Quality control system for ground improvement
Patent Information
- Application Number
- JP2024139616
- Authority / Receiving Office
- JP · JP
- Patent Type
- Patents
- Current Assignee / Owner
- Filing Date
- 2024-08-21
- Publication Date
- 2024-10-25
- Estimated Expiration
- 2044-08-21
AI Technical Summary
【0018】 本発明によれば、施工開始時において、これから施工を開始する仮想区割りブロックの中心座標が重なる施工区割り全体ブロックの施工記録値を前記中心座標が位置する仮想区割りブロックに反映させるため、既に施工済となった施工記録に応じて累積記録値を調整する、すなわち、仮想区割り上における固化材の注入量やチェーン累積移動距離の施工記録を把握して施工をすることが可能となり、トレンチャの横行速度や固化材の注入量を正確に調整することができる。これにより、固化材の注入量やチェーンの累積移動距離について過剰な改良が抑制され、ロスの少ない地盤改良を行うことができる。
Smart Images

Figure 0007573229000001_ABST
Abstract
Description
[Technical field]
[0001] The present invention relates to a quality control system for ground improvement in which a ground improvement device equipped with a mixing and stirring head having mixing and stirring blades that move in a vertical direction is used to excavate the original ground while mixing and stirring it with a solidification material, thereby increasing the strength of the original ground. [Background technology]
[0002] A conventional quality control system for ground improvement using a ground improvement device equipped with a mixing and stirring head is known, for example, from the system described in Patent Document 1 below.
[0003] In this conventional quality control system for ground improvement, the current position in the global coordinate system is detected using GNSS (Global Navigation Satellite System), and based on this position information, when the mixing head is excavated horizontally, a virtual division diagram is used that divides the planned construction area for ground improvement in a plan view, and the movement trajectory and movement speed of the mixing head can be visually confirmed in real time, along with the rotation speed of the mixing impeller and the injection amount of solidification material.This makes it possible to always excavate according to the planned position regardless of the operator's experience or ability, and prevents wasteful construction. [Prior art documents] [Patent documents]
[0004] [Patent Document 1] Patent No. 7041435 Summary of the Invention [Problem to be solved by the invention]
[0005] However, in the conventional quality control system for ground improvement, the amount of solidification material injected and the cumulative travel distance of the chain are not quantified at each position of the mixing and stirring head. Therefore, whether the amount of solidification material injected and the cumulative travel distance of the chain are sufficient is judged based on whether the predetermined amount is satisfied for the entire construction area. As a result, even if there is partial insufficient improvement in a part of the construction area and excessive improvement in a part, the improvement quality is judged to be good as long as the predetermined amount is satisfied for the entire construction area. There is still room for improvement in terms of ensuring good improvement quality with little excess or deficiency.
[0006] Therefore, the present invention has been devised in consideration of the technical problems associated with the conventional ground improvement methods, and aims to provide a quality control system for ground improvement that can ensure good improvement quality with little excess or deficiency. [Means for solving the problem]
[0007] In a first aspect, the present invention provides a quality control system for ground improvement, in which a ground improvement device is provided at the tip of a boom and arm of a construction machine functioning as a base machine, and which has a mixing and stirring head having mixing and stirring blades that move in a circling manner in the vertical direction via a chain based on the driving force of a hydraulic actuator, and which performs ground improvement by excavating an original ground while mixing and stirring a solidifying material, thereby increasing the strength of the original ground, the quality control system uses a global navigation satellite system to calculate position coordinates of the mixing and stirring head in a global coordinate system, and uses the position coordinates to perform construction management of the ground improvement using an overall construction section map of a planned construction area where the ground improvement will be performed and a virtual division map into sections, the quality control system for ground improvement comprising: a plurality of receiving antennas that receive satellite signals transmitted from a positioning satellite; a measuring means that measures the horizontal distance from the base machine to the mixing and stirring head; a computing device that calculates the planar position and penetration depth of the mixing and stirring head based on the position coordinates of the base machine calculated based on the satellite signals and the measurement results of the measuring means; and a computing device that calculates the planar position and penetration depth of the mixing and stirring head based on an image that allows the planar position of the mixing and stirring head to be visually recognized in real time. The apparatus is equipped with a display means for displaying on a division map, and a recording means for recording the injection amount of the solidification material at the planar position of the mixing and stirring head and the cumulative movement distance of the chain as construction record values for each of the virtual division blocks divided in the virtual division map and the entire construction section block divided in the entire construction section map to the same size or smaller than the virtual division blocks, and the calculation device records the construction record value of the entire construction section block that overlaps with the center coordinates of the virtual division block where construction will be started at the start of construction, based on the construction record value of the entire construction section block that overlaps with the center coordinates of the virtual division block where construction will be started ... reflecting the results in the virtual division block, adding the actual measured values of the injection amount of the solidification material and the cumulative travel distance of the chain in the virtual division block and the entire construction section block to the construction record value as cumulative recorded values, and judging the pass / fail of the construction quality by comparing the construction record values of the injection amount of the solidification material and the cumulative travel distance of the chain in the virtual division block with threshold values distributed in the virtual division block obtained by dividing the design injection amount of the solidification material and the cumulative travel distance of the chain by the number of the virtual division blocks, respectively;The result of the determination is displayed by color on the display means.
