Drilling rig
The drilling equipment enhances drilling efficiency and speed by using a rotatable rod pipe with a diameter-expanding bit and flow management features to optimize the excavation process, addressing issues of material handling and hole stability in the BCH method.
Patent Information
- Application Number
- JP2021166674
- Authority / Receiving Office
- JP · JP
- Patent Type
- Patents
- Current Assignee / Owner
- Filing Date
- 2021-10-11
- Publication Date
- 2024-10-22
- Estimated Expiration
- 2041-10-11
AI Technical Summary
Existing drilling technologies, such as the BCH method, face challenges in improving drilling efficiency and speed, particularly in handling large excavated materials like gravel and maintaining hole wall stability, leading to decreased excavation rates and mud cake adhesion.
The drilling equipment incorporates a rotatable rod pipe with a lower stable liquid supply port, a diameter-expanding bit with upward stabilizing liquid supply, and features like ascending and descending wings to manage the flow of excavated materials, along with a mud pumping pipe and stabilizing liquid to enhance fluidity and suction efficiency.
This configuration improves drilling efficiency and speed by optimizing the flow and mixing of excavated materials, reducing mud cake adhesion, and maintaining hole wall stability, while also facilitating the use of fine bubbles to enhance the suction process.
Smart Images

Figure 0007570995000001 
Figure 0007570995000002 
Figure 0007570995000003
Abstract
Description
[Technical field]
[0001] The present invention relates to a drilling rig. [Background technology]
[0002] The BCH (Bottom Circulation Hole) method has been proposed as a method for constructing cast-in-place piles. For example, Patent Document 1 discloses a drilling device that includes a rod pipe that is rotatable and vertically movable and has a lower stabilizing liquid supply port at its lower part that sprays stabilizing liquid, a lower bit that is provided at the lower end of the rod pipe and excavates a borehole as the rod pipe rotates, a mud lift pipe that has a suction port at its lower end that sucks in mud water and the suction port is located above the lower end of the rod pipe, and a stabilizing liquid supply pipe that has an upper stabilizing liquid supply port that supplies stabilizing liquid at the mouth of the borehole. [Prior art documents] [Patent documents]
[0003] [Patent Document 1] Patent No. 4205551 Summary of the Invention [Problem to be solved by the invention]
[0004] However, in the above-mentioned techniques, further improvements in drilling efficiency and drilling speed are desired.
[0005] Therefore, an object of the present invention is to provide a drilling device that improves drilling efficiency and drilling speed. [Means for solving the problem]
[0006] The present invention is provided with a rod tube that is rotatable and vertically movable and has a lower stabilizing liquid supply port at the lower part thereof for spraying stabilizing liquid, a lower bit that is provided at the lower part of the rod tube and excavates a borehole as the rod tube rotates, a stabilizing liquid supply pipe that has an upper stabilizing liquid supply port at the opening of the borehole, an expansion bit that is provided above the lower bit and expands the diameter of the borehole excavated by the lower bit, and a mud lifting pipe that has a suction port at its lower end for sucking in mud water and has the suction port located above the expansion bit. The enlarged bit further includes an enlarged bit stabilizing liquid supply port that is provided in the enlarged bit and that sprays the stabilizing liquid upward. It is a drilling rig.
[0007] According to this configuration, the drilling device comprises a rod tube that is rotatable and movable up and down and has a lower stabilizing liquid supply port at its lower part which sprays stabilizing liquid, a lower bit that is attached to the lower end of the rod tube and drills a borehole as the rod tube rotates, a mud lifting pipe that has a suction port at its lower end which sucks in mud water, and a stabilizing liquid supply pipe that has an upper stabilizing liquid supply port which supplies stabilizing liquid at the mouth of the borehole, and further comprises an expanding bit that is attached above the lower bit and expands the diameter of the borehole drilled by the lower bit, and since the suction port of the mud lifting pipe is located above the expanding bit, the drilling capacity is improved and the drilling efficiency and drilling speed are improved.
[0009] According to this configuration, the expansion bit is further provided with an expansion bit stabilizing liquid supply port that sprays stabilizing liquid upward, so that the stabilizing liquid sprayed upward further stirs and mixes the excavated soil and the stabilizing liquid, homogenizing and optimizing the specific gravity, viscosity, etc., thereby improving fluidity and making it easier to rise, thereby improving the efficiency with which the mud lifting pipe sucks up the excavated soil, and improving the drilling efficiency and drilling speed.
[0010] It is also preferable that the enlarged bit further comprises an enlarged bit blade which is provided on the enlarged bit and directs the flow direction of the mud water toward the center of the borehole.
[0011] According to this configuration, the expansion bit is further equipped with an expansion bit wing that directs the flow of mud water toward the center of the borehole, thereby concentrating the excavated soil from the hole wall toward the suction port of the mud lifting pipe and accelerating the flow, thereby improving fluidity and improving the efficiency with which the mud lifting pipe sucks up the excavated soil.This in turn suppresses the adhesion of mud cake due to the quality maintenance of the stabilizing liquid near the hole wall, thereby improving drilling efficiency, drilling speed and peripheral friction force of the pile.
[0012] The present invention also provides a drilling machine comprising: a rod tube which is rotatable and movable up and down and has a lower stabilizing liquid supply port at the lower part thereof for spraying stabilizing liquid; a lower bit which is provided at the lower part of the rod tube and which excavates a borehole as the rod tube rotates; a mud lifting pipe which has a suction port at the lower end thereof for sucking in mud water and which is located above the lower bit; a stabilizing liquid supply pipe which has an upper stabilizing liquid supply port for supplying stabilizing liquid at the mouth of the borehole; and a lifting wing which is provided at a height position between the lower bit and the suction port of the mud lifting pipe on the outside of the rod tube and which lifts mud water. The rod tube further includes a penetration portion provided at the lower end thereof and inserted into the bottom of the borehole, and a bearing portion for rotatably connecting the rod tube to the penetration portion inserted into the bottom of the borehole, and the lower stabilizing liquid supply port of the rod tube is located above the bottom of the borehole into which the penetration portion is inserted. It is a drilling rig.
[0013] According to this configuration, the drilling device comprises a rod tube that is rotatable and movable up and down and has a lower stabilizing liquid supply port at its lower part which sprays stabilizing liquid, a lower bit that is provided at the lower part of the rod tube and which drills a borehole as the rod tube rotates, a mud lifting pipe that has a suction port at its lower end which sucks in mud water and is located above the lower bit, and a stabilizing liquid supply pipe that has an upper stabilizing liquid supply port which supplies stabilizing liquid at the mouth of the borehole.The drilling device further comprises a lifting wing that is provided at a height position between the lower bit and the suction port of the mud lifting pipe on the outside of the rod tube and lifts the mud water, which makes it easier for the excavated soil to rise from the lower bit to the suction port of the mud lifting pipe, improving the efficiency at which the mud lifting pipe sucks up the excavated soil and improving the drilling efficiency and drilling speed.
[0014] The present invention also relates to a drilling device comprising a rod tube that is rotatable and movable up and down and has a lower stabilizing liquid supply port at its lower part which sprays stabilizing liquid, a lower bit that is attached to the lower part of the rod tube and which drills a borehole as the rod tube rotates, a mud lifting pipe that has a suction port at its lower end which draws in mud water and is located above the lower bit, a stabilizing liquid supply pipe that has an upper stabilizing liquid supply port which supplies stabilizing liquid at the mouth of the borehole, and a descending wing that is attached at a position outside the rod tube at or above the height of the suction port of the mud lifting pipe and which descends the mud water.
