Secondary battery management method, secondary battery charging method, secondary battery management device, secondary battery management system, and secondary battery management program
The method manages secondary battery charging by setting a pattern based on internal state, target, and relational data to prevent excessive deterioration, ensuring safe and efficient charging aligned with user activities.
Patent Information
- Application Number
- JP2021116243
- Authority / Receiving Office
- JP · JP
- Patent Type
- Patents
- Current Assignee / Owner
- Filing Date
- 2021-07-14
- Publication Date
- 2024-10-15
- Estimated Expiration
- 2041-07-14
AI Technical Summary
Existing secondary battery charging methods do not effectively utilize available charging time while ensuring safe and appropriate charging to prevent rapid deterioration.
A method for managing secondary batteries that sets a charging pattern based on estimated internal state data, target data, and relational data to ensure the deterioration rate does not exceed a threshold, allowing charging within a target time, considering user activities and battery conditions.
This approach enables safe and appropriate charging of secondary batteries by effectively utilizing available charging time, reducing deterioration and ensuring the battery is charged to the desired state of charge (SOC) within the scheduled time.
Smart Images

Figure 0007566694000001 
Figure 0007566694000002 
Figure 0007566694000003
Abstract
Description
[Technical field]
[0001] The embodiments of the present invention relate to a method for managing a secondary battery, a method for charging a secondary battery, a management device for a secondary battery, a management system for a secondary battery, And, Secondary battery management program To Regarding. [Background technology]
[0002] In recent years, secondary batteries such as lithium-ion secondary batteries have been installed in battery-equipped devices such as smartphones, large-scale power storage devices for power systems, vehicles, stationary power supply devices, robots, and drones. In such battery-equipped devices, it is necessary to charge the secondary battery when the remaining capacity of the secondary battery installed in the battery-equipped device becomes low. When charging the secondary battery, it is required to charge the secondary battery appropriately and safely, for example, by charging the secondary battery with a charging pattern that suppresses rapid deterioration of the secondary battery. In addition, it is required to charge the secondary battery by effectively utilizing the time during the activity of the user of the battery-equipped device when the secondary battery of the battery-equipped device can be charged. [Prior art documents] [Patent documents]
[0003] [Patent Document 1] JP 2018-147827 A [Patent Document 2] JP 2012-251806 A [Patent Document 3] JP 2020-92598 A [Patent Document 4] International Publication No. 2017 / 042931 Summary of the Invention [Problem to be solved by the invention]
[0004] The problem to be solved by the present invention is to provide a method for managing a secondary battery, a method for charging a secondary battery, an apparatus for managing a secondary battery, and a system for managing a secondary battery, which make effective use of the time when the secondary battery can be charged, and enable the secondary battery to be safely and appropriately charged. And, Secondary battery management program M The purpose is to provide. [Means for solving the problem]
[0005] In an embodiment, a method for managing a secondary battery is provided. In the method, a charging pattern for charging to be performed is set based on estimation data including an estimation result of an internal state of the secondary battery based on measurement results of a current and a voltage of the secondary battery during charging or discharging of the secondary battery, target data including a target time for charging the secondary battery in the charging to be performed, and relationship data indicating a relationship between each of the internal state of the secondary battery and the charging conditions of the secondary battery and a deterioration rate of the secondary battery. The charging pattern is set to a charging pattern in which the deterioration rate does not exceed a threshold value and the secondary battery is charged for the target time. In the management method, a target time is calculated based on the content of an activity performed by a user of a battery-equipped device in which a secondary battery is mounted, in parallel with the charging that is scheduled to be performed. [Brief description of the drawings]
[0006] [Figure 1] FIG. 1 is a schematic diagram illustrating an example of a management system according to an embodiment. [Diagram 2] FIG. 2 is a schematic diagram illustrating internal state parameters indicating the internal state of the secondary battery. [Diagram 3] FIG. 3 is a schematic diagram showing an example in which charging of a secondary battery and a service other than charging are provided to a user of a battery-equipped device in an embodiment. [Figure 4A] FIG. 4A is a schematic diagram showing an example of information indicated in relationship data stored in a data storage unit in the embodiment. [Figure 4B] FIG. 4B is a schematic diagram showing an example of information different from that shown in FIG. 4A and shown in the relationship data stored in the data storage unit in the embodiment. [Diagram 5] FIG. 5 is a schematic diagram for explaining the processing in the charging pattern setting unit of the processing unit in the embodiment. [Figure 6] FIG. 6 is a schematic diagram illustrating an example of a charging pattern set by the charging pattern setting unit according to the embodiment. [Figure 7] FIG. 7 is a flowchart illustrating an example of processing performed by the processing unit of the management device according to the embodiment. [Figure 8] FIG. 8 is a schematic diagram showing an example of a unit cell used in the management system according to the embodiment. [Figure 9] FIG. 9 is a schematic diagram illustrating the configuration of an electrode group in the unit cell of FIG. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0007] Hereinafter, embodiments will be described with reference to the drawings.
[0008] (Secondary battery management system) Fig. 1 is a schematic diagram showing an example of a management system according to an embodiment. As shown in Fig. 1, the management system 1 includes a battery-equipped device 2 and a management device 3. The battery-equipped device 2 is equipped with a secondary battery 5, a measurement circuit 6, and a device control unit 7. Examples of the battery-equipped device 2 include smartphones, large-scale power storage devices for power systems, vehicles, stationary power supply devices, robots, drones, etc., and examples of the vehicles that can be the battery-equipped device 2 include railroad cars, electric buses, electric cars, plug-in hybrid cars, and electric motorcycles.
[0009] The secondary battery 5 is, for example, a lithium ion secondary battery. The secondary battery 5 may be formed of a single cell (single battery), or may be a battery module or a cell block formed by electrically connecting a plurality of single cells. When the secondary battery 5 is formed of a plurality of single cells, the plurality of single cells may be electrically connected in series, or may be electrically connected in parallel in the secondary battery 5. In addition, the secondary battery 5 may be formed in both a series connection structure in which a plurality of single cells are connected in series, and a parallel connection structure in which a plurality of single cells are connected in parallel. In addition, the secondary battery 5 may be any of a battery string, a battery array, and a storage battery in which a plurality of battery modules are electrically connected.
[0010] The measurement circuit 6 detects and measures parameters related to the secondary battery 5 while the secondary battery 5 is being charged or discharged. In the measurement circuit 6, for example, parameters are measured periodically at a predetermined timing during one charge or discharge of the secondary battery 5. In this case, the measurement circuit 6 measures parameters related to the secondary battery 5 at each of a plurality of measurement points during one charge or discharge of the secondary battery 5, and measures the parameters related to the secondary battery 5 a plurality of times. The parameters related to the secondary battery 5 include the current flowing through the secondary battery 5, the voltage of the secondary battery 5, and the temperature of the secondary battery 5. For this reason, the measurement circuit 6 includes an ammeter that measures the current, a voltmeter that measures the voltage, and a temperature sensor that measures the temperature.
[0011] The device control unit 7 constitutes a processing device (computer) that controls the operation of the battery-equipped device 2, including the operation of the secondary battery 5. The device control unit 7 controls the charging and discharging of the secondary battery 5 by controlling the driving of a driving circuit (not shown) formed in the battery-equipped device 2, and controls the operation of the secondary battery 5. The device control unit 7 includes a processor and a storage medium. The processor includes any one of a CPU (Central Processing Unit), an ASIC (Application Specific Integrated Circuit), a microcomputer, an FPGA (Field Programmable Gate Array), and a DSP (Digital Signal Processor). The storage medium may include an auxiliary storage device in addition to a main storage device such as a memory. Examples of the storage medium include a magnetic disk, an optical disk (CD-ROM, CD-R, DVD, etc.), a magneto-optical disk (MO, etc.), and a semiconductor memory. In the device control unit 7, the processor and the storage medium may each be one or more. In the device control unit 7, the processor performs processing by executing a program stored in the storage medium, etc. In addition, in the device control unit 7, the program executed by the processor may be stored in a computer (server) connected via a network such as the Internet, or in a server in a cloud environment. In this case, the processor downloads the program via the network. In the example of FIG. 1, the processor of the device control unit 7 performs processing based on a command transmitted from the management device 3.
[0012] (Secondary battery management method, secondary battery charging method, secondary battery management device, and secondary battery management program) The management device 3 will be described below. In addition, a management method and a charging method of a secondary battery executed by the management device 3 will be described, and a management program executed by the management device 3 will be described. The management device 3 manages the secondary battery 5 based on information about the secondary battery 5. Therefore, the secondary battery 5 is a target for management by the management device 3. In the example of FIG. 1, the management device 3 is provided outside the battery-equipped device 2. The management device 3 includes a processing unit 11, a data storage unit 12, and a transmission / reception unit 13. The management device 3 includes a processing device such as a server that can communicate with the device control unit 7 via a network. In this case, the management device 3 includes a processor and a storage medium, similar to the device control unit 7. The processing unit 11 performs at least a part of the processing performed by the processor, etc. of the management device 3, and the storage medium of the management device 3 functions as the data storage unit 12. The transmission / reception unit 13 is composed of an interface of the processing device, etc. The processing unit 11 can communicate with the device control unit 7 of the battery-equipped device 2 via the transmission / reception unit 13, and can exchange information, etc. with the device control unit 7. The processing unit 11 includes an estimated data generating unit 15, a target data generating unit 16, a charging pattern setting unit 17, and a charging control unit 18. Each of the estimated data generating unit 15, the target data generating unit 16, the charging pattern setting unit 17, and the charging control unit 18 performs a part of the processing performed by the processing unit 11.
[0013] 1, the management device 3 also functions as a charger capable of charging the secondary battery 5 of the battery-equipped device 2, and includes a power source 21 and a drive circuit 22. The power source 21 can be electrically connected to the secondary battery 5 via the drive circuit 22 and the drive circuit of the battery-equipped device 2. When the power source 21 is electrically connected to the secondary battery 5, the charge control unit 18 of the processing unit 11 controls the drive of the drive circuit 22 and transmits a control command to the device control unit 7 via the transmission / reception unit 13, causing the device control unit 7 to control the drive of the drive circuit of the battery-equipped device 2. As a result, the charge control unit 18 and the device control unit 7 control the supply of power from the power source 21 to the secondary battery 5, and the charging of the secondary battery 5 is controlled.
[0014] In one example, the power source 21 may not be provided in the management device 3 serving as a charger. In this case, a power source external to the management device 3 can be electrically connected to the secondary battery 5 via the drive circuit 22 and the drive circuit of the battery-equipped device 2. Even in a configuration in which the power source 21 is not provided in the management device 3, in a state in which the power source external to the management device 3 is electrically connected to the secondary battery 5, the charging control unit 18 of the processing unit 11 controls the drive of the drive circuit 22 and transmits a control command to the device control unit 7 via the transmission / reception unit 13 to cause the device control unit 7 to control the drive of the drive circuit of the battery-equipped device 2. As a result, the charging control unit 18 and the device control unit 7 control the supply of power from the external power source to the secondary battery 5, and the charging of the secondary battery 5 is controlled.
