Linear object laying method and linear object laying structure
By using steel shoring with guide parts to secure optical fiber cables along tunnel excavation surfaces, the method addresses the inefficiencies and hazards of existing cable-laying methods, ensuring accurate and efficient installation and measurement of ground conditions.
Patent Information
- Application Number
- JP2021103378
- Authority / Receiving Office
- JP · JP
- Patent Type
- Patents
- Current Assignee / Owner
- Priority Date
- 2020-06-26
- Filing Date
- 2021-06-22
- Publication Date
- 2024-10-09
- Estimated Expiration
- 2041-06-22
AI Technical Summary
The existing method for laying optical fiber cables in tunnel construction is time-consuming and hazardous due to the need for secure tying to wire mesh, which is prone to dislodgment during concrete spraying.
A method involving the use of steel shoring with guide parts along excavation surfaces to efficiently hang and secure optical fiber cables, ensuring they are laid along the excavation surfaces, and the cables are anchored at predetermined positions within the sprayed concrete thickness to maintain consistent distance and prevent dislodgment.
This method allows for efficient and safe laying of optical fiber cables, reducing time near hazardous areas and enabling accurate measurement of ground conditions and stress distribution during tunnel excavation.
Smart Images

Figure 0007564775000001 
Figure 0007564775000002 
Figure 0007564775000003
Abstract
Description
[Technical field]
[0001] The present invention relates to a method for laying a linear object in a tunnel and a structure for laying a linear object in a tunnel. [Background technology]
[0002] Patent Document 1 discloses a method of laying an optical fiber cable along an excavation surface as a linear object for measuring stress in shotcrete sprayed onto the excavation surface when constructing a tunnel. In the method disclosed in Patent Document 1, the optical fiber cable is tied to a wire mesh installed along the excavation surface via a hook. [Prior art documents] [Patent documents]
[0003] [Patent Document 1] JP 2020-041856 A Summary of the Invention [Problem to be solved by the invention]
[0004] In the laying method described in Patent Document 1, when concrete is sprayed onto the wire mesh as a support member, it is necessary to securely fasten the hooks and the optical fiber cable to the wire mesh so that they do not come loose due to the spraying pressure. Firmly fastening the optical fiber cable to the wire mesh is time-consuming and takes a long time to complete, but since the work of laying the optical fiber cable is dangerous and done near the tunnel face, it is desirable to keep the work time as short as possible.
[0005] An object of the present invention is to efficiently lay a linear body along an excavation surface. [Means for solving the problem]
[0006] The present invention relates to This is a linear body laying method for laying a linear body along the upper and lower half excavation surfaces when constructing a tunnel, and includes the steps of erecting a steel support provided with a guide portion along the upper and lower half excavation surfaces, and hanging the linear body on the guide portion, wherein the guide portion extends from the steel support along the tunnel excavation direction, and multiple guide portions are provided along the circumferential direction of the steel support. Effect of the Invention
[0007] According to the present invention, the linear body can be efficiently laid along the excavation surface. [Brief description of the drawings]
[0008] [Figure 1] 1 is a perspective view showing an overview of a linear object installation structure according to a first embodiment of the present invention. [Diagram 2] FIG. 1 is a front view of a linear object laying structure according to a first embodiment of the present invention, viewed in the direction of excavation. [Diagram 3] FIG. 3 is a cross-sectional view showing a cross section taken along line AA in FIG. 2. [Figure 4] 3 is an enlarged cross-sectional view showing a cross section taken along line BB in FIG. 2. [Diagram 5] 5 is a cross-sectional view showing a cross section taken along line CC in FIG. 4. [Figure 6] FIG. 2 is a diagram showing an installation pattern of a linear object laid in a tunnel in the linear object installation structure according to the first embodiment of the present invention. [Figure 7] 6 is a cross-sectional view showing a cross section along the tunneling direction of a linear object laying structure according to a second embodiment of the present invention. FIG. [Figure 8] FIG. 8 is a cross-sectional view taken along line DD in FIG. [Figure 9] FIG. 5 is a diagram showing a first modified example of the linear object installation structure according to the first embodiment of the present invention, and is a cross-sectional view showing a cross section corresponding to FIG. [Figure 10] FIG. 5 is a diagram showing a second modified example of the linear object installation structure according to the first embodiment of the present invention, and is a cross-sectional view showing a cross section corresponding to FIG. [Figure 11] FIG. 5 is a diagram showing a third modified example of the linear object installation structure according to the first embodiment of the present invention, and is a cross-sectional view showing a cross section corresponding to FIG. [Figure 12] FIG. 11 is a diagram for explaining another method for laying a linear object according to the first embodiment of the present invention. [Figure 13] FIG. 11 is a front view of the linear object laying structure relating to the third embodiment of the present invention, viewed in the excavation direction. [Figure 14]FIG. 11 is a diagram showing an installation pattern of a linear object laid in a tunnel in a linear object installation structure according to a third embodiment of the present invention. [Figure 15] FIG. 14 is a diagram showing a modified example of the linear object installation structure according to the third embodiment of the present invention, and corresponds to FIG. 13. [Figure 16] 16 is a cross-sectional view showing a cross section taken along line FF in FIG. 15. [Figure 17] FIG. 13 is a diagram showing another installation pattern of a linear object installed in a tunnel. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0009] DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS Hereinafter, a linear object laying method and a linear object laying structure according to an embodiment of the present invention will be described with reference to the drawings.
[0010] First Embodiment A linear object laying method and a linear object laying structure 100 according to the first embodiment will be described with reference to Figures 1 to 5. Figure 1 is a schematic diagram of the linear object laying structure 100 as seen obliquely from above, Figure 2 is a front view of the linear object laying structure 100 as seen toward the working face 5 along the excavation direction shown in Figure 1, Figure 3 is a cross-sectional view showing a cross section along line AA in Figure 2, Figure 4 is an enlarged cross-sectional view showing a cross section along line BB in Figure 2, and Figure 5 is a cross-sectional view showing a cross section along line CC in Figure 4.
[0011] When constructing mountain tunnels by NATM or other methods, the sprayed concrete sprayed on the inner wall of the excavation hole is easily affected by changes in the ground during excavation. For this reason, it is possible to lay a linear object such as an optical fiber cable in the sprayed concrete and measure the distortion of this linear object to continuously grasp changes in the ground condition. For example, if the linear object is an optical fiber cable, the property of the optical fiber cable that the incident pulse light is slightly scattered backwards can be utilized to measure the frequency of the scattered light, and the distortion, stress, and temperature can be calculated from the measured values. Continuously grasping the ground condition is also important for optimizing the structure of the support members from the viewpoints of safety and economy.
[0012] The linear object laying structure 100 is used to lay a linear object such as an optical fiber cable at an appropriate position in an excavation hole in order to continuously monitor changes in the condition of the ground.
