Engineering management device

The process control device addresses the issue of identifying delayed partial processes in mounting operations by providing real-time visualization of delays, enhancing the accuracy of process management.

JP7561995B2Active Publication Date: 2024-10-04FUJI CORP

Patent Information

Application Number
JP2023534493
Authority / Receiving Office
JP · JP
Patent Type
Patents
Current Assignee / Owner
Filing Date
2021-07-13
Publication Date
2024-10-04
Estimated Expiration
2041-07-13

AI Technical Summary

Technical Problem

Existing process control devices fail to identify which partial process is causing a delay during the current operation in mounting-related processes, despite being able to predict potential delays in subsequent operations.

Method used

A process control device that includes a display showing a plan image of mounting-related processes, a first display control unit for displaying each partial process, a second display control unit for displaying progress images, and a third display control unit for indicating delays in the progress of processes, allowing for the visualization of delays in real-time.

Benefits of technology

Enables the user to identify the specific partial process where a delay has occurred, preventing misinterpretation of the progress status and ensuring timely corrective actions.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 0007561995000001
    Figure 0007561995000001
  • Figure 0007561995000002
    Figure 0007561995000002
  • Figure 0007561995000003
    Figure 0007561995000003
Patent Text Reader

Abstract

This process management device comprises: a first display control unit configured to cause a plan image indicating a plan for a mounting-related process including a plurality of partial processes to be displayed by a display for each partial process; a second display control unit configured to, when the mounting-related process is being performed on the basis of the plan for the mounting-related process, cause a progress image indicating the progress of the mounting-related process to be displayed by the display for each partial process together with the plan image; and a third display control unit configured to, when the progress of the mounting-related process is delayed relative to the plan for the mounting-related process when the mounting-related process is being performed on the basis of the plan for the mounting-related process, cause a delay image indicating the delay of the mounting-related process relative to the plan for the mounting-related process to be displayed together with the plan image in association with the partial process of the mounting-related process in which the delay has occurred.
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The technology disclosed in this specification relates to a process management device for managing mounting-related processes in which a mounting device mounts components on a board. [Background technology]

[0002] There is known a process control device for controlling the progress of a mounting-related process having a plurality of sub-processes, to determine whether the process is being carried out as planned. For example, Patent Document 1 discloses a device for performing an operation fluctuation prediction process in a steelmaking process in the steel industry, which compares an operation plan with an operation record in a current operation, and predicts a process in which a delay from the operation plan will occur in a subsequent operation. [Prior art documents] [Patent documents]

[0003] [Patent Document 1] JP 2001-34672 A Summary of the Invention [Problem to be solved by the invention]

[0004] Even when a mounting-related process is carried out, the progress of the mounting-related process may be delayed from the plan. For example, it is assumed that the technology of Patent Document 1 is adopted for a mounting-related process. In this case, only a partial process that will cause a delay in a subsequent operation is predicted, and it is not possible to inform the user during the current operation which partial process is causing a delay.

[0005] The present specification provides a technique for notifying a partial process in which a delay is occurring when a mounting-related process is being carried out based on a plan. [Means for solving the problem]

[0006] The process management device disclosed in this specification includes a display, a first display control unit that causes the display to display a plan image indicating a plan of a mounting-related process for a mounting device to mount components on a board, the mounting-related process including a plurality of sub-processes, for each of the sub-processes, a second display control unit that causes the display to display a progress image indicating the progress of the mounting-related process together with the plan image for each of the sub-processes when the mounting-related process is being carried out based on the plan of the mounting-related process, and a third display control unit that causes the display to display a delay image indicating the delay in the progress of the mounting-related process relative to the plan of the mounting-related process, in association with the sub-process among the mounting-related processes in which the delay is occurring, together with the plan image, when the mounting-related process is being carried out based on the plan of the mounting-related process and the progress of the mounting-related process is delayed relative to the plan of the mounting-related process.

