Dredge control system and dredging method
The dredging control system uses a spud as a fulcrum for rudder rotation and adjusts horizontal turning speed based on three-dimensional position information to form smooth slopes accurately, addressing the challenge of bulky equipment and operator skill reliance.
Patent Information
- Application Number
- JP2021066582
- Authority / Receiving Office
- JP · JP
- Patent Type
- Patents
- Current Assignee / Owner
- Filing Date
- 2021-04-09
- Publication Date
- 2024-10-11
- Estimated Expiration
- 2041-04-09
AI Technical Summary
Existing dredging equipment becomes bulky and requires high operator skill to form smooth slopes on the water bottom due to the need for precise control of rudder rotation speed, which is difficult to achieve without excessive load on the rudder winch.
A dredging control system using a spud as a fulcrum for rudder rotation, combined with a control device that adjusts the horizontal turning speed of the rudder based on three-dimensional position information and design depth map data, maintaining a constant vertical rotation speed to form smooth slopes without increasing equipment size.
The system allows for precise formation of smooth slopes on the water bottom with high accuracy, reducing the reliance on operator skill and preventing the need for bulky equipment by maintaining a constant rudder rotation speed.
Smart Images

Figure 0007565853000001 
Figure 0007565853000002 
Figure 0007565853000003
Abstract
Description
[Technical field]
[0001] The present invention relates to a dredging control system and a dredging method, and more particularly to a dredging control system and a dredging method that can form a smooth slope on the bottom of the water while avoiding an increase in the weight of dredging equipment. [Background technology]
[0002] For example, a pump dredger is used to dredge the bottom of the water and form a channel. In this process, the ladder is rotated vertically at a constant speed relative to the hull, and the ladder is rotated horizontally together with the hull, using a spud driven into the bottom of the water as a fulcrum. The excavation part at the end of the ladder is rotated in an arc shape in a plan view to gradually dredge the soil deeper, and this is done at positions where the hull is moved forward one after another. Therefore, the operator needs high skills to form the side walls of the channel into a smooth, continuous slope.
[0003] Therefore, a system and method have been proposed that enables pump dredging to be performed with high accuracy without relying on the skill of the operator (see, for example, Patent Document 1).The dredging construction management system proposed in Patent Document 1 controls a ladder winch that swings the ladder based on a cutter control depth that is preset according to the design dredging depth of the construction area and the calculated cutter position and depth, and automatically adjusts the cutter depth to be equal to the cutter control depth.
[0004] Although the ladder is a movable structure, it is very heavy, so it is practically difficult to instantly change the speed at which it is rotated up and down by the ladder winch. If the ladder's vertical movement speed is suddenly changed to precisely control the cutter depth, excessive load is placed on the ladder winch, etc. Therefore, the ladder of a pump dredger is designed to rotate at a constant rotation speed. Therefore, in order to realize the above dredging construction management system, the dredging equipment will become increasingly heavy, such as by increasing the output of the ladder winch. [Prior art documents] [Patent documents]
[0005] [Patent Document 1] JP 2020-56250 A Summary of the Invention [Problem to be solved by the invention]
[0006] An object of the present invention is to provide a dredging control system and a dredging method that can form a smooth slope on the bottom of the water while avoiding the dredging equipment from becoming heavy. [Means for solving the problem]
[0007] In order to achieve the above object, the dredging control system of the present invention is a dredging control system using a pump dredger equipped with a spud provided at the rear of a hull, a rotation means for rotating a ladder having an excavation section at its tip in a vertical direction relative to the hull, a suction means for sucking in soil and sand from the bottom of the water excavated by the excavation section, and a rotation means for rotating the ladder in a horizontal direction together with the hull, using the spud driven into the bottom of the water as a fulcrum. The dredging control system further comprises a memory unit for storing design depth map data of a slope to be formed on the bottom of the water, a hull position information acquisition means for acquiring three-dimensional position information of the hull, and a control device communicably connected to the memory unit, the hull position information acquisition means, the rotation means and the rotation means, and a control device for controlling the dredging control system for forming the slope on the bottom of the water. When the excavation section is excavated, the rotation speed at which the ladder is rotated in the vertical direction by the rotating means is set to a constant rotation speed, and the control device calculates three-dimensional position information of the excavation section based on the three-dimensional position information of the hull input from the hull position information acquisition means and the information on the inclination angle of the ladder input from the rotating means, and the horizontal rotation speed of the hull and the ladder by the rotating means is controlled based on the calculated three-dimensional position information of the excavation section, the information on the inclination angle of the ladder, and the design depth map data of the slope input from the memory unit so that the difference in elevation between the design depth of the slope and the excavation depth by the excavation section is within a preset tolerance range.