[0013] As shown in Figures 1 to 3, the linear object laying structure 100 comprises a steel support 10 erected along upper and lower half excavation surfaces 1 (excavation surfaces) excavated in an arch shape, a plurality of guide sections 20 provided on the steel support 10, and an optical fiber cable 30 as a linear object hung on the guide sections 20. Note that the optical fiber cable 30 is not shown in Figures 2 and 3. Also, in Figure 3, the steel support erected in the excavation hole before the steel support 10 is not shown.
[0014] The steel support 10 is a member formed of an H-shaped steel material having a pair of flange portions 11a and a web portion 11b sandwiched between the pair of flange portions 11a, as shown in Fig. 4, and is formed in an arch shape curved along the circumferential direction of the upper and lower half excavation surfaces 1, as shown in Fig. 2. Note that the "circumferential direction" means the direction along the upper and lower half excavation surfaces 1 excavated in a substantially arc shape, but since the upper and lower half excavation surfaces 1 are not formed in an accurate arc shape, the steel support 10 actually has a shape that generally follows the upper and lower half excavation surfaces 1.
[0015] As shown in Figures 1 and 2, the steel support 10 is erected in an excavation shaft by connecting a pair of support materials 11 at the top end of the excavation shaft. The work of erecting the steel support 10 in the excavation shaft is carried out every time the excavation shaft is excavated a preset distance, for example 1 m. In other words, multiple steel supports 10 are erected at predetermined intervals in the excavation direction.
[0016] As shown in Figure 2, the pair of support materials 11 are formed almost symmetrically when viewed toward the face 5 along the excavation direction, and are each integrally formed in an arc shape along the upper and lower half excavation surfaces 1 from the top end of the excavation hole to the bottom. A connecting flange portion 12 is provided at the end on the top end side of each support material 11, and the pair of support materials 11 are connected to each other via this connecting flange portion 12. Note that each support material 11 does not need to be formed integrally, and may be formed, for example, by connecting multiple H-shaped steel members formed in an arc shape in the circumferential direction of the upper and lower half excavation surfaces 1.
[0017] 4 and 5, the guide portion 20 is a steel plate bent into an L-shape, and has a fixing portion 22 fixed to the support material 11 via a fastening member such as a screw (not shown), and an extending portion 21 extending in a direction perpendicular to the fixing portion 22. The extending portion 21 is formed with a plurality of through holes 23 as guide holes through which the optical fiber cable 30 is passed. Note that the guide portion 20 is not limited to being made of steel, and may be made of plastic.
[0018] A plurality of guide parts 20 of the above shape are provided at approximately equal intervals along the circumferential direction of the steel support 10, and are attached to the support material 11 so that the extension part 21 extends toward the opposite side of the face 5 along the excavation direction when the steel support 10 is erected along the upper and lower half excavation surfaces 1. In other words, the fixing part 22 of the guide part 20 is fixed to the surface of the web part 11b of the support material 11 opposite the face 5. The guide part 20 may be fixed to the support material 11 by welding or adhesive instead of by fastening members such as screws, or by the attractive force of a magnet provided on the support material 11 or the guide part 20.
[0019] The optical fiber cable 30 is a cable consisting of an optical fiber and a protective member formed to cover the optical fiber. The optical fiber cable 30 is passed through a through hole 23 formed in the guide parts 20 and hung on each guide part 20, so that it is stretched between the guide parts 20 and laid along the steel support 10, that is, laid along the circumferential direction of the upper and lower half excavation surfaces 1, as shown in FIG.
[0020] Both ends of the laid optical fiber cable 30 are connected to a measuring device (not shown) that uses the optical fiber cable 30 to measure the distribution of stress, strain, and temperature in the secondary shotcrete 3 described below. Note that a plurality of optical fiber cables 30 may be provided, such as a cable for measuring strain and a cable for measuring temperature, and the extending portion 21 of the guide portion 20 is formed with a number of through holes 23 sufficient to accommodate the number of optical fiber cables 30 to be laid. Note that the linear body stretched between the guide portions 20 is not limited to the optical fiber cable 30, and may be, for example, a plurality of sensor portions capable of measuring strain and temperature that are arranged in a linear fashion.
[0021] Next, a method for laying the optical fiber cable 30 using the linear object laying structure 100 having the above-mentioned configuration will be described with reference to FIGS.
[0022] The excavation pit is excavated by blasting, and the upper and lower half excavation surfaces 1 are subjected to finish excavation by an excavation device or the like, and then primary shotcrete 2 is sprayed onto the upper and lower half excavation surfaces 1 as a support member, as shown in Fig. 4. Then, along the first surface 2a, which has become relatively smooth by spraying the primary shotcrete 2, the steel support 10 having the above configuration is erected as a member provided with a guide portion 20 (erection process).
[0023] Specifically, the steel support 10 is erected in the excavation shaft by connecting the connecting flanges 12 of a pair of support materials 11 with bolts (not shown) at the top end of the excavation shaft. The erected steel support 10 is then connected in the excavation direction to a previously erected steel support (not shown), i.e., a steel support erected at a position farther from the working face 5 than the steel support 10 in the excavation direction, by a connecting member (not shown).
[0024] Next, the optical fiber cable 30 is hung on each guide part 20 of the erected steel support 10 (hanging process). Specifically, first, the optical fiber cable 30 is passed through the through hole 23 of the guide part 20 provided at the lowest position of the support material 11 on the left side in FIG. 2, and then the optical fiber cable 30 is passed through the through hole 23 of the guide part 20 provided adjacent to it. By repeating the process of passing the optical fiber cable 30 through the through hole 23 of the guide part 20 provided adjacently in this manner, the optical fiber cable 30 is passed through the through hole 23 of all the guide parts 20 provided on the steel support 10, that is, the optical fiber cable 30 is hung on each guide part 20 and the optical fiber cable 30 is stretched between the guide parts 20. As a result, the optical fiber cable 30 is laid along the circumferential direction of the upper and lower half excavation surfaces 1.
[0025] Next, secondary shotcrete 3 is sprayed onto the first surface 2a as a support member so as to bury the optical fiber cable 30 held by the guide portion 20 (spraying process). Specifically, the secondary shotcrete 3 is sprayed by a concrete sprayer (not shown) so as to fill the space formed between the steel support 10 and the previously erected steel support.
[0026] The spraying thickness T of the secondary shotcrete 3, i.e., the thickness from the first surface 2a to the second surface 3a formed by spraying the secondary shotcrete 3, is set to a thickness that covers the flange portion 11a of the support material 11, for example. Note that the spraying thickness T may be such that the flange portion 11a of the support material 11 is partially exposed.
