Temperature estimation device and converter system
The temperature estimation device addresses the challenge of inaccurate junction temperature calculation in high unbalance AC power supplies by using current and voltage detection with a compensation coefficient, ensuring accurate temperature estimation and preventing overheating.
Patent Information
- Application Number
- JP2023522102
- Authority / Receiving Office
- JP · JP
- Patent Type
- Patents
- Current Assignee / Owner
- Filing Date
- 2021-05-19
- Publication Date
- 2024-10-08
- Estimated Expiration
- 2041-05-19
AI Technical Summary
Existing temperature estimation methods for power semiconductor elements in converters and inverters fail to accurately calculate junction temperatures when the unbalance rate of a three-phase AC power supply is high, leading to deviations between estimated and true values, which can result in overheating and reduced lifespan.
A temperature estimation device that calculates an estimated junction temperature value by detecting current and voltage, considering the unbalance rate of the three-phase AC power supply, using a provisional junction temperature value and a temperature compensation coefficient to enhance accuracy.
The device accurately estimates junction temperatures even under conditions of high unbalance in the AC power supply, reducing processing load and protecting power semiconductor elements from overheating.
Smart Images

Figure 0007564356000018 
Figure 0007564356000019 
Figure 0007564356000020
Abstract
Description
[Technical field]
[0001] The present invention relates to a temperature estimation device and a converter system. [Background technology]
[0002] Converters and inverters are power conversion devices that convert DC power to AC power or AC power to DC power. For example, in motor drive devices that drive motors in machine tools, presses, injection molding machines, industrial machines, or various robots, the AC power supplied from an AC power source is converted to DC power by a converter and output to a DC link, and the DC power in the DC link is further converted to AC power by an inverter, and this AC power is supplied as drive power to a motor provided for each drive shaft. Here, the DC link refers to a circuit portion that electrically connects the DC output side of the converter and the DC input side of the inverter, and may also be called a "DC link section," "DC link," "DC link section," or "DC intermediate circuit."
[0003] When a current flows through the power semiconductor elements provided in the converter and inverter, the converter and inverter generate heat. In particular, in converters and inverters using the PWM control method, the power semiconductor elements generate heat due to the steady-state loss of the power semiconductor elements, and the switching loss and reverse recovery loss caused by the switching operation of the power semiconductor elements, causing the temperature of the power semiconductor elements to rise. If the temperature of the power semiconductor elements exceeds the rated temperature and enters an overheated state, the power semiconductor elements in the converter and inverter will be damaged or their lifespan will be shortened. For this reason, when operating converters and inverters, it is necessary to grasp the temperature of the power semiconductor elements or the temperature near the power semiconductor elements as accurately as possible and protect the power semiconductor elements from overheating.
[0004] Methods for grasping the temperature of the power semiconductor elements or the vicinity of the power semiconductor elements in the converter and inverter include a method for estimating the junction temperature of the power semiconductor elements by calculation, a method for measuring the case temperature of the power semiconductor elements (mold surface temperature and base plate surface temperature), a method for measuring the temperature of the heat sink in contact with the power semiconductor elements, and the like.
[0005] Among these, the method of estimating the junction temperature of a power semiconductor element by calculation estimates the junction temperature, which is the temperature of the junction part of the power semiconductor element, by calculation processing using a calculation processing device based on the current value flowing through the power semiconductor element and a thermal equivalent circuit.
[0006] For example, there is known a motor control device including a converter that converts an AC voltage into a DC voltage, an inverter that converts the DC voltage into an AC voltage and drives a motor, a speed control unit that generates a torque command based on a speed command and a motor speed, a torque control unit that generates a PWM signal based on the torque command and the motor current to drive the inverter, a current detection unit that detects the motor current, an inverter temperature detection unit that detects the temperature of the inverter and generates an inverter temperature signal, and an overload protection unit that generates a torque limit signal based on the motor temperature signal, the inverter temperature signal, the motor current and the motor speed.The overload protection unit includes a power element loss estimation unit that generates an estimated power element loss of the inverter from the motor current, a junction temperature estimation unit that estimates a junction temperature based on the estimated power element loss and the inverter temperature, a motor loss estimation unit that estimates a motor loss from the motor current and the motor speed, a coil temperature estimation unit that estimates a coil temperature from the estimated motor loss and the motor temperature signal, and an overload processing unit that generates a torque limit signal or an alarm signal based on the estimated junction temperature and the estimated coil temperature (see, for example, Patent Document 1).
[0007] For example, in an elevator control device having an inverter device that drives and controls an AC motor that drives an elevator car in the up and down direction, there is known an elevator control device that is equipped with a switching loss calculator that calculates the instantaneous switching loss when a semiconductor power element in the inverter device is switched on, and an on-loss calculator that calculates the instantaneous on-loss when the semiconductor power element is on and a constant current is flowing, and that estimates the instantaneous junction temperature rise from the switching loss and on-loss, and reduces the load on the power element in accordance with this junction temperature (see, for example, Patent Document 2).
[0008] A power element overheat protection device is provided in a drive device that drives a load by PWM control using an inverter that converts direct current to a desired alternating current, and protects a plurality of power elements constituting the inverter from overheating, characterized in that the power element overheat protection device comprises: temperature detection means for detecting the temperature of a case encasing the plurality of power elements; temperature estimation means for calculating an increase in temperature difference between a junction temperature of each of the power elements and the case temperature, adding the case temperature to the increase in temperature difference obtained, and estimating a junction temperature of each of the power elements based on the calculation result; overheat abnormality determination means for comparing the junction temperature of each of the power elements with an allowable operating temperature of each of the power elements, and determining that the power element is in an overheated state when the junction temperature is higher than the allowable operating temperature based on the calculation result, and outputting an overheat abnormality signal; and power cut-off signal output means for outputting a power cut-off signal to cut off the gate of the power element when at least one overheat abnormality signal is input from the overheat abnormality determination means (see, for example, Patent Document 3). [Prior art documents] [Patent documents]
[0009] [Patent Document 1] JP 2009-261078 A [Patent Document 2] Japanese Patent Application Publication No. 11-255442 [Patent Document 3] JP 2008-131722 A Summary of the Invention [Problem to be solved by the invention]
[0010] Generally, if the three-phase AC power supply connected to the converter is normal, the voltage or current unbalance rate is small, and therefore the individual junction temperatures of the multiple power semiconductor elements present in the converter do not vary much. Therefore, even if the junction temperatures of the power semiconductor elements are estimated based on one thermal equivalent circuit in order to reduce the proportion (e.g., CPU usage rate) of the junction temperature estimation process in the arithmetic processing of the arithmetic processing device, the estimated junction temperature does not deviate much from the true value of the junction temperature of each power semiconductor element. In this way, when the voltage or current unbalance rate of the three-phase AC power supply connected to the converter is small, the junction temperature estimation process of the power semiconductor elements based on one thermal equivalent circuit can achieve both a reduction in the computational processing load of the arithmetic processing device and a highly accurate temperature estimation.
[0011] However, when the power quality of the three-phase AC power source connected to the converter is poor or when an abnormality such as a missing phase occurs in the three-phase AC power source, the unbalance rate of the voltage or current increases, and the individual junction temperatures of the multiple power semiconductor elements present in the converter also vary widely. When the junction temperature of the power semiconductor elements is estimated based on one thermal equivalent circuit under a situation where the unbalance rate of the three-phase AC power source is large, the calculated estimated value of the junction temperature is significantly different from the true value of the junction temperature for some of the multiple power semiconductor elements. That is, a power semiconductor element having a true value of the junction temperature that is significantly different from the calculated estimated value of the junction temperature appears. In order to accurately estimate the junction temperature of each of the multiple power semiconductor elements, it is possible to set a thermal equivalent circuit for each power semiconductor element and execute the junction temperature estimation process. In this case, however, the proportion of the junction temperature estimation process (e.g., CPU usage rate) in the arithmetic processing of the arithmetic processing device becomes large, and there is a possibility that it may affect other arithmetic processing other than the junction temperature estimation process. In addition, it is possible to use a high-performance arithmetic processing device in order to suppress the influence on other arithmetic processing, but such an arithmetic processing device is expensive. Therefore, it is desirable to realize a temperature estimation device that can calculate with high accuracy an estimated junction temperature of a power semiconductor element provided in a converter even when the unbalance rate of the three-phase AC power supply connected to the converter is high, and a converter system including the same. [Means for solving the problem]
[0012] According to one aspect of the present disclosure, a temperature estimation device that calculates an estimated junction temperature of a power semiconductor element provided in a converter that performs power conversion between AC power on a three-phase AC power supply side and DC power on a DC side includes a current detection unit that detects a value of a current flowing through the power semiconductor element, and a junction temperature estimator that calculates an estimated junction temperature of the power semiconductor element based on a provisional junction temperature value calculated based at least on the value of the current detected by the current detection unit and an unbalance rate of the three-phase AC power supply connected to the converter.
