Battery control device, power storage system, and battery control method
The storage battery control device accurately estimates SOH and SOC by using buffer strings to manage current and voltage measurements during normal operation, addressing inaccuracies in existing methods and maintaining system functionality.
Patent Information
- Application Number
- JP2022080671
- Authority / Receiving Office
- JP · JP
- Patent Type
- Patents
- Current Assignee / Owner
- Filing Date
- 2022-05-17
- Publication Date
- 2024-10-07
- Estimated Expiration
- 2042-05-17
AI Technical Summary
Existing SOH estimation methods for storage batteries in power storage systems are inaccurate due to changing current during input/output requests, and they either restrict input/output during estimation or cannot accurately estimate SOH based on these requests.
A storage battery control device that includes multiple storage batteries connected in series, with power converters and a control device that selects target batteries for estimation by using buffer strings to manage current and voltage measurements during normal system operation, allowing accurate SOH and SOC estimation without disrupting the system's input/output.
Enables precise estimation of SOH and SOC regardless of input/output demands, maintaining system functionality by using buffer strings to manage current and voltage measurements during estimation.
Smart Images

Figure 0007562598000001 
Figure 0007562598000002 
Figure 0007562598000003
Abstract
Description
[Technical field]
[0001] The present invention relates to a storage battery control device, a power storage system, and a storage battery control method. [Background technology]
[0002] There is known an SOH estimation device that estimates the SOH (State of Health) that indicates the health of a battery (see, for example, Patent Document 1). In the SOH estimation device described in Patent Document 1, when charging of a battery is completed, the voltage of the battery is acquired from a voltage detection unit and measurement of the polarization recovery time is started, and when the difference between the acquired voltage and the voltage to be acquired again becomes equal to or greater than a predetermined voltage, measurement of the polarization recovery time is terminated. Then, the SOH estimation device estimates the SOH of the battery based on the measured polarization recovery time. [Prior art documents] [Patent documents]
[0003] [Patent Document 1] JP 2013-148452 A Summary of the Invention [Problem to be solved by the invention]
[0004] In a power storage system equipped with the SOH estimation device described in Patent Document 1, the current of each storage battery changes while inputting and outputting power in response to a request from a power supply destination, so SOH estimation cannot be performed with high accuracy. Therefore, depending on the input / output request to the power storage system, SOH estimation cannot be performed. Alternatively, input / output to the power storage system is limited during the period when SOH estimation is performed.
[0005] In view of the above circumstances, the present invention aims to provide a battery control device, a battery storage system, and a battery control method that can accurately estimate the state of a battery's SOH, SOC (State of Charge), etc. regardless of the state of input / output requirements for the battery storage system. [Means for solving the problem]
[0006] The battery control device of the present invention includes a plurality of batteries connected in series and interconnected by power lines. 3 or more pairs and a plurality of power converters each provided between the storage battery string and the power line for converting an input / output voltage of the storage battery string, the storage battery control device controlling the storage battery system includes: determining one or more target storage batteries which are the storage batteries for which state estimation is performed; determining a buffer string which is the storage battery string that receives the discharged power of the target storage battery from among the plurality of storage battery strings excluding a target string which is the storage battery string including the target storage battery; While continuing normal operation of the storage system Charging the target battery; While continuing normal operation of the storage system Discharging the buffer string to ensure that the buffer string has a capacity capable of accepting the discharged power of the target battery; While continuing normal operation of the battery system using the battery strings other than the target string and the buffer string, The target battery is discharged to the buffer string or outside the storage system, and at least one of the discharge current and voltage of the target battery is measured, and a state estimation of the target battery is performed based on the measured at least one of the discharge current and voltage of the target battery.
[0007] The battery control device of the present invention includes a plurality of batteries connected in series and interconnected by power lines. 3 or more pairs and a plurality of power converters each provided between the storage battery string and the power line for converting an input / output voltage of the storage battery string, the storage battery control device controlling the storage battery system includes: determining one or more target storage batteries which are the storage batteries for which state estimation is performed; determining a buffer string which is the storage battery string providing charging power for the target storage battery from among the plurality of storage battery strings excluding a target string which is the storage battery string including the target storage battery; While continuing normal operation of the storage system Discharging the target battery; While continuing normal operation of the storage system Charging the buffer string to ensure that the buffer string has a capacity capable of providing charging power to the target battery; While continuing normal operation of the battery system using the battery strings other than the target string and the buffer string,The target battery is discharged from the buffer string or from outside the storage system, and at least one of the charging current and voltage of the target battery is measured, and a state estimation of the target battery is performed based on the measured at least one of the charging current and voltage of the target battery.
[0008] The power storage system of the present invention includes a plurality of storage batteries connected in series and interconnected by power lines. 3 or more pairs a storage battery string, a plurality of power converters each provided between the storage battery string and the power line for converting an input / output voltage of the storage battery string, and a storage battery control device for controlling the plurality of storage battery strings and the plurality of power converters, wherein the storage battery control device determines one or more target storage batteries which are the storage batteries for which state estimation is to be performed, and determines a buffer string which is the storage battery string that receives discharge power of the target storage battery from among the plurality of storage battery strings excluding a target string which is the storage battery string including the target storage battery, While continuing normal operation of the storage system Charging the target battery; While continuing normal operation of the storage system Discharging the buffer string to ensure that the buffer string has a capacity capable of accepting the discharged power of the target battery; While continuing normal operation of the battery system using the battery strings other than the target string and the buffer string, from the target battery to the buffer string or The above At least one of the discharge current and the voltage of the target battery is measured by discharging the battery outside the power storage system, and a state of the target battery is estimated based on at least one of the measured discharge current and the voltage of the target battery.
