Steel plate production equipment, order-taking, production and sales support equipment, steel plate order-taking, production and sales method, and steel plate order-taking, production and sales program
The steel plate production and sales support device addresses inefficiencies in existing systems by integrating storage, input, and processing devices to automate data management and scheduling, improving order and sales operations through automated planning and prioritization of orders.
Patent Information
- Application Number
- JP2024532890
- Authority / Receiving Office
- JP · JP
- Patent Type
- Patents
- Current Assignee / Owner
- Priority Date
- 2023-01-06
- Filing Date
- 2024-01-05
- Publication Date
- 2024-10-21
- Estimated Expiration
- 2044-01-05
AI Technical Summary
Existing systems for steel production control, such as those described in Patent Document 1, lack efficient methods for systematically sharing and managing various types of information among metal mills, customers, and processing centers, leading to manual and inefficient production and sales operations.
A steel plate production and sales support device that integrates storage, input, planning, and processing devices to manage base material and product information, formulate ordering, processing, and shipping plans, and prioritize permanent orders over provisional ones, using a network system to streamline operations.
The device significantly enhances the efficiency of steel plate order management, production, and sales operations by automating data handling and scheduling, reducing errors, and ensuring timely delivery while optimizing inventory and resource usage.
Smart Images

Figure 0007570567000001 
Figure 0007570567000002 
Figure 0007570567000003
Abstract
Description
[Technical field]
[0001] The present invention relates to an order-taking, production and sales support device for steel sheets. [Background technology]
[0002] In recent years, so-called SCM (Supply Chain Management), which uses IT technology to manage the entire process of product manufacturing, sales, or logistics, has been applied to many product fields. For example, in the field of metal products, computer-based systems have been developed and put to practical use for the manufacturing and sales of metal products.
[0003] Patent Document 1 discloses an information processing device, a network system, and a production management method for optimizing the production of metal base materials supplied by metal mills of steel manufacturers and the like, and the integrated process of processing the materials. [Prior art documents] [Patent documents]
[0004] [Patent Document 1] JP 2002-258929 A Summary of the Invention [Problem to be solved by the invention]
[0005] Even in the system described in Patent Document 1, for example, production management of steel products is performed manually, and there is room for improvement in systematization that allows various types of information to be shared between metal mills such as steel manufacturers (steelworks), customers such as automobile companies, and processing centers. [Means for solving the problem]
[0006] The present invention has been made for the purpose of providing a support device for smoothly managing the receipt of data on inventory, ordering, shipping, etc., and a steel plate production device, and the gist of the present invention is as follows:
[0007] (1) An order-taking, production and sales support device for steel plates used in manufacturing products made of steel plates by processing a base steel material in response to an order from a customer, the device comprising a storage device, an input device, a planning device, an output device and a processing device, the storage device stores base material master information and product master information, the base material master information includes information on a plurality of base materials, the information including at least the current inventory amount and specifications, the product master information includes information on a plurality of products, the information including at least the current inventory amount, base material information used for each product, and information regarding the production line and production period for manufacturing the products, the input device inputs order information including at least the order amount and delivery date of the product for each customer and the order type of a real order or a provisional order, and the order information is input in the planning device, and when it is confirmed based on the inventory information, the base material master information, and the product master information that there is a shortage of base material for producing the ordered product, formulates an ordering plan that includes at least an order amount of base material, and when there is a shortage of the required amount of inventory for the ordered product, formulates a processing plan that includes at least a processing schedule for each production line for the deficient product, and formulates a shipping plan that includes at least a scheduled shipping date and a shipping quantity for each scheduled shipping date of the ordered product, outputting the ordering plan as necessary in the output device, and also aggregating and outputting the processing schedule for each production line and the shipping plan for each customer, and processing the steel material that is the base material in the processing device based on the processing plan to produce a product made of steel plate.
[0008] (2) The steel plate production device according to (1) above, characterized in that the base material information used for each product included in the product master information includes information on a main base material and one or more secondary base materials that can be used in the production of the product.
[0009] (3) The steel plate production device according to (1) or (2), wherein the inventory of the base material includes an amount of base material that has been ordered but not yet received.
[0010] (4) A steel plate production device according to any one of (1) to (3), characterized in that the product information in the product master information includes both an individual number assigned to each product and a lot number for managing the individual numbers as a whole.