[0007] According to this configuration, when a mounting-related process is being carried out based on a plan, a delay image showing a delay in the progress of the mounting-related process relative to the plan of the mounting-related process is displayed in association with the partial process in which a delay is occurring, together with a plan image showing the plan of the mounting-related process. The delay image can inform the user of the partial process in which a delay is occurring. [Brief description of the drawings]

[0008] [Figure 1] 1 shows a component mounting system according to each embodiment. [Diagram 2] A sequence diagram of a process for managing mounting-related processes is shown. [Diagram 3] 1 shows a management screen according to a first embodiment. [Figure 4] 13 shows a management screen according to a second embodiment. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0009] The main features of the embodiment described below are listed below. Note that the technical elements described below are independent technical elements that exhibit technical usefulness alone or in various combinations, and are not limited to the combinations described in the claims at the time of filing.

[0010] (Feature 1) The third display control unit may cause the display to display the delay image in association with a first partial plan image showing a plan of the first partial process in which the delay is occurring. With this configuration, a user who sees the first partial plan image can know that a delay is occurring in the progress of the first partial process.

[0011] (Feature 2) The first display control unit may cause the display to display the first partial plan image and a second partial plan image showing a plan of a second partial process that is a process subsequent to the first partial process, side-by-side along a time axis, the third display control unit may cause the display to display the delayed image positioned between the first partial plan image and the second partial plan image, and the first display control unit may cause the display to display the second partial plan image positioned at a position delayed by the time indicated by the delayed image.

[0012] For example, when the progress of the first partial process is delayed, an image showing the progress of the second partial process (hereinafter, referred to as "second partial progress image") is placed at a position delayed by the amount of the delay in the progress of the first partial process. For example, a comparative example is assumed in which the second partial plan image is placed at a position as originally planned in a situation in which the progress of the first partial process is delayed. In this comparative example, the start time of the second partial progress image appears to be delayed by the amount of the delay in the progress of the first partial process with respect to the start time of the second partial plan image. For example, assume a specific case in which the start time of the second partial process is delayed due to the delay in the end time of the first partial process, but the second partial process is progressing as planned. In this case, the user may see the second partial progress image that appears delayed and mistakenly recognize that the progress of the second partial process is delayed relative to the plan. In contrast, according to the above configuration, the second partial plan image is placed at a position delayed by the amount of the delay in the progress of the first partial process. Therefore, the start time of the second partial progress image appears to be aligned with the start time of the second partial plan image. For example, in the particular case described above, the user can be prevented from mistakenly perceiving that the progress of the second partial process is behind plan, because the start time of the second partial progress image and the start time of the second partial plan image are aligned.

[0013] (First embodiment) (Component Mounting System 2; Figure 1) As shown in FIG. 1, the component mounting system 2 includes a management terminal 10, a picking terminal 100, a setup terminal 200, and a mounting device 300. Each of the devices 10, 100, 200, and 300 is connected to a local area network 4 (hereinafter, referred to as "LAN4"). Each of the devices 10, 100, 200, and 300 can communicate with each other via the LAN4. The management terminal 10, the picking terminal 100, and the setup terminal 200 are terminal devices such as desktop PCs, notebook PCs, tablet terminals, smartphones, and handheld terminals. The mounting device 300 is a device that mounts electronic components on a board. Specifically, the mounting device 300 includes a cassette to which a component feeder that stores a plurality of electronic components can be attached, a transport device that transports the board into the mounting device 300, and a mounting unit that mounts the electronic components supplied from the component feeder on the board transported by the transport device.

[0014] The picking terminal 100 is a terminal device operated by a picking worker. The picking worker picks (collects) components (i.e., boards and component feeders) to be used by the mounting device 300 from a warehouse that manages the inventory of boards and component feeders. The process performed by the picking worker is hereinafter referred to as a "picking process." The picking process includes the operation of reading a code (e.g., a barcode) that identifies each component in the warehouse with the picking terminal 100. In a modified example, the picking process may be performed not only by a picking worker but also by a robot. In this case, a control device that controls the robot may function as a picking terminal.

