Piping support device, piping support system, piping support method, and program

The piping support device efficiently allocates and processes piping pieces to diagrams, addressing the inefficiencies in conventional methods by providing allocation and cutting instructions, thereby enhancing production efficiency.

JP7563952B2Active Publication Date: 2024-10-08SEKISUI CHEMICAL CO LTD
View PDF 8 Cites 0 Cited by

Patent Information

Application Number
JP2020194392
Authority / Receiving Office
JP · JP
Patent Type
Patents
Current Assignee / Owner
Filing Date
2020-11-24
Publication Date
2024-10-08
Estimated Expiration
2040-11-24

AI Technical Summary

Technical Problem

Conventional prefabricated construction methods for piping in buildings require time-consuming arrangement of piping pieces, often necessitating the manufacture of new pieces if suitable ones are not available, leading to increased burdens and reduced production efficiency.

Method used

A piping support device and system that acquires and allocates processed piping pieces, including joints and straight pipes, to a piping diagram, providing allocation and processing mode information, and outputs construction drawings with cutting instructions, enabling efficient assignment of piping pieces to the diagram.

Benefits of technology

The solution suppresses decreases in production efficiency by allowing for the efficient allocation and processing of piping pieces, reducing the need for on-site manufacturing and improving overall efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 0007563952000001
    Figure 0007563952000001
  • Figure 0007563952000002
    Figure 0007563952000002
  • Figure 0007563952000003
    Figure 0007563952000003
Patent Text Reader

Abstract

To provide a piping support device, a piping support system, a piping support method, and a program capable of suppressing lowering of productive efficiency.SOLUTION: A piping support device comprises: an acquisition unit which acquires piping diagram information; an allocation unit which allocates one of a plurality of processed piping pieces having at least joints and straight pipes to one part of a piping diagram included in the piping diagram information; and an output unit which outputs allocation information on the processed piping piece allocated to the piping diagram. The allocation unit allocates the processed piping piece corresponding to one part of the piping diagram by being processed to one part of the piping diagram as an allocated processed piping piece. The output unit outputs processing mode information on a processing mode of the processed piping piece.SELECTED DRAWING: Figure 1
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to a piping support device, a piping support system, a piping support method, and a program. Regarding. [Background technology]

[0002] In recent years, when a prefabricated construction method is adopted for piping in a building, etc., piping module data is created, for example. One method for creating piping module data is to store data on piping pieces, such as joints and straight pipes of general shapes, and further processed piping pieces obtained by processing these joints and straight pipes, and to assign the piping pieces to a part of the piping module data (for example, see Patent Document 1). [Prior art documents] [Patent documents]

[0003] [Patent Document 1] JP 2009-277134 A Summary of the Invention [Problem to be solved by the invention]

[0004] In the above conventional technology, when a pipe piece is assigned to a part of the pipe module data, it is assumed that all the pipe pieces are manufactured in the factory. Therefore, it takes time to arrange the pipe pieces, and if there is no suitable pipe piece, a new processed pipe piece is manufactured, which imposes a large burden on picking, moving, processing, etc., and also takes time to calculate and arrange materials, which may lead to a decrease in production efficiency.

[0005] Therefore, an object of the present invention is to provide a piping support device, a piping support system, a piping support method, and a program that can suppress a decrease in production efficiency. [Means for solving the problem]

[0006] One aspect of the present invention for solving the above-mentioned problems is a piping support device including an acquisition unit that acquires piping diagram information, an allocation unit that assigns one of a plurality of processed piping pieces having at least a fitting and a straight pipe to a part of a piping diagram included in the piping diagram information, and an output unit that outputs allocation information regarding the processed piping pieces assigned to the piping diagram, wherein the allocation unit assigns the processed piping pieces that correspond to a part of the piping diagram by processing them to the part of the piping diagram as assigned processed piping pieces, and the output unit outputs processing mode information regarding the processing mode of the processed piping pieces.

[0007] Another aspect of the present invention is a piping support device in which the allocation unit assigns the processed piping piece having a straight pipe that is longer than or equal to the length of a portion corresponding to a straight pipe in the piping diagram as the assigned processed piping piece, and the output unit outputs cutting information regarding the cutting length of the assigned processed piping piece as the processing mode information.

[0008] Another aspect of the present invention is a piping support device, wherein the piping diagram includes a bend and the processed piping piece has an elbow portion, and the allocation unit assigns the processed piping piece to the piping diagram by matching the elbow portion to the bend.

[0009] Another aspect of the present invention is a piping support device in which the piping diagram includes a branching section, the processed piping piece has a tee section, and the allocation unit assigns the processed piping piece to the piping diagram by corresponding the tee section to the branching section.

[0010] Moreover, one aspect of the present invention is a piping support device further comprising a display control unit that causes a display device to display a working drawing in which the processed piping piece is assigned to the piping drawing.

[0011] In another aspect of the present invention, the display control unit causes the display device to display the cutting length together with the construction drawing.

[0012] Another aspect of the present invention is a piping support device in which, when the processed piping piece assigned to the working drawing is specified, the display control unit causes the display device to display cutting information of the specified processed piping piece.