[0015] In one example, the management device 3 does not function as a charger, and a charger capable of charging the secondary battery 5 of the battery-equipped device 2 is provided separately from the management device 3. In this case, the processing unit 11 of the management device 3 can communicate with the device control unit 7 via the transmission / reception unit 13, and can also communicate with the charger. When the charger is electrically connected to the secondary battery 5 of the battery-equipped device 2 and can supply power from the charger to the secondary battery 5, the charging control unit 18 of the processing unit 11 transmits a control command to the device control unit 7 via the transmission / reception unit 13 to cause the device control unit 7 to control the driving of the drive circuit of the battery-equipped device 2, and transmits a control command to the charger to cause the processor of the charger to control the output of power from the charger to the battery-equipped device 2, etc. As a result, the charging control unit 18, the device control unit 7, and the processor of the charger control the supply of power from the charger to the secondary battery 5, and the charging of the secondary battery 5 is controlled.
[0016] Furthermore, when the management device 3 does not function as a charger, the management device 3 may be a cloud server configured in a cloud environment. The infrastructure of the cloud environment is configured by a virtual processor such as a virtual CPU and a cloud memory. Therefore, when the management device 3 is a cloud server, the processing unit 11 executes at least a part of the processing performed by the virtual processor. And the cloud memory functions as the data storage unit 12.
[0017] The data storage unit 12 may also be provided in a computer separate from the device control unit 7 and the management device 3. In this case, the management device 3 is connected to the computer in which the data storage unit 12 and the like are provided via a network. The management device 3 may also be mounted in the battery-equipped device 2. In this case, the management device 3 includes a processing device and the like mounted in the battery-equipped device 2, and the processor or the like of the processing device mounted in the battery-equipped device 2 performs the processing of the processing unit 11. The processing of the management device 3, including the processing of the processing unit 11, will be described below.
[0018] The processor or the like of the management device 3 diagnoses the degradation state of the secondary battery 5 by estimating the internal state of the secondary battery 5 or the like. The diagnosis of the degradation state of the secondary battery 5, including the estimation of the internal state of the secondary battery 5, is performed periodically, for example, once a year. When estimating the internal state of the secondary battery 5, the processing unit 11 transmits a command to the device control unit 7 via the transceiver unit 13, and the device control unit 7 charges or discharges the secondary battery 5 under predetermined conditions based on the command transmitted from the processing unit 11. At this time, power may be supplied to the secondary battery 5 from the management device 3, which serves as a charger, and the secondary battery 5 may be charged under predetermined conditions.
[0019] Here, data indicating the predetermined conditions for charging or discharging the secondary battery 5 performed in estimating the internal state of the secondary battery 5 is stored in, for example, the data storage unit 12 or the like. The above-mentioned predetermined conditions include, for example, a condition related to the SOC (state of charge) at the start of charging or discharging, a condition related to the SOC range of the secondary battery 5 during charging or discharging, a condition related to the current (C rate of the secondary battery 5) flowing through the secondary battery 5 during charging or discharging, a condition related to the temperature of the secondary battery 5 during charging or discharging, and a condition for terminating charging or discharging. Under the predetermined conditions, the current value of the current of the secondary battery 5 is set to a relatively small value, and the SOC range is set to a relatively wide value. For this reason, the internal state of the secondary battery 5 is estimated by charging or discharging the secondary battery 5 at a relatively low rate and within a relatively wide SOC range.
[0020] In diagnosing the internal state of the secondary battery 5, the measurement circuit 6 measures the aforementioned parameters related to the secondary battery 5 while the secondary battery 5 is being charged or discharged under the aforementioned predetermined conditions. Then, the processing unit 11 of the management device 3 receives measurement data indicating the measurement results of the measurement circuit 6 of the aforementioned parameters related to the secondary battery 5 from the equipment control unit 7 or the like via the transmitting / receiving unit 13. The measurement data is generated by the equipment control unit 7 based on, for example, the measurement results of the measurement circuit 6 during charging or discharging under the predetermined conditions.
[0021] When the secondary battery 5 is being charged or discharged under the above-mentioned predetermined conditions, the measurement circuit 6 measures parameters related to the secondary battery 5 at each of a plurality of measurement time points. Therefore, the measurement data received by the processing unit 11 includes measurement values of the parameters related to the secondary battery 5 at each of a plurality of measurement time points (a plurality of measurements). The measurement data also includes time changes (time history) of the parameters related to the secondary battery 5 when the secondary battery 5 is being charged or discharged under the above-mentioned predetermined conditions. Therefore, the measurement data includes time changes (time history) of the current of the secondary battery 5, time changes (time history) of the voltage of the secondary battery 5, and time changes (time history) of the temperature of the secondary battery 5, etc.
[0022] Further, either the device control unit 7 or the processing unit 11 (processor) of the management device 3 may estimate a time change (time history) in charging or discharging the secondary battery 5 under the above-mentioned predetermined conditions for either the charge amount or SOC of the secondary battery 5 based on the measurement results of the measurement circuit 6 of the parameters related to the secondary battery 5. The measurement data may include data indicating the relationship of the above-mentioned parameters related to the measured secondary battery 5 to either the estimated charge amount or SOC of the secondary battery 5. In this case, for example, data indicating the relationship of the measured voltage of the secondary battery 5 to either the estimated charge amount or SOC of the secondary battery 5 is included in the measurement data. The processing unit 11 can write the above-mentioned measurement data to the data storage unit 12.
[0023] Here, the charge amount of the secondary battery 5 can be calculated based on the charge amount (SOC) of the secondary battery 5 at the start of charging or discharging under the above-mentioned predetermined conditions and the change over time in the current of the secondary battery 5. In this case, the charge amount of the secondary battery 5 is calculated by a current integration method. The charge amount of the secondary battery 5 can also be calculated by a calculation method using the relationship between the terminal voltage and the charge amount of the secondary battery 5, an estimation method using a Kalman filter, or the like.
[0024] The SOC of the secondary battery 5 is specified based on, for example, the voltage of the secondary battery 5. For the secondary battery 5, a lower limit voltage Vmin and an upper limit voltage Vmax are specified for the voltage. For the secondary battery 5, for example, a state in which the open circuit voltage (OCV) or the voltage in discharging under a certain specified condition is the lower limit voltage Vmin is specified as a state in which the SOC is 0%, and a state in which the open circuit voltage or the voltage in charging under a certain specified condition is the upper limit voltage Vmax is specified as a state in which the SOC is 100%. For the secondary battery 5, the discharge capacity from a state in which the SOC is 100% to a state in which the SOC is 0%, or the charge capacity from a state in which the SOC is 0% to a state in which the SOC is 100%, is the battery capacity. For the secondary battery 5, the ratio of the remaining charge amount up to a state in which the SOC is 0% to the battery capacity is specified as the SOC. Therefore, the SOC of the secondary battery 5 can be calculated based on the charge amount of the secondary battery 5, etc.
[0025] The estimated data generating unit 15 acquires the above-mentioned measurement data including the measurement results of the current and voltage of the secondary battery 5, and estimates the internal state of the secondary battery 5 based on the measurement data. In this embodiment, the estimated data generating unit 15 estimates an internal state parameter indicating the internal state of the secondary battery 5. In one example, the estimated data generating unit 15 analyzes at least data indicating the time changes of the current and voltage of the secondary battery 5 during charging or discharging under the above-mentioned predetermined conditions. In this case, the estimated data generating unit 15 performs a charging curve analysis or a discharging curve analysis of the secondary battery 5. Furthermore, the estimated data generating unit 15 may analyze data indicating the time changes of the temperature of the secondary battery 5 in addition to the data indicating the time changes of the current and voltage of the secondary battery 5.
[0026] FIG. 2 is a schematic diagram for explaining the internal state parameters showing the internal state of the secondary battery. In FIG. 2, the horizontal axis indicates the charge amount Q, and the vertical axis indicates the potential E. As shown in FIG. 2, in the secondary battery 5, a lower limit potential Epmin and an upper limit potential Epmax are defined for the positive electrode potential, and the positive electrode potential becomes higher as the charge amount of the positive electrode increases. In addition, in the positive electrode, the charge amount when the positive electrode potential becomes the lower limit potential Epmin is the initial charge amount Qpmin of the positive electrode, and the charge amount when the positive electrode potential becomes the upper limit potential Epmax is the upper limit charge amount Qpmax of the positive electrode. The charge amount from the initial charge amount Qpmin to the upper limit charge amount Qpmax of the positive electrode is the positive electrode capacity Mp of the secondary battery 5, which corresponds to the chargeable and dischargeable amount of the positive electrode of the secondary battery 5.
[0027] In the secondary battery 5, a lower limit potential Enmin and an upper limit potential Enmax are specified for the negative electrode potential, and the negative electrode potential decreases as the charge amount of the negative electrode increases. In addition, in the negative electrode, the charge amount when the negative electrode potential becomes the upper limit potential Enmax is the initial charge amount Qnmin of the negative electrode, and the charge amount when the negative electrode potential becomes the lower limit potential Enmin is the upper limit charge amount Qnmax of the negative electrode. The charge amount of the negative electrode from the initial charge amount Qnmin to the upper limit charge amount Qnmax is the negative electrode capacity Mn of the secondary battery 5, which corresponds to the chargeable and dischargeable amount of the negative electrode of the secondary battery 5.
[0028] The internal state parameters of the secondary battery 5 include the above-mentioned positive electrode capacity Mp, negative electrode capacity Mn, positive electrode initial charge amount Qpmin, and negative electrode initial charge amount Qnmin. The internal state parameters of the secondary battery 5 also include a positive electrode mass, which is a parameter corresponding to the positive electrode capacity Mp, and a negative electrode mass, which is a parameter corresponding to the negative electrode capacity Mn. The positive electrode mass can be calculated based on the positive electrode capacity and the type of material forming the positive electrode. Similarly, the negative electrode mass can be calculated based on the negative electrode capacity and the type of material forming the negative electrode. The internal state parameters of the secondary battery 5 also include a positive electrode capacity maintenance rate and a negative electrode capacity maintenance rate. Here, the positive electrode capacity maintenance rate is the ratio of an estimated positive electrode capacity to a positive electrode capacity at the start of use, and the negative electrode capacity maintenance rate is the ratio of an estimated negative electrode capacity to a negative electrode capacity at the start of use.