[0008] The dredging method of the present invention comprises driving a spud provided at the rear of the hull of a pump dredger into the bottom of the water, rotating a ladder in the vertical direction by a rotating means, rotating the ladder together with the hull in the horizontal direction with the spud as a fulcrum by a rotating means, excavating soil on the bottom of the water by an excavation section provided at the tip of the ladder, and dredging the bottom of the water by sucking in the excavated soil by a suction means. In this dredging method, when forming a slope on the bottom of the water, the rotation speed at which the ladder is rotated in the vertical direction by the rotating means is set to a constant rotation speed, and design depth map data of the slope to be formed on the bottom of the water and hull position information are acquired. The three-dimensional position information of the hull acquired by the rotating means and information on the inclination angle of the ladder by the rotating means are input to a control device, and the control device calculates three-dimensional position information of the excavation section based on the three-dimensional position information of the hull and the information on the inclination angle of the ladder, and controls the horizontal rotation speed of the hull and the ladder by the rotating means based on the calculated three-dimensional position information of the excavation section, the information on the inclination angle of the ladder, and the design depth map data of the slope so that the elevation difference between the design depth of the slope and the excavation depth by the excavation section is within a predetermined tolerance range. Effect of the Invention
[0009] According to the present invention, a slope is formed on the bottom of the water under a constant rotation speed for vertically rotating the ladder by the rotating means. The control device controls the horizontal rotation speed of the hull and ladder by the rotating means based on the calculated three-dimensional position information of the excavation section, the information on the inclination angle of the ladder, and the design depth map data of the slope so that the difference in height between the design depth of the slope and the excavation depth by the excavation section is within a preset allowable range. This makes it possible to accurately form a smooth slope on the bottom of the water. Furthermore, since there is no need to change the vertical rotation speed of the ladder by the rotating means, the dredging equipment of the pump dredger can be prevented from becoming heavy. [Brief description of the drawings]
[0010] [Figure 1]1 is an explanatory diagram illustrating an embodiment of a pump dredger equipped with the dredging control system of the present invention from a side view. [Diagram 2] FIG. 2 is an explanatory diagram illustrating the pump dredger of FIG. 1 in a plan view. [Diagram 3] FIG. 2 is an explanatory diagram illustrating a schematic configuration of the dredging control system of FIG. 1. [Figure 4] FIG. 2 is an explanatory diagram illustrating, in cross section, the rough excavation process in which the bottom of the water is dredged in a stepped manner using the pump dredger of FIG. 1. [Diagram 5] FIG. 5 is an explanatory diagram illustrating, in cross section, the situation in which the finish excavation process is being carried out on the stepped dredged water bottom of FIG. 4 using the pump dredger of FIG. 1. [Figure 6] FIG. 11 is an explanatory diagram illustrating design depth map data; [Figure 7] 2 is an explanatory diagram illustrating, in a plan view, a state in which the pump dredger of FIG. 1 is rotated. FIG. [Figure 8] 2 is an explanatory diagram illustrating, in a plan view, the state in which the pump dredger of FIG. 1 is moving forward. [Figure 9] FIG. 2 is an explanatory diagram illustrating, in a plan view, a situation in which the bottom of the water is dredged using the pump dredger of FIG. 1. [Figure 10] 7 is an explanatory diagram illustrating another design depth map data different from that in FIG. 6; [Figure 11] 1 is an explanatory diagram illustrating an example of a side view of the inside of a suction pipe provided with a water supply valve. FIG. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0011] Hereinafter, a dredging control system and a dredging method of the present invention will be described based on the embodiments shown in the drawings.
[0012] A dredging control system 10 of the present invention illustrated in Figs. 1 to 3 is used in construction for dredging a water bottom B by a pump dredger ship 1. For example, in order to construct a channel in a harbor that allows large ships to enter the harbor, soil S on the water bottom B is dredged to form a recessed passage C on the water bottom B extending from the harbor to the offshore side. In this embodiment, as shown in Fig. 5, a case will be described as an example in which a recessed passage C is formed having a flat portion C1 in the center that becomes the bottom surface portion, and slopes C2 that smoothly incline upward on both sides of the flat portion C1 in the width direction.
[0013] As illustrated in Figures 1 and 2, the pump dredger 1 comprises a spud 3 (3a, 3b) provided at the rear of the hull 2, a ladder 4 provided at the front of the hull 2 and extending forward of the hull 2, an excavation section 5 provided at the tip of the ladder 4 for excavating soil S from the bottom of the water B, and a suction means 7 for sucking in the soil S excavated by the excavation section 5. The pump dredger 1 further comprises a rotation means 6 for rotating the ladder 4 in the vertical direction around the rear end of the ladder 4 as the rotation axis, and a rotation means 9 for rotating the ladder 4 together with the hull 2 in the horizontal direction around the spud 3 driven into the bottom of the water B as a fulcrum.
[0014] 3, the dredging control system 10 includes a memory unit 11 for storing design depth map data of a recessed passage C (flat portion C1 and slope C2) to be formed in the water bottom B, a hull position information acquisition means 12 for acquiring three-dimensional position information of the hull 2, and a control device 13 communicatively connected to the memory unit 11, the hull position information acquisition means 12, the rotation means 6, and the slewing means 9. The dredging control system 10 of this embodiment further includes a display means 14 and a warning means 15 communicatively connected to the control device 13.