[0027] As described above, the extension 21 of the guide section 20 in which the through hole 23 through which the optical fiber cable 30 is passed extends from the steel support 10 toward the previously erected steel support along the excavation direction. In other words, the optical fiber cable 30 stretched between the guide sections 20 is laid in the excavation direction between the steel support 10 and the previously erected steel support. For this reason, the optical fiber cable 30 is embedded in the secondary shotcrete 3 sprayed between the steel support 10 and the previously erected steel support, along the circumferential direction of the upper and lower half excavation surfaces 1.
[0028] Thereafter, as necessary, rock bolts (not shown) are driven radially into the ground within the area where the secondary shotcrete 3 has been sprayed, thereby completing the process of installing supports on the upper and lower half excavation surfaces 1.
[0029] Once the installation of support structures on the upper and lower half excavation surfaces 1 has been completed in this manner, the construction of the invert is then carried out.
[0030] In constructing an invert, first, the ground below the above-mentioned steel support 10 is excavated to form an invert excavation surface 6 in order to install the invert struts 14.
[0031] The invert strut 14, like the steel support 10, is a member formed from an H-shaped steel material, and is formed in an arch shape curved along the circumferential direction of the invert excavation surface 6, as shown in FIG.
[0032] The invert strut 14 is erected in the excavation hole by connecting the connecting flange parts 16 of a pair of invert strut materials 15 via bolts (not shown) at the lower end of the invert excavation surface 6, thereby connecting the lower end of the steel support 10. As a result, the upper and lower half excavation surfaces 1 and the invert excavation surface 6 exposed by excavation are closed in a ring shape.
[0033] Next, shotcrete 7 is sprayed onto the invert excavation surface 6 to the extent that the erected invert struts 14 are buried. Invert concrete 8 will be finally poured onto the surface of the shotcrete 7 as shown in Fig. 2, but the surface of the shotcrete 7 where work vehicles will pass to proceed with the excavation work is temporarily backfilled with backfill soil 9 as shown in Fig. 3.
[0034] As the excavation pit is dug, the backfill soil 9 is excavated and removed, and invert concrete 8 is poured using a formwork (not shown) on the surface of the shotcrete 7. When the invert concrete 8 and the secondary shotcrete 3 are stabilized, lining concrete 4 is poured on the second surface 3a using a formwork (not shown), as shown in FIG.
[0035] The upper and lower halves of the upper and lower excavation surfaces 1 may be excavated simultaneously using the so-called full section method, or the upper half may be excavated prior to the lower half using the bench cut method. When the upper and lower half excavation surfaces 1 are formed by dividing them into the upper and lower halves, the steel support 10 may be divided into the upper and lower halves. If the ground is stable, the shotcrete 7 and the invert concrete 8 may be used as support members without providing the invert struts 14 as support members for the invert.
[0036] Here, if the position of the optical fiber cable 30 within the spray thickness T is partially too close to the first surface 2a or too close to the second surface 3a, the distance from the upper and lower half excavation surfaces 1 to the optical fiber cable 30 will vary. If the distance between the upper and lower half excavation surfaces 1 and the optical fiber cable 30 varies in the circumferential direction in this way, it is not possible to accurately measure the stress distribution in the circumferential direction in the secondary shotcrete 3, which changes in response to changes in the ground during excavation, and as a result, it becomes difficult to accurately grasp the changes in the ground condition during excavation of the tunnel.
[0037] Therefore, in this embodiment, in order to lay the optical fiber cable 30 at a predetermined position within the spraying thickness T of the secondary shotcrete 3, each guide portion 20 is fixed to the support material 11 so that the position of the through hole 23 through which the optical fiber cable 30 is inserted is located at a predetermined position within the spraying thickness T of the secondary shotcrete 3.
[0038] Specifically, as shown in Figure 4, the guide portion 20 is attached to the support material 11 so that the distance L from the end face of each flange portion 11a of the support material 11 to the center of the through hole 23 is the same, that is, so that the center of the through hole 23 is located approximately in the middle between the pair of flange portions 11a.
[0039] By attaching the guide portion 20 to the support material 11 in this manner, it becomes possible to lay the optical fiber cable 30 passed through the through hole 23 at a predetermined position approximately in the center of the spraying thickness T of the secondary shotcrete 3. Note that the predetermined position is not limited to approximately in the center of the spraying thickness T, and may be, for example, closer to the first surface 2a. In this case, the through hole 23 is formed in a portion of the extension portion 21 closer to the first surface 2a.
[0040] In this way, by laying the optical fiber cable 30 at a predetermined position within the sprayed thickness T of the secondary shotcrete 3, the distance between the upper and lower half excavation faces 1 and the optical fiber cable 30 becomes almost constant in the circumferential direction, and the stress distribution in the circumferential direction within the secondary shotcrete 3, which changes in response to changes in the ground during excavation of the tunnel, can be measured with high accuracy. As a result, it becomes possible to accurately grasp changes in the ground condition during excavation in sequence, and the structure of the support members can be optimized by increasing the sprayed thickness T of the secondary shotcrete 3 or increasing the number of rock bolts in response to changes in the ground condition.
[0041] The optical fiber cable 30 laid on each steel support 10 may be laid continuously in the axial direction of the tunnel as shown in Fig. 6. Fig. 6 is a development view showing the laying pattern of the optical fiber cable 30 laid along the upper and lower half excavation faces 1, developed on a plane centered on the top end.
[0042] In this way, by laying the optical fiber cables 30 at predetermined intervals along the circumferential direction of the upper and lower half excavation surfaces 1 and in the axial direction of the tunnel, it becomes possible to grasp the change in stress of the secondary shotcrete 3 in the axial direction of the tunnel. This makes it possible to set the timing for starting pouring of the lining concrete 4 according to the convergence state of the stress change of the secondary shotcrete 3, and to set the strength of the concrete used in the lining concrete 4 based on the stress state of the secondary shotcrete 3, i.e., the state of the ground.
[0043] According to the above-described first embodiment, the following effects are achieved.
[0044] The above-mentioned linear body laying method includes the steps of erecting steel supports 10, each having a plurality of guide sections 20 with through holes 23 arranged circumferentially, along the upper and lower half excavation surfaces 1, and passing the optical fiber cable 30 through the through holes 23 and hanging it on the guide sections 20, and bridging the optical fiber cable 30 between the guide sections 20. Through these steps, the optical fiber cable 30 is laid circumferentially around the upper and lower half excavation surfaces 1 when constructing a tunnel.
[0045] In this manner, with the linear body laying method described above, it is possible to efficiently lay the optical fiber cable 30 along the upper and lower excavation surfaces 1 simply by hanging the optical fiber cable 30 on the guide section 20 provided on the steel support 10, thereby shortening the time required for laying the optical fiber cable 30 near the working face 5.