[0029] The internal state parameters of the secondary battery 5 also include an operation window shift (SOW) that is a difference between the initial charge amount Qpmin of the positive electrode and the initial charge amount Qnmin of the negative electrode. The internal state parameters of the secondary battery 5 also include a parameter related to the internal resistance of the secondary battery 5. Note that FIG. 2 also shows a battery capacity Mb, which is one of the battery characteristic parameters that indicate the battery characteristics of the secondary battery 5. As described above, the battery capacity Mb corresponds to the amount of charge until the voltage of the secondary battery 5 (the difference between the positive electrode potential and the negative electrode potential) reaches the upper limit voltage Vmax from the lower limit voltage Vmin.
[0030] In this embodiment, a battery model of the secondary battery 5 is stored in the data storage unit 12. The battery model includes data indicating the relationship of the internal state of the secondary battery 5 to at least one of the voltage and current of the secondary battery 5, and includes, for example, a calculation formula for calculating at least one of the voltage and current of the secondary battery 5 from the internal state of the secondary battery 5. Therefore, the battery model includes data indicating the relationship of internal state parameters such as the positive electrode capacity and the negative electrode capacity to at least one of the current and voltage of the secondary battery 5. Note that the relationship of the internal state to each of the current and voltage of the secondary battery 5 changes in response to the temperature of the secondary battery 5, etc. For this reason, in the battery model of the secondary battery 5, the relationship of the internal state to at least one of the current and voltage of the secondary battery 5 may be set for each of a plurality of temperatures that are different from each other.
[0031] In the above-mentioned charge curve analysis or discharge curve analysis of the secondary battery 5, the estimated data generating unit 15 performs a fitting calculation (regression calculation) using at least the measurement results of the voltage and current of the secondary battery 5 included in the measurement data, and the above-mentioned data indicating the relationship of the internal state to at least one of the current and voltage of the secondary battery 5. At this time, the fitting calculation is performed using one or more internal state parameters as variables in a calculation formula that calculates at least the voltage and current of the secondary battery 5 from the internal state of the secondary battery 5. In one example, data indicating the relationship of the internal state of the secondary battery 5 to the voltage of the secondary battery 5 is used in the fitting calculation, and the relationship of the internal state of the secondary battery 5 to the voltage of the secondary battery 5 indicated by the data indicates the relationship between the positive electrode potential and the charge amount of the positive electrode, and the relationship between the negative electrode potential and the charge amount of the negative electrode. Then, the estimated data generating unit 15 estimates the internal state of the secondary battery 5 by calculating one or more internal state parameters that are variables by the fitting calculation. The estimated data generating unit 15 generates estimated data indicating an estimation result of the internal state of the secondary battery 5 including an estimated value of the internal state parameter of the secondary battery 5, and is capable of writing the generated estimated data to the data storage unit 12. In the fitting calculation for calculating the internal state parameters, in addition to the measurement results of the voltage and current of the secondary battery 5 and data indicating the relationship of the internal state of the secondary battery 5 to the voltage and current of the secondary battery 5, the measurement results of the temperature of the secondary battery 5 and data indicating the relationship of the internal state of the secondary battery 5 to the temperature of the secondary battery 5 may be used.
[0032] In one example, the battery model includes a calculation formula (1) as data indicating the relationship between the internal state of the secondary battery 5 and the voltage V(t) of the secondary battery 5 at a certain time t. The estimated data generating unit 15 estimates the internal state of the secondary battery 5 by performing a fitting calculation using the measurement result of the voltage V(t) of the secondary battery 5 included in the measurement data and the calculation formula (1) included in the battery model. In the fitting calculation using formula (1), for example, the positive electrode capacity Mp, the negative electrode capacity Mn, the initial charge amount Qpmin of the positive electrode, the initial charge amount Qnmin of the negative electrode, and a parameter R related to the internal resistance are set as internal state parameters, and the fitting calculation is performed using these internal state parameters as variables.
[0033] V(t)=Ep(Mp,Qpmin)-En(Mn,Qnmin)+R×I (1)
[0034] In formula (1), I represents the current of the secondary battery 5, and a measured value included in the measurement data or the like is used as the current I. In formula (1), Ep(Mp, Qpmin) represents a function for calculating the open circuit potential (OCP) of the positive electrode using at least the positive electrode capacity Mp and the initial charge amount Qpmin of the positive electrode as variables, and En(Mn, Qnmin) represents a function for calculating the open circuit potential of the negative electrode using at least the negative electrode capacity Mn and the initial charge amount Qnmin of the negative electrode as variables.
[0035] Methods for estimating the internal state of a secondary battery by charging curve analysis are shown in Patent Document 1 (JP 2018-147827 A), Patent Document 2 (JP 2012-251806 A), and Patent Document 3 (JP 2020-92598 A). In each of Patent Documents 1 to 3, the internal state of the secondary battery is estimated by performing a fitting calculation using at least the measurement results for the current and voltage of the secondary battery and data indicating the relationship of the internal state of the secondary battery to the voltage and current of the secondary battery. In the embodiment, the internal state of the secondary battery 5 may be estimated in the same manner as in any of Patent Documents 1 to 3. In addition, the estimated data generation unit 15 reads out a battery model including the calculation formula of Equation (1) and the like from the data storage unit 12 in estimating the internal state of the secondary battery 5. Then, the estimated data generation unit 15 can store in the data storage unit 12 the tentative estimated value for the internal state parameter and the estimated value that is required for subsequent processing among the final estimated value.
[0036] The estimated data generating unit 15 may estimate the battery characteristics of the secondary battery 5 based on the estimated internal state of the secondary battery 5. The battery characteristics of the secondary battery 5 include the open circuit voltage and OCV curve of the secondary battery 5 in addition to the above-mentioned battery capacity Mb. Here, the OCV curve is a function indicating the relationship between a parameter other than the OCV and the OCV, for example, a function indicating the relationship of the OCV to the SOC or the charge amount. The internal resistance of the secondary battery 5 indicates the internal state of the secondary battery 5 as described above, and also indicates the battery characteristics of the secondary battery 5. Each of Patent Document 1 and Patent Document 3 discloses a method of estimating the battery characteristics of the secondary battery 5 based on the internal state of the secondary battery. In the embodiment, the battery characteristics of the secondary battery 5 may be estimated in the same manner as either Patent Document 1 or Patent Document 3. When the battery characteristics of the secondary battery 5 are estimated, the estimated data includes the estimated result of the battery characteristics of the secondary battery 5 in addition to the estimated result of the internal state of the secondary battery 5.
[0037] The above-mentioned estimation of the internal state of the secondary battery 5 does not have to be performed by the management device 3, and may be performed by a processing device (computer) other than the management device 3. In this case, the processing unit 11 of the management device 3 is not provided with the estimated data generation unit 15. Furthermore, the processing unit 11 of the management device 3 receives estimated data including the estimation result of the internal state of the secondary battery 5 via the transmitting / receiving unit 13 from the processing device that estimated the internal state. Then, the processing unit 11 can write the received estimated data to the data storage unit 12.
[0038] The target data generating unit 16 generates target data indicating a target value for charging the secondary battery 5 scheduled to be performed after the current time. The target data generated by the target data generating unit 16 includes a target time for charging the secondary battery 5 in the scheduled charging, and includes a target SOC of the secondary battery at the end of the scheduled charging. The target time corresponds to a time that can be required for charging the secondary battery 5 in the scheduled charging. The target data generating unit 16 acquires the above-mentioned target SOC based on either the information received via the transmitting / receiving unit 13 or the information inputted in a user interface (not shown) or the like provided in the management device 3. The target data generating unit 16 also acquires the activity content performed by the user of the battery-equipped device 2 in which the secondary battery 5 is mounted in parallel with the scheduled charging, based on either the information received via the transmitting / receiving unit 13 or the information inputted in a user interface or the like of the management device 3. The target data generating unit 16 then calculates the target time based on the activity content performed by the user of the battery-equipped device 2 in parallel with the scheduled charging. The target data generating unit 16 is capable of writing the generated target data into the data storage unit 12 .
[0039] Here, the activities performed by the user of the battery-equipped device 2 in parallel with the scheduled charging include using restrooms at department stores, concert venues, movie theaters, etc., shopping at department stores, supermarkets, convenience stores, etc., moving by car, escalator, and elevator, and sitting at restaurants, concerts, movies, etc. The goal data generation unit 16 calculates the target time by assuming that the time during which the user of the battery-equipped device 2 performs the above-mentioned activities is the time during which the secondary battery 5 can be charged. In one example, in response to payment by the user of the battery-equipped device 2, the owner of a charger provides the user of the battery-equipped device 2 with charging of the secondary battery 5 and a service other than charging. Then, in parallel with the scheduled charging, the user of the battery-equipped device 2 performs an activity corresponding to the service provided along with the charging. At this time, the goal data generation unit 16 predicts the activity performed by the user of the battery-equipped device 2 based on the service provided along with the charging. Then, the goal data generation unit 16 calculates the target time based on the predicted activity, i.e., the activity corresponding to the service provided along with the charging.
[0040] FIG. 3 is a schematic diagram showing an example of providing a secondary battery charging service and a service other than charging to a user of a battery-equipped device in an embodiment. In the example of FIG. 3, the battery-equipped device 2 is a smartphone, and the owner of a charger provides the user of the battery-equipped device 2 with charging of the secondary battery 5 and transportation by a vehicle or the like in exchange for a payment by the user of the smartphone. In this case, the user of the smartphone inputs information indicating the current location and a destination by transportation, etc., on the smartphone, and transmits the information indicating the current location and the destination by transportation, etc., to the management device 3 functioning as a charger. Then, the target data generation unit 16 of the management device 3 calculates a target time by setting the travel time of the smartphone user to the destination as the time during which the secondary battery 5 can be charged. Then, the processing unit 11 of the management device 3 causes the battery-equipped device 2 to supply power based on the calculated target time, etc., and causes the secondary battery 5 to be charged as described below.
[0041] The generation of the target data described above does not need to be performed by the management device 3, and may be performed by a processing device (computer) other than the management device 3. In this case, the target data generation unit 16 is not provided in the processing unit 11 of the management device 3. Furthermore, the processing unit 11 of the management device 3 receives the target data including the target time that can be required for the planned charging via the transmitting / receiving unit 13 from the processing device that generated the target data. Then, the processing unit 11 can write the received target data in the data storage unit 12.
[0042] In this embodiment, the data storage unit 12 stores relationship data indicating the relationship between the internal state of the secondary battery 5 and each of the charging conditions for charging the secondary battery 5 and the deterioration rate of the secondary battery 5. In the relationship data, for example, the relationship between the charging conditions of the secondary battery 5 and the deterioration rate of the secondary battery 5 is indicated for each of a plurality of mutually different internal states. Among the multiple internal states in which the relationship between the charging conditions and the deterioration rate is indicated, one or more of the above-mentioned internal state parameters including the positive electrode capacity and the negative electrode capacity are mutually different. In the relationship data, the relationship between one or more parameters related to the charging conditions and the deterioration rate of the secondary battery 5 is indicated for each of the multiple internal states.
