Parts demand trend analysis system and method

The system uses economic index data analysis to predict construction machinery parts demand, addressing regional variations and global conditions, ensuring optimal inventory levels and reducing surplus stock.

JP7572889B2Active Publication Date: 2024-10-24HITACHI CONSTRUCTION MACHINERY CO LTD
View PDF 5 Cites 0 Cited by

Patent Information

Application Number
JP2021050987
Authority / Receiving Office
JP · JP
Patent Type
Patents
Current Assignee / Owner
Filing Date
2021-03-25
Publication Date
2024-10-24
Estimated Expiration
2041-03-25

AI Technical Summary

Technical Problem

Existing methods struggle to accurately predict construction machinery parts demand due to regional variations and global conditions, leading to difficulties in maintaining optimal inventory levels without surplus stock.

Method used

A system that utilizes economic index data acquisition and analysis to determine demand trends by selecting indicators with high correlation to past parts order data, calculating recommended order quantities, and transmitting this information to maintenance bases.

Benefits of technology

Enables accurate prediction of parts demand at each base, optimizing inventory levels and reducing surplus stock, thereby improving management efficiency and cost-effectiveness.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 0007572889000001
    Figure 0007572889000001
  • Figure 0007572889000002
    Figure 0007572889000002
  • Figure 0007572889000003
    Figure 0007572889000003
Patent Text Reader

Abstract

To provide a component demand trend analysis system and method that enable an accurate prediction of component demand in each base.SOLUTION: A demand trend analysis system has: an economic index acquisition device 1: a trend analysis device 2; and a plurality of base-side devices 3. The demand trend analysis system is configured to:, in the trend analysis device 2, select economic index data related to information (component past order-acceptance data) on an order-acceptance of components in the past in each base where the base-side device 3 is installed;, in the trend analysis device 2, perform a trend analysis of future demand of the component in each base from the selected economic index data and component past order-acceptance data; and calculate recommendation amount of order-placement data and the like to be obtained by adding an analysis result to information (component order-placement schedule data) on an order-placement of component scheduled for each base.SELECTED DRAWING: Figure 1
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to a demand trend analysis system and method for analyzing demand trends for parts. [Background technology]

[0002] To keep construction machinery in operation for a long period of time while maintaining its quality and functionality at the site of use, continuous and proper maintenance (inspection, repair, parts replacement, etc.) is required after the sale of the machinery. Because construction machinery is operated all over the world, in order to perform maintenance quickly and properly, it is necessary to set up maintenance bases around the world, predict the number of parts required at each base in advance, and secure an inventory of the necessary parts at each base.

[0003] In this case, to avoid parts shortages, it is possible to secure a large amount of parts as inventory at each base. However, from the perspective of the maintenance and management costs of the warehouse and the asset value of inventory, it is not desirable from the perspective of management efficiency for each base to have a large amount of surplus parts as inventory.

[0004] In order to secure the necessary number of parts in advance without generating excess inventory, it is essential to forecast future demand. However, since the demand for parts in each region increases and decreases depending on the situation at the time, it is difficult to accurately forecast the demand for parts.

[0005] As a method for solving such problems, Patent Document 1 discloses a method for predicting part demand from past part replacement history. This method predicts future demand from the timing of parts installation on machines and the lifespan of the parts. However, this method is based on the assumption that each machine will operate for the same operating hours as before, so it is difficult to accurately predict sudden increases or decreases in demand that occur due to regional differences, global situations, etc. [Prior art documents] [Patent documents]

[0006] [Patent Document 1] International Publication No. 2015 / 198453 Summary of the Invention [Problem to be solved by the invention]

[0007] The present invention provides a parts demand trend analysis system and method that makes it possible to accurately predict demand for construction machine parts at each base. [Means for solving the problem]