[0013] Moreover, according to one aspect of the present disclosure, a converter system includes the above-mentioned temperature estimation device, and a converter provided with a power semiconductor element and configured to perform power conversion between AC power on the three-phase AC power supply side and DC power on the DC side by turning on and off the power semiconductor element, and the junction temperature estimator calculates an estimated junction temperature of the power semiconductor element. Effect of the Invention
[0014] According to one aspect of the present disclosure, it is possible to realize a temperature estimation device and a converter system including the same that can calculate with high accuracy a junction temperature estimation value of a power semiconductor element provided in a converter even when the power quality of a three-phase AC power supply connected to the converter is poor or when an abnormality such as a phase loss occurs in the three-phase AC power supply and the unbalance rate of the three-phase AC power supply is high. That is, according to one aspect of the present disclosure, the proportion (e.g., CPU usage rate) of the junction temperature estimation process in the calculation process of the calculation processing device is reduced, so that the influence on other calculation processes other than the temperature estimation process in the calculation processing device can be suppressed. [Brief description of the drawings]
[0015] [Figure 1] 1 is a diagram illustrating a temperature estimation device and a converter system including the same according to first and fourth embodiments of the present disclosure. [Diagram 2] 10 is a diagram illustrating a modified example of an unbalance rate calculation unit in the temperature estimation device and the converter system including the same according to the first embodiment of the present disclosure. FIG. [Diagram 3] 11 is a diagram illustrating an example of the relationship between the unbalance factor k and the temperature compensation coefficient A calculated by a second calculation method of the temperature compensation coefficient. FIG. [Figure 4] 4 is a flowchart showing an operation flow of the temperature estimation device according to the first embodiment of the present disclosure. [Diagram 5] FIG. 11 is a diagram illustrating a temperature estimation device and a converter system including the same according to a second embodiment of the present disclosure. [Figure 6] 10 is a flowchart showing an operation flow of a temperature estimation device according to a second embodiment of the present disclosure. [Figure 7] FIG. 13 is a diagram illustrating a temperature estimation device and a converter system including the same according to a third embodiment of the present disclosure. [Figure 8] 13 is a flowchart showing an operation flow of a temperature estimation device according to a fourth embodiment of the present disclosure. [Figure 9] 13 is a flowchart showing an operation flow of a temperature estimation device according to a fourth embodiment of the present disclosure. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0016] Hereinafter, a temperature estimation device and a converter system including the same will be described with reference to the drawings. The scale of the drawings is appropriately changed to facilitate understanding. The embodiment shown in the drawings is one example for carrying out the present invention, and the present invention is not limited to the embodiment shown in the drawings.
[0017] The load on the DC side of the converter system including the temperature estimation device according to the embodiment of the present disclosure includes a combination of an inverter and an AC motor, a DC motor, etc. Machines in which an AC motor or a DC motor is installed include, for example, machine tools, press machines, injection molding machines, industrial machines, various robots, etc.
[0018] Hereinafter, as an example, an example will be described in which an inverter and an AC motor are provided as a load on the DC side of a converter system including a temperature estimation device according to an embodiment of the present disclosure. The type of AC motor is not particularly limited, and may be, for example, an induction motor or a synchronous motor. Furthermore, the number of phases of the AC motor is not particularly limited to the embodiment of the present disclosure, and may be, for example, three-phase or single-phase. The following description is also similarly applicable to the case in which a DC motor is provided as a load on the DC side of a converter system including a temperature estimation device according to an embodiment of the present disclosure.
[0019] First, a temperature estimation device according to a first embodiment of the present disclosure and a converter system including the same will be described.
[0020] Fig. 1 is a diagram showing a temperature estimation device and a converter system including the same according to the first and fourth embodiments of the present disclosure. The connection relationship of each element in the temperature estimation device and the converter system including the same shown in Fig. 1 is also applicable to the fourth embodiment described later.
[0021] The converter system 100 includes a temperature estimation device 1 according to the first embodiment of the present disclosure, a converter 2, and a converter control device 3. A three-phase AC power supply 4 is connected to the AC side of the converter 2, for example, via an electromagnetic contactor (MCC) and a three-phase AC reactor. Examples of the three-phase AC power supply 4 include a three-phase 400V AC power supply, a three-phase 200V AC power supply, and a three-phase 600V AC power supply.
[0022] The converter 2 in the converter system 100 includes a three-phase bridge circuit 31, a smoothing capacitor 32, a DC link capacitor 33, a pre-charging circuit , and a temperature detection element .
[0023] The three-phase bridge circuit 31 in the converter 2 may be any circuit capable of converting AC power into DC power, and may be, for example, a rectifier circuit using a PWM switching control method, a rectifier circuit using a synchronous rectification method, a rectifier circuit using a diode rectification method, etc. In the example shown in Fig. 1, the three-phase bridge circuit 31 is, for example, a rectifier circuit using a PWM switching control method or a rectifier circuit using a synchronous rectification method.
[0024] The three-phase bridge circuit 31 has three legs corresponding to the three phases. Each leg has an upper arm and a lower arm. When the converter 2 is configured as a rectifier circuit of a PWM switching control type or a synchronous rectification type, each upper arm and each lower arm of the three-phase bridge circuit 31 is provided with a power semiconductor element consisting of a semiconductor switching element and a diode connected in anti-parallel to the semiconductor switching element. Examples of the semiconductor switching element include IGBT, FET, thyristor, GTO, and transistor. When the converter 2 is configured as a rectifier circuit of a diode rectification type, each upper arm and each lower arm of the three-phase bridge circuit 31 is provided with a power semiconductor element consisting of a diode.
[0025] The smoothing capacitor 32 is provided on the DC side of the three-phase bridge circuit 31, and has a function of suppressing pulsation of the DC output from the three-phase bridge circuit 31. Examples of the smoothing capacitor 32 include an electrolytic capacitor and a film capacitor.
[0026] The DC link capacitor 33 is provided between the smoothing capacitor 32 and the DC side of the inverter 5, and has a function of storing DC power. Examples of the DC link capacitor 33 include an electrolytic capacitor and a film capacitor.
[0027] A pre-charging circuit (initial charging circuit) 34 is provided to pre-charge (initial charging) the DC link capacitor 33 before the inverter 5 starts operating. The pre-charging circuit 34 has a switch that opens and closes an electric path between the three-phase bridge circuit 31 and the DC link capacitor 33, and a charging resistor connected in parallel to the switch. During the pre-charging period from immediately after the inverter 5 is started (immediately after the power is turned on) until the inverter 5 starts normal operation, the switch is opened (off). During the pre-charging period, the switch remains open, so that the current output from the three-phase bridge circuit 31 flows into the DC link capacitor 33 as a charging current via the charging resistor, and the DC link capacitor 33 is charged (pre-charged). During the pre-charging period, the current output from the three-phase bridge circuit 31 flows through the charging resistor, so that the occurrence of an inrush current can be prevented. When the DC link capacitor 33 is charged to a predetermined voltage, the switch is switched from open to closed, and the pre-charging by the pre-charging circuit 34 is completed. After the preliminary charging is completed, the current output from the three-phase bridge circuit 31 flows through the closed switch toward the inverter 5 and the DC link capacitor 33 connected to the DC link.
[0028] The temperature detection element 35 is provided near the power semiconductor element, and the output changes with the change in temperature of the temperature detection element 35. A signal output from the temperature detection element 35 is sent to an ambient temperature detection unit 14 in the temperature estimation device 1, which will be described later. Examples of the temperature detection element 35 include a PTC thermistor, an NTC thermistor, and a platinum resistance temperature sensor.
[0029] The converter control device 3 in the converter system 100 includes a switching control unit 41 and a DC link voltage detection unit .
[0030] The DC link section voltage detection section 42 detects a DC link capacitor voltage value, which is a potential difference across the DC link capacitor 33. This capacitor voltage value corresponds to a DC link voltage value. In other words, the DC link capacitor voltage value is the potential difference value between the positive potential appearing at the positive terminal on the DC output side of the three-phase bridge circuit 31 and the negative potential appearing at the negative terminal on the DC output side of the three-phase bridge circuit 31. The DC link capacitor voltage value detected by the DC link section voltage detection section 42 is sent to the switching control section 41, and is also sent to a higher-level control device (not shown) for controlling the inverter 5.
[0031] The switching control unit 41 generates switching commands to instruct the semiconductor switching elements of each power semiconductor element in the three-phase bridge circuit 31 to turn on and off based on a drive command received from a higher-level control device (not shown), a DC link capacitor voltage value detected by a DC link voltage detection unit 42, a value of a current input to the converter 2 (value of a current flowing through the power semiconductor elements) detected by a current detection unit 11 (described later), and a value of a voltage between terminals of the converter 2 on the three-phase AC power supply side detected by a voltage detection unit 13 (described later). The generated switching commands are sent to drive circuits (not shown) for the semiconductor switching elements. The drive circuits apply gate voltages to each semiconductor switching element for turning the semiconductor switching elements on and off according to the content of the switching command.
[0032] 1, the current detection unit 11 and the voltage detection unit 13 are shared by the temperature estimation device 1 and the converter control device 3. As an alternative, the temperature estimation device 1 and the converter control device 3 may each be provided with a current detection unit and a voltage detection unit separately.
[0033] An arithmetic processing device (processor) is provided in the converter control device 3. This arithmetic processing device has the above-mentioned switching control unit 41 and DC link unit voltage detection unit 42. Each of these units of the arithmetic processing device is, for example, a functional module realized by a computer program executed on the processor. For example, when the switching control unit 41 and the DC link unit voltage detection unit 42 are constructed in the form of a computer program, the arithmetic processing device can be operated in accordance with the computer program to realize the functions of each unit. The computer program for executing each process of the switching control unit 41 and the DC link unit voltage detection unit 42 may be provided in a form recorded on a computer-readable recording medium such as a semiconductor memory, a magnetic recording medium, or an optical recording medium. Alternatively, the switching control unit 41 and the DC link unit voltage detection unit 42 may be realized as a semiconductor integrated circuit in which a computer program for realizing the functions of each unit is written.