[0015] Two spuds 3a, 3b extending in the vertical direction are arranged at a distance from each other in the ship's width direction at the rear of the hull 2 of the pump dredger 1. Each of the spuds 3a, 3b is configured to be able to move up and down relative to the hull 2. The rear end of the ladder 4 is rotatably supported on a shaft support fixed to the hull 2. The ladder 4 rotates in the vertical direction relative to the hull 2 with the rear end as the rotation axis.
[0016] The excavation section 5 has a plurality of cutters for cutting the soil S on the water bottom B, and the plurality of cutters are configured to rotate relative to the ladder 4. The suction means 7 has a suction pipe 7b into which the soil S and water W sucked in from a soil suction port 7a arranged near the excavation section 5 flow, and a pump 7c connected to the suction pipe 7b. The suction pipe 7b is arranged inside the ladder 4 and extends from the tip of the ladder 4 to a storage site (soil dump site) for the soil S arranged outside the pump dredger 1. In this embodiment, the pump 7c is mounted on the pump dredger 1, but the pump 7c can also be provided outside the pump dredger 1, for example.
[0017] The rotation means 6 includes a support frame 6a provided at the front of the hull 2, a winch 6b installed on the hull 2, a plurality of hoisting wires 6c paid out from the winch 6b, a hoisting tool 6d, and a plurality of chains 6e. The plurality of hoisting wires 6c paid out from the winch 6b are each hung around a sheave provided at the tip of the support frame 6a, and the lower ends of the plurality of hoisting wires 6c extending downward from the sheave are connected to the hoisting tool 6d. The lower ends of the plurality of chains 6e connected to the lower part of the hoisting tool 6d are connected to the front of the ladder 4. The rotation means 6 rotates the ladder 4 in the vertical direction relative to the hull 2 by changing the payout length of the hoisting wires 6c by rotating the drum of the winch 6b.
[0018] When the winch 6b of the rotating means 6 is started and the rotation speed of the drum of the winch 6b becomes stable, the vertical rotation speed of the ladder 4 is maintained at a constant rotation speed V0. When the driving of the rotating means 6 is stopped, the rotation of the ladder 4 stops and the ladder 4 becomes fixed at the stopped inclination angle.
[0019] The rotating means 6 has a function of detecting the vertical inclination angle of the ladder 4 relative to the hull 2 based on the amount of lifting wire 6c reeled out by the winch 6b. Information on the inclination angle of the ladder 4 is sequentially input from the rotating means 6 to the control device 13. For example, it is possible to provide an inclination sensor that detects the inclination angle of the ladder 4, and to configure so that information on the inclination angle of the ladder 4 acquired by the inclination sensor is sequentially input to the control device 13. The rotating means 6 is simply driven and stopped by commands from the control device 13, so the rotation speed V0 of the ladder 4 when the rotating means 6 is driven is basically constant. The length of the ladder 4 is known, so this length is input and stored in the control device 13.
[0020] The turning means 9 has a pair of reel sections 9a, 9b installed on the rudder 4, and wires 9c, 9d wound around the respective reel sections 9a, 9b. The wire 9c unwound from one reel section 9a extends to the port side of the hull 2, and the wire 9d unwound from the other reel section 9b extends to the starboard side of the hull 2, with the ends of the wires 9c, 9d fixed to the bottom B spaced apart from the hull 2 in the ship's width direction using an anchor or the like. In this turning means 9, the horizontal turning speed of the hull 2 and the rudder 4 is changed by changing the unwound and reeled speeds of the pair of wires 9c, 9d by the pair of reel sections 9a, 9b.
[0021] The storage unit 11 is a memory for storing data. The design depth map data of the recessed passage C (flat portion C1 and slope C2) formed in the water bottom B stored in the storage unit 11 is created based on a design drawing of the water bottom shape (recessed passage C) provided in advance. As illustrated in FIG. 6, the design depth map data divides the dredging target area of the water bottom B into a plurality of sections in a plan view based on the design drawing of the recessed passage C, and determines the design depth L1 for each of the divided sections. In the design depth map data of this embodiment, the dredging target area is divided into a lattice shape by a plurality of straight lines extending in the extension direction (longitudinal direction) of the recessed passage C and a plurality of straight lines extending in the width direction of the recessed passage C, and each section is rectangular. The storage unit 11 of this embodiment further stores initial depth map data indicating the shape of the water bottom B of the dredging target area before dredging work. The initial depth map data can be created before dredging work begins by measuring the depth of the water bottom B in the area to be dredged using an acoustic sounding device or the like.