[0008] In order to solve the above problems, the parts demand determination system of the present invention includes an economic indicator acquisition unit that acquires economic indicator data, a planned order quantity data acquisition unit that acquires planned order quantity data related to the planned order quantities of parts for construction machines at bases of the construction machines, an economic indicator selection unit that selects, from the economic indicator data acquired by the economic indicator acquisition unit, economic indicator data that has a predetermined correlation with past parts order data related to orders for the parts at each of the bases in the past, a demand trend analysis unit that calculates demand trend data by analyzing the demand trend of the parts at each of the bases based on the economic indicator data selected by the economic indicator selection unit, an order quantity calculation unit that calculates recommended order quantity data, which is the order quantity of the parts to be recommended, based on the demand trend data and the planned order quantity data, and a transmission unit that transmits the demand trend data and the recommended order quantity data to a base device. Effect of the Invention

[0009] According to the present invention, it is possible to provide a parts demand trend analysis system and method that makes it possible to accurately predict demand for construction machine parts at each base. [Brief description of the drawings]

[0010] [Figure 1] 1 is a block diagram illustrating a demand trend analysis system according to an embodiment. [Diagram 2]FIG. 2 is a block diagram illustrating the details of devices 1 to 3 in the system of FIG. [Diagram 3] 1 is a conceptual diagram for explaining the flow of data between a trend analysis terminal 5 and a base side terminal 6 or an economic index acquisition terminal 4, and a determination procedure. FIG. [Figure 4] FIG. 2 is a block diagram illustrating a detailed configuration example of the economic index acquisition device 1 (economic index acquisition terminal 4). [Diagram 5] The economic index data is acquired and stored in the economic index data storage unit 9. An example of data items included in the acquired and stored economic index data is shown below. [Figure 6] 2 is a schematic diagram for explaining the detailed configuration and operation of a trend analysis device 2. FIG. [Figure 7] The past parts order data for each base, which is acquired and stored in the data storage unit 15, will be described. [Figure 8] FIG. 1 is a schematic diagram for explaining a procedure for selecting economic indicator data having high relevance (large correlation coefficient) in the indicator selection unit 16. [Figure 9A] 13 is a graph illustrating a method of trend analysis in trend analysis unit 17. [Figure 9B] 13 is a schematic diagram for explaining a method of calculating a recommended order amount in the tendency analysis unit 17. FIG. [Figure 10] 10 is a schematic diagram illustrating transmission of trend information acquired by a trend analysis unit 17 to a transmitting-side device 3. FIG. [Figure 11] 2 is a schematic diagram for explaining the detailed configuration of a base side device 3. FIG. [Figure 12] An example of a screen display in the tendency analysis result display unit 21 will be described. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0011] Hereinafter, the present embodiment will be described with reference to the accompanying drawings. In the accompanying drawings, functionally identical elements may be indicated by the same numbers. Note that the accompanying drawings show embodiments and implementation examples according to the principles of the present disclosure, but these are for understanding the present disclosure and are not to be used to interpret the present disclosure in a limiting manner. The description in this specification is merely a typical example and does not limit the scope or application of the present disclosure in any sense.

[0012] In the present embodiment, the description is given in sufficient detail for a person skilled in the art to implement the present disclosure, but it should be understood that other implementations and forms are possible, and that changes in configuration and structure and substitutions of various elements are possible without departing from the scope and spirit of the technical ideas of the present disclosure. Therefore, the following description should not be interpreted as being limited thereto.

[0013] A demand trend analysis system according to an embodiment will be described with reference to the block diagram of Fig. 1. This demand trend analysis system is mainly composed of an economic indicator acquisition device 1, a trend analysis device 2, and a base device 3. In this system, the trend analysis device 2 selects economic indicator data related to information on past orders of parts at each base where the base device 3 is installed (past parts order data), and performs a trend analysis of future demand for parts at each base from the selected economic indicator data and the past parts order data in the trend analysis device 2. Then, the system performs a more accurate forecast of demand for parts by calculating recommended order quantity data and the like obtained by adding the analysis results to information on parts orders planned for each base (scheduled parts order data).