[0043] Here, the charging conditions for charging the secondary battery 5 include conditions related to the SOC range from the start to the end of charging, conditions related to the current flowing through the secondary battery 5 during charging (the charging rate of the secondary battery 5), and conditions related to the temperature of the secondary battery 5 during charging. Parameters related to the charging conditions include the SOC of the secondary battery 5 during charging, the charging rate of the secondary battery 5 (the charging current of the secondary battery 5), and the temperature of the secondary battery 5 during charging.
[0044] FIG. 4A is a schematic diagram showing an example of information shown in the relationship data stored in the data storage unit in the embodiment. FIG. 4B is a schematic diagram showing an example of information different from FIG. 4A shown in the relationship data stored in the data storage unit in the embodiment. FIG. 4A shows the relationship between the SOC of the secondary battery 5 at the time of charging and the deterioration rate of the secondary battery 5 when the secondary battery 5 is in a predetermined internal state and the parameters related to the charging conditions other than the SOC of the secondary battery 5 at the time of charging, including the temperature of the secondary battery 5 at the time of charging and the charging rate, are predetermined values. In FIG. 4A, the horizontal axis shows the SOC, and the vertical axis shows the deterioration rate. In FIG. 4B, the relationship between the charging rate and the deterioration rate of the secondary battery 5 when the secondary battery 5 is in the same predetermined internal state as FIG. 4A and the parameters related to the charging conditions other than the charging rate, including the temperature of the secondary battery 5 at the time of charging and the SOC of the secondary battery 5 at the time of charging, are predetermined values. In FIG. 4B, the horizontal axis shows the charging rate, and the vertical axis shows the deterioration rate. Fig. 4A shows that, with other conditions being the same, the deterioration rate of the secondary battery 5 increases when charging in a low SOC region and when charging in a high SOC region. Fig. 4B shows that, with other conditions being the same, the deterioration rate of the secondary battery 5 increases as the charging rate increases.
[0045] Furthermore, the relationship data may indicate not only the relationship between the internal state of the secondary battery 5 and the charging conditions of the secondary battery 5 and the deterioration rate of the entire secondary battery 5, but also the relationship between the internal state of the secondary battery 5 and the charging conditions of the secondary battery 5 and the deterioration rate of the positive electrode and the negative electrode of the secondary battery 5. In one example, the relationship data indicates, for each of a plurality of mutually different internal states, the relationship between one or more parameters related to the charging conditions and the deterioration rate of the positive electrode, and the relationship between one or more parameters related to the charging conditions and the deterioration rate of the negative electrode.
[0046] In addition, the relationship data may indicate the relationship between the internal state of the secondary battery 5 and the charging conditions for charging the secondary battery 5 and the deterioration rate of the secondary battery 5, as well as the relationship between the use history of the secondary battery 5 and the deterioration rate of the secondary battery 5. In this case, the relationship data indicates, for example, the relationship between the charging conditions of the secondary battery 5 and the deterioration rate of the secondary battery 5 for each of a plurality of conditions in which at least one of the internal state and the usage history is different from each other. Among the plurality of conditions in which the relationship between the charging conditions and the deterioration rate is indicated, one or more of the above-mentioned internal state parameters including the positive electrode capacity and the negative electrode capacity, and the parameters related to the usage history are different from each other. Examples of parameters related to the usage history include the number of times the secondary battery 5 has been charged and discharged since the start of use, the elapsed time since the start of use of the secondary battery 5, and the integrated value of the charging time (net charging time) and the integrated value of the discharging time (net discharging time) from the start of use of the secondary battery 5.
[0047] Moreover, the information indicated by the relationship data does not need to be a graph such as that shown in FIG. 4A and FIG. 4B, and may be a function deriving the deterioration rate of the secondary battery 5. In one example, in the relationship data, a function deriving the deterioration rate of the secondary battery 5 from one or more parameters related to the charging condition is defined for each of a plurality of mutually different internal states. In another example, in the relationship data, a function deriving the deterioration rate of the secondary battery 5 from one or more internal state parameters and one or more parameters related to the charging condition is defined. In addition, in the case where the relationship between the usage history of the secondary battery 5 and the deterioration rate of the secondary battery 5 is also indicated in the relationship data, a function deriving the deterioration rate of the secondary battery 5 from one or more internal state parameters, one or more parameters related to the charging condition, and one or more parameters related to the usage history may be defined in the relationship data.
[0048] Patent Document 3 shows data indicating the relationship between the internal state of the secondary battery and the charging conditions of the secondary battery, and the deterioration rate of the secondary battery 5. For example, Patent Document 3 shows a deterioration model, a deterioration map, and the like as the relationship between the internal state of the secondary battery and the charging conditions of the secondary battery, and the deterioration rate of the secondary battery 5. In this embodiment, the deterioration model, the deterioration map, and the like of Patent Document 3 may be shown in the relationship data stored in the data storage unit 12.
[0049] The charging pattern setting unit 17 acquires estimation data including the estimation result of the internal state, target data including the target time for charging the secondary battery 5 in the charging to be performed, and relationship data indicating the relationship between each of the internal state of the secondary battery 5 and the charging conditions of the secondary battery 5 and the deterioration rate of the secondary battery 5. Then, the charging pattern setting unit 17 sets a charging pattern for the charging of the secondary battery 5 to be performed based on the estimation data, the target data, and the relationship data. At this time, the charging pattern setting unit 17 acquires a real-time state of the secondary battery 5, and sets a charging pattern based on the real-time state of the secondary battery 5 in addition to the above-mentioned estimation data, target data, and relationship data. The real-time state of the secondary battery 5 includes the real-time SOC of the secondary battery 5 and the real-time temperature of the secondary battery 5. The charging pattern setting unit 17 of the processing unit 11 acquires the real-time state of the secondary battery 5 including the real-time SOC and temperature of the secondary battery 5 by receiving the real-time SOC and temperature of the secondary battery 5 from the battery-mounted device 2 via the transmitting / receiving unit 13, for example.
[0050] FIG. 5 is a schematic diagram for explaining the processing in the charging pattern setting unit of the processing unit in the embodiment. As shown in FIG. 5, the charging pattern setting unit 17 receives the estimation data, whereby the latest estimation result of the internal state of the secondary battery 5 is input, and the latest estimation result of the internal state parameters including the positive electrode capacity, the negative electrode capacity, and the internal resistance is input. Furthermore, the charging pattern setting unit 17 receives the target data, whereby the target time for charging the secondary battery 5 in the charging to be performed and the target SOC of the secondary battery 5 at the end of the charging to be performed are input. Then, the charging pattern setting unit 17 receives the real-time state of the secondary battery 5 including the real-time SOC and temperature of the secondary battery 5. Furthermore, the charging pattern setting unit 17 acquires the above-mentioned relationship data stored in the data storage unit 12. Then, the charging pattern setting unit 17 sets the charging pattern in the charging of the secondary battery 5 to be performed based on the input information and the relationship data, and outputs the set charging pattern. The charging pattern setting unit 17 can write the set charging pattern to the data storage unit 12.
[0051] The charging pattern setting unit 17 sets the charging pattern in the charging to be performed to a charging pattern in which the deterioration rate of the secondary battery 5 does not exceed a threshold and the secondary battery 5 is charged for a target time. Therefore, in the charging pattern to be set, power is supplied to the secondary battery 5 within a range in which the deterioration rate of the secondary battery 5 does not exceed a threshold from the start to the end of the target time. In one example, a charging pattern is set in which the deterioration rate of the secondary battery 5 does not exceed a threshold and the secondary battery 5 is charged continuously or almost continuously for the target time. The threshold value for the deterioration rate of the secondary battery 5 may be stored in the data storage unit 12 or the like, or may be input through a user interface or the like. In addition, the charging pattern setting unit 17 sets the charging pattern in the charging to be performed to a charging pattern in which the SOC of the secondary battery 5 at the end of the target time becomes the target SOC indicated by the target data. Therefore, in the charging pattern to be set, the SOC of the secondary battery 5 increases from the real-time SOC to the target SOC by charging during the target time.
[0052] In setting the charging pattern, the charging pattern setting unit 17, for example, specifies an internal state corresponding to the internal state of the secondary battery 5 estimated in the estimation data from among the multiple internal states indicated by the relationship data. Then, the charging pattern setting unit 17 sets the charging pattern using the relationship between the charging condition of the secondary battery 5 in the specified internal state and the deterioration rate of the secondary battery 5. At this time, the charging pattern setting unit 17 calculates the upper limit value of the charging current (charging rate) of the secondary battery 5 on the condition that the deterioration rate does not exceed a threshold value, based on the relationship between the charging condition of the secondary battery 5 in the specified internal state and the deterioration rate of the secondary battery 5, the real-time state of the secondary battery 5, and the like. In addition, the charging pattern setting unit 17 calculates the change over time of the upper limit value of the charging current described above during the charging to be performed, that is, the change over time of the upper limit value of the charging current during the target time. Then, based on the calculation result of the change over time of the upper limit value of the charging current during the target time, the charging pattern setting unit 17 sets a charging pattern in which the charging current does not continuously exceed the upper limit value during the target time as the charging pattern for the charging to be performed.
[0053] In one example, the charging pattern setting unit 17 specifies an internal state corresponding to the internal state of the secondary battery 5 estimated in the estimation data from among a plurality of internal states indicated by the relationship data, and calculates the above-mentioned upper limit value of the charging current and a time-dependent change in the upper limit value of the charging current during the target time based on the relationship between the temperature, SOC, and charging current (charging rate) of the secondary battery 5 in the specified internal state and the deterioration rate of the secondary battery 5. In this case, the charging pattern setting unit 17 estimates the temperature and SOC of the secondary battery 5 at each of a plurality of time points during the target time based on the real-time state of the secondary battery 5, the target data, etc. Then, for each of a plurality of time points during the target time, the charging pattern setting unit 17 calculates a value of the charging current (charging rate) at which the deterioration rate of the secondary battery 5 becomes equal to a threshold value based on the estimated temperature and SOC of the secondary battery 5 and the relationship between the temperature, SOC, and charging current of the secondary battery 5 in the specified internal state and the deterioration rate of the secondary battery 5. Then, charging pattern setting unit 17 calculates the value of the charging current at which the deterioration rate becomes equal to the threshold value for each of a plurality of times during the target time as the upper limit value of the charging current of secondary battery 5 under the condition that the deterioration rate does not exceed the threshold value. In this way, the change over time of the upper limit value of the charging current during the target time is calculated.
