Dredge control system and dredging method

The dredging control system uses a spud and rudder rotation to manage dredging depth and volume, ensuring efficient excavation by maintaining the right amount of soil intake, thus enhancing work efficiency and reducing excess material.

JP7565854B2Active Publication Date: 2024-10-11TOA KENSETSU KK
View PDF 9 Cites 0 Cited by

Patent Information

Application Number
JP2021066583
Authority / Receiving Office
JP · JP
Patent Type
Patents
Current Assignee / Owner
Filing Date
2021-04-09
Publication Date
2024-10-11
Estimated Expiration
2041-04-09

AI Technical Summary

Technical Problem

Existing dredging technologies using pump dredgers struggle with inefficiencies due to the inability to measure water bottom depth in real time, leading to excess or insufficient excavation, which prolongs work time and increases post-processing of soil.

Method used

A dredging control system that includes a spud, rudder rotation means, and a control device to manage the horizontal and vertical turning of the rudder, utilizing data from planned dredging volumes, hull position, and sediment intake to maintain the right amount of excavation within a preset tolerance range.

Benefits of technology

Enables precise control over the excavation process, avoiding under or over-digging, thereby improving work efficiency and reducing excess material that needs post-processing.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 0007565854000001
    Figure 0007565854000001
  • Figure 0007565854000002
    Figure 0007565854000002
  • Figure 0007565854000003
    Figure 0007565854000003
Patent Text Reader

Abstract

To provide a dredging control system and a dredging method capable of more securely avoiding work for re-performing dredging caused by remaining excavation in dredging work using a pump dredger.SOLUTION: A controller 14 calculates three-dimensional position information on an excavation part 5 based on three-dimensional position information on a ship body 2 of a pump dredger 1 and information on an inclination angle of a ladder 4, and based on the calculated three-dimensional position information on the excavation part 5, planned dredging soil amount map data specifying a planned dredging soil amount for each section of a water bottom B, and measurement data on a sediment suction amount sucked by suction means 7 that is measured by sediment suction amount measurement means 13, controls at least either one of the swing speed of the ship body 2 and the ladder 4 by swing means 9 or the rotation speed of a cutter 5a, a component of the excavation part 5, so that a difference between a planned dredging soil amount of a section being excavated by the excavation part 5 and a sediment suction amount to be sucked by the suction means 7 in the section becomes within a preset allowable range.SELECTED DRAWING: Figure 1
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to a dredging control system and a dredging method, and more particularly to a dredging control system and a dredging method that can dredge soil more efficiently without excess or deficiency in dredging operations using a pump dredger. [Background technology]

[0002] For example, a pump dredger is used to dredge the bottom of the water to form a channel. In this process, the ladder is rotated vertically at a constant speed relative to the hull, and the ladder is rotated horizontally together with the hull, using a spud driven into the bottom of the water as a fulcrum. At the same time, the excavation part at the tip of the ladder is rotated in an arc in plan view to gradually dredge the bottom of the water deeper, and this operation is carried out at positions where the hull is moved forward in stages.

[0003] Conventionally, the depth of the bottom of the water is measured by a depth measuring means such as a multi-beam sonar in the area where dredging work has been completed, and the shape of the formed depression and the remaining areas where dredging is insufficient compared to the design depth are confirmed. However, the depth measuring means cannot measure the depth of the bottom of the water at the position where the excavation unit is excavating in real time. Therefore, if the remaining areas are found in the area where dredging has been completed, it is necessary to dredge the area again. If the area is excavated deeper than the target depth in order to avoid the remaining areas, problems arise in that the work time is extended and the amount of dredged soil to be post-processed increases. [Prior art documents] [Patent documents]

[0004] [Patent Document 1] JP 2020-56250 A Summary of the Invention [Problem to be solved by the invention]

[0005] An object of the present invention is to provide a dredging control system and a dredging method that can dredge soil more efficiently without excess or deficiency in dredging operations using a pump dredger. [Means for solving the problem]

[0006] In order to achieve the above object, the dredging control system of the present invention uses a pump dredger ship equipped with a spud provided at the rear of a hull, a rotation means for rotating a ladder having an excavation section at its tip in a vertical direction relative to the hull, a suction means for sucking in sediment from the bottom of the water excavated by the excavation section, and a rotation means for rotating the ladder together with the hull in a horizontal direction with the spud driven into the bottom of the water as a fulcrum. The dredging control system further comprises a memory unit for storing planned dredging volume map data in which planned dredging volumes for each of a plurality of sections obtained by dividing the dredging target area of ​​the bottom of the water into a plurality of sections are defined, a hull position information acquisition means for acquiring three-dimensional position information of the hull, a sediment suction volume measurement means for measuring the volume of sediment suctioned by the suction means, and The device is equipped with a measuring means, a control device communicatively connected to the rotating means and the slewing means, and the control device calculates three-dimensional position information of the excavation section based on the three-dimensional position information of the hull input from the hull position information acquisition means and the inclination angle of the ladder input from the rotating means, and the horizontal rotation speed of the hull and the ladder by the slewing means is controlled based on the calculated three-dimensional position information of the excavation section, the planned dredged soil volume map data input from the memory unit, and the measurement data of the sediment suction volume input from the sediment suction volume measuring means so that the difference between the planned dredged soil volume of the section being excavated by the excavation section and the sediment suction volume sucked in by the suction means in that section is within a predetermined allowable range.

[0007] Another dredging control system of the present invention is a dredging control system using a pump dredger equipped with a spud provided at the rear of the hull, a rotation means for rotating a ladder with an excavation section at its tip in a vertical direction relative to the hull, a suction means for sucking in sediment from the bottom of the water excavated by the excavation section, and a rotation means for rotating the ladder horizontally together with the hull, using the spud driven into the bottom of the water as a fulcrum. The dredging control system further comprises a memory unit in which planned dredged soil volume map data is stored, which defines the planned dredged soil volume for each of a plurality of sections obtained by dividing the dredging target area of ​​the bottom of the water into a plurality of sections, a hull position information acquisition means for acquiring three-dimensional position information of the hull, a sediment suction volume measurement means for measuring the amount of sediment suctioned by the suction means, and a control unit for controlling the memory unit, the hull position information acquisition means, the sediment suction volume measurement means, and the control unit for controlling the sediment suction volume measurement means. The excavation unit is provided with a control device communicatively connected to the hull position information acquisition means, the excavation unit, the rotating means and the slewing means, and the control device calculates three-dimensional position information of the excavation unit based on the three-dimensional position information of the hull input from the hull position information acquisition means and the inclination angle of the ladder input from the rotating means, and the control device controls the rotational speed of the cutter that constitutes the excavation unit based on the calculated three-dimensional position information of the excavation unit, the planned dredged soil volume map data input from the memory unit, and the measurement data of the sediment suction volume input from the sediment suction volume measuring means so that the difference between the planned dredged soil volume of the section being excavated by the excavation unit and the sediment suction volume sucked in by the suction means in that section is within a predetermined allowable range.