[0014] The devices 1 to 3 in the system of Fig. 1 will be described in detail with reference to the block diagram of Fig. 2. The economic index acquisition device 1 includes an economic index acquisition terminal 4, the trend analysis device 2 includes a trend analysis terminal 5, and the base device 3 includes a base terminal 6. The base terminal 6 is connected to the trend analysis terminal 5 and the economic index acquisition terminal 4 via a network.

[0015] The economic indicator acquisition terminal 4 is connected not only to the internal network but also to the external Internet, and has the function of automatically acquiring various economic indicators from the Internet. The trend analysis terminal 5 acquires economic indicator data from the economic indicator acquisition terminal 4, and also acquires parts past order data and parts order schedule data from the base terminal 6.

[0016] Like a general computer, the trend analysis terminal 5 and the base terminal 6 are configured to include, for example, a CPU 101, a ROM 102, a RAM 103, a hard disk drive 104, a flash memory 105, an input unit (keyboard, touch panel, pen device, mouse, etc.) 106, a display unit 107 (display), a communication control unit 108, a speaker 109, a microphone 110, and a camera 111. The hard disk drive 104 and the flash memory 105 function as storage units that store various data. In addition, the hard disk drive 104 etc. store a computer program that executes a parts demand trend analysis, which will be described later.

[0017] The data flow and judgment procedure between the trend analysis terminal 5 and the base terminal 6 or the economic indicator acquisition terminal 4 will be described with reference to Fig. 3. The trend analysis terminal 5 acquires past parts order data and economic indicator data from the base terminal 6 and the economic indicator acquisition terminal 4, respectively, and selects economic indicator data suitable for prediction according to the result of comparison with the past parts order data. As economic indicator data suitable for prediction, economic indicator data having a high correlation (high correlation coefficient) with the past parts order data is selected. Then, using the selected economic indicator data, a judgment is made on the demand trend of parts at the base where the base terminal 6 is located, and trend analysis data is generated. The generated trend analysis data is transmitted to the base terminal 6.

[0018] Next, a detailed configuration example of the economic index acquisition device 1 (economic index acquisition terminal 4) will be described with reference to Fig. 4. The economic index acquisition terminal 4 includes an economic index data acquisition unit 8 and an economic index data storage unit 9, for example.

[0019] The economic indicator data acquisition unit 8 automatically collects various economic indicator data from the internet (web) data 7 using web crawling technology. The collected economic indicator data is acquired and stored in the economic indicator data storage unit 9. The acquired and stored economic indicator data may include time series information and the numerical values ​​of the indicators as data items, as exemplified in FIG. 5.

[0020] The economic indicator data acquired by the economic indicator data acquisition unit 8 is deployed to the trend analysis device 2 via the network connection unit 10. It is essential that the economic indicator data selected is related to the construction machinery industry. However, although it is generally thought that there is no relation to the construction machinery industry, there is a possibility that there is economic indicator data that is highly correlated with the trend of demand for parts of construction machinery. For this reason, it is preferable that the economic indicator acquisition device 1 does not narrow down the field as much as possible and collects all indicators that can be acquired by WEB crawling. For example, data that is directly related to the construction machinery industry, such as the number of construction cases in each country, the number of housing starts, and the price of mineral resources obtained in mines where mining machines are operated, is always acquired. In addition to this, it is preferable that the economic indicator acquisition device 1 of this embodiment acquires indicators that are not directly related to the construction machinery industry, such as the gross domestic product of the country where each base is located, economic comprehensive indexes such as NASDAQ, agricultural sector indexes, food prices, etc.

[0021] In addition, it is also possible to collect economic indicator data generated by combining multiple economic indicators and use the collected data as candidates for selection. As an example, economic indicator data A and economic indicator data B may be multiplied by a predetermined weighting coefficient and then added to generate new economic indicator data, which may be used as one of the candidates for economic indicator data that may be selected.

[0022] In addition, the economic indicator data acquisition unit 8 may be configured to collect all economic indicator data without specifying any conditions when collecting economic indicator data, or may be configured to specify certain conditions and collect only economic indicator data that meets those conditions in order to improve the data processing speed.