[0008] In this way, in the present invention, at the start of construction, the construction record value of the entire construction block where the center coordinates of the virtual division block where construction will start are overlapped is reflected to the virtual division block where the center coordinates are located. Therefore, for example, in a case where the mixing and stirring head protrudes into an adjacent virtual division and the adjacent virtual division is partially completed during construction, it is possible to adjust the cumulative record value according to the construction record of the already completed construction. This prevents excessive improvement in the amount of solidification material injected and the cumulative travel distance of the chain, and allows ground improvement with little loss.
[0009] In addition, by visualizing the quality of the improvement through pass / fail judgment by coloring, it becomes possible to adjust the quality of the improvement during construction. This ensures good ground improvement with minimal excess or deficiency.
[0010] In addition, as another aspect of the quality control system for ground improvement, it is desirable that the calculation device calculates or records the time when the mixing state becomes good when the mixing impeller mixes and stirs the original ground as a judgment time, and when the planar position of the mixing head projected on the virtual division diagram is located on the virtual division block for longer than the judgment time, averages the construction record values recorded in the virtual division block within the range of the planar position.
[0011] If the amount of solidification material injected and the cumulative travel distance of the chain are accumulated by simple addition processing, for example, there will be an excess when the mixing head penetrates and a shortage when the mixing head is pulled out, and the cumulative recorded value recorded in the virtual division block will be excessive or insufficient, which may cause a discrepancy with the actual mixing state. Therefore, in the present invention, if the mixing head is positioned on the virtual division block for a specified time (judgment time) or more, the cumulative recorded values are averaged, making it possible to perform appropriate improved quality control.
[0012] In addition, if the averaging process is performed immediately after the mixing and stirring head moves the virtual partition block, the improvement may be judged as homogeneous even if the improvement is insufficient. Therefore, according to the present invention, the time when the mixed state becomes good is set as the judgment time until the averaging process is performed, thereby ensuring good improvement quality.
[0013] In addition, as yet another aspect of the quality control system for ground improvement, it is desirable that the judgment time is a time at which the mixed state is judged to be good, calculated based on the designed cumulative travel distance of the chain.
[0014] In this way, in the present invention, the time at which the mixing state is judged to be good, calculated based on the designed cumulative travel distance of the chain, is set as the judgment time, thereby ensuring appropriate improvement quality that takes into account the mixing capacity of the mixing head and the soil quality of the original ground.
[0015] Although it is possible to calculate the judgment time each time according to the mixing capacity of the mixing head, by setting it to a fixed, predetermined value, it is possible to set it on the safe side in terms of the quality of the improved product and further simplify the control content, which reduces the processing capacity required for calculation and the cost of building the system.
[0016] In addition, as another aspect of the quality control system for ground improvement, the computing device is also capable of making a pass / fail judgment by making a combined judgment on the construction record value of the injection amount of the solidification material and the construction record value of the cumulative travel distance of the chain.
[0017] In this way, in the present invention, the pass / fail judgment is made by comprehensively judging the cumulative recorded value of the amount of solidification material injected and the cumulative recorded value of the cumulative travel distance of the chain. Therefore, it is possible to proceed with the improvement work without checking the pass / fail judgment for each parameter, reducing the effort (burden) of the operator. Effect of the Invention
[0018] According to the present invention, at the start of construction, the construction record value of the entire construction division block where the center coordinates of the virtual division block where construction will start are overlapped is reflected in the virtual division block where the center coordinates are located, so that the cumulative record value is adjusted according to the construction record of the already completed construction, that is, it is possible to grasp the construction record of the injection amount of the solidification material and the cumulative movement distance of the chain on the virtual division and carry out construction, and it is possible to accurately adjust the traverse speed of the trencher and the injection amount of the solidification material. As a result, excessive improvement of the injection amount of the solidification material and the cumulative movement distance of the chain is suppressed, and ground improvement with little loss can be carried out. [Brief description of the drawings]
[0019] [Figure 1] 1 is a system configuration diagram of a ground improvement device according to the present invention. [Diagram 2] FIG. 2 is a front view of the trencher shown in FIG. [Diagram 3] FIG. 13 is an image of a monitor screen installed on the ground improvement device. [Figure 4] FIG. 2 is a control block diagram of a quality control system for ground improvement according to the present invention. [Diagram 5] 5 is a flowchart relating to quality management control executed based on the control block diagram shown in FIG. 4. [Figure 6] FIG. 6 is a conceptual diagram of a first step in the control flowchart shown in FIG. 5. [Figure 7] FIG. 6 is a conceptual diagram of a sixth step in the control flowchart shown in FIG. 5. [Figure 8] FIG. 13 is a diagram showing a modified example of a quality control system for ground improvement according to the present invention, and is an image diagram of a monitor screen installed in a ground improvement device. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0020] Hereinafter, an embodiment of a quality control system for ground improvement according to the present invention will be described in detail with reference to the drawings.
