0024] The output unit 17 outputs the grouping results by the grouping unit 14, the FV importance calculated for each group, the group selected by the group selection unit 16, etc. to a display device, an electronic file, or the like. The storage unit 18 stores information necessary for selecting a group of base events that are significant in terms of risk. For example, the storage unit 18 stores the FT information acquired by the FT information acquisition unit 11.

[0025] (operation) Next, the operation of the risk influence assessment device 10 will be described with reference to FIG. FIG. 7 is a flowchart showing an example of a risk influence assessment process according to the embodiment. First, the FT information acquisition unit 11 acquires information on the FT to be evaluated (step S10). The FT information acquisition unit 11 records the FT information in the storage unit 18.

[0026] Next, the probability setting unit 12 randomly sets a probability for each base event of the FT acquired in step S10 (step S11). The probability setting unit 12 analyzes the information of the FT stored in the storage unit 18, extracts the base event, randomly generates a random number for each base event, and sets the random number as the occurrence probability of the base event. If the random number is less than a predetermined reference value, the probability setting unit 12 generates a random number again. In addition, the probability setting unit 12 sets a probability multiple times for one base event. For example, the probability setting unit 12 sets five probabilities for each of the base events A1 to D1. The probability setting unit 12 associates the set probabilities with the target base event and records them in the storage unit 18 by the number of trials (for example, the probability set for the first trial to the probability set for the fifth trial separately).

[0027] The RAW value calculation unit 13 calculates the RAW value of each base event (step S12). For example, the RAW value calculation unit 13 calculates five RAW values ​​using each of the five probabilities set for the base event A1 and formula (1) based on the FT acquired in step S10. The RAW value calculation unit 13 also calculates five RAW values ​​for each of the base events B1 to D1. The RAW value calculation unit 13 associates the calculated RAW values ​​with the base events in question, and records them in the storage unit 18 by the number of trials (for example, the RAW value based on the probability set for the first trial to the RAW value based on the probability set for the fifth trial, separately).

[0028] Next, the grouping unit 14 groups base events with close RAW values ​​together (step S13). For example, the grouping unit 14 groups base events whose differences in RAW values ​​at the same trial number are all within a predetermined range over five trials into the same group. There is no limit to the number of base events that belong to one group, and there may be only one, or three or more. There is also no limit to the number of groups that can be created.

[0029] Next, the grouping unit 14 judges whether or not a consistent grouping result has been obtained (step S14). For example, if the number of groups created in each of the first to fifth trials and the basic events constituting each group are all different, the grouping unit 14 judges that a consistent grouping result has not been obtained. For example, as in the example shown in FIG. 5, if the grouping results are the same four times out of five times, the grouping unit 14 judges that a consistent grouping result has been obtained. If a consistent grouping result has not been obtained (step S14; No), the processes of steps S11 to S14 are performed again.

[0030] When a consistent grouping result is obtained (step S14; Yes), the FV importance calculation unit 15 calculates the FV importance for each group indicated by the consistent grouping result (step S15). The FV importance calculation unit 15 uses the actual occurrence probability of the base events belonging to each group to calculate the sum of the contributions to risk made by the base events belonging to the group (the degree of risk reduction when all the base events in the group do not occur) by FT and formula (2). The FV importance calculation unit 15 records the calculated FV importance in the memory unit 18.

[0031] The FV importance calculation unit 15 compares the FV importance with a predetermined threshold value and determines whether or not a significant result has been obtained (step S16). If a significant result has not been obtained (step S16; No), the groups are merged as described in FIG. 6 (step S17). For example, the FV importance calculation unit 15 selects the group with the highest FV importance, and then creates all possible combinations by selecting and merging two of the selected groups. The FV importance calculation unit 15 then calculates the FV importance for the merged group (step S15) and determines whether or not a significant result has been obtained (step S16). The FV importance calculation unit 15 repeats the processes of steps S17, S15, and S16 until a significant result is obtained.

[0032] If a significant result is obtained (step S16; Yes), the group selection unit 16 selects the group with the highest FV importance as the group with the highest risk importance (step S18). Next, the output unit 17 outputs the group selected by the group selection unit 16 (step S19). For example, in the case of FIG. 6, the group selection unit 16 outputs "G_003+G_004+G_001" and "G_003+G_004+G_002" and the basic events belonging to each group. In addition to the groups selected in step S18, the output unit 17 may also output, for example, the finally created groups and their FV importance, and a list of the basic events that make up each group.

[0033] As described above, according to this embodiment, by using the indices (RAW, FV importance) used in importance analysis in PRA, it is possible to group a large number of base events that can be treated similarly in terms of their impact on risk. In addition, it is possible to extract groups that are important in terms of risk from multiple groups. This enables efficient risk evaluation by giving priority to detailed analysis and countermeasure consideration for base events that belong to groups that are important in terms of risk.