[0013] Another aspect of the present invention is a piping assistance system including the above piping assistance device and a display device that displays an image according to the control of the display control unit.

[0014] Moreover, one aspect of the present invention is a piping support method in which a computer acquires piping diagram information, assigns any one of a plurality of processed piping pieces having at least a fitting and a straight pipe to a part of a piping diagram included in the piping diagram information, and outputs assignment information regarding the processed piping piece assigned to the piping diagram, wherein when the computer assigns the processed piping piece to the part of the piping diagram, the processed piping piece that corresponds to the part of the piping diagram by processing it is assigned to the part of the piping diagram as an assigned processed piping piece, and the assignment information includes processing mode information regarding the processing mode of the processed piping piece.

[0015] Moreover, one aspect of the present invention is a program that causes a computer to acquire piping diagram information, assign one of a plurality of processed piping pieces having at least a fitting and a straight pipe to a portion of a piping diagram included in the piping diagram information, and output assignment information regarding the processed piping piece assigned to the piping diagram, wherein, when causing the computer to assign the processed piping piece to a portion of the piping diagram, the processed piping piece that corresponds to a portion of the piping diagram by processing is assigned to the portion of the piping diagram as an assigned processed piping piece, and the assignment information includes processing mode information regarding the processing mode of the processed piping piece. Effect of the Invention

[0016] According to the piping support device, the piping support system, the piping support method, and the program of the present invention, it is possible to suppress a decrease in production efficiency. [Brief description of the drawings]

[0017] [Figure 1] FIG. 1 is a block diagram of a piping support system according to an embodiment. [Diagram 2] 13 is a diagram showing an example of a processed pipe piece DB62. FIG. [Diagram 3] 4 is a flowchart showing an example of processing executed by the piping support device 20. [Figure 4] FIG. 2 is a diagram showing an example of a piping diagram. [Diagram 5] This is a diagram explaining the process of creating construction drawings based on pipe division drawings. [Figure 6] FIG. 13 is a diagram explaining the process for creating a construction drawing based on an isometric drawing. [Figure 7] 2 is a diagram showing an example of an image displayed on a display device 30. FIG. [Figure 8] 2 is a diagram showing an example of an image displayed on a display device 30. FIG. [Figure 9] 13 is a diagram showing another example of the processed pipe piece DB62. FIG. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0018] Hereinafter, an embodiment of a piping support device, a piping support system, a piping support method, and a program according to the present invention will be described with reference to the drawings. Fig. 1 is a block diagram of a piping support system according to an embodiment. As shown in Fig. 1, the piping support system 1 according to the embodiment includes, for example, an input device 10, a piping support device 20, and a display device 30.

[0019] The input device 10 includes physical operation parts that can be operated by a user, such as a mouse, a keyboard, a touch panel, etc. The input device 10 is not limited to those including these physical operation parts, and may be, for example, an electrical signal processing circuit that receives an electrical signal corresponding to an input operation from an external input device provided separately from the device and outputs the electrical signal to a control circuit.

[0020] The piping support device 20 assigns piping pieces to each portion of the piping shown in the piping diagram, creates a construction drawing for completing the piping, and outputs the drawing to, for example, a user. This output may be output by displaying on a display device, or may be output by printing using a printer or the like. The piping pieces include, for example, existing joints (general joints that are handled as existing products), straight pipes, and processed piping pieces. Hereinafter, piping pieces other than processed piping pieces may be collectively referred to as non-processed piping pieces.

[0021] An existing joint is, for example, a pipe piece in which a flared connection portion that connects straight pipes to each other is applied. A straight pipe is a pipe piece that is a straight pipe and has connection portions at both ends that are connected to the flared portions of an existing joint. A processed pipe piece is a pipe piece that is manufactured by combining an existing joint and a straight pipe in advance. There are various types of processed pipe pieces, such as a straight pipe with an elbow, a straight pipe with a branch, and a straight pipe with a socket.

[0022] The piping support device 20 includes, for example, a control unit 50 and a storage unit 60. The control unit 50 is realized by hardware such as a CPU (Central Processing Unit) executing a program (software). The program executed by the hardware may be stored in the storage unit 60, may be stored in advance in a storage device such as a HDD (Hard Disk Drive) or a flash memory, or may be stored in a removable storage medium such as a DVD or CD-ROM and installed by inserting the storage medium into a drive device.

[0023] The control unit 50 includes, for example, an acquisition unit 51, an allocation unit 52, an output unit 53, and a display control unit 54. The storage unit 60 stores, for example, a processed pipe piece database (hereinafter, referred to as "processed pipe piece DB") 62. The processed pipe piece DB 62 includes information on a plurality of processed pipe piece models. The storage unit 60 also stores information on existing joint models and straight pipe models in addition to the processed pipe piece DB 62.

[0024] FIG. 2 is a diagram showing an example of the processed pipe piece DB 62. The processed pipe piece DB 62 includes information on each item of the product number, name, straight pipe adjustable length, and shape for a plurality of processed pipe pieces. The processed pipe piece DB 62 shown in FIG. 2 includes, for example, information on five types of elbow-equipped straight pipes, two types of branched straight pipes, and two types of socket-equipped straight pipes, each having a different straight pipe adjustable length, as processed pipe pieces. The processed pipe piece DB 62 may include information on even more processed pipe pieces. The maximum straight pipe adjustable length is the length of the straight pipe portion of the processed pipe piece.