[0021] (System configuration of the ground improvement device) Fig. 1 shows a system configuration diagram of a ground improvement device in which a quality control system for ground improvement according to this embodiment is implemented. Fig. 2 shows a front view of the trencher shown in Fig. 1. In the following explanation, the upper side in Fig. 1 and the upper side in the vertical direction are referred to as "upper", and the lower side in Fig. 1 and the lower side in the vertical direction are referred to as "lower".
[0022] The ground improvement device according to this embodiment is configured with a backhoe 1, which is a construction machine, as a base machine, as shown in Fig. 1, and a boom 2 and an arm 3 are rotatably connected to the front of a base 1a, which is rotatably mounted on the upper part of a track 1b, and a trencher 4, which is a mixing and stirring head, is detachably mounted on the tip of the boom 2 and the arm 3. The backhoe 1 penetrates the trencher 4 into the ground to a design improvement depth H as shown in Fig. 1, and by operating the boom 2 and the arm 3 to horizontally advance the trencher 4 back and forth, the soil is excavated and the solidification material is mixed and stirred.
[0023] As shown in Fig. 2, the trencher 4 is configured by wrapping an endless drive chain 43 around a drive wheel 41 that is driven by a hydraulic motor 44 provided on the upper part of a frame 40, and a driven wheel 42 provided on the lower end of the frame 40. A plurality of mixing and stirring blades 45 are attached at approximately equal intervals (equal pitch) on the outer periphery of the drive chain 43, and a plurality of cutter blades 46 are arranged in parallel along the width direction on each mixing and stirring blade 45. A plurality of solidification material discharge parts 47 that discharge the solidification material downward are provided on the lower part of the frame 40, and a slurry or powder solidification material that is pressure-fed through a pipe 48 by a pump not shown, such as a grout pump, is discharged from the solidification material discharge parts 47. With this configuration, as the drive wheel 41, which is rotated by the hydraulic motor 44 corresponding to the hydraulic actuator of the present invention, rotates, each mixing and stirring blade 45 moves in a circular movement in the vertical direction together with the drive chain 43, and the solidification material is discharged from the solidification material discharge section 47, thereby stirring and mixing the excavated raw soil and the solidification material while excavating the ground.
[0024] In addition, at the rear of a cabin (operating room) 1c provided at the front of the base 1a of the backhoe 1 and used for driving by an operator, there are provided a plurality of (two in this embodiment) GNSS receiving antennas AN1 for receiving satellite signals (GNSS signals) transmitted from a positioning satellite DS (e.g., GPS satellites, etc.), and a wireless receiving antenna AN2 for receiving satellite signals (GNSS signals) observed at a fixed base station FB or a public base station CB within the ground improvement construction site. Both the GNSS receiving antenna AN1 and the wireless receiving antenna AN2 are electrically connected to a later-described arithmetic unit PU disposed at the rear of the cabin 1c. The GNSS receiving antenna AN1 and the wireless receiving antenna AN2 are included in the receiving antenna according to the present invention.
[0025] A calculation unit PU is provided at the rear of the cabin 1c of the backhoe 1, which is a calculation means for calculating the planar position, penetration depth, and excavation speed of the trencher 4 based on angle detection signals from angle sensors AS0, AS1, AS2, and AS3 that detect the inclination angle of the backhoe 1 and satellite signals received by each GNSS receiving antenna AN1 and wireless receiving antenna AN2. A monitor screen MD, for example as shown in Fig. 3, is provided in the cabin 1c as a display means for displaying the calculation results of the calculation unit PU.
[0026] Based on the above configuration, the ground improvement device according to this embodiment performs horizontal excavation by continuously moving the penetrated trencher 4 in a single stroke so as to form a movement trajectory that is approximately N-shaped in plan view by turning back at predetermined turning lines R1 and R2 without completely pulling it out, as shown in Fig. 1. In this horizontal excavation, the straight excavation and the oblique excavation are performed so as to overlap, so that the section is excavated without leakage, and the solidification material is mixed.
[0027] (Screen monitor configuration) FIG. 3 shows an image of the monitor screen MD installed on the ground improvement device.
[0028] The monitor screen MD displays a plurality of display windows F1 to F14, which display the results of calculations performed by the arithmetic unit PU, laid out for each display item, as shown in Fig. 3. Note that the screen display shown in Fig. 3 is only an example, and it is not necessary for all of the items shown in the figure to be displayed. Also, any display item can be added and displayed as necessary, and can be arbitrarily changed according to the management items for quality control, etc.
[0029] That is, the monitor screen MD illustrated in this embodiment has three relatively large display windows F1, F2, and F3, which show the main management items, displayed in parallel in the center of the screen. The display window F1 displays an image of the planar position of the trencher 4 in the construction area and the progress of the number of blade cuttings (the cumulative travel distance of the drive chain 43). The display window F2 displays an image of the planar position of the trencher 4 in the construction area and the progress of the amount of solidification material inflow. The display window F3 displays a cross section of the improved body, and displays an image of the penetration state of the trencher 4 and the quality state of the improved body. For the sake of convenience of illustration, the color display shown in each of the display windows F1 to F3, which will be described later, is displayed by different hatching patterns to indicate different colors.