[0011] (5) A steel plate production device according to any one of (1) to (4), characterized in that the order information input during a predetermined period is aggregated, and an ordering plan and a shipping plan are revised in the planning device to generate a new ordering plan and a revised plan.
[0012] (6) The steel plate production device according to (5) above, wherein the order information includes order type change information for changing the order type from a provisional order to an actual order.
[0013] (7) The steel plate production device according to any one of (1) to (6), wherein the planning device prioritizes actual orders over provisional orders when formulating the ordering plan and the shipping plan.
[0014] (8) The steel plate production device according to any one of (1) to (7), characterized in that the input device can accept input from a plurality of input persons, and the output device selects, consolidates, and outputs information relating to an ordering plan and a shipping plan that are associated with order information corresponding to the input persons.
[0015] (9) The steel plate production apparatus according to any one of (1) to (8), wherein the processing device includes one or more of a leveller device, a blanking device, a shearing device, and a slitter device.
[0016] (10) An order-taking, production and sales support device for steel plates used in manufacturing products made of steel plates by processing a base steel material in response to an order from a customer, the device comprising a storage device, an input device, a planning device and an output device, the storage device stores base material master information and product master information, the base material master information includes information on a plurality of base materials, the information including at least the current inventory amount and specifications, the product master information includes information on a plurality of products, the information including at least the current inventory amount, base material information used for each product, and information regarding the production line and production period for manufacturing the products, order information including at least the order amount and delivery date of the product for each customer and the order type of a real order or a provisional order is input to the input device, and The steel plate order-taking, production and sales support device is characterized in that, when it is confirmed based on the order information, the base material master information, and the product master information that there is a shortage of base material for producing the ordered product, the planning formulation device formulates an ordering plan that includes at least the order amount of base material, and when the required amount of inventory for the ordered product is insufficient, the planning device formulates a processing plan that includes at least a processing schedule for each production line for the deficient product, and formulates a shipping plan that includes at least a scheduled shipping date and a shipping quantity for each scheduled shipping date of the ordered product, and the output device outputs the ordering plan when necessary, and also aggregates and outputs the processing schedule for each production line and the shipping plan for each customer.
[0017] (11) The steel plate order-taking, production, and sales support device according to (10), characterized in that the base material information used for each product included in the product master information includes information on a main base material and one or more secondary base materials that can be used in the production of the product.
[0018] (12) The steel plate order-taking, production, and sales support device according to (10), characterized in that the base material information used for each product included in the product master information includes information on a main base material and one or more secondary base materials that can be used in the production of the product.
[0019] (12) The steel plate order-taking, production, and sales support device according to (10) or (11), characterized in that the inventory of the base material includes an amount of base material that has been ordered but not yet received.
[0020] (13) An order-taking, production, and sales support device for steel plates according to any one of (10) to (11), characterized in that the product information in the product master information includes both an individual number assigned to each product and a lot number for managing the individual numbers as a whole.
[0021] (14) The steel plate order-taking, production, and sales support device according to any one of (10) to (13), characterized in that the order information input during a predetermined period is consolidated, and an ordering plan and a shipping plan are revised in the planning device to generate a new ordering plan and a revised plan.
[0022] (15) The steel plate order-taking, production, and sales support device according to any one of (10) to (14), characterized in that the order information includes order type change information for changing the order type from a provisional order to an actual order.
[0023] (16) The order-taking, production, and sales support device for steel plates according to any one of (10) to (15), characterized in that, in the planning device, when formulating the ordering plan and the shipping plan, actual orders are given priority over provisional orders.
[0024] (17) The steel plate order-taking, production, and sales support device according to any one of (10) to (16), characterized in that the input device can accept input from a plurality of inputters, and the output device selects, consolidates, and outputs information relating to ordering plans and shipping plans that are related to order information corresponding to the inputters.