[0009] The power storage system of the present invention includes a plurality of storage batteries connected in series and interconnected by power lines. 3 or more pairsa storage battery string, a plurality of power converters each provided between the storage battery string and the power line for converting an input / output voltage of the storage battery string, and a storage battery control device for controlling the plurality of storage battery strings and the plurality of power converters, wherein the storage battery control device determines one or more target storage batteries which are the storage batteries for which state estimation is performed, and determines a buffer string which is the storage battery string providing charging power for the target storage battery from among the plurality of storage battery strings excluding a target string which is the storage battery string including the target storage battery, While continuing normal operation of the storage system Discharging the target battery; While continuing normal operation of the storage system Charging the buffer string to ensure that the buffer string has a capacity capable of providing charging power to the target battery; While continuing normal operation of the battery system using the battery strings other than the target string and the buffer string, said buffer string or The above The target battery is discharged from outside the power storage system, and at least one of the charging current and voltage of the target battery is measured, and a state of the target battery is estimated based on the measured at least one of the charging current and voltage of the target battery.
[0010] The battery control method of the present invention is directed to a storage battery control system including a plurality of storage batteries connected in series and connected to each other by a power line. 3 or more pairs and a plurality of power converters each provided between the storage battery string and the power line for converting an input / output voltage of the storage battery string, the method comprising the steps of: determining one or more target storage batteries which are the storage batteries for which state estimation is performed; determining a buffer string which is the storage battery string that receives the discharged power of the target storage battery from among the plurality of storage battery strings excluding a target string which is the storage battery string including the target storage battery; While continuing normal operation of the storage system Charging the target battery; While continuing normal operation of the storage system Discharging the buffer string to ensure that the buffer string has a capacity capable of accepting the discharged power of the target battery; While continuing normal operation of the battery system using the battery strings other than the target string and the buffer string,The target battery is discharged to the buffer string or outside the storage system, and at least one of the discharge current and voltage of the target battery is measured, and a state estimation of the target battery is performed based on the measured at least one of the discharge current and voltage of the target battery.
[0011] The battery control method of the present invention is directed to a storage battery control system including a plurality of storage batteries connected in series and connected to each other by a power line. 3 or more pairs and a plurality of power converters each provided between the storage battery string and the power line for converting an input / output voltage of the storage battery string, the method comprising the steps of: determining one or more target storage batteries which are the storage batteries for which state estimation is performed; determining a buffer string which is the storage battery string providing charging power for the target storage battery from among the plurality of storage battery strings excluding a target string which is the storage battery string including the target storage battery; While continuing normal operation of the storage system Discharging the target battery; While continuing normal operation of the storage system Charging the buffer string to ensure that the buffer string has a capacity capable of providing charging power to the target battery; While continuing normal operation of the battery system using the battery strings other than the target string and the buffer string, The target battery is discharged from the buffer string or from outside the storage system, and at least one of the charging current and voltage of the target battery is measured, and a state estimation of the target battery is performed based on the measured at least one of the charging current and voltage of the target battery. Effect of the Invention
[0012] According to the present invention, it is possible to accurately estimate the state of a storage battery, such as SOH or SOC, regardless of the state of input / output requests to a power storage system. [Brief description of the drawings]
[0013] [Figure 1] FIG. 1 is a circuit diagram showing an outline of a power storage system including a battery control device according to one embodiment of the present invention. [Diagram 2]FIG. 2 is a flowchart showing a process of estimating the state of the target battery module by the battery control device of FIG. [Diagram 3] FIG. 3 is a flowchart illustrating another embodiment of the process of estimating the state of the target battery module by the battery control device of FIG. [Figure 4] FIG. 4 is a circuit diagram showing an outline of a power storage system including a battery control device according to another embodiment of the present invention. [Diagram 5] FIG. 5 is a flowchart showing a process of estimating the state of a target string by the battery control device of FIG. [Figure 6] FIG. 6 is a flowchart showing another embodiment of the process of estimating the state of the target string by the battery control device of FIG. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0014] The present invention will be described below along with preferred embodiments. Note that the present invention is not limited to the embodiments shown below, and the embodiments can be appropriately modified within the scope of the present invention. In addition, in the embodiments shown below, some configurations are omitted from illustration and description, but for the details of the omitted technologies, publicly known or well-known technologies are appropriately applied within the scope of not causing any contradiction with the contents described below.
[0015] Fig. 1 is a circuit diagram showing an outline of a power storage system 1 including a battery control device 100 according to one embodiment of the present invention. As shown in this figure, the power storage system 1 includes m (m is an integer equal to or greater than 3) storage battery strings STR1-STRm, a string bus 3, m power converters PC1-PCm, and the battery control device 100. The m storage battery strings STR1-STRm are connected to each other and to an external system (not shown) via the m power converters PC1-PCm and the string bus 3. The power storage system 1 is a stationary or vehicle-mounted power source.
[0016] Each of the storage battery strings STR1 to STRm includes n (n is an integer of 2 or more) storage battery modules M1 to Mn connected in series. Although not particularly limited, the storage battery strings STR1 to STRm in this embodiment are regenerated second-hand storage batteries, and the storage battery modules M1 to Mn have different degrees of deterioration. The storage battery modules M1 to Mn are, for example, secondary batteries such as lithium ion batteries and lithium ion capacitors.
[0017] The storage battery modules M1-Mn are charged by receiving power from an external system via the string bus 3 and the power converters PC1-PCm, and discharge the charged power via the power converters PC1-PCm and the string bus 3 to supply power to the external system. As will be described later, the storage battery modules M1-Mn are charged by receiving power from other storage battery strings STR1-STRm via the string bus 3 and the power converters PC1-PCm, and discharge the charged power to charge the storage battery modules M1-Mn of the other storage battery strings STR1-STRm via the power converters PC1-PCm and the string bus 3.
[0018] The external system includes a load, a generator, etc. When the power storage system 1 is for stationary use, household appliances, commercial power systems, liquid crystal displays, communication modules, etc. are the loads, and a solar power generation system, etc. are the generators. On the other hand, when the power storage system 1 is for vehicle use, the drive motor, air conditioner, various vehicle electrical equipment, etc. are the loads. The drive motor is both a load and a generator.
[0019] The battery strings STR1 to STRm may include n battery cells or battery packs connected in series, instead of the n battery modules M1 to Mn connected in series. The power storage system 1 may include a bypass circuit that bypasses each battery cell or each battery pack.