[0022] The hull position information acquisition means 12 is configured to include a GNSS receiver 12a that acquires position coordinate data of the hull 2 from the global positioning system, an inclinometer 12b that measures the inclination of the hull 2, a compass 12c that measures the bow direction of the hull 2, and a freeboard gauge 12d that measures the freeboard of the hull 2. The hull position information acquisition means 12 in this embodiment further includes a tide gauge 12e that measures the tide level in the construction water area. The position coordinate data of the hull 2 acquired by the GNSS receiver 12a and the respective measurement data acquired by the inclinometer 12b, the compass 12c, the freeboard gauge 12d, and the tide gauge 12e are sequentially input to the control device 13. The hull position information acquisition means 12 only needs to be configured to acquire three-dimensional position information of the hull 2, more specifically, at least the three-dimensional position coordinates of a specific position of the hull 2, the orientation of the hull 2, and information on the inclination angle of the hull 2, and various other configurations can be adopted.
[0023] A computer or the like is used as the control device 13. The control device 13 is installed in the hull 2. The memory unit 11 and the control device 13 can be configured, for example, as the same computer or the like. The control device 13 controls the horizontal turning speed V1 of the hull 2 and the rudder 4 by the turning means 9 based on the design depth map data of the recessed passage C input from the memory unit 11, the three-dimensional position information of the hull 2 input from the hull position information acquisition means 12, and the information on the inclination angle of the rudder 4 input from the turning means 6. The details of the control by the control device 13 will be described later.
[0024] Known monitors are used as the display means 14. Information input and stored in the memory unit 11 and the control device 13, and information calculated and processed by the control device 13 are displayed on the display means 14. The warning means 15 issues a warning to workers (operators, etc.) of the pump dredger 1. For example, an alarm that issues a warning sound or a warning light is used as the warning means 15. For example, the display means 14 can be made to function as the warning means 15, and a warning can be displayed on the display means 14.
[0025] The basic steps for dredging the bottom B of the water by the pump dredger 1 to form a recess C are as follows.
[0026] As shown in Fig. 7, one of the spuds 3a provided at the rear of the hull 2 of the pump dredger 1 is driven into the water bottom B. The ladder 4 is then rotated vertically by the rotating means 6, and the ladder 4 is rotated horizontally together with the hull 2 using the spud 3a driven into the water bottom B as a fulcrum by the rotating means 9, so that the excavation part 5 provided at the tip of the ladder 4 excavates the soil S on the water bottom B. The excavated soil S is then sucked in by the suction means 7 together with the water W of the construction water area, and the soil S on the water bottom B is dredged. The engine that drives the pump 7c is basically driven to rotate at a constant speed.
[0027] Next, as illustrated in FIG. 8, the hull 2 is advanced in the direction in which the recessed path C extends, and the excavation range by the excavation unit 5 is moved. When the hull 2 is advanced, the other spud 3b is driven into the bottom B of the water, and one spud 3a is withdrawn from the bottom B, with the hull 2 facing the direction in which the recessed path C extends. Then, the hull 2 is rotated at a predetermined angle (e.g., about 8 degrees to 15 degrees) with the other spud 3b driven into the bottom B as a fulcrum, and the position of one spud 3a is advanced a distance D (e.g., about 1.5 to 2.5 m). Next, one spud 3a is driven into the bottom B of the water, and the other spud 3b is withdrawn from the bottom B. Then, the rudder 4 is rotated horizontally together with the hull 2, with the spud 3b driven into the bottom B as a fulcrum by the rotating means 9, and the sediment S of the bottom B is dredged in the same manner as the above-mentioned procedure.
[0028] In other words, as illustrated in Figure 9, a concave passage C is formed by alternately rotating the excavation section 5 in an arc shape in a plan view around one of the spuds 3a driven into the water bottom B as a fulcrum to dredging, and moving the hull 2 forward.
[0029] In the present invention, before dredging work is performed by the pump dredger ship 1, design depth map data of a recessed channel C to be formed in the bottom B of the water is created, as shown in Fig. 6. Then, a permissible range of the excavation depth by the excavation unit 5 with respect to the design depth L1 is set.
[0030] In FIG. 4, which will be described later, the design depth L1 of the recessed path C in the design drawing is indicated by a dashed line, and in FIG. 5, the design depth L1 is indicated by a solid line. In addition, in FIG. 4 and FIG. 5, the minimum depth L2, which is the lower limit of the allowable range for the design depth L1, is indicated by a dashed line, and the limit depth L3, which is the upper limit of the allowable range, is indicated by a two-dot chain line. The allowable range of the excavation depth for the design depth L1 can be appropriately determined according to the construction conditions, etc., but the minimum depth L2 is set to a depth that is shallower than the design depth L1, for example, by 0.5 to 2.0 m. The limit depth L3 is set to a depth that is deeper than the design depth L1, for example, by 0.5 to 2.0 m. For example, a different allowable range can be set for each section of the design depth map data according to the depth of the design depth L1, etc. The created design depth map data of the recessed path C and the set allowable range are stored in the memory unit 11. The memory unit 11 further stores initial depth map data of the water bottom B of the dredging target area before dredging work is carried out.