[0025] The acquisition unit 51 acquires various information in response to an input operation of the user to the input device 10. The information acquired by the acquisition unit 51 includes piping diagram information showing a piping diagram. The piping diagram includes a pipe division diagram showing the route and contents of the piping, and an isometric diagram showing only the route of the piping (hereinafter referred to as an "isometric diagram"). The piping diagram information acquired by the acquisition unit 51 may be information on only the pipe division diagram or only the isometric diagram, or may be both of them. For example, the acquisition unit 51 acquires piping diagram information in response to an input operation of the user to the input device 10. For example, the acquisition unit 51 may read and acquire piping diagram information stored in advance in the storage unit 60, may acquire piping diagram information output from another computer or database, or may receive and acquire piping information transmitted from an external system. The acquisition unit 51 outputs the acquired information to an appropriate output destination. For example, the acquisition unit 51 outputs the acquired piping diagram information to the allocation unit 52.

[0026] When the piping diagram information is output by the acquisition unit 51, the allocation unit 52 reads out each piece of information on the existing joint model, straight pipe model, and processed piping piece model stored in the storage unit 60 and included in the processed piping piece DB 62. The allocation unit 52 executes a process to associate the read existing joint model, straight pipe model, and processed piping piece model with a part of the piping diagram included in the piping diagram information, thereby allocating the existing joint, straight pipe, and processed piping piece, and creates a working drawing. The working drawing is a diagram showing a piping module, and shows the arrangement of piping pieces to be allocated to each part of the piping diagram. The allocation unit 52 outputs working drawing information on the created working drawing to the output unit 53.

[0027] For example, when the processed piping piece corresponds to a part of the piping diagram by cutting the processed piping piece on-site, the allocation unit 52 allocates the processed piping piece to a part of the piping diagram. When the allocation unit 52 allocates the processed piping piece corresponding to a part of the piping diagram by cutting it to the piping diagram, the allocation unit 52 creates both cutting information and piping piece processing information.

[0028] The cutting information is information about the cutting portion and cutting length of the processed pipe piece assigned to the piping diagram. The pipe piece processing information includes information about the type, product number, and processing content of the processed pipe piece assigned to the piping diagram. The processing content information includes text and information about an image showing the entire image of the processed pipe piece and the cut portion separately.

[0029] The cut length of the processed piping piece is, for example, the length corresponding to the part of the piping diagram to which the processed piping piece is assigned minus the straight pipe length of the processed piping piece assigned to the part of the piping diagram. The allocation unit 52 creates an on-site processing instruction sheet and a quality control table for the processed piping piece, and includes them in the piping piece processing information. A processed piping piece that is assigned to a part of the piping diagram by processing, for example by cutting, is an example of an assigned processed piping piece.

[0030] The output unit 53 performs processing for outputting the piping piece processing information including the working drawing information and the cutting information output by the allocation unit 52. In the embodiment, the working drawing information is output by displaying it on the display device 30 together with the piping piece processing information. For this reason, the output unit 53 outputs the working drawing information and the piping piece processing information to the display control unit 54. The output unit 53 may output the working drawing information and the piping piece processing information, for example, by converting the working drawing information and the piping piece processing information into data and transmitting it to another device, or by storing it in a removable storage medium such as a DVD or CD-ROM. The output unit 53 may output only one of the working drawing information and the piping piece processing information, or may output the cutting information separately from other information of the piping piece processing information. Cutting is an example of a processing mode. Cutting information is an example of processing mode information. The working drawing information is an example of allocation information.

[0031] The display control unit 54 controls the display device 30 to image a construction drawing corresponding to the construction drawing information output by the output unit 53 and display the image on the display device 30. The display control unit 54 may image the processed piping piece DB 62 stored in the storage unit 60 in response to an input operation by a user to the input device 10 and display the image on the display device 30. The construction drawing displayed by the display control unit 54 functions as, for example, a GUI (Graphical User Interface) switch.

[0032] When a construction drawing displayed on the display device 30 is operated, the display control unit 54 causes the display device 30 to display cutting information and piping piece processing information of the operated portion (piping) of the construction drawing together with the construction drawing. The display control unit 54 may also cause the display device 30 to display the cutting information and piping piece processing information even if the construction drawing is not operated.

[0033] The display device 30 includes, for example, a display. The display device 30 may be provided integrally with the piping support device 20 or may be provided separately. The display device 30 displays various information according to the control of the display control unit 54. The information displayed by the display device 30 includes construction drawing information. The display device 30 may be a touch panel integrated with the input device 10.

[0034] Next, the process in the piping support device 20 will be described. Fig. 3 is a flowchart showing an example of the process executed by the piping support device 20. As shown in Fig. 3, the piping support device 20 first acquires piping diagram information corresponding to an input operation of a user to the input device 10 in the acquisition unit 51 (step S11). Next, the allocation unit 52 detects bending points, branch points, and straight pipe connection points included in the piping diagram (step S13).