[0034] In addition, by grouping basic events that have the same degree of impact on risk, it is possible to simplify a FT consisting of many basic events into a risk assessment model with groups as units (for example, the FT in Figure 4B), and then determine which groups are important in terms of risk. In addition, the simplified risk assessment model makes it possible to grasp combinations of groups that have a large impact on risk if they fail simultaneously. This makes it possible to efficiently analyze which equipment will lead to a top event if it fails simultaneously, and to efficiently consider equipment responses that will prevent a top event from occurring. For example, when probabilistically assessing the risk of fire in a nuclear plant (fire PRA), all combinations of equipment A to D are created, such as when a fire occurs in both equipment A and equipment B, when a fire occurs in equipment A and equipment C, when a fire occurs in equipment A to C, etc., and detailed analysis and equipment responses are considered for each combination. Although it is sufficient if the number of equipment is about four, the number of equipment equipped in a nuclear plant is enormous, and it is difficult to perform detailed analysis, etc. for all combinations of equipment. According to this embodiment, a group of equipment (base events) with a large risk impact can be identified, and detailed analysis can be performed by limiting the detailed analysis to combinations including equipment (base events) belonging to the identified group, thereby making the detailed analysis more efficient. Also, as illustrated in FIG. 4B, according to this embodiment, the original FT can be simplified and modeled. For example, according to the simplified risk assessment model, it is easy to understand that it is important to prevent simultaneous failures of group 1 and group 2. By identifying groups in which a top event occurs when failures occur simultaneously and considering measures to prevent simultaneous failures of equipment belonging to these groups, effective equipment response can be efficiently performed.

[0035] In addition, in conventional fire risk assessments, a nuclear power plant is divided into sections, and when a fire occurs in one piece of equipment in a section, the risk assessment is often performed assuming that the fire has occurred in the entire section, which often results in an overly conservative assessment result. In contrast, according to this embodiment, risk assessment can be effectively performed by focusing on equipment that belongs to a group that is important in terms of risk, so that risk assessment and countermeasures can be more precisely considered. Note that the application of the risk impact assessment of this embodiment is not limited to fire risk assessment.

[0036] In addition, both the RAW value and the FV importance are indices used in risk assessment, but generally, the magnitude of risk is often assessed by comparing these values ​​with a certain reference value. In contrast, in this embodiment, the base events are grouped based on the RAW value, which is an index indicating an increase in risk when equipment breaks down. In addition, for each group of grouped base events, the FV importance, which is an index indicating a reduction in risk when the equipment does not break down, is calculated, and a group with a large FV importance value is selected. In this way, in this embodiment, by combining and using general indices, it is possible to simplify an FT consisting of a large number of base events into a model with groups as units, and to determine which groups are important in terms of risk.

[0037] FIG. 8 is a diagram illustrating an example of a hardware configuration of the risk effect assessment apparatus according to the embodiment. The computer 900 includes a CPU 901 , a main memory device 902 , an auxiliary memory device 903 , an input / output interface 904 , and a communication interface 905 . The risk effect assessment device 10 described above is implemented in a computer 900. Each of the above-mentioned functions is stored in the auxiliary storage device 903 in the form of a program. The CPU 901 reads the program from the auxiliary storage device 903, loads it in the main storage device 902, and executes the above-mentioned processing in accordance with the program. The CPU 901 also reserves a memory area in the main storage device 902 in accordance with the program. The CPU 901 also reserves a memory area in the auxiliary storage device 903 for storing data being processed in accordance with the program.

[0038] In addition, a program for realizing all or part of the functions of the risk impact assessment device 10 may be recorded on a computer-readable recording medium, and the program recorded on the recording medium may be read into a computer system and executed to perform processing by each functional unit. The term "computer system" as used herein includes hardware such as an OS and peripheral devices. In addition, if a WWW system is used, the term "computer system" also includes a homepage providing environment (or display environment). In addition, the term "computer-readable recording medium" refers to a portable medium such as a CD, DVD, or USB, and a storage device such as a hard disk built into a computer system. In addition, if the program is distributed to a computer 900 through a communication line, the computer 900 that receives the program may expand the program in the main storage device 902 and execute the above processing. In addition, the above program may be for realizing part of the functions described above, or may be capable of realizing the functions described above in combination with a program already recorded in the computer system. The risk impact assessment device 10 may be composed of multiple computers 900 that are capable of communicating with each other.