[0020] The power converters PC1 to PCm are DC / DC converters or DC / AC converters, and are connected to the string bus 3. In addition, the power converters PC1 to PCm are connected to the positive electrode of the starting storage battery module M1 and the negative electrode of the terminal storage battery module Mn.
[0021] When the storage battery strings STR1-STRm are being charged, the power converters PC1-PCm convert the voltage input from the string bus 3 and output it to the multiple storage battery modules M1-Mn. On the other hand, when the storage battery strings STR1-STRm are being discharged, the power converters PC1-PCm convert the voltage input from the multiple storage battery modules M1-Mn and output it to the string bus 3. When the current flowing through the string bus 3 is a direct current, the power converters PC1-PCm are DC / DC converters, and when the current flowing through the string bus 3 is an alternating current, the power converters PC1-PCm are DC / AC converters. When the current flowing through the string bus 3 is an alternating current, the power converters PC1-PCm are provided with synchronization means for following changes in instantaneous values.
[0022] Each of the battery strings STR1 to STRm includes n voltage sensors 12, a current sensor 13, and n bypass circuits B1 to Bn. The voltage sensor 12 is connected between the positive and negative terminals of each of the battery modules M1 to Mn. The voltage sensor 12 measures the inter-terminal voltage of each of the battery modules M1 to Mn.
[0023] The current sensor 13 is provided in the current path of the storage battery strings STR1 to STRm. The current sensor 13 measures the charge / discharge current of the storage battery strings STR1 to STRn.
[0024] The bypass circuits B1 to Bn are provided for each of the storage battery modules M1 to Mn. The bypass circuits B1 to Bn include a bypass line BL and switches S1 and S2. The bypass line BL is a power line that bypasses each of the storage battery modules M1 to Mn. The switch S1 is provided on the bypass line BL. This switch S1 is, for example, a mechanical switch. The switch S2 is provided between the positive electrode of each of the storage battery modules M1 to Mn and one end of the bypass line BL. This switch S2 is, for example, a semiconductor switch or a relay.
[0025] The starting battery module M1 and the ending battery module Mn are connected to an external system via power converters PC1-PCm and a string bus 3. When the switch S1 is open and the switch S2 is closed in all of the bypass circuits B1-Bn, all of the battery modules M1-Mn are connected in series to the external system. On the other hand, when the switch S2 is open and the switch S1 is closed in any of the bypass circuits B1-Bn, the battery module M1-Mn corresponding to that bypass circuit B1-Bn is bypassed.
[0026] The battery control device 100 is connected to the battery strings STR1-STRm, the bypass circuits B1-Bn, and the power converters PC1-PCm, and performs monitoring and control of each of the battery modules M1-Mn, switching control of each of the bypass circuits B1-Bn, and charge / discharge control by the power converters PC1-PCm. In particular, the battery control device 100 of this embodiment estimates battery states (hereinafter referred to as state estimation) such as SOH and SOC of the battery modules M1-Mn based on the voltage detected by a voltage sensor 12 and the current detected by a current sensor 13.
[0027] Examples of methods for estimating SOH include methods using charge / discharge tests, current integration methods, open circuit voltage measurements, terminal voltage measurements, model-based methods (all of which use changes in SOC over time), AC impedance measurements, model-based methods using an adaptive digital filter, linear regression from IV characteristics (current-voltage characteristics) (the slope of the straight line in the IV characteristics), and step response methods (all of which are methods of estimation using the increase in internal resistance over time).
[0028] Examples of methods for estimating the SOC include various known methods such as a current integration method, a method (voltage method) that calculates the SOC from the OCV (Open Circuit Voltage), a method that combines the current integration method and the voltage method, etc. Also, the OCV can be estimated using various known methods that estimate the SOC using the change in terminal voltage over time or the increase in internal resistance over time.
[0029] The power storage system 1 of the present embodiment includes a storage battery module M_ target The integrated value of the discharge current and the voltage are recorded, and a SOC-OCV curve is generated from the recorded values, and the SOH is estimated from the generated SOC-OCV curve.
[0030] Here, in the power storage system 1 of the present embodiment, while continuing the output from the power storage system 1 to the external system and the input from the external system to the power storage system 1, target The state of the target storage battery module M_ target The state estimation process will be described below.
[0031] FIG. 2 is a diagram showing a target battery module M_ target 2 is a flowchart showing a process of estimating the state of a target storage battery module M_ among the m sets of storage battery strings STR1 to STRm in step S1. target Determine a target battery module M_target Examples of methods for determining the battery module M1 to Mn to be selected include a method of determining the battery module M1 to Mn whose integrated value of charging / discharging current has reached a certain value, and a method of determining the battery module M1 to Mn whose state estimation error has exceeded a threshold value.
[0032] Next, in step S2, the storage battery control device 100 determines the target storage battery module M_ target Here, the battery control device 100 estimates the current battery capacity of the target battery module M_ target Each time the state estimation is performed, the estimation result is recorded. target Based on the state estimation result of the target battery module M_ target Estimate the current battery capacity of the
[0033] Next, in step S3, the storage battery control device 100 selects the target storage battery module M_ target The battery string (hereinafter referred to as the buffer string) STR_ buffer The buffer string STR_ is determined from among m sets of storage battery strings STR1 to STRm. buffer is the target battery module M_ target A battery string including the target string STR_ target The battery string STR1 to STRm is determined from among the battery strings STR1 to STRm excluding the buffer string STR_ buffer is the target battery module M_ target The battery strings STR1 to STRm are determined on the condition that a battery capacity equal to or larger than the battery capacity of the buffer string STR_ buffer may be determined.
[0034] Next, in step S4, the battery control device 100 controls the bypass circuits B1 to Bn and the power converters PC1 to PCm to normally operate the power storage system 1 (output to and input from the external system), while controlling the target battery module M_ target The battery control device 100 also controls the power converters PC1 to PCm to charge the buffer string STR_ while operating the battery storage system 1 normally. buffer Discharge the buffer string STR_ buffer This free space is allocated to the target battery module M_ target The battery capacity is equal to or larger than the battery capacity of the target battery module M_ target The battery capacity is set based on the current battery capacity estimate.