[0015] According to this configuration, the drilling device comprises a rod tube that is rotatable and movable up and down and has a lower stabilizing liquid supply port at its lower part which sprays stabilizing liquid, a lower bit that is provided at the lower part of the rod tube and which drills a borehole as the rod tube rotates, a mud lifting pipe that has a suction port at its lower end which sucks in mud water and is located above the lower bit, and a stabilizing liquid supply pipe that has an upper stabilizing liquid supply port which supplies stabilizing liquid at the mouth of the borehole.The drilling device further comprises a lowering wing that is provided at a position above the height of the suction port of the mud lifting pipe on the outside of the rod tube and which lowers the mud water, so that the excavated soil and sand can more easily descend to the height of the suction port of the mud lifting pipe, improving the efficiency with which the mud lifting pipe sucks up the excavated soil and improving the drilling efficiency and drilling speed.
[0016] The present invention also relates to a drilling device comprising a rod tube that is rotatable and movable up and down and has a lower stabilizing liquid supply port at its lower part which sprays stabilizing liquid, a lower bit that is provided at the lower part of the rod tube and which drills a borehole as the rod tube rotates, a mud lifting pipe that has a suction port at its lower end which sucks in mud water and is located above the lower bit, a stabilizing liquid supply pipe that has an upper stabilizing liquid supply port which supplies stabilizing liquid at the mouth of the borehole, and a baffle plate that suppresses the flow of mud water at a position above the height of the suction port of the mud lifting pipe.
[0017] According to this configuration, in an excavation device comprising a rod tube that is rotatable and movable up and down and has a lower stabilizing liquid supply port at its lower part which sprays stabilizing liquid, a lower bit that is provided at the lower part of the rod tube and excavates a borehole as the rod tube rotates, a mud lifting pipe that has a suction port at its lower end which sucks in mud water and is located above the lower bit, and a stabilizing liquid supply pipe that has an upper stabilizing liquid supply port which supplies stabilizing liquid at the mouth of the borehole, the device further comprises a straightening plate that suppresses the flow of mud water at a position above the height of the suction port of the mud lifting pipe, so that the flow of mud water of the excavated soil and sand at the height of the suction port of the mud lifting pipe is suppressed, improving the efficiency with which the mud lifting pipe sucks up the excavated soil and sand, and suppressing the adhesion of mud cake due to the quality of the stabilizing liquid on the hole wall shallower than the straightening plate, thereby improving the drilling efficiency, the drilling speed, and the peripheral friction force of the pile.
[0018] In addition, it is preferable that the baffle plate has a baffle fan that rotates due to the flow of muddy water from below.
[0019] With this configuration, the baffle plate has a baffle fan that rotates due to the flow of muddy water from below, thereby further suppressing the flow of muddy water from the excavated soil at the height of the suction port of the mud lifting pipe, thereby improving the efficiency with which the mud lifting pipe sucks up the excavated soil, and improving the drilling efficiency and drilling speed.
[0020] The present invention also provides a method for drilling a borehole by using a rod tube that is rotatable and movable up and down and has a lower stabilizing liquid supply port at its lower part for spraying stabilizing liquid, a lower bit that is provided at the lower part of the rod tube and drills a borehole as the rod tube rotates, a mud lifting pipe that has a suction port at its lower end for sucking in mud water, and a stabilizing liquid supply pipe that has an upper stabilizing liquid supply port for supplying stabilizing liquid at the mouth of the borehole, the suction port of the mud lifting pipe being located at a position at the bottom of the borehole, spaced apart from the center of the bottom of the hole, and its position is moved as the rod tube rotates. The rod tube further includes a penetration portion provided at the lower end thereof and inserted into the bottom of the borehole, and a bearing portion for rotatably connecting the rod tube to the penetration portion inserted into the bottom of the borehole, and the lower stabilizing liquid supply port of the rod tube is located above the bottom of the borehole into which the penetration portion is inserted. It is a drilling rig.
[0021] According to this configuration, in a drilling device comprising a rod tube that is rotatable and movable up and down and has a lower stabilizing liquid supply port at its lower part that sprays stabilizing liquid, a lower bit that is provided at the lower part of the rod tube and drills a borehole as the rod tube rotates, a mud lifting pipe that has a suction port at its lower end that sucks in mud water, and a stabilizing liquid supply pipe that has an upper stabilizing liquid supply port that supplies stabilizing liquid at the mouth of the borehole, the suction port of the mud lifting pipe is located at the bottom of the borehole and is positioned away from the center of the hole bottom and moves in position as the rod tube rotates, thereby improving the efficiency with which the mud lifting pipe sucks up the excavated soil and sand, and improving the drilling efficiency and drilling speed.
[0022] The present invention also provides a method for producing a method for manufacturing a semiconductor device comprising the steps of: The drilling machine comprises a rod tube which is rotatable and movable up and down and has a lower stabilizing liquid supply port at its lower part which sprays stabilizing liquid, a lower bit which is provided at the lower part of the rod tube and which excavates a borehole in accordance with the rotational movement of the rod tube, a stabilizing liquid supply pipe which has an upper stabilizing liquid supply port which supplies stabilizing liquid at the mouth of the borehole, an expansion bit which is provided above the lower bit and which expands the diameter of the borehole excavated by the lower bit, and a mud lifting pipe which has a suction port at its lower end which sucks in mud water and which is located above the expansion bit, The stabilizing liquid that sprays out from the stabilizing liquid supply port at the bottom of the rod tube has the following properties: Diameter of 10μm to several tens of μm Contains fine bubbles Drilling equipment .
[0023] According to this configuration, the stabilizing liquid sprayed out from the lower stabilizing liquid supply port of the rod tube contains fine air bubbles, which makes it easier for the excavated soil to rise as the air bubbles rise, improving the efficiency with which the mud lifting pipe sucks up the excavated soil, and improving the drilling efficiency and drilling speed.
[0024] It is also preferable that the rod tube further comprises a penetration portion provided at the lower end thereof for penetrating into the bottom of the borehole, and a bearing portion for rotatably connecting the rod tube to the penetration portion penetrated into the bottom of the hole, and that the lower stabilizing liquid supply port of the rod tube is positioned above the bottom of the hole into which the penetration portion is penetrated.