[0008] In order to achieve the above object, the dredging method of the present invention comprises driving a spud provided at the rear of the hull of a pump dredger into the bottom of the water, vertically rotating a ladder using a rotating means, and horizontally rotating the ladder together with the hull around the spud as a fulcrum using a rotating means, excavating soil on the bottom of the water using an excavation section provided at the tip of the ladder, and dredging the bottom of the water by sucking in the excavated soil using a suction means, The control device inputs planned dredged soil volume map data, which defines the planned dredged soil volume for each of the multiple sections into which the dredging target area of ​​the water bottom is divided, three-dimensional position information of the hull acquired by a hull position information acquisition means, measurement data of the amount of sediment suctioned by the suction means measured by a sediment suction volume measuring means, and information on the inclination angle of the ladder by the rotating means, and the control device calculates three-dimensional position information of the excavation section based on the three-dimensional position information of the hull and the information on the inclination angle of the ladder, and controls the horizontal rotation speed of the hull and the ladder by the rotating means based on the calculated three-dimensional position information of the excavation section, the planned dredged soil volume map data, and the measurement data of the sediment suction volume so that the difference between the planned dredged soil volume of the section being excavated by the excavation section and the amount of sediment suctioned by the suction means in that section is within a predetermined allowable range.

[0009] Another dredging method of the present invention comprises driving a spud provided at the rear of the hull of a pump dredger into the bottom of the water, rotating a ladder vertically by a rotating means, and rotating the ladder horizontally together with the hull around the spud as a fulcrum by a rotating means, excavating soil from the bottom of the water with an excavating section provided at the tip of the ladder, and dredging the bottom of the water by sucking in the excavated soil with a suction means. In this dredging method, the dredging target area of ​​the bottom of the water is divided into a plurality of sections, and planned dredging soil volume map data defining the planned dredging soil volume for each of the sections, three-dimensional position information of the hull acquired by a hull position information acquisition means, and the sediment intake amount measured by a sediment intake amount measurement means are acquired. Measurement data on the amount of soil suctioned by the suction means and information on the inclination angle of the ladder by the rotating means are input into a control device, and the control device calculates three-dimensional position information of the excavation section based on the three-dimensional position information of the hull and the information on the inclination angle of the ladder, and controls the rotational speed of the cutter that constitutes the excavation section based on the calculated three-dimensional position information of the excavation section, the planned dredged soil volume map data, and the measurement data of the soil suction volume so that the difference between the planned dredged soil volume of the section being excavated by the excavation section and the soil suction volume sucked in by the suction means in that section is within a predetermined tolerance range. Effect of the Invention

[0010] According to the present invention, the amount of sediment intake can be grasped in real time based on the measured data from the sediment intake measurement means. The control device controls at least one of the horizontal rotation speed of the hull and ladder by the rotation means or the rotation speed of the cutter constituting the excavation unit so that the difference between the planned dredged soil volume of the section being excavated by the excavation unit and the amount of sediment intake by the suction means in that section is within a preset allowable range, so that the soil can be dredged in the section being excavated without excess or deficiency. As a result, it is possible to avoid redoing dredging due to remaining soil and there is no need to excavate too deeply, which is advantageous for further improving work efficiency. [Brief description of the drawings]

[0011] [Figure 1] 1 is an explanatory diagram illustrating an embodiment of a pump dredger equipped with the dredging control system of the present invention from a side view. [Diagram 2] FIG. 2 is an explanatory diagram illustrating the pump dredger of FIG. 1 in a plan view. [Diagram 3] FIG. 2 is an explanatory diagram illustrating a schematic configuration of the dredging control system of FIG. 1. [Figure 4] FIG. 2 is an explanatory diagram illustrating, in cross section, the rough excavation process in which the bottom of the water is dredged in a stepped manner using the pump dredger of FIG. 1. [Diagram 5] FIG. 5 is an explanatory diagram illustrating, in cross section, the situation in which the finish excavation process is being carried out on the stepped dredged water bottom of FIG. 4 using the pump dredger of FIG. 1. [Figure 6] FIG. 2 is an explanatory diagram illustrating planned dredging volume map data. [Figure 7] 2 is an explanatory diagram illustrating, in a plan view, a state in which the pump dredger of FIG. 1 is rotated. FIG. [Figure 8] 2 is an explanatory diagram illustrating, in a plan view, the state in which the pump dredger of FIG. 1 is moving forward. [Figure 9] FIG. 2 is an explanatory diagram illustrating, in a plan view, a situation in which the bottom of the water is dredged using the pump dredger of FIG. 1. [Figure 10] FIG. 7 is an explanatory diagram illustrating another example of planned dredging volume map data different from that shown in FIG. 6. [Figure 11] 1 is an explanatory diagram illustrating an example of a side view of the inside of a suction pipe provided with a water supply valve. FIG. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0012] Hereinafter, a dredging control system and a dredging method of the present invention will be described based on the embodiments shown in the drawings.

[0013] A dredging control system 10 of the present invention illustrated in Figs. 1 to 3 is used in construction for dredging a water bottom B by a pump dredger ship 1. For example, in order to construct a channel in a harbor that allows large ships to enter the harbor, soil S on the water bottom B is dredged to form a recessed passage C on the water bottom B extending from the harbor to the offshore side. In this embodiment, as shown in Fig. 5, a case will be described as an example in which a recessed passage C is formed having a flat portion C1 in the center that becomes the bottom surface portion, and slopes C2 that smoothly incline upward on both sides of the flat portion C1 in the width direction.

[0014] As illustrated in Figures 1 and 2, the pump dredger 1 comprises a spud 3 (3a, 3b) provided at the rear of the hull 2, a ladder 4 provided at the front of the hull 2 ​​and extending forward of the hull 2, an excavation section 5 provided at the tip of the ladder 4 for excavating soil S from the bottom of the water B, and a suction means 7 for sucking in the soil S excavated by the excavation section 5. The pump dredger 1 further comprises a rotation means 6 for rotating the ladder 4 in the vertical direction around the rear end of the ladder 4 as the rotation axis, and a rotation means 9 for rotating the ladder 4 together with the hull 2 ​​in the horizontal direction around the spud 3 driven into the bottom of the water B as a fulcrum.

[0015] 3, the dredging control system 10 includes a memory unit 11 in which planned dredging volume map data of the dredging target area of ​​the water bottom B is stored, a hull position information acquisition means 12 for acquiring three-dimensional position information of the hull 2, a sediment suction amount measurement means 13 for measuring the amount of sediment suctioned by the suction means 7, and a control device 14 communicatively connected to the memory unit 11, the hull position information acquisition means 12, the sediment suction amount measurement means 13, the rotating means 6, and the swivel means 9. The dredging control system 10 of this embodiment further includes a display means 15 and a warning means 16 communicatively connected to the control device 14.

[0016] Two spuds 3a, 3b extending in the vertical direction are arranged at a distance from each other in the ship's width direction at the rear of the hull 2 ​​of the pump dredger 1. Each of the spuds 3a, 3b is configured to be able to move up and down relative to the hull 2. The rear end of the ladder 4 is rotatably supported on a shaft support fixed to the hull 2. The ladder 4 rotates in the vertical direction relative to the hull 2 ​​with the rear end as the rotation axis.