[0025] (18) A method for receiving, producing and selling steel plates used in manufacturing products made of steel plates by processing a steel material as a base material in response to an order from a customer, comprising: an input step for inputting order information including at least an order amount and a delivery date of the product for each customer and an order type of a definite order or a provisional order; a master reading step for reading base material master information including information on a plurality of base materials including at least a current inventory amount and a specification, and product master information including information on a plurality of products including at least information on a production line and a production period for manufacturing the products; and a step for manufacturing the ordered products based on the order information, the base material master information and the product master information. a processing plan formulation step of, when it is confirmed that there is a shortage of base material for an ordered product, formulating an ordering plan including at least an order amount for the base material; a processing plan formulation step of, when there is a shortage of a required amount of inventory for the ordered product, formulating a processing plan including at least a processing schedule for each production line for the shortage product; a shipping plan formulation step of, when there is a shortage of a required amount of inventory for the ordered product, formulating a shipping plan including at least a scheduled shipping date for the ordered product and a shipping quantity for each scheduled shipping date; and an output step of,
[0026] (19) An order-taking, production, and sales program for steel plates used in processing a steel material as a base material to produce a product made of steel plate in response to an order from a customer, the order-taking, production, and sales program for steel plates, characterized in that when it is confirmed that a base material for producing an ordered product is insufficient, an order plan including at least an order amount of the base material is formulated based on order information including at least an order amount and delivery date of the product for each customer, and an order type of a real order or a provisional order, base material master information including information on a plurality of base materials including at least a current inventory amount and specifications, and product master information including information on a plurality of products including at least information on a production line and a production period for producing the product, and when it is confirmed that a base material for producing the ordered product is insufficient, an order plan including at least an order amount of the base material is formulated based on the order information including at least an order amount and delivery date of the product for each customer, and an order type of a real order or a provisional order, base material master information including information on a plurality of products including at least a current inventory amount, information on the base material used for each product, and information on a production line and a production period for producing the product, and Effect of the Invention
[0027] According to the present invention, it is possible to provide a support device and a steel plate production device that significantly improve the efficiency of the order receiving, production, and sales operations of steel plates and smoothly manage the receipt of data on inventory, ordering, shipping, etc. [Brief description of the drawings]
[0028] [Figure 1] FIG. 1 is a block diagram showing an example of a steel plate production apparatus according to the present invention. [Diagram 2] FIG. 1 is a block diagram showing an example of an order-receiving, production, and sales support device for steel sheets according to the present invention. [Diagram 3] 4 is a flowchart showing an example of output of an order plan, a processing plan, and a shipping plan by a planning device of the steel plate production device and the steel plate order-taking, production, and sales support device of the present invention. [Figure 4]1 is a diagram for explaining an outline of an order plan, a processing plan, and a shipping plan by a planning device of the steel plate production device and the steel plate order-taking / production / sales support device of the present invention. FIG. [Diagram 5] FIG. 2 is a diagram illustrating a leveller device as a processing device of the steel plate production apparatus of the present invention. [Figure 6] FIG. 2 is a diagram illustrating a leveler device and a blanking device as processing devices of the steel plate production apparatus of the present invention. [Figure 7] FIG. 1 is a diagram illustrating an outline of a slitter device as a processing device of a steel plate production apparatus according to the present invention. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0029] The present invention will be described in detail below.
[0030] The present invention relates to an order-taking, production, and sales support device for steel plates used when processing base steel material to produce products made of steel plates according to customer orders, and can be used, for example, in coil centers that process steel strips (coils) manufactured by steel manufacturers, such as by cutting as necessary, and ship them to customers. Coil centers do not simply process products, but also store coils and processed products, and also play the role of distributors that consolidate small orders from end customers and process them into orders for steel manufacturers.
[0031] A customer places an order with a coil center, specifying, for example, the specifications, dimensions and tolerances, number of sheets, delivery date, etc. of the steel plate. In the present invention, a "customer" refers to an entity, such as an automobile manufacturer, that purchases a metal base material or a metal processed product, processes or assembles it, and manufactures and sells products for consumers. In the present invention, a "base material" refers to, for example, a coil made by winding a steel plate into a coil shape. In the present invention, a "product" refers to a product that has been cut or processed according to the request of the "customer," such as sheet processing to cut the coil into plates, or hoop processing to cut the coil in the width direction.
[0032] As shown in FIG. 1, the steel plate production apparatus 1 of the present invention includes, for example, a memory device 11, an input device 12, an output device 13, a planning device 14, and a processing device 15, each of which is connected by a communication means 16 such as a network system.