[0035] FIG. 4 is a diagram showing an example of a piping diagram. In the piping shown in FIG. 4, two bending points EP (a first bending point EP1 and a second bending point EP2), one branch point RP, and one straight pipe connection point SP are provided. The piping diagram shown in FIG. 4 is a pipe division diagram. In the following description, the bending points, branch points, and straight pipe connection points may be collectively referred to as reference points. Two pipes are connected to each of the bending point EP and the straight pipe connection point SP on both sides, and the branch point RP is connected to two pipes on both sides and one pipe at an intermediate position, for a total of three pipes. The bending point is an example of a bending portion, and the branch point is an example of a branch portion. The bending portion and the branch portion do not have to be points, and may be, for example, a straight line, a curved line, or an area having a certain area.

[0036] Next, the allocation unit 52 reads the processed pipe piece DB 62 stored in the storage unit 60 (step S15). The allocation unit 52 sequentially allocates pipe pieces to all reference points included in the piping diagram. As pipe pieces to be allocated to reference points, allocation of elbow pipes to bending points, branched straight pipes to branching points, and socketed straight pipes to straight pipe connection points is considered. Elbow pipes include a straight pipe section and an elbow section, and branched pipes include a straight pipe section and a tee section. For example, the elbow section of an elbow pipe is assigned to a bending point, and the tee section of a branched straight pipe is assigned to a branching point.

[0037] In order to assign the piping piece to the reference point, the assigning unit 52 identifies the reference point (hereinafter referred to as the "target point") to which the piping piece is to be assigned, and judges whether or not the processed piping piece that can correspond to the target point is included in the processed piping piece DB 62 (step S17). Whether or not the target point can be corresponded is judged based on the type of the target point and whether or not the length of the pipe connected to the target point can be corresponded within the range of the straight pipe adjustment length.

[0038] For example, when the target point is the first bending point EP1 shown in Fig. 4, the target point is a bending point, so the processed pipe piece to be assigned is a straight pipe with an elbow. Next, the assigning unit 52 determines whether or not there is a straight pipe with an elbow included in the processed pipe piece DB62 whose straight pipe length includes the length L of the straight pipe section ST connected to the first bending point EP1. For example, when the length L of the straight pipe section ST is 1.5 m, the processed pipe pieces with product numbers A2 to A5 are applicable, so it is determined that the processed pipe piece DB62 includes the applicable processed pipe pieces.

[0039] When it is determined that the processed pipe piece DB 62 contains a corresponding processed pipe piece for the target point (step S17; YES), the allocation unit 52 determines whether or not the length of the straight pipe part of the corresponding processed pipe piece needs to be adjusted (step S19). Here, when the length of the straight pipe part of the processed pipe piece matches the length of the pipe connected to the target point, it is determined that the length of the straight pipe part of the corresponding processed pipe piece does not need to be adjusted, and when they do not match, it is determined that the length needs to be adjusted.

[0040] When it is determined that the length of the straight pipe portion of the applicable processed pipe piece does not need to be adjusted (step S19; NO), the allocation unit 52 allocates the processed pipe piece that does not need to have the length of the straight pipe portion adjusted to the target point (step S21), and proceeds to step S41. On the other hand, when it is determined that the length of the straight pipe portion of the applicable processed pipe piece needs to be adjusted (step S19; YES), the allocation unit 52 determines whether the length of the pipe connected to the target point is equal to or longer than the straight pipe length of the processed pipe piece with the longest straight pipe portion (step S23).

[0041] When it is determined that the length of the pipe connected to the target point is equal to or longer than the straight pipe portion of the processed pipe piece having the longest straight pipe portion length (step S23; YES), the allocation unit 52 allocates the processed pipe piece having the longest straight pipe portion length to the target point (step S25). In this case, even if the processed pipe piece having the longest straight pipe portion length is allocated to the target point, the length of the pipe connected to the target point is not reached, so the allocation unit 52 sets a new straight pipe connection point at the end position of the allocated processed pipe piece (step S27) and proceeds to step S41.

[0042] When it is determined that the length of the pipe connected to the target point is not longer than the straight pipe portion of the processed pipe piece having the longest straight pipe portion length (step S23; NO), the allocation unit 52 allocates to the target point a processed pipe piece having a straight pipe portion longer than the length of the pipe connected to the target point and closest to the length of the pipe connected to the target point (step S29). Next, the allocation unit 52 creates pipe piece processing information including the type, product number, processing content, on-site processing instructions, quality control table, etc. of the processed pipe piece (step S31), and proceeds to step S41.

[0043] In step S17, when it is determined that the processed pipe piece DB 62 does not include a processed pipe piece that can correspond to the target point (step S17; NO), the allocation unit 52 allocates an existing joint and a straight pipe to the target point (step S33). Next, the allocation unit 52 determines whether or not the target point is prefabricated (step S35). The determination as to whether or not the target point is prefabricated is based on a signal output by the user operating the input device 10, for example.

