Estimation device, estimation method, and computer program
The estimation device uses current and voltage data, along with optional vibration stress and learning models, to accurately predict lead-acid battery breakage risk, addressing the limitations of temperature-based estimation methods.
Patent Information
- Application Number
- JP2019183334
- Authority / Receiving Office
- JP · JP
- Patent Type
- Patents
- Current Assignee / Owner
- Filing Date
- 2019-10-03
- Publication Date
- 2024-10-16
- Estimated Expiration
- 2039-10-03
AI Technical Summary
Existing systems for lead-acid batteries fail to accurately estimate the risk of breakage, despite determining deterioration based on temperature.
An estimation device that acquires current and voltage data, extracts noise amounts, and uses historical data to estimate breakage risk, optionally incorporating vibration stress values and a learning model for enhanced accuracy.
Enables precise estimation of lead-acid battery breakage risk, improving safety and maintenance by predicting potential failures.
Smart Images

Figure 0007568394000001 
Figure 0007568394000002 
Figure 0007568394000003
Abstract
Description
[Technical field]
[0001] The present invention relates to an estimation device, an estimation method, and a computer program. [Background technology]
[0002] A lead-acid battery includes positive and negative plates, an electrolyte, and a case that houses them. The positive and negative plates are immersed in the electrolyte in the case. Lead-acid batteries are used in a variety of applications, including automotive and industrial applications. For example, automotive lead-acid batteries are installed in vehicles and supply power to in-vehicle devices (electrical loads) such as lighting and car stereos. Lead-acid batteries are charged with power generated by a generator (alternator) installed in the vehicle. For example, industrial lead-acid batteries are used as power supplies to emergency power sources.
[0003] Patent Document 1 discloses a power supply system including a lead-acid battery that supplies power to an electrical load of a vehicle, an acquisition device that acquires the temperature of the lead-acid battery, and a determination device that determines deterioration of the lead-acid battery based on the acquired temperature. [Prior art documents] [Patent documents]
[0004] [Patent Document 1] JP 2019-78571 A Summary of the Invention [Problem to be solved by the invention]
[0005] In the power supply system described in Patent Document 1, deterioration of the lead-acid battery is determined based on the temperature of the lead-acid battery, but the risk of rupture of the lead-acid battery cannot be estimated.
[0006] The present invention aims to provide an estimation device, an estimation method, and a computer program capable of estimating the risk of rupture in a lead-acid battery. [Means for solving the problem]
[0007] The estimation device includes an acquisition unit that acquires the current and voltage of a lead-acid battery, an extraction unit that extracts the amount of noise from the acquired current and voltage, a data storage unit that accumulates data relating to the amount of noise extracted by the extraction unit, an estimation unit that estimates the risk of rupture of the lead-acid battery based on historical data accumulated in the data storage unit, and an output unit that outputs the estimation result of the estimation unit.
[0008] The estimation device includes an acquisition unit that acquires a vibration stress value of a lead-acid battery, a data storage unit that accumulates data related to an integrated value of the acquired vibration stress value, an estimation unit that estimates a risk of rupture of the lead-acid battery based on historical data accumulated in the data storage unit, and an output unit that outputs the estimation result of the estimation unit.
[0009] The estimation method uses a computer to acquire the current and voltage of a lead-acid battery, extracts the amount of noise from the acquired current and voltage, accumulates data related to the extracted amount of noise, and estimates the risk of rupture of the lead-acid battery based on the accumulated historical data.
[0010] The estimation method uses a computer to acquire vibration stress values of a lead-acid battery, accumulates data relating to the integrated values of the acquired vibration stress values, and estimates the risk of rupture of the lead-acid battery based on the historical data accumulated in the data accumulation unit.
[0011] The computer program causes a computer to execute a process of acquiring the current and voltage of a lead-acid battery, extracting the amount of noise from the acquired current and voltage, accumulating data relating to the extracted amount of noise, and estimating the risk of rupture of the lead-acid battery based on the accumulated historical data.
[0012] The computer program causes a computer to execute a process of acquiring vibration stress values of a lead-acid battery, accumulating data relating to an integrated value of the acquired vibration stress values, and estimating a risk of rupture of the lead-acid battery based on the historical data accumulated in the data accumulation unit. Effect of the Invention
[0013] With the above configuration, the risk of rupture in a lead-acid battery can be estimated. [Brief description of the drawings]
[0014] [Figure 1] FIG. 1 is a block diagram illustrating a schematic configuration of an estimation system. [Diagram 2] FIG. 1 is a perspective view showing an external configuration of a lead-acid battery. [Diagram 3] FIG. 3 is a cross-sectional view taken along line III-III in FIG. [Figure 4] FIG. 2 is a block diagram illustrating an internal configuration of an estimation device. [Diagram 5] 11 is a graph showing a change in the amount of noise over time. [Figure 6] 4 is a flowchart illustrating a procedure of a process executed by the estimation device in the first embodiment. [Figure 7] 1 is a graph showing changes in vibration stress over time. [Figure 8] 10 is a flowchart illustrating a procedure of a process executed by an estimation device in a second embodiment. [Figure 9] FIG. 13 is a schematic diagram showing the configuration of a learning model in the third embodiment. [Figure 10] FIG. 2 is a block diagram showing a configuration of a server device. [Figure 11] 11 is a flowchart illustrating a procedure for generating a learning model. [Figure 12] 11 is a flowchart illustrating the procedure of an estimation process using a learning model. [Figure 13] FIG. 13 is a schematic diagram showing the configuration of a learning model in the fourth embodiment. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0015] The estimation device includes an acquisition unit that acquires the current and voltage of a lead-acid battery, an extraction unit that extracts the amount of noise from the acquired current and voltage, a data storage unit that accumulates data relating to the amount of noise extracted by the extraction unit, an estimation unit that estimates the risk of rupture of the lead-acid battery based on historical data accumulated in the data storage unit, and an output unit that outputs the estimation result of the estimation unit. According to this configuration, the risk of rupture can be estimated based on the amount of noise extracted from the current and voltage of the lead-acid battery.