[0035] Next, in step S5, the battery control device 100 determines the target string STR_ target and the buffer string STR_ buffer and are excluded from the storage battery strings STR1 to STRm used in the normal operation of the power storage system 1. That is, the storage battery control device 100 controls the power converters PC1 to PCm to exclude the target strings STR_ target and the buffer string STR_ buffer Normal operation is continued using the storage battery strings STR1 to STRm excluding STR1 and STRm.
[0036] Next, in step S6, the battery control device 100 determines the target string STR_ target Target battery module M_ target Next, in step S7, the storage battery control device 100 bypasses the target storage battery module M1 to Mn except for the target storage battery module M1 to Mn by the bypass circuits B1 to Bn. target The battery control device 100 starts a constant C rate discharge at a low current by the target battery module M_ target During discharging, the target battery module M_ target The integrated discharge current and voltage are recorded.
[0037] Here, when there is an output request from the external system to the power storage system 1, the storage battery control device 100 target On the other hand, when there is no output request from the external system to the power storage system 1, the storage battery control device 100 controls the power converters PC1 to PCm so that the target storage battery module M_ target From the buffer string STR_ buffer The power converters PC1 to PCm are controlled so that the power is discharged to the positive terminal.
[0038] Next, in step S8, the storage battery control device 100 selects the target storage battery module M_ target Until a positive determination is made in step S8, the target storage battery module M_ target The discharge of the target battery module M_ target The integrated value of the discharge current and the voltage are continuously recorded. If a positive determination is made in step S8, the process proceeds to step S9.
[0039] In step S9, the battery control device 100 selects the recorded target battery module M_ target Based on the integrated value of the discharge current and the voltage of the target storage battery module M_ target The state of the target battery module M_1 in step S9 is estimated. Examples of the state estimation include estimating the SOH and generating a SOC-OCV curve. Next, in step S10, the battery control device 100 performs a state estimation of the target battery module M_1 in step S9. target The result of the state estimation is then recorded. This completes the process shown in the flowchart of FIG.
[0040] The battery control device 100 repeats the processes of steps S1 to S10 to perform state estimation for all of the battery modules M1 to Mn included in the power storage system 1. The frequency of performing state estimation for the battery modules M1 to Mn may be set according to the progress of deterioration of the battery modules M1 to Mn. For example, if the deterioration of the battery modules M1 to Mn progresses slowly, state estimation for the battery modules M1 to Mn may be performed approximately once every several months to once every six months.
[0041] In addition, the storage battery control device 100 is a target storage battery module M target After the power storage system 1 returns to normal operation from the state estimation process, various calculations are performed based on the updated state estimation results. For example, the battery control device 100 estimates the SOH based on the SOC-OCV curve updated in the process, calculates the capacity of the battery modules M1 to Mn based on the SOH updated in the process, and so on.
[0042] As described above, the storage battery control device 100 of the present embodiment is configured to estimate the state of the target storage battery module M_ target In addition, the battery control device 100 determines the target battery module M_ target Target string containing STR_ target Among the multiple storage battery strings STR1 to STRm excluding buffer Determine the buffer string STR_ buffer is the target battery module M_ target The battery control device 100 receives the discharge power of the target battery module M_ target , and the buffer string STR_ buffer Discharge the target battery module M_ target The capacity of the buffer string STR_ buffer Then, the battery control device 100 secures the target battery module M_ target From the buffer string STR_ buffer Or discharge to an external system to target battery module M_target The battery control device 100 measures the discharge current and voltage of the measured target battery module M_ target Based on the discharge current and voltage of the target battery module M_ target Perform state estimation of
[0043] Here, during the state estimation process, the target string STR_ target The other battery strings STR1 to STRm are operated in response to input / output requests to the power storage system 1, and change the charge / discharge current. target Regardless of the input / output request to the energy storage system 1, the buffer string STR_ buffer Or, the target battery module M_ can be discharged at a constant C rate to the external grid during the state estimation process. target The change in the discharge current of the target string STR_ target Therefore, according to the storage battery control device 100 of the present embodiment, regardless of the state of the input / output request to the power storage system 1, the target storage battery module M_ target The state estimation can be performed with high accuracy.
[0044] In particular, the storage battery control device 100 of the present embodiment is target Determine the target string STR_ target Target battery module M_ target In a state where the storage battery modules M1 to Mn other than the storage battery modules M1 to Mn are bypassed by the bypass circuits B1 to Bn, target Then, the battery control device 100 charges the target string STR_ target Target battery module M_ target In a state where the storage battery modules M1 to Mn other than the storage battery modules M1 to Mn are bypassed by the bypass circuits B1 to Bn, the target storage battery module M target From the buffer string STR_ bufferOr discharge to an external system to target battery module M_ target Measure the discharge current and voltage.
[0045] Here, while the power storage system 1 is performing normal operation in response to input / output requests from an external system, in the storage battery strings STR1 to STRm used in normal operation, bypass occurs through the bypass circuits B1 to Bn of the storage battery modules M1 to Mn. Each time this occurs, the discharge current and voltage of the storage battery modules M1 to Mn change. In contrast, in the power storage system 1 of this embodiment, during the state estimation process, target Target string containing STR_ target is excluded from the storage battery strings STR1 to STRm used in normal operation. In addition, the target string STR_ target In the target battery module M_ target The storage battery modules M1 to Mn except for the target storage battery module M_ target Therefore, according to the storage battery control device 100 of the present embodiment, during the state estimation process, only the target storage battery module M_ target It is possible to continuously perform a constant C rate discharge of the target storage battery module M_ target The state estimation can be performed continuously and accurately.
[0046] FIG. 3 is a diagram showing the target battery module M_ target 13 is a flowchart showing another embodiment of the process of state estimation of . Note that the description of the above embodiment is cited for the same processes as those of the above embodiment.