[0017] The excavation section 5 has a number of cutters 5a for cutting the soil S on the water bottom B, and the cutters 5a rotate relative to the ladder 4. If other conditions are the same, increasing the rotation speed of the cutters 5a increases the amount of soil excavated, and therefore the amount of soil suction. The cutters 5a are not limited to being driven at a constant rotation speed (number of revolutions) by a drive motor as in this embodiment, but may also be inverter-controlled to vary the rotation speed of the drive motor.

[0018] The suction means 7 has a suction pipe 7b into which the soil S and water W sucked in from a soil suction port 7a arranged near the excavation section 5 flow, and a pump 7c connected to the suction pipe 7b. The suction pipe 7b is arranged inside the ladder 4 and extends from the tip of the ladder 4 to a storage area (soil dumping area) for the soil S arranged outside the pump dredger 1. In this embodiment, the pump 7c is mounted on the pump dredger 1, but the pump 7c can also be provided outside the pump dredger 1, for example.

[0019] The rotation means 6 includes a support frame 6a provided at the front of the hull 2, a winch 6b installed on the hull 2, a plurality of hoisting wires 6c paid out from the winch 6b, a hoisting tool 6d, and a plurality of chains 6e. The plurality of hoisting wires 6c paid out from the winch 6b are each hung around a sheave provided at the tip of the support frame 6a, and the lower ends of the plurality of hoisting wires 6c extending downward from the sheave are connected to the hoisting tool 6d. The lower ends of the plurality of chains 6e connected to the lower part of the hoisting tool 6d are connected to the front of the ladder 4. The rotation means 6 rotates the ladder 4 in the vertical direction relative to the hull 2 ​​by changing the payout length of the hoisting wires 6c by rotating the drum of the winch 6b.

[0020] When the winch 6b of the rotating means 6 is started and the rotation speed of the drum of the winch 6b becomes stable, the vertical rotation speed of the ladder 4 is maintained at a constant rotation speed V0. When the driving of the rotating means 6 is stopped, the rotation of the ladder 4 stops and the ladder 4 becomes fixed at the stopped inclination angle.

[0021] The rotating means 6 has a function of detecting the vertical inclination angle of the ladder 4 relative to the hull 2 ​​based on the amount of lifting wire 6c reeled out by the winch 6b. Information on the inclination angle of the ladder 4 is sequentially input from the rotating means 6 to the control device 14. For example, it is possible to provide an inclination sensor that detects the inclination angle of the ladder 4, and to configure so that information on the inclination angle of the ladder 4 acquired by the inclination sensor is sequentially input to the control device 14. The rotating means 6 is simply driven and stopped by commands from the control device 14, so the rotation speed V0 of the ladder 4 when the rotating means 6 is driven is basically constant. The length of the ladder 4 is known, so this length is input and stored in the control device 14.

[0022] The turning means 9 has a pair of reel sections 9a, 9b installed on the rudder 4, and wires 9c, 9d wound around the respective reel sections 9a, 9b. The wire 9c unwound from one reel section 9a extends to the port side of the hull 2, and the wire 9d unwound from the other reel section 9b extends to the starboard side of the hull 2, with the ends of the wires 9c, 9d fixed to the bottom B spaced apart from the hull 2 ​​in the ship's width direction using an anchor or the like. In this turning means 9, the horizontal turning speed of the hull 2 ​​and the rudder 4 is changed by changing the unwound and reeled speeds of the pair of wires 9c, 9d by the pair of reel sections 9a, 9b.

[0023] The storage unit 11 is a memory that stores data. The planned dredging volume map data of the dredging target area of ​​the bottom B stored in the storage unit 11 is created based on the initial depth map data of the bottom B of the dredging target area before dredging work that has been surveyed in advance and a design drawing of the bottom shape (concave path C) that has been provided in advance. As illustrated in FIG. 6, the planned dredging volume map data divides the dredging target area of ​​the bottom B into multiple sections in a plan view and determines the planned dredging volume for each of the divided sections. The planned dredging volume for each section can be calculated based on the initial depth of the bottom B of the section before dredging work and the design depth L1 of the bottom B in the design drawing.

[0024] In the planned dredging volume map data of this embodiment, the dredging target area is divided into a grid shape by a plurality of straight lines extending in the extension direction (longitudinal direction) of the recessed path C and a plurality of straight lines extending in the width direction of the recessed path C, and each section is rectangular. The planned dredging volume map data also includes data on the design depth L1 of each section of the recessed path C defined in the design drawing. The memory unit 11 of this embodiment further stores initial depth map data indicating the shape of the water bottom B of the dredging target area before dredging work. The initial depth map data can be created before dredging work by measuring the depth of the water bottom B of the dredging target area using an acoustic depth sounding device or the like.

[0025] The hull position information acquisition means 12 is configured to include a GNSS receiver 12a that acquires position coordinate data of the hull 2 ​​from the global positioning system, an inclinometer 12b that measures the inclination of the hull 2, a compass 12c that measures the bow direction of the hull 2, and a freeboard gauge 12d that measures the freeboard of the hull 2. The hull position information acquisition means 12 of this embodiment further includes a tide gauge 12e that measures the tide level of the construction water area. The position coordinate data of the hull 2 ​​acquired by the GNSS receiver 12a and the respective measurement data acquired by the inclinometer 12b, the compass 12c, the freeboard gauge 12d, and the tide gauge 12e are sequentially input to the control device 14. The hull position information acquisition means 12 is only required to acquire three-dimensional position information of the hull 2, more specifically, at least information on the three-dimensional position coordinates of a predetermined position of the hull 2, the direction of the hull 2, and the inclination angle of the hull 2, and various other configurations can be adopted.

[0026] The sediment intake amount measuring means 13 has a flowmeter 13a that measures the flow rate of the sediment S and water W passing through the suction pipe 7b, and a densitometer 13b that measures the density of the sediment S and water W passing through the suction pipe 7b. For example, a Doppler flowmeter is used as the flowmeter 13a. For example, a gamma ray densitometer is used as the densitometer 13b. The flowmeter 13a and the densitometer 13b are installed on the outer surface of the suction pipe 7b. The ratio of sediment S in the sediment S and water W passing through the suction pipe 7b can be calculated from the measured values ​​of the densities of the sediment S and water W passing through the suction pipe 7b. Then, the amount of sediment intake sucked in by the suction means 7 can be calculated based on the calculated ratio of sediment S and the measured values ​​of the flow rates of the sediment S and water W passing through the suction pipe 7b.

[0027] It is preferable that the sediment intake amount measuring means 13 measures the amount of sediment intake at a position as close as possible to the sediment intake port 7a of the suction pipe 7b. For example, the measuring devices and sensors constituting the sediment intake amount measuring means 13 can be installed near the sediment intake port 7a of the suction pipe 7b. The sediment intake amount measuring means 13 may have various other configurations as long as it can measure the amount of sediment intake by the suction means.

[0028] A computer or the like is used as the control device 14. The control device 14 is installed in the hull 2. The memory unit 11 and the control device 14 can be configured, for example, as the same computer or the like. The control device 14 controls the horizontal rotation speed V1 of the hull 2 ​​and the rudder 4 by the rotation means 9 based on the planned dredging volume map data of the dredging target area input from the memory unit 11, the three-dimensional position information of the hull 2 ​​input from the hull position information acquisition means 12, and the information on the inclination angle of the rudder 4 input from the rotation means 6. The details of the control by the control device 14 will be described later.