[0025] When the lower bit rotates while drilling the bottom of the hole, the lower bit rotates more easily if there is no friction between the lower bit and the bottom of the hole. However, in order for the lower bit to drill efficiently, it is necessary to apply a certain pushing force to the lower bit, but if the pushing force applied to the lower bit is too strong, the lower bit is difficult to rotate. On the other hand, according to this configuration, the lower bit can be easily rotated while applying a certain pushing force to the lower bit because the penetrating part that is provided at the lower end of the rod tube and penetrates into the bottom of the hole of the drilling hole and the bearing part that rotatably connects the rod tube on which the lower bit is provided to the penetrating part penetrated into the bottom of the hole are further provided. Also, if the pushing force applied to the lower bit and the rod tube is too strong, the amount of stabilizing liquid ejected from the lower stabilizing liquid supply port of the rod tube may decrease. On the other hand, according to this configuration, the lower stabilizing liquid supply port of the rod tube is located above the bottom of the hole into which the penetrating part is inserted, so that the lower stabilizing liquid supply port can stably eject stabilizing liquid even if the pushing force of the lower bit and the rod tube to the bottom of the hole is strong. Effect of the Invention
[0026] The drilling device of the present invention improves drilling efficiency and drilling speed. [Brief description of the drawings]
[0027] [Figure 1] FIG. 1 is a side view showing an excavation device according to a first embodiment. [Diagram 2] 2 is a diagram showing an expansion bit stabilizing fluid supply port of the drilling rig of FIG. 1. [Diagram 3] 2 is a side view of an alternative embodiment of the lower bit, the expansion bit, and the riser of the drilling rig of FIG. 1. FIG. [Figure 4] FIG. 2 is a side view showing a solidification material supply pipe of the excavation equipment of FIG. 1. [Diagram 5] 2 is a side view showing the unevenness forming means and mud removing means of the excavation equipment of FIG. 1. [Figure 6] FIG. 11 is a side view showing the excavation equipment according to the second embodiment. [Figure 7] FIG. 7 is a plan view showing a baffle plate of the drilling equipment of FIG. 6. [Figure 8]FIG. 11 is a side view showing a rod pipe and a lower bit of the drilling rig according to the third embodiment. [Figure 9] 10(A) is a diagram showing the rod tube, penetration portion and bearing portion of the drilling equipment of the fourth embodiment, (B) is a cross-sectional view of (A) taken along an alpha line, and (C) is a cross-sectional view of (A) taken along a beta line. [Figure 10] FIG. 13A is a diagram showing the rod tube, the penetration part, and the bearing part of the drilling device of the fifth embodiment in a disassembled state, FIG. 13B is a cross-sectional view of FIG. 13A taken along a gamma line, FIG. 13C is a cross-sectional view of FIG. 13A taken along a delta line, FIG. 13D is a cross-sectional view of FIG. 13A taken along an epsilon line, and FIG. 13E is a cross-sectional view of FIG. 13A taken along a zeta line. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0028] Hereinafter, the drilling device according to the embodiment of the present invention will be described in detail with reference to the drawings. The drilling device 1A according to the first embodiment of the present invention shown in FIG. 1 includes a rod tube 10, a lower bit 20, a mud lifting pipe 30, a stabilizing liquid supply pipe 40, and an expanding bit 50. The drilling device 1A according to the first embodiment of the present invention is applied to excavate a borehole 100 when constructing a cast-in-place pile (cast-in-place pile) by, for example, a BCH (Bottom Circulation Hole) construction method. The rod tube 10 can rotate and move up and down by a power source such as an electric motor (not shown). The rod tube 10 has a lower stabilizing liquid supply port 11 that sprays the stabilizing liquid L1 at the lower part. In addition, as described later, the rod tube 10 sprays the solidifying material L2 and fine bubbles B from the lower stabilizing liquid supply port 11.
[0029] The lower bit 20 is provided at the lower part of the rod tube 10, and excavates the borehole 100 in accordance with the rotation of the rod tube 10. The mud lifting pipe 30 has a suction port 31 at the lower end for sucking in mud water 104, and the suction port 31 is located above the lower bit 20 and the enlarged diameter bit 50. In this embodiment, the mud lifting pipe 30 branches into a plurality of parts, and has a plurality of suction ports 31 spaced apart from each other in the width direction of the borehole 100. The stabilizing liquid supply pipe 40 has an upper stabilizing liquid supply port 41 for supplying the stabilizing liquid L1 at the mouth 101 of the borehole 100. The stabilizing liquid L1 is usually filled up to the vicinity of the mouth 101 of the borehole 100. The stabilizing liquid L1 refers to a liquid that is injected into the borehole 100 to keep the hole wall 103 stable, and an appropriate type of stabilizing liquid is selected depending on the nature of the ground, etc.
[0030] The drilling device 1A of this embodiment further includes an expansion bit 50 that is provided above the lower bit 20 and expands the borehole 100 drilled by the lower bit 20. In this embodiment, three expansion bits 50 are provided. The first expansion bit provided above the lower bit 20 has a larger outer diameter than the lower bit 20 and excavates the hole bottom 102 and hole wall 103 on the outer periphery side of the lower bit 20. The second expansion bit provided above the first expansion bit 50 has a larger outer diameter than the first expansion bit 50 and excavates the hole bottom 102 and hole wall 103 on the outer periphery side of the first expansion bit 50. The third expansion bit provided above the second expansion bit 50 has a larger outer diameter than the second expansion bit 50 and excavates the hole bottom 102 and hole wall 103 on the outer periphery side of the second expansion bit 50. The number of stages of the expansion bit 50 can be changed as appropriate.
[0031] 1 and 2, the drilling device 1A further includes an expansion bit stabilizing liquid supply port 51 that is provided on the expansion bit 50 and sprays the stabilizing liquid L1 upward. As shown in Fig. 2, a downward introduction pipe 52 is disposed inside the rod pipe 10 near the expansion bit 50. The downward introduction pipe 52 introduces a portion of the stabilizing liquid L1 supplied from above the downward introduction pipe 52 into the rod pipe 10 below the downward introduction pipe 52 via the downward introduction pipe 52.
[0032] The enlarged bit 50 is provided with an upper inlet pipe 53, one end of which communicates with the inside of the rod pipe 10 and the other end of which opens as an enlarged bit stabilizing liquid supply port 51, and which extends from the inside to the outside of the enlarged bit 50 along the enlarged bit 50. The upper inlet pipe 53 ejects the other part of the stabilizing liquid L1 supplied from above the lower inlet pipe 52 upward from the enlarged bit stabilizing liquid supply port 51 via the upper inlet pipe 53. The enlarged bit stabilizing liquid supply port 51 may eject the stabilizing liquid L1 upward and toward the center of the borehole 100. This allows the flow direction of the mud water 104 to be directed toward the center of the borehole 100.
[0033] 1, the drilling device 1A further includes an expansion bit blade 54 that is provided on the expansion bit 50 and directs the flow of the mud water 104 toward the center of the borehole 100. The expansion bit blade 54 is, for example, a plate-like member that is disposed substantially vertically on a side surface of the expansion bit 50 that is spaced apart from the borehole wall 103 and is oriented to increase the upward movement speed of the soil so as to direct the flow of the mud water 104 toward the center of the borehole 100. The expansion bit blade 54 may be provided on any of the multiple stages of the expansion bit 50.
[0034] The drilling device 1A further includes a lifting wing 60A that is provided at a height between the lower bit 20 and the suction port 31 of the mud lifting pipe 30 on the outside of the rod pipe 10 and lifts the muddy water 104 with the rotation of the rod pipe 10. The lifting wing 60A is, for example, a screw (auger) provided continuously on the outer circumferential surface of the rod pipe 10. The screw-shaped lifting wing 60A has the effect of mechanically lifting things that cannot be lifted by the upward flow of the muddy water 104, such as gravel. In addition, as shown in FIG. 3, the drilling device 1A may include, for example, a lifting wing 60B that is a plate-shaped member provided in plurality on the outer circumferential surface of the rod pipe 10. The lifting wing 60B made of a plate-shaped member has the effect of lifting the muddy water 104. In the example of FIG. 3, the lower stabilizing liquid supply port 11 of the rod pipe 10 is disposed at the lower end of the rod pipe 10 and does not contact the hole bottom 102, but the lower stabilizing liquid supply port 11 may be disposed above the lower end of the rod pipe 10.
[0035] Moreover, the lifting wings 60A, 60B preferably have a shape that allows the soil excavated by the lower bit 20 and the stabilizing liquid L1 supplied from the lower stabilizing liquid supply port 11 to be mixed and stirred without being separated from each other, to ensure a predetermined specific gravity (e.g., 1.08 to 1.15) and viscosity (e.g., 0.001 to 0.003 Pa·s or 0.001 to 0.005 Pa·s), and to make the flow of the soil a laminar flow state. In other words, the lifting wings 60A, 60B preferably have a shape that makes it difficult for vortexes to occur, such as the laminar flow wings of an aircraft. Moreover, the vertical pitch (spacing) and overhang length of the lifting wings 60A, 60B are preferably set in accordance with the size of the particles of the excavated soil, and in conjunction with the flow of the stabilizing liquid L1 supplied from the lower stabilizing liquid supply port 11, to provide an upward flow speed (e.g., 0.2 to 1.0 m / s) sufficient to lift the soil. In addition, it is preferable that the rotation speeds of the rod pipe 10 and the lower bit 20 are set in the order of increasing for clay and silt, sand, gravel and boulders.