[0034] The inverter 5 is connected to the DC side of the converter 2. The inverter 5 is composed of a bridge circuit of switching elements and diodes connected in inverse parallel to the switching elements. Examples of the switching elements include IGBTs, FETs, thyristors, GTOs, and transistors, but other semiconductor elements may also be used. In the example shown in FIG. 1, the motor 6 is a three-phase AC motor, so the inverter 5 is composed of a three-phase bridge circuit. If the motor 6 is a single-phase AC motor, the inverter 5 is composed of a single-phase bridge circuit. The inverter 5 converts DC power in the DC link into AC power and supplies it to the motor 6 on the AC input / output side by PWM control of the on / off operation of the internal switching elements based on a command from a higher-level control device (not shown), and also converts AC power regenerated by deceleration of the motor 6 into DC power and returns it to the DC link. The speed, torque, or rotor position of the motor 6 is controlled based on the AC power supplied from the inverter 5. The higher-level control device that controls the inverter 5 may be composed of a combination of an analog circuit and a processor, or may be composed of only a processor. The arithmetic processing device that can constitute the upper control device that controls the inverter 5 includes, for example, an IC, an LSI, a CPU, an MPU, and a DSP.
[0035] A temperature estimation device 1 according to a first embodiment of the present disclosure calculates an estimated junction temperature value of a power semiconductor element provided in a three-phase bridge circuit 31 in a converter 2. The temperature estimation device 1 includes a current detection unit 11, a junction temperature estimation unit 12, a voltage detection unit 13, an ambient temperature detection unit 14, a temperature comparison unit 15, and an alarm output unit 16.
[0036] The current detection unit 11 detects the value of a current flowing through a power semiconductor element provided in the three-phase bridge circuit 31 of the converter 2 (the value of a current input to the converter 2). The current value detected by the current detection unit 11 is sent to a provisional value calculation unit 23 in the junction temperature estimation unit 12 and a switching control unit 41 in the converter control device 3. The current detection unit 11 may be shared with a current detection unit provided in the converter control device 3.
[0037] The voltage detection unit 13 detects the value of the terminal-to-terminal voltage (line voltage) on the three-phase AC power supply 4 side of the converter 2. The terminal voltage value detected by the voltage detection unit 13 is sent to the provisional value calculation unit 23 and the unbalance rate calculation unit 21 in the junction temperature estimator 12, and to the switching control unit 41 in the converter control device 3. The voltage detection unit 13 may be shared with a voltage detection unit provided in the converter control device 3.
[0038] The ambient temperature detection unit 14 detects the ambient temperature of the power semiconductor element based on a signal sent from a temperature detection element 35 provided in the vicinity of the power semiconductor element. The ambient temperature of the power semiconductor element detected by the ambient temperature detection unit 14 is sent to a provisional value calculation unit 23 in the junction temperature estimation unit 12.
[0039] The junction temperature estimator 12 calculates an estimated junction temperature value of the power semiconductor element based on a provisional junction temperature value calculated based at least on the value of the current detected by the current detector 11 and on the unbalance rate of the three-phase AC power supply 4 connected to the converter 2. To this end, the junction temperature estimator 12 has an unbalance rate calculator 21, a temperature compensation coefficient calculator 22, a provisional value calculator 23, and an estimated value calculator 24.
[0040] The provisional value calculation unit 23 calculates a provisional value of the junction temperature of the power semiconductor element based on the value of the current detected by the current detection unit 11, the value of the terminal voltage detected by the voltage detection unit 13, and the ambient temperature of the power semiconductor element detected by the ambient temperature detection unit 14. The provisional value of the junction temperature is a value of the junction temperature estimated in a state in which the three-phase AC power supply 4 is in balance, that is, a value estimated without taking into consideration the unbalance rate of the three-phase AC power supply 4.
[0041] Provisional value T of the junction temperature of the power semiconductor element j1 can be expressed as in Equation 1. In Equation 1, the power generated by a current flowing through the power semiconductor element is W. In addition, in Equation 1, the unit reference power of the power semiconductor element that is specified in advance is W0 The unit reference power of the power semiconductor element is W 0 The temperature rise rate per unit is defined as "ΔT / W 0 " (constant). In addition, in the formula 1, the ambient temperature of the power semiconductor element detected by the ambient temperature detection unit 14 is defined as T a The thermal time constant is τ, and the time during which power is generated in the power semiconductor element (the time during which current flows through the power semiconductor element) is t.
[0042]
number
[0043] In formula 1, the power W generated in the power semiconductor element can be calculated by multiplying the square of the value of the current detected by the current detection unit 11 by the value of the resistance component of the power semiconductor element. For example, when the resistance of the power semiconductor element is R and the current flowing through the power semiconductor element is I, the power W generated in the power semiconductor element is expressed as "W=R×I 2 " Therefore, the provisional value calculation unit 23 calculates the provisional value of the junction temperature of the power semiconductor element based on the value of the current detected by the current detection unit 11, the value of the terminal voltage detected by the voltage detection unit 13, and the ambient temperature of the power semiconductor element detected by the ambient temperature detection unit 14 in accordance with the formula 1. Note that, for example, when the temperature of the installation location of the converter 2 is substantially constant, the ambient temperature T a By setting the temperature to a constant (that is, the temperature of the location where the converter 2 is installed), the ambient temperature detection unit 14 and the temperature detection element 35 may be omitted.
[0044] The unbalance rate calculation unit 21 calculates the unbalance rate of the three-phase AC power supply 4. In the example shown in FIG. 1, the unbalance rate calculation unit 21 calculates the unbalance rate of the voltage of the three-phase AC power supply 4 based on the value of the terminal-to-terminal voltage (line voltage) detected by the voltage detection unit 13.
[0045] The voltage unbalance rate of the three-phase AC power supply 4 can be calculated according to a known formula. Two examples of methods for calculating the voltage unbalance rate of the three-phase AC power supply 4 are listed below. The source of the two calculation methods is the website of the Institute of Electrical Engineers of Japan (https: / / jeea.or.jp / course / contents / 05102 / ).
[0046] The first method for calculating the voltage unbalance rate of the three-phase AC power supply 4 will be described below.
[0047] The value of the terminal voltage (line voltage) of the three-phase RST detected by the voltage detection unit 13 is E RS , E ST and E TR Then, the average terminal voltage E avg can be expressed as Equation 2.
[0048]
number
[0049] Positive sequence voltage E 1 can be expressed as Equation 3.
[0050]
number
[0051] Negative-phase voltage E 2 can be expressed as Equation 4.
[0052]
number
[0053] Therefore, according to the first calculation method of the voltage unbalance rate of the three-phase AC power source 4, the positive-phase voltage E 1 and the negative-phase voltage E shown in Equation 4 2 Using the above, the voltage unbalance factor k of the three-phase AC power supply 4 can be expressed as in Equation 5.
[0054]
number
[0055] The second method for calculating the voltage unbalance rate of the three-phase AC power supply 4 will be described below.
[0056] The value of the terminal voltage (line voltage) of the three-phase RST detected by the voltage detection unit 13 is E RS , E ST , and E TR Then, the average terminal voltage E avg can be expressed as Equation 2 above. At this time, the voltage between each terminal E RS , E ST and E TR and the average terminal voltage E avg The maximum absolute difference between diffmax can be expressed as Equation 6.
[0057]
number
[0058] Therefore, according to the second calculation method of the voltage unbalance rate of the three-phase AC power supply 4, the average terminal voltage E avg and E shown in Eq. diffmax Using the above, the voltage unbalance factor k of the three-phase AC power supply 4 can be expressed as in Equation 7.
[0059]
number
[0060] The unbalance rate calculation unit 21 calculates the unbalance rate of the voltage of the three-phase AC power supply 4 based on the value of the inter-terminal voltage detected by the voltage detection unit 13, for example, according to the above-mentioned formula 5 or formula 7.
[0061] The unbalance rate calculation unit 21 may calculate the unbalance rate of the current of the three-phase AC power source 4 based on the value of the current detected by the current detection unit 11 (the value of the current input to the converter 2) as the unbalance rate of the three-phase AC power source 4. FIG. 2 is a diagram showing a modified example of the unbalance rate calculation unit in the temperature estimation device according to the first embodiment of the present disclosure and the converter system including the same. The value of the current detected by the current detection unit 11 is sent to the unbalance rate calculation unit 21. The unbalance rate calculation unit 21 calculates the unbalance rate of the current of the three-phase AC power source 4 based on the value of the current detected by the current detection unit 11. In calculating the unbalance rate of the current of the three-phase AC power source 4, for example, an equation in which the "value of the voltage" in the above-mentioned equation 5 or equation 7 is replaced with the "value of the current" may be used. In FIG. 2, the circuit components other than the unbalance rate calculation unit 21 are the same as the circuit components shown in FIG. 1, so the same circuit components are denoted by the same reference numerals and detailed description of the circuit components is omitted.
[0062] The unbalance rate of the three-phase AC power supply 4 calculated by the unbalance rate calculation unit 21 is sent to the temperature compensation coefficient calculation unit 22. The temperature compensation coefficient calculation unit 22 calculates a temperature compensation coefficient based on the unbalance rate. The temperature compensation coefficient calculated by the temperature compensation coefficient calculation unit 22 is sent to the estimated value calculation unit 24. The estimated value calculation unit 24 outputs a value obtained by multiplying the provisional junction temperature value by the temperature compensation coefficient as an estimated junction temperature value of the power semiconductor element.