[0039] As described above, several embodiments according to the present disclosure have been described, but all of these embodiments are presented as examples and are not intended to limit the scope of the invention. These embodiments can be implemented in various other forms, and various omissions, substitutions, and modifications can be made without departing from the gist of the invention. These embodiments and their modifications are included in the scope of the invention and its equivalents as described in the claims, as well as in the scope and gist of the invention.

[0040] <Additional Notes> The risk and effect assessment method, risk and effect assessment apparatus, and program described in each embodiment can be understood, for example, as follows.

[0041] (1) A risk impact assessment method according to a first aspect includes the steps of: randomly setting a probability of failure for each of base events A1 to D1 constituting a fault tree (FIG. 2A) (S11); calculating a RAW value for each base event based on the fault tree and the probability (S12); grouping base events whose RAW values ​​are within a predetermined range (S13); and calculating an FV importance for each of the grouped groups (S15). As a result, even when there are many pieces of equipment or base events to be evaluated, those that can be treated similarly from the perspective of risk impact can be grouped together. By calculating the FV demand for each group, the impact of each group on risk can be evaluated. By referring to the impact of each group on risk, it is possible to identify base events that are effective for risk assessment. By grouping base events, the original FT can be modeled in a simple format. This makes it easy to identify the combinations that lead to the top event out of the many combinations of equipment failures that exist. As a result, risk assessment based on FT can be carried out efficiently.

[0042] (2) A risk impact assessment method according to a second aspect is the risk impact assessment method of (1), further comprising the step (S18) of selecting a group whose FV importance is equal to or greater than a predetermined value. This makes it possible to identify groups of base events that have a large impact on risk from among a huge number of combinations of base events. By understanding the base events that have a large impact on risk, detailed analysis can be performed with little effort, and failure countermeasures can be considered with little effort.

[0043] (3) A risk impact assessment method according to a third aspect is a risk impact assessment method according to (1) to (2), in which, if the FV importance is less than a predetermined threshold, the groups are integrated and the FV importance is calculated again. If the FV importance is not a significant value, the groups are integrated and the FV importance is calculated again, thereby making it possible to create and extract groups that are significant in terms of risk.

[0044] (4) A risk impact assessment method according to a fourth aspect is a risk impact assessment method according to any one of (1) to (3), wherein in the step of setting the probability, a process of generating random numbers and setting the probability for the base event is executed multiple times, in the step of calculating a RAW value of the base event, the RAW value is calculated for each of the multiple probabilities set by executing the process multiple times, and in the step of grouping, grouping is performed based on the multiple calculated RAW values. By setting the probabilities multiple times and calculating the RAW values, it is possible to eliminate the influence of setting the probabilities randomly (for example, the RAW values ​​being close to each other by chance).

[0045] (5) A risk impact assessment method according to a fifth aspect is a risk impact assessment method according to any one of (1) to (4), wherein in the step of calculating the FV importance, the degree of risk reduction is calculated in the case where none of the base events classified into the group occurs. By calculating the FV importance based on the difference in the probability of reaching the top event when the failure probability of all base events belonging to the group is 0 and when it is not, the impact on the risk of the entire group can be evaluated.

[0046] (6) A risk impact assessment method according to a sixth aspect is a risk impact assessment method according to any one of (1) to (5), wherein the fault tree is a fault tree that models a top event that occurs when a fire occurs in equipment provided in a nuclear plant. The risk impact assessment method of this embodiment is effective in the case of performing a fire risk assessment for each combination of a large number of devices equipped in a nuclear power plant. For example, by performing the process shown in Fig. 7 on a fault tree for assessing the risk of a fire occurring in each device equipped in a nuclear power plant, it is possible to extract a combination of devices that has a large impact on the fire risk.

[0047] (7) The risk impact assessment device 10 of the seventh aspect includes a probability setting unit 12 that randomly sets a probability of failure for each of the base events that constitute a fault tree, a RAW value calculation unit 13 that calculates a RAW value for each of the base events based on the fault tree and the probability, a grouping unit 14 that groups base events whose RAW values ​​are within a predetermined range, and an FV importance calculation unit 15 that calculates the FV importance for each of the grouped groups.