[0036] As shown in FIG. 1, the drilling device 1A further includes a descending wing 70 that is provided at a position at or above the height of the suction port 31 of the mud lifting pipe 30 on the outside of the rod pipe 10 and that descends the mud water 104 as the rod pipe 10 rotates. The descending wing 70 is a plate-shaped member provided on the outer circumferential surface of the rod pipe 10. The descending wing 70 has a radial length in the borehole 100 such that it does not come into contact with the mud lifting pipe 30 as the rod pipe 10 rotates. The descending wing 70 is arranged in multiple stages in the vertical direction of the rod pipe 10 as necessary. It is preferable that the descending wing 70 is provided with an auxiliary wing that generates a flow that directs the flow direction of the mud water 104 toward the center of the borehole 100.
[0037] The expanded diameter bit blade 54, the rising blades 60A, 60B and the descending blade 70 are arranged with their positions, numbers, sizes and inclinations adjusted appropriately so as to direct the flow of the muddy water 104 toward the suction port 31 of the mud lifting pipe 30. The expanded diameter bit blade 54, the rising blades 60A, 60B and the descending blade 70 may be detachable, and the inclination may be changeable.
[0038] As shown in Fig. 1, the stabilized liquid L1 spouting from the lower stabilized liquid supply port 11 of the rod pipe 10 contains fine bubbles B having a diameter of 10 µm to several tens of µm. The fine bubbles B are mixed into the rod pipe 10 in the ground equipment if the ground equipment is not adversely affected and the fine bubbles B do not dissipate until the lower bit 20. If it is impossible to mix the fine bubbles B into the rod pipe 10 in the above ground equipment, the fine bubbles B may be generated by providing a screw on the lower end of the rod pipe 10 or the lower bit 20. Ideally, the fine bubbles B rise to the suction port 31 of the mud lifting pipe 30 and disappear above the suction port 31.
[0039] As shown in FIG. 1 and FIG. 4, the drilling device 1A further includes a solidification material supply pipe 90 having a solidification material supply port 91 for supplying the solidification material L2 to the bottom of the borehole 100. The solidification material L2 is, for example, cement milk or mortar for solidifying the soil and mud at the bottom of the borehole 102. The solidification material supply pipe 90 is disposed inside the rod pipe 10, and the solidification material supply port 91 supplies the solidification material L2 to the bottom of the borehole 100 above the lower stabilizing liquid supply port 11 of the rod pipe 10. The solidification material supply pipe 90 may be disposed inside the mud lifting pipe 30. If possible, the solidification material supply pipe 90 may also serve as the rod pipe 10 or the mud lifting pipe 30. The solidification material L2 may be supplied after the drilling of the borehole 100 is completed.
[0040] As shown in Fig. 1 and Fig. 5, the drilling device 1A further includes an unevenness forming means 55 for forming unevenness on the hole wall 103 of the drilled hole 100. As shown in Fig. 5, the unevenness forming means 55 is a claw-shaped bit arranged on the side of the expansion bit 50 facing the hole wall 103. The unevenness forming means 55 are arranged at intervals of, for example, 50 mm to several hundred mm in the vertical direction of the hole wall 103, and form unevenness on the hole wall 103 as the rod tube 10 rotates. The unevenness forming means 55 may form unevenness on the hole wall 103 by a high-pressure jet nozzle.
[0041] The drilling rig 1A further includes a mud removing means 56 for removing mud from the hole wall 103 of the drilled hole 100. The mud removing means 56 is a brush 57 that is arranged above the unevenness forming means 55 on the side of the expansion bit 50 that faces the hole wall 103 and comes into contact with the hole wall 103. The mud removing means 56 is also a suction nozzle 58 that is arranged above the unevenness forming means 55 on the side of the expansion bit 50 that faces the hole wall 103 and sucks up mud from the hole wall 103.
[0042] It is also possible to spray a chemical or material that makes it difficult for mud to adhere to the hole wall 103. It is also possible to spray a chemical or material that adheres to and solidifies the hole wall 103 with a strength equal to or greater than that of the ground to the hole wall 103. When removing mud from the hole wall 103, the water level of the muddy water 104 may be raised to increase the pressure on the hole wall 103 in order to protect the hole wall 103.
[0043] In this embodiment, the drilling rig 1A includes a rod tube 10 that is rotatable and movable up and down and has a lower stabilizing liquid supply port 11 at its lower part that sprays stabilizing liquid L1, a lower bit 20 that is provided at the lower part of the rod tube 10 and drills a borehole 100 as the rod tube 10 rotates, a mud lifting pipe 30 that has a suction port 31 at its lower end that sucks in mud water 104, and a stabilizing liquid supply pipe 40 that has an upper stabilizing liquid supply port 41 that supplies stabilizing liquid L1 at the hole mouth 101 of the borehole 100.The drilling rig 1A further includes an expansion bit 50 that is provided above the lower bit 20 and expands the diameter of the borehole 100 drilled by the lower bit 20, and since the suction port 31 of the mud lifting pipe 30 is located above the expansion bit 50, the drilling capacity is improved, and the drilling efficiency and drilling speed are improved.
[0044] The expansion bit 50 can expand the borehole 100 and ensure clearance around the rod pipe 10. It also ensures space for mud to flow, allowing the mud to flow smoothly. In other words, it is possible to suppress and minimize the clogging of the excavated pieces, such as gravel and consolidated clay, which are large.
[0045] In addition, according to this embodiment, the enlarged bit 50 is further provided with an enlarged bit stabilizing liquid supply port 51 that sprays the stabilizing liquid L1 upward, so that the excavated soil and the stabilizing liquid L1 are further mixed and mixed with the stabilizing liquid L1 sprayed upward, and the specific gravity, viscosity, etc. are homogenized and optimized, improving the fluidity and making it easier to rise, improving the efficiency of the mud lift pipe 30 to suck up the excavated soil, and improving the drilling efficiency and drilling speed. In other words, the stabilizing liquid L1 supplied from the lower stabilizing liquid supply port 11 and the excavated soil are mixed and mixed, but the excavated soil of each stage of the enlarged bit 50 accumulates, which may increase the mud properties (specific gravity, viscosity), resulting in a decrease in the mud's rising function. Therefore, the enlarged bit stabilizing liquid supply port 51 supplies new stabilizing liquid L1 at the upper or middle part of the enlarged bit 50, thereby optimizing the mud properties.
[0046] In addition, according to this embodiment, the expansion bit 50 is further provided with an expansion bit wing 54 that directs the flow direction of the mud water 104 toward the center of the borehole 100, thereby concentrating the excavated soil from the direction of the hole wall 103 toward the suction port of the mud lifting pipe 30 and accelerating the flow, thereby improving fluidity and improving the efficiency with which the mud lifting pipe 30 sucks up the excavated soil.This suppresses the adhesion of mud cake due to the quality retention of the stabilizing liquid L1 near the hole wall 103, and improves the drilling efficiency, drilling speed, and peripheral friction force of the pile.