[0044] When a user operates the input device 10 to accommodate prefabrication and a signal for prefabrication is output by the input device 10, the allocation unit 52 determines that prefabrication will be performed, and when a user operates the input device 10 to not accommodate prefabrication and a signal for not matching prefabrication is output by the input device 10, the allocation unit 52 determines that prefabrication will not be performed.

[0045] If it is determined that the prefabricated portion corresponds to the prefabricated portion, the allocation unit 52 determines the range of the prefabricated portion (step S37). Furthermore, the allocation unit 52 creates prefabricated processing information based on the user's operation of the input device 10 or the like (step S39). The prefabricated processing information includes, for example, a drawing of the prefabricated piping, the contents of the prefabricated processing, an on-site processing instruction sheet for the prefabricated portion, a quality control table, and the like.

[0046] Next, the allocation unit 52 judges whether or not the allocation of the piping pieces to all the reference points in the piping diagram has been completed (step S41). If it is judged that the allocation of the piping pieces to all the reference points in the piping diagram has not been completed (step S41; NO), the allocation unit 52 changes the target point to another reference point (step S43), and returns to step S17 to repeat the same process.

[0047] When it is determined that the allocation of piping pieces to all reference points in the piping diagram is completed (step S41; YES), the allocation unit 52 creates a working drawing (step S45). Next, the output unit 53 outputs the working drawing and processed piping piece information created by the allocation unit 52 to the display control unit 54 for output, and the display control unit 54 displays an image corresponding to the working drawing information and the processed piping piece information on the display device 30 (step S47). In this way, the piping support device 20 ends the process shown in FIG. 3.

[0048] Next, the flow up to creating a working drawing based on a pipe division drawing will be explained by showing the pipe division drawing and the working drawing. Figure 5 is a diagram explaining the flow up to creating a working drawing based on a pipe division drawing. Figure 5(A) shows a pipe division drawing F1. The pipe division drawing F1 is the same as the piping drawing shown in Figure 4, and has a first bending point EP1, a second bending point EP2, a branch point RP, a first straight pipe connection point SP1, and a second straight pipe connection point SP2.

[0049] When creating a working drawing based on a pipe division drawing, first, a pipe piece is assigned using an arbitrary reference point, for example, the first bending point EP1 as a target point. An elbow-equipped pipe is assigned to the first bending point EP1. The processed pipe piece DB62 includes five elbow-equipped pipe models with straight pipes of different lengths as elbow-equipped pipes.

[0050] If the length L1 of the first straight pipe section where the elbowed straight pipe assigned to the first bending point EP1 is placed is 1.5 m, the elbowed straight pipe assigned to the first bending point EP1 is an elbowed straight pipe whose straight pipe section length is 1.5 m or more and whose length is closest to 1.5 m. Therefore, an elbowed straight pipe with product number A2 (hereinafter referred to as the "first assigned processed piping piece") TA1 with a straight pipe length of 2 m is assigned to the first bending point EP1.

[0051] Since the straight pipe portion of the first assigned processed piping piece TA1 is longer than the length L1 of the first straight pipe portion, the end portion TA1C of the straight pipe portion of the first assigned processed piping piece is cut off when assembled to the first bending point EP1. The straight pipe portion of the first assigned processed piping piece TA1 has a length of 2 m, and the length L1 of the first straight pipe portion is 1.5 m. Therefore, as shown in Figure 5 (B), the cut length of the end portion TA1C of the straight pipe portion of the first assigned processed piping piece TA1 is 0.5 m. In Figures 5 (B) and (C), the pipe cutting diagram is shown by virtual lines.

[0052] Next, the piping pieces are assigned with the branch point RP as a target point. A branched pipe is assigned to the branch point RP. The processed pipe piece DB62 includes two branched pipe models with straight pipe portions of different lengths as branched pipes. If the length L2 of the second straight pipe portion in which the branched straight pipe assigned to the branch point RP is placed is 2.3 m, the branched straight pipe assigned to the branch point RP is a branched straight pipe whose straight pipe portion has a length of 2.3 m or more and is closest to 2.3 m. Therefore, a branched straight pipe with product number B2 and a straight pipe length of 3 m (hereinafter referred to as the "second assigned processed pipe piece") TA2 is assigned to the branch point RP.

[0053] Since the length of the straight pipe portion of the second assigned processing piping piece TA2 is longer than the length L2 of the second straight pipe portion, the end TA2C of the straight pipe portion of the second assigned processing piping piece TA2 is cut off when assembled to the branch point RP. The length of the straight pipe portion of the second assigned processing piping piece TA2 is 3 m, and the length of the second straight pipe portion ST2 is 2.3 m. Therefore, as shown in FIG. 5(B), the cut length of the end TA2C of the straight pipe portion of the second assigned processing piping piece TA2 is 0.7 m.

[0054] Additionally, an existing joint EF with an elbow is assigned to the second bend point EP2. A short pipe (short straight pipe) MT is assigned to the joint portion of the second assigned processed piping piece TA2. Additionally, a straight pipe with a branch is assigned to the branch pipe of the second assigned processed piping piece TA2. In this example, due to the size of the piping area and other factors, the straight pipe on the short side of the second assigned processed piping piece TA2 is cut and a straight pipe with a socket is assigned.