[0023] The selected economic indicator data may differ for each base-side device 3. As described above, the base-side devices 3 are located in different places around the world. For this reason, the past parts order data provided by each base-side device 3 is influenced by the economic situation and political situation, which differ for each base, and therefore the economic indicator data with a large correlation coefficient may also differ for each base.

[0024] 6 shows the detailed configuration and operation of the trend analysis device 2. The trend analysis device 2 (trend analysis terminal 5) is composed of a data acquisition unit 14, a data storage unit 15, an index selection unit 16, a trend analysis unit 17, an order quantity calculation unit 18, and a data transmission unit 19.

[0025] The data acquisition unit 14 has a function of acquiring past parts order data for each base and parts order schedule data indicating parts ordering schedule from the storage units (22, 23) of the base side device 3, and also acquiring economic indicator data from the economic indicator data storage unit 9 of the economic indicator acquisition device 1. In other words, the data acquisition unit 14 functions as an economic indicator acquisition unit that acquires economic indicator data, and a planned order quantity data acquisition unit that acquires planned order quantity data of construction machine parts at the construction machine base. The data storage unit 15 is a storage unit that stores the data acquired by the data acquisition unit 14.

[0026] The index selection unit 16 has a function of selecting, for each base, economic index data having a large correlation coefficient with the past parts order data for each base acquired from each base-side device 3. The tendency analysis unit 17 has a function of judging the future demand tendency at each base from the economic index data selected for each base by the index selection unit 16 and the past parts order data, and outputting the result as demand tendency data. The order quantity calculation unit 18 assigns the demand tendency data obtained by the tendency analysis unit 17 to the parts order schedule data held by each base-side device 3, and calculates the order quantity (recommended order quantity) of the part recommended at each base based on this. The data created by the tendency analysis unit 17 and the order quantity calculation unit 18 is transmitted to the base-side device 3 by the data transmission unit 19.

[0027] An example of the data structure of past parts order data for each base, acquired and stored in data storage unit 15, will be described with reference to Fig. 7. The past parts order data may include the name of the base related to the data, a part number which is a code for identifying the part, a machine classification indicating the classification of the machine on which the part is to be installed, order date, order quantity, order amount, etc. In addition to the items exemplified in Fig. 7, the past parts order data may also include data such as the delivery date of the part, the number of days delivery was delayed, and the name of the company that manufactured the part.

[0028] With reference to FIG. 8, the procedure of selecting economic indicator data with high relevance (large correlation coefficient) in the index selection unit 16 will be described. The index selection unit 16 first compares the parts past order data acquired from the base side device 3 with the acquired economic indicator data group (economic indicator data A, B, C...) to calculate a correlation coefficient. The economic indicator data A, B, C... are candidates for the economic indicator data to be finally selected. The index selection unit 16 makes the economic indicator data precede the parts past order data by a predetermined period (for example, April), compares the numerical value of the parts order data at a certain point in time with the numerical value of the economic indicator data preceding that point by a predetermined period, and calculates the correlation coefficient based on the result of the comparison. Note that the length of time for which the economic indicator data is preceded is arbitrary and is not limited to four months.

[0029] The index selection unit 16 selects economic indicator data from a plurality of sets of economic indicator data according to the calculation result of the correlation coefficient. For example, the economic indicator data with the largest correlation coefficient (for example, economic indicator C) is selected from the plurality of sets of economic indicator data. The economic indicator data selected by the index selection unit 16 is not limited to only one set (only the economic indicator data with the largest correlation coefficient), and a plurality of sets of economic indicator data may be selected. The number of sets of economic indicator data to be selected is arbitrary. For example, in addition to selecting the economic indicator data with the highest correlation coefficient, it is also possible to select economic indicator data with the second (runner-up) to fifth largest correlation coefficients. The number of sets of economic indicator data to be selected is not limited to a specific number. For example, when there are a large number of economic indicator data that satisfy a predetermined condition, the number of economic indicator data to be selected may be changed depending on the situation without imposing a limit on the number of economic indicator data to be selected.