[0047] Further, according to this embodiment, there is provided a rod tube 10 which is rotatable and movable up and down and has a lower stabilizing liquid supply port 11 at the lower part thereof for spraying stabilizing liquid L1, a lower bit 20 which is provided at the lower part of the rod tube 10 and excavates a borehole 100 as the rod tube 10 rotates, a mud lift pipe 30 which has a suction port 31 at the lower end thereof for sucking in mud water 104 and the suction port 31 is located above the lower bit 20, and an upper stabilizing liquid supply port 11 which supplies stabilizing liquid L1 at the mouth 101 of the borehole 100. The drilling rig 1A is equipped with a stable liquid supply pipe 40 having a constant liquid supply port 41, and further includes lifting wings 60A, 60B that are provided at a height position between the lower bit 20 and the suction port 31 of the mud lifting pipe 30 on the outside of the rod tube 10 and lift the mud water 104, making it easier for the excavated soil to rise from the lower bit 20 to the suction port 31 of the mud lifting pipe 30, improving the efficiency with which the mud lifting pipe 30 sucks up the excavated soil, and improving the drilling efficiency and drilling speed.
[0048] The rising wings 60A, 60B can homogenously mix the drilling soil and mud to produce highly fluid muddy water 104. The rising wings 60A, 60B accelerate the flow of the muddy water 104. In addition, the rising wings 60A, 60B cause the muddy water to be carried on the surfaces of the rising wings 60A, 60B and move upward.
[0049] In addition, according to this embodiment, the drilling rig 1A includes a rod tube 10 that is rotatable and movable up and down and has a lower stabilizing liquid supply port 11 at its lower part that sprays stabilizing liquid L1, a lower bit 20 that is provided at the lower part of the rod tube 10 and drills a borehole 100 as the rod tube 10 rotates, a mud lifting pipe 30 that has a suction port 31 at its lower end that sucks in mud water 104 and is located above the lower bit 20, and a stabilizing liquid supply pipe 40 that has an upper stabilizing liquid supply port 41 that supplies stabilizing liquid L1 at the hole mouth 101 of the borehole 100.The drilling rig 1A further includes a lowering wing 70 that is provided at a position above the height of the suction port 31 of the mud lifting pipe 30 on the outside of the rod tube 10 and lowers the mud water 104, so that the excavated soil and sand can more easily descend to the height of the suction port 31 of the mud lifting pipe 30, improving the efficiency of the mud lifting pipe 30 in sucking in the excavated soil and improving the drilling efficiency and drilling speed.
[0050] In the conventional BCH method, drilling is performed by rotating the bit, and the excavated soil is discharged with the upward flow of water, so as the diameter of the drilled hole becomes larger, the upward flow rate decreases, and the excavated soil cannot be discharged smoothly, which reduces the drilling efficiency. In particular, when gravel with a high specific gravity is present, the gravel cannot be pushed upward and remains at the bottom of the hole, causing a significant decrease in the drilling speed.
[0051] In such cases, the commonly used BH (Boring Hole) method involves increasing the specific gravity of the mud produced by excavation to make the gravel easier to float and promote discharge. However, because increasing the specific gravity of the mud makes it easier for mud cake to adhere to the hole walls, this method is not currently approved for permanent piles.
[0052] Therefore, in this embodiment, by arranging the rising wings 60A, 60B, which are flow straightening devices that generate an upward flow in the borehole 100, the expansion bit stabilizing liquid supply port 51 and the expansion bit wings 54 near the lower bit 20 and the suction port 31 of the mud lifting pipe 30, without increasing the specific gravity of the mud water 104, the excavation efficiency is improved by stirring up the soil and sand that tend to settle.
[0053] Furthermore, in this embodiment, a descending wing 70, which is a straightening device that suppresses the upward flow, is arranged near the suction port 31 of the mud lifting pipe 30, so that the stabilizing liquid L1 in the borehole 100 in the area where drilling has already been completed is kept in a still water state, thereby maintaining the stability of the hole wall 103.
[0054] In this way, this embodiment aims to improve drilling efficiency and hole wall quality by dividing the water in a single borehole 100 into two: a "drilling water circulation area" below the suction port 31 of the mud lifting pipe 30, and a "stable liquid still water area" above the suction port 31 of the mud lifting pipe 30.
[0055] In addition, according to this embodiment, the mud lifting pipe 30 has multiple suction ports 31 spaced apart from each other in the width direction of the borehole 100, so that the efficiency of the mud lifting pipe 30 in sucking up the excavated soil and sand can be maintained even if the diameter of the borehole 100 becomes larger.
[0056] According to this embodiment, the stabilizing liquid L1 spouting from the lower stabilizing liquid supply port 11 of the rod pipe 10 contains fine bubbles B having a diameter of 10 μm to several tens of μm, so that the excavated soil and sand easily rises with the rise of the fine bubbles B, and the efficiency of the mud lifting pipe 30 in sucking the excavated soil and sand is improved, and the drilling efficiency and drilling speed are improved. Fine bubbles B having a small diameter of 10 μm to several tens of μm can prevent malfunction of the suction pump that serves as the suction power of the mud lifting pipe 30. Furthermore, while fine bubbles having a normal diameter are only effective in entraining soil and sand in a narrow range in the upward direction, fine bubbles B having a small diameter of 10 μm to several tens of μm are effective in entraining soil and sand over a wide range. Furthermore, the fine fine bubbles B of this embodiment pull off soil particles adhering to the lower bit 20 and the enlarged diameter bit 50. Further, the fine bubbles B of this embodiment reduce the rotational resistance of the ascending wings 60A, 60B and the descending wings .
[0057] In addition, the fine bubbles B of this embodiment combine with the colloid particles contained in the stabilizing liquid L1 to add buoyancy to the colloid particles. The colloid particles rise without remaining in the stabilizing liquid L1, which contributes to preventing the formation of mud cake from progressing. Furthermore, the fine bubbles B of this embodiment peel off the mud cake that has already formed, which contributes to reducing the thickness of the mud cake. In addition, when erecting the reinforcing bar cage after the completion of excavation and replacing the stabilizing liquid L1 with concrete, the fine bubbles B of this embodiment reduce the friction between the reinforcing bar cage and the stabilizing liquid L1, thereby reducing the amount of bentonite attached to the reinforcing bar cage. In addition, the replaced concrete can be densified by injecting carbon dioxide gas into the fine bubbles B of this embodiment.
[0058] Furthermore, according to this embodiment, the lower stabilizing liquid supply port 11 of the rod tube 10 is positioned at a position spaced upward from the lower end of the rod tube 10, so that even if the pushing force of the lower end of the rod tube 10 against the bottom of the hole is strong, the lower stabilizing liquid supply port 11 can stably supply the stabilizing liquid L1.
[0059] In addition, according to this embodiment, the drilling hole 100 further includes a solidification material supply pipe 90 having a solidification material supply port 91 for supplying solidification material L2 to the bottom 102 of the drilling hole 100. Therefore, by solidifying the soil and mud at the bottom 102 of the hole with the solidification material, the efficiency with which the mud lifting pipe 30 sucks up the solidified soil and mud is improved, thereby improving the drilling efficiency and the drilling speed.
[0060] In addition, according to this embodiment, the present invention further includes an unevenness forming means 55 for forming unevenness on the hole wall 103 of the borehole 100, so that the frictional force of the hole wall 103 can be improved when concrete is poured into the borehole 100 and a cast-in-place pile is constructed.
[0061] In addition, according to this embodiment, a mud removal means 56 for removing mud from the hole wall 103 of the borehole 100 is further provided, so that the frictional force of the hole wall 103 can be improved when concrete is poured into the borehole 100 and a cast-in-place pile is constructed.
[0062] In the above-described excavation device 1A of the present embodiment, any one of the expansion bit 50, the ascending blades 60A, 60B, and the descending blade 70 may be provided, and any one of the expansion bit 50, the ascending blades 60A, 60B, and the descending blade 70 may be omitted. In addition, in the excavation device 1A of the present embodiment, any one of the expansion bit stabilizing liquid supply port 51, the expansion bit blade 54, the flow straightening fan 82, the mixing of fine bubbles B, the solidification material supply pipe 90, the unevenness forming means 55, and the mud removal means 56 may be omitted.