[0054] In addition, Patent Document 3 discloses a method for calculating an upper limit of the charging current of the secondary battery under the condition that the deterioration rate does not exceed a threshold value, using data indicating the relationship between the internal state of the secondary battery, the charging condition of the secondary battery, and the deterioration rate of the secondary battery, and the result of estimating the internal state of the secondary battery. In this embodiment, similarly to Patent Document 3, the upper limit of the charging current of the secondary battery 5 under the condition that the deterioration rate does not exceed a threshold value may be calculated using the estimation data, the relationship data, etc.
[0055] FIG. 6 is a schematic diagram showing an example of a charging pattern set by the charging pattern setting unit of the embodiment. In FIG. 6, the horizontal axis indicates time based on the start time of charging to be performed, and the vertical axis indicates charging current (charging rate). In addition, in FIG. 6, the change over time of the set charging pattern is indicated by a solid line, and the change over time of the above-mentioned upper limit value of the charging current (charging rate) of the secondary battery 5 on the condition that the deterioration rate does not exceed the threshold value is indicated by a dashed line. As in the example of FIG. 6, in this embodiment, the charging pattern in the charging to be performed is set to a charging pattern in which the charging current continues to not exceed the above-mentioned upper limit value during the target time. Therefore, by charging the secondary battery 5 with the set charging pattern, the deterioration rate of the secondary battery 5 is continuously suppressed to below the threshold value during the target time, and the deterioration rate of the secondary battery 5 does not exceed the threshold value during the target time. Also, as in the example of FIG. 6, in this embodiment, the charging pattern in the charging to be performed is set to a charging pattern in which the secondary battery 5 is charged during the target time. That is, a charging pattern is set in which the secondary battery 5 is charged from the start to the end of the target time.
[0056] The charging control unit 18 acquires the charging pattern set by the charging pattern setting unit 17. When charging according to the set charging pattern is performed, the charging control unit 18 controls the supply of power from the power source 21, etc. to the secondary battery 5 based on the set charging pattern, thereby charging the secondary battery 5 according to the set charging pattern. The control of the supply of power to the secondary battery 5 by the charging control unit 18, i.e., the control of the charging of the secondary battery 5, is performed as described above.
[0057] The processing by the charging control unit 18 described above does not need to be performed by the management device 3, and may be performed by a processing device (computer) other than the management device 3, including the processing device of the battery-equipped device 2. In this case, the charging control unit 18 is not provided in the processing unit 11 of the management device 3. Also, the processing unit 11 of the management device 3 transmits the charging pattern set by the charging pattern setting unit 17 to the processing device that controls the charging of the secondary battery 5 via the transmitting / receiving unit 13.
[0058] FIG. 7 is a flowchart showing an example of processing performed by the processing unit of the management device according to the embodiment. The processing shown in FIG. 7 is performed by the charging pattern setting unit 17 and the charging control unit 18 when target data including a target time is generated and the secondary battery 5 of the battery-equipped device 2 is charged based on the generated target data. When the processing of FIG. 7 is started, the charging pattern setting unit 17 acquires estimated data indicating the latest estimation result of the internal state of the secondary battery 5 (S31). In addition, the charging pattern setting unit 17 acquires target data including a target time for charging the secondary battery 5 in the charging to be performed (S32). In addition, the charging pattern setting unit 17 acquires a real-time state of the secondary battery 5 including a real-time SOC and temperature of the secondary battery 5 (S33). In addition, the charging pattern setting unit 17 acquires relationship data indicating a relationship between each of the internal state of the secondary battery 5 and the charging condition of the secondary battery 5 and the deterioration rate of the secondary battery 5 from the data storage unit 12 (S34).
[0059] Then, the charging pattern setting unit 17 calculates the upper limit of the charging current (charging rate) of the secondary battery 5 on the condition that the deterioration rate does not exceed the threshold value based on the estimated data, the target data, the related data, etc., as described above (S35), and calculates the change over time of the upper limit of the charging current during the charging to be performed. Then, the charging pattern setting unit 17 sets a charging pattern in which the charging current does not continuously exceed the upper limit value during the target time as the charging pattern for the charging to be performed based on the calculation result of the change over time of the upper limit of the charging current during the target time (S36). At this time, the charging pattern for the charging to be performed is set to a charging pattern in which the deterioration rate does not exceed the threshold value and the secondary battery 5 is charged during the target time. Then, the charging control unit 18 charges the secondary battery 5 with the charging pattern set by the charging pattern setting unit 17 (S37).
[0060] As described above, in this embodiment, the charging pattern for the charging to be performed is set based on the estimation data including the estimation result of the internal state of the secondary battery 5, the target data including the target time for charging the secondary battery 5 in the charging to be performed, and the relationship data indicating the relationship between each of the internal state of the secondary battery 5 and the charging conditions of the secondary battery 5 and the deterioration rate of the secondary battery 5. The charging pattern for the charging to be performed is set to a charging pattern in which the deterioration rate does not exceed a threshold and the secondary battery 5 is charged for the target time. By charging the secondary battery 5 with a charging pattern in which the deterioration rate does not exceed a threshold, deterioration of the secondary battery 5 due to charging is appropriately suppressed, and the secondary battery 5 can be safely and appropriately charged. In addition, by charging the secondary battery 5 with a charging pattern in which the secondary battery 5 is charged for the target time, the secondary battery 5 can be charged by effectively utilizing the target time corresponding to the time during which the secondary battery 5 can be charged. Therefore, in this embodiment, the chargeable time can be effectively utilized to safely and appropriately charge the secondary battery 5.
[0061] Furthermore, in this embodiment, a target time for the scheduled charging is calculated based on the activity of the user of the battery-equipped device 2 in which the secondary battery 5 is mounted, performed in parallel with the scheduled charging. Therefore, the secondary battery 5 can be charged by appropriately and effectively utilizing the time during the activity of the user of the battery-equipped device 2 during which the secondary battery 5 can be charged.
[0062] In the present embodiment, the target data includes the target SOC of the secondary battery 5 at the end of the scheduled charging, and the charging pattern in the scheduled charging is set to a charging pattern in which the SOC of the secondary battery 5 at the end of the target time is the target SOC. This makes it possible to charge the secondary battery 5 more appropriately in the scheduled charging. In the present embodiment, the above-mentioned relationship data used to set the charging pattern in the scheduled charging may indicate the relationship between the usage history of the secondary battery 5 and the deterioration rate of the secondary battery 5 in addition to the relationship between the internal state of the secondary battery 5 and the charging conditions of the secondary battery 5 and the deterioration rate of the secondary battery 5. By using the data indicating the relationship between the usage history of the secondary battery 5 and the deterioration rate of the secondary battery 5 to set the charging pattern, it becomes possible to charge the secondary battery 5 with a charging pattern that more appropriately suppresses deterioration of the secondary battery 5 due to charging in the scheduled charging.
[0063] In addition, in the present embodiment, in setting the charging pattern, the upper limit of the charging current of the secondary battery 5, which is set on the condition that the deterioration rate does not exceed a threshold, and the change over time of the upper limit of the charging current during the target time are calculated based on the estimated data, the relational data, etc. Then, the charging pattern in which the charging current continues not to exceed the upper limit during the target time is set as the charging pattern for the charging to be performed. As a result, the charging pattern in which the deterioration rate does not exceed the threshold is appropriately set as the charging pattern for the charging to be performed.
[0064] (Electrode group and cell) An example of a unit cell (single cell) forming the above-mentioned secondary battery 5 will be described below. The above-mentioned secondary battery 5 may be formed from only one unit cell as described below, or may be formed by providing a plurality of unit cells as described below and electrically connecting the plurality of unit cells. The unit cell described below is, for example, a battery cell forming a lithium ion secondary battery. FIG. 8 is a schematic diagram showing an example of a unit cell used in the management system according to the embodiment. As shown in FIG. 8, a unit cell 40 includes an exterior member 41 and an electrode group 42, and includes a negative terminal 45 and a positive terminal 46 as a pair of electrode terminals.
[0065] The exterior member 41 is formed into an appropriate shape, and is formed into any one of flat, square, cylindrical, coin, and button shapes. As the exterior member 41, any one of a bag-shaped container made of a laminate film and a metal container can be used. As the laminate film, for example, a multi-layer film is used, and the multi-layer film includes a plurality of resin layers and a metal layer disposed between the resin layers. The metal layer of the laminate film is preferably formed from aluminum or an aluminum alloy. In addition, as a material for forming the resin layer of the laminate film, a polymer material such as polypropylene (PP), polyethylene (PE), nylon, and polyethylene terephthalate (PET) can be used. The thickness of the laminate film is preferably 0.5 mm or less, and more preferably 0.2 mm or less. In addition, in the laminate film, the inside is sealed by heat-sealing the resin layers to each other, for example.
[0066] The metal container is preferably made of at least one metal selected from the group consisting of aluminum, zinc, titanium, and iron, or an alloy of these metals. The thickness of the metal container is preferably 0.5 mm or less, and more preferably 0.2 mm or less. In one example, the metal container includes a container body and a lid, and the inside is sealed by welding the lid to the container body while the opening of the container body is closed with the lid.
[0067] The electrode group 42 is housed inside the exterior member 41. Fig. 9 is a schematic diagram illustrating the configuration of the electrode group in the cell of Fig. 8. As shown in Fig. 9, the electrode group 42 includes a bipolar electrode 51, a negative electrode 52, and a positive electrode 53. The electrode group 42 is formed from a laminate of the bipolar electrode 51, the negative electrode 52, and the positive electrode 53. In the laminate forming the electrode group 42, the negative electrode 52 is laminated on the bipolar electrode 51, and the positive electrode 53 is laminated on the bipolar electrode 51 from the side opposite to the negative electrode 52.
[0068] The bipolar electrode 51 includes a current collector (first current collector) 55, a positive electrode active material-containing layer (first positive electrode active material-containing layer) 56, and a negative electrode active material-containing layer (first negative electrode active material-containing layer) 57. The positive electrode active material-containing layer 56 and the negative electrode active material-containing layer 57 are each supported on a surface of the current collector 55. In one example of FIG. 9, the positive electrode active material-containing layer 56 is supported on one surface of the current collector 55, and is supported on the surface of the current collector 55 facing the side on which the negative electrode 52 is stacked. The negative electrode active material-containing layer 57 is supported on the surface of the current collector 55 opposite to the surface on which the positive electrode active material-containing layer 56 is supported, and is supported on the surface of the current collector 55 facing the side on which the positive electrode 53 is stacked.