[0047] As shown in the flowchart of FIG. 3, in step S1, the storage battery control device 100 selects one target storage battery module M_ among the m sets of storage battery strings STR1 to STRm. target Next, in step S2, the battery control device 100 determines the target battery module M_target Next, in step S3, the battery control device 100 estimates the current battery capacity of the buffer string STR_ buffer is determined from among m sets of storage battery strings STR1 to STRm.
[0048] Next, in step S14, the battery control device 100 controls the bypass circuits B1 to Bn and the power converters PC1 to PCm to perform normal operation of the power storage system 1 while controlling the target battery module M_ target The battery control device 100 also controls the power converters PC1 to PCm to discharge the buffer string STR_ while performing normal operation of the battery storage system 1. buffer Charge the buffer string STR_ buffer This discharge capacity is set to the target battery module M_ target The battery capacity is equal to or larger than the battery capacity of the target battery module M_ target The battery capacity is set based on the current battery capacity estimate.
[0049] Next, in step S5, the battery control device 100 determines the target string STR_ target and the buffer string STR_ buffer Then, in step S6, the battery control device 100 excludes the target string STR_ target Target battery module M_ target The storage battery modules M1 to Mn except for the above are bypassed by bypass circuits B1 to Bn.
[0050] Next, in step S17, the storage battery control device 100 selects the target storage battery module M_ target The battery control device 100 starts constant C-rate charging at a low current by the target battery module M_ target During charging, the target battery module M_ target The integrated charging current and voltage are recorded.
[0051] Here, when there is an input request from the external system to the power storage system 1, the storage battery control device 100 receives an input request from the external system to the target storage battery module M_ target Discharged to the target battery module M_ target On the other hand, when there is no input request from the external system to the power storage system 1, the battery control device 100 controls the buffer string STR_ buffer From target battery module M_ target Discharged to the target battery module M_ target The power converters PC1 to PCm are controlled so that the power converters PC1 to PCm are charged.
[0052] Next, in step S18, the storage battery control device 100 selects the target storage battery module M_ target Until a positive determination is made in step S18, the charging of the target storage battery module M_ target Charging of the target battery module M_ target The integrated value of the charging current and the voltage are continuously recorded. If a positive determination is made in step S18, the process proceeds to step S19.
[0053] In step S19, the battery control device 100 selects the target battery module M_ target Based on the integrated charging current and voltage of the target storage battery module M_ target The state of the target battery module M_1 in step S19 is estimated. Examples of the state estimation include estimating the SOH and generating a SOC-OCV curve. Next, in step S10, the battery control device 100 performs a state estimation of the target battery module M_1 in step S19. target The result of the state estimation is then recorded. This completes the process shown in the flowchart of FIG.
[0054] As described above, the storage battery control device 100 of the present embodiment is configured to estimate the state of the target storage battery module M_ target In addition, the battery control device 100 determines the target battery module M_ targetTarget string containing STR_ target Among the multiple storage battery strings STR1 to STRm excluding buffer Determine the buffer string STR_ buffer is the target battery module M_ target The battery control device 100 provides charging power to the target battery module M_ target and discharge the buffer string STR_ buffer Charge the target battery module M_ target The capacity that can provide charging power for the buffer string STR_ buffer Then, the battery control device 100 reserves the buffer string STR_ buffer Or from the external system to the target battery module M_ target Discharge the target battery module M_ target The battery control device 100 measures the charging current and voltage of the measured target battery module M_ target Based on the charging current and voltage of the target battery module M_ target Perform state estimation of
[0055] Here, during the state estimation process, the target string STR_ target The other battery strings STR1 to STRm are operated in response to input / output requests from an external system, and change the charge / discharge current. target Regardless of the external input / output requirements, the buffer string STR_ buffer Alternatively, the target battery module M_ can be charged at a constant C rate by being powered from an external system. target The change in the charging current of the target string STR_ target Therefore, according to the storage battery control device 100 of the present embodiment, regardless of the state of the input / output request to the power storage system 1, the target storage battery module M_ targetThe state estimation can be performed with high accuracy.
[0056] In particular, the storage battery control device 100 of the present embodiment is target Determine the target string STR_ target Target battery module M_ target In a state where the storage battery modules M1 to Mn other than the storage battery modules M1 to Mn are bypassed by the bypass circuits B1 to Bn, target Then, the battery control device 100 discharges the target string STR_ target Target battery module M_ target With the storage battery modules M1 to Mn except for the above-mentioned, being bypassed by the bypass circuits B1 to Bn, the buffer string STR buffer Or from the external system to the target battery module M_ target Discharge the target battery module M_ target Measure the charging current and voltage.
[0057] Here, while the power storage system 1 is performing normal operation in response to input / output requests from an external system, in the storage battery strings STR1 to STRm used in normal operation, bypass circuits B1 to Bn are generated in the storage battery modules M1 to Mn. Each time this occurs, the charging current and voltage of the storage battery modules M1 to Mn change. In contrast, in the power storage system 1 of this embodiment, the target storage battery module M_ target Target string containing STR_ target is excluded from the storage battery strings STR1 to STRm used in normal operation. In addition, the target string STR_ target In the target battery module M_ target The storage battery modules M1 to Mn except for the target storage battery module M_ target Therefore, according to the storage battery control device 100 of the present embodiment, during the state estimation process, only the target storage battery module M_ targetIt is possible to continuously perform constant C rate charging of the target storage battery module M_ target The state estimation can be performed continuously and accurately.
[0058] 4 is a circuit diagram showing an outline of a power storage system 2 including a battery control device 200 according to another embodiment of the present invention. The power storage system 2 shown in this figure differs from the power storage system 1 of the above-described embodiment in that it does not include bypass circuits B1 to Bn. Note that the same reference numerals are used to designate the same components as those in the above-described embodiment, and the description of the above-described embodiment is incorporated herein by reference.
[0059] FIG. 5 illustrates the target string STR_ target 13 is a flowchart showing a process of state estimation of . Note that the description of the above-mentioned embodiment is used for the same processes as those of the above-mentioned embodiment.