[0029] The display means 15 may be a publicly known monitor. The display means 15 displays information input and stored in the memory unit 11 and the control device 14, and information processed by the control device 14. The warning means 16 issues a warning to a worker (such as an operator) of the pump dredger 1. The warning means 16 may be, for example, an alarm that emits a warning sound or a warning light. For example, the display means 15 may be configured to function as the warning means 16 and display a warning on the display means 15.

[0030] The basic steps for dredging the bottom B of the water by the pump dredger 1 to form a recess C are as follows.

[0031] As shown in Fig. 7, one of the spuds 3a provided at the rear of the hull 2 ​​of the pump dredger 1 is driven into the water bottom B. The ladder 4 is then rotated vertically by the rotating means 6, and the ladder 4 is rotated horizontally together with the hull 2 ​​using the spud 3a driven into the water bottom B as a fulcrum by the rotating means 9, so that the excavation part 5 provided at the tip of the ladder 4 excavates the soil S on the water bottom B. The excavated soil S is then sucked in by the suction means 7 together with the water W of the construction water area, and the soil S on the water bottom B is dredged. The engine that drives the pump 7c is basically driven to rotate at a constant speed.

[0032] Next, as illustrated in FIG. 8, the hull 2 ​​is advanced in the direction in which the recessed path C extends, and the excavation range by the excavation unit 5 is moved. When the hull 2 ​​is advanced, the other spud 3b is driven into the bottom B of the water, and one spud 3a is withdrawn from the bottom B, with the hull 2 ​​facing the direction in which the recessed path C extends. Then, the hull 2 ​​is rotated at a predetermined angle (e.g., about 8 degrees to 15 degrees) with the other spud 3b driven into the bottom B as a fulcrum, and the position of one spud 3a is advanced a distance D (e.g., about 1.5 to 2.5 m). Next, one spud 3a is driven into the bottom B of the water, and the other spud 3b is withdrawn from the bottom B. Then, the rudder 4 is rotated horizontally together with the hull 2, with the spud 3b driven into the bottom B as a fulcrum by the rotating means 9, and the sediment S of the bottom B is dredged in the same manner as the above-mentioned procedure.

[0033] In other words, as illustrated in Figure 9, a concave passage C is formed by alternately rotating the excavation section 5 in an arc shape in a plan view around one of the spuds 3a driven into the water bottom B as a fulcrum to dredging, and moving the hull 2 ​​forward.

[0034] In the present invention, before dredging work is performed by the pump dredger 1, map data of the planned dredged soil volume of the dredged target area forming a concave channel C is created as shown in FIG. 6. Then, an allowable range of the soil suction volume (corresponding to the dredged soil volume) by the suction means 7 of each section relative to the planned dredged soil volume when dredging is performed at the design depth L1 of the design drawing is set. The allowable range of the soil suction volume by the suction means 7 of each section relative to the planned dredged soil volume can be appropriately determined depending on the construction conditions, etc., and for example, the allowable range is set to 80% to 120%, more preferably 90% to 110% of the planned dredged soil volume. For example, a different allowable range can be set for each section depending on the planned dredged soil volume.

[0035] In FIG. 4, which will be described later, the design depth L1 of the concave passage C in the design drawing is indicated by a dashed line, and in FIG. 5, the design depth L1 is indicated by a solid line. In addition, in FIG. 4 and FIG. 5, the minimum depth L2 when the amount of sediment suctioned by the suction means 7 is the lower limit of the allowable range of the planned dredging volume is indicated by a dashed line, and the limit depth L3 when the amount of sediment suctioned by the suction means 7 is the upper limit of the allowable range of the planned dredging volume is indicated by a dashed line. The minimum depth L2 is, for example, about 0.5 to 2.0 m shallower than the design depth L1, and the limit depth L3 is, for example, about 0.5 to 2.0 m deeper than the design depth L1. The created planned dredging volume map data and the set allowable range are stored in the memory unit 11. The memory unit 11 further stores initial depth map data of the water bottom B of the dredging target area before dredging work.

[0036] As illustrated in Fig. 4, in the dredging operation, the pump dredger ship 1 performs a rough excavation process in which the area forming the concave channel C in the bottom B is dredged in a stepped manner at a depth similar to the design depth L1 (slightly shallower depth). In the rough excavation process, the control device 14 calculates three-dimensional position information of the excavation section 5 based on three-dimensional position information of the hull 2 ​​input from the hull position information acquisition means 12 and information on the inclination angle of the ladder 4 input from the rotation means 6. The control device 14 of this embodiment calculates three-dimensional position information of the excavation section 5 based on position coordinate data of the hull 2 ​​input from the GNSS receiver 12a constituting the hull position information acquisition means 12, measurement data input from the inclinometer 12b, the compass 12c, the freeboard gauge 12d, and the tide gauge 12e, respectively, and information on the inclination angle of the ladder 4.

[0037] Then, based on the calculated three-dimensional position information of the excavation unit 5, the information on the inclination angle of the ladder 4, and the planned dredging volume map data and the initial depth map data input from the memory unit 11, the control unit 14 sets the excavation depth by the excavation unit 5 to a position deeper than the depth of the bottom B before dredging by the depth that can be excavated by the excavation unit 5 (for example, about 1 to 2 m). Then, the control unit 14 drives the turning means 6 to turn the ladder 4, thereby moving the excavation unit 5 downward to the set depth position, and stops driving the turning means 6. In this state, the control unit 14 controls the turning means 9 to turn the excavation unit 5 within (shallower than) the line of the design depth L1 set in the planned dredging volume map data, and dredges the soil S of the surface layer of the bottom B.

[0038] Next, the control device 14 sets the excavation depth of the excavation unit 5 to a position deeper than the depth that can be excavated by the excavation unit 5. Then, the control device 14 drives the turning means 6 to turn the ladder 4 toward the water bottom B, thereby moving the excavation unit 5 downward to the set depth position, and stops driving the turning means 6. In this state, the control device 14 controls the turning means 9 to turn the excavation unit 5 within a range inside the line of the design depth L1 set in the planned dredging volume map data, and dredges the soil S of the water bottom B.

[0039] In the rough excavation process, the dredging work described above is repeated, and the excavation depth by the excavation section 5 is gradually deepened with each rotation of the rotating means 9, thereby dredging the area forming the recessed passage C in a stepped manner. In the rough excavation process, it is preferable to dredge the water bottom B to a depth where the design depth L1 of the recessed passage C is the minimum depth L2 of the deepest section (in this embodiment, the flat section C1). The rotation speed V0 of the ladder 4 when the rotating means 6 is driven in the rough excavation process is substantially constant.

[0040] Normally, dredging work by the pump dredger 1 is performed under conditions of calm waves, but the hull 2 ​​may sway vertically due to the effects of offshore waves and wake waves, causing the vertical position of the excavation unit 5 to fluctuate even when the rotation of the ladder 4 is stopped. When the excavation unit 5 moves above the set excavation depth, the amount of dredged soil per unit time by the excavation unit 5 and the suction means 7 becomes relatively small.