[0063] Hereinafter, an excavation device according to a second embodiment of the present invention will be described. The excavation device 1B according to the second embodiment of the present invention shown in FIG. 6 includes a current plate 80 instead of the descending wing 70 of the excavation device 1A according to the first embodiment. As shown in FIG. 6 and FIG. 7, the current plate 80 suppresses the flow of the mud water 104 at a position equal to or higher than the height of the suction port 31 of the mud lifting pipe 30. The current plate 80 is a disk-shaped member having a diameter such that it does not come into contact with the mud lifting pipe 30. As shown in FIG. 7, the current plate 80 has a rod pipe insertion hole 81 through which the rod pipe 10 is inserted. Since the outer peripheral surface of the rod pipe 10 and the inner peripheral surface of the rod pipe insertion hole 81 are not connected, the current plate 80 does not rotate in response to the rotation of the rod pipe 10.
[0064] The straightening plate 80 has a straightening fan 82 that rotates due to the flow of the muddy water 104 from below. In the example of FIG. 7, the straightening plate 80 has four straightening fans 82 at positions symmetrical to each other in a plan view. The four straightening fans 82 that face each other in a plan view rotate in the opposite direction to the rotational movement of the rod tube 10 due to the flow of the muddy water 104 from below. As a result, the flow of the muddy water 104 from below disappears and the muddy water 104 becomes still water, preventing the rotational movement of the straightening plate 80. In order to maintain the depth of the straightening plate 80 in the borehole 100, the straightening plate 80 may be supported by a support member (not shown) that extends from the mud lifting pipe 30 or the hole mouth 101 to the straightening plate 80.
[0065] According to this embodiment, the present invention includes a rod tube 10 that is rotatable and vertically movable and has a lower stabilizing liquid supply port 11 at its lower part for spraying stabilizing liquid L1, a lower bit 20 that is provided at the lower part of the rod tube 10 and excavates a borehole 100 as the rod tube 10 rotates, a mud lift pipe 30 that has a suction port 31 at its lower end for sucking in mud water and that is positioned above the lower bit 20, and a stabilizing liquid supply pipe 41 that supplies stabilizing liquid L1 at the hole mouth 101 of the borehole 100. The drilling rig 1B equipped with the supply pipe 40 further includes a straightening plate 80 for suppressing the flow of mud water 104 at a position above the height of the suction port 31 of the mud lifting pipe 30. This suppresses the flow of mud water 104 of the excavated soil at the height of the suction port 31 of the mud lifting pipe 30, improving the efficiency with which the mud lifting pipe 30 sucks up the excavated soil. This suppresses the adhesion of mud cake due to the quality retention of the stabilizing liquid L1 on the hole wall 103 shallower than the straightening plate 80, thereby improving the drilling efficiency, drilling speed, and peripheral friction force of the pile.
[0066] In addition, according to this embodiment, the straightening plate 80 has a straightening fan 82 that rotates due to the flow of muddy water 104 from below, thereby further suppressing the flow of muddy water 104 of the excavated soil at the height of the suction port 31 of the mud lifting pipe 30, thereby improving the efficiency with which the mud lifting pipe 30 sucks up the excavated soil, and improving the drilling efficiency and drilling speed.
[0067] As with the drilling equipment 1A of the first embodiment described above, in this embodiment, a straightening plate 80, which is a straightening device that suppresses the upward flow, is arranged near the suction port 31 of the mud lifting pipe 30, thereby keeping the stabilizing liquid L1 in the drilling hole 100 in the area where drilling has already been completed in a still water state, thereby maintaining the stability of the hole wall 103.
[0068] As such, similar to the drilling equipment 1A of the first embodiment described above, this embodiment aims to improve drilling efficiency and hole wall quality by dividing the water in a single borehole 100 into two: a "drilling water circulation area" below the suction port 31 of the mud lifting pipe 30, and a "stable liquid still water area" above the suction port 31 of the mud lifting pipe 30.
[0069] In the above-described drilling device 1B of this embodiment, it is sufficient to include the straightening plate 80, and any one of the expansion bit 50 and the lifting blades 60A, 60B may be omitted. In addition, in the drilling device 1B of this embodiment, any one of the expansion bit stabilizing liquid supply port 51, the expansion bit blades 54, the straightening fan 82, the mixing of fine bubbles B, the solidification material supply pipe 90, the unevenness forming means 55, and the mud removal means 56 may be omitted.
[0070] Hereinafter, a drilling device according to a third embodiment of the present invention will be described. The drilling device 1C according to the third embodiment of the present invention shown in FIG. 8 includes a rod tube 10, a lower bit 20, a mud lifting pipe 30, a stabilizing liquid supply pipe 40 (not shown), an expanded bit 50, a solidification material supply pipe 90, a roughness forming means 55, and a mud removal means 56, similar to the drilling device 1A according to the first embodiment. The stabilizing liquid L1 ejected from the lower stabilizing liquid supply port 11 of the rod tube 10 includes fine bubbles B having a diameter of 10 μm to several tens of μm. In this embodiment, the suction port 31 of the mud lifting pipe 30 does not necessarily need to be located above the lower bit 20, and if possible, the suction port 31 of the mud lifting pipe 30 may be at the same height as the lower end of the lower bit 20. On the other hand, the drilling device 1C according to this embodiment does not include the rising wings 60A, 60B, the falling wings 70, the expanded bit stabilizing liquid supply port 51, and the expanded bit wings 54 of the drilling device 1A according to the first embodiment. Moreover, the excavation equipment 1C of this embodiment does not include the baffle plate 80 of the excavation equipment 1B of the second embodiment.
[0071] In the drilling equipment 1C of this embodiment, the suction port 31 of the mud lifting pipe 30 is located at the bottom 102 of the borehole 100, at a position separated from the center of the bottom 102, and moves in position with the rotational movement of the rod pipe 10. The mud lifting pipe 30 has an upper non-rotating part 32 that surrounds the rod pipe 10 while sealing it off from external mud water 104, and a lower rotating part 33 that is below the upper non-rotating part 32 and surrounds the rod pipe 10 while sealing it off from external mud water 104.
[0072] The upper non-rotating part 32 is connected to the rod pipe 10 so that the rod pipe 10 can rotate, while the space between the upper non-rotating part 32 and the rod pipe 10 is sealed via a bearing 34. With the above structure, the upper non-rotating part 32 does not rotate with the rotation of the rod pipe 10. The upper non-rotating part 32 is integrated with the hole mouth 101 side of the mud lifting pipe 30. The inside of the upper non-rotating part 32 communicates with the hole mouth 101 side of the mud lifting pipe 30.
[0073] The lower rotating part 33 is connected to the upper non-rotating part 32 via a rotary joint 35 so as to be rotatable relative to the upper non-rotating part 32 which does not rotate, while being sealed between them. The lower part of the lower rotating part 33 is integrated with the rod tube 10, while being sealed between them. With the above structure, the lower rotating part 33 rotates in accordance with the rotation of the rod tube 10. The inside of the lower rotating part 33 is connected to the inside of the upper non-rotating part 32. The lower rotating part 33 is integrated with the suction port 31 side of the mud lifting pipe 30. The inside of the lower rotating part 33 is connected to the suction port 31 side of the mud lifting pipe 30.