[0030] The display windows F1 and F2 are unit sections obtained by arbitrarily dividing the construction area shown in the global coordinate system, and are any mesh (for example, 10 cm) or less than the effective mixing width E (see FIG. 2) of the trencher 4 in the global coordinate system. 2 ) Mx is cut on the virtual divisional map VM, and the projection surface of the trencher 4 is superimposed on the virtual divisional map VM. In the virtual divisional map VM, each mesh Mx is displayed in three levels of color according to the color coding shown in the upper left corner of each display window F1, F2, making it possible to manage the quality (progress) of the improved structure in real time.
[0031] In this embodiment, the improvement quality is divided into three stages of 20%, 70%, and 100% for coloring, but the number of stages can be changed as desired depending on the quality control specifications of the ground improvement work. In this embodiment, the improvement quality is divided into stages with 100% as the upper limit, but it is also possible to set the upper limit to 100% or more, for example, 110% or 120%, since this has the advantage of allowing confirmation of the extent to which excessive construction has been performed.
[0032] In addition, the monitor screen MD displays, below the display windows F1 to F3, a display window F4 that numerically displays the design depth, which is the planned improvement depth, a display window F5 that numerically displays the implemented depth, which is the actual improvement depth, a display window F6 that numerically displays the difference between the design depth and the implemented depth, a display window F7 that numerically displays the implemented maximum depth, which is the maximum depth of the implemented depths, and a display window F8 that numerically displays the verticality (tilt angle) of the trencher 4.
[0033] Further, on the monitor screen MD, to the right of the display window F3, a display window F9 that displays the block number where construction is to be performed, a display window F10 that numerically displays the moving speed (rotation speed) of the drive chain 43 (see FIG. 2), a display window F11 that numerically displays the accumulated moving distance of the drive chain 43, a display window F12 that numerically displays the planned design flow rate of the solidification material, a display window F13 that numerically displays the accumulated flow rate of the solidification material mixed in as a result of improvement implementation, a display window F14 that numerically displays the instantaneous flow rate of the solidification material discharged from the trencher 4, and a display window F15 that numerically displays the hydraulic pressure generated by the hydraulic motor 44 (see FIG. 2) are displayed in a vertical row. Note that a construction end button FSW is located below the display window F14 and at the bottom right of the monitor screen MD.
[0034] (Configuration of the arithmetic unit) FIG. 4 shows a control block diagram of the arithmetic unit PU according to this embodiment.
[0035] That is, the arithmetic unit PU has a division information recording section B1 in which information on division is recorded, and an entire improvement range recording section B2 in which information on the entire improvement range is recorded, as shown in Fig. 4, for example. The division information recording section B1 stores construction record values such as division coordinates, block size, depth, solidification material injection amount (slurry amount) of virtual division blocks VB subdivided in the virtual division map VM, and accumulated movement distance of the drive chain 43 (hereinafter abbreviated as "chain cumulative movement distance"). Similarly, the entire improvement range recording section B2 stores construction record values such as coordinates of the entire construction section that is the improvement range, block size, depth, solidification material injection amount, and chain cumulative movement distance of the entire construction section block WB subdivided to the same size or less as the virtual division block VB in the entire construction section map WM.
[0036] The arithmetic unit PU also has a trencher position information calculation unit B3 that calculates the position information of the trencher 4, a solidification material instantaneous flow rate recording unit B4, and an instantaneous chain speed recording unit B5. The trencher position information calculation unit B3 calculates the planar position (coordinates) of the trencher 4 based on the angle detection signal of the inclinometer (angle sensors AS0, AS1, AS2, and AS3 in this embodiment) provided at the rear of the cabin 1c of the backhoe 1 and the satellite signals received by each GNSS receiving antenna AN1 and the wireless receiving antenna AN2. The solidification material instantaneous flow rate recording unit B4 records the instantaneous flow rate of the solidification material measured by the solidification material flow meter SF provided on the trencher 4. The instantaneous chain speed recording unit B5 records the instantaneous speed of the drive chain 43 calculated based on the number of rotations of the drive chain 43 measured by the chain rotation meter RT provided on the trencher 4.
[0037] The calculation unit PU also has an actual measurement value calculation unit B6 that calculates the actual measurement values (hereinafter referred to as ``accumulated recorded values'') of the solidification material injection amount (instantaneous flow rate) and the instantaneous speed (travel distance) of the drive chain 43 for each block unit in the virtual division block VB and the entire construction section block WB, and an actual measurement value addition unit B7 that adds the actual measurement values (hereinafter referred to as ``accumulated recorded values'') of the solidification material injection amount and the chain cumulative travel distance for each block unit at the planar position of the trencher 4 to the recorded values (hereinafter referred to as ``construction recorded values'') of the solidification material injection amount and the chain cumulative travel distance for each block unit. The actual measurement value calculation unit B6 calculates cumulative recorded values, which are actual measurements of the instantaneous flow rate of the solidifying material for each block unit corresponding to the position (coordinates) of the trencher 4 calculated by the trencher position information calculation unit B3, and the instantaneous speed (travel distance) of the drive chain 43, based on the instantaneous flow rate of the solidifying material input from the instantaneous solidifying material flow rate recording unit B4 and the instantaneous speed of the drive chain 43 input from the instantaneous chain speed recording unit B5. The actual measurement value addition unit B7 adds the cumulative recorded values of the instantaneous flow rate of the solidifying material for each block unit and the instantaneous speed of the drive chain 43 input from the actual measurement value calculation unit B6 to the construction record values for each block unit input from the division information recording unit B1 and the entire improvement range recording unit B2, respectively. Here, based on the judgment result of the overlap judgment unit B8, which judges the entire construction section block WB that overlaps with the center coordinate Q of the virtual division block VB (see Figure 6), the actual measurement value addition unit B7 reflects (feedback processing) the construction record value of the entire construction section block WB that overlaps with the center coordinate Q of the virtual division block VB to the virtual division block VB in which the center coordinate Q is located.