[0016] The estimation device includes an acquisition unit that acquires a vibration stress value of a lead-acid battery, a data storage unit that accumulates data related to an integrated value of the acquired vibration stress value, an estimation unit that estimates a risk of rupture of the lead-acid battery based on historical data accumulated in the data storage unit, and an output unit that outputs the estimation result of the estimation unit. According to this configuration, the risk of rupture can be estimated based on the integrated value of the vibration stress of the lead-acid battery.
[0017] In the estimation device, the estimation unit may estimate the rupture risk using a learning model configured to output information related to the rupture risk of the lead-acid battery in response to input of the history data. With this configuration, the rupture risk is estimated using the learning model, so that the rupture risk can be estimated with high accuracy.
[0018] In the estimation device, the learning model may include an input layer to which the history data is input, an output layer to which information regarding the risk of rupture of the lead-acid battery is output, and an intermediate layer that learns the relationship between the history data and the risk of rupture using the history data of the lead-acid battery and label data indicating whether the lead-acid battery has ruptured as teacher data, and may be configured to perform calculations in the intermediate layer in response to input of the history data stored in the data storage unit, and output information regarding the risk of rupture from the output layer. With this configuration, the risk of rupture is estimated using the learning model, so that the risk of rupture can be estimated with high accuracy.
[0019] The estimation method uses a computer to acquire the current and voltage of a lead-acid battery, extracts the amount of noise from the acquired current and voltage, accumulates data related to the extracted amount of noise, and estimates the risk of rupture of the lead-acid battery based on the accumulated historical data.
[0020] The estimation method uses a computer to acquire vibration stress values of a lead-acid battery, accumulates data relating to the integrated values of the acquired vibration stress values, and estimates the risk of rupture of the lead-acid battery based on the historical data accumulated in the data accumulation unit.
[0021] The computer program causes a computer to execute a process of acquiring the current and voltage of a lead-acid battery, extracting the amount of noise from the acquired current and voltage, accumulating data relating to the extracted amount of noise, and estimating the risk of rupture of the lead-acid battery based on the accumulated historical data.
[0022] The computer program causes a computer to execute a process of acquiring vibration stress values of a lead-acid battery, accumulating data relating to an integrated value of the acquired vibration stress values, and estimating a risk of rupture of the lead-acid battery based on the historical data accumulated in the data accumulation unit.
[0023] (First embodiment) FIG. 1 is a block diagram for explaining a schematic configuration of an estimation system. The estimation system according to the first embodiment includes an estimation device 1 and a lead-acid battery 2. The estimation device 1 is, for example, a BMU (Battery Management Unit), which estimates a rupture risk in the lead-acid battery 2 by a method described later, and outputs an estimation result. In the example of FIG. 1, the estimation device 1 and the lead-acid battery 2 are described as separate entities for convenience, but the estimation device 1 and the lead-acid battery 2 may be integrated into one structure. Furthermore, the estimation device 1 may be an information processing device such as a computer or a server device that is communicably connected to a battery system including the lead-acid battery 2.
[0024] A load 3 is connected to the lead-acid battery 2. The lead-acid battery 2 supplies DC power to the connected load 3. Alternatively, a charging device (not shown) is connected to the lead-acid battery 2. The lead-acid battery 2 stores electricity by receiving DC power from the connected charging device.
[0025] The current sensor 4 measures the current flowing through the lead-acid battery 2 in a time series manner, and outputs data indicating the measurement results to the estimation device 1. The voltage sensor 5 measures the voltage of the lead-acid battery 2 in a time series manner, and outputs data indicating the measurement results to the estimation device 1. In this embodiment, the voltage sensor 5 measures the open circuit voltage (OCV) of the lead-acid battery 2. For example, the voltage sensor 5 may measure a voltage value when the battery is in a state close to no load as the OCV. Alternatively, the estimation device 1 may calculate the OCV of the lead-acid battery 2 based on the current value obtained from the current sensor 4, the voltage value obtained from the voltage sensor 5, and a resistance value of the lead-acid battery 2 measured in advance.
[0026] The estimation system may include an acceleration sensor 6. The acceleration sensor 6 measures the acceleration applied to the lead-acid battery 2 in a time series manner, and outputs data indicating the measurement result to the estimation device 1. Instead of the configuration including the acceleration sensor 6, a vibration sensor that measures vibrations applied to the lead-acid battery 2 may be used.
[0027] The estimation device 1 in the first embodiment estimates the risk of rupture in the lead-acid battery 2 based on time-series data of the current and voltage of the lead-acid battery 2.
[0028] Fig. 2 is a perspective view showing the external configuration of the lead-acid battery 2, and Fig. 3 is a cross-sectional view taken along line III-III in Fig. 2. As shown in Figs. 2 and 3, the lead-acid battery 2 includes a battery case 20, a positive terminal 28, a negative terminal 29, and a plurality of plate groups 23.