[0074] The suction port 31 side of the mud lifting pipe 30 is disposed at a position spaced apart from the rod pipe 10 at the center of the hole bottom 102. Therefore, with the rotation of the rod pipe 10, the lower rotating part 33 integrated with the rod pipe 10 rotates, and the suction port 31 side of the mud lifting pipe 30 integrated with the lower rotating part 33 moves in position so as to draw a circle centered on the rod pipe 10 in a plan view while moving away from the center of the hole bottom 102. The suction port 31 side of the mud lifting pipe 30 and the hole mouth 101 side of the mud lifting pipe 30 are connected to each other via the upper non-rotating part 32 and the lower rotating part 33, so that the muddy water 104 sucked in by the suction port 31 is lifted up to the hole mouth 101.
[0075] According to this embodiment, in a drilling rig 1C comprising a rod tube 10 which is rotatable and movable up and down and has a lower stabilizing liquid supply port 11 at its lower part which sprays stabilizing liquid L1, a lower bit 20 which is provided at the lower part of the rod tube 10 and which drills a borehole 100 in association with the rotational movement of the rod tube 10, a mud lifting pipe 30 which has a suction port 31 at its lower end which sucks in mud water 104, and a stabilizing liquid supply pipe 40 which has an upper stabilizing liquid supply port 41 which supplies stabilizing liquid L1 at the mouth 101 of the borehole 100, the suction port 31 of the mud lifting pipe 30 is located at the bottom 102 of the borehole 100 and is positioned away from the center of the bottom 102, and moves in position in association with the rotational movement of the rod tube 10, thereby improving the efficiency with which the mud lifting pipe 30 sucks up the excavated soil and sand, thereby improving the drilling efficiency and drilling speed.
[0076] That is, in the BCH method, since the specific gravity of the muddy water 104 is small, the slime 105 generated by drilling tends to accumulate at the bottom of the hole 102. In particular, at a portion away from the center of the bottom of the hole 102 where the lower stabilizing liquid supply port 11 of the rod tube 10 is disposed, the flow of the stabilizing liquid L1 is slow, and the position of the suction port 31 of the mud lifting pipe 30 is fixed, so that the slime 105 tends to accumulate. On the other hand, in this embodiment, the suction port 31 of the mud lifting pipe 30 is disposed at the bottom of the hole 102 of the borehole 100, and moves in position in a circle centered on the rod tube 10 in a plan view while moving away from the center of the bottom of the hole 102, so that the slime 105 at the position where it tends to accumulate can be efficiently sucked up.
[0077] In the excavation device 1C of this embodiment described above, any one of the expansion bit 50, the mixing of fine bubbles B, the solidification material supply pipe 90, the unevenness forming means 55 and the mud removing means 56 may be omitted.
[0078] Hereinafter, a drilling device according to a fourth embodiment of the present invention will be described. As shown in Fig. 9(A), Fig. 9(B) and Fig. 9(C), the drilling device 1D of this embodiment further includes a penetrating part 12A provided at the lower end of the rod tube 10 and penetrating into the hole bottom 102 of the drilled hole 100, and a bearing part 13A that rotatably connects the rod tube 10 to the penetrating part 12A penetrating into the hole bottom 102. The lower stabilizing liquid supply port 11 of the rod tube 10 is located above the hole bottom 102 into which the penetrating part 12A has been penetrated. In this embodiment, the lower stabilizing liquid supply port 11 of the rod tube 10 is located above the hole bottom 102 into which the penetrating part 12A has been penetrated, and below the lower bit 20.
[0079] The penetration portion 12A is composed of a plate material having an isosceles triangle shape extending in the vertical direction and a lower end forming an apex angle in a side view. Either side of a right-angled plate material extending in the vertical direction and having an acute angle in a side view is joined to the front and back surfaces of the plate material having an isosceles triangle shape in a side view. The penetration portion 12A is cross-shaped in a plan view. The bearing portion 13A is a ball bearing whose axial direction extends in the vertical direction. The upper end of the penetration portion 12A is joined to the lower end of the bearing portion 13A. The bearing portion 13A penetrates the hole bottom 102 and rotatably supports the outer circumferential surface of the rod tube 10 with respect to the penetration portion 12A fixed to the hole bottom 102. The lower stabilizing liquid supply port 11 of the rod pipe 10 communicates with the outside through a gap between the plate members of the penetration portion 12A that is cross-shaped in a plan view, and sprays out the stabilizing liquid L1.
[0080] When the lower bit 20 rotates to drill the hole bottom 102, the lower bit 20 rotates more easily if there is no friction between the lower bit 20 and the hole bottom 102. However, in order for the lower bit 20 to drill efficiently, it is necessary to apply a certain pushing force to the lower bit 20, but if the pushing force applied to the lower bit 20 is too strong, the lower bit 20 is difficult to rotate. On the other hand, in this embodiment, the rod tube 10 further includes a penetration part 12A that is provided at the lower end of the rod tube 10 and penetrates into the hole bottom 102 of the drilled hole 100, and a bearing part 13A that rotatably connects the rod tube 10 on which the lower bit 20 is provided to the penetration part 12A penetrated into the hole bottom 102, so that the lower bit 20 can be easily rotated while applying a certain pushing force to the lower bit 20.
[0081] Also, if the pushing force applied to the lower bit 20 and the rod tube 10 is too strong, the amount of the stabilizing liquid L1 spouted from the lower stabilizing liquid supply port 11 of the rod tube 10 may decrease. On the other hand, according to this embodiment, the lower stabilizing liquid supply port 11 of the rod tube 10 is located above the hole bottom 102 into which the penetration part 12A has penetrated, so even if the pushing force of the lower bit 20 and the rod tube 10 to the hole bottom 102 is strong, the lower stabilizing liquid supply port 11 can stably spout the stabilizing liquid L1. In this embodiment, the pushing force can be kept constant. Also, the hole bottom 102 is dug by the flow of the stabilizing liquid L1 spouted from the lower stabilizing liquid supply port 11. In this embodiment, the hole bottom 102 is dug by the pushing force and the flow of the stabilizing liquid L1, and the lower bit 20 is excavated by the amount by which the lower bit 20 has lowered.
[0082] Furthermore, in this embodiment, the penetration portion 12A penetrates the hole bottom 102, and the rod tube 10 is rotatably connected to the penetration portion 12A penetrated into the hole bottom 102 by the bearing portion 13A, improving the rotational stability of the rod tube 10. For this reason, the apex angle (pit angle) of the conical hole bottom 102 is relaxed and the hole bottom 102 becomes gentler, making it difficult for slime to accumulate at the hole bottom 102. This makes it possible to reduce the height of the lower bit 20 and bring the suction port 31 of the mud lifting pipe 30 closer to the lower bit 20, further improving the mud lifting capacity.
[0083] Hereinafter, a drilling device according to a fifth embodiment of the present invention will be described. As shown in Fig. 10(A), Fig. 10(B), Fig. 10(C), Fig. 10(D) and Fig. 10(E), the drilling device 1E according to this embodiment further includes a penetrating portion 12B provided at the lower end of the rod tube 10 and penetrating into the bottom 102 of the drilled hole 100, and a bearing portion 13B that rotatably connects the rod tube 10 to the penetrating portion 12B penetrating into the bottom 102 of the drilled hole 100, in addition to the configuration of any one of the drilling devices 1A according to the first embodiment, 1B according to the second embodiment and 1C according to the third embodiment. In addition, the lower stabilizing liquid supply port 11 of the rod tube 10 is located above the bottom 102 of the hole into which the penetrating portion 12B has penetrated. In this embodiment, the lower stabilizing liquid supply port 11 of the rod tube 10 is located above the bottom 102 of the hole into which the penetrating portion 12B has penetrated, and below the lower bit 20.