[0041] Therefore, in the rough excavation process, it is advisable to control the rotation speed V1 of the rotating means 9 to be decelerated when the excavation unit 5 moves above the set excavation depth based on the three-dimensional position information of the excavation unit 5 calculated by the control device 14. Since the amount of dredged soil per unit time increases by slowing down the rotation speed V1, this is more advantageous in avoiding leaving soil unexcavated in the rough excavation process than when the rotation speed V1 of the rotating means 9 is kept constant.

[0042] In the rough excavation process, the amount of sediment suctioned by the suction means 7 measured by the sediment suction amount measuring means 13 during stepped dredging work is recorded for each section divided by the planned dredged soil volume map data. Then, the planned dredged soil volume of each section in the planned dredged soil volume map data is updated by subtracting the amount of sediment suctioned by the rough excavation process from the original planned dredged soil volume of each section.

[0043] Next, as illustrated in Fig. 5, a finish excavation process is performed on the area dredged in a stepped manner in the rough excavation process. In the finish excavation process, when the slope C2 of the recessed passage C is formed, the control device 14 drives the rotating means 6, and causes the rotating means 6 to rotate the ladder 4 in the vertical direction. The rotation speed V0 of the rotating means 6 in the finish process is substantially constant. When the excavation unit 5 is moved from the slope C2 side of the recessed passage C toward the flat portion C1 side to form the slope C2, the control device 14 inputs a command to the rotating means 6 to rotate the ladder 4 from above to below.

[0044] The control device 14 receives the planned dredging volume map data stored in the memory unit 11, the three-dimensional position information of the hull 2 ​​acquired by the hull position information acquisition means 12, and information on the inclination angle of the ladder 4 by the turning means 6. The control device 14 calculates the three-dimensional position information of the excavation section 5 based on the input three-dimensional position information of the hull 2 ​​and the information on the inclination angle of the ladder 4.

[0045] Then, based on the calculated three-dimensional position information of the excavation section 5, the planned dredged soil volume map data, and the measurement data of the sediment suction volume input from the sediment suction volume measuring means 13, the control device 14 controls the horizontal rotation speed V1 of the hull 2 ​​and rudder 4 by the rotation means 9 so that the difference between the planned dredged soil volume of the section being excavated by the excavation section 5 and the sediment suction volume sucked in by the suction means 7 in that section is within a predetermined allowable range.

[0046] In other words, the control device 14 adjusts the rotation speed V1 of the rotating means 9 based on the three-dimensional position information of the excavation unit 5, the planned dredged soil volume map data, and the measurement data of the sediment intake volume input from the sediment intake volume measuring means 13 so that the sediment intake volume (dredged soil volume) sucked in by the suction means 7 in a section from when the excavation unit 5 enters the section until the excavation of the section is completed falls within an allowable range that is neither too much nor too little with respect to the planned dredged soil volume set for the section. That is, for example, when the sediment intake volume measured by the sediment intake volume measuring means 13 is less than the planned dredged soil volume, the control device 14 controls the rotation speed V1 of the rotating means 9 to be decelerated, and when the measurement value of the sediment intake volume is greater than the planned dredged soil volume, the control device 14 controls the rotation speed V1 of the rotating means 9 to be accelerated.

[0047] The control device 14 in this embodiment controls the payout and winding of a pair of wires 9c, 9d by a pair of reel sections 9a, 9b that constitute the rotation means 9, thereby maintaining each of the wires 9c, 9d in a taut state (a state in which tension is applied and there is no slack) and controls the horizontal rotation speed V1 of the hull 2 ​​and rudder 4.

[0048] In this way, when forming the slope C2, the vertical rotation speed V0 of the ladder 4 by the rotating means 6 is kept constant, and the horizontal rotation speed V1 of the hull 2 ​​and ladder 4 by the rotating means 9 is adjusted by the control device 14, while the excavation section 5 is moved from side end to side end of the range for forming the slope C2 set in the planned dredging volume map data, to dredge the soil S from the water bottom B.

[0049] Next, when forming the flat portion C1 of the recessed path C, the control device 14 stops driving the rotating means 6 when the excavation unit 5 reaches the side end of the slope C2 that has been dredged. The turning means 9 is controlled to move the excavation section 5 from one side end to the other side of the range of the flat section C1 set in the planned dredging volume map data, thereby dredging soil S from the water bottom B.

[0050] Similarly, when forming the flat portion C1 of the concave path C, the control device 14 controls the horizontal rotation speed V1 of the hull 2 ​​and the rudder 4 by the turning means 9 based on the calculated three-dimensional position information of the excavation unit 5, the planned dredged soil volume map data, and the measurement data of the sediment intake volume input from the sediment intake volume measuring means 13 so that the difference between the planned dredged soil volume of the section being excavated by the excavation unit 5 and the sediment intake volume sucked in by the suction means 7 in that section falls within a preset allowable range. Then, the control device 14 controls the turning means 9 to move the excavation unit 5 from side end to side end of the range of the flat portion C1 set in the planned dredged soil volume map data to dredge the sediment S from the water bottom B.

[0051] Even during the dredging of the flat portion C1, the vertical position of the excavation section 5 may fluctuate with the vertical rocking of the hull 2. Therefore, when the excavation section 5 moves above the design depth L1 and the amount of sediment sucked by the suction means 7 decreases, the control device 14 controls the rotation speed V1 of the rotation means 9 to be decelerated. Conversely, for example, when the excavation section 5 moves below the design depth L1 and the amount of sediment sucked by the suction means 7 increases, the control device 14 controls the rotation speed V1 of the rotation means 9 to be accelerated. By performing the above-mentioned control, the control device 14 ensures that the amount of sediment sucked by the suction means 7 in each section (amount of dredged soil) falls within an allowable range that is neither too much nor too little with respect to the planned amount of dredged soil set for that section. If the vertical position of the excavation section 5 hardly fluctuates, the rotation speed V1 is maintained constant and dredging is performed.

[0052] Next, when the excavation unit 5 is moved from the flat portion C1 side of the recessed path C toward the slope C2 side to form the other slope C2, the control device 14 inputs a command to the rotating means 6 to rotate the ladder 4 from below to above. Then, the control device 14 performs control to adjust the rotation speed V1 in the same manner as when the above-mentioned slope C2 is formed, and moves the excavation unit 5 from one side end to the other side end of the other slope C2 set in the planned dredging volume map data, dredging the soil S of the water bottom B.

[0053] This completes the finish excavation process. In the dredging method using the dredging control system 10, the recessed channel C is formed by sequentially repeating the rough excavation process, the finish excavation process, and the process of advancing the hull 2 ​​described above. If the dredging depth is shallow and the recessed channel C can be formed by only performing the finish excavation process, the rough excavation process can be omitted. The task of advancing the hull 2 ​​can be configured to be performed automatically by the dredging control system 10, or can be performed manually by an operator.

[0054] The display means 15 displays three-dimensional position information (excavation depth) of the excavation section 5 calculated by the control device 14, the planned dredged soil volume of the section in which the excavation section 5 is located in the planned dredged soil volume map data, the amount of sediment suctioned by the suction means 7 measured by the sediment suction volume measuring means 13, and the rotation speed V1 of the hull 2 ​​and rudder 4 by the rotation means 9. By checking the information displayed on the display means 15, the operator can confirm whether the dredging operation by the dredging control system 10 is being performed normally.