[0038] The arithmetic unit PU also has an elapsed time determination unit B9 for determining the elapsed time Tx when the trencher 4 passes (is located) in each block based on the planar position of the trencher 4, an averaging processing unit B10 for calculating an average processing value by averaging each of the construction record values of the solidification material injection amount and the chain cumulative movement distance of each block at the planar position of the trencher 4, and a processing value recording unit B11 for recording each of the construction record values or each average processing value of the solidification material injection amount and the chain cumulative movement distance. The elapsed time determination unit B9 compares the elapsed time Tx when the trencher 4 passes (is located) in each block of the virtual division block VB and the entire construction section block WB with a predetermined time Tp, which is a threshold value set in the counter time setting unit B12, and determines whether the elapsed time Tx when the trencher 4 passes (is located) reaches the predetermined time Tp. The predetermined time Tp is a predetermined time when the mixing and stirring blades 45 (see FIG. 2) are in a good mixed state when mixing and stirring the original ground. The averaging unit B10 averages the solidification material injection amount and the chain cumulative travel distance of each block by dividing the construction record values of the solidification material injection amount and the chain cumulative travel distance of each block at the planar position of the trencher 4 by the quantity of each block overlapping at the planar position of the trencher 4. The processing value recording unit B11 records the construction record values of the solidification material injection amount and the chain cumulative travel distance as processing values Sx when the predetermined time Tp has not elapsed and the averaging has not been performed, and records the average processed values of the solidification material injection amount and the chain cumulative travel distance input from the averaging unit B10 as processing values Sx when the averaging has been performed after the predetermined time Tp has elapsed.
[0039] The calculation unit PU also has a coloring judgment unit B13 that judges the improvement quality by coloring based on the threshold value of the virtual division block VB. The coloring judgment unit B13 compares the processing value Sx of the solidification material flow rate and the chain cumulative travel distance of each block input from the processing value recording unit B11 with the threshold value Sp of the solidification material flow rate and the chain cumulative travel distance of each block recorded in the threshold value recording unit B14 to judge whether the processing value Sx of each block has reached the threshold value Sp of each block. Specifically, if "Sx=0.2Sp", it is judged as "20%, if "Sx=0.7Sp", it is judged as "70%, if "Sx=Sp", it is judged as "100%, and the color scheme is determined according to the degree of reaching (20%, 70%, 100%) (see FIG. 3). The judgment result of the coloring judgment unit B13 is constantly output to the monitor screen MD, and is visible to the operator operating the backhoe 1.
[0040] (Quality Control Control Flow) FIG. 5 shows a flowchart relating to the quality control control executed based on the control block diagram shown in FIG.
[0041] As shown in Fig. 5, in the first step S1, the arithmetic unit PU performs a feedback process of the construction record value of the entire construction section block WB to the virtual section block VB in the virtual section block VM of the section (section) where construction will be performed. As a result, the construction record values of the solidification material injection amount and the chain cumulative travel distance of the entire construction section block WB that overlaps with the center coordinate Q of the virtual section block VB are reflected in the virtual section block VB of the section (section) where construction will be started.
[0042] Next, in a second step S2, the cumulative recorded values (instantaneous flow rate of solidification material and instantaneous speed (travel distance) of the drive chain 43) for each block in the virtual division block VB and the entire construction section block WB are calculated. Then, in a third step S3, the cumulative recorded values (instantaneous flow rate of solidification material and instantaneous speed (travel distance) of the drive chain 43) for each block calculated in the second step S2 are added to the construction recorded values of the solidification material injection amount and the chain cumulative travel distance for each block at the planar position of the trencher 4.
[0043] Next, in a fourth step S4, the counter is incremented (1UP) for each block included in the planar position of the trencher 4 in the virtual section block VB and the entire construction section block WB. Then, in a fifth step S5, it is determined whether or not the elapsed time Tx during which the trencher 4 passes (is located) in each block of the virtual section block VB and the entire construction section block WB counted in the fourth step S4 reaches a predetermined time Tp which is a threshold value, that is, whether or not "Tx=Tp".
[0044] Here, if the fifth step S5 is "No", i.e., the trencher 4 has not passed the predetermined time Tp in each block, the process proceeds to the seventh step S7 described below. On the other hand, if the fifth step S5 is "Yes", i.e., the trencher 4 has passed the predetermined time Tp in each block, in the next sixth step S6, the construction record values for each block (solidification material flow rate and cumulative chain travel distance) are averaged, and the average processed values of the solidification material flow rate and cumulative chain travel distance are calculated.