[0015] The setup terminal 200 is a terminal device operated by an external setup worker. The external setup worker carries out external setup by transporting the components picked in the picking process to the periphery of the mounting device 300 and arranging them at predetermined positions around the mounting device 300. Note that the process performed by the external setup worker is hereinafter referred to as an "external setup process." Note that, in a modified example, the external setup process may be performed not only by an external setup worker but also by a robot. In this case, a control device that controls the robot may function as the setup terminal.

[0016] The management terminal 10 is a terminal device for creating plan data showing a plan of a mounting-related process for the mounting device 300 to mount electronic components on a board, and further managing the progress of the mounting-related process. The mounting-related process includes an internal setup process and a production process in addition to the above-mentioned picking process and external setup process. The internal setup process is a process in which an internal setup worker attaches components arranged at a predetermined position in the external setup process to a conveying device and a cassette of the mounting device 300. The components in the cassette attached to the mounting device 300 by the internal setup process are mounted on a board by the mounting device 300 in the production process. In a modified example, the internal setup process may be performed by a robot, not limited to an internal setup worker. In this case, the management terminal 10 may function as a control device that controls the robot.

[0017] The management terminal 10 comprises a communication interface 12, a display 14, an operation unit 16, and a control unit 30. In the following, "interface" will be abbreviated to "I / F".

[0018] The communication I / F 12 is an I / F for performing communication via the LAN 4, and is connected to the LAN 4. The display 14 displays various information. The operation unit 16 includes a plurality of keys (e.g., a keyboard) for receiving instructions from the user. The display 14 may function as a touch screen (i.e., the operation unit 16) for receiving instructions from the user.

[0019] The control unit 30 includes a CPU 32 and a memory 34. The CPU 32 executes various processes in accordance with a program 40 stored in the memory 34. The memory 34 is composed of a volatile memory, a non-volatile memory, and the like. The program 40 is an application program for executing creation of mounting-related processes and management of the progress thereof. The program 40 is provided, for example, by a vendor of the mounting device 300, and installed in the management terminal 10 by a user of the management terminal 10.

[0020] (Process for managing mounting-related processes; Fig. 2, Fig. 3) The processing in FIG. 2 is realized by the component mounting system 2. In the following, for ease of understanding, the processing executed by each CPU of each device (e.g., CPU 32 of the management terminal 10) will be described as being mainly about each device (e.g., the management terminal 10) rather than each CPU. Also, in the following, communication is performed between the management terminal 10 and other devices (e.g., the picking terminal 100) via the LAN 4 and the communication I / F 12. However, in the following, unless otherwise specified, the descriptions "via LAN 4" and "via communication I / F 12" will be omitted.

[0021] The user operates the operation unit 16 of the management terminal 10 to start the program 40. At T10, the user generates plan data using the operation unit 16 and a graphical user interface displayed according to the program 40. The plan data is data indicating a plan for a mounting-related process related to one type of production object (a board (i.e., a circuit board) on which components are mounted). The plan data includes a start time and an end time for each process (e.g., a picking process, etc.) in the mounting-related process. In a modified example, plan data indicating a plan for mounting-related processes related to multiple types of production objects may be generated.

[0022] In T12A to T12C, the management terminal 10 transmits the plan data generated in T10 (hereinafter, referred to as "target plan data") to each of the picking terminal 100, the setup terminal 200, and the mounting device 300. As a result, each of the devices 100, 200, and 300 displays a screen showing the plan of the mounting-related process indicated by the target plan data.

[0023] In this case, the user starts a mounting-related process based on the plan indicated by the target plan data. At T20, the user operates the operation unit 16 of the management terminal 10 to display a management screen (e.g., S1 in FIG. 3) for managing the mounting-related process on the display 14. Although details will be described later, after displaying the management screen, the management terminal 10 receives progress data from each of the devices 100, 200, 300, and displays a progress image indicated by the progress data within the management screen. The progress data is data indicating the progress of the mounting-related process.