[0055] In this embodiment, the control device 14 controls the excavation unit 5 to issue a warning when the amount of sediment sucked by the suction means 7 in a section excavated by the excavation unit 5 exceeds a preset limit amount of sediment sucked in, based on the three-dimensional position information of the excavation unit 5 calculated based on the three-dimensional position information of the hull 2 ​​and the information on the inclination angle of the ladder 4, the planned dredged soil volume map data input from the memory unit 11, and the measurement data of the sediment sucked in from the sediment sucked in measuring means 13. By issuing a warning from the warning means 16, the operator can reliably recognize that the amount of sediment sucked by the suction means 7 exceeds the limit amount of sediment sucked in, and can promptly take measures to prevent over-excavation.

[0056] As described above, in the present invention, the amount of sediment intake (amount of dredged soil) of the section being excavated can be grasped in real time based on the measurement data from the sediment intake measurement means 13. The control device 14 controls the horizontal rotation speed V1 of the hull 2 ​​and the ladder 4 by the rotation means 9 so that the difference between the planned dredged soil amount of the section being excavated by the excavation unit 5 and the amount of sediment intake by the suction means 7 in that section is within a preset allowable range, so that the sediment S can be dredged without excess or deficiency in the section being excavated. As a result, redoing of dredging due to remaining excavation can be avoided, and there is no need to excavate excessively deep, which is advantageous for further improving work efficiency. Over-excavation generates excess dredged soil to be post-treated, so being able to avoid over-excavation is very beneficial for those skilled in the art. This dredging control system 10 can be easily applied to existing pump dredger ships 1. Therefore, it is very useful for those skilled in the art.

[0057] In this embodiment, the control device 14 controls the payout and winding of the pair of wires 9c, 9d by the pair of reel units 9a, 9b so as to maintain each of the wires 9c, 9d in a taut state. By keeping the pair of wires 9c, 9d in a taut state without slack, the movement due to the inertia of the hull 2 ​​and the rudder 4 and the influence of water resistance are suppressed, which is advantageous for precisely adjusting the turning speed V1 of the hull 2 ​​and the rudder 4.

[0058] When the water bottom B is dredged by the pump dredger 1, the excavation unit 5 is rotated in an arc shape to excavate the water bottom B. Therefore, as illustrated in Fig. 10, the planned dredged soil volume map data can be configured such that the dredged area is divided into arc shapes in accordance with the trajectory of the excavation unit 5, and each arc-shaped section is further divided into a plurality of sections in the width direction of the recessed channel C. Creating such planned dredged soil volume map data allows the arc-shaped trajectory of the excavation unit 5 to correspond more accurately to the sections of the planned dredged soil volume map data, which is more advantageous for forming the recessed channel C with high accuracy.

[0059] In the above-described embodiment, the control device 14 is configured to control the horizontal rotation speed V1 of the hull 2 ​​and rudder 4 by the rotation means 9, but in the dredging control system 10 of the present invention, the control device 14 can also be configured to control the rotation speed of the cutter 5a that constitutes the excavation section 5 instead of the rotation speed V1 by the rotation means 9.

[0060] When the control device 14 controls the rotation speed of the cutter 5a of the excavation unit 5, the excavation unit 5 is further connected to the control device 14 so as to be able to communicate with it. In the finish excavation process, the control device 14 calculates three-dimensional position information of the excavation unit 5 based on the three-dimensional position information of the hull 2 ​​input from the hull position information acquisition means 12 and the inclination angle of the ladder 4 input from the rotation means 6. Based on the calculated three-dimensional position information of the excavation unit 5, the planned dredged soil volume map data input from the memory unit 11, and the measurement data of the sediment intake volume input from the sediment intake volume measurement means 13, the control device 14 controls the rotation speed of the cutter 5a constituting the excavation unit 5 so that the difference between the planned dredged soil volume of the section being excavated by the excavation unit 5 and the sediment intake volume sucked in by the suction means 7 in that section falls within a preset allowable range.

[0061] The faster the rotation speed of the cutter 5a constituting the excavation section 5 is, the more the sediment S excavated by the excavation section 5 is, and therefore the amount of sediment suctioned by the suction means 7 is increased. Conversely, the slower the rotation speed of the cutter 5a of the excavation section 5 is, the less the sediment S is excavated by the excavation section 5 is, and therefore the amount of sediment suctioned by the suction means 7 is reduced. Therefore, for example, when the amount of sediment suction measured by the sediment suction amount measuring means 13 is less than the planned amount of dredged soil, the control device 14 controls to accelerate the rotation speed of the cutter 5a of the excavation section 5, and when the measured value of the amount of sediment suction is greater than the planned amount of dredged soil, the control device 14 controls to decelerate the rotation speed of the cutter 5a of the excavation section 5.

[0062] In this way, by controlling the rotation speed of the cutter 5a constituting the excavation section 5, just the right amount of soil S can be dredged from the section being excavated, as in the case of controlling the rotation speed V1 of the rotation means 9, and the same effect as that of the dredging control system 10 of the embodiment exemplified above can be achieved. The control device 14 can also be configured to control both the rotation speed V1 of the rotation means 9 and the rotation speed of the cutter 5a.

[0063] The dredging control system 10 according to the present invention can also be configured as shown in FIG.

[0064] The suction means 7 of this embodiment further has a water supply valve 8 provided on the circumferential surface at a midpoint of the suction pipe 7b. A valve operating section that operates the opening and closing of the water supply valve 8 is connected to the control device 14 so as to be able to communicate with each other, and the control device 14 is configured to be able to remotely control the opening and closing of the water supply valve 8.

[0065] In this embodiment, the control device 14 controls at least one of the above-mentioned rotation speed V1 of the rotation means 9 and the rotation speed of the cutter of the excavation unit 5, and further controls the opening and closing of the water supply valve 8. Specifically, the control device 14 determines whether or not the amount of sediment suction sucked by the suction means 7 in the section excavated by the excavation unit 5 exceeds a preset limit sediment suction amount (upper limit of the allowable range) for the planned dredged soil amount of the section excavated by the excavation unit 5 based on the three-dimensional position information of the excavation unit 5 calculated based on the three-dimensional position information of the hull 2 ​​and the information on the inclination angle of the ladder 4, the planned dredged soil amount map data, and the measurement data of the sediment suction amount input from the sediment suction amount measuring means 13. Then, when the control device 14 determines that the amount of sediment suction sucked by the suction means 7 in the section excavated by the excavation unit 5 exceeds the preset limit sediment suction amount, it controls the water supply valve 8 to be switched from a closed state to an open state by remote control.

[0066] When the water supply valve 8 is closed, normally, sediment S flows vigorously into the suction pipe 7b together with water W. As shown in Fig. 11, when the water supply valve 8 is switched to an open state, water W flows vigorously into the suction pipe 7b from the water supply port of the water supply valve 8 provided at the midpoint of the suction pipe 7b, so that the inflow of sediment S from the sediment suction port 7a into the suction pipe 7b is suppressed, and the amount of sediment sucked into the suction pipe 7b is reduced.