[0055] Next, the piping pieces are assigned with the first straight pipe connection point SP1 as the target point. A socketed straight pipe is assigned to the first straight pipe connection point SP1. The processed piping piece DB62 includes two socketed piping models with different lengths of straight pipe parts as socketed piping. If the length of the second straight pipe part ST2 in which the socketed straight pipe assigned to the first straight pipe connection point SP1 is arranged is 3.5 m, the socketed straight pipe assigned to the branch point RP is a socketed straight pipe whose straight pipe part length is 3.5 m or more and whose length is closest to 3.5 m. Therefore, as shown in FIG. 5(C), a socketed straight pipe with product number C2 and a straight pipe length of 3 m (hereinafter referred to as the "third assigned processed piping piece") TA3 is assigned to the branch point RP.

[0056] At the straight pipe connection point SP, the socket part of the third assigned processing piping piece TA3 is connected to the branch pipe of the second assigned processing piping piece TA2, so instead of adjusting the length by cutting the socket part of the third assigned processing piping piece, the length is adjusted by cutting the branch pipe of the second assigned processing piping piece TA2. Therefore, the cutting length of the branch pipe of the second assigned processing piping piece TA2 is determined.

[0057] Further, in the same manner, piping pieces are assigned to the second straight pipe connection point SP2. A socketed straight pipe is assigned to the second straight pipe connection point SP2. As shown in FIG. 5(C), the straight pipes to be assigned to the second straight pipe connection point SP2 are determined, for example, from the two socketed piping models included in the processed pipe piece DB62, as in the case of the first straight pipe connection point SP1. After that, the pipe division drawing is erased to create the working drawing shown in FIG. 5(D).

[0058] Next, the flow up to creating a working drawing based on an isometric drawing will be explained by showing the isometric drawing and the working drawing. Figure 6 is a diagram explaining the flow up to creating a working drawing based on an isometric drawing. Figure 6(A) shows an isometric drawing F2. The isometric drawing F2 shows only the route of the piping diagram shown in Figure 4, and a first bending point EP1, a second bending point EP2, and a branch point RP are provided. In the isometric drawing, since there is no break in the piping in the straight section, a straight pipe connection point is not provided.

[0059] When creating a construction drawing based on an isometric drawing, first, as in the case of creating a construction drawing based on a pipe division drawing, piping pieces are assigned using an arbitrary reference point, for example, the first bending point EP1 as the target point. The first assigned processed piping piece TA1 is assigned to the first bending point EP1 in the same procedure as in the case of creating a construction drawing based on a pipe division drawing, and the cut length of the end TA1C of the straight pipe part of the first assigned processed piping piece TA1 is set to 0.5 m, as shown in Figure 6(B).

[0060] Next, the piping pieces are assigned using the branch point RP as the target point, and the second assigned processed piping piece TA2 is assigned to the branch point RP in the same procedure as when it is based on the pipe division drawing. Furthermore, the cut length of the end TA2C of the straight pipe part of the second assigned processed piping piece TA2 is set to 0.7m. Furthermore, an existing joint with elbow EF is assigned to the second bending point EP2, and a straight pipe with a socket is assigned to the straight pipe on the short side of the second assigned processed piping piece TA2.

[0061] Next, a piping piece is assigned to the straight portion of the isometric drawing. The assigned piping piece is one of two socketed pipes included in the processed piping piece DB62. Since the isometric drawing does not have a straight pipe connection point like the pipe division drawing, a straight pipe connection point is set between the portion of the straight pipe portion in the isometric drawing to which the piping piece is assigned and the portion to which the piping piece is not assigned. In the example shown in FIG. 6(B), the first straight pipe connection point is set at the tip of the branch pipe in the second assigned processed piping piece TA2. Next, as shown in FIG. 6(C), the third assigned processed piping piece TA3 is assigned using the same procedure as in the case of using the pipe division drawing as the target point, with the first straight pipe connection point SP1 as the target point.

[0062] Furthermore, a second straight pipe connection point is set at the socket part of the socket-equipped straight pipe connected to the elbow part of the first assigned processed piping piece TA1. Next, in the same procedure as when based on a pipe division drawing, piping pieces are assigned to the second straight pipe connection point SP2, and the fourth assigned processed piping piece TA4 and the fifth assigned processed piping piece TA5 are assigned. After that, the piping drawing is erased to create the construction drawing shown in Figure 6(D).

[0063] In this way, the working drawings created by the allocation unit 52 are displayed on the display device 30 by, for example, the display control unit 54. Figs. 7 and 8 are diagrams showing examples of images displayed on the display device 30. As shown in Fig. 7, an image showing the working drawings is displayed on the display device 30. The image showing the working drawings includes a first assigned processed piping piece image GTA1 to a fifth assigned processed piping piece image GTA5 and an existing joint image GEF corresponding to each drawing of the piping pieces such as the first assigned processed piping piece TA1 to the fifth assigned processed piping piece TA5 and the existing joint EF. Hereinafter, the images of the piping pieces are referred to as piping piece images.