[0024] 3 shows a management screen S1 immediately after a mounting-related process is started. The management screen S1 includes a plan image L1 showing a plan of the mounting-related process shown by the target plan data, a progress image R1 showing the progress of the mounting-related process, and an update button BT.

[0025] The plan image L1 includes four partial plan images. The four partial plan images include a partial plan image for a picking process, a partial plan image for an external setup process, a partial plan image for an internal setup process, and a partial plan image for a production process. The four partial plan images are arranged along the time axis in the order of the picking process, the external setup process, the internal setup process, and the production process. For example, the partial plan image showing the picking process is a rectangle, and the left edge of the rectangle indicates the start time of the picking process, and the right edge of the rectangle indicates the end time of the picking process.

[0026] Furthermore, when the management screen S1 is displayed, the first picking process has not yet started, and therefore the progress image R1 in the management screen S1 is a blank image.

[0027] The update button BT is a button for updating the images in the management screen (i.e., the plan image and the progress image). When the update button BT is selected, the management terminal 10 updates the images in the management screen based on the progress data received from each of the devices 100, 200, 300. In a modified example, the management screen S1 does not need to include the update button BT. In this case, the management terminal 10 may automatically update the images in the management screen periodically based on the progress data that has already been received.

[0028] Returning to Fig. 2, the description will be continued. In this case, the user of the management terminal 10 issues an instruction to the picking worker to start the mounting-related process. At T22, the picking worker operates the picking terminal 100 to input information indicating the start of the picking process to the picking terminal 100.

[0029] In T24, the picking terminal 100 periodically transmits picking progress data indicating the progress of the picking process to the management terminal 10. The picking progress data includes the elapsed time from the start of T22. In a modified example, the picking terminal 100 may transmit the picking progress data to the management terminal 10 each time a picking worker picks up an individual part.

[0030] When the picking process is completed, at T26, the picking operator operates the picking terminal to input information indicating the completion of the picking process to the picking terminal 100. As a result, the picking terminal 100 transmits completion data indicating the completion of the picking process to the management terminal 10. Then, after receiving the completion data from the picking terminal 100, the management terminal 10 notifies the off-site setup operator of the start of the off-site setup process when the scheduled start time of the off-site setup process arrives. For example, the management terminal 10 transmits a notification indicating the start of the off-site setup process to the setup terminal 200.

[0031] At T32, the off-site setup operator operates the setup terminal 200 to input to the setup terminal 200 information indicating the start of an off-site setup process.

[0032] In T34, the setup terminal 200 periodically transmits external setup progress data indicating the progress of the external setup process to the management terminal 10. The external setup progress data includes the elapsed time from the start of T32. In a modified example, the setup terminal 200 may transmit the external setup progress data to the management terminal 10 every time an external setup worker finishes an individual process in the external setup process.

[0033] In this case, the user of the management terminal 10 selects the update button BT in the management screen S1 during the execution of an off-site setup process, which causes the management terminal 10 to display the management screen S2 shown in FIG.

[0034] The management screen S2 is similar to the management screen S1, except that it includes a progress image R2 updated from the progress image R1 in the management screen S1. The progress image R2 includes a partial progress image showing the progress of the picking process and a partial progress image showing the progress of the off-site setup process. The partial progress image is rectangular, like the partial plan image, and the left edge of the rectangle indicates the start time of the process shown by the partial progress image, and the right edge of the rectangle indicates the progress of the process (i.e., the elapsed time from the start time).

[0035] In this case, there is no delay in the progress of the picking process with respect to the plan of the picking process indicated by the target plan data. Therefore, in the management screen S2, the start time of the partial plan image of the picking process and the start time of the partial progress image of the picking process are aligned on the time axis. Furthermore, in the management screen S2, the end time of the partial plan image of the picking process and the end time of the partial progress image of the picking process are aligned on the time axis. Also, in this case, the external setup process is started as planned. Therefore, in the management screen S2, the start time of the partial plan image of the external setup process and the start time of the partial progress image of the external setup process are aligned on the time axis. Note that, at the moment, the external setup process is in the middle of being carried out, so the right edge of the partial progress image of the external setup process in the management screen S2 indicates a time earlier than the right edge of the partial plan image of the external setup process.