[0033] The processing equipment may be independent and may be, for example, as shown in FIG. 2, provided with a memory device 11, an input device 12, an output device 13, and a planning device 14, each of which is connected by a communication means 16 such as a network system, to form a steel plate order-receiving, production, and sales support device 2.
[0034] Hereinafter, each device constituting the steel plate production device and the steel plate order-taking, production, and sales support device of the present invention will be described.
[0035] (Storage device) The storage device stores base material master information and product master information. The base material master information includes information on multiple base materials, which at least includes the current inventory and specifications. The product master information includes information on multiple products, which at least includes the current inventory, information on the base materials used in each product, and information on the production line and production period for producing the products. The storage device includes at least a storage device such as a semiconductor storage device, a magnetic tape device, a magnetic disk device, and an optical disk device. Multiple storage devices may be provided to store backups, etc.
[0036] That is, in the steel plate order-taking, production, and sales support device of the present invention, all financial resources are managed by base material master information or product master information. This management is performed, for example, by assigning numbers to all financial resources. Furthermore, a base material product linking master that manages the linking of base materials and products may be stored.
[0037] Here, "financial resources" refers to, for example, stock of base materials and intermediate work-in-progress inventory. Furthermore, information on base materials that have been ordered but not yet received may be included as ordered inventory. "Financial resources" can be thought of as being interchangeable with "inventory," but "financial resources" may also include things that are not yet in "inventory" in reality. In other words, when a base material is ordered, it may be included in "financial resources" even if the base material has not yet been received.
[0038] By managing "financial resources" using base material master information and product master information, it is possible to reduce input errors made by workers and improve input efficiency. For example, when receiving an order for a product, only the delivery date and order quantity are input into an input device (described later), and other information is set from base material master information and product master information, thereby realizing the association of base materials and products with all financial resources. Here, base materials include ordered base materials, and products include ordered products.
[0039] The "specifications" of the base material contained in the base material master information include, for example, characteristics such as the tensile strength and yield strength of the coiled steel sheet, and the thickness and width of the steel sheet.
[0040] The product master information includes information on multiple products in accordance with customer requests. The product information includes the specifications, dimensions, and tolerances of the steel plate of the product, as well as information on which base material each product is manufactured from, which is stored as base material master information. It also includes information on the production line and production period for producing this product at the coil center.
[0041] The product master information can be automatically generated when new order information that is not registered as product master information is input. This reduces the workload of registering the master. Furthermore, the planning device described below can easily track information such as the amount of product inventory associated with the order and the amount of base material that can be processed into the product.
[0042] Furthermore, by including product specification information in the product master, inspection information for products manufactured at the coil center can be input and compared with the quality assurance values of the product master.
[0043] Since the base material master information and the product master information are important, the registration, amendment, and abolition of the base material master and the product master may be configured so that they are not updated unless checked by multiple people, for example.
[0044] The base material information used for each product included in the product master information includes base materials that can be used in the production of the product. Although a specific base material is usually used in the production of a product, it is possible to use other base materials if it satisfies the customer's order. For example, when there is a slight shortage of base material coils, it is efficient to use other base materials if possible rather than ordering that base material. The base material information can also include information on the main base material that is usually used in the production of the product and the auxiliary base material, which is another base material that can be used in place of the main base material. The number of auxiliary base materials is not limited to one, and there may be multiple auxiliary base materials.
[0045] Since the product master information includes the base materials that can be used in the production of each product, it is possible to prevent the mixing of different materials due to mismatching. Furthermore, since the information on the secondary base materials is included, it is possible to realize flexibility according to the actual business.
[0046] The product information in the product master information may include both an individual number assigned to each product and a lot number for managing the individual numbers as a group. By managing products manufactured under the same conditions by lot, it is possible to allocate other products manufactured under the same conditions for shipping instead of products placed in a position that is difficult to retrieve, which is efficient.
[0047] (Input Device) When a customer places an order for a product, the product specifications, order quantity, delivery date, and the order type (actual order or provisional order) are entered into the input device as order information. The input device may be any device that allows data input. Examples include a keyboard and a touch panel. The input device is not limited to one, and there may be multiple input devices in multiple locations.