[0064] The display manner of the piping piece images differs depending on whether the piping pieces are processed piping pieces or non-processed piping pieces, and if they are processed piping pieces, whether on-site processing is required. In this example, the display device 30 displays images showing non-processed piping pieces (hereinafter referred to as "non-processed piping piece images") in a first color, for example, black, images showing processed piping pieces that require on-site processing (hereinafter referred to as "processed piping piece images") in a second color, for example, light blue, and images showing processed piping pieces that do not require on-site processing (hereinafter referred to as "unnecessary processed piping piece images") in a third color, for example, green.

[0065] The colors used in the piping piece images may be any colors. These colors may be the same, some may be the same and other may be different, or all may be different. In Fig. 7 and Fig. 8, black is shown by a solid line, blue by a dashed line, and green by a dashed line, but the display device 30 actually displays the solid lines of the corresponding colors.

[0066] Specifically, the non-machined piping piece images include an existing joint image GEF and a short pipe image GMT shown in Fig. 7. Among the processed piping piece images, the processing-required piping piece images include a first assigned processed piping piece image GTA1, a second assigned processed piping piece image GTA2, and a fifth assigned processed piping piece image GTA5. The unnecessary processed piping piece images include a third assigned processed piping piece image GTA3 and a fourth assigned processed piping piece image GTA4.

[0067] Furthermore, when a piping piece image displayed on the display device 30 is operated, a specification image GS is displayed, which displays the specifications of the piping piece corresponding to the operated piping piece image, as shown in FIG. 8. The specifications of the piping piece include each item indicated by the cutting information and the piping piece processing information. In the example shown in FIG. 8, the fifth assigned processed piping piece image GTA5 is operated, and a specification image GS of the fifth assigned processed piping piece image GTA5 is displayed. The specification image GS includes information such as the cut portion and cut length included in the cutting information, and information such as the piece number, processing number, processing content, product number, and product name included in the piping piece processing information. The processing content in the specification image GS includes an image showing the socketed straight pipe corresponding to the fifth assigned processed piping piece image GTA5 and its cut portion. Operating a piping piece image is an example of designating a piping piece image.

[0068] Furthermore, although not shown, by operating another piping piece image, a specification image showing the specifications of the piping piece corresponding to the operated piping piece image is displayed. The specification image may be erased by a specific erasing operation, for example, by including a close button in the specification image and operating this close button, or may be erased after a certain period of time has passed. Alternatively, the specification image may be erased when another specification image is displayed, or when a specified number of specification images are displayed, or when the display area of ​​the specification image becomes a specified area or more.

[0069] The piping support system 1 of the embodiment described above, when allocating piping pieces to a piping diagram to create a working drawing, allocates processed piping pieces to the piping diagram together with existing piping pieces such as existing joints and straight pipes. When allocating processed piping pieces to a working drawing, the piping support system 1 allocates processed piping pieces that correspond to a part of the piping diagram by processing to a part of the piping diagram. Therefore, even if there is no suitable processed piping piece among the existing processed piping pieces, the processed piping pieces can be allocated. Therefore, the burden of picking, moving, processing, etc., and the effort of estimating costs and arranging parts can be reduced, and a decrease in production efficiency can be suppressed.

[0070] In addition, in the above piping assistance system 1, when a processed piping piece that needs to be cut is assigned when the construction drawing is displayed on the display device 30, the cutting portion and cutting length of the processed piping piece are displayed on the display device 30. Therefore, for example, by installing the display device 30 of the piping assistance system 1 at a work site, when a processed piping piece needs to be cut when performing piping work at the work site, the worker can easily grasp the cutting portion and cutting length.

[0071] When the display device 30 is installed at a work site, the piping support device 20 may be installed at the work site, or may be installed at a location other than the work site, such as a design office where piping is designed. When the piping support device 20 is installed at a location other than the location where the display device 30 is installed, the working drawing information, cutting information, and piping piece processing information may be transmitted from the piping support device 20 to the display device 30 via the Internet or the like. Alternatively, a removable storage medium such as a DVD or CD-ROM on which the working drawing information, cutting information, and piping piece processing information are stored may be created in the piping support device 20, and the storage medium may be played on the display device 30.

[0072] Although the embodiment of the present invention has been described above, the technical scope of the present invention is not limited to the above embodiment, and various modifications can be made within the scope of the present invention. For example, in the above embodiment, the piping support device 20 displays and outputs the working drawing information and the cutting information on the display device 30, but the information may be output in other forms. For example, the information may be output by transmitting it to a server other than the display device 30, or may be output by transmitting it to a management device in a storage facility that is a shipping source for storing piping pieces including processed piping pieces.

[0073] For example, by outputting working drawing information and cutting information to a management device in a storage facility, the processed piping pieces can be processed at the storage facility before being shipped. Alternatively, an information medium indicating that the processed piping pieces are to be cut at the work site, such as a two-dimensional code such as a QR code (registered trademark), may be attached to the processed piping pieces at the storage facility. In this case, the cutting work of the processed piping pieces can be smoothly performed at the work site.

[0074] In addition, the working drawing information, the cutting information, and the piping piece processing information may be output to, for example, a calculation device that calculates the cost of the piping. By inputting the working drawing information, the cutting information, and the piping piece processing information to the calculation device, it is possible to compare the integrated price when using the existing piping piece and when not using it.