[0036] Returning to FIG. 2, the explanation will be continued. In this case, the progress of the external setup process is delayed with respect to the plan indicated by the target plan data. When the external setup process is completed by the external setup worker, at T36, the setup terminal 200 is operated to input information indicating the completion of the external setup process to the setup terminal 200. As a result, the setup terminal 200 transmits completion data indicating the completion of the external setup process to the management terminal 10. Then, after receiving the completion data from the setup terminal 200, the management terminal 10 notifies the internal setup worker of the start of the internal setup process when the scheduled start time of the internal setup process arrives. For example, the management terminal 10 transmits a notification indicating the start of the internal setup process to the setup terminal 200.

[0037] At T42, the internal setup operator operates the mounting device 300 to input to the mounting device 300 information indicating the start of the internal setup process.

[0038] In T44, the mounting device 300 periodically transmits internal setup progress data indicating the progress of the internal setup process to the management terminal 10. The internal setup progress data includes the elapsed time from the start of T42. In a modified example, the mounting device 300 may transmit the internal setup progress data to the management terminal 10 every time the internal setup worker finishes each process in the internal setup process.

[0039] When the internal setup process is completed, the internal setup worker operates the mounting device 300 in T46 to input information indicating the completion of the internal setup process to the mounting device 300.

[0040] In this case, the internal setup worker operates the mounting device 300 at T52 to input information to the mounting device 300 indicating the start of the production process.

[0041] In T54, the mounting device 300 periodically transmits production progress data indicating the progress of the production process to the management terminal 10. The production progress data includes the elapsed time from the start of T52.

[0042] In this case, the user of the management terminal 10 selects the update button BT in the management screen S2 during the execution of the internal setup process, which causes the management terminal 10 to display the management screen S3 shown in FIG.

[0043] The management screen S3 is similar to the management screen S2, except that it includes a progress image R3 updated from the progress image R2 in the management screen S2, and a plan image L3 updated from the plan image L1 in the management screen S2. The progress image R3 is similar to the progress image R3 in the management screen S2, except that the right edge of the partial progress image for the external setup process extends to a position indicating the end time of the setup process, and that a partial progress image for an internal setup process has been added.

[0044] Also, the plan image L3 is similar to the plan image L1, except that a delay image is added and both the partial plan image of the internal setup process and the partial plan image of the production process are arranged at positions delayed by the time indicated by the delay image. Here, the delay image indicates the time by which the progress of the external setup process is delayed with respect to the plan of the external setup process. As shown in FIG. 3, the delay image is arranged between the partial plan image of the external setup process and the partial plan image of the internal setup process. The delay image is a rectangle, and the width of the rectangle along the time axis indicates the time by which the progress is delayed with respect to the plan. In this case, the left edge of the delay image is the right edge of the partial plan image of the external setup process, and the right edge of the delay image indicates the end time of the delayed external setup process.

[0045] 3, in the management screen S3, the end time of the delay image and the end time of the partial progress image of the external setup process are aligned on the time axis. Also, the start time of the internal setup process and the start time of the partial progress image of the internal setup process are aligned on the time axis.

[0046] (Effects of this embodiment) According to the configuration of this embodiment, when a mounting-related process is being carried out based on a plan indicated by the target plan data, a delay image showing a delay in the progress of the mounting-related process relative to the plan of the mounting-related process is displayed on the display 14 adjacent to a partial plan image of the external setup process in which the delay occurs (management screen S3 in FIG. 3). The delay image adjacent to the external setup process can inform the user that a delay occurs in the external setup process. Note that the process in which a delay occurs is not limited to the external setup process, but may be another process (e.g., a picking process, etc.).