[0029] The battery case 20 has a battery case body 201 and a lid 202. The battery case body 201 is a rectangular parallelepiped container with an open top, and is made of, for example, synthetic resin. The lid 202, made of, for example, synthetic resin, closes the opening of the battery case body 201. The peripheral portion of the lower surface of the lid 202 and the peripheral portion of the opening of the battery case body 201 are joined by, for example, thermal welding. The space inside the battery case 20 is divided by partitions 27 into a plurality of cell chambers 21 aligned in the longitudinal direction of the battery case 20.
[0030] Each cell chamber 21 in the battery case 20 contains one electrode plate group 23. Each cell chamber 21 in the battery case 20 contains an electrolyte 22 containing dilute sulfuric acid, and the entire electrode plate group 23 is immersed in the electrolyte 22. The electrolyte 22 is poured into the cell chamber 21 through a pouring port (not shown) provided in the lid 202.
[0031] The electrode plate group 23 includes a plurality of positive electrode plates 231, a plurality of negative electrode plates 235, and a separator 239. The plurality of positive electrode plates 231 and the plurality of negative electrode plates 235 are arranged alternately.
[0032] The positive electrode plate 231 has a positive electrode grid 232 and a positive electrode material 234 supported by the positive electrode grid 232. The positive electrode grid 232 is a conductive member having bones arranged in a substantially grid or mesh pattern, and is made of, for example, lead or a lead alloy. The positive electrode grid 232 has an ear 233 protruding upward near the upper end. The positive electrode material 234 includes lead dioxide. The positive electrode material 234 may further include a known additive.
[0033] The negative electrode plate 235 has a negative electrode grid 236 and a negative electrode material 238 supported by the negative electrode grid 236. The negative electrode grid 236 is a conductive member having bones arranged in a substantially grid or mesh pattern, and is made of, for example, lead or a lead alloy. The negative electrode grid 236 has an ear 237 protruding upward near the upper end. The negative electrode material 238 contains lead. The negative electrode material 238 may further contain known additives.
[0034] The separator 239 is formed of an insulating material such as glass or synthetic resin. The separator 239 is interposed between the positive electrode plate 231 and the negative electrode plate 235 adjacent to each other. The separator 239 may be configured as an integral member, or may be provided separately between the positive electrode plate 231 and the negative electrode plate 235. Alternatively, the separator 239 may be arranged to wrap either the positive electrode plate 231 or the negative electrode plate 235.
[0035] Ears 233 of the multiple positive electrode plates 231 are connected to straps 24 made of, for example, lead or a lead alloy. The multiple positive electrode plates 231 are electrically connected in parallel via the straps 24. Similarly, ears 237 of the multiple negative electrode plates 235 are connected to straps 25 made of, for example, lead or a lead alloy. The multiple negative electrode plates 235 are electrically connected via the straps 25.
[0036] In the lead-acid battery 2, the strap 25 in one cell chamber 21 is connected to the strap 24 in one cell chamber 21 adjacent to the one cell chamber 21 via an intermediate pole 26 made of, for example, lead or a lead alloy. The strap 24 in the one cell chamber 21 is connected to the strap 25 in the other cell chamber 21 adjacent to the one cell chamber 21 via the intermediate pole 26. That is, the multiple plate groups 23 of the lead-acid battery 2 are electrically connected in series via the straps 24, 25 and the intermediate pole 26. As shown in FIG. 3, the strap 24 housed in the cell chamber 21 located at one end in the longitudinal direction of the battery case 20 is connected to a positive pole 282 (described later) rather than the intermediate pole 26. The strap 25 housed in the cell chamber 21 located at the other end in the longitudinal direction of the battery case 20 is connected to a negative pole (not shown) rather than the intermediate pole 26.
[0037] The positive electrode terminal 28 is disposed at one end of the battery case 20 in the longitudinal direction, and the negative electrode terminal 29 is disposed near the other end of the battery case 20 in the longitudinal direction.
[0038] As shown in FIG. 3, the positive terminal 28 includes a bushing 281 and a positive pole 282. The bushing 281 is a substantially cylindrical conductive member, and is formed of, for example, a lead alloy. The lower portion of the bushing 281 is integrated with the lid 202 by insert molding, and the upper portion of the bushing 281 protrudes upward from the upper surface of the lid 202. The positive pole 282 is a substantially cylindrical conductive member, and is formed of, for example, a lead alloy. The positive pole 282 is inserted into a hole in the bushing 281. The upper end of the positive pole 282 is located at substantially the same position as the upper end of the bushing 281, and is joined to the bushing 281 by, for example, welding. The lower end of the positive pole 282 protrudes downward from the lower end of the bushing 281, and further protrudes downward from the lower surface of the lid 202, and is connected to a strap 24 housed in a cell chamber 21 located at one end of the battery case 20 in the longitudinal direction. Like the positive terminal 28, the negative terminal 29 includes a bushing 291 and a negative pole 292 (see FIG. 2), and has a similar configuration to the positive terminal 28.
[0039] A load is connected to the bushing 281 of the positive terminal 28 and the bushing 291 of the negative terminal 29. Power is supplied from the lead-acid battery 2 to the load. That is, the lead-acid battery 2 discharges. Instead of the load, a charging device may be connected to the bushing 281 of the positive terminal 28 and the bushing 291 of the negative terminal 29. In this case, the lead-acid battery 2 is charged by the power supplied from the charging device to the lead-acid battery 2.
[0040] 4 is a block diagram illustrating the internal configuration of the estimation device 1. The estimation device 1 includes a control unit 11, a storage unit 12, an input unit 13, a communication unit 14, an operation unit 15, and a display unit 16.