[0063] Here, the provisional junction temperature value, the temperature compensation coefficient, and the estimated junction temperature value will be described in more detail.
[0064] As described above, the junction temperature provisional value calculated by provisional value calculation unit 23 according to Equation 1 is the value of the junction temperature estimated in a situation where the three-phase AC power supply 4 is balanced (not unbalanced). The junction temperature provisional value calculated according to Equation 1 based on the current value detected by current detection unit 11 and the voltage value detected by voltage detection unit 13 in a situation where the three-phase AC power supply 4 is balanced (not unbalanced) is close to the true value of the junction temperature, so there is little error even if the junction temperature provisional value is directly estimated as the junction temperature of the power semiconductor element (i.e., used as an estimated junction temperature value).
[0065] However, in a situation where the unbalance rate of the three-phase AC power supply 4 is large, the provisional junction temperature value calculated according to Equation 1 based on the current value detected by the current detection unit 11 and the voltage value detected by the voltage detection unit 13 will be significantly deviated from the true junction temperature value for some of the multiple power semiconductor elements. Therefore, in the first embodiment of the present disclosure, a temperature compensation coefficient reflecting the unbalance rate of the three-phase AC power supply 4 is calculated as a parameter for reducing the deviation between the provisional junction temperature value calculated by the provisional value calculation unit 23 in a situation where the unbalance rate of the three-phase AC power supply 4 is large and the true junction temperature value, and a value obtained by multiplying the provisional junction temperature value by the temperature compensation coefficient is determined as the estimated junction temperature value of the power semiconductor element.
[0066] Here, two examples of the method for calculating the temperature compensation coefficient will be listed.
[0067] The first method for calculating the temperature compensation coefficient will be described below.
[0068] For example, the unbalance factor k is calculated by the second calculation method of the voltage unbalance factor of the three-phase AC power supply 4 described above. In this case, in Equation 6, the terminal voltage E RS , E ST and E TR Among them, the minimum value is E RS Assuming that, Equation 8 holds.
[0069]
number
[0070] By transforming Equation 8 using Equation 7, Equation 9 is obtained.
[0071]
number
[0072] When the voltage of the three-phase AC power supply 4 is unbalanced, a voltage E RS The power W generated in the R-phase or S-phase power semiconductor element when RS can be expressed as Equation 10.
[0073]
number
[0074] On the other hand, when the voltage of the three-phase AC power supply 4 is balanced, a voltage E RS The power W generated in the R-phase or S-phase power semiconductor element when RS can be expressed as Equation 11.
[0075]
number
[0076] The power W of the three-phase AC power supply 4 when the voltage is balanced as shown in Equation 11 RS By multiplying this by the coefficient A shown in Equation 12, the power W when the voltage of the three-phase AC power supply 4 is unbalanced, as shown in Equation 10, is obtained. RS It can be seen that the following can be obtained.
[0077]
number
[0078] The coefficient A shown in Equation 12 is used as a temperature compensation coefficient for reducing the discrepancy between the provisional junction temperature value calculated by provisional value calculation unit 23 and the true value of the junction temperature when the unbalance rate of the three-phase AC power supply 4 is large. For example, when the unbalance rate k is 0%, the temperature compensation coefficient A is 1. The temperature compensation coefficient calculation unit 22 calculates the temperature compensation coefficient A using the unbalance rate k calculated by the unbalance rate calculation unit 21 according to Equation 12, and sends this temperature compensation coefficient A to the estimated value calculation unit 24. The estimated value calculation unit 24 outputs, for example, a value obtained by multiplying the provisional junction temperature value shown in Equation 1 by the temperature compensation coefficient A calculated by the temperature compensation coefficient calculation unit 22 as the estimated value of the junction temperature of the power semiconductor element.
[0079] The second method of calculating the temperature compensation coefficient will be described below.
[0080] The second calculation method of the temperature compensation coefficient is to operate the converter system 100 connected to an experimental three-phase AC power supply capable of outputting a line voltage with an arbitrary unbalance ratio of 0% to 100% by an experiment before the actual operation of the converter system 100, and to obtain a relational expression between the unbalance ratio and the temperature compensation coefficient. In the experiment, the experimental three-phase AC power supply is made to output a line voltage with a specific unbalance ratio of 0% to 100%, and the junction temperature of each power semiconductor element in the three-phase bridge circuit 31 is actually measured, and the maximum value of the measured junction temperatures is divided by the estimated junction temperature value shown in Equation 1 to calculate the temperature compensation coefficient A at the specific unbalance ratio. FIG. 3 is a diagram illustrating the relationship between the unbalance ratio k and the temperature compensation coefficient A calculated by the second calculation method of the temperature compensation coefficient. In FIG. 3, the temperature compensation coefficient A corresponding to an unbalance ratio k of 0% to 30% obtained by the experiment is indicated by a black circle. An approximation expression showing the relationship between the unbalance ratio k and the temperature compensation coefficient A is obtained from the values of the unbalance ratio k and the temperature compensation coefficient A obtained by the experiment. In FIG. 3, the relationship between the unbalance rate k and the temperature compensation coefficient A is obtained by linear approximation (linear function) as an example, but a function other than a linear function may be used as the approximation formula. The approximation formula showing the relationship between the unbalance rate k and the temperature compensation coefficient A may be obtained for an unbalance rate of 0% to 100% as one interval. Alternatively, the unbalance rate of 0% to 100% may be divided into a plurality of intervals, and an approximation formula showing the relationship between the unbalance rate k and the temperature compensation coefficient A may be obtained for each interval. The approximation formula showing the relationship between the unbalance rate k and the temperature compensation coefficient A obtained by experiment is stored in advance in the temperature compensation coefficient calculation unit 22. The temperature compensation coefficient calculation unit 22 calculates the temperature compensation coefficient A corresponding to the unbalance rate k calculated by the unbalance rate calculation unit 21 according to the approximation formula, and sends this temperature compensation coefficient A to the estimated value calculation unit 24. The estimated value calculation unit 24 outputs, for example, a value obtained by multiplying the provisional junction temperature value shown in Equation 1 by the temperature compensation coefficient A calculated by the temperature compensation coefficient calculation unit 22 as the junction temperature estimated value of the power semiconductor element.
[0081] In this way, the junction temperature estimate of the power semiconductor element is obtained by multiplying the provisional junction temperature value shown in Equation 1 by the temperature compensation coefficient A calculated by the temperature compensation coefficient calculation unit 22. That is, the junction temperature estimate T j2 can be expressed as Equation 13.
[0082]
number
[0083] When calculating the provisional value of the junction temperature according to Equation 1, the power W generated in the power semiconductor element is calculated by multiplying the square of the current detected by the current detection unit 11 by the resistance component of the power semiconductor element. f and collector-emitter saturation voltage V CE The power W generated in the power semiconductor element may be calculated by multiplying the current value detected by the current detection unit 11 by (sat). When the resistance of the power semiconductor element is R and the current flowing through the power semiconductor element is I, the power W generated in the power semiconductor element is calculated by the following formula: W=R×I 2 " Therefore, equation 1 can be transformed into equation 14.
[0084]
number
[0085] In Equation 14, the temperature rise rate ΔT, the resistance R of the power semiconductor element, and the reference power W of the power semiconductor element 0 is regarded as a constant value to simplify the calculation, and a constant M shown in Equation 15 is introduced.
[0086]
number
[0087] Substituting Equation 15 into Equation 14, the provisional junction temperature T j1 is obtained.
[0088]
number
[0089] The provisional value calculation unit 23 can calculate the provisional value of the junction temperature of the power semiconductor element based on the value of the current detected by the current detection unit 11 and the ambient temperature of the power semiconductor element detected by the ambient temperature detection unit 14 according to Equation 16. Therefore, the junction temperature estimated value T j2 can be expressed as Equation 17.
[0090]
number
[0091] The junction temperature estimated value calculated by the estimated value calculation unit 24 as described above is displayed, for example, on a display unit (not shown). Examples of the display unit include a standalone display device, a display device attached to a higher-level control unit, a display device attached to the temperature estimation device 1, a display device attached to the converter system 100, a display device attached to a motor drive device including the converter system 100, and a display device attached to a personal computer and a mobile terminal. Alternatively, instead of the display unit, the junction temperature estimated value calculated by the temperature estimation device 1 may be output as sound by an audio device (not shown). This allows the operator to accurately and accurately grasp the junction temperature estimated value of the power semiconductor element even when the power quality of the three-phase AC power source 4 is poor or when an abnormality such as a phase loss occurs in the three-phase AC power source 4 and the unbalance rate of the three-phase AC power source 4 is high.
[0092] Moreover, the junction temperature estimated value calculated by the estimated value calculation unit 24 as described above is sent to the temperature comparison unit 15 .
[0093] The temperature comparison unit 15 compares the junction temperature estimate calculated by the estimate calculation unit 24 in the junction temperature estimation unit 12 with a predetermined temperature threshold. The comparison result by the temperature comparison unit 15 is sent to the alarm output unit 16. The temperature threshold may be set to, for example, a temperature several tens of percent lower than the temperature at which the power semiconductor element is destroyed by overheating, a temperature several tens of percent lower than the temperature at which the converter system 100 is destroyed by overheating of the power semiconductor element, or a temperature several tens of percent higher than a rated temperature previously defined for the power semiconductor element or the converter system. The numerical values given here are merely examples, and other numerical values may be used. In addition, the temperature threshold may be set after previously determining the relationship between the application environment of the converter system 100 and the presence or absence of an alarm output by the alarm output unit 16, for example, by operating the converter system 100 through experiments or actual operation, or by computer simulation. The set temperature threshold is stored in a storage unit (not shown). In addition, by making the storage unit (not shown) that stores the temperature threshold value rewritable by an external device, even after the temperature threshold value has been set once, it is possible to change it to an appropriate value as necessary.