[0047] Also, for example, a comparative example is assumed in which, in a situation where the progress of an external setup process is delayed, the partial plan image of the internal setup process is arranged at a position as originally planned. In this comparative example, the start time of the partial progress image of the internal setup process appears to be delayed by the delay in the progress of the external setup process with respect to the start time of the partial plan image of the internal setup process (see the dashed line in the management screen S3 of FIG. 3). For example, a specific case is assumed in which the start time of the internal setup process is delayed due to the delay in the end time of the external setup process, but the internal setup process is progressing as planned. In this case, the user may mistakenly recognize that the progress of the internal setup process is delayed relative to the plan, seeing the partial progress image of the internal setup process that appears delayed. In contrast, according to the configuration of this embodiment, the partial plan image of the internal setup process is arranged at a position delayed by the delay in the progress of the external setup process. Therefore, the start time of the partial progress image of the internal setup process appears to be aligned with the start time of the partial plan image of the internal setup process. For example, in the above specific case, since the start time of the partial progress image of the internal setup process and the start time of the partial plan image of the internal setup process are aligned, the user can be prevented from mistakenly perceiving that the progress of the internal setup process is behind schedule.

[0048] (Correspondence) The management terminal 10, the display 14, and the mounting device 300 are examples of a "process management device," a "display," and a "mounting device," respectively. The picking process, the external setup process, the internal setup process, and the production process are examples of a "plurality of partial processes." The plan image L3, the progress image R3, and the delay image in the management screen S3 are examples of a "plan image," a "progress image," and a "delay image," respectively. The external setup process and the internal setup process are examples of a "first partial process" and a "second partial process," respectively. The partial plan image of the external setup process in the management screen S3 and the partial plan image of the internal setup process in the management screen S3 are examples of a "first partial plan image" and a "second partial plan image," respectively.

[0049] The control unit 30 that causes the plan image L3 in the management screen S3 to be displayed on the display 14, the control unit 30 that causes the progress image R3 in the management screen S3 to be displayed on the display 14, and the control unit 30 that causes the delayed image in the management screen S3 to be displayed on the display 14 are examples of a "first display control unit," a "second display control unit," and a "third display control unit," respectively.

[0050] (Second Example) In this embodiment, mounting-related processes related to a plurality of types of production objects are carried out. Specifically, the mounting-related processes include a first partial process for producing a first production object, a second partial process for producing a second production object, and a third partial process for producing a third production object. Each of the first to third partial processes includes a picking process, an external setup process, an internal setup process, and a production process. Note that, in a modified example, each of the first to third partial processes includes at least a production process, and may not include any of the picking process, the external setup process, and the internal setup process.

[0051] The management screen S5 in Fig. 4 shows the management screen immediately after the mounting-related process is started in this embodiment. The management screen S5 includes a plan image L5 showing a plan of the mounting-related process including the first to third partial processes, a progress image R5 showing the progress of the mounting-related process, and an update button BT. At this point in time, since the first partial process has not yet started, the progress image R5 in the management screen S5 is a blank image.

[0052] Then, the user selects the update button BT in the management screen S5 during the execution of the second partial process of the second production target, which causes the management terminal 10 to display the management screen S6 shown in FIG.

[0053] The management screen S6 is similar to the management screen S5, except that it includes a progress image R6 updated from the progress image R5 in the management screen S5, and a plan image L6 updated from the plan image L5 in the management screen S6. The progress image R6 is similar to the progress image R5, except that it includes a partial progress image of a first partial process and a partial progress image of a second partial process.

[0054] The plan image L6 is similar to the plan image L5, except that a delay image is added and both the partial plan image of the second partial process and the third partial plan image are positioned at positions delayed by the time indicated by the delay image. Here, the delay image indicates the time by which the progress of the first partial process is delayed relative to the plan of the first partial process.