[0041] The control unit 11 is composed of a CPU (Central Processing Unit), a ROM (Read Only Memory), a RAM (Random Access Memory), etc. The CPU of the control unit 11 controls the operation of the entire device by expanding various computer programs stored in the ROM or the storage unit 12 onto the RAM and executing them.
[0042] The control unit 11 is not limited to the above configuration, and may be any processing circuit or arithmetic circuit equipped with multiple CPUs, a multi-core CPU, a GPU (Graphics Processing Unit), a microcomputer, a volatile or non-volatile memory, etc. The control unit 11 may also have functions such as a timer that measures the elapsed time from when a measurement start instruction is given to when a measurement end instruction is given, a counter that counts numbers, and a clock that outputs date and time information.
[0043] The storage unit 12 includes a storage device using a hard disk drive (HDD), a solid state drive (SSD), etc. The storage unit 12 stores various computer programs executed by the control unit 11, data required for executing the computer programs, etc. The computer programs stored in the storage unit 12 include an estimation program EP for causing the estimation device 1 to execute a process for estimating a rupture risk of the lead-acid battery 2. The estimation program EP may be a single computer program, or may be a group of programs configured by multiple computers.
[0044] The program stored in the storage unit 12 may be provided by a non-transitory recording medium M on which the program is readably recorded. The recording medium M is, for example, a portable memory such as a CD-ROM, a Universal Serial Bus (USB) memory, a Secure Digital (SD) card, a micro SD card, or a Compact Flash (registered trademark). In this case, the control unit 11 reads the program from the recording medium M using a reading device (not shown), and installs the read program in the storage unit 12. The program stored in the storage unit 12 may also be provided by communication via the communication unit 14. In this case, the control unit 11 acquires the program through the communication unit 14, and installs the acquired program in the storage unit 12.
[0045] Furthermore, the storage unit 12 may have a battery table BT that stores information about the lead-acid battery 2. The battery table BT stores, for example, a battery ID that identifies the lead-acid battery 2, a user ID that identifies a user, and battery information in association with each other. The battery information registered in the battery table BT includes, for example, information about the positive and negative electrodes, and information about the electrolyte. The information about the positive and negative electrodes is information about the names of the active materials of the positive and negative electrodes, thickness, width, depth, open circuit potential, and the like. The information about the electrolyte is information about the ion species, transport number, diffusion coefficient, conductivity, and the like. The information stored in the battery table BT may be used as a part of parameters when estimating the risk of breakage of a lead-acid battery.
[0046] The input unit 13 includes an interface for connecting the current sensor 4, the voltage sensor 5, and the acceleration sensor 6, and acquires data on the current measured by the current sensor 4, the voltage measured by the voltage sensor 5, and the acceleration measured by the acceleration sensor 6. In this embodiment, the current sensor 4, the voltage sensor 5, and the acceleration sensor 6 are directly connected to the input unit 13. Alternatively, the estimation device 1 may acquire data on the current measured by the current sensor 4, the voltage measured by the voltage sensor 5, and the acceleration measured by the acceleration sensor 6 through wired or wireless communication.
[0047] The operation unit 15 has an input interface such as various switches and buttons, and accepts operations by the user. The display unit 16 has a liquid crystal display device or the like, and displays information to be notified to the user. In this embodiment, the estimation device 1 is configured to have the operation unit 15 and the display unit 16. Alternatively, a computer may be connected to the outside of the estimation device 1, and the estimation device 1 may be configured to accept operations via the external computer and output information to be notified to the external computer. In this case, the estimation device 1 does not need to have the operation unit 15 and the display unit 16.
[0048] The method for estimating the risk of fracture in the first embodiment will be described below. Fig. 5 is a graph showing the change in noise amount over time. The horizontal axis of the graph shown in Fig. 5 represents the number of days from the start of measurement, and the vertical axis represents the amount of noise in the current for each fixed period. The amount of noise in the current is measured by applying a known filter to the current data obtained from the current sensor 4. The control unit 11 of the estimation device 1 integrates the amount of noise measured by the filter for each fixed period (e.g., each day) and stores it in the memory unit 12. The control unit 11 estimates that there is a risk of breakage when the integrated value of the noise amount exceeds a preset threshold value (noise threshold value).
[0049] In the example of FIG. 5, a method of estimating the risk of rupture using the amount of noise in the current has been described. Alternatively, the risk of rupture may be estimated using the amount of noise in the voltage.
[0050] The following describes the procedure of the process executed by the estimation device 1. The estimation device 1 may execute the following procedure at appropriate timing, such as periodically.
[0051] 6 is a flowchart explaining the procedure of the process executed by the estimation device 1 in the first embodiment. The control unit 11 of the estimation device 1 acquires data of the current measured by the current sensor 4 and the voltage measured by the voltage sensor 5 through the input unit 13 (step S101), and extracts the amount of noise contained in the acquired data (step S102). The control unit 11 calculates the amount of noise from the extracted noise, accumulates the calculated amount of noise, and stores it in the storage unit 12 (step S103). In step S103, the control unit 11 may accumulate the amount of noise for each predetermined period (for example, each day).
[0052] The control unit 11 estimates the risk of rupture by comparing the integrated value of the noise amount with the noise threshold (step S104), and determines whether or not there is a risk of rupture (step S105). At this time, the control unit 11 may determine that there is a risk of rupture when the integrated value of the noise amount is greater than the noise threshold, and may determine that there is no risk of rupture when the integrated value of the noise amount is smaller than the noise threshold.