[0046] Furthermore, if the optical fiber cable 30 is passed through the through hole 23 and hung on the guide portion 20, it is possible to prevent the optical fiber cable 30 from coming off the guide portion 20 due to the spraying pressure when the secondary sprayed concrete 3 is sprayed onto the optical fiber cable 30.
[0047] <Second embodiment> Next, a linear object laying method and a linear object laying structure 200 according to a second embodiment of the present invention will be described with reference to Figures 7 and 8. Below, differences from the first embodiment will be mainly described, and descriptions of configurations that are the same as or equivalent to those described in the first embodiment will be omitted.
[0048] The linear object laying structure 200 of the second embodiment differs from the linear object laying structure 100 of the first embodiment in that a guide portion 120 on which the optical fiber cable 30 is hung is provided on a tie rod 115 as a connecting member connecting steel supports 110A, 110B erected at a predetermined interval in the direction of tunnel excavation.
[0049] As shown in Fig. 7 and Fig. 8, the linear body-laying structure 200 includes steel supports 110A, 110B erected at a predetermined interval in the excavation direction, a plurality of tie rods 115 as connecting members that connect the two steel supports 110A, 110B in the excavation direction, guides 120 provided on each tie rod 115, and an optical fiber cable 30 as a linear body hung on the guides 120. Fig. 7 is a cross-section of the linear body-laying structure 200 along the excavation direction, and is a cross-sectional view showing a cross-section along line EE in Fig. 8, and Fig. 8 is a cross-sectional view showing a cross-section of the linear body-laying structure 200 seen along line DD in Fig. 7 toward the face 5. Note that Fig. 7 does not show the optical fiber cable 30. Fig. 7 also does not show the steel supports, connecting members, and guides erected in the excavation hole before the steel supports 110A, 110B.
[0050] The configuration of each of the steel supports 110A, 110B is similar to that of the steel support 10 of the first embodiment described above, and therefore a description thereof will be omitted.
[0051] The tie rod 115 is a rod-shaped member that connects, in the excavation direction, two steel supports 110A, 110B that are erected at a predetermined interval in the excavation direction, and a plurality of tie rods are provided at approximately equal intervals along the circumferential direction of the steel supports 110A, 110B as shown in Fig. 8. One end of the tie rod 115 is connected to the web portion 11b of one steel support 110A via a fastening member (not shown), and the other end is connected to the web portion 11b of the other steel support 110B via a fastening member (not shown), thereby connecting the two steel supports 110A, 110B that are arranged at a predetermined interval in the excavation direction.
[0052] In addition, the connecting member is not limited to the tie rod 115, but may be, for example, a rod-shaped member with both ends bent so that one end is inserted into a sheath tube provided on the flange portion 11a of one steel support 110A and the other end is inserted into a sheath tube provided on the flange portion 11a of the other steel support 110B, or it may be an extension member formed by extending along the excavation direction from each steel support 110A, 110B arranged opposite each other in the excavation direction, and formed so as to be connected at the overlapping portions.
[0053] The guide parts 120 are plate-like members in which a plurality of through holes 121 are formed as guide holes through which the optical fiber cables 30 are passed, and are fixed by welding to each tie rod 115. Therefore, similar to the tie rods 115, a plurality of guide parts 20 are provided at approximately equal intervals along the circumferential direction of the steel supports 110A, 110B.
[0054] In this manner, the optical fiber cable 30 is passed through the through hole 121 of the guide portion 120 provided on the tie rod 115 and hung on each guide portion 120, so that, as shown in Figure 8, the optical fiber cable 30 is spanned between the guide portions 120 and laid along the steel supports 110A, 110B, i.e., laid along the circumferential direction of the upper and lower half excavation surfaces 1.
[0055] Both ends of the laid optical fiber cable 30 are connected to a measuring device (not shown) that uses the optical fiber cable 30 to measure the distribution of stress, strain, and temperature in the secondary shotcrete, similarly to the first embodiment described above.
[0056] Next, a method for laying the optical fiber cable 30 using the linear object laying structure 200 having the above-mentioned configuration will be described with reference to FIGS.
[0057] The excavation shaft is dug by blasting, and finish excavation is performed using an excavation device or the like on the upper and lower half excavation surfaces 1. As in the first embodiment described above, primary sprayed concrete is sprayed onto the upper and lower half excavation surfaces 1 as a support material, and steel support structure 110A is erected along the surface of the primary sprayed concrete (erection process).
[0058] Then, the erected steel support 110A is connected in the excavation direction to the steel support 110B, which was erected earlier at a position farther from the face 5 than the steel support 110A in the excavation direction, by a plurality of tie rods 115 (connecting process). That is, in this process, a plurality of tie rods 115 are installed along the inner circumferential surfaces of the upper and lower half excavation surfaces 1 as members provided with guide parts 120.
[0059] Next, the optical fiber cable 30 is passed through the through holes 121 of the guide parts 120 provided on each tie rod 115 in sequence, so that the optical fiber cable 30 is hung on each guide part 120 and the optical fiber cable 30 is stretched between the guide parts 120 (hanging process). As a result, the optical fiber cable 30 is laid along the circumferential direction of the upper and lower half excavation surfaces 1 as shown in FIG.
[0060] Next, secondary sprayed concrete is sprayed by a concrete sprayer (not shown) as a support material to fill the space formed between the two steel supports 110A, 110B, i.e., the space where the tie rod 115 and the guide portion 120 are arranged (spraying process).
[0061] As a result, the optical fiber cable 30 held by the guide portion 120 provided on the tie rod 115 is buried in the secondary shotcrete in a state in which it is laid along the upper and lower half excavation surfaces 1 .
[0062] After this, as necessary, rock bolts (not shown) are driven radially into the ground within the area where the secondary shotcrete has been sprayed, completing the process of installing the support. Then, as in the first embodiment, the excavation pit is further excavated, and when the invert concrete (not shown) and secondary shotcrete are stabilized, lining concrete is poured onto the surface of the secondary shotcrete using a formwork (not shown).
[0063] In this embodiment, as in the first embodiment described above, in order to lay the optical fiber cable 30 at a predetermined position within the sprayed thickness of the secondary sprayed concrete, the guide portion 120 is attached to the tie rod 115 so that the through hole 121 is positioned between a pair of flange portions 11a.
[0064] Therefore, also in this embodiment, the distance between the upper and lower half excavation surfaces 1 and the optical fiber cable 30 is almost constant in the circumferential direction, and the stress distribution in the circumferential direction in the secondary shotcrete, which changes in response to changes in the ground during excavation of the tunnel, can be measured with high accuracy. As a result, it becomes possible to accurately grasp changes in the ground condition during excavation in sequence, and the structure of the support members can be optimized by increasing the thickness of the secondary shotcrete or the number of rock bolts in response to changes in the ground condition.