[0031] As illustrated in Fig. 4, in the dredging operation, the pump dredger ship 1 performs a rough excavation process in which the area forming the concave channel C in the bottom B is dredged in a stepped manner at a depth similar to the design depth L1 (slightly shallower depth). In the rough excavation process, the control device 13 calculates three-dimensional position information of the excavation section 5 based on three-dimensional position information of the hull 2 input from the hull position information acquisition means 12 and information on the inclination angle of the ladder 4 input from the rotation means 6. The control device 13 of this embodiment calculates three-dimensional position information of the excavation section 5 based on position coordinate data of the hull 2 input from the GNSS receiver 12a constituting the hull position information acquisition means 12, measurement data input from the inclinometer 12b, the compass 12c, the freeboard gauge 12d, and the tide gauge 12e, respectively, and information on the inclination angle of the ladder 4.
[0032] Then, based on the calculated three-dimensional position information of the excavation unit 5, the information on the inclination angle of the ladder 4, and the design depth map data and the initial depth map data input from the memory unit 11, the control device 13 sets the excavation depth by the excavation unit 5 to a position deeper than the depth of the bottom B before dredging by the depth that can be excavated by the excavation unit 5 (for example, about 1 to 2 m). Then, the control device 13 drives the turning means 6 to turn the ladder 4, thereby moving the excavation unit 5 downward to the set depth position, and stops driving the turning means 6. In this state, the control device 13 controls the turning means 9 to turn the excavation unit 5 within (shallower than) the line of the design depth L1 set in the design depth map data, and dredges the soil S of the surface layer of the bottom B.
[0033] Next, the control device 13 sets the excavation depth of the excavation unit 5 to a position deeper by the depth that can be excavated by the excavation unit 5. Then, the control device 13 drives the turning means 6 to turn the ladder 4 toward the water bottom B, thereby moving the excavation unit 5 downward to the set depth position, and stops driving the turning means 6. In this state, the control device 13 controls the turning means 9 to turn the excavation unit 5 within a range inside the line of the design depth L1 set in the design depth map data, and dredges the soil S of the water bottom B.
[0034] In the rough excavation process, the dredging work described above is repeated, and the excavation depth by the excavation section 5 is gradually deepened with each rotation of the rotating means 9, thereby dredging the area forming the recessed passage C in a stepped manner. In the rough excavation process, it is preferable to dredge the water bottom B to a depth where the design depth L1 of the recessed passage C is the minimum depth L2 of the deepest section (in this embodiment, the flat section C1). The rotation speed V0 of the ladder 4 when the rotating means 6 is driven in the rough excavation process is substantially constant.
[0035] Normally, dredging work by the pump dredger 1 is performed under conditions of calm waves, but the hull 2 may sway vertically due to the effects of offshore waves and wake waves, causing the vertical position of the excavation unit 5 to fluctuate even when the rotation of the ladder 4 is stopped. When the excavation unit 5 moves above the set excavation depth, the amount of dredged soil per unit time by the excavation unit 5 and the suction means 7 becomes relatively small.
[0036] In the rough excavation process, it is not necessary to strictly control the amount of dredged soil per unit time. In the case where this is strictly controlled, it is preferable to control the rotation speed V1 of the rotating means 9 to be slowed down when the excavation unit 5 moves above the set excavation depth based on the three-dimensional position information of the excavation unit 5 calculated by the control device 13. Since the amount of dredged soil per unit time increases by slowing down the rotation speed V1, this is more advantageous in avoiding leaving any soil unexcavated in the rough excavation process than when the rotation speed V1 of the rotating means 9 is constant.
[0037] Next, as illustrated in Fig. 5, a finish excavation process is performed on the area dredged in a stepped manner in the rough excavation process. In the finish excavation process, when the slope C2 of the recessed passage C is formed, the control device 13 drives the rotating means 6, and causes the rotating means 6 to rotate the ladder 4 in the vertical direction. The rotation speed V0 of the rotating means 6 in the finish process is substantially constant. When the excavation unit 5 is moved from the slope C2 side of the recessed passage C toward the flat portion C1 side to form the slope C2, the control device 13 inputs a command to the rotating means 6 to rotate the ladder 4 from above to below.
[0038] The control device 13 receives as input the design depth map data of the slope C2 stored in the memory unit 11, the three-dimensional position information of the hull 2 acquired by the hull position information acquisition means 12, and information on the inclination angle of the ladder 4 by the turning means 6. The control device 13 calculates the three-dimensional position information of the excavation section 5 based on the input three-dimensional position information of the hull 2 and the information on the inclination angle of the ladder 4.
[0039] Then, based on the calculated three-dimensional position information of the excavation unit 5, the information on the inclination angle of the ladder 4, and the design depth map data of the slope C2, the control device 13 controls the horizontal rotation speed V1 of the hull 2 and the ladder 4 by the rotation means 9 so that the difference in height between the design depth L1 of the slope C2 defined in the design depth map data and the excavation depth of the excavation unit 5 falls within a preset tolerance range. More specifically, based on the difference between the design depth L1 of the section where the excavation unit 5 is currently located and the design depth L1 of the section to which the excavation unit 5 will next move, defined in the design depth map data, the control device 13 adjusts the rotation speed V1 by the rotation means 9 so that the difference in height between the design depth L1 of the section to which the excavation unit 5 will next move falls within a preset tolerance range at the time when the excavation unit 5 enters the section to which it will next move.