[0048] A final order is an order in which a customer has placed an actual order, and there is no problem in starting production of the product immediately. A provisional order is, for example, an unofficial indication from a customer, and it is not certain at the time of the provisional order whether it will result in an actual order. However, by inputting information about provisional orders as order information and accumulating data on whether or not they have actually resulted in a final order and storing this in a storage device, it is possible to create a plan in accordance with the provisional order in the planning device described below. The order information may include order type change information that changes the order type from provisional order to final order.
[0049] (Planning device) The planning device formulates an order plan for ordering base materials as needed at the coil center, a processing plan for producing products as needed, and a shipping plan including a shipping schedule for the products based on the order information, base material master information, and product master information input to the input device. The storage device, the input device, and the planning device are connected by a communication means, and information is exchanged quickly. The planning device is, for example, a CPU, and formulates the order plan, processing plan, and shipping plan by executing a program. Processing may be distributed using multiple planning devices.
[0050] The ordering plan for ordering base materials includes the order quantity of the base materials, and is created, for example, when it is confirmed that there is a shortage of base materials to produce a product when an order is received. Alternatively, even if there is no shortage of base materials at that time, an ordering plan can be created if the inventory of base materials falls below a certain amount after the product is produced.
[0051] If the required amount of stock is not available for an ordered product, a processing plan is created, including a processing schedule for each production line at the coil center. Typical processing equipment at a coil center includes leveler equipment, slitter equipment, shearing equipment, blanking equipment, etc. Coil centers often have multiple units of this equipment and multiple production lines. Information such as the production speed of the production line can be registered in advance as master data. Orders for multiple products are usually received at the same time. The processing schedule is created by taking this information into consideration and counting backwards from the delivery date specified by the customer. In addition, by recording the processing results, the processing schedule can be automatically revised by incorporating the results.
[0052] By automatically determining the schedule for which base material is to be processed on which production line, it is possible to prevent mismatching.
[0053] Once the processing schedule is determined, the scheduled shipping date and shipping quantity of the ordered products can be determined. These are included in the shipping plan. If the scheduled shipping date spans multiple days, the shipping quantity for each scheduled shipping date is included in the shipping plan.
[0054] If the required amount of the ordered product is in stock, no new processing is required, so the scheduled shipping date and shipping quantity of the ordered product can be determined immediately.
[0055] Fig. 3 is a flow chart showing an example of output of a shipping plan by the planning device of the steel plate production equipment and the steel plate order-receiving, production, and sales support equipment of the present invention described above. The output process of the shipping plan shown in Fig. 3 is executed mainly by the planning device in cooperation with each element of the steel plate production equipment and the steel plate order-receiving, production, and sales support equipment based on a program stored in a storage device in advance.
[0056] The order information input in the process of S101, and the base material master information and product master information read in the process of S102 are sent to the planning device. In the process of S103, the program of the planning device compares the order information with the product master information to determine whether the ordered product is in stock. If there is stock, a shipping plan is output in the process of S107. If there is no stock of the product, it is determined in the process of S104 whether there is stock of the base material to manufacture the product. If there is stock of the base material, a processing schedule is formulated in the process of S106. If there is no stock of the base material, an ordering plan is formulated in the process of S105.
[0057] The order information includes the type of order, whether it is a final order or a provisional order. The final order and the provisional order may be treated as equivalent orders, but for example, in formulating a processing schedule, the products of the final order may be given priority in production.
[0058] In the case of a provisional order, if there is the required amount of inventory for the ordered product, the inventory may be marked as "waiting for shipment" in the product master information so that it will not be used for other orders, and the scheduled shipping date and shipping quantity may be determined when the provisional order is switched to a final order.
[0059] In the case of a tentative order, if the required amount of inventory for the ordered product is not available but the base material to be used in the product is in stock, the inventory may be put into a "waiting for use" state in the product master information so that it will not be used for other orders, and a processing schedule may be created when the tentative order is switched to a final order.
[0060] The shipping plan may be updated as a new ordering plan and a revised plan based on order information at every predetermined time period. An overview of the update is shown in Fig. 3. The repetitive process at every predetermined time period shown in Fig. 4 is executed mainly by the planning device in cooperation with each element of the steel plate production device and the steel plate order receiving, production and sales support device based on a program stored in a storage device in advance.