[0065] According to the above-described second embodiment, the following effects are achieved.
[0066] In the above-mentioned linear body laying method, the optical fiber cable 30 is laid along the circumferential direction of the upper and lower excavation surfaces 1 when constructing a tunnel, by the steps of erecting the steel support 110A along the upper and lower excavation surfaces 1, connecting the two steel supports 110A, 110B erected at a predetermined interval in the tunnel excavation direction using a plurality of tie rods 115 each having a guide section 120 with a through hole 121, and passing the optical fiber cable 30 through the through hole 121, hanging the optical fiber cable 30 on the guide section 120, and bridging the optical fiber cable 30 between the guide sections 120.
[0067] In this manner, with the linear body laying method described above, it is possible to efficiently lay the optical fiber cable 30 along the upper and lower excavation surfaces 1 simply by hanging the optical fiber cable 30 on the guide section 120 provided on the tie rod 115 connecting the steel supports 110A, 110B, and it is possible to shorten the time required for laying the optical fiber cable 30 near the face 5.
[0068] Furthermore, if the optical fiber cable 30 is passed through the through hole 121 and hung on the guide portion 120, it is possible to prevent the optical fiber cable 30 from coming off the guide portion 120 due to the spraying pressure when the secondary sprayed concrete 3 is sprayed onto the optical fiber cable 30.
[0069] In addition, the following modified examples are also within the scope of the present invention, and it is possible to combine the configurations shown in the modified examples with the configurations described in the above-mentioned embodiments, or to combine the configurations described in the different modified examples below.
[0070] In the first embodiment, the guide section 20 on which the optical fiber cable 30 is hung holds the optical fiber cable 30 by the through hole 23. Alternatively, as in the first modified example shown in Fig. 9, the guide section 20 may hold the optical fiber cable 30 by the notch 24 formed by cutting out from the upper and lower half excavation surface 1 side. By making the portion on which the optical fiber cable 30 is hung a notch instead of a hole in this way, the optical fiber cable 30 can be easily stretched between the guide sections 20 by hooking it on the notch 24 of each guide section 20, compared to the work of passing the optical fiber cable 30 through the holes one by one. Note that Fig. 9 shows a cross section corresponding to Fig. 4.
[0071] In the first embodiment, the optical fiber cable 30 is embedded in the secondary shotcrete 3. Alternatively or in addition to this, the optical fiber cable 30 may be embedded in the lining concrete 4, as in a second modified example shown in Fig. 10 and a third modified example shown in Fig. 11. Figs. 10 and 11 each show a cross section corresponding to Fig. 4.
[0072] In the second modified example shown in Figure 10, the guide portion 20 is provided with a second extension portion 25 extending from the extension portion 21 radially inward toward the area where the lining concrete 4 is poured, and this second extension portion 25 is formed with a through hole 26 serving as a guide hole through which the optical fiber cable 30 is passed.
[0073] In other words, in the second modified example, the optical fiber cable 30 passed through the through hole 23 formed in the extension portion 21 and hung on each guide portion 20 is laid along the circumferential direction of the upper and lower half excavation surfaces 1 in the area to be buried in the secondary sprayed concrete 3, while the optical fiber cable 30 passed through the through hole 26 formed in the second extension portion 25 and hung on each guide portion 20 is laid along the circumferential direction of the upper and lower half excavation surfaces 1 in the area to be buried in the covering concrete 4.
[0074] Therefore, by measuring the stress distribution in the circumferential direction within the secondary shotcrete 3, the same effect as in the first embodiment described above can be obtained, and by measuring the stress distribution in the circumferential direction within the lining concrete 4, changes in the condition of the lining concrete 4 in the circumferential direction can be grasped.
[0075] In addition, in a third modified example shown in Figure 11, the guide portion 20 is provided with a third extension portion 27 that extends radially inward from the extension portion 21 toward the area where the lining concrete 4 is poured and is bent so as to be parallel to the fixing portion 22, and this third extension portion 27 is formed with a through hole 28 that serves as a guide hole through which the optical fiber cable 30 is passed.
[0076] In other words, in the third modified example, the optical fiber cable 30 passed through the through hole 23 formed in the extension portion 21 and hung on each guide portion 20 is laid along the circumferential direction of the upper and lower half excavation surfaces 1 in the area to be buried in the secondary sprayed concrete 3, while the optical fiber cable 30 passed through the through hole 28 formed in the third extension portion 27 and hung on the guide portion 20 is further passed through the through hole 28 of the guide portion 20 of another steel support erected at a predetermined interval in the excavation direction, thereby being laid along the excavation direction of the upper and lower half excavation surfaces 1, i.e., along the axial direction of the tunnel, in the area to be buried in the covering concrete 4.
[0077] Therefore, by measuring the stress distribution in the circumferential direction within the secondary shotcrete 3, the same effect as in the first embodiment described above can be obtained, and by measuring the stress distribution in the excavation direction within the lining concrete 4, changes in the condition of the lining concrete 4 in the axial direction of the tunnel can be grasped.
[0078] In the second embodiment, too, as in the second and third modified examples, the guide portion 120 may be provided with an extension portion extending toward the area where the lining concrete 4 is poured, so that the optical fiber cable 30 can be laid within the lining concrete 4.
[0079] In the first embodiment, in the hanging step, the optical fiber cable 30 is hung on each guide part 20 of the steel support 10 by passing the optical fiber cable 30 sequentially through the through holes 23 of the guide parts 20. As a method for hanging the optical fiber cable 30 on each guide part 20, the method shown in Fig. 12 may be used instead of this method. Note that Fig. 12 is a front view of the linear object laying structure 100 as seen toward the face 5 along the excavation direction, similar to Fig. 2.
[0080] In the method shown in Figure 12, when connecting the connecting flange portions 12 of a pair of support materials 11 during the construction process of erecting a steel support 10, this work also involves connecting one ends 40a of the wiring wires 40 passed through the through holes 23 of the guide portions 20 of each support material 11 around the connecting flange portions 12 via connecting members 41.
[0081] The wiring wire 40 is a steel wire provided for pulling the optical fiber cable 30 into the guide section 20, and is passed through the through hole 23 of the guide section 20 of each support material 11 in advance before the steel support 10 is erected.
[0082] Subsequently, the optical fiber cable 30 is connected via a connection member 42 to the other end 40b of one of the pulling wires 40 (the other end 40b of the pulling wire 40 provided on the left support material 11 in FIG. 12).
[0083] In this state where the two pulling wires 40 and the optical fiber cable 30 are connected as one, by pulling the other end 40b of the other pulling wire 40 (the other end 40b of the pulling wire 40 provided on the support material 11 on the right side in FIG. 12), the optical fiber cable 30 is passed through the through hole 23 of each guide section 20 in place of the pulling wire 40, that is, the optical fiber cable 30 is hung on each guide section 20 and is stretched between the guide sections 20 (hanging process). As a result, the optical fiber cable 30 is laid along the circumferential direction of the upper and lower half excavation surfaces 1.