[0060] As shown in the flowchart of FIG. 5, in step S21, the storage battery control device 200 selects one target string STR_ from among the m sets of storage battery strings STR1 to STRm. target Determine a target string STR_ target Examples of methods for determining the battery string STR1-STRm include a method of determining the battery string STR1-STRm whose integrated value of the charging / discharging current has reached a certain value, and a method of determining the battery string STR1-STRm whose state estimation error has exceeded a threshold value.
[0061] Next, in step S22, the battery control device 200 determines the target string STR_ target Here, the battery control device 200 estimates the current battery capacity of the target string STR_ target Each time the state estimation is performed, the estimation result is recorded. Therefore, the battery control device 200 records the target string STR_ target Based on the result of the state estimation of the target string STR_ target Estimate the current battery capacity of the
[0062] Next, in step S23, the battery control device 200 determines the target string STR_ target The buffer string STR_ buffer The buffer string STR_ is determined from among m sets of storage battery strings STR1 to STRm. buffer is the target string STR_ target The battery string STR1 to STRm is determined from among the battery strings STR1 to STRm excluding the buffer string STR_ buffer is the target string STR_ target The battery strings STR1 to STRm are determined on the condition that a battery capacity equal to or larger than the battery capacity of the buffer string STR_ buffer may be determined.
[0063] Next, in step S24, the battery control device 200 controls the power converters PC1 to PCm to perform normal operation of the battery storage system 1 while controlling the target string STR_ target The battery control device 200 also controls the power converters PC1 to PCm to charge the buffer string STR_ while performing normal operation of the battery storage system 1. buffer Discharge the buffer string STR_ buffer This free space is allocated to the target string STR_ target The battery capacity is equal to or greater than the battery capacity of the target string STR_ in step S22. target The battery capacity is set based on the current battery capacity estimate.
[0064] Next, in step S5, the battery control device 200 determines the target string STR_ target and the buffer string STR_ buffer and are excluded from the storage battery strings STR1 to STRm used in the normal operation of the power storage system 1. That is, the storage battery control device 200 controls the power converters PC1 to PCm to exclude the target strings STR_ targetand the buffer string STR_ buffer Normal operation is continued using the storage battery strings STR1 to STRm excluding STR1 and STRm.
[0065] Next, in step S27, the battery control device 200 determines the target string STR_ target The battery control device 200 starts a constant C-rate discharge at a low current by the target string STR_ target During the discharge of the target string STR_ target The integrated discharge current and voltage are recorded.
[0066] Here, when there is an output request from the external system to the power storage system 2, the storage battery control device 200 target On the other hand, when there is no output request from the external system to the power storage system 2, the storage battery control device 200 controls the power converters PC1 to PCm so that the target string STR_ target From the buffer string STR_ buffer The power converters PC1 to PCm are controlled so that the power is discharged to the positive terminal.
[0067] Next, in step S28, the battery control device 200 determines the target string STR_ target It is determined whether or not the discharge of the target string STR_ has been completed until a positive determination is made in step S28. target The discharge of the target string STR_ target The integrated value of the discharge current and the voltage are continuously recorded. If a positive determination is made in step S28, the process proceeds to step S29.
[0068] In step S29, the battery control device 200 determines whether the recorded target string STR_ target Based on the integrated discharge current and voltage of the target string STR_ targetThe state of the target string STR_ in step S29 is estimated. Examples of the state estimation include estimating the SOH and generating a SOC-OCV curve. Next, in step S30, the battery control device 200 performs a state estimation of the target string STR_ in step S29. target The result of the state estimation is then recorded. This completes the process shown in the flowchart of FIG.
[0069] As described above, the battery control device 200 of the present embodiment performs state estimation on the target string STR_ target In addition, the battery control device 200 determines the target string STR_ target Among the multiple storage battery strings STR1 to STRm excluding buffer Determine the buffer string STR_ buffer is the target string STR_ target The battery control device 200 receives the discharge power of the target string STR_ target , and the buffer string STR_ buffer Discharge the target string STR_ target The capacity of the buffer string STR_ buffer Then, the battery control device 200 secures the target string STR_ target From the buffer string STR_ buffer Or discharge to an external system to target string STR_ target The battery control device 200 then measures the discharge current and voltage of the measured target string STR_ target Based on the discharge current and voltage of the target string STR_ target Perform state estimation of
[0070] Here, during the state estimation process, the target string STR_ target The other battery strings STR1 to STRm are operated in response to input / output requests from an external system, and change the charge / discharge current. target Regardless of the external input / output requirements, the buffer string STR_buffer or to the external grid at a constant C rate. This allows the target string STR_ target The change in the discharge current of the target string STR_ target Therefore, according to the storage battery control device 200 of the present embodiment, regardless of the state of the input / output request to the power storage system 1, the target string STR_ target The state estimation can be performed with high accuracy.
[0071] FIG. 6 illustrates the target string STR_ target 13 is a flowchart showing another example of the process of state estimation of . Note that the description of the above example is used for the same processes as those in the above embodiment.
[0072] As shown in the flowchart of FIG. 6, in step S21, the storage battery control device 200 selects one target string STR_ from among the m sets of storage battery strings STR1 to STRm. target Next, in step S22, the battery control device 200 determines the target string STR_ target Estimate the current battery capacity of the
[0073] Next, in step S33, the battery control device 200 determines the target string STR_ target Buffer string that provides charging power for STR_ buffer The target string STR_ target The battery strings STR1 to STRm are selected from the battery strings STR1 to STRm excluding the battery strings STR1 to STRm.
[0074] Next, in step S34, the battery control device 200 controls the power converters PC1 to PCm to perform normal operation of the battery storage system 1 while controlling the target string STR_ target The battery control device 200 also controls the power converters PC1 to PCm to discharge the buffer string STR_ while performing normal operation of the battery storage system 1.buffer Charge the buffer string STR_ buffer This discharge capacity is set to the target string STR_ target The battery capacity is equal to or greater than the battery capacity of the target string STR_ in step S32. target The battery capacity is set based on the current battery capacity estimate.