[0040] For example, when forming a slope C2 with a relatively small gradient where the difference between the design depth L1 of the section where the excavation unit 5 is currently located and the design depth L1 of the section to which the excavation unit 5 will next move is small, the control device 13 sets the rotation speed V1 by the turning means 9 to a relatively high speed. On the other hand, when forming a slope C2 with a relatively large gradient where the difference between the design depth L1 of the section where the excavation unit 5 is currently located and the design depth L1 of the section to which the excavation unit 5 will next move is large, the control device 13 sets the rotation speed V1 by the turning means 9 to a relatively low speed.
[0041] The control device 13 of this embodiment controls the payout and winding of a pair of wires 9c, 9d by a pair of reel sections 9a, 9b that constitute the rotation means 9, thereby maintaining each of the wires 9c, 9d in a taut state (a state in which tension is applied and there is no slack) and controls the horizontal rotation speed V1 of the hull 2 and rudder 4.
[0042] In this way, when forming the slope C2, the vertical rotation speed V0 of the ladder 4 by the rotating means 6 is kept constant, and the horizontal rotation speed V1 of the hull 2 and ladder 4 by the rotating means 9 is adjusted by the control device 13, while the excavation section 5 is moved from side end to side end of the range in which the slope C2 is to be formed, which is set in the design depth map data, to dredge the soil S from the water bottom B.
[0043] Next, when forming the flat portion C1 of the recessed path C, the control device 13 stops driving the rotating means 6 when the excavation unit 5 reaches the side end of the slope C2 that has been dredged. Then, in a state where the difference in height between the design depth L1 of the flat portion C1 defined in the design depth map data and the excavation depth by the excavation unit 5 is within a preset allowable range, the control device 13 controls the rotating means 9 to move the excavation unit 5 from side end to side end of the range of the flat portion C1 set in the design depth map data, thereby dredging the soil S of the water bottom B.
[0044] Even during the dredging of the flat portion C1, the vertical position of the excavation section 5 may fluctuate with the vertical rocking of the hull 2. Therefore, when the excavation section 5 moves above the design depth L1, the control device 13 may control the rotation speed V1 of the rotation means 9 to be slowed down based on the three-dimensional position information of the excavation section 5 calculated by the control device 13 and the design depth map data. Since the amount of dredged soil per unit time increases by slowing the rotation speed V1, this is more advantageous in avoiding leaving any soil unexcavated in the finish excavation process than when the rotation speed V1 of the rotation means 9 is kept constant. If the vertical position of the excavation section 5 hardly fluctuates, the rotation speed V1 is maintained constant and dredging is performed.
[0045] Next, when the excavation unit 5 is moved from the flat portion C1 side of the recessed passage C toward the slope C2 side to form the other slope C2, the control device 13 inputs a command to the rotating means 6 to rotate the ladder 4 from below to above. Then, the control device 13 performs control to adjust the rotation speed V1 in the same manner as when the above-mentioned slope C2 is formed, and moves the excavation unit 5 from one side end to the other side end of the other slope C2 set in the design depth map data, dredging the soil S of the water bottom B.
[0046] This completes the finish excavation process. In the dredging method using the dredging control system 10, the recessed channel C is formed by sequentially repeating the rough excavation process, the finish excavation process, and the process of advancing the hull 2 described above. If the dredging depth is shallow and the recessed channel C can be formed by only performing the finish excavation process, the rough excavation process can be omitted. The task of advancing the hull 2 can be configured to be performed automatically by the dredging control system 10, or can be performed manually by an operator.
[0047] The display means 14 displays three-dimensional position information (excavation depth) of the excavation section 5, the design depth L1 of the section in which the excavation section 5 is located in the design depth map data, and the rotation speed V1 of the hull 2 and rudder 4 by the rotation means 9, all of which are calculated by the control device 13. By checking the information displayed on the display means 14, the operator can confirm whether the dredging operation by the dredging control system 10 is being performed normally.
[0048] In this embodiment, further, under the control of the control device 13, the warning means 15 issues a warning when the excavation depth excavated by the excavation unit 5 exceeds a preset limit depth L3 with respect to the design depth L1 set in the design depth map data, based on the calculated three-dimensional position information of the excavation unit 5 and the design depth map data input from the memory unit 11. By issuing a warning from the warning means 15, the operator can reliably recognize that the excavation depth of the excavation unit 5 has exceeded the limit depth L3, and can promptly take measures to prevent over-excavation.
[0049] As described above, in the present invention, when forming a slope C2 on the water bottom B, the horizontal rotation speed V1 of the hull 2 and the rudder 4 by the rotating means 9 is controlled under the condition of a constant rotation speed V0. This makes it possible to form a smooth slope C2 on the water bottom B with high accuracy without excessively depending on the skill of the operator. Furthermore, since there is no need to change the rotation speed V0 of the rudder 4 by the rotating means 6, it is possible to avoid making the dredging equipment (rotating means 6, etc.) of the pump dredger ship 1 heavier. This dredging control system 10 can form a slope C2 simply by controlling the operation of the rotating means 9, so it can be easily applied to existing pump dredger ships 1. Therefore, it is very useful for those skilled in the art.