[0084] In this way, by using the wiring wire 40 when hanging the optical fiber cable 30 on each guide section 20, the optical fiber cable 30 can be laid more efficiently along the upper and lower excavation surfaces 1, and the time required for laying the optical fiber cable 30 near the face 5 can be shortened.
[0085] <Third embodiment> Next, a linear object laying method and a linear object laying structure 300 according to a third embodiment of the present invention will be described with reference to Fig. 13. Below, differences from the first embodiment will be mainly described, and descriptions of configurations that are the same as or equivalent to those described in the first embodiment will be omitted.
[0086] The linear object laying structure 300 of the third embodiment differs from the linear object laying structure 100 of the first embodiment in that a guide portion 220 on which the optical fiber cable 30 is hung is provided on an invert strut 14 (steel support) erected along the invert excavation surface 6.
[0087] As shown in Fig. 13, the linear object-laying structure 300 comprises invert struts 14 erected along an invert excavation surface 6 (excavation surface) excavated downward in an arch shape, a plurality of guide parts 220 provided on the invert struts 14, and optical fiber cables 30 as linear objects hung on the guide parts 220. Note that Fig. 13 is a diagram showing a cross section equivalent to Fig. 2, and in this diagram, the optical fiber cables 30 are omitted.
[0088] As described above, the invert strut 14, like the steel support 10, is a member formed from H-shaped steel material, and is formed into an arch shape curved along the circumferential direction of the invert excavation surface 6, as shown in Figure 13.
[0089] The invert struts 14 are erected in the excavation hole by connecting the lower ends of the steel supports 10 by connecting the connecting flange portions 16 of a pair of invert strut materials 15 via bolts (not shown) at the lower ends of the invert excavation surface 6. In other words, the invert struts 14 are erected at the same intervals as the steel supports 10 in the excavation direction.
[0090] The guide portion 220 has the same shape as the guide portion 20 of the first embodiment, and therefore, the description thereof will be omitted.
[0091] The guide portions 220 are provided at approximately equal intervals along the circumferential direction of the invert strut 14, and are attached to the invert strut material 15 so that when the invert strut 14 is erected along the invert excavation surface 6, the extension portion extends along the excavation direction toward the opposite side to the face.
[0092] The optical fiber cable 30 is passed through a through hole (not shown) formed in the guide parts 220 and hung on each guide part 220, thereby being bridged between the guide parts 220 and laid along the invert struts 14, i.e., laid along the circumferential direction of the invert excavation surface 6. Both ends of the laid optical fiber cable 30 are connected to a measuring device (not shown) that uses the optical fiber cable 30 to measure the distribution of stress, strain, and temperature in the shotcrete 7.
[0093] Next, a method for laying the optical fiber cable 30 using the linear object laying structure 300 having the above configuration will be described.
[0094] The laying of the optical fiber cable 30 using the linear object laying structure 300 configured as described above is carried out in an invert construction process that is carried out after the installation of the steel supports 10 on the upper and lower half excavation surfaces 1 is completed.
[0095] In the invert construction process, first, the ground below the steel support 10 is excavated to install the invert struts 14, and an invert excavation surface 6 is formed.
[0096] Then, the invert strut 14 having the above configuration is erected along the invert excavation surface 6 as a member provided with a guide portion 220. Specifically, the invert strut 14 is erected in the excavation hole so as to connect the lower end of the steel support 10 by connecting the connecting flange portions 16 of a pair of invert strut materials 15 at the lower end of the invert excavation surface 6 via bolts (not shown) (erecting process).
[0097] Next, the optical fiber cable 30 is passed through the through holes (not shown) of each guide portion 220 of the erected invert strut 14 in sequence, so that the optical fiber cable 30 is hung on each guide portion 220 (hanging process). As a result, the optical fiber cable 30 is passed through the through holes of all the guide portions 220 provided on the invert strut 14, i.e., the optical fiber cable 30 is hung on each guide portion 220 and is bridged between the guide portions 220. In this manner, the optical fiber cable 30 is laid along the circumferential direction of the invert excavation surface 6.
[0098] Next, sprayed concrete 7 is sprayed as a support member for the invert section so as to bury the optical fiber cable 30 held by the guide section 220 (spraying process). Specifically, a concrete sprayer (not shown) is used to spray the shotcrete 7 onto the invert excavation surface 6 to the extent that the invert struts 14 are buried. As a result, the optical fiber cable 30 is buried in the sprayed shotcrete 7 along the circumferential direction of the invert excavation surface 6.
[0099] Here, the guide portion 220 is attached to the invert strut material 15 so that the center of the through hole through which the optical fiber cable 30 passes is positioned approximately in the center of the radial width of the invert strut 14 .
[0100] By attaching the guide portion 220 to the invert strut material 15 in this manner, it is possible to lay the optical fiber cable 30 passed through the through hole at a predetermined position within the sprayed thickness of the sprayed concrete 7.
[0101] In this way, by laying the optical fiber cable 30 at a predetermined position within the sprayed thickness of the shotcrete 7, the distance between the invert excavation surface 6 and the optical fiber cable 30 becomes almost constant in the circumferential direction, and it is possible to accurately measure the stress distribution in the circumferential direction within the shotcrete 7 that changes in response to changes in the ground during excavation of the tunnel. Furthermore, it is possible to accurately measure the stress distribution within the shotcrete 7 that changes in response to the displacement that occurs when the surface of the shotcrete 7 is backfilled with backfill soil 9 and the displacement that occurs when the backfill soil 9 is removed from the surface of the shotcrete 7.
[0102] Also, as shown in Fig. 14, the optical fiber cable 30 laid on each invert strut 14 may be laid continuously in the axial direction of the tunnel. Fig. 14 is a development view showing the laying pattern of the optical fiber cable 30 laid along the invert excavation surface 6, developed on a plane centered on the lower end of the invert part.
[0103] In this way, by laying the optical fiber cables 30 at predetermined intervals along the circumferential direction of the invert excavation surface 6 and in the axial direction of the tunnel, it is possible to grasp the change in stress of the shotcrete 7 in the axial direction of the tunnel. This makes it possible to set the timing for starting pouring of the invert concrete 8 according to the convergence state of the stress change of the shotcrete 7, and to set the strength of the concrete used in the invert concrete 8 and the excavation radius of the invert excavation surface 6 based on the stress state of the shotcrete 7, i.e., the state of the natural ground.
[0104] According to the above-described third embodiment, the following effects are achieved.