[0061] For example, the created order plan, processing plan, and shipping plan 101 can be modified based on a plurality of order information 111-112 for the next specified period, updated base material master information 113, and updated product master information 114 to create a modified order plan, processing plan, and shipping plan 102. By repeating this process, the order plan, processing plan, and shipping plan can be constantly optimized. At this time, the priority of the order plan, processing plan, and shipping plan for the order may be changed based on the order type change information included in the order information, which changes the order type from a provisional order to a final order. The specified period may be set to every order, or may be set to, for example, 3 days, 1 week, etc.
[0062] (Output device) The output device aggregates and outputs the formulated shipping plans for each production line or each customer. The output method of the output device may be on paper or electronic data. The output device may be any device, such as a liquid crystal display, an organic electroluminescence display, or a printer. The output device is not limited to one, and there may be multiple output devices at multiple locations.
[0063] In this way, by creating plans based on actual and provisional orders, consistently managing inventory and delivery dates, and automatically outputting shipping instructions, it is possible to prevent inventory surpluses or shortages of base materials and finished products, as well as delays in delivery, and it also becomes possible to level out work.
[0064] (Processing equipment) The processing equipment is included in the production line. As described above, information about the production line for producing the product is included in the product master information, and the processing schedule is formulated in the planning device according to the ordered product and output from the output device. The processing equipment processes the base steel material according to the output processing schedule, and produces products made of steel plates.
[0065] The processing device may include a leveller device that flattens the coiled steel sheet. FIG. 5 shows an outline of the leveller device. The coiled steel sheet 21 is sent to the leveller 23 using an uncoiler 22. The leveller 23 may, for example, sandwich the steel sheet between alternately arranged rolls (work rolls) and apply deformation alternately in the up and down directions to remove distortion. The leveller device may include a pinch roll 24 for moving the steel sheet. The pinch roll 24 may, for example, be arranged only on the downstream side of the leveller 23, or may be arranged both on the upstream side and downstream side of the leveller 23. The leveller 23 may be given the role of driving the leveller 23 itself and moving the steel sheet.
[0066] The processing equipment may include a blanking device that continuously punches out the steel plate with a die. The blanking device may be installed downstream of the above-mentioned leveler device, or the flattened steel plate that has passed through the leveler device may be conveyed and processed through the blanking device. FIG. 6 shows an example of a processing equipment in which a blanking device is disposed downstream of a leveler device. In the processing equipment of FIG. 6, the steel plate 21 sent to the leveler 23 using an uncoiler 22 is flattened by the leveler 23 and is further sent to the blanking device 25 using a pinch roll 24. In the blanking device, the steel plate 21 is punched out by a die 26 for obtaining a desired product, and a product made of the steel plate is obtained.
[0067] The processing device may include a shearing device that shears the steel plate to a predetermined width and length. The shearing device may be installed downstream of the above-mentioned leveling device, or the steel plate that has passed through the leveling device and has become flat may be processed by passing it through the shearing device while being conveyed.
[0068] The processing device may be a slitter device that cuts the coiled steel sheet to the required width and winds it up into a roll. Fig. 7 is a diagram illustrating an outline of the slitter device. The coiled steel sheet 31 is sent to the slitter 32 by an uncoiler, pinch rolls, etc. (not shown). The steel sheet 31 is cut in the traveling direction by the slitter 32, adjusted to the desired width, and wound up again into a coil.
[0069] The processing device may include a plurality of the above-mentioned devices. The processing device is not limited to the above-mentioned devices. Any other device that processes steel plates may be used.
[0070] The steel plate order-receiving / production / sales support device of the present invention allows multiple users to input order information and can be used as a steel plate production management system used in a coil center. The steel plate production management system can select, consolidate, and output shipping information related to order information input by multiple users. More specifically, it can be used by connecting to "customers" and coil manufacturers such as "steel manufacturers" via communication means.
[0071] Furthermore, by connecting the steel manufacturer's terminal device, the customer's terminal device, and the coil center's steel plate order-taking, production, and sales support device through a network system, orders entered into the customer's terminal device are sent to the input device of the coil center's device, making it possible to formulate a shipping plan. At this time, if necessary, order information for the "base material" can be sent to the steel manufacturer's terminal device. Furthermore, base material delivery information can be received from the steel manufacturer's terminal device, and "financial resource" information can be recorded in the storage device as base material master information.
[0072] These operations can be realized, for example, by a computer program that performs the operations described above.