[0053] When it is determined that there is a risk of rupture (S105: YES), the control unit 11 notifies the user that there is a risk of rupture (step S106). For example, the control unit 11 generates screen data including text information indicating that there is a risk of rupture, and causes the display unit 16 to display the text information indicating that there is a risk of rupture based on the generated screen data. Alternatively, the control unit 11 may notify a terminal device carried by a user, etc., of the text information indicating that there is a risk of rupture via the communication unit 14. When it is determined that there is no risk of rupture (S105: NO), the control unit 11 ends the processing according to this flowchart.
[0054] As described above, in the first embodiment, the risk of rupture of the lead-acid battery 2 can be estimated based on data of the current, voltage, and the like measured on the lead-acid battery 2.
[0055] The control unit 11 may have a function of detecting that the lead-acid battery 2 has been replaced by a user or the like. For example, when the lead-acid battery 2 has been replaced by the user, the user inputs to the operation unit 15 that the battery 2 has been replaced. The operation unit 15 transmits a signal indicating that the battery 2 has been replaced to the control unit 11. When the control unit 11 receives a signal indicating that the battery 2 has been replaced from the operation unit 15, it resets the integrated value of the amount of noise stored in the memory unit 12.
[0056] Also, for example, the control unit 11 may compare the integrated value of noise for each specified period with a noise threshold, and if the integrated value of noise falls below the noise threshold for a specified consecutive number of times, determine that the battery 2 has been replaced and reset the integrated value of the amount of noise stored in the memory unit 12.
[0057] Second embodiment In the second embodiment, a configuration for estimating a fracture risk based on a vibration stress value will be described.
[0058] The estimation device 1 in the second embodiment calculates a vibration stress value (accumulated value) for each fixed period of time based on acceleration data obtained from the acceleration sensor 6, and estimates the risk of breakage by comparing the calculated accumulated vibration stress with a vibration stress threshold value.
[0059] The method of estimating the risk of fracture in the second embodiment will be described below. FIG. 7 is a graph showing the change in vibration stress over time. The horizontal axis of the graph shown in FIG. 7 represents the number of days from the start of measurement, and the vertical axis represents the accumulated amount (integrated value) of vibration stress per fixed period. The vibration stress is calculated using acceleration data obtained from the acceleration sensor 6 with a known calculation method. The control unit 11 of the estimation device 1 integrates the calculated vibration stress value per fixed period (e.g., per day) and stores it in the memory unit 12. If the accumulated amount of vibration stress exceeds a preset threshold (vibration stress threshold), the control unit 11 estimates that there is a risk of breakage.
[0060] The following describes the procedure of the process executed by the estimation device 1. The estimation device 1 may execute the following procedure at appropriate timing, such as periodically.
[0061] 8 is a flowchart explaining the procedure of the process executed by the estimation device 1 in the second embodiment. The control unit 11 of the estimation device 1 acquires acceleration data of the lead-acid battery 2 measured by the acceleration sensor 6 through the input unit 13 (step S201), and calculates a vibration stress value using the acquired data (step S202). The control unit 11 accumulates the calculated vibration stress value and stores it in the storage unit 12 (step S203). In step S203, the control unit 11 may accumulate the vibration stress value for each predetermined period (for example, each day).
[0062] The control unit 11 estimates the risk of rupture by comparing the accumulated amount of vibration stress with the vibration stress threshold (step S204), and determines whether or not there is a risk of rupture (step S205). At this time, the control unit 11 may determine that there is a risk of rupture when the accumulated amount of vibration stress is greater than the vibration stress threshold, and may determine that there is no risk of rupture when the accumulated amount of vibration stress is less than the vibration stress threshold.
[0063] When it is determined that there is a risk of rupture (S205: YES), the control unit 11 notifies the user that there is a risk of rupture (step S206). For example, the control unit 11 generates screen data including text information indicating that there is a risk of rupture, and causes the display unit 16 to display the text information indicating that there is a risk of rupture based on the generated screen data. Alternatively, the control unit 11 may notify a terminal device carried by a user, etc., of the text information indicating that there is a risk of rupture via the communication unit 14. When it is determined that there is no risk of rupture (S205: NO), the control unit 11 ends the processing according to this flowchart.
[0064] As described above, in the second embodiment, the risk of breakage of the lead-acid battery 2 can be estimated based on data such as acceleration measured on the lead-acid battery 2.
[0065] The control unit 11 may have a function of detecting that the lead-acid battery 2 has been replaced by a user or the like. For example, when the lead-acid battery 2 has been replaced by the user, the user inputs to the operation unit 15 that the battery 2 has been replaced. The operation unit 15 transmits a signal indicating that the battery 2 has been replaced to the control unit 11. When the control unit 11 receives a signal indicating that the battery 2 has been replaced from the operation unit 15, it resets the accumulated amount of vibration stress stored in the memory unit 12.
[0066] Third embodiment In the third embodiment, a configuration for estimating a breakage risk using a learning model configured by a neural network will be described.
[0067] The estimation device 1 estimates the risk of rupture using a learning model configured to output data related to the risk of rupture in response to input data related to the current, voltage, and acceleration of the lead-acid battery 2.
[0068] 9 is a schematic diagram showing a configuration of a learning model 110 in the third embodiment. The learning model 110 in the third embodiment is a learning model using CNN (Convolutional Neural Networks), R-CNN (Region-based CNN), or the like, and includes an input layer 111, an intermediate layer 112, and an output layer 113. The learning model 110 is trained to output data on a rupture risk in response to an input of a graph (image) showing a time-series change in the amount of noise, the amount of accumulated vibration stress, and the like of the lead-acid battery 2. The learning model 110 is generated, for example, by an external server device 100 (see FIG. 10) communicably connected to the estimation device 1, and stored in the storage unit 12 of the estimation device 1.