[0105] In the above-mentioned linear object laying method, the optical fiber cable 30 is laid along the circumferential direction of the invert excavation surface 6 when constructing a tunnel, by the steps of erecting invert struts 14, each having a plurality of guide sections 220 with through holes arranged along the circumferential direction, along the invert excavation surface 6, passing the optical fiber cable 30 through the through hole, hanging the optical fiber cable 30 on the guide sections 220, and bridging the optical fiber cable 30 between the guide sections 220.
[0106] In this manner, in the linear body laying method described above, the optical fiber cable 30 can be efficiently laid along the invert excavation surface 6 simply by hanging the optical fiber cable 30 on the guide portion 220 provided on the invert strut 14, thereby shortening the time required for laying the optical fiber cable 30 near the face 5.
[0107] Furthermore, by passing the optical fiber cable 30 through the through hole and hanging it on the guide portion 220, it is possible to prevent the optical fiber cable 30 from coming off the guide portion 220 due to the spraying pressure when the sprayed concrete 7 is sprayed onto the optical fiber cable 30.
[0108] In addition, the following modified examples are also within the scope of the present invention, and it is possible to combine the configurations shown in the modified examples with the configurations described in the above-mentioned embodiments, or to combine the configurations described in the different modified examples below.
[0109] In the third embodiment, the optical fiber cable 30 is hung on a guide portion 220 provided on the invert strut 14. Alternatively, when the invert strut 14 is not provided as a support member, as shown in Figures 15 and 16, a plurality of support members 224 provided with guide portions 225 may be erected on the invert excavation surface 6, and the optical fiber cable 30 may be hung on the guide portions 225. Note that Figure 15 is a diagram showing a cross section corresponding to Figure 13, and Figure 16 is a diagram showing a cross section along the line FF in Figure 15.
[0110] 15, in this modification, a plurality of support members 224, which are members provided with guide portions 225, are provided along the circumferential direction of the invert excavation surface 6. The support members 224 are rod-shaped members such as reinforcing bars.
[0111] The guide portion 225 has a fixed portion 226 having an insertion hole 226a formed therethrough through which the support member 224 is inserted, and a flat plate portion 227 having a through hole 227a (guide hole) formed therethrough as a guide hole through which the optical fiber cable 30 is passed. The fixed portion 226 and the flat plate portion 227 are integrally formed such that the axial direction of the insertion hole 226a and the axial direction of the through hole 227a are perpendicular to each other.
[0112] Further, in the fixing portion 226, a female screw hole 226b is formed with one end opening on the inner peripheral surface of the insertion hole 226a, and in the female screw hole 226b, a fixing screw 228 is attached, which can fix the guide portion 225 to the support member 224 by abutting the tip of the screw portion against the support member 224. In other words, the mounting position of the guide portion 225 with respect to the support member 224 is freely adjustable.
[0113] Next, a method for laying the optical fiber cable 30 using the support member 224 to which the guide portion 225 is attached will be described.
[0114] In this case, too, the optical fiber cable 30 is laid in the invert construction process that is carried out after the installation of the steel supports 10 on the upper and lower half excavation faces 1 is completed, as in the third embodiment.
[0115] In the invert construction process, first, the ground below the steel support 10 is excavated in order to spray shotcrete 7 as a support material, and an invert excavation surface 6 is formed.
[0116] A plurality of support members 224 having guide portions 225 are erected at predetermined intervals along the invert excavation surface 6. Specifically, one end of each support member 224 is inserted into the ground.
[0117] Next, in order to lay the optical fiber cable 30 at a predetermined position within the sprayed concrete 7, the position of the guide portion 225 relative to the support member 224 is adjusted so that the through hole 227a through which the optical fiber cable 30 is inserted is positioned at a predetermined position within the sprayed thickness of the sprayed concrete 7.
[0118] The position of the guide portion 225 is adjusted, for example, using a total station or laser marker while the designed spraying height of the sprayed concrete 7 is displayed by a laser or the like, and the position of the guide portion 225 relative to the support member 224 is adjusted so that the distance between the expected surface of the sprayed concrete 7 and the center position of the through hole 227a becomes the predetermined distance L1.
[0119] Once the position of the guide portion 225 has been determined, the fixing screw 228 is tightened, and the guide portion 225 is fixed to the support member 224 .
[0120] It should be noted that the adjustment of the position of guide portion 225 is not limited to this method, and may be performed, for example, by setting the distance from the upper end surface of support member 224 to the center position of through hole 227a to a preset predetermined distance L1, and driving support member 224 into the ground so that the upper end surface of support member 224 aligns with a line displayed by a laser or the like.
[0121] Next, the optical fiber cable 30 is passed through the through holes 227a of the guide parts 225 whose positions have been adjusted in sequence, so that the optical fiber cable 30 is hung on each guide part 225. As a result, the optical fiber cable 30 is passed through the through holes 227a of all the guide parts 225 provided on each support member 224, that is, the optical fiber cable 30 is hung on each guide part 225 and is stretched between the guide parts 225. In this manner, the optical fiber cable 30 is laid along the circumferential direction of the invert excavation surface 6.
[0122] Next, sprayed concrete 7 is sprayed as a support member for the invert section so as to bury the optical fiber cable 30 held by the guide section 225. Specifically, a predetermined thickness of the sprayed concrete 7 is sprayed onto the invert excavation surface 6 by a concrete sprayer (not shown). As a result, the optical fiber cable 30 is buried in the sprayed concrete 7 along the circumferential direction of the invert excavation surface 6.
[0123] As described above, the position of the through hole 227a through which the optical fiber cable 30 is passed is adjusted so that the optical fiber cable 30 is laid at a predetermined position within the sprayed thickness of the sprayed concrete 7. Therefore, in this modified example, as in the third embodiment described above, by laying the optical fiber cable 30 at a predetermined position within the sprayed thickness of the sprayed concrete 7, the distance between the invert excavation surface 6 and the optical fiber cable 30 becomes approximately constant in the circumferential direction, and the stress distribution in the circumferential direction within the sprayed concrete 7, which changes in accordance with changes in the ground during excavation of the tunnel, can be accurately measured.
[0124] In this modified example, the through hole 227a through which the optical fiber cable 30 is passed is formed in the flat plate portion 227, but the hole through which the optical fiber cable 30 is passed is not limited to a through hole formed in a member. For example, a hole formed by shaping a resin or metal cable tie into a ring shape may be used as the hole through which the optical fiber cable 30 is passed.
[0125] In this case, by appropriately adjusting the position at which the ring-shaped cable tie is fastened to the support member 224 via a cable tie, it is possible to set the position of the hole through which the optical fiber cable 30 is passed to a predetermined position.