[0045] Next, in the seventh step S7, if the averaging process was performed in the sixth step S6, the average process values are recorded as the construction record values of each block in the virtual section block VB and the entire construction section block WB. Also, if the fifth step S5 is judged as "No", the averaging process is not performed, and the actual measured values of the solidification material flow rate and the chain cumulative travel distance are recorded as the construction record values of each block in the virtual section block VB and the entire construction section block WB.
[0046] Thereafter, in an eighth step S8, based on the construction record values of each block of the virtual division block VB, a coloring judgment process is performed for the solidification material flow rate and the chain cumulative travel distance of each block, and then this control flow is terminated.
[0047] (Feedback processing of construction record values) Fig. 6 shows a conceptual diagram of the feedback process of the construction record value in the first step S1 of the control flowchart shown in Fig. 5. In Fig. 6, the virtual section block VB is shown by a solid line, and the entire construction section block WB is shown by a dashed line.
[0048] The feedback process of the construction record values performed in the first step S1 of the control flow reflects, for example, as shown in Figure 6, the construction record values of the solidification material injection amount and the cumulative chain travel distance of the entire construction section block WB (WB1 to WB6) that overlaps with the center coordinate Q (Q1 to Q6) of the virtual division block VB (VB1 to VB6) of the section (division) where construction is to begin.
[0049] Specifically, as shown in FIG. 6, the first virtual section block VB and the second virtual section block VB2 reflect the construction record values of the solidification material injection amount and the chain cumulative travel distance of the first construction section overall block WB1, where the center coordinate Q1 of the first virtual section block VB and the center coordinate Q2 of the second virtual section block VB2 overlap. The third virtual section block VB3 reflects the construction record values of the solidification material injection amount and the chain cumulative travel distance of the third construction section overall block WB3, where the center coordinate Q3 of the third virtual section block VB3 overlaps. The fourth virtual section block VB4 reflects the construction record values of the solidification material injection amount and the chain cumulative travel distance of the fourth construction section overall block WB4, where the center coordinate Q4 of the fourth virtual section block VB4 overlaps. The fifth virtual sectioning block VB5 reflects the construction record values of the solidification material injection amount and the chain cumulative travel distance of the fifth construction section overall block WB5, which overlaps with the center coordinate Q5 of the fifth virtual sectioning block VB5. The sixth virtual sectioning block VB6 reflects the construction record values of the solidification material injection amount and the chain cumulative travel distance of the sixth construction section overall block WB6, which overlaps with the center coordinate Q6 of the sixth virtual sectioning block VB6.
[0050] By performing the above-described feedback processing, even if construction of each section (division) goes beyond the section (division) during construction, the construction records of the construction carried out due to the overhang are reflected at the time of construction of the section (division) that was carried out due to the overhang, making it possible to prevent excessive improvements to the section (division).
[0051] (Averaging of cumulative recorded values) FIG. 7 shows an image on the monitor screen MD that illustrates the problem that occurs when the cumulative recorded values of the amount of solidification material injected and the cumulative chain travel distance are simply added to the construction record values.
[0052] As the actual improved body will end up having the same strength at all positions, there will be no problem with the improvement quality; however, if the construction record values for the amount of solidifier injected and the cumulative chain travel distance are managed by simply adding up each cumulative record value, as shown in Figure 7, there is a risk that the improvement quality of the improved body will not be uniform depending on the elapsed time it takes for the trencher 4 to pass through each block.
[0053] For example, as shown in Fig. 7(a), if each of the three management blocks (first management block PB, second management block SB, and third management block TB) is to be constructed in 6 minutes, the remaining second management block SB and third management block TB will be constructed in 12 minutes after the first management block PB, but as shown in Fig. 7(b), Fig. 7(c), and Fig. 7(d), if construction is carried out one row at a time from the first management block PB, the area where the trencher 4 overlaps with the first management block PB will gradually become darker as shown in each figure, and the latter half of the first management block PB will be mixed and stirred more. On the other hand, if the trencher 4 is quickly pulled out when it reaches the third management block TB, there is a problem that the amount of mixing and stirring decreases as it approaches the end of the third management block TB, as shown in Fig. 7(e).
[0054] In contrast, the trencher 4 mixes and stirs the solidification material by moving the mixing and stirring blades 45 in a vertical orbit, so that in a plan view of the trencher 4, the improved soil in the front moves backward and the improved soil in the rear moves forward. Therefore, in this embodiment, by performing the averaging process on the construction record values of the amount of solidification material injected and the cumulative chain travel distance, it becomes possible to perform quality control that conforms to the actual situation.
[0055] On the other hand, depending on the soil quality at the site, there may be soil quality that is difficult to mix and stir at the planar position of the projected trencher 4, and it is not always possible to perform the averaging process. Therefore, for example, by having the calculation unit PU record in advance the improvement depth at which the averaging process can be performed, it is possible to avoid performing the averaging process in a state where mixing and stirring is insufficient, and quality control that is more in line with the actual situation can be performed.