[0069] When the server device 100 acquires data on the current, voltage, acceleration, and the like of the lead-acid battery 2, it generates graphs showing time-series changes in the amount of noise and the integrated amount of vibration stress based on the data.
[0070] A graph (image) showing the time series change in the amount of noise and the integrated amount of vibration stress is input to an input layer 111 of the learning model 110.
[0071] The intermediate layer 112 is composed of, for example, a convolutional layer 112a, a pooling layer 112b, and a fully connected layer 112c. The convolutional layers 112a and the pooling layers 112b may be provided alternately in a plurality of layers. The convolutional layers 112a and the pooling layers 112b extract features of the graph input through the input layer 111 by calculation using the nodes of each layer. The fully connected layer 112c combines data from which feature parts have been extracted by the convolutional layer 112a and the pooling layer 112b into one node, and outputs feature variables transformed by an activation function. The feature variables are output to the output layer 113 through the fully connected layer 112c.
[0072] The output layer 113 includes one or more nodes. The output layer 113 converts the feature variables input from the fully connected layer 112c of the intermediate layer 112 into probabilities using a softmax function, and outputs a probability indicating a fracture risk from each node.
[0073] For example, the output layer 113 may be configured with 11 nodes from the first node to the eleventh node, and a probability indicating the risk of fracture may be output from each node, such as the probability that the fracture risk is 100% from the first node, the probability that the fracture risk is 90% from the second node, ..., and the probability that the fracture risk is 0% from the eleventh node. The number of nodes constituting the output layer 113 and the calculation results assigned to each node are not limited to the above example, and may be designed as appropriate.
[0074] The control unit 11 of the estimation device 1 can estimate the fracture risk by referring to the calculation results obtained from the learning model 110 and selecting, for example, the node with the highest probability.
[0075] The internal parameters (weights and biases between nodes) that determine the configuration of the learning model 110 are learned, for example, in the server device 100 by using an appropriate learning algorithm.
[0076] 10 is a block diagram showing the configuration of the server device 100. The server device 100 includes a control unit 101, a storage unit 102, a communication unit 103, an operation unit 104, and a display unit 105.
[0077] The control unit 101 includes, for example, a CPU, a ROM, and a RAM. The ROM included in the control unit 101 stores a control program for controlling the operation of each hardware unit included in the server device 100. The CPU in the control unit 101 executes the control program stored in the ROM and various programs stored in the storage unit 102, and controls the operation of each hardware unit.
[0078] The control unit 101 is not limited to the above-mentioned configuration. The control unit 101 is not limited to a configuration including a CPU, a ROM, and a RAM. The control unit 101 may be, for example, one or more control circuits or arithmetic circuits including a GPU, an FPGA, a DSP, a volatile or non-volatile memory, etc. The control unit 101 may also have functions such as a clock that outputs date and time information, a timer that measures the elapsed time from when a measurement start instruction is given to when a measurement end instruction is given, and a counter that counts numbers.
[0079] The storage unit 102 includes a storage device such as a hard disk drive. The storage unit 102 stores various computer programs executed by the control unit 101, various data used by the computer programs, data acquired from the outside, and the like. An example of a computer program stored in the storage unit 102 is a model generation program for generating a learning model 110. The storage unit 102 may also store teacher data that includes history data including integrated values or calculated values by collecting data on current, voltage, and acceleration from the lead-acid battery 2, and label data indicating whether the lead-acid battery 2 has been broken. These data may be acquired from the estimation device 1 through the communication unit 103.
[0080] The communication unit 103 includes a communication interface for connecting to a communication network. The communication network may be the Internet, a LAN for a specific purpose, or a Wide Area Network (WAN), etc. The communication unit 103 transmits data to be transmitted to the estimation device 1 via the communication network. The communication unit 103 also receives data transmitted from the estimation device 1 to the server device 100 via the communication network N.
[0081] The operation unit 104 includes an input interface such as a keyboard and a mouse, and receives various types of operation information and setting information. The control unit 101 performs appropriate control based on the operation information input from the operation unit 104, and stores the setting information in the storage unit 102 as necessary.
[0082] The display unit 105 includes a display device such as a liquid crystal display panel or an organic EL display panel, and displays information to be notified to the administrator of the server device 100, etc., based on a control signal output from the control unit 101.
[0083] In this embodiment, the server device 100 is configured to include an operation unit 104 and a display unit 105. However, the operation unit 104 and the display unit 105 are not essential, and the server device 100 may be configured to accept operations via an externally connected computer and output information to be notified to the external computer.
[0084] 11 is a flowchart for explaining the procedure for generating the learning model 110. As a preparatory step for generating the learning model 110, the server device 100 collects time-series data of the current, voltage, and acceleration of the lead-acid battery 2 and label data indicating whether the lead-acid battery 2 has ruptured, and stores the collected data as teacher data in the storage unit 102. By collecting a sufficient number of time-series data and label data in this preparatory step, it is possible to improve the estimation accuracy of the rupture risk.