[0094] The alarm output unit 16 outputs an alarm when the comparison result by the temperature comparison unit 15 indicates that the junction temperature estimated value is equal to or higher than the temperature threshold value. The alarm output from the alarm output unit 16 is sent to, for example, a display unit (not shown), and the display unit displays, for example, a message notifying an operator of "overheating of the power semiconductor element". Examples of the display unit include a standalone display device, a display device attached to the upper control unit, a display device attached to the temperature estimation device 1, a display device attached to the converter system 100, a display device attached to a motor drive device including the converter system 100, and a display device attached to a personal computer and a mobile terminal. Alternatively, the alarm output from the alarm output unit 16 is sent to, for example, an audio device (not shown). For example, the alarm output from the alarm output unit 16 is sent to, for example, a light-emitting device such as an LED or a lamp (not shown), and the light-emitting device emits light when receiving the alarm to notify an operator of "overheating of the power semiconductor element". Also, for example, the alarm output from the alarm output unit 16 is sent to, for example, an audio device (not shown), and when the audio device receives the alarm, it emits a sound such as a voice, a speaker, a buzzer, or a chime to notify the worker of "overheating of the power semiconductor element". This allows the worker to certainly and easily grasp the overheating of the power semiconductor element. For example, the worker can easily take measures such as emergency stopping the converter system 100 or replacing the power semiconductor element. Also, the alarm output from the alarm output unit 16 may be used for a protective operation of the converter system 100, or for a protective operation of a motor drive device including the converter system 100.
[0095] FIG. 4 is a flowchart showing an operation flow of the temperature estimation device according to the first embodiment of the present disclosure.
[0096] The temperature estimation process for the power semiconductor elements in the temperature estimation device 1 according to the first embodiment of the present disclosure and the converter system 100 including the same is periodically executed when the converter system 100 is connected to a three-phase AC power source 4 and is actually in operation.
[0097] In step S101, the voltage detection unit 13 detects the value of the voltage between the terminals on the three-phase AC power supply 4 side of the converter 2. Although not shown in FIG. 4, the current detection unit 11 detects the value of the current flowing through the power semiconductor elements provided in the three-phase bridge circuit 31 of the converter 2 (the value of the current input to the converter 2), and the ambient temperature detection unit 14 detects the ambient temperature of the power semiconductor elements based on a signal sent from the temperature detection element 35.
[0098] In step S102, the unbalance rate calculation unit 21 calculates the unbalance rate of the three-phase AC power supply 4. The unbalance rate of the three-phase AC power supply 4 to be calculated may be either the voltage unbalance rate or the current unbalance rate.
[0099] In step S103 , the temperature compensation coefficient calculation unit 22 calculates a temperature compensation coefficient using the unbalance factor calculated by the unbalance factor calculation unit 21 .
[0100] In step S104, the provisional value calculation unit 23 calculates a provisional value of the junction temperature of the power semiconductor element based on the current value detected by the current detection unit 11, the inter-terminal voltage value detected by the voltage detection unit 13, and the ambient temperature of the power semiconductor element detected by the ambient temperature detection unit 14.
[0101] In step S105, the estimate value calculation unit 24 outputs a value obtained by multiplying the junction temperature provisional value calculated by the provisional value calculation unit 23 by the temperature compensation coefficient calculated by the temperature compensation coefficient calculation unit 22 as the junction temperature estimate value of the power semiconductor element. The junction temperature estimate value calculated by the estimate value calculation unit 24 is sent to the temperature comparison unit 15. In addition, the junction temperature estimate value calculated by the estimate value calculation unit 24 may be displayed on a display unit (not shown), for example, or may be output as sound by an audio device (not shown).
[0102] In step S106, temperature comparison unit 15 compares the junction temperature estimate calculated by estimate calculation unit 24 in junction temperature estimation unit 12 with a predetermined temperature threshold. If it is determined in step S106 that the junction temperature estimate is equal to or greater than the temperature threshold, the process proceeds to step S107, and if it is determined that the junction temperature estimate is less than the temperature threshold, the process returns to step S101.
[0103] In step S107, the alarm output unit 16 outputs an alarm.
[0104] The above-mentioned processes of steps S101 to S107 are repeatedly executed periodically until an alarm is output by the alarm output unit 16 in step S107.
[0105] Next, a temperature estimation device according to a second embodiment of the present disclosure and a converter system including the same will be described.
[0106] The second embodiment of the present disclosure switches between outputting the value obtained by multiplying the provisional junction temperature value by a temperature compensation coefficient as the junction temperature estimated value, or outputting the provisional junction temperature value as is as the junction temperature estimated value, depending on the magnitude of the current flowing through a power semiconductor element.
[0107] FIG. 5 is a diagram illustrating a temperature estimation device and a converter system including the same according to the second embodiment of the present disclosure.
[0108] The temperature estimation device 1 according to the second embodiment of the present disclosure is obtained by adding a current comparison unit 25 to the junction temperature estimation unit 12 in the temperature estimation device 1 according to the first embodiment shown in Fig. 1 or 2. That is, the junction temperature estimation unit 12 further includes a current comparison unit 25.
[0109] The value of the current detected by the current detection unit 11 is sent to a provisional value calculation unit 23 in the junction temperature estimation unit 12 and a switching control unit 41 in the converter control device 3 , as well as to a current comparison unit 25 .
[0110] The current comparison unit 25 compares the value of the current detected by the current detection unit 11 with a predetermined current threshold. The comparison result by the current comparison unit 25 is sent to the estimated value calculation unit 24. The current threshold is set to, for example, 60% of the rated current of the power semiconductor element, but the numerical value given here is merely an example and may be other numerical values. In addition, the current threshold may be set after previously determining the application environment of the converter system 100 and the relationship with the presence or absence of an alarm output by the alarm output unit 16, for example, by operating the converter system 100 through an experiment or actual operation, or by a computer simulation. The set current threshold is stored in a storage unit (not shown). Note that the storage unit (not shown) that stores the current threshold can be rewritten by an external device, so that the current threshold can be changed to an appropriate value as necessary even after it has been set.
[0111] When the current flowing through the power semiconductor elements is small, the unbalance rate of the three-phase AC power supply 4 has a small effect, and therefore the provisional value of the junction temperature calculated by the provisional value calculation unit 23 is considered to be close to the true value. Therefore, in the second embodiment of the present disclosure, when the current flowing through the power semiconductor elements is small, the unbalance rate calculation unit 21 and the temperature compensation coefficient calculation unit 22 are not operated, and the provisional value of the junction temperature is determined as the junction temperature estimation unit, thereby reducing the calculation load of the arithmetic processing device constituting the unbalance rate calculation unit 21 and the temperature compensation coefficient calculation unit 22. On the other hand, when the current flowing through the power semiconductor elements is large, the unbalance rate of the three-phase AC power supply 4 has a large effect, and therefore the provisional value of the junction temperature calculated by the provisional value calculation unit 23 is considered to be significantly deviated from the true value. Therefore, in the second embodiment of the present disclosure, when the current flowing through the power semiconductor element is large, the value obtained by multiplying the junction temperature provisional value calculated by the provisional value calculation unit 23 and the temperature compensation coefficient calculated by the temperature compensation coefficient calculation unit 22 is determined as the junction temperature estimated value, thereby prioritizing improvement of the accuracy of the temperature estimation process over reduction of the calculation load.
[0112] When the comparison result by current comparing unit 25 indicates that the value of the current detected by current detecting unit 11 is equal to or greater than the current threshold, estimated value calculating unit 24 outputs the value obtained by multiplying the junction temperature provisional value calculated by provisional value calculating unit 23 by the temperature compensation coefficient calculated by temperature compensation coefficient calculating unit 22 as the junction temperature estimated value. When the comparison result by current comparing unit 25 indicates that the value of the current detected by current detecting unit 11 is less than the current threshold, estimated value calculating unit 24 outputs the junction temperature provisional value calculated by provisional value calculating unit 23 as the junction temperature estimated value as is.
[0113] In the temperature estimation device 1 according to the second embodiment of the present disclosure and the converter system 100 including the same, the configuration and operation other than the current detection unit 11, the estimated value calculation unit 24, and the current comparison unit 25 are similar to the configuration and operation described with reference to FIG. 1, and therefore will not be described again.
[0114] FIG. 6 is a flowchart showing an operation flow of the temperature estimation device according to the second embodiment of the present disclosure.
[0115] The temperature estimation process for the power semiconductor elements in the temperature estimation device 1 according to the second embodiment of the present disclosure and the converter system 100 including the same is periodically executed when the converter system 100 is connected to a three-phase AC power source 4 and is actually in operation.
[0116] In step S201, the voltage detection unit 13 detects the value of the terminal voltage on the three-phase AC power supply 4 side of the converter 2. Although not shown in FIG. 6, the ambient temperature detection unit 14 detects the ambient temperature of the power semiconductor element based on a signal sent from the temperature detection element 35.