[0048] (8) A program according to an eighth aspect causes a computer 900 to execute the steps of randomly setting a probability of failure for each of the base events constituting a fault tree, calculating a RAW value for each of the base events based on the fault tree and the probability, grouping base events whose RAW values ​​are within a predetermined range, and calculating an FV importance for each of the grouped groups. [Explanation of symbols]

[0049] 10. Risk impact assessment device 11...FT information acquisition section 12. Probability setting section 13 RAW value calculation section 14. Grouping section 15...FV importance calculation part 16 Group selection section 17 Output section 18...Storage section 900...Computer 901···CPU, 902...Main memory, 903...Auxiliary storage device, 904 Input / Output Interface 905 Communication Interface

Claims

1. A computer-implemented method for risk impact assessment, comprising: A step of randomly setting a probability of failure for each of the basic events constituting the fault tree by the computer; calculating, by the computer, a Risk Achievement Worth (RAW) value for each of the base events based on the fault tree and the probability; grouping, by the computer, the base events whose RAW values ​​are within a predetermined range; calculating, by the computer, a Fussell-Vesely (FV) importance for each of the groups; having In the step of calculating a RAW value for each base event, the RAW value of the base event i constituting the fault tree is RAWi, P(TOP / i=1) is the occurrence probability of a top event when the occurrence probability of the base event i in the fault tree becomes 1, and P(TOP) is the occurrence probability of the top event in the fault tree, and the RAW value is calculated by RAWi=P(TOP / i=1)÷P(TOP); In the step of calculating the FV importance, the FV importance of the group i is FVi, and Pi(TOP) is the difference between the occurrence probability of the top event in the case where none of the base events belonging to the group i occurs and P(TOP), and the FV value is calculated by FVi=Pi(TOP)÷P(TOP). Risk impact assessment methods.

2. A step of selecting, by the computer, the group whose FV importance is equal to or greater than a predetermined value.

2. The risk impact assessment method of claim 1, further comprising:

3. If the FV importance is less than a predetermined threshold, the groups are integrated and the FV importance is calculated again.

3. The risk impact assessment method according to claim 2.

4. In the step of setting the probability, a process of generating a random number and setting the probability for the base event is executed a plurality of times; In the step of calculating a RAW value for each of the base events, the RAW value is calculated for each of a plurality of the probabilities set by performing the calculation a plurality of times; In the grouping step, grouping is performed based on the plurality of calculated RAW values. A risk effect assessment method according to any one of claims 1 to 3.

5. In the step of calculating the FV importance, a degree of risk reduction in a case where none of the basic events belonging to the group occurs is calculated. A risk influence assessment method according to any one of claims 1 to 4.

6. The fault tree is a fault tree that models a top event that occurs when a fire occurs in equipment included in a nuclear power plant. A risk influence assessment method according to any one of claims 1 to 5.

7. a probability setting unit that randomly sets a probability of failure for each of the basic events that constitute the fault tree; a RAW value calculation unit that calculates a RAW (Risk Achievement Worth) value for each of the base events based on the fault tree and the probability; a grouping unit that groups the basic events whose RAW values ​​are within a predetermined range; an FV importance calculation unit that calculates an FV importance for each of the grouped groups; Equipped with the RAW value calculation unit calculates the RAW value by RAWi=P(TOP / i=1)÷P(TOP), where RAW value of the base event i constituting the fault tree is RAWi, P(TOP / i=1) is the occurrence probability of a top event when the occurrence probability of the base event i in the fault tree becomes 1, and P(TOP) is the occurrence probability of the top event in the fault tree; In the step of calculating the FV importance, the FV importance of the group i is FVi, and Pi(TOP) is the difference between the occurrence probability of the top event in the case where none of the base events belonging to the group i occurs and P(TOP), and the FV value is calculated by FVi=Pi(TOP)÷P(TOP). Risk impact assessment instrument.

8. On the computer, A step of randomly setting a probability of failure for each of the basic events constituting the fault tree; Calculating a Risk Achievement Worth (RAW) value for each of the base events based on the fault tree and the probability; A step of grouping the base events whose RAW values ​​are within a predetermined range; Calculating FV importance for each of the groups; having In the step of calculating a RAW value for each base event, the RAW value of the base event i constituting the fault tree is RAWi, P(TOP / i=1) is the occurrence probability of a top event when the occurrence probability of the base event i in the fault tree becomes 1, and P(TOP) is the occurrence probability of the top event in the fault tree, and the RAW value is calculated by RAWi=P(TOP / i=1)÷P(TOP); In the step of calculating the FV importance, the FV importance of the group i is FVi, and Pi(TOP) is the difference between the occurrence probability of the top event in the case where none of the base events belonging to the group i occurs and P(TOP), and the FV value is calculated by FVi=Pi(TOP)÷P(TOP); A program that executes the following.

Citation Information

Patent Citations

  • Method for operating plant, and operation apparatus thereof

    JP2004227298A

  • Risk evaluation support system, information processor, method for supporting risk evaluation, and program

    JP2005190402A

  • Plant inspection safe treatment management method and its system

    JP2011076210A

  • Risk quantitative assessment method by computer supported top logic for nuclear power plant

    JP2012008744A

  • Method and apparatus for a common-cause failure module for probabilistic risk assessment tools

    US20030070108A1