[0085] The control unit 101 accesses the storage unit 102 and acquires teacher data used to generate the learning model 110 (step S301). The teacher data includes time series data of the current, voltage, and acceleration of the lead-acid battery 2, and label data indicating whether the lead-acid battery 2 has been broken. In step S301, one set of time series data and label data may be acquired from a large number of time series data and label data included as the teacher data. In the initial stage of generating the learning model 110, the teacher data is set to data prepared by an administrator of the server device 100 or the like. In addition, as the learning progresses, the estimation result by the learning model 110 and the time series data used in the estimation process may be acquired, and the acquired data may be set as the teacher data.
[0086] Next, the control unit 101 generates graphs (images) showing time series changes in the amount of noise and the amount of accumulated vibration stress from the time series data of the current, voltage, and acceleration of the lead-acid battery 2, inputs the graphs (images) to the learning model 110 (step S302), and obtains the calculation results from the learning model 110 (step S303). Before the start of learning, it is assumed that initial settings are given to the definition information describing the learning model 110. In the learning model 110, as described above, a predetermined calculation is performed between the nodes constituting each layer.
[0087] Next, the control unit 101 evaluates the calculation result obtained in step S303 (step S304) and determines whether learning is complete or not (step S305). Specifically, the control unit 101 can evaluate the calculation result using an error function (also called an objective function, loss function, or cost function) based on the calculation result obtained in step S303 and the teacher data. The control unit 101 determines that learning is complete when the error function becomes equal to or smaller than a threshold (or equal to or larger than a threshold) in the process of optimizing (minimizing or maximizing) the error function by a gradient descent method such as the steepest descent method. In order to avoid the problem of overlearning, a method such as cross-validation or early termination may be adopted to terminate learning at an appropriate timing.
[0088] When it is determined that the learning is not completed (S305: NO), the control unit 101 updates the weights and biases between the nodes of the learning model 110 (step S306) and returns the process to step S301. The control unit 101 can update the weights and biases between the nodes by using an error backpropagation method that sequentially updates the weights and biases between the nodes from the output layer 113 to the input layer 111 of the learning model 110.
[0089] When it is determined that the learning is completed (S305: YES), the control unit 101 stores the learning model 110 as a trained learning model in the storage unit 102 (step S307), and ends the process according to this flowchart.
[0090] In this way, the server device 100 can collect time series data of the current, voltage, and acceleration of the lead-acid battery 2, as well as label data indicating whether or not the battery has ruptured, and generate the learning model 110 by using the collected data as training data.
[0091] The estimation device 1 downloads the learning model 110 generated in the server device 100. The estimation device 1 can estimate the risk of rupture in the lead-acid battery 2 by inputting into the learning model 110 graphs showing time series changes in noise and time series changes in the amount of accumulated vibration stress generated from data on the current, voltage, and acceleration of the lead-acid battery 2 measured in the operation phase.
[0092] FIG. 12 is a flowchart for explaining the procedure of the estimation process using the learning model 110. The control unit 11 of the estimation device 1 acquires from the storage unit 12 the history data of the current, voltage, and acceleration of the lead-acid battery 2 collected in the operation phase (step S321), and performs a calculation by the learning model 110 by providing the learning model 110 with image data of a graph showing a time series change in the amount of noise and a time series change in the amount of accumulated vibration stress generated based on the acquired history data (step S322). The image data of the graph provided to the input layer 111 of the learning model 110 is sent to the intermediate layer 112. In the intermediate layer 112, a calculation is performed using an activation function including weights and biases between nodes. In the convolution layer 112a and the pooling layer 112b of the intermediate layer 112, image features are extracted. The data of the feature parts extracted by the convolution layer 112a and the pooling layer 112b are connected to each node constituting the fully connected layer 112c, and are converted into feature variables by the activation function. The converted feature variables are output to the output layer 113 via the fully connected layer 112c. The output layer 113 converts the feature variables input from the fully connected layer 112c of the intermediate layer 112 into probabilities using a softmax function, and outputs the probability of belonging to each category from each node.
[0093] The control unit 11 acquires the calculation result from the learning model 110, and estimates the rupture risk based on the acquired calculation result (step S323). As described above, a probability related to the rupture risk is output from each node constituting the output layer 113 of the learning model 110. The control unit 11 can estimate the rupture risk based on the probability output from each node of the output layer 113.
[0094] The control unit 11 outputs the estimation result of step S323 (step S324). For example, the control unit 11 may display information indicating the estimation result on the display unit 16. Alternatively, the control unit 11 may notify the information indicating the estimation result to the user's terminal device via the communication unit 14.
[0095] As described above, in the third embodiment, since the learning model 110 is used, the risk of fracture can be estimated with high accuracy.
[0096] (Fourth embodiment) In the fourth embodiment, a configuration for estimating a breakage risk using another learning model configured by a neural network will be described.
[0097] 13 is a schematic diagram showing a configuration of a learning model 120 in the fourth embodiment. The learning model 120 in the fourth embodiment is a seq2seq (sequence to sequence) model, which is a type of recurrent neural network. The learning model 120 is generated by, for example, the server device 100 and stored in the storage unit 12 of the estimation device 1.
[0098] The learning model 120 includes m encoders E1 to Em to which time-series data is input, and n decoders D1 to Dn to which time-series data is output. The indexes m and n are integers of 2 or more. In FIG. 13, the encoders E1 to Em and the decoders D1 to Dn are illustrated as a single block, but each of them has a plurality of layers, about 2 to 8 layers, including an input layer and a hidden layer. The internal structures of the encoders E1 to Em and the decoders D1 to Dn, and the learning method of the internal parameters of the encoders E1 to Em and the decoders D1 to Dn are publicly known, so that detailed description thereof will be omitted. In this embodiment, the internal parameters of the learning model 120 are learned so that the time-series data of the current, voltage, and acceleration of the lead-acid battery 2 is input to the learning model 120, and the learning model 120 outputs time-series data of the amount of noise or the amount of vibration stress accumulation.