[0069] The negative electrode 52 includes a current collector (second current collector) 61 and a negative electrode active material-containing layer (second negative electrode active material-containing layer) 62. The negative electrode active material-containing layer 62 is supported on the surface of the current collector 61. In one example of FIG. 9, the negative electrode active material-containing layer 62 is supported on one side of the current collector 61, and is supported on the surface of the current collector 61 facing the side on which the bipolar electrode 51 is laminated. The positive electrode 53 includes a current collector (third current collector) 65 and a positive electrode active material-containing layer (second positive electrode active material-containing layer) 66. The positive electrode active material-containing layer 66 is supported on the surface of the current collector 65. In one example of FIG. 9, the positive electrode active material-containing layer 66 is supported on one side of the current collector 65, and is supported on the surface of the current collector 65 facing the side on which the bipolar electrode 51 is laminated.
[0070] Each of the current collectors 55, 61, and 65 is made of a conductive metal. Each of the current collectors 55, 61, and 65 is, but is not limited to, for example, an aluminum foil or an aluminum alloy foil, and has a thickness of about 10 μm to 30 μm.
[0071] Each of the negative electrode active material-containing layers 57, 62 includes a negative electrode active material, and may optionally include a binder and a conductive agent. In the electrode group 42, each of the negative electrode active material-containing layers 57, 62 includes lithium titanate as the negative electrode active material. Thus, in the electrode group 42, each of the bipolar electrode 51 and the negative electrode 52 includes lithium titanate as the negative electrode active material. By using lithium titanate as the negative electrode active material, the operating potential of the negative electrode active material becomes higher than when a carbonaceous material is used as the negative electrode active material, and the operating potential of the negative electrode active material becomes, for example, 0.4 V (vs. Li / Li + ) or more.
[0072] In each of the negative electrode active material containing layers 57, 62, the conductive agent enhances the current collecting performance of the active material and suppresses the contact resistance with the current collector. In each of the negative electrode active material containing layers 57, 62, the active material and the conductive agent are bound together by the binder. As the conductive agent, for example, a carbonaceous material such as acetylene black, carbon black, or graphite can be used. As the binder, for example, any one of polytetrafluoroethylene (PTFE), polyvinylidene fluoride (PVdF), fluorine-based rubber, and styrene butadiene rubber can be used.
[0073] The mixing ratio of the negative electrode active material, the conductive agent, and the binder in each of the negative electrode active material-containing layers 57 and 62 is preferably 70% by mass or more and 96% by mass or less of the negative electrode active material, 2% by mass or more and 28% by mass or less of the conductive agent, and 2% by mass or more and 28% by mass or less of the binder. In forming the negative electrode active material-containing layers 57 and 62, the negative electrode active material, the conductive agent, and the binder are suspended in an organic solvent to prepare a slurry. The prepared slurry is then applied to one side of the current collector 55 of the bipolar electrode 51, and the applied slurry is dried and rolled to form the negative electrode active material-containing layer 57 supported on one side of the current collector 55. Similarly, the prepared slurry is applied to one side of the current collector 61 of the negative electrode 52, and the applied slurry is dried and rolled to form the negative electrode active material-containing layer 62 supported on one side of the current collector 61.
[0074] Each of the positive electrode active material-containing layers 56, 66 includes a positive electrode active material, and may optionally include a binder and a conductive agent. In the electrode group 42, the positive electrode active material-containing layer 56 includes a first active material as a positive electrode active material, and the positive electrode active material-containing layer 66 includes a second active material different in type from the first active material as a positive electrode active material. Thus, in the electrode group 42, the bipolar electrode 51 includes a first active material as a positive electrode active material, and the positive electrode 53 includes a second active material different in type from the first active material as a positive electrode active material.
[0075] One of the first active material and the second active material is olivine-type lithium iron phosphate. The other of the first active material and the second active material other than the olivine-type lithium iron phosphate is any one of lithium nickel cobalt aluminum oxide, lithium nickel manganese cobalt oxide, and lithium cobalt oxide. Therefore, one of the positive electrode active material containing layers 56, 66 contains olivine-type lithium iron phosphate as a positive electrode active material, and the other of the positive electrode active material containing layers 56, 66 contains any one of lithium nickel cobalt aluminum oxide, lithium nickel manganese cobalt oxide, and lithium cobalt oxide as a positive electrode active material. In each of the positive electrode active material containing layers 56, 66, the conductive agent and the binder act in the same manner as the conductive agent and the binder of the negative electrode active material containing layers 57, 62. And, as the conductive agent and the binder of each of the positive electrode active material containing layers 56, 66, the same materials as the conductive agent and the binder of the negative electrode active material containing layers 57, 62 can be used.
[0076] The compounding ratio of the positive electrode active material, the conductive agent, and the binder in each of the positive electrode active material-containing layers 56, 66 is preferably 80% by mass or more and 95% by mass or less of the positive electrode active material, 3% by mass or more and 18% by mass or less of the conductive agent, and 2% by mass or more and 17% by mass or less of the binder. In forming the positive electrode active material-containing layers 56, 66, a slurry is prepared by suspending the positive electrode active material, the conductive agent, and the binder in an organic solvent. The prepared slurry is then applied to the surface of the current collector 55 of the bipolar electrode 51 opposite to the surface supporting the negative electrode active material-containing layer 57, and the applied slurry is dried and rolled to form the positive electrode active material-containing layer 56 supported on one side of the current collector 55. Similarly, the prepared slurry is applied to one side of the current collector 65 of the positive electrode 53, and the applied slurry is dried and rolled to form the positive electrode active material-containing layer 66 supported on one side of the current collector 65.
[0077] In the single cell 40, an electrode group 42 formed of a laminate of a bipolar electrode 51, a negative electrode 52, and a positive electrode 53 is wound and stored inside an exterior member 41. In the electrode group 42, a separator 67 is interposed between the positive electrode active material-containing layer 56 of the bipolar electrode 51 and the negative electrode active material-containing layer 62 of the negative electrode 52, and the separator 67 prevents contact between the bipolar electrode 51 and the negative electrode 52. Similarly, in the electrode group 42, a separator 68 is interposed between the negative electrode active material-containing layer 57 of the bipolar electrode 51 and the positive electrode active material-containing layer 66 of the positive electrode 53, and the separator 68 prevents contact between the bipolar electrode 51 and the positive electrode 53. In the electrode group 42 that is wound and placed inside the exterior member 41, a separator (not shown) is interposed between the negative electrode 52 and the positive electrode 53, and the separator prevents contact between the negative electrode 52 and the positive electrode 53.
[0078] The separators 67, 68, etc. are made of an electrically insulating material. Therefore, in the electrode group 42, the bipolar electrode 51, the negative electrode 52, and the positive electrode 53 are electrically insulated from each other by the separators. The separator may be, but is not limited to, a porous film or a nonwoven fabric made of a synthetic resin. Examples of the synthetic resin that forms the separator include polyethylene, polypropylene, cellulose, and polyvinylidene fluoride (PVdF).
[0079] Inside the exterior member 41, the electrode group 42 is retained (impregnated) with an electrolytic solution. The electrolytic solution may be a nonaqueous electrolytic solution in which an electrolyte is dissolved in an organic solvent, or may be an aqueous electrolytic solution such as an aqueous solution in which an electrolyte is dissolved in an aqueous solvent. As the electrolyte dissolved in an organic solvent, for example, one type of lithium salt or a mixture of two or more types of lithium salts is used. However, when an electrolytic solution is used as the electrolyte, it is necessary to perform shielding or the like so as not to cause charging and discharging between the negative electrode 52 and the positive electrode 53. Also, instead of the electrolytic solution, a gel electrolyte in which the electrolytic solution and a polymer material are composited may be used. Also, instead of the electrolytic solution or in addition to the electrolytic solution, a solid electrolyte may be used. When a solid electrolyte is used as the electrolyte, in the electrode group 42, the bipolar electrode 51, the negative electrode 52, and the positive electrode 53 may be electrically insulated from each other by the solid electrolyte instead of the separator. It is preferable to use either a gel electrolyte or a solid electrolyte as the electrolyte, since it is possible to prevent charging and discharging between the negative electrode 52 and the positive electrode 53.
[0080] Each of the negative electrode terminal 45 and the positive electrode terminal 46 that constitute a pair of electrode terminals may be an internal terminal formed inside the exterior member 41, or may be an external terminal formed on the outer surface of the exterior member 41. The electrode terminals are formed from a conductive material, and are preferably formed from at least one metal selected from the group consisting of aluminum, zinc, titanium, and iron, or an alloy of these metals.
[0081] A current collector 61 of the negative electrode 52 is electrically connected to the negative electrode terminal 45. The current collector (negative electrode current collector) 61 may be directly connected to the negative electrode terminal 45, or may be connected to the negative electrode terminal 45 via one or more leads formed of a conductive material. In addition, a current collector 65 of the positive electrode 53 is electrically connected to the positive electrode terminal 46. The current collector (positive electrode current collector) 65 may be directly connected to the positive electrode terminal 46, or may be connected to the positive electrode terminal 46 via one or more leads formed of a conductive material.
[0082] In addition, in the single cell 40, the potential at the negative electrode terminal 45 and the current collector 61 of the negative electrode 52 becomes the negative electrode potential of the single cell 40, and the potential at the positive electrode terminal 46 and the current collector 65 of the positive electrode 53 becomes the positive electrode potential of the single cell 40. The potential at the current collector 55 of the bipolar electrode 51 becomes higher than the negative electrode potential and lower than the positive electrode potential. In the single cell 40, the potential difference between the current collector 61 (negative electrode terminal 45) of the negative electrode 52 and the current collector 65 (positive electrode terminal 46) of the positive electrode 53 corresponds to the voltage applied to the entire single cell 40. In addition, the potential difference between the current collector 61 of the negative electrode 52 and the current collector 55 of the bipolar electrode 51 corresponds to a voltage Vα applied to the laminated portion of the positive electrode active material-containing layer 56 and the negative electrode active material-containing layer 62, and the potential difference between the current collector 65 of the positive electrode 53 and the current collector 55 of the bipolar electrode 51 corresponds to a voltage Vβ applied to the laminated portion of the negative electrode active material-containing layer 57 and the positive electrode active material-containing layer 66.
[0083] In the cell 40, lithium titanate is used as the negative electrode active material of each of the bipolar electrode 51 and the negative electrode 52. Therefore, unlike a case where a carbonaceous material or the like is used as the negative electrode active material, lithium metal is not precipitated in each of the negative electrode active material-containing layers 57, 62 during charging of the cell 40. As a result, even if the cell 40 is charged at a high charging rate, deterioration of the cell 40 and the secondary battery formed from the cell 40 is appropriately suppressed, and the secondary battery can be safely charged.