[0030] Next, a method of trend analysis in the trend analysis unit 17 and a method of calculating a recommended order quantity in the order quantity calculation unit 18 will be described with reference to Figs. 9A and 9B.

[0031] As shown in FIG. 9A, assume that economic indicator data that precedes the past parts order data by four months and has the highest correlation coefficient is obtained. As shown in FIG. 9A, the past parts order data is data up to July 2020, and economic indicator data C is selected as the economic indicator data with the highest correlation coefficient. In this case, a prediction of the trend of parts orders from August to November 2020 is made based on the change in the economic indicator data C from four months prior, and a trend analysis value is obtained according to this prediction (see FIG. 9B). Here, the trend analysis value is a numerical value that indicates an increase or decrease in the following several months, with the latest month's data of the economic indicator data C (July 2020 in the example of FIG. 9A) being 100%. The trend analysis value of a certain month is calculated in the trend analysis unit 17 based on the economic indicator data C from four months prior.

[0032] The order amount calculation unit 18 of the trend analysis device 2 modifies the parts order schedule data obtained from the base device 3 based on this trend analysis value, and calculates this modified value as recommended order amount data. Specifically, the recommended order amount data is calculated by multiplying the number of parts order schedules for a certain month by the trend analysis value. Since the parts order schedule data is modified by the trend analysis value (trend analysis data) calculated based on the economic indicator data C determined to have a high correlation with the parts past order data, it becomes possible to order parts that more accurately reflect the demand. Trend information including the calculated recommended order amount data is transmitted (provided) to the corresponding base device 3 (see FIG. 10). The recommended order amount data is calculated for each base based on the parts past order data etc. provided by the base device 3, and the recommended order amount data calculated for that base is transmitted to the base device 3 of the corresponding base.

[0033] The detailed configuration of the base side device 3 will be described with reference to Fig. 11. The base side device 3 includes, for example, a trend data acquiring unit 20, a trend analysis result display unit 21, a parts past order data storage unit 22, an order schedule data storage unit 23, and a data transmitting unit 24.

[0034] The trend data acquiring unit 20 acquires, as trend analysis data, the trend analysis values, recommended order volume data, etc. calculated by the trend analysis unit 17 and the order volume calculating unit 18 of the trend analysis device 2. The trend analysis result display unit 21 displays the trend analysis data acquired by the trend data acquiring unit 20.

[0035] The parts past order data storage unit 22 stores past parts order data at the base where the base device 3 is installed. In addition, the order schedule data storage unit 23 stores parts order schedule data for the base where the base device 3 is installed. The data transmission unit 24 has a function of transmitting the parts past order data and the parts order schedule data stored in the parts past order data storage unit 22 and the order schedule data storage unit 23 to the tendency analysis device 2.

[0036] 12, an example of a screen display in the trend analysis result display unit 21 will be described. This screen includes, as an example, a selection index display unit 45, a selection index trend display unit 46, a correlation coefficient top index display unit 47, a graph display unit 48, and a recommended order quantity list display unit 49.

[0037] The selection index display unit 45 displays the name of the base where the base device 3 is located (e.g., base 1), a part number (e.g., A0001) that identifies the part that is the subject of demand forecasting, and the name of economic index data selected to forecast the demand trend of the part (e.g., XX price). The selection index trend display unit 46 displays the demand trend of the part predicted for the most recent several months (e.g., 4 months) according to the selected economic index data.

[0038] The top correlation coefficient indicator display section 47 is a section that displays, in addition to the economic indicator data with the highest correlation coefficient used in the demand forecast, other economic indicator data that are recognized to have high correlation coefficients (e.g., the top 2 to 6), along with the name of the indicator, its correlation coefficient, and its comparison with the same month of the previous year.

[0039] The graph display section 48 is a section that displays a graph showing changes over time in economic index data selected for demand forecasting and data showing past orders for the parts that are the subject of demand forecasting (parts past order data). Also, the recommended order quantity list display section 49 is a section that displays a list of the recommended order quantities calculated by the order quantity calculation section 18 together with the part numbers related to the forecast, the planned order quantities, the planned order month, the order amount difference, etc.