[0067] In this way, by controlling the opening and closing of the water supply valve 8 by the control device 14, it is possible to more effectively prevent over-excavation of the sediment S on the bottom B without stopping the pump 7c. Since the hull 2 ​​may temporarily move up and down due to the effects of offshore waves and wake waves, it is more advantageous to prevent over-excavation in such cases. Even if the pump 7c is stopped, the suction of the sediment S does not immediately stop, and over-excavation will generate excess dredged soil that must be treated afterwards, so that being able to quickly suppress the amount of sediment being sucked in is very beneficial to those skilled in the art.

[0068] The display means 15 of this embodiment further displays the sediment suction limit for the section in which the excavation section 5 is located and the open / closed state of the water supply valve 8, and displays a warning when the sediment suction amount by the suction means 7 exceeds the sediment suction limit. By checking the information displayed on the display means 15, the operator can confirm whether the water supply valve 8 is being normally controlled by the control device 14.

[0069] The dredging control system 10 may further include a configuration in which, for example, design depth map data of the dredging target area is stored in the memory unit 11, and the control device 14 determines whether the excavation depth excavated by the excavation unit 5 exceeds a preset limit depth L3 with respect to the design depth L1 set in the design depth map data based on the calculated three-dimensional position information of the excavation unit 5 and the design depth map data. When the control device 14 determines that the excavation depth excavated by the excavation unit 5 exceeds a preset limit depth L3 with respect to the design depth L1 set in the design depth map data, the control device 14 may remotely control the water supply valve 8 to be switched from a closed state to an open state.

[0070] The design depth map data divides the dredging target area of ​​the water bottom B into multiple sections in a plan view, and determines the design depth L1 for each of the sections. The design depth map data can be created based on the design drawing of the recess C, which is provided in advance, in the same way as the planned dredging volume map data.

[0071] In this way, when the control device 14 controls the opening and closing of the water supply valve 8, even if the hull 2 ​​moves up and down due to the influence of offshore waves, wake waves, etc., and the excavation depth excavated by the excavation section 5 temporarily exceeds the limit depth L3, the water supply valve 8, which is in a closed state, can be remotely switched to an open state, thereby more effectively preventing over-excavation of the soil S at the bottom B without stopping the pump 7c.

[0072] Furthermore, when the control device 14 performs control to switch the open water supply valve 8 to a closed state at the point in time when the determination result changes to indicate that the excavation depth of the excavation unit 5 does not exceed the limit depth L3, the pump 7c is operating and dredging work can be resumed promptly. The operation of switching the open water supply valve 8 to a closed state can also be configured to be manually performed by an operator.

[0073] The display means 15 of this embodiment further displays the limit depth L3 of the section in which the excavation unit 5 is located and the open / closed state of the water supply valve 8, and displays a warning when the excavation depth by the excavation unit 5 exceeds the limit depth L3. By checking the information displayed on the display means 15, the operator can confirm whether the water supply valve 8 is being normally controlled by the control device 14.

[0074] In this embodiment, further, under the control of the control device 14, the warning means 16 issues a warning when the excavation depth excavated by the excavation unit 5 exceeds a preset limit depth L3 with respect to the design depth L1 set in the design depth map data, based on the calculated three-dimensional position information of the excavation unit 5 and the design depth map data input from the memory unit 11. By issuing a warning from the warning means 16, the operator can reliably recognize that the excavation depth of the excavation unit 5 has exceeded the limit depth L3, and can promptly take measures to prevent over-excavation.

[0075] The present invention is not limited to the case where a recessed passage C having slopes C2 on both sides of a flat portion C1 is formed, but can also be adopted, for example, in the case where only slopes C2 are formed on the bottom B of the water. The spud 3, ladder 4, excavation unit 5, rotation means 6, suction means 7, and swivel means 9 constituting the pump dredger 1 are not limited to the above-mentioned embodiment, and can be configured in various other ways. The swivel means 6 can be configured, for example, by directly connecting the lower end of the hoisting wire 6c unwound from the winch 6b to the ladder 4. The excavation unit 5 can be configured, for example, by rotating a drill-shaped blade. The swivel means 9 can be configured, for example, by using a thruster or the like provided on the side of the hull 2 ​​to rotate the hull 2 ​​and the ladder 4. [Explanation of symbols]

[0076] 1. Pump dredger 2. Hull 3, 3a, 3b Spud 4. Ladder 5. Excavation Section 5a Cutter 6 Rotation means 6a Support frame 6b Winch 6c Suspension wire 6d sling 6e chain 7 Inhalation means 7a Sediment intake 7b Suction pipe 7c Pump 8. Water supply valve 9. Rotation means 9a, 9b Reel section 9c, 9d Wire 10 Dredge Control System 11 Storage section 12 Hull position information acquisition means 12a GNSS receiver 12b Inclinometer 12c Compass 12d freeboard gauge 12e Tide gauge 13. Means for measuring sediment intake volume 13a flow meter 13b Density meter 14 Control device 15 Display means 16 Warning measures B Underwater C concave road C1 flat part C2 Slope L1 design depth L2 minimum depth L3 Depth Limit S. Soil W water

Claims

1. A dredging control system using a pump dredger vessel comprising a spud provided at the rear of a vessel body, a rotation means for rotating a ladder having an excavation section at its tip in a vertical direction relative to the vessel body, a suction means for sucking in soil and sand excavated from the bottom of the water by the excavation section, and a rotation means for rotating the ladder together with the vessel body in a horizontal direction with the spud driven into the bottom of the water as a fulcrum, The dredging apparatus comprises a memory unit in which planned dredging volume map data is stored, in which the planned dredging volume for each of a plurality of sections obtained by dividing the dredging target area of ​​the water bottom is set, a hull position information acquisition means for acquiring three-dimensional position information of the hull, a sediment intake volume measurement means for measuring the amount of sediment intake by the suction means, and a control device communicatively connected to the memory unit, the hull position information acquisition means, the sediment intake volume measurement means, the rotation means, and the slewing means, A dredging control system characterized in that the control device calculates three-dimensional position information of the excavation section based on the three-dimensional position information of the hull input from the hull position information acquisition means and the inclination angle of the ladder input from the rotating means, and the horizontal rotation speed of the hull and ladder by the rotating means is controlled based on the calculated three-dimensional position information of the excavation section, the planned dredged soil volume map data input from the memory unit, and the measurement data of the sediment suction volume input from the sediment suction volume measuring means so that the difference between the planned dredged soil volume of the section being excavated by the excavation section and the sediment suction volume sucked in by the suction means in that section is within a predetermined allowable range.