[0055] 4, the delay image is placed between the partial plan image of the first partial process and the partial plan image of the second partial process. In the management screen S6, the end time of the delay image and the end time of the partial progress image of the first partial process are aligned on the time axis. Also, the start time of the second partial process and the start time of the partial progress image of the second partial process are aligned on the time axis.

[0056] In this embodiment, the delay image adjacent to the first partial process can inform the user that a delay is occurring in the first partial process. Furthermore, since the start time of the partial progress image of the second partial process and the start time of the partial plan image of the second partial process are aligned, it is possible to prevent the user from mistakenly thinking that the progress of the second partial process is behind schedule.

[0057] (Correspondence) The first to third partial processes are examples of "plurality of partial processes." The plan image L6, the progress image R6, and the delay image in the management screen S6 are examples of a "plan image," a "progress image," and a "delay image," respectively. The first partial process of the first production object and the second partial process of the second production object are examples of a "first partial process" and a "second partial process," respectively. The partial plan image of the first partial process in the management screen S6 and the partial plan image of the second partial process in the management screen S6 are examples of a "first partial plan image" and a "second partial plan image," respectively.

[0058] Points to note regarding the board manufacturing system described in the embodiments will be described. In the above first embodiment, the delay image is placed adjacent to the partial plan image of the external setup process. Alternatively, the delay image may be placed adjacent to the partial progress image of the external setup process. Generally speaking, it is sufficient that the "delay image" is displayed on the display in association with the partial process in which a delay is occurring (i.e., at least one of the partial plan image and the partial progress image).

[0059] In addition, the delay image does not have to be placed between the partial plan image of the external setup process and the partial plan image of the internal setup process. For example, the delay image may be placed above the partial plan image of the external setup process, or may be placed overlapping the partial plan image of the external setup process. In addition, in this modification, the partial plan image of the internal setup process may be placed at the position as originally planned. [Explanation of symbols]

[0060] 2: Component mounting system 4: Local area network 10: Management terminal 12: Communication I / F 14: Display 16:Operation section 30: Control section 32 :CPU 34: Memory 40: Program 100: Picking terminal 200: Setup terminal 300: Mounting equipment S1~S6: Management screen L1~L6: Planning images R1~R6: Progress images BT: Update button

Claims

1. A display and a first display control unit that displays, on the display, a plan image showing a plan of a mounting-related process for mounting components on a board by a mounting device, the mounting-related process including a plurality of sub-processes, for each of the sub-processes; a second display control unit that causes the display to display, when the mounting-related process is being performed based on a plan of the mounting-related process, a progress image indicating a progress of the mounting-related process together with the plan image for each partial process; a third display control unit that, when the mounting-related process is being performed based on a plan of the mounting-related process and the progress of the mounting-related process is delayed relative to the plan of the mounting-related process, causes a delay image indicating the delay in the progress of the mounting-related process relative to the plan of the mounting-related process to be displayed on the display together with the plan image in association with the partial process of the mounting-related process in which the delay is occurring; A process control device comprising:

2. 2. The process management device according to claim 1, wherein the third display control unit causes the delay image to be displayed on the display in association with a first partial plan image showing a plan for the first partial process in which the delay is occurring.

3. the first display control unit causes the display to display the first partial plan image and a second partial plan image showing a plan of a second partial process that is a process subsequent to the first partial process, side by side along a time axis; the third display control unit causes the delayed image to be arranged between the first partial plan image and the second partial plan image and displayed on the display; 3. The process management device according to claim 2, wherein the first display control unit causes the second partial plan image to be displayed on the display at a position delayed by a time indicated by the delayed image.

Citation Information

Patent Citations

  • Brake device for vehicle

    JP1987043346A

  • Ac arc welding starting method

    JP1989075173A

  • Production system for printed board unit

    JP1999232339A

  • Operation plan adjusting method and operation plan adjusting system

    JP2001034672A

  • Information processing device, control method thereof, and production control system

    JP2017091223A

Cited By

  • Production management device and production management method

    JP2024027332A

  • Information processing device and information processing program

    JP2024149817A