[0075] Next, in step S5, the battery control device 200 determines the target string STR_ target and the buffer string STR_ buffer and are excluded from the storage battery strings STR1 to STRm used in the normal operation of the power storage system 1. That is, the storage battery control device 200 controls the power converters PC1 to PCm to exclude the target strings STR_ target and the buffer string STR_ buffer Normal operation is continued using the storage battery strings STR1 to STRm excluding STR1 and STRm.
[0076] Next, in step S37, the battery control device 200 determines the target string STR_ target The battery control device 200 starts constant C-rate charging at a low current by the target string STR_ target While charging, target string STR_ target The integrated charging current and voltage are recorded.
[0077] Here, when there is an input request from the external system to the power storage system 2, the storage battery control device 200 receives the target string STR_ target On the other hand, when there is no input request from the external system to the power storage system 2, the battery control device 200 controls the buffer string STR_ buffer From target string STR_ target The power converters PC1 to PCm are controlled so that the power is discharged to the positive terminal.
[0078] Next, in step S38, the battery control device 200 determines the target string STR_target Until a positive determination is made in step S38, the target string STR_ target continues to charge and the target string STR_ target The integrated value of the charging current and the voltage are continuously recorded. If the determination in step S38 is affirmative, the process proceeds to step S39.
[0079] In step S39, the battery control device 200 determines whether the recorded target string STR_ target Based on the accumulated charging current and voltage of the target string STR_ target The state of the target string STR_ in step S39 is estimated. Examples of the state estimation include estimating the SOH and generating a SOC-OCV curve. Next, in step S40, the battery control device 200 performs state estimation of the target string STR_ in step S39. target The result of the state estimation is then recorded. This completes the process shown in the flowchart of FIG.
[0080] As described above, the battery control device 200 of the present embodiment performs state estimation on the target string STR_ target In addition, the battery control device 200 determines the target string STR_ target Among the multiple storage battery strings STR1 to STRm excluding buffer Determine the buffer string STR_ buffer is the target string STR_ target The battery control device 200 provides the charging power of the target string STR_ target and the buffer string STR_ buffer Charge the target string STR_ target The capacity that can provide charging power for the buffer string STR_ buffer Then, the battery control device 200 secures the buffer string STR_ buffer Or target string STR_ from an external system target Discharge the target string STR_ targetThe power storage control device 200 then measures the charging current and voltage of the measured target string STR_ target Based on the charging current and voltage of the target string STR_ target Perform state estimation of
[0081] Here, during the state estimation process, the target string STR_ target The other battery strings STR1 to STRm are operated in response to input / output requests from an external system, and change the charge / discharge current. target Regardless of the external input / output requirements, the buffer string STR_ buffer Or it can be charged at a constant C rate from an external grid. This allows the target string STR_ target The change in the charging current of the target string STR_ target Therefore, according to the storage battery control device 200 of the present embodiment, regardless of the request state of input / output to the power storage system 1, the target string STR_ target The state estimation can be performed with high accuracy.
[0082] The present invention has been described above based on the above-mentioned embodiment, but the present invention is not limited to the above-mentioned embodiment, and modifications may be made without departing from the spirit of the present invention, and publicly known or well-known technologies may be combined as appropriate.
[0083] For example, in the above embodiment, the target battery module M_ target or target string STR_ target After fully charging or discharging the target battery module M, a constant C-rate discharge or a constant C-rate charge is performed. target or target string STR_ target It is not necessary to fully charge or fully discharge the target storage battery module M_ target or target string STR_ target The charge or discharge amount may be set appropriately.
[0084] In the above embodiment, for the storage battery strings STR1 to STRm including the bypass circuits B1 to Bn, target The target battery module M_ target However, for the battery strings STR1 to STRm having the bypass circuits B1 to Bn, the state estimation was performed for the target battery modules M_ target The target battery modules M_ target In this case, the state estimation may be performed for all of the target storage battery modules M1 to Mn at the timing when the bypass of the storage battery modules M1 to Mn occurs by the bypass circuits B1 to Bn. target It is preferable to interrupt the recording of the integrated charge / discharge current and the voltage.
[0085] In the above embodiment, the target storage battery module M target or target string STR_ target The charge and discharge current and voltage of the target battery module M_ target or target string STR_ target Alternatively, either the charge / discharge current or the voltage may be measured and recorded.
[0086] Furthermore, in the above embodiment, the target string STR_ target and the buffer string STR_ buffer The battery strings STR1 to STRm are excluded from the battery strings STR1 to STRm used in the normal operation of the power storage system 1. However, the buffer strings STR_ buffer If the buffer capacity is available, the buffer string STR_ buffer may simultaneously realize the buffer function and the normal operation function. [Explanation of symbols]
[0087] 1: Energy storage system 2: Energy storage system 3: String bus (power line) 100: Battery control device 200: Battery control device B1~Bn: Bypass circuit M1~Mn: Battery module (battery) M_ target :Target battery module (target battery) PC1~PCm: Power converter STR1~STRm: Battery strings STR_ buffer :buffer string STR_ target :Target string
Claims
1. Three or more battery strings each including a plurality of batteries connected in series and connected to each other by a power line; a plurality of power converters each provided between the battery string and the power line, the power converters converting input / output voltages of the battery string; A battery control device for controlling a power storage system comprising: determining one or more target batteries, the target batteries being the batteries for which state estimation is performed; determining a buffer string, which is the battery string that receives the discharged power of the target battery, from among a plurality of battery strings excluding a target string, which is the battery string that includes the target battery; Charging the target battery while continuing normal operation of the power storage system; Discharging the buffer string while continuing normal operation of the power storage system to ensure that the buffer string has a capacity capable of accepting the discharged power of the target storage battery; Discharging the target battery to the buffer string or to an outside of the power storage system while continuing normal operation of the power storage system using the battery strings other than the target string and the buffer string, and measuring at least one of a discharge current and a voltage of the target battery; A battery control device that estimates a state of the target battery based on at least one of a measured discharge current and a measured voltage of the target battery.