[0084] The penetrating portion 12B is composed of an annular base 14 and a plate-shaped tip 15. The plate-shaped tip 15 is composed of an isosceles triangular plate extending vertically and having an apex angle at its lower end in side view, as in the penetrating portion 12A of the fourth embodiment. Either side of a right-angled triangular plate extending vertically and having an acute angle at its lower end in side view is joined to the front and back surfaces of the isosceles triangular plate in side view. The plate-shaped tip 15 is cross-shaped in plan view. The annular base 14 is a member having a circular ring shape in plan view. The upper end of the plate-shaped tip 15 is joined to the lower end of the annular base 14.
[0085] The bearing portion 13B is a thrust bearing whose axial direction extends vertically. The upper end of the annular base portion 14 of the penetration portion 12B is joined to the lower end of the bearing portion 13B. The lower end of the rod tube 10 is joined to the upper end of the bearing portion 13B. The bearing portion 13B penetrates the hole bottom 102 and rotatably supports the lower end of the rod tube 10 relative to the penetration portion 12B fixed to the hole bottom 102. The lower stabilizing liquid supply port 11 of the rod tube 10 communicates with the outside from the inside of the annular base portion 14, which is annular in plan view, and between the plate materials of the plate-shaped tip portion 15, which is cross-shaped in plan view, and sprays the stabilizing liquid L1. This embodiment also has the same effects as the above-mentioned fourth embodiment.
[0086] Although the embodiment of the present invention has been described above, the present invention is not limited to the above embodiment and can be embodied in various forms. For example, the shape, position and quantity of the penetration parts 12A, 12B, the bearing parts 13A, 13B, the enlarged bit 50, the rising wings 60A, 60B, the descending wings 70, the straightening plate 80, the enlarged bit stabilizing liquid supply port 51, the enlarged bit blades 54, the straightening fan 82, the solidification material supply pipe 90, the unevenness forming means 55 and the mud removal means 56 can be appropriately changed. In addition, in the above-mentioned drilling device 1C, the suction port 31 of the mud lifting pipe 30 is located at the bottom 102 of the drilling hole 100, at a position separated from the center of the bottom 102, and the position is moved with the rotation of the rod pipe 10, so that the structure can be appropriately changed. [Explanation of symbols]
[0087] 1A, 1B, 1C, 1D, 1E...drilling equipment, 10...rod pipe, 11...lower stabilizing liquid supply port, 12A, 12B...penetration portion, 13A, 13B...bearing portion, 14...annular base portion, 15...plate-shaped tip portion, 20...lower bit, 30...mud pumping pipe, 31...suction port, 32...upper non-rotating portion, 33...lower rotating portion, 34...bearing, 35...rotary joint, 40...stabilizing liquid supply pipe, 41...upper stabilizing liquid supply port, 50...expanding bit, 51...expanding bit stabilizing liquid supply port, 52 ...Downward introduction pipe, 53...upper introduction pipe, 54...expanding bit blade, 55...unevenness forming means, 56...mud removal means, 57...brush, 58...suction nozzle, 60A, 60B...ascending blade, 70...descending blade, 80...straightening plate, 81...rod tube insertion hole portion, 82...straightening fan, 90...solidification material supply pipe, 91...solidification material supply port, 100...drilling hole, 101...hole mouth, 102...hole bottom, 103...hole wall, 104...mud water, 105...slime, L1...stabilizing liquid, L2...solidification material, B...fine bubbles.
Claims
1. a rod tube that is rotatable and vertically movable and has a lower stabilizing liquid supply port at its lower portion for spraying stabilizing liquid; A lower bit is provided at a lower part of the rod pipe and excavates a drilling hole in accordance with the rotational movement of the rod pipe; a stabilizing liquid supply pipe having an upper stabilizing liquid supply port for supplying stabilizing liquid at the opening of the borehole; An expansion bit provided above the lower bit and expanding the diameter of the borehole excavated by the lower bit; A mud lifting pipe having a suction port at a lower end for sucking mud water, the suction port being located above the expansion bit; Equipped with The enlarged bit further includes an enlarged bit stabilizing liquid supply port that is provided on the enlarged bit and sprays stabilizing liquid upward. Drilling equipment.
2. 2. The drilling device according to claim 1, further comprising an expansion bit wing provided on the expansion bit for directing the flow direction of mud water toward the center of the drilled hole.
3. a rod tube that is rotatable and vertically movable and has a lower stabilizing liquid supply port at its lower portion for spraying stabilizing liquid; A lower bit is provided at a lower part of the rod pipe and excavates a drilling hole in accordance with the rotational movement of the rod pipe; A mud lift pipe having a suction port at a lower end for sucking mud water, the suction port being located above the lower bit; a stabilizing liquid supply pipe having an upper stabilizing liquid supply port for supplying stabilizing liquid at the opening of the borehole; A lifting wing is provided at a height between the lower bit and the suction port of the mud lifting pipe on the outside of the rod pipe, and lifts the mud water; Equipped with A penetration portion provided at the lower end of the rod pipe and inserted into the bottom of the borehole; a bearing portion that rotatably connects the rod tube to the insertion portion that is inserted into the bottom of the hole; Further equipped with The lower stabilizing liquid supply port of the rod pipe is located above the bottom of the hole into which the penetration portion is inserted. Drilling equipment.
4. a rod tube that is rotatable and vertically movable and has a lower stabilizing liquid supply port at its lower portion for spraying stabilizing liquid; A lower bit is provided at a lower part of the rod pipe and excavates a drilling hole in accordance with the rotational movement of the rod pipe; A mud lift pipe having a suction port at a lower end for sucking mud water, the suction port being located above the lower bit; a stabilizing liquid supply pipe having an upper stabilizing liquid supply port for supplying stabilizing liquid at the opening of the borehole; A descending wing is provided at a position equal to or higher than the height of the suction port of the mud lifting pipe on the outside of the rod pipe, and descends muddy water; Drilling rig equipped with
5. a rod tube that is rotatable and vertically movable and has a lower stabilizing liquid supply port at its lower portion for spraying stabilizing liquid; A lower bit is provided at a lower part of the rod pipe and excavates a drilling hole in accordance with the rotational movement of the rod pipe; A mud lift pipe having a suction port at a lower end for sucking mud water, the suction port being located above the lower bit; a stabilizing liquid supply pipe having an upper stabilizing liquid supply port for supplying stabilizing liquid at the opening of the borehole; A straightening plate for suppressing the flow of muddy water at a position above the height of the suction port of the mud lifting pipe; Drilling rig equipped with
6. The excavation equipment according to claim 5 , wherein the baffle plate has a baffle fan that rotates due to a flow of mud water from below.
7. a rod tube that is rotatable and vertically movable and has a lower stabilizing liquid supply port at its lower portion for spraying stabilizing liquid; A lower bit is provided at a lower part of the rod pipe and excavates a drilling hole in accordance with the rotational movement of the rod pipe; A mud lift pipe having a suction port at the lower end for sucking muddy water; a stabilizing liquid supply pipe having an upper stabilizing liquid supply port for supplying stabilizing liquid at the opening of the borehole; Equipped with The suction port of the mud lifting pipe is disposed at a position at the bottom of the borehole, away from the center of the bottom of the hole, and moves in position with the rotational movement of the rod pipe; A penetration portion provided at the lower end of the rod pipe and inserted into the bottom of the borehole; a bearing portion that rotatably connects the rod tube to the insertion portion that is inserted into the bottom of the hole; Further equipped with The lower stabilizing liquid supply port of the rod pipe is located above the bottom of the hole into which the penetration portion is inserted. Drilling equipment.
Citation Information
Patent Citations
JP1975149101A
For widening the excavator post foundation
JP1981033391U
Reflux spiral foundation work
JP1989244016A
Excavator and its method
JP1991103593A
Inside excavating excavator
JP1996193482A