[0056] As described above, in the case of N-shaped construction, in which the trencher 4 is moved continuously in a single stroke to form a moving trajectory that is almost N-shaped in plan view by turning back at a predetermined turning line R1, R2 (see FIG. 1) without completely pulling out the penetrated trencher 4, the horizontal excavation is performed so that the straight excavation and the oblique excavation overlap. In the N-shaped construction performed by reciprocating, if the accumulated recorded values of the solidification material injection amount and the accumulated chain movement distance are simply added to each other, there is a risk of a large bias in the coloring judgment. Therefore, by performing the averaging process, more effective quality control can be performed. In addition, it is desirable to set the elapsed time Tx to half for the construction of the overlapping part of the N-shaped construction. This makes it possible to suppress excessive construction of the overlapping part of the N-shaped construction.
[0057] (How to set the counter threshold) As described above, the predetermined time Tp, which is the threshold value of the counter, is set as a judgment time when the mixing condition becomes good when the mixing impeller 45 mixes and stirs the original ground. Specifically, it is set based on the following calculation, for example.
[0058] Generally, the number of blade cuts correlates to the cumulative travel distance of the chain, and is 50 (cuts / m 2 ) the mixing condition is good.
[0059] For example, if the number of blade cuts designed is 50 (times / m 2 ), the partition (division) dimensions are 5 (m) × 5 (m) × improvement depth 7 (m), the planar dimensions of the trencher 4 are thickness 1 (m) × width 1 (m), the chain length of the drive chain 43 is 14 (m), the number of mixing agitator blades 45 is 14 (pieces), and the design chain speed of the drive chain 43 is 1 (m / sec), The pitch of the mixing impeller 45 is Chain length 14 (m) ÷ number of mixing blades 14 (pieces) = 1.0 (m / piece) It becomes. Then, the number of impellers passing through in one second is: Design chain speed 1 (m / sec) ÷ mixing blade pitch 1.0 (m / blade) = 1 (blade / sec) It becomes. In other words, it takes 1 (second / piece) for the mixing agitating blade 45 to pass per 1.0 (m) of cumulative chain movement distance. In addition, the set cumulative chain movement distance per section (division) is 50 (times / m 2 ) is calculated by dividing the section (division) dimension 5 (m) x 5 (m) x improvement depth 7 (m) by the width of the trencher 4 1 (m) and multiplying the result by the agitator blade pitch 1 (m), to obtain 8,750 (m). Therefore, the set cumulative chain travel distance per planar dimension of the trencher 4 is 350 (m), obtained by dividing 8750 (m) by the section (division) dimension 5 (m) x 5 (m) x improvement depth 7 (m).Since the cumulative chain travel distance passed by one mixing agitator blade 45 is 1.0 (m), the required time per planar dimension of the trencher 4 is 350 (seconds). Furthermore, the averaging process is performed every 0.1 (m) in the direction of travel of the trencher 4, so the time required per planar dimension of the trencher 4, 350 (seconds), is multiplied by the distance in the direction of travel, 0.1 (m), obtained by dividing the time required per planar dimension of the trencher 4 by the thickness of the trencher 4, 1 (m), to obtain 35 (seconds). From the above calculations, under the above conditions, it can be considered that a homogeneous improved body has been formed if 35 seconds have elapsed at the planar position of the trencher 4.
[0060] The design chain speed must be determined taking into account the soil type, but there are few cases in which the average chain speed for the entire section (division) will be below 1.0 (m / s), and when the measured value is greater than 1.0 (m / s), it is on the safe side, so there is no thought to be a problem.
[0061] (How to set the coloring judgment threshold) For example, the construction conditions are as follows: the plot (division) dimensions are 5 (m) x 5 (m) x 7 (m), the design amount of solidification material for the plot (division) is 45,000 (L), the plan dimensions of the trencher 4 are 1 (m) x 1 (m), and the block dimensions are 0.1 (m) x 0.1 (m).
[0062] The threshold amount of solidification material injected under the specified construction conditions is calculated using the following formula. Under these construction conditions, the number of each block is calculated by dividing the plot (division) dimensions (5 (m) x 5 (m)) by the block dimensions (0.1 (m) x 0.1 (m)), resulting in 2,500 (pieces). Then, the design solidification material amount per unit block is calculated by dividing the design solidification material amount of the section (division) 45,000 (L) by the number of blocks 2,500 (pieces), and the coloring judgment threshold is 18 (L / block).
[0063] On the other hand, the threshold value of the cumulative chain travel distance under the above construction conditions is calculated by the following formula. The set cumulative chain travel distance per section (division) is 50 (times / m 2 ) is divided by the construction dimension 5 (m) x 5 (m) x 7 (m) by the width of the trencher 4 1 (m) x 1 (m), and multiplied by the mixing blade pitch 1 (m) to get 8750 (m). Then, the design chain cumulative travel distance per unit block is calculated by dividing the design chain cumulative travel distance of the section (division) of 8750 (m) by the number of blocks of 2500 (pieces), and the coloring determination threshold is 3.5 (m / block).