[0099] 13, the horizontal direction represents time steps, and the procedure progresses from left to right in the figure. Time-series data on the current, voltage, and acceleration of the lead-acid battery 2 is input to each of the encoders E1 to Em.
[0100] In the hidden layers of the encoders E1 to Em, the input time series data is recorded as an internal vector ct as an internal state. Here, t represents the time step, and takes values from 1 to m within the encoders E1 to Em. The internal vector ct is passed to the value step for each input, and when all inputs have been completed, the internal vector cm is obtained to be passed to the decoder D1.
[0101] The internal vector cm in the final encoder Em is passed to the decoder D1. A reserved word that indicates the start of output is input to the decoder D1. In the example of FIG. 13, the reserved word is <go>is described, but it may be any fixed value that has been set in advance. When the internal vector cm is passed from the encoder Em and a reserved word indicating the start of output is input, the decoder D1 outputs the output h1, and the internal vector changes to cm+1. The output h1 of the decoder D1 is used as the input to the decoder D2 in the next step. The internal vector cm+1 of the decoder D1 is used as the internal state of the decoder D2 in the next step. In this way, the outputs ht and internal vectors ct of D1, D2, ..., Dn-1 are input in sequence to the next decoders D2, D3, ..., Dn, and the final decoder Dn receives the reserved word cm indicating the end of output. <eos>The operations are executed sequentially until the output is
[0102] As a result of the above, the n-1 outputs h1 to hn-1 obtained from the decoders D1 to Dn-1, respectively, become the final outputs of the learning model 120. These outputs h1 to hn-1 represent time-series data on the amount of noise or the amount of accumulated vibration stress.
[0103] The control unit 11 acquires time-series data on the amount of noise or the amount of accumulated vibration stress from the decoders D1 to Dn-1 of the learning model 120. The control unit 11 can estimate the change over time in the amount of noise or the amount of accumulated vibration stress by sequentially repeating the input of the time-series data to the encoders E1 to Em and the acquisition of the time-series data output from the decoders D1 to Dn-1.
[0104] The control unit 11 can estimate the risk of breakage based on the estimated amount of noise or the amount of accumulated vibration stress. That is, when the control unit 11 estimates the amount of noise using the learning model 120, it can estimate the risk of breakage by comparing the estimated amount of noise with a noise threshold. Similarly, when the control unit 11 estimates the amount of accumulated vibration stress using the learning model 120, it can estimate the risk of breakage by comparing the estimated amount of accumulated vibration stress with a vibration stress threshold.
[0105] As described above, in the fourth embodiment, the risk of breakage in the lead-acid battery 2 can be estimated based on data measured on the lead-acid battery 2, such as the current, voltage, and acceleration.
[0106] The embodiments disclosed herein are illustrative in all respects and should not be considered as limiting. The scope of the present invention is defined by the claims, not by the above meaning, and is intended to include all modifications within the meaning and scope of the claims. [Explanation of symbols]
[0107] 1 Estimation device 11 Control section 12 Storage section 13 Input section 14 Communications Department 15 Control section 16 Display 2 Lead-acid battery 3. Load 4 Current Sensor 5 Voltage Sensor 6 Acceleration Sensor EP Estimation Program< / eos> < / go>
Claims
1. An acquisition unit that acquires measurement data of at least one of a current and a voltage of the lead-acid battery; an extraction unit that extracts a noise amount indicating an amount of noise included in the acquired measurement data; an integrating unit that integrates the amount of noise extracted by the extracting unit for each set period; an estimation unit that estimates a risk of rupture of the lead-acid battery based on history data of the amount of noise integrated for each set period; an output unit that outputs an estimation result of the estimation unit; An estimation device comprising:
2. The estimation unit estimates a rupture risk using a learning model configured to output information regarding a rupture risk of the lead-acid battery in response to input of the history data. The estimation device according to claim 1 .
3. The learning model is an input layer to which the history data is input; An output layer that outputs information regarding the risk of rupture of the lead-acid battery; and An intermediate layer that has learned the relationship between the history data of the lead-acid battery and the risk of rupture by using the history data of the lead-acid battery and label data indicating whether the lead-acid battery has ruptured as training data. Equipped with The intermediate layer is configured to perform calculations in response to input of history data of the amount of noise integrated for each set period, and information regarding the risk of fracture is output from the output layer. The estimation device according to claim 2 .
4. Using a computer, Acquire measurement data of at least one of a current and a voltage of a lead-acid battery; A noise amount indicating the amount of noise contained in the acquired measurement data is extracted. The amount of extracted noise is accumulated for each set period. A risk of rupture of the lead-acid battery is estimated based on history data of the amount of noise integrated for each set period. Estimation method.
5. On the computer, Acquire measurement data of at least one of a current and a voltage of a lead-acid battery; A noise amount indicating the amount of noise contained in the acquired measurement data is extracted. The amount of extracted noise is accumulated for each set period. A risk of rupture of the lead-acid battery is estimated based on history data of the amount of noise integrated for each set period. A computer program for executing a process.
Citation Information
Patent Citations
Exchange price setting device, exchange price setting method, program and record medium
JP2016170600A
Evaluation device and method for on-vehicle battery
JP2017084693A
Power supply system
JP2019078571A
Method and system for diagnosing battery system problems
US20170146611A1
Method and apparatus for monitoring battery state
US20170261473A1