2. The battery string includes a bypass circuit that bypasses the battery; determining one of the target batteries; charging the target battery while continuing normal operation of the power storage system in a state where the batteries other than the target battery of the target string are bypassed by the bypass circuit; 2. The battery control device according to claim 1, wherein, with the batteries other than the target battery of the target string being bypassed by the bypass circuit, normal operation of the power storage system is continued using the battery strings other than the target string and the buffer string, and the target battery is discharged to the buffer string or outside the power storage system, thereby measuring at least one of the discharge current and voltage of the target battery.
3. Three or more battery strings each including a plurality of batteries connected in series and connected to each other by a power line; a plurality of power converters each provided between the battery string and the power line, the power converters converting input / output voltages of the battery string; A battery control device for controlling a power storage system comprising: determining one or more target batteries, the target batteries being the batteries for which state estimation is performed; determining a buffer string, which is the battery string that provides charging power for the target battery, from among a plurality of battery strings excluding a target string, which is the battery string that includes the target battery; Discharging the target battery while continuing normal operation of the power storage system; Charging the buffer string while continuing normal operation of the power storage system to ensure that the buffer string has a capacity capable of providing charging power to the target storage battery; Discharging the target battery from the buffer string or from outside the storage system while continuing normal operation of the storage system using the storage battery strings other than the target string and the buffer string, and measuring at least one of a charging current and a voltage of the target battery; A battery control device that estimates a state of the target battery based on at least one of a measured charging current and a measured voltage of the target battery.
4. The battery string includes a bypass circuit that bypasses the battery; determining one of the target batteries; Discharging the target battery while continuing normal operation of the power storage system in a state where the batteries other than the target battery of the target string are bypassed by the bypass circuit; 4. The battery control device according to claim 3, wherein, with the batteries other than the target battery of the target string being bypassed by the bypass circuit, normal operation of the power storage system is continued using the battery strings other than the target string and the buffer string, and the target battery is discharged from the buffer string or from outside the power storage system to measure at least one of the charging current and voltage of the target battery.
5. Three or more battery strings each including a plurality of batteries connected in series and connected to each other by a power line; a plurality of power converters each provided between the battery string and the power line, the power converters converting input / output voltages of the battery string; a battery control device that controls the plurality of battery strings and the plurality of power converters; A power storage system comprising: The battery control device includes: determining one or more target batteries, the target batteries being the batteries for which state estimation is performed; determining a buffer string, which is the battery string that receives the discharged power of the target battery, from among a plurality of battery strings excluding a target string, which is the battery string that includes the target battery; Charging the target battery while continuing normal operation of the power storage system; Discharging the buffer string while continuing normal operation of the power storage system to ensure that the buffer string has a capacity capable of accepting the discharged power of the target storage battery; Discharging the target battery to the buffer string or to an outside of the power storage system while continuing normal operation of the power storage system using the battery strings other than the target string and the buffer string, and measuring at least one of a discharge current and a voltage of the target battery; A power storage system that estimates a state of the target storage battery based on at least one of a measured discharge current and a measured voltage of the target storage battery.
6. Three or more battery strings each including a plurality of batteries connected in series and connected to each other by a power line; a plurality of power converters each provided between the battery string and the power line, the power converters converting input / output voltages of the battery string; a battery control device that controls the plurality of battery strings and the plurality of power converters; A power storage system comprising: The battery control device includes: determining one or more target batteries, the target batteries being the batteries for which state estimation is performed; determining a buffer string, which is the battery string that provides charging power for the target battery, from among a plurality of battery strings excluding a target string, which is the battery string that includes the target battery; Discharging the target battery while continuing normal operation of the power storage system; Charging the buffer string while continuing normal operation of the power storage system to ensure that the buffer string has a capacity capable of providing charging power to the target storage battery; Discharging the target battery from the buffer string or from outside the storage system while continuing normal operation of the storage system using the storage battery strings other than the target string and the buffer string, and measuring at least one of a charging current and a voltage of the target battery; A power storage system that estimates a state of the target battery based on at least one of a measured charging current and a measured voltage of the target battery.
7. Three or more battery strings each including a plurality of batteries connected in series and connected to each other by a power line; a plurality of power converters each provided between the battery string and the power line, the power converters converting input / output voltages of the battery string; A battery control method executed by a battery control device that controls a power storage system comprising: determining one or more target batteries, the target batteries being the batteries for which state estimation is performed; determining a buffer string, which is the battery string that receives the discharged power of the target battery, from among a plurality of battery strings excluding a target string, which is the battery string that includes the target battery; Charging the target battery while continuing normal operation of the power storage system; Discharging the buffer string while continuing normal operation of the power storage system to ensure that the buffer string has a capacity capable of accepting the discharged power of the target storage battery; Discharging the target battery to the buffer string or to an outside of the power storage system while continuing normal operation of the power storage system using the battery strings other than the target string and the buffer string, and measuring at least one of a discharge current and a voltage of the target battery; A battery control method for estimating a state of a target battery based on at least one of a measured discharge current and a measured voltage of the target battery.
8. Three or more battery strings each including a plurality of batteries connected in series and connected to each other by a power line; a plurality of power converters each provided between the battery string and the power line, the power converters converting input / output voltages of the battery string; A battery control method implemented by a battery control device that controls a power storage system comprising: determining one or more target batteries, the target batteries being the batteries for which state estimation is performed; determining a buffer string, which is the battery string that provides charging power for the target battery, from among a plurality of battery strings excluding a target string, which is the battery string that includes the target battery; Discharging the target battery while continuing normal operation of the power storage system; Charging the buffer string while continuing normal operation of the power storage system to ensure that the buffer string has a capacity capable of providing charging power to the target storage battery; Discharging the target battery from the buffer string or from outside the storage system while continuing normal operation of the storage system using the storage battery strings other than the target string and the buffer string, and measuring at least one of a charging current and a voltage of the target battery; A battery control method for estimating a state of a target battery based on at least one of a measured charging current and a measured voltage of the target battery.
Citation Information
Patent Citations
Power storage system
JP2012253849A