2. A dredging control system using a pump dredger vessel comprising a spud provided at the rear of a vessel body, a rotation means for rotating a ladder having an excavation section at its tip in a vertical direction relative to the vessel body, a suction means for sucking in soil and sand excavated from the bottom of the water by the excavation section, and a rotation means for rotating the ladder together with the vessel body in a horizontal direction with the spud driven into the bottom of the water as a fulcrum, The dredging device comprises a memory unit in which planned dredging volume map data is stored, in which the planned dredging volume for each of a plurality of sections obtained by dividing the dredging target area of ​​the water bottom is set, a hull position information acquisition means for acquiring three-dimensional position information of the hull, a sediment intake volume measurement means for measuring the amount of sediment intake by the suction means, and a control device communicatively connected to the memory unit, the hull position information acquisition means, the sediment intake volume measurement means, the excavation unit, the rotation means and the slewing means, A dredging control system characterized in that the control device calculates three-dimensional position information of the excavation section based on the three-dimensional position information of the hull input from the hull position information acquisition means and the inclination angle of the ladder input from the rotation means, and the rotational speed of the cutter that constitutes the excavation section is controlled based on the calculated three-dimensional position information of the excavation section, the planned dredged soil volume map data input from the memory unit, and the measurement data of the sediment suction volume input from the sediment suction volume measuring means so that the difference between the planned dredged soil volume of the section being excavated by the excavation section and the sediment suction volume sucked in by the suction means in that section is within a predetermined tolerance range.

3. The excavation unit is communicatively connected to the control device, The dredging control system of claim 1, further comprising: a control device for controlling the rotational speed of a cutter constituting the excavation unit based on the calculated three-dimensional position information of the excavation unit, the planned dredged soil volume map data input from the memory unit, and the measurement data of the soil suction volume input from the soil suction volume measuring means, so that the difference between the planned dredged soil volume of the section being excavated by the excavation unit and the soil suction volume sucked in by the suction means in that section is within a predetermined tolerance range.

4. the suction means has a suction pipe into which the soil and water sucked from a soil suction port disposed in the vicinity of the excavation portion flow, A dredging control system as described in any one of claims 1 to 3, wherein the sediment suction amount measuring means has a flow meter for measuring the flow rate of sediment and water passing through the suction pipe, and a density meter for measuring the density of the sediment and water passing through the suction pipe, and the sediment suction amount is measured based on the measurement data of the flow meter and the measurement data of the density meter.

5. a warning means communicatively connected to the control device; A dredging control system as described in any one of claims 1 to 4, configured such that, under control of the control device, the warning means issues a warning when the amount of sediment suction sucked in by the suction means in a section being excavated by the excavation unit exceeds a predetermined limit sediment suction amount based on the calculated three-dimensional position information of the excavation unit, the planned dredged soil volume map data input from the memory unit, and the measurement data of the sediment suction amount input from the sediment suction amount measuring means, relative to the planned dredging volume of the section being excavated by the excavation unit.

6. the suction means comprises a suction pipe into which the soil and water sucked in from a soil suction port disposed in the vicinity of the excavation portion flow, a pump connected to the suction pipe, and a water supply valve provided on a peripheral surface of the suction pipe at a midpoint; A dredging control system as described in any one of claims 1 to 5, wherein the control device remotely switches the water supply valve, which is in a closed state, to an open state when the sediment suction volume sucked in by the suction means in the section being excavated by the excavation unit exceeds a predetermined limited sediment suction volume based on the calculated three-dimensional position information of the excavation unit, the planned dredged soil volume map data input from the memory unit, and the measurement data of the sediment suction volume input from the sediment suction volume measuring means, relative to the planned dredging volume of the section being excavated by the excavation unit.

7. a warning means communicatively connected to the control device; The storage unit stores design depth map data of the dredging target area, The dredging control system according to any one of claims 1 to 6, wherein the warning means is configured to issue a warning when the excavation depth excavated by the excavation section exceeds a preset limit depth based on the calculated three-dimensional position information of the excavation section and the design depth map data input from the memory section, based on the control by the control device, relative to the design depth defined in the design depth map data.

8. the suction means comprises a suction pipe into which the soil and water sucked in from a soil suction port disposed in the vicinity of the excavation portion flow, a pump connected to the suction pipe, and a water supply valve provided on a peripheral surface of the suction pipe at a midpoint; The storage unit stores design depth map data of the dredging target area, A dredging control system as described in any one of claims 1 to 7, wherein the control device remotely switches the water supply valve, which is in a closed state, to an open state when the excavation depth excavated by the excavation unit exceeds a predetermined limit depth relative to the design depth defined in the design depth map data based on the calculated three-dimensional position information of the excavation unit and the design depth map data input from the memory unit.

9. A dredging method in which a spud provided at the rear of the hull of a pump dredger is driven into the bottom of the water, a ladder is rotated vertically by a rotating means, and the ladder and the hull are rotated horizontally with the swivel means using the spud as a fulcrum, so that soil is excavated from the bottom of the water by an excavation section provided at the tip of the ladder, and the excavated soil is sucked in by a suction means to dredge the bottom of the water, inputting into a control device planned dredging volume map data, which defines the planned dredging volume for each of a number of sections into which the dredging target area of ​​the water bottom is divided, three-dimensional position information of the hull acquired by a hull position information acquisition means, measurement data of the amount of sediment suctioned by the suction means measured by a sediment suction volume measurement means, and information on the inclination angle of the ladder by the rotation means; The control device calculates three-dimensional position information of the excavation section based on three-dimensional position information of the hull and information on the inclination angle of the ladder, and controls the horizontal rotation speed of the hull and the ladder by the rotation means based on the calculated three-dimensional position information of the excavation section, the planned dredged soil volume map data, and the measurement data of the sediment suction volume so that the difference between the planned dredged soil volume of the section being excavated by the excavation section and the sediment suction volume sucked in by the suction means in that section is within a predetermined tolerance range.

10. A dredging method in which a spud provided at the rear of the hull of a pump dredger is driven into the bottom of the water, a ladder is rotated vertically by a rotating means, and the ladder and the hull are rotated horizontally with the swivel means using the spud as a fulcrum, so that soil is excavated from the bottom of the water by an excavation section provided at the tip of the ladder, and the excavated soil is sucked in by a suction means to dredge the bottom of the water, inputting into a control device planned dredging volume map data, which defines the planned dredging volume for each of a number of sections into which the dredging target area of ​​the water bottom is divided, three-dimensional position information of the hull acquired by a hull position information acquisition means, measurement data of the amount of sediment suctioned by the suction means measured by a sediment suction volume measurement means, and information on the inclination angle of the ladder by the rotation means; The control device calculates three-dimensional position information of the excavation section based on three-dimensional position information of the hull and information on the inclination angle of the ladder, and controls the rotational speed of the cutter that constitutes the excavation section based on the calculated three-dimensional position information of the excavation section, the planned dredged soil volume map data, and the measurement data of the sediment suction volume so that the difference between the planned dredged soil volume of the section being excavated by the excavation section and the sediment suction volume sucked in by the suction means in that section is within a predetermined tolerance range.

11. The dredging method described in claim 9, further comprising: controlling the rotational speed of a cutter constituting the excavation unit based on the calculated three-dimensional position information of the excavation unit, the planned dredged soil volume map data, and the measurement data of the soil suction volume so that the difference between the planned dredged soil volume of the section being excavated by the excavation unit and the soil suction volume sucked in by the suction means in that section is within a predetermined tolerance range.

Citation Information

Patent Citations

  • Method of mining the sea bed

    EP1811127A1

  • Method and apparatus for displaying locus of cutter of pump dredger

    JP1983080035A

  • Self-controller for swing winch

    JP1983086231A

  • Dredger for bottom under water

    JP1983131238A

  • Controller for revolving number of cutter of pump dredger

    JP1987268434A