[0117] In step S202, the current detection unit 11 detects the value of the current flowing through the power semiconductor elements provided in the three-phase bridge circuit 31 of the converter 2 (the value of the current input to the converter 2).
[0118] In step S203, current comparison unit 25 compares the value of the current detected by current detection unit 11 with a predetermined current threshold. If it is determined in step S203 that the value of the current detected by current detection unit 11 is equal to or greater than the current threshold, the process proceeds to step S204, and if it is determined that the value of the current detected by current detection unit 11 is less than the current threshold, the process proceeds to step S208.
[0119] In step S204, the unbalance rate calculation unit 21 calculates the unbalance rate of the three-phase AC power supply 4. The unbalance rate of the three-phase AC power supply 4 to be calculated may be either the voltage unbalance rate or the current unbalance rate.
[0120] In step S205, the temperature compensation coefficient calculation unit 22 calculates a temperature compensation coefficient by using the unbalance factor calculated by the unbalance factor calculation unit 21.
[0121] In step S206, the provisional value calculation unit 23 calculates a provisional value of the junction temperature of the power semiconductor element based on the value of the current detected by the current detection unit 11, the value of the resistance component of the power semiconductor element, and the ambient temperature of the power semiconductor element detected by the ambient temperature detection unit 14.
[0122] In step S207, the estimation value calculation unit 24 outputs the value obtained by multiplying the junction temperature provisional value calculated by the provisional value calculation unit 23 by the temperature compensation coefficient calculated by the temperature compensation coefficient calculation unit 22 as the junction temperature estimation value of the power semiconductor element.
[0123] On the other hand, if it is determined in step S203 that the value of the current detected by the current detection unit 11 is less than the current threshold value, in step S208, the provisional value calculation unit 23 calculates a provisional value of the junction temperature of the power semiconductor element based on the value of the current detected by the current detection unit 11, the value of the resistance component of the power semiconductor element, and the ambient temperature of the power semiconductor element detected by the ambient temperature detection unit 14.
[0124] In step S209, the estimate value calculation unit 24 outputs the junction temperature provisional value calculated by the provisional value calculation unit 23 as an estimate value of the junction temperature of the power semiconductor element.
[0125] The junction temperature estimates calculated by the estimate calculation unit 24 in steps S207 and S209 are sent to the temperature comparison unit 15. The junction temperature estimates calculated by the estimate calculation unit 24 may be displayed on a display unit (not shown), for example, or may be output as sound by an audio device (not shown).
[0126] In step S210, temperature comparison unit 15 compares the junction temperature estimate calculated by estimate calculation unit 24 in junction temperature estimation unit 12 with a predetermined temperature threshold. If it is determined in step S210 that the junction temperature estimate is equal to or greater than the temperature threshold, the process proceeds to step S211, and if it is determined that the junction temperature estimate is less than the temperature threshold, the process returns to step S201.
[0127] In step S211, the alarm output unit 16 outputs an alarm.
[0128] The above-mentioned processes of steps S201 to S211 are repeatedly executed periodically until an alarm is output by the alarm output unit 16 in step S211.
[0129] As described above, when it is determined in step S203 that the value of the current detected by the current detection unit 11 is less than the current threshold value, the unbalance rate calculation unit 21 and the temperature compensation coefficient calculation unit 22 do not operate, and the calculation load of the arithmetic processing device constituting the unbalance rate calculation unit 21 and the temperature compensation coefficient calculation unit 22 is reduced. Therefore, compared to the first embodiment, the second embodiment of the present disclosure can improve the accuracy of the junction temperature estimation value while reducing the proportion (e.g., CPU usage) of the junction temperature estimation process in the arithmetic processing of the arithmetic processing device. Note that in steps S206 and S208, the forward voltage V of the power semiconductor is used as the resistance component of the power semiconductor element. f and collector-emitter saturation voltage V CE A provisional value of the junction temperature of the power semiconductor element may be calculated based on (sat).
[0130] Next, a temperature estimation device according to a third embodiment of the present disclosure and a converter system including the same will be described.
[0131] A third embodiment of the present disclosure switches between outputting a value obtained by multiplying a provisional junction temperature value by a temperature compensation coefficient as a junction temperature estimated value or outputting the provisional junction temperature value as is as the junction temperature estimated value, depending on the magnitude of the current flowing through a power semiconductor element and the unbalance rate of the three-phase AC power supply.
[0132] FIG. 7 is a diagram showing a temperature estimation device and a converter system including the same according to the third embodiment of the present disclosure.
[0133] The temperature estimation device 1 according to the third embodiment of the present disclosure is obtained by adding a current comparison unit 25 and an unbalance rate comparison unit 26 to the junction temperature estimation unit 12 in the temperature estimation device 1 according to the first embodiment shown in Fig. 1 or 2. That is, the junction temperature estimation unit 12 further includes the current comparison unit 25 and the unbalance rate comparison unit 26.
[0134] The value of the current detected by the current detection unit 11 is sent to a provisional value calculation unit 23 in the junction temperature estimation unit 12 and a switching control unit 41 in the converter control device 3 , as well as to a current comparison unit 25 .
[0135] The current comparator 25 compares the value of the current detected by the current detector 11 with a predetermined current threshold. The current threshold is set to, for example, 60% of the rated current of the power semiconductor element, but the numerical value given here is merely an example and may be other numerical values. The comparison result by the current comparator 25 is sent to the estimated value calculator 24.
[0136] The unbalance factor calculated by the unbalance factor calculation section 21 is sent to the unbalance factor comparison section 26 in addition to the temperature compensation coefficient calculation section 22 .
[0137] The unbalance ratio comparison unit 26 compares the unbalance ratio calculated by the unbalance ratio calculation unit 21 with a predetermined unbalance ratio threshold. The comparison result by the unbalance ratio comparison unit 26 is sent to the estimated value calculation unit 24. The unbalance ratio threshold is set to, for example, 2%, but the numerical value given here is merely an example and may be other numerical values. In addition, the unbalance ratio threshold may be set after determining in advance the application environment of the converter system 100 and the relationship with the presence or absence of an alarm output by the alarm output unit 16, for example, by operating the converter system 100 through experiments or actual operation, or by computer simulation. The set unbalance ratio threshold is stored in a storage unit (not shown). Note that the storage unit (not shown) that stores the unbalance ratio threshold can be rewritten by an external device, so that the unbalance ratio threshold can be changed to an appropriate value as necessary even after it has been set.
[0138] When the current flowing through the power semiconductor element is small, the influence of the unbalance rate of the three-phase AC power supply 4 is small, and therefore the provisional value of the junction temperature calculated by the provisional value calculation unit 23 is considered to be close to the true value. Therefore, in the third embodiment of the present disclosure, when the current flowing through the power semiconductor element is small, the unbalance rate calculation unit 21 and the temperature compensation coefficient calculation unit 22 are not operated, and the provisional value of the junction temperature is determined as the estimated junction temperature value as is, thereby reducing the calculation load of the arithmetic processing device constituting the unbalance rate calculation unit 21 and the temperature compensation coefficient calculation unit 22. Furthermore, even if the current flowing through the power semiconductor element is large, when the unbalance rate of the three-phase AC power supply 4 is small, the influence of the unbalance rate of the three-phase AC power supply 4 is small, and therefore the provisional value of the junction temperature calculated by the provisional value calculation unit 23 is considered to be close to the true value. Therefore, in the third embodiment of the present disclosure, when the current flowing through the power semiconductor element is small and the unbalance rate of the three-phase AC power supply 4 is small, the temperature compensation coefficient calculation unit 22 is not operated and the provisional junction temperature value is directly determined as the junction temperature estimated value, thereby reducing the calculation load of the arithmetic processing device constituting the temperature compensation coefficient calculation unit 22. Also, when the current flowing through the power semiconductor element is large and the unbalance rate of the three-phase AC power supply 4 is large, the influence of the unbalance rate of the three-phase AC power supply 4 is large, so that the provisional junction temperature value calculated by the provisional value calculation unit 23 is considered to be significantly deviated from the true value. Therefore, in the third embodiment of the present disclosure, when the current flowing through the power semiconductor element is large, the value obtained by multiplying the provisional junction temperature value calculated by the provisional value calculation unit 23 and the temperature compensation coefficient calculated by the temperature compensation coefficient calculation unit 22 is determined as the junction temperature estimated value, thereby prioritizing improvement of the accuracy of the temperature estimation process over reduction of the calculation load.
[0139] If the comparison result by current comparator 25 indicates that the value of the current detected by current detector 11 is equal to or greater than the current threshold and the comparison result by unbalance rate comparator 26 indicates that the unbalance rate calculated by the unbalance rate calculator is equal to or greater than the unbalance rate threshold, estimate value calculator 24 outputs the value obtained by multiplying the junction temperature provisional value calculated by provisional value calculator 23 and the temperature compensation coefficient calculated by temperature compensation coefficient calculator 22 as the junction temperature estimated value. If the comparison result by current comparator 25 indicates that the value of the current detected by current detector 11 is less than the current threshold, estimate value calculator 24 outputs the junction temperature provisional value calculated by provisional value calculator 23 as the junction temperature estimated value as is. Furthermore, when the comparison result by the current comparison unit 25 indicates that the value of the current detected by the current detection unit 11 is equal to or greater than the current threshold value and indicates that the unbalance rate calculated by the unbalance rate comparison unit 26 is less than the unbalance rate threshold value, the estimate value calculation unit 24 outputs the junction temperature provisional value calculated by the provisional value calculation unit 23 as the junction temperature estimate value without modification.