[0050] In this embodiment, the control device 13 controls the payout and winding of the pair of wires 9c, 9d by the pair of reel units 9a, 9b so as to maintain each of the wires 9c, 9d in a taut state. By maintaining the pair of wires 9c, 9d in a taut state without slack, the movement due to the inertia of the hull 2 and the rudder 4 and the influence of water resistance are suppressed, which is advantageous for precisely adjusting the turning speed V1 of the hull 2 and the rudder 4.
[0051] When the water bottom B is dredged by the pump dredger 1, the excavation unit 5 is rotated in an arc shape to excavate the water bottom B. Therefore, as illustrated in Fig. 10, the design depth map data can be configured such that the dredging target area is divided into arc shapes in accordance with the trajectory of the excavation unit 5, and each arc-shaped section is further divided into a plurality of sections in the width direction of the recessed passage C. Creating such design depth map data allows the arc-shaped trajectory of the excavation unit 5 to correspond more accurately to the sections of the design depth map data, which is more advantageous for accurately forming a smooth slope C2.
[0052] The dredging control system 10 according to the present invention can also be configured as shown in FIG.
[0053] The suction means 7 of this embodiment further has a water supply valve 8 provided on the circumferential surface at a midpoint of the suction pipe 7b. A valve operating section that operates the opening and closing of the water supply valve 8 is connected to the control device 13 so as to be able to communicate with each other, and the control device 13 is configured to be able to remotely control the opening and closing of the water supply valve 8.
[0054] In addition to the above-mentioned controls, the control device 13 of this embodiment further performs opening and closing control of the water supply valve 8. Specifically, the control device 13 determines whether the excavation depth excavated by the excavation unit 5 exceeds a preset limit depth L3 with respect to the design depth L1 based on three-dimensional position information of the excavation unit 5 calculated based on three-dimensional position information of the hull 2 and information on the inclination angle of the ladder 4, and on the design depth map data. Then, when the control device 13 determines that the excavation depth excavated by the excavation unit 5 exceeds the limit depth L3, it performs control to remotely switch the water supply valve 8 from a closed state to an open state.
[0055] When the water supply valve 8 is closed, normally, sediment S flows vigorously into the suction pipe 7b together with water W. As shown in Fig. 11, when the water supply valve 8 is switched to an open state, water W flows vigorously into the suction pipe 7b from the water supply port of the water supply valve 8 provided at the midpoint of the suction pipe 7b, so that the inflow of sediment S from the sediment suction port 7a into the suction pipe 7b is suppressed, and the amount of sediment sucked into the suction pipe 7b is reduced.
[0056] In this way, by controlling the opening and closing of the water supply valve 8 by the control device 13, it is possible to more effectively prevent over-excavation of the sediment S at the bottom B without stopping the pump 7c. Since the hull 2 may temporarily move up and down due to the effects of offshore waves and wake waves, this is advantageous in preventing over-excavation in such cases. Even if the pump 7c is stopped, the suction of the sediment S does not immediately stop, and over-excavation will generate excess dredged soil that must be treated afterwards, so being able to quickly suppress the amount of sediment being sucked in is very beneficial to those skilled in the art.
[0057] Furthermore, when the control device 13 changes the determination result to one indicating that the excavation depth of the excavation unit 5 does not exceed the limit depth L3, the open water supply valve 8 is switched to the closed state, and the dredging work can be quickly resumed since the pump 7c is operating. The operation of switching the open water supply valve 8 to the closed state can also be configured to be manually performed by an operator.
[0058] The display means 14 of this embodiment further displays the limit depth L3 of the section in which the excavation unit 5 is located and the open / closed state of the water supply valve 8, and displays a warning when the excavation depth by the excavation unit 5 exceeds the limit depth L3. By checking the information displayed on the display means 14, the operator can confirm whether the water supply valve 8 is being normally controlled by the control device 13.