[0040] By displaying the information as described above on the base device 3, the administrator of the base device 3 or the like can visually grasp information including the recommended order quantity and use it as a reference when ordering parts.

[0041] As described above, according to the parts demand trend forecasting system of this embodiment, economic index data having a high correlation with the parts past order data at each base is selected from the acquired economic index data, and a demand trend is calculated based on the selected economic index. Then, recommended order quantity data is calculated based on the demand trend data and the planned order quantity data. Since the recommended order quantity data is calculated based on the highly correlated economic index data and transmitted to each base, it becomes possible to accurately forecast the demand for parts at each base.

[0042] The present invention is not limited to the above-described embodiment, and includes various modified examples other than those described above. For example, the above-described embodiment has been described in detail to clearly explain the present invention, and is not necessarily limited to those having all of the configurations described. In addition, it is possible to replace a part of the configuration of one embodiment with the configuration of another embodiment, and it is also possible to add the configuration of another embodiment to the configuration of one embodiment. In addition, it is possible to add, delete, or replace a part of the configuration of each embodiment with another configuration. [Explanation of symbols]

[0043] 1. Economic indicator acquisition device 2…Trend analysis device 3...Base device 4…Economic indicator acquisition terminal 5…Trend analysis terminal 6…Base terminal 8…Economic Indicator Data Acquisition Department 9…Economic indicator data storage section 10…Network connection 14…Data acquisition section 15...Data storage section 16…Indicator selection department 17…Trend analysis department 18...Order quantity calculation section 19...Data transmission section 20…Trend data acquisition section 21…Trend analysis result display section 22... Parts past order data storage section 23...Order schedule data storage unit 24...Data transmission section 45...Selection index display section 46...Selection index trend display section 47…Correlation coefficient top indicator display section 48...Graph display section 49…Recommended order quantity list display section

Claims

1. an economic indicator acquisition unit that acquires economic indicator data; a planned order quantity data acquisition unit that acquires planned order quantity data regarding the planned order quantity of parts for the construction machine at a base of the construction machine; an economic indicator selection unit that selects, from the economic indicator data acquired by the economic indicator acquisition unit, economic indicator data having a predetermined correlation with past part order data related to orders for the parts at each of the bases in the past; a demand trend analysis unit that calculates demand trend data by analyzing a demand trend of the parts at each of the bases based on the economic index data selected by the economic index selection unit; an order quantity calculation unit that calculates recommended order quantity data, which is an order quantity of the part to be recommended, based on the demand trend data and the planned order quantity data; a transmission unit that transmits the demand trend data and the recommended order amount data to a base device; A parts demand trend forecasting system comprising:

2. 2. The parts demand trend forecasting system according to claim 1, wherein the economic indicator selection unit calculates a correlation coefficient between the parts past order data and the economic indicator data that precedes the parts past order data by a predetermined period, and selects the economic indicator data from the calculation result.

3. 2. The parts demand trend forecasting system according to claim 1, wherein the economic indicator acquisition unit acquires, as the economic indicator data, economic indicator data unrelated to the construction machinery industry in addition to economic indicator data directly related to the construction machinery industry.

4. 2. The parts demand trend forecasting system according to claim 1, wherein said economic index selection unit selects economic index data having a largest correlation coefficient with said parts past order data.

5. 5. The parts demand trend forecasting system according to claim 4, wherein said economic index selection unit selects a plurality of sets of economic index data that satisfy a predetermined condition in addition to the economic index data with the largest correlation coefficient.

6. 6. The parts demand trend forecasting system according to claim 5, further comprising a display unit that lists and displays the plurality of sets of economic index data selected by said economic index selection unit, said display unit being provided in said base side device.

Citation Information

Patent Citations

  • Component demand prediction device and component demand prediction method

    JP2015118412A

  • Business support device

    JP2018169684A

  • Analysis and correction of supply chain design through machine learning

    US20200074401A1

  • Elevating machine component demand forecasting system

    WO2015198453A1

  • Demand prediction device and demand prediction method

    WO2020188637A1