[0075] In the above embodiment, the processed pipe piece DB 62 is stored in the piping support device 20, but may be stored in another manner. For example, the processed pipe piece DB 62 may be stored in a server on the cloud, and the piping support device 20 may read the processed pipe piece DB 62 stored in the server on the cloud.

[0076] In the above embodiment, the processed piping piece that corresponds to a part of the piping diagram by processing is a processed piping piece that corresponds to a part of the piping diagram by cutting, but it may be processed in a manner other than cutting. Examples of the processing manner other than cutting include cutting, adding, bending, etc.

[0077] In the above embodiment, the processed pipe pieces included in the processed pipe piece DB62 have a common range of straight pipe adjustable lengths among the processed pipe pieces of the same type, but the straight pipe adjustable lengths may be different, for example, as shown in Fig. 9. In this case, when allocating the pipe pieces, multiple processed pipe pieces are not targeted depending on the length of the straight pipe portion of the processed pipe piece, so that the process of step S29 is not required when executing the flowchart shown in Fig. 4. [Explanation of symbols]

[0078] 1...piping support system, 10...input device, 20...piping support device, 30...display device, 50...control unit, 51...acquisition unit, 52...assignment unit, 53...output unit, 54...display control unit, 60...storage unit, 62...machined piping piece DB, F1...pipe division drawing, F2...isometric drawing

Claims

1. An acquisition unit for acquiring piping diagram information; an allocation unit that allocates any one of a plurality of processed piping pieces having at least a joint and a straight pipe to a part of the piping diagram included in the piping diagram information; An output unit that outputs allocation information regarding the processed piping pieces allocated to the piping diagram, The allocation unit allocates the processed piping piece, which corresponds to a part of the piping diagram by processing, to the part of the piping diagram as an allocated processed piping piece, and determines whether the allocated processed piping piece corresponds to a prefabricated piece. If the allocated processed piping piece corresponds to the prefabricated piece, generates prefabricated processing information; The output unit outputs processing mode information regarding a processing mode of the processed pipe piece. Piping support equipment.

2. The allocation unit sets the processed piping piece having a straight pipe having a length equal to or longer than a length of a portion corresponding to a straight pipe in the piping diagram as the allocated processed piping piece, The output unit outputs cutting information regarding a cutting length of the assigned processed pipe piece as the processing mode information. The piping support device of claim 1 .

3. The piping diagram includes a bend, The processed piping piece includes an elbow portion, The allocation unit allocates the processed piping piece to the piping diagram by making the elbow portion correspond to the bent portion. The piping support device according to claim 1 or 2.

4. The piping diagram includes a branch portion, The processed piping piece includes a tee portion, The allocation unit allocates the processed piping piece to the piping diagram by making the tee portion correspond to the branch portion. A piping support device according to any one of claims 1 to 3.

5. A display control unit is further provided for displaying, on a display device, a working drawing in which the processed piping piece is assigned to the piping drawing. The piping support device of claim 2.

6. The display control unit causes the display device to display the cutting information together with the construction drawing. The piping support device according to claim 5.

7. The display control unit, when the processed pipe piece assigned to the working drawing is designated, displays cutting information of the designated processed pipe piece on the display device. The piping support device of claim 6.

8. A piping support device according to any one of claims 5 to 7; A display device that displays an image according to the control of the display control unit. Piping support system.

9. The computer Obtain piping diagram information, Allocating any one of a plurality of processed piping pieces having at least a joint and a straight pipe to a part of the piping diagram included in the piping diagram information; A piping support method for outputting allocation information regarding the processed piping pieces allocated to the piping diagram, The computer, When allocating to a part of the piping diagram, the processed piping piece that corresponds to a part of the piping diagram by processing is allocated to the part of the piping diagram as an allocated processed piping piece, and it is determined whether or not the allocated processed piping piece corresponds to a prefabricated piece. If the allocated processed piping piece corresponds to the prefabricated piece, prefabricated processing information is generated; The allocation information includes processing mode information regarding the processing mode of the processed pipe piece. Plumbing support method.

10. On the computer, Obtain piping diagram information, Allocating any one of a plurality of processed piping pieces having at least a joint and a straight pipe to a part of the piping diagram included in the piping diagram information; A program for outputting allocation information regarding the processed piping pieces allocated to the piping diagram, The computer includes: When allocating to a part of the piping diagram, the processed piping piece that corresponds to a part of the piping diagram by processing is allocated to the part of the piping diagram as an allocated processed piping piece, and it is determined whether or not the allocated processed piping piece corresponds to a prefabricated piece. If the allocated processed piping piece corresponds to the prefabricated piece, prefabricated processing information is generated; The allocation information includes processing mode information regarding the processing mode of the processed pipe piece. program.

Citation Information

Patent Citations

  • BIM (Building Information Model)-based pipe prefabrication method

    CN103218492A

  • Pipeline prefabricating method based on BIM

    CN111666625A

  • Air duct life cycle management method based on BIM+numerical control technology

    CN111914324A

  • Production of piping formed by using friction press welding

    JP1992118187A

  • Piping work management system

    JP1998131490A