[0059] The present invention is not limited to the case where a recessed passage C having slopes C2 on both sides of a flat portion C1 is formed, but can also be adopted, for example, in the case where only slopes C2 are formed on the bottom B of the water. The spud 3, ladder 4, excavation unit 5, rotation means 6, suction means 7, and swivel means 9 constituting the pump dredger 1 are not limited to the above-mentioned embodiment, and can be configured in various other ways. The swivel means 6 can be configured, for example, by directly connecting the lower end of the hoisting wire 6c unwound from the winch 6b to the ladder 4. The excavation unit 5 can be configured, for example, by rotating a drill-shaped blade. The swivel means 9 can be configured, for example, by using a thruster or the like provided on the side of the hull 2 to rotate the hull 2 and the ladder 4. [Explanation of symbols]
[0060] 1. Pump dredger 2. Hull 3, 3a, 3b Spud 4. Ladder 5. Excavation Section 6 Rotation means 6a Support frame 6b Winch 6c Suspension wire 6d sling 6e chain 7 Inhalation means 7a Sediment intake 7b Suction pipe 7c Pump 8. Water supply valve 9. Rotation means 9a, 9b Reel section 9c, 9d Wire 10 Dredge Control System 11 Storage section 12 Hull position information acquisition means 12a GNSS receiver 12b Inclinometer 12c Compass 12d freeboard gauge 12e Tide gauge 13 Control device 14 Display means 15 Warning measures B Underwater C concave road C1 flat part C2 Slope L1 design depth L2 minimum depth L3 Depth Limit S. Soil W water
Claims
1. A dredging control system using a pump dredger vessel comprising a spud provided at the rear of a vessel body, a rotation means for rotating a ladder having an excavation section at its tip in a vertical direction relative to the vessel body, a suction means for sucking in soil and sand excavated from the bottom of the water by the excavation section, and a rotation means for rotating the ladder together with the vessel body in a horizontal direction with the spud driven into the bottom of the water as a fulcrum, a storage unit for storing design depth map data of a slope to be formed on the water bottom; a hull position information acquisition means for acquiring three-dimensional position information of the hull; and a control device communicatively connected to the storage unit, the hull position information acquisition means, the rotation means, and the slewing means; When forming the slope on the water bottom, the rotation speed at which the ladder is rotated in the up and down direction by the rotation means is set to a constant rotation speed, A dredging control system characterized in that the control device calculates three-dimensional position information of the excavation section based on three-dimensional position information of the hull input from the hull position information acquisition means and information on the inclination angle of the ladder input from the rotation means, and controls the horizontal rotation speed of the hull and the ladder by the rotation means based on the calculated three-dimensional position information of the excavation section, information on the inclination angle of the ladder, and the design depth map data of the slope input from the memory unit so that the difference in elevation between the design depth of the slope and the excavation depth by the excavation section is within a predetermined tolerance range.
2. the rotating means has a pair of reel units installed on the rudder and a wire wound around each of the reel units, the wire unwound from one of the reel units extends to the port side of the hull, the wire unwound from the other reel unit extends to the starboard side of the hull, and a tip of each of the wires is fixed to the bottom of the water spaced apart from the hull in the ship's width direction, The dredging control system of claim 1, wherein the control device controls the payout and winding of a pair of the wires by a pair of the reel sections, thereby maintaining each of the wires in a taut state.
3. a warning means communicatively connected to the control device; The dredging control system of claim 1 or 2, wherein the warning means is configured to issue a warning under the control of the control device when the excavation depth excavated by the excavation unit exceeds a predetermined limit depth with respect to the design depth defined in the design depth map data based on the calculated three-dimensional position information of the excavation unit and the design depth map data input from the memory unit.
4. the suction means comprises a suction pipe into which the soil and water sucked in from a soil suction port disposed in the vicinity of the excavation portion flow, a pump connected to the suction pipe, and a water supply valve provided on a peripheral surface of the suction pipe at a midpoint; A dredging control system as described in any one of claims 1 to 3, wherein the control device switches the water supply valve in a closed state to an open state when the excavation depth excavated by the excavation unit exceeds a predetermined limit depth relative to the design depth set in the design depth map data based on the calculated three-dimensional position information of the excavation unit and the design depth map data input from the memory unit.
5. A dredging method in which a spud provided at the rear of the hull of a pump dredger is driven into the bottom of the water, a ladder is rotated vertically by a rotating means, and the ladder and the hull are rotated horizontally with the swivel means using the spud as a fulcrum, so that soil is excavated from the bottom of the water by an excavation section provided at the tip of the ladder, and the excavated soil is sucked in by a suction means to dredge the bottom of the water, When forming a slope on the bottom of the water, a rotation speed at which the ladder is rotated in the vertical direction by the rotation means is set to a constant rotation speed, and design depth map data of the slope to be formed on the bottom of the water, three-dimensional position information of the hull acquired by a hull position information acquisition means, and information on the inclination angle of the ladder by the rotation means are input to a control device, The dredging method is characterized in that the control device calculates three-dimensional position information of the excavation section based on three-dimensional position information of the hull and information on the inclination angle of the ladder, and controls the horizontal rotation speed of the hull and the ladder by the rotation means based on the calculated three-dimensional position information of the excavation section, information on the inclination angle of the ladder, and design depth map data of the slope so that the difference in elevation between the design depth of the slope and the excavation depth by the excavation section is within a predetermined tolerance range.
6. The dredging method according to claim 5, wherein the bottom of the water is dredged in a stepped manner by performing a rough excavation process using the pump dredger before forming the slope on the bottom of the water.
Citation Information
Patent Citations
Automatic dredge device for pump type dredger
JP1983069940A
Pump dredge ship and dredge method using pump dredge ship
JP2013091909A
Dredger with pump and pump dredging method
JP2019148065A
Dredging management system and dredging management method
JP2020056250A