[0126] In addition, in the above first embodiment, as shown in Figure 6, the optical fiber cable 30 is described as being laid along the circumferential direction of the upper and lower half excavation surfaces 1, and in the above third embodiment, as shown in Figure 14, the optical fiber cable 30 is described as being laid along the circumferential direction of the invert excavation surface 6, but these do not necessarily have to be implemented one by one, and both may be implemented for the same tunnel.
[0127] By carrying out both in this way, it becomes possible to measure the stress distribution along the circumferential direction of the upper and lower half excavation faces 1 and the stress distribution along the circumferential direction of the invert excavation face 6, i.e., the stress distribution around the entire circumference of a given cross section of the tunnel, at given intervals along the axial direction of the tunnel. This makes it possible to detect changes in the ground and inside the tunnel one after another, facilitating the maintenance and management of the tunnel.
[0128] In order to detect changes in the ground or inside a tunnel, it is possible to simply lay an optical fiber cable along the axial direction of the tunnel. However, for example, in curved sections where the direction bends significantly, the length of the optical fiber cable installed on the inner side will be different from the length of the optical fiber cable installed on the outer side, and even if the same displacement occurs, the detection sensitivity will be different, making it difficult to accurately detect changes in the ground or inside the tunnel.
[0129] In contrast, by measuring the stress distribution around the entire circumference of the tunnel at a given interval in the axial direction of the tunnel as described above, it becomes possible to accurately grasp the change in each cross section of the tunnel at every given distance, and therefore it is possible to accurately detect the magnitude of change in the natural ground or inside the tunnel, and the location where the change has occurred.
[0130] In addition, instead of measuring the upper and lower half excavation surfaces 1 and the invert excavation surface 6 using separate optical fiber cables, as shown in Figure 17, an optical fiber cable 30a laid along the circumferential direction of the upper and lower half excavation surfaces 1 and an optical fiber cable 30b laid along the circumferential direction of the invert excavation surface 6 may be used as a single optical fiber cable 30, allowing the upper and lower half excavation surfaces 1 and the invert excavation surface 6 to be continuously measured at a predetermined interval in the axial direction of the tunnel.
[0131] By laying only one optical fiber cable 30 in the tunnel in this way, installation is easier than when multiple stress detection sensors are installed, and the required measurement system is significantly simplified, so that the introduction and operation costs of the measurement system can be reduced. In addition, since the measurement points are continuous lines rather than points, measurement omissions are less likely to occur, and as a result, the measurement accuracy can be improved.
[0132] Although the embodiments of the present invention have been described above, the above-mentioned embodiments merely show some of the application examples of the present invention, and it is not intended that the technical scope of the present invention be limited to the specific configurations of the above-mentioned embodiments. [Explanation of symbols]
[0133] 100,200,300... Linear body laying structure 1...Upper and lower half excavation surface (excavation surface) 3. Secondary sprayed concrete 5. Face 6. Invert excavation surface (excavation surface) 7. Sprayed concrete 10,110A,110B...Steel shoring 14. Invert strut (steel support) 20,120,220,225···Guide part 23,26,28,121,227a...Through hole (guide hole) 30, 30a, 30b... Optical fiber cable (linear body) 40... Wire puller 115... Tie rod (connecting member) 224... Support member
Claims
1. A method for laying a linear body along upper and lower half excavation surfaces when constructing a tunnel, comprising the steps of: A step of erecting a steel support provided with a guide portion along the upper and lower half excavation surfaces; and hanging the linear object on the guide portion. The guide portion extends from the steel support along the excavation direction of the tunnel, and a plurality of guide portions are provided along the circumferential direction of the steel support. Linear body laying method.
2. A method for laying a linear body along upper and lower half excavation surfaces when constructing a tunnel, comprising the steps of: A step of erecting a steel support along the upper and lower half excavation surfaces; a step of connecting the steel supports erected at a predetermined interval in the tunnel excavation direction by a connecting member provided with a guide portion; and hanging the linear body on the guide portion. Linear body laying method.
3. A linear body laying method for laying a linear body along an invert excavation face when constructing a tunnel, comprising the steps of: A process of erecting a steel support having a guide portion along the invert excavation surface; and hanging the linear object on the guide portion. The guide portion extends from the steel support along the excavation direction of the tunnel, and a plurality of guide portions are provided along the circumferential direction of the steel support. Linear body laying method.
4. The method further includes a step of spraying concrete between the steel supports erected at predetermined intervals in the tunnel excavation direction, The linear body is held by the guide portion so as to be positioned within the thickness of the sprayed concrete. A method for laying a linear object according to any one of claims 1 to 3.
5. A linear body laying method for laying a linear body along an invert excavation face when constructing a tunnel, comprising the steps of: A step of erecting a support member having a guide portion on the invert excavation surface; a step of hanging the linear object on the guide portion; and spraying concrete onto the invert excavation surface. The attachment position of the guide portion relative to the support member is freely adjustable, The linear body is held by the guide portion so as to be positioned within the thickness of the sprayed concrete. Linear body laying method.
6. The guide portion has a guide hole through which the linear body is passed.
6. A method for laying a linear object according to claim 1 .
7. A linear body laying structure for laying a linear body along the upper and lower half excavation surfaces when constructing a tunnel, A steel support structure is erected along the upper and lower half excavation surfaces; A guide portion provided on the steel support; The linear body is hung on the guide portion, The guide portion extends from the steel support along the excavation direction of the tunnel, and a plurality of guide portions are provided along the circumferential direction of the steel support. Linear body laying structure.
8. A linear body laying structure for laying a linear body along the upper and lower half excavation surfaces when constructing a tunnel, A steel support structure is erected along the upper and lower half excavation surfaces; A connecting member that connects the steel supports erected at a predetermined interval in the tunnel excavation direction; A guide portion provided on the connecting member; The linear body is hung on the guide portion. Linear body laying structure.
9. A linear body laying structure for laying a linear body along an invert excavation surface when constructing a tunnel, comprising: A steel support structure is erected along the invert excavation surface; A guide portion provided on the steel support; The linear body is hung on the guide portion, The guide portion extends from the steel support along the excavation direction of the tunnel, and a plurality of guide portions are provided along the circumferential direction of the steel support. Linear body laying structure.
10. A linear body laying structure for laying a linear body along an invert excavation surface when constructing a tunnel, comprising: A support member erected on the invert excavation surface; A guide portion provided on the support member; The linear body is hung on the guide portion, The attachment position of the guide portion relative to the support member is freely adjustable, The linear body is held by the guide portion so as to be located within the thickness of the concrete sprayed on the invert excavation surface. Linear body laying structure.
Citation Information
Patent Citations
Health-monitoring system of distributed sensing fiber tunnel
CN101713691A
Installing method of optical fiber sensor
JP1992216425A
Monitoring device for wall surface supporting member
JP1997042912A
System for predicting danger of tunnel
JP1998062212A
Rock fall and collapse monitor system
JP2000097737A