[0140] In the temperature estimation device 1 according to the third embodiment of the present disclosure and the converter system 100 including the same, the configurations and operations other than those of the current detection unit 11, the unbalance rate calculation unit 21, the estimated value calculation unit 24, the current comparison unit 25, and the unbalance rate comparison unit 26 are similar to those described with reference to FIG. 1, and therefore will not be described again.
[0141] FIG. 8 is a flowchart showing an operation flow of the temperature estimation device according to the third embodiment of the present disclosure.
[0142] The temperature estimation process of the power semiconductor element in the temperature estimation device 1 according to the third embodiment of the present disclosure and the converter system 100 including the same is periodically executed when the converter system 100 is connected to a three-phase AC power source 4 and is actually operated.
[0143] In step S301, the voltage detection unit 13 detects the value of the terminal voltage on the three-phase AC power supply 4 side of the converter 2. Although not shown in FIG. 8, the ambient temperature detection unit 14 detects the ambient temperature of the power semiconductor element based on a signal sent from the temperature detection element 35.
[0144] In step S302, the current detection unit 11 detects the value of the current flowing through the power semiconductor elements provided in the three-phase bridge circuit 31 of the converter 2 (the value of the current input to the converter 2).
[0145] In step S303, current comparison unit 25 compares the value of the current detected by current detection unit 11 with a predetermined current threshold. If it is determined in step S303 that the value of the current detected by current detection unit 11 is equal to or greater than the current threshold, the process proceeds to step S304, and if it is determined that the value of the current detected by current detection unit 11 is less than the current threshold, the process proceeds to step S309.
[0146] In step S304, the unbalance rate calculation unit 21 calculates the unbalance rate of the three-phase AC power supply 4. The unbalance rate of the three-phase AC power supply 4 to be calculated may be either the voltage unbalance rate or the current unbalance rate.
[0147] In step S305, the unbalance rate comparison unit 26 compares the unbalance rate calculated by the unbalance rate calculation unit 21 with a predetermined unbalance rate threshold. If it is determined in step S305 that the unbalance rate calculated by the unbalance rate calculation unit 21 is equal to or greater than the unbalance rate threshold, the process proceeds to step S306, and if it is determined that the unbalance rate calculated by the unbalance rate calculation unit 21 is less than the unbalance rate threshold, the process proceeds to step S309.
[0148] In step S306, the temperature compensation coefficient calculation unit 22 calculates a temperature compensation coefficient using the unbalance factor calculated by the unbalance factor calculation unit 21.
[0149] In step S307, the provisional value calculation unit 23 calculates a provisional value of the junction temperature of the power semiconductor element based on the value of the current detected by the current detection unit 11, the value of the resistance component of the power semiconductor element, and the ambient temperature of the power semiconductor element detected by the ambient temperature detection unit 14.
[0150] In step S308, the estimation value calculation unit 24 outputs the value obtained by multiplying the junction temperature provisional value calculated by the provisional value calculation unit 23 by the temperature compensation coefficient calculated by the temperature compensation coefficient calculation unit 22 as the junction temperature estimation value of the power semiconductor element.
[0151] On the other hand, if it is determined in step S303 that the value of the current detected by the current detection unit 11 is less than the current threshold value, or if it is determined in step S305 that the unbalance rate calculated by the unbalance rate calculation unit 21 is less than the unbalance rate threshold value, in step S309, the provisional value calculation unit 23 calculates a provisional value of the junction temperature of the power semiconductor element based on the value of the current detected by the current detection unit 11, the value of the terminal voltage detected by the voltage detection unit 13, and the ambient temperature of the power semiconductor element detected by the ambient temperature detection unit 14.
[0152] In step S310, the estimate value calculation unit 24 outputs the provisional value of the junction temperature calculated by the provisional value calculation unit 23 as an estimate of the junction temperature of the power semiconductor element.
[0153] The junction temperature estimates calculated by the estimate calculation unit 24 in steps S308 and S310 are sent to the temperature comparison unit 15. The junction temperature estimates calculated by the estimate calculation unit 24 may be displayed on a display unit (not shown), for example, or may be output as sound by an audio device (not shown).
[0154] In step S311, temperature comparison unit 15 compares the junction temperature estimate calculated by estimate calculation unit 24 in junction temperature estimation unit 12 with a predetermined temperature threshold. If it is determined in step S311 that the junction temperature estimate is equal to or greater than the temperature threshold, the process proceeds to step S312, and if it is determined that the junction temperature estimate is less than the temperature threshold, the process returns to step S301.
[0155] In step S312, the alarm output unit 16 outputs an alarm.
[0156] The processes of steps S301 to S312 described above are repeatedly executed periodically until an alarm is output by the alarm output unit 16 in step S311.
[0157] As described above, when it is determined in step S303 that the value of the current detected by the current detection unit 11 is less than the current threshold, the unbalance rate calculation unit 21 and the temperature compensation coefficient calculation unit 22 do not operate, and the calculation load of the arithmetic processing device constituting the unbalance rate calculation unit 21 and the temperature compensation coefficient calculation unit 22 is reduced. Therefore, compared to the first embodiment, the third embodiment of the present disclosure can improve the accuracy of the junction temperature estimated value while reducing the proportion (e.g., CPU usage) of the junction temperature estimation process in the arithmetic processing of the arithmetic processing device. Furthermore, when it is determined in step S305 that the unbalance rate calculated by the unbalance rate calculation unit 21 is less than the unbalance rate threshold, the temperature compensation coefficient calculation unit 22 does not operate, and the calculation load of the arithmetic processing device constituting the temperature compensation coefficient calculation unit 22 is reduced. Therefore, compared to the second embodiment, the third embodiment of the present disclosure can improve the accuracy of the junction temperature estimated value while reducing the proportion (e.g., CPU usage) of the junction temperature estimation process in the arithmetic processing of the arithmetic processing device.
[0158] Next, a temperature estimation device according to a fourth embodiment of the present disclosure and a converter system including the same will be described.
[0159] A fourth embodiment of the present disclosure detects the value of a current flowing through a power semiconductor element for each phase of a converter, and calculates an estimated junction temperature of the power semiconductor element through which the maximum current flows.
[0160] The connection relationships of the elements in the temperature estimation device according to the fourth embodiment of the present disclosure and the converter system including the same are the same as the connection relationships of the elements in the temperature estimation device according to the first embodiment and the converter system including the same shown in Fig. 1. However, the operations of the current detection unit 11 and the provisional value calculation unit 23 and the estimated value calculation unit 24 in the junction temperature estimation unit 12 in the fourth embodiment of the present disclosure are different from the operations of the current detection unit 11 and the provisional value calculation unit 23 and the estimated value calculation unit 24 in the junction temperature estimation unit 12 in the first embodiment. Specifically, they are as follows.
[0161] The current detection unit 11 detects the value of a current flowing through the power semiconductor elements of the three-phase bridge circuit 31 of the converter 2 for each phase of the converter. That is, the current detection unit 11 detects the value of a current flowing through the R-phase power semiconductor elements, the value of a current flowing through the S-phase power semiconductor elements, and the value of a current flowing through the T-phase power semiconductor elements of the three-phase bridge circuit 31. The current values of each phase detected by the current detection unit 11 are sent to the provisional value calculation unit 23.
[0162] The junction temperature estimation unit 12 calculates an estimated junction temperature of the power semiconductor element through which the maximum current flows, based on the unbalance rate and a provisional junction temperature value calculated based on at least the maximum value of the current values of each phase detected by the current detection unit 11. The operations of the provisional value calculation unit 23 and the estimated value calculation unit 24 in the junction temperature estimation unit 12 will be described in more detail below.
[0163] The provisional value calculation unit 23 identifies the maximum current value from the currents of each phase detected by the current detection unit 11, and calculates a provisional junction temperature value of the power semiconductor element through which the maximum current flows based on the maximum current value, the inter-terminal voltage value detected by the voltage detection unit 13, and the ambient temperature of the power semiconductor element detected by the ambient temperature detection unit 14.
[0164] The estimated value calculation unit 24 outputs a value obtained by multiplying the provisional junction temperature value of the power semiconductor element through which the maximum current calculated by the provisional value calculation unit 23 flows by the temperature compensation coefficient calculated by the temperature compensation coefficient calculation unit 22 as an estimated junction temperature value of the power semiconductor element through which the maximum current flows.
[0165] In the temperature estimation device 1 according to the fourth embodiment of the present disclosure and the converter system 100 including the same, the configuration and operation other than the current detection unit 11 and the provisional value calculation unit 23 and the estimated value calculation unit 24 in the junction temperature estimation unit 12 are similar to the configuration and operation described with reference to FIG. 1, and therefore will not be described again.
[0166] FIG. 9 is a flowchart showing an operation flow of the temperature estimation device according to the fourth embodiment of the present disclosure.
[0167] The temperature estimation process of the power semiconductor elements in the temperature estimation device 1 according to the fourth embodiment of the present disclosure and the converter system 100 including the same is periodically executed when the converter system 100 is connected to a three-phase AC power source 4 and is actually operated.
[0168] In step S401, the voltage detection unit 13 detects the value of the terminal voltage on the three-phase AC power supply 4 side of the converter 2. Although not shown in FIG. 9, the ambient temperature detection unit 14 detects the ambient temperature of the power semiconductor element based on a signal sent from the temperature detection element 35.