[0073] As described above, according to the present invention, the steel plates are processed by the processing device through the input process by the input device, the master reading process from the storage device, the plan formulation process by the plan formulation device, the processing plan formulation process, the shipping plan creation process, and the output process by the output device, so that financial resources are managed, and the ordering of base materials, production of products, and shipping schedules are automatically generated in response to orders including provisional orders, so that the production of steel plates and the ordering, production, and sales operations of steel plates can be significantly streamlined, and the receipt of data such as inventory, ordering, and shipping can be smoothly managed. Furthermore, these processes can be made into a program, a steel plate ordering, production, and sales program. [Explanation of symbols]
[0074] 1. Steel plate production equipment 2. Steel plate order, production and sales support equipment 21 Steel plate 22 Uncoiler 23 Leveller 24 Pinch Roll 25 Blanking device 26 Molds 31 Steel plate 32 Slitter
Claims
1. A steel plate production device used when processing a base steel material to produce a product made of a steel plate in response to an order from a customer, storage device, Input device, Planning device, An output device, and processing equipment Equipped with The storage device stores base material master information and product master information, The base material master information includes information on a plurality of base materials, the information including at least a current inventory amount and a specification, The product master information includes information on a plurality of products, and the information includes at least the current inventory amount, information on the base material used for each product, and information on the production line and production period for producing the products; Order information including at least the order quantity and delivery date of the product for each customer and the order type (actual order or provisional order) is input to the input device; In the planning device, based on the order information, the base material master information, and the product master information, If it is confirmed that there is a shortage of base materials to produce the ordered products, an ordering plan will be developed that includes at least the order amount of the base materials, Formulating a processing plan including at least a processing schedule for each of the production lines for the ordered products; Develop a shipping plan that includes at least the scheduled shipping dates and shipping quantities for each scheduled shipping date for the ordered products, The output device outputs the ordering plan when necessary, and also outputs the processing schedule for each production line and the shipping plan for each customer, The processing device is included in the production line, and the processing device processes the base steel material based on the processing plan to produce a product made of a steel plate. A steel plate production apparatus comprising:
2. The steel plate production device according to claim 1, characterized in that the base material information used for each product included in the product master information includes information on a main base material and one or more secondary base materials that can be used in the production of the product.
3. 3. The steel plate production apparatus according to claim 1, wherein the stock amount of the base material includes an amount of base material that has been ordered but not yet received.
4. 3. The steel plate production device according to claim 1, wherein the product information in the product master information includes both an individual number assigned to each product and a lot number for managing the individual numbers as a whole.
5. The steel plate production device according to claim 1 or 2, characterized in that the order information input during a predetermined period is consolidated, and the ordering plan and shipping plan are revised in the planning device to generate a new ordering plan and a revised plan.
6. 6. The steel plate production device according to claim 5, wherein the order information includes order type change information for changing the order type from a provisional order to a final order.
7. 3. The steel sheet production apparatus according to claim 1, wherein said plan formulation device prioritizes actual orders over provisional orders when formulating said order plan and said shipping plan.
8. 3. The steel plate production apparatus according to claim 1 or 2, characterized in that the input device can be used by a plurality of inputters, and the output device selects, consolidates, and outputs information relating to ordering plans and shipping plans associated with order information corresponding to the inputters.
9. The steel plate production apparatus according to claim 1 or 2, wherein the processing device includes at least one of a leveller device, a slitter device, a blanking device, and a shearing device.
10. A steel plate order-taking, production, and sales support device used when manufacturing products made of steel plates by processing a base steel material in response to an order from a customer, storage device, Input device, Planning device, Output Device Equipped with The storage device stores base material master information and product master information, The base material master information includes information on a plurality of base materials, the information including at least a current inventory amount and a specification, The product master information includes information on a plurality of products, and the information includes at least the current inventory amount, information on the base material used for each product, and information on the production line and production period for producing the products; Order information including at least the order quantity and delivery date of the product for each customer and the order type (actual order or provisional order) is input to the input device; In the planning device, based on the order information, the base material master information, and the product master information, If it is confirmed that there is a shortage of base materials to produce the ordered products, an ordering plan will be developed that includes at least the order amount of the base materials, When the ordered product is insufficient in the required amount of inventory, a processing plan is formulated including at least a processing schedule for each of the production lines for the insufficient product; Develop a shipping plan that includes at least the scheduled shipping dates and shipping quantities for each scheduled shipping date for the ordered products, The output device outputs the ordering plan when necessary, and also outputs the processing schedule for each production line and the shipping plan for each customer. A steel plate order, production and sales support device characterized by the above.