[0084] In addition, in the single cell 40, the first active material used as the positive electrode active material of the bipolar electrode 51 is different in type from the second active material used as the positive electrode active material of the positive electrode 53. Therefore, in the electrode group 42, the voltage (first voltage) Vα between the current collector 61 of the negative electrode 52 and the current collector 55 of the bipolar electrode 51 is different in magnitude from the voltage (second voltage) Vβ between the current collector 65 of the positive electrode 53 and the current collector 55 of the bipolar electrode 51. For example, the positive electrode active material containing layer 56 of the bipolar electrode 51 contains olivine-type lithium iron phosphate as the first active material, and the positive electrode active material containing layer 66 of the positive electrode 53 contains any one of lithium nickel cobalt aluminum oxide, lithium nickel manganese cobalt oxide, and lithium cobalt oxide as the second active material. In this case, when the cell 40 is in a fully charged state (SOC is 100%), the voltage Vα between the current collectors 55 and 61 is about 2.2 V, and the voltage Vβ between the current collectors 55 and 65 is about 2.7 V. If the first and second active materials are reversed, the magnitudes of the voltages Vα and Vβ will also be reversed.
[0085] Here, a single cell in which an electrode group is formed from a positive electrode and a negative electrode, and the negative electrode contains a carbonaceous material as a negative electrode active material, is referred to as a carbon-based negative electrode single cell. The electrode group of the carbon-based negative electrode single cell is not provided with a bipolar electrode. In one example, the electrode group of the carbon-based negative electrode single cell is formed from a negative electrode containing graphite, which is a type of carbonaceous material, as a negative electrode active material, and a positive electrode containing lithium cobalt oxide as a positive electrode active material.
[0086] In the cell 40, the electrode group 42 is formed as described above, so that when the cell 40 is in a fully charged state, the terminal voltage between the negative electrode terminal 45 and the positive electrode terminal 46 (the potential difference between the negative electrode potential and the positive electrode potential) is about 4.9 V, which is smaller than 5 V. Therefore, the difference between the terminal voltage of the cell 40 in a fully charged state and the terminal voltage of the carbon-based negative electrode cell in a fully charged state does not become large. Furthermore, the deviation of the range of variation of the terminal voltage of the cell 40 from the range of variation of the terminal voltage of the carbon-based negative electrode cell does not become large. Therefore, the control system used for controlling the charge and discharge of the secondary battery formed from the carbon-based negative electrode cell can be easily used for controlling the charge and discharge of the secondary battery formed from the cell 40.
[0087] In addition, in the single battery 40, the voltage Vα between the current collectors 55 and 61 and the voltage Vβ between the current collectors 55 and 65 can be measured. Therefore, based on the measurement result of the voltage Vα, it is possible to estimate the deterioration state of the laminated portion of the positive electrode active material containing layer 56 and the negative electrode active material containing layer 62, and based on the measurement result of the voltage Vβ, it is possible to estimate the deterioration state of the laminated portion of the negative electrode active material containing layer 57 and the positive electrode active material containing layer 66. That is, in addition to the deterioration state of the entire single battery 40, it is possible to estimate the deterioration state locally of the laminated portion of the positive electrode active material containing layer 56 and the negative electrode active material containing layer 62, and the laminated portion of the negative electrode active material containing layer 57 and the positive electrode active material containing layer 66, etc.
[0088] In this embodiment, the secondary battery 5 is formed from the cells 40 including the electrode group 42 as described above, and the secondary battery 5 is appropriately charged according to the charging pattern set as described above. Therefore, the secondary battery 5 formed from the cells 40 can be safely and appropriately charged by effectively utilizing the chargeable time.
[0089] In at least one of the above-described embodiments or examples, a charging pattern for charging to be performed is set based on estimation data including an estimation result of an internal state of the secondary battery based on measurement results of the current and voltage of the secondary battery, target data including a target time for charging the secondary battery in the charging to be performed, and relationship data indicating a relationship between each of the internal state of the secondary battery and the charging conditions of the secondary battery and a deterioration rate of the secondary battery. The charging pattern is set to a charging pattern in which the deterioration rate does not exceed a threshold and the secondary battery is charged for the target time. This makes it possible to provide a secondary battery management method, a secondary battery charging method, a secondary battery management device, a secondary battery management system, and a secondary battery management program that make it possible to effectively use the chargeable time to safely and appropriately charge the secondary battery.
[0090] In at least one of the above-described embodiments or examples, in the electrode group, the bipolar electrode contains lithium titanate as a negative electrode active material and contains a first active material as a positive electrode active material. In the electrode group, the negative electrode is stacked on the bipolar electrode and contains lithium titanate as a negative electrode active material. In the electrode group, the positive electrode is stacked on the bipolar electrode from the side opposite to the negative electrode and contains a second active material of a different type from the first active material as a positive electrode active material. This makes it possible to provide an electrode group and a single cell that can effectively utilize the chargeable time and safely and appropriately charge a secondary battery.
[0091] Although some embodiments of the present invention have been described, these embodiments are presented as examples and are not intended to limit the scope of the invention. These novel embodiments can be implemented in various other forms, and various omissions, substitutions, and modifications can be made without departing from the spirit of the invention. These embodiments and their modifications are included in the scope and spirit of the invention, and are included in the scope of the invention and its equivalents described in the claims. The following are additional notes. [1] A method for managing a secondary battery, comprising: A management method comprising: setting a charging pattern for the planned charging to a charging pattern in which the deterioration rate does not exceed a threshold and the secondary battery is charged for the target time, based on estimation data including an estimation result of the internal state of the secondary battery based on measurement results of the current and voltage of the secondary battery during charging or discharging of the secondary battery, target data including a target time for charging the secondary battery in the planned charging, and relationship data indicating the relationship between each of the internal state of the secondary battery and the charging conditions of the secondary battery and a deterioration rate of the secondary battery. [2] The management method described in [1], further comprising calculating the target time based on the content of an activity performed by a user of a battery-equipped device in which the secondary battery is mounted in parallel with the planned charging. [3] The management method described in [2], further comprising predicting the content of the activity to be performed by the user based on the content of the service to be provided to the user of the battery-equipped device in parallel with the planned charging. [4] the target data includes a target SOC of the secondary battery at a time when the charging to be performed is to be completed; the charging pattern in the charging to be performed is set to a charging pattern in which the SOC of the secondary battery at the end of the target time becomes the target SOC; The management method described in any one of [1] to [3]. [5] In setting the charging pattern for the charging to be performed, Calculating an upper limit of a charging current under the condition that the deterioration rate does not exceed the threshold value, and a change over time of the upper limit of the charging current during the target time, based on the estimated data and the relationship data; a charging pattern in which the charging current does not continuously exceed the upper limit value during the target time is set as the charging pattern for the charging to be performed based on a calculation result of the change over time of the upper limit value of the charging current during the target time. The management method described in any one of [1] to [4]. [6] The management method described in any one of [1] to [5], wherein the relationship data used to set the charging pattern for the charging to be performed indicates, in addition to the relationship between the internal state of the secondary battery and the charging conditions of the secondary battery and the deterioration rate of the secondary battery, the relationship between the usage history of the secondary battery and the deterioration rate of the secondary battery. [7] Setting a charging pattern for the charging to be performed by the management method according to any one of [1] to [6]; Charging the secondary battery according to the set charging pattern; A method for charging the secondary battery, comprising: [8] A management device for a secondary battery, A management device comprising: a processor that sets a charging pattern for the planned charging to a charging pattern in which the deterioration rate does not exceed a threshold and the secondary battery is charged for the target time, based on estimation data including an estimation result of the internal state of the secondary battery based on measurement results of the current and voltage of the secondary battery during charging or discharging of the secondary battery, target data including a target time for charging the secondary battery in the planned charging, and relationship data indicating the relationship between each of the internal state of the secondary battery and the charging conditions of the secondary battery and a deterioration rate of the secondary battery. [9] The processor controls the supply of power from a power source to the secondary battery based on the set charging pattern, thereby charging the secondary battery according to the set charging pattern. The management device according to [8], which serves as a charger.
[10] [8] or [9], the secondary battery managed by the management device; The management system for the secondary battery comprises:
[11] The management system according to
[10] , further comprising a battery-equipped device in which the secondary battery is mounted.
[12] The secondary battery includes a single cell, The cell includes an electrode group, The electrode group of the single battery is a bipolar electrode including lithium titanate as a negative electrode active material and a first active material as a positive electrode active material; a negative electrode laminated on the bipolar electrode and containing lithium titanate as a negative electrode active material; a positive electrode that is laminated on the bipolar electrode from the opposite side to the negative electrode and contains a second active material different from the first active material as a positive electrode active material; Equipped with The management system according to
[10] or
[11] .
[13] A secondary battery management program, comprising: A management program that sets a charging pattern for the planned charging to a charging pattern in which the deterioration rate does not exceed a threshold and the secondary battery is charged for the target time, based on estimation data including an estimation result of the internal state of the secondary battery based on measurement results of the current and voltage of the secondary battery during charging or discharging of the secondary battery, target data including a target time for charging the secondary battery in the planned charging, and relationship data indicating the relationship between each of the internal state of the secondary battery and the charging conditions of the secondary battery and the deterioration rate of the secondary battery.
[14] A bipolar electrode including lithium titanate as a negative electrode active material and a first active material as a positive electrode active material; a negative electrode laminated on the bipolar electrode and containing lithium titanate as a negative electrode active material; a positive electrode that is laminated on the bipolar electrode from the opposite side to the negative electrode and contains a second active material different from the first active material as a positive electrode active material; An electrode group comprising:
[15] One of the first active material and the second active material is an olivine-type lithium iron phosphate; The one of the first active material and the second active material other than the olivine-type lithium iron phosphate is any one of lithium nickel cobalt aluminum oxide, lithium nickel manganese cobalt oxide, and lithium cobalt oxide.
[14] An electrode group according to the present invention.
[16] An electrode group according to
[14] or
[15] , a negative electrode terminal to which the negative electrode of the electrode group is electrically connected; a positive electrode terminal to which the positive electrode of the electrode group is electrically connected; A single battery comprising: [Explanation of symbols]
[0092] 1...management system, 2...battery-equipped equipment, 3...management device, 5...secondary battery, 6...measurement circuit, 7...equipment control unit, 11...processing unit, 12...data memory unit, 15...estimated data generation unit, 16...target data generation unit, 17...charging pattern setting unit, 18...charging control unit, 40...single battery, 42...electrode group, 45...negative electrode terminal, 46...positive electrode terminal, 51...bipolar electrode, 52...negative electrode, 53...positive electrode.
Claims
1. A method for managing a secondary battery, comprising: setting a charging pattern for the charging to be performed to a charging pattern in which the deterioration rate does not exceed a threshold and the secondary battery is charged for the target time, based on estimation data including an estimation result of an internal state of the secondary battery based on measurement results of the current and voltage of the secondary battery during charging or discharging of the secondary battery, target data including a target time for charging the secondary battery in the charging to be performed, and relationship data indicating a relationship between each of the internal state of the secondary battery and the charging conditions of the secondary battery and a deterioration rate of the secondary battery; Calculating the target time based on an activity performed by a user of a battery-equipped device in which the secondary battery is mounted in parallel with the charging that is to be performed; (c) a method of administration;
2. The management method according to claim 1, further comprising predicting the content of the activity to be performed by the user based on the content of a service to be provided to the user of the battery-equipped device in parallel with the planned charging.