[0064] In addition, when the improvement depth differs at the ends of a section (division), the coloring judgment threshold for each block can be calculated by taking the improvement lower end of each block, obtained by connecting the depths of the ends of the section (division) with a straight line, as the designed improvement lower end of each block, multiplying this depth by the amount of solidification material injected and the cumulative chain travel distance, and dividing it by the average depth.
[0065] (Calculation method for cumulative record value for each block) For example, the mixing impeller width of the mixing impeller 45 of the trencher 4 is 1 (m), the thickness of the trencher 4 is 1 (m), the width of each block is 0.1 (m), the thickness of each block is 0.1 (m), the designed amount of solidification material per section (division) is 45,000 (L), and the work volume is 50 (m 3 / h) and the plot (division) dimensions are 5(m) x 5(m) x 7(m) as construction conditions.
[0066] The measured instantaneous flow rate of the solidification material is Designed amount of solidification material per section (division) 45,000 (L) ÷ (section (division) dimensions 5 (m) × 5 (m) × 7 (m) ÷ work volume 50 (m 3 / h)×60)≒215(L / min) and the instantaneous flow rate of the solidification material in the design, The number of blocks where trencher 4 is located is Plane dimension of trencher 4 (1 (m) x 1 (m)) ÷ block dimension (0.1 (m) x 0.1 (m)) = 100 (pieces) Therefore, the measured instantaneous flow rate of the solidification material, 215 (L / min), is divided by the number of blocks, 100 (pieces), to get 2.15 (L / min · pieces), and converted per second, the cumulative recorded amount of solidification material is 0.036 (L / s · pieces).
[0067] Similarly, if the measured instantaneous chain speed is 1.0 (m / s), dividing the instantaneous chain speed of 1.0 (m / s) by the number of blocks (100) will result in the cumulative recorded value of the chain being 0.01 (m / s).
[0068] (Effects of this embodiment) As described above, the quality control system for ground improvement according to this embodiment records the construction record values not only in the virtual section block VB but also in the entire construction section block WB, and performs a feedback process to reflect the construction record value of the entire construction section block WB overlapping with the center coordinate Q of the virtual section block VB to be started from now on, to the virtual section block VB where the center coordinate Q is located, at the start of construction from the next time onwards. For this reason, for example, in a case where the trencher 4 protrudes into an adjacent virtual section during construction and the adjacent virtual section is partially completed at the time of construction, each construction record value of the solidification material injection amount and the chain cumulative travel distance that have already been completed is reflected (feedback) to the virtual section block VB to be started from now on, thereby making it possible to adjust each construction record value of the solidification material injection amount and the chain cumulative travel distance in the virtual section block VB to be started from. As a result, excessive improvement in the virtual section block VB is suppressed, and ground improvement with less loss can be performed.
[0069] Moreover, in this embodiment, as shown in the eighth step S8 of the control flow, the excess or deficiency of the improvement quality can be visualized by the pass / fail judgment by coloring processing. Therefore, the operator who operates the backhoe 1 during construction can adjust the excess or deficiency of the improvement quality according to the pass / fail judgment by the coloring processing. This makes it possible to ensure good ground improvement with little excess or deficiency.
[0070] In addition, when adding up the cumulative recorded values of the solidification material injection amount and the cumulative chain travel distance to the construction record values, if the cumulative recorded values of the solidification material injection amount and the cumulative chain travel distance are accumulated by a simple addition process, there is a risk that an excess or deficiency in construction record values will be recorded in the virtual division block VB, for example, when the trencher 4 penetrates and when the trencher 4 is pulled out.
[0071] Therefore, in this embodiment, when the trencher 4 is positioned on the virtual division block VB for a predetermined time Tp or longer, which is a threshold value, the construction record values of the solidification material injection amount and the cumulative chain travel distance are averaged, thereby making it possible to perform more appropriate improved quality control.
[0072] If the averaging process is performed within the predetermined time Tp, for example, immediately after the trencher 4 moves the virtual partitioning block VB, the surface may be determined to be homogeneous even if the improvement is not yet sufficient.
[0073] Therefore, in this embodiment, the time when the mixed state becomes good is set as the judgment time until the averaging process, and the averaging process is performed when the trencher 4 is located in the virtual partition block VB for a predetermined time Tp or more, which is the judgment time. In this way, by setting the predetermined time Tp when the mixed state becomes good as the judgment time until the averaging process, good refinement quality can be guaranteed.
[0074] In addition, in this embodiment, the time at which the mixed state is judged to be good, calculated based on the designed cumulative chain travel distance, is set as the judgment time, thereby ensuring appropriate improvement quality taking into account the mixing capacity of the trencher 4 and the soil quality of the original ground.
[0075] In this case, the judgment time can be calculated each time according to the mixing capacity of the trencher 4, but by setting it to a fixed, predetermined value, it is possible to set it on the safe side in terms of the quality of the improved substance, and furthermore, it is possible to simplify the control content. This makes it possible to reduce the processing capacity required for calculation and the costs related to system construction.
[0076] (Modification) FIG. 8 is a diagram showing another example of the quality control system for ground improvement according to the present invention, and shows an image on a monitor screen MD installed on a backhoe 1. In FIG.
[0077] For example, as shown in FIG. 8