11. The steel plate order-taking, production, and sales support device according to claim 10, characterized in that the base material information used for each product included in the product master information includes information on a main base material and one or more auxiliary base materials that can be used in the production of the product.
12. 12. The steel plate order-taking, production and sales support device according to claim 10 or 11, wherein the stock amount of base material includes an amount of base material that has been ordered but not yet received.
13. The steel plate order-taking, production, and sales support device according to claim 10 or 11, characterized in that the product information in the product master information includes both an individual number assigned to each product and a lot number for managing the individual numbers as a whole.
14. The steel plate order-taking, production, and sales support device according to claim 10 or 11, characterized in that the order information input during a specified period is consolidated, and the ordering plan and shipping plan are revised in the planning device to generate a new ordering plan and a revised plan.
15. 15. The steel plate order-producing and sales support device according to claim 14, wherein the order information includes order type change information for changing the order type from a provisional order to a final order.
16. 12. The steel sheet order-making, production and sales support device according to claim 10 or 11, wherein said plan making device gives priority to actual orders over provisional orders when making said ordering plan and said shipping plan.
17. The steel plate order-taking, production, and sales support device according to claim 10 or 11, characterized in that the input device can be used by a plurality of inputters, and the output device selects, consolidates, and outputs information relating to ordering plans and shipping plans that are related to the order information corresponding to the inputters.
18. A method for receiving, producing, and selling steel plates, which is used when manufacturing products made of steel plates by processing a base steel material in response to an order from a customer, comprising the steps of: An input step in which an inputter inputs order information including at least the order quantity and delivery date of the product for each customer and the order type (actual order or provisional order); a master reading process in which the computer reads base material master information, which includes information on a plurality of base materials including at least the current stock amount and specifications stored in the storage device, and product master information, which includes information on a plurality of products including at least the current stock amount, base material information used in each product, and information on the production line and production period for producing the products; an order plan formulation step of formulating an order plan including at least an order amount of the base material when the computer determines that the base material is insufficient for producing the ordered product based on the order information, the base material master information, and the product master information; a processing plan formulation step of formulating a processing plan including at least a processing schedule for each of the production lines for the products that are insufficient when the computer determines that the required amount of inventory for the ordered products is insufficient based on the order information, the base material master information, and the product master information; A shipping plan formulation step in which the computer formulates a shipping plan including at least a scheduled shipping date and a shipping quantity for each scheduled shipping date of the ordered product; an output step in which the computer outputs the necessary ordering plan, the processing schedule, and the shipping plan, aggregating the processing schedule for each production line and aggregating the shipping plan for each customer; A method for receiving, producing, and selling steel sheets, comprising the steps of:
19. A steel plate order, production, and sales program used in manufacturing products made of steel plates by processing a base steel material in response to an order from a customer, Order information including at least the order quantity and delivery date of the product for each customer, and the order type (actual order or provisional order); Base material master information including information on a plurality of base materials including at least the current inventory amount and specifications; and Product master information including information on multiple products, including at least the current inventory amount, information on the base material used for each product, and information on the production line and production period for producing the products. Based on If it is confirmed that there is a shortage of base materials to produce the ordered products, an ordering plan will be developed that includes at least the order amount of the base materials, When the ordered product is insufficient in the required amount of inventory, a processing plan is formulated including at least a processing schedule for each of the production lines for the insufficient product; Develop a shipping plan that includes at least the scheduled shipping dates and shipping quantities for each scheduled shipping date for the ordered products, The necessary ordering plan, processing schedule, and shipping plan are output by aggregating the processing schedule for each production line and the shipping plan for each customer. A program for ordering, producing, and selling steel plates that enables a computer to do this.
Citation Information
Patent Citations
Information processor and network system and production management method and storage medium
JP2002258929A
Information processor, information processing method, and program
JP2005316878A
Production shipping plan preparation system and method for steel products
JP2006309572A
Sales production planning method, sales production planning system and computer program
JP2009134399A
Production management device, production management method, and program
JP2011123829A