3. A method for managing a secondary battery, comprising: setting a charging pattern for the charging to be performed to a charging pattern in which the deterioration rate does not exceed a threshold and the secondary battery is charged for the target time, based on estimation data including an estimation result of an internal state of the secondary battery based on measurement results of the current and voltage of the secondary battery during charging or discharging of the secondary battery, target data including a target time for charging the secondary battery in the charging to be performed, and relationship data indicating a relationship between each of the internal state of the secondary battery and the charging conditions of the secondary battery and a deterioration rate of the secondary battery, the target data includes a target SOC of the secondary battery at the end of the charging to be performed; the charging pattern in the charging to be performed is set to a charging pattern in which the SOC of the secondary battery at the end of the target time becomes the target SOC; Management method.
4. A method for managing a secondary battery, comprising: setting a charging pattern for the charging to be performed to a charging pattern in which the deterioration rate does not exceed a threshold and the secondary battery is charged for the target time, based on estimation data including an estimation result of an internal state of the secondary battery based on measurement results of the current and voltage of the secondary battery during charging or discharging of the secondary battery, target data including a target time for charging the secondary battery in the charging to be performed, and relationship data indicating a relationship between each of the internal state of the secondary battery and the charging conditions of the secondary battery and a deterioration rate of the secondary battery, In setting the charging pattern for the charging to be performed, Calculating an upper limit of a charging current under the condition that the deterioration rate does not exceed the threshold value, and a change over time of the upper limit of the charging current during the target time, based on the estimated data and the relationship data; a charging pattern in which the charging current does not continuously exceed the upper limit value during the target time is set as the charging pattern for the charging to be performed based on a calculation result of the change over time of the upper limit value of the charging current during the target time. Management method.
5. A method for managing a secondary battery, comprising: setting a charging pattern for the charging to be performed to a charging pattern in which the deterioration rate does not exceed a threshold and the secondary battery is charged for the target time, based on estimation data including an estimation result of an internal state of the secondary battery based on measurement results of the current and voltage of the secondary battery during charging or discharging of the secondary battery, target data including a target time for charging the secondary battery in the charging to be performed, and relationship data indicating a relationship between each of the internal state of the secondary battery and the charging conditions of the secondary battery and a deterioration rate of the secondary battery, The relationship data used to set the charging pattern for the charging to be performed indicates a relationship between the internal state of the secondary battery and the charging condition of the secondary battery, and the deterioration rate of the secondary battery, as well as a relationship between a usage history of the secondary battery and the deterioration rate of the secondary battery. Management method.
6. Setting a charging pattern for the charging to be performed by the management method according to any one of claims 1 to 5; Charging the secondary battery according to the set charging pattern; A method for charging the secondary battery, comprising:
7. A management device for a secondary battery, comprising: setting a charging pattern for the charging to be performed to a charging pattern in which the deterioration rate does not exceed a threshold and the secondary battery is charged for the target time, based on estimation data including an estimation result of an internal state of the secondary battery based on measurement results of the current and voltage of the secondary battery during charging or discharging of the secondary battery, target data including a target time for charging the secondary battery in the charging to be performed, and relationship data indicating a relationship between each of the internal state of the secondary battery and the charging conditions of the secondary battery and a deterioration rate of the secondary battery, calculating the target time based on an activity performed by a user of a battery-equipped device in which the secondary battery is mounted in parallel with the charging that is to be performed; A management device comprising a processor.
8. A management device for a secondary battery, comprising: a processor that sets a charging pattern for the charging to be performed based on estimation data including an estimation result of an internal state of the secondary battery based on measurement results of a current and a voltage of the secondary battery during charging or discharging of the secondary battery, target data including a target time for charging the secondary battery in the charging to be performed, and relationship data indicating a relationship between each of the internal state of the secondary battery and the charging conditions of the secondary battery and a deterioration rate of the secondary battery, to a charging pattern in which the deterioration rate does not exceed a threshold value and the secondary battery is charged for the target time; the target data includes a target SOC of the secondary battery at the end of the charging to be performed; the processor sets the charging pattern in the charging to be performed to a charging pattern such that an SOC of the secondary battery at the end of the target time becomes the target SOC; Management device.
9. A management device for a secondary battery, comprising: a processor that sets a charging pattern for the charging to be performed based on estimation data including an estimation result of an internal state of the secondary battery based on measurement results of a current and a voltage of the secondary battery during charging or discharging of the secondary battery, target data including a target time for charging the secondary battery in the charging to be performed, and relationship data indicating a relationship between each of the internal state of the secondary battery and the charging conditions of the secondary battery and a deterioration rate of the secondary battery, to a charging pattern in which the deterioration rate does not exceed a threshold value and the secondary battery is charged for the target time; The processor, in setting the charging pattern for the charging to be performed, Calculating an upper limit of a charging current under the condition that the deterioration rate does not exceed the threshold value, and a change over time of the upper limit of the charging current during the target time, based on the estimated data and the relationship data; a charging pattern in which the charging current does not continuously exceed the upper limit value during the target time is set as the charging pattern for the charging to be performed based on a calculation result of the change over time of the upper limit value of the charging current during the target time. Management device.
10. A management device for a secondary battery, comprising: a processor that sets a charging pattern for the charging to be performed based on estimation data including an estimation result of an internal state of the secondary battery based on measurement results of a current and a voltage of the secondary battery during charging or discharging of the secondary battery, target data including a target time for charging the secondary battery in the charging to be performed, and relationship data indicating a relationship between each of the internal state of the secondary battery and the charging conditions of the secondary battery and a deterioration rate of the secondary battery, to a charging pattern in which the deterioration rate does not exceed a threshold value and the secondary battery is charged for the target time; The relationship data used to set the charging pattern for the charging to be performed indicates a relationship between the internal state of the secondary battery and the charging condition of the secondary battery, and the deterioration rate of the secondary battery, as well as a relationship between a usage history of the secondary battery and the deterioration rate of the secondary battery. Management device.
11. the processor controls a supply of power from a power source to the secondary battery based on the set charging pattern, thereby charging the secondary battery according to the set charging pattern; The management device according to any one of claims 7 to 10, which functions as a charger.
12. A management device according to any one of claims 7 to 11, the secondary battery managed by the management device; The management system for the secondary battery comprises:
13. The management system according to claim 12 , further comprising a battery-mounted device in which the secondary battery is mounted.
14. The secondary battery includes a single cell, The cell includes an electrode group, The electrode group of the single battery is a bipolar electrode including lithium titanate as a negative electrode active material and a first active material as a positive electrode active material; a negative electrode laminated on the bipolar electrode and containing lithium titanate as a negative electrode active material; a positive electrode that is laminated on the bipolar electrode from the opposite side to the negative electrode and contains a second active material different in type from the first active material as a positive electrode active material; Equipped with The management system according to claim 12 or 13.
15. A secondary battery management program, comprising: based on estimation data including an estimation result of an internal state of the secondary battery based on measurement results of the current and voltage of the secondary battery during charging or discharging of the secondary battery, target data including a target time for charging the secondary battery in the charging to be performed, and relationship data indicating a relationship between each of the internal state of the secondary battery and the charging conditions of the secondary battery and a deterioration rate of the secondary battery, a charging pattern for the charging to be performed is set to a charging pattern in which the deterioration rate does not exceed a threshold value and the secondary battery is charged for the target time; calculating the target time based on the content of an activity performed by a user of a battery-equipped device in which the secondary battery is mounted in parallel with the charging that is to be performed; Management program.
16. A management program for a secondary battery, comprising: causing a computer to set a charging pattern for the charging to be performed based on estimation data including an estimation result of an internal state of the secondary battery based on measurement results of the current and voltage of the secondary battery during charging or discharging of the secondary battery, target data including a target time for charging the secondary battery in the charging to be performed, and relationship data indicating a relationship between each of the internal state of the secondary battery and the charging conditions of the secondary battery and a deterioration rate of the secondary battery, to a charging pattern in which the deterioration rate does not exceed a threshold value and the secondary battery is charged for the target time; the target data includes a target SOC of the secondary battery at the end of the charging to be performed; causing the computer to set the charging pattern in the charging to be performed to a charging pattern such that the SOC of the secondary battery at the end of the target time becomes the target SOC; Management program.
17. A management program for a secondary battery, comprising: causing a computer to set a charging pattern for the charging to be performed based on estimation data including an estimation result of an internal state of the secondary battery based on measurement results of the current and voltage of the secondary battery during charging or discharging of the secondary battery, target data including a target time for charging the secondary battery in the charging to be performed, and relationship data indicating a relationship between each of the internal state of the secondary battery and the charging conditions of the secondary battery and a deterioration rate of the secondary battery, to a charging pattern in which the deterioration rate does not exceed a threshold value and the secondary battery is charged for the target time; In setting the charging pattern for the charging to be performed, the computer Calculating an upper limit value of a charging current under the condition that the deterioration rate does not exceed the threshold value, and a change over time of the upper limit value of the charging current during the target time, based on the estimated data and the relationship data; a charging pattern in which the charging current does not continuously exceed the upper limit value during the target time is set as the charging pattern for the charging to be performed based on a calculation result of the change over time of the upper limit value of the charging current during the target time; Management program.
18. A management program for a secondary battery, comprising: causing a computer to set a charging pattern for the charging to be performed based on estimation data including an estimation result of an internal state of the secondary battery based on measurement results of the current and voltage of the secondary battery during charging or discharging of the secondary battery, target data including a target time for charging the secondary battery in the charging to be performed, and relationship data indicating a relationship between each of the internal state of the secondary battery and the charging conditions of the secondary battery and a deterioration rate of the secondary battery, to a charging pattern in which the deterioration rate does not exceed a threshold value and the secondary battery is charged for the target time; The relationship data used to set the charging pattern for the charging to be performed indicates a relationship between the internal state of the secondary battery and the charging condition of the secondary battery, and the deterioration rate of the secondary battery, as well as a relationship between a usage history of the secondary battery and the deterioration rate of the secondary battery. Management program.
Citation Information
Patent Citations
Calculation method, calculation program, calculation system, and calculation device
JP2012251806A
Hybrid vehicle controller with secondary battery and navigation system
JP2017121103A
Charger for vehicular battery
JP2017121148A
Charge and discharge control device, service condition creation device, program and power storage system
JP2018147827A
Electrode composite, secondary battery, battery pack, and vehicle
JP2018160420A