[0169] In step S402, the current detection unit 11 detects the value of the current flowing through the power semiconductor elements of the three-phase bridge circuit 31 of the converter 2 (the value of the current of each phase input to the converter 2) for each phase of the converter. The current value of each phase detected by the current detection unit 11 is sent to the provisional value calculation unit 23.
[0170] In step S403, the provisional value calculating unit 23 identifies the maximum current value from among the currents of the respective phases detected by the current detecting unit 11.
[0171] In step S404, the unbalance rate calculation unit 21 calculates the unbalance rate of the three-phase AC power supply 4. The unbalance rate of the three-phase AC power supply 4 to be calculated may be either the voltage unbalance rate or the current unbalance rate.
[0172] In step S405, the temperature compensation coefficient calculation unit 22 calculates a temperature compensation coefficient using the unbalance factor calculated by the unbalance factor calculation unit 21.
[0173] The process in step S403 and the processes in steps S404 and S405 may be executed in a reverse order.
[0174] In step S406, the provisional value calculation unit 23 calculates a provisional value of the junction temperature of the power semiconductor element through which the maximum current flows, based on the value of the maximum current identified in step S403, the value of the resistance component of the power semiconductor element, and the ambient temperature of the power semiconductor element detected by the ambient temperature detection unit 14.
[0175] In step S407, the estimate value calculation unit 24 outputs a value obtained by multiplying the junction temperature provisional value of the power semiconductor element through which the maximum current calculated by the provisional value calculation unit 23 flows by the temperature compensation coefficient calculated by the temperature compensation coefficient calculation unit 22 as the junction temperature estimate of the power semiconductor element through which the maximum current flows. The junction temperature estimate calculated by the estimate value calculation unit 24 in step S407 is sent to the temperature comparison unit 15. The junction temperature estimate calculated by the estimate value calculation unit 24 may be displayed on a display unit (not shown), for example, or may be output as sound by an audio device (not shown).
[0176] In step S408, temperature comparison unit 15 compares the junction temperature estimate calculated by estimate calculation unit 24 in junction temperature estimation unit 12 with a predetermined temperature threshold. If it is determined in step S408 that the junction temperature estimate is equal to or greater than the temperature threshold, the process proceeds to step S409, and if it is determined that the junction temperature estimate is less than the temperature threshold, the process returns to step S401.
[0177] In step S409, the alarm output unit 16 outputs an alarm.
[0178] The above-mentioned processes of steps S401 to S409 are repeatedly executed periodically until an alarm is output by the alarm output unit 16 in step S408.
[0179] In the three-phase bridge circuit 31, the power semiconductor elements provided in the phase through which the maximum current flows generate the most heat, and are therefore more likely to be damaged and have a shorter lifespan. According to the fourth embodiment of the present disclosure, whether or not to output an alarm is determined based on the estimated junction temperature of the power semiconductor element through which the maximum current flows, so that the power semiconductor elements can be more reliably protected from overheating, and the possibility of damage to and shortening of the lifespan of the power semiconductor elements can be reduced.
[0180] An arithmetic processing device (processor) is provided in the temperature estimation device 1 according to the first to fourth embodiments. This arithmetic processing device has the above-mentioned current detection unit 11, junction temperature estimation unit 12, voltage detection unit 13, ambient temperature detection unit 14, temperature comparison unit 15, and alarm output unit 16. Each of these units in the arithmetic processing device is a functional module realized by, for example, a computer program executed on the processor. For example, when the current detection unit 11, junction temperature estimation unit 12, voltage detection unit 13, ambient temperature detection unit 14, temperature comparison unit 15, and alarm output unit 16 are constructed in the form of a computer program, the arithmetic processing device can be operated according to the computer program to realize the functions of each unit. The computer program for executing each process of the current detection unit 11, junction temperature estimation unit 12, voltage detection unit 13, ambient temperature detection unit 14, temperature comparison unit 15, and alarm output unit 16 may be provided in a form recorded on a computer-readable recording medium such as a semiconductor memory, a magnetic recording medium, or an optical recording medium. Alternatively, the current detection unit 11, the junction temperature estimation unit 12, the voltage detection unit 13, the ambient temperature detection unit 14, the temperature comparison unit 15, and the alarm output unit 16 may be realized as a semiconductor integrated circuit into which a computer program that realizes the functions of each unit is written. [Explanation of symbols]
[0181] 1 Temperature estimation device 2. Converter 3 Converter Control Device 4 Three-phase AC power supply 5. Inverter 6 Motor 11 Current detection section 12 Junction temperature estimation section 13 Voltage detection section 14 Ambient temperature detector 15 Temperature comparison section 16 Alarm output section 21 Unbalance rate calculation section 22 Temperature compensation coefficient calculation section 23 Provisional Value Calculation Department 24 Estimated value calculation section 25 Current comparison section 26 Unbalance rate comparison section 31 Three-phase bridge circuit 32 Smoothing capacitor 33 DC link capacitor 34 Pre-charging circuit 35 Temperature detection element 41 Switching control section 42 DC link voltage detection section
Claims
1. A temperature estimation device that calculates an estimated value of a junction temperature of a power semiconductor element provided in a converter that performs power conversion between AC power on a three-phase AC power supply side and DC power on a DC side, a current detection unit that detects a value of a current flowing through the power semiconductor element; a junction temperature estimating unit that calculates an estimated junction temperature of the power semiconductor element based on a provisional junction temperature value calculated based at least on the value of the current detected by the current detecting unit and an unbalance rate of the three-phase AC power supply connected to the converter; and A temperature estimation device comprising:
2. The junction temperature estimation unit is an unbalance rate calculation unit for calculating the unbalance rate; a temperature compensation coefficient calculation unit that calculates a temperature compensation coefficient based on the unbalance rate; a provisional value calculation unit that calculates the provisional value of the junction temperature; an estimate calculation unit that multiplies the provisional junction temperature value by the temperature compensation coefficient and outputs the multiplied value as the junction temperature estimate; The temperature estimation device according to claim 1 , further comprising:
3. The temperature estimation device according to claim 2 , wherein the provisional value calculation unit calculates the provisional junction temperature value based on at least a value of the current detected by the current detection unit and a value of a resistance component of the power semiconductor element.
4. An ambient temperature detector for detecting an ambient temperature of the power semiconductor element is further provided. The temperature estimation device according to claim 2 , wherein the provisional value calculation unit calculates the provisional junction temperature value based on at least the value of the current detected by the current detection unit and the ambient temperature.
5. a voltage detection unit that detects a voltage between terminals of the converter on the three-phase AC power supply side, The temperature estimation device according to claim 2 , wherein the unbalance rate calculation unit calculates the unbalance rate based on a value of the inter-terminal voltage detected by the voltage detection unit.
6. The temperature estimation device according to claim 2 , wherein the unbalance rate calculation unit calculates the unbalance rate based on a value of the current detected by the current detection unit.
7. the junction temperature estimation unit further includes a current comparison unit that compares the value of the current detected by the current detection unit with a predetermined current threshold value; The temperature estimation device according to any one of claims 2 to 6, wherein the estimation value calculation unit outputs a value obtained by multiplying the junction temperature provisional value and the temperature compensation coefficient as the junction temperature estimation value when the value of the current detected by the current detection unit is equal to or greater than the current threshold, and outputs the junction temperature provisional value as the junction temperature estimation value when the value of the current detected by the current detection unit is less than the current threshold.
8. the junction temperature estimator further includes a current comparator that compares the value of the current detected by the current detector with a predetermined current threshold, and an unbalance ratio current comparator that compares the unbalance ratio with a predetermined unbalance ratio threshold, The temperature estimation device according to any one of claims 2 to 6, wherein the estimate calculation unit outputs a value obtained by multiplying the junction temperature provisional value and the temperature compensation coefficient as the junction temperature estimate value when the value of the current detected by the current detection unit is equal to or greater than the current threshold and the unbalance rate is equal to or greater than the unbalance rate threshold, and outputs the junction temperature provisional value as the junction temperature estimate value when the value of the current detected by the current detection unit is less than the current threshold or when the value of the current detected by the current detection unit is equal to or greater than the current threshold and the unbalance rate is less than the unbalance rate threshold.
9. the current detection unit detects a value of a current flowing through the power semiconductor element for each phase of the converter; The temperature estimation device according to any one of claims 1 to 8, wherein the junction temperature estimation unit calculates a junction temperature estimation value of the power semiconductor element through which the maximum current flows based on a provisional junction temperature value calculated based on at least the maximum value of the current values of each phase detected by the current detection unit and the unbalance rate.
10. a temperature comparison unit that compares the junction temperature estimated value calculated by the junction temperature estimation unit with a predetermined temperature threshold value; an alarm output unit that outputs an alarm when the estimated junction temperature value is equal to or greater than the temperature threshold; The temperature estimation device according to any one of claims 1 to 9, further comprising:
11. A temperature estimation device according to any one of claims 1 to 9, the converter, in which the power semiconductor element is provided and which performs power conversion between AC power on a three-phase AC power source side and DC power on a DC side by turning on and off the power semiconductor element; Equipped with The junction temperature estimator calculates an estimated value of a junction temperature of the power semiconductor element.
Citation Information
Patent Citations
Elevator control device
JP1999255442A
Power element overheating protection device
JP2008131722A
Motor controller and temperature estimation method
JP2009261078A
Power converter
JP2013201870A
Power conversion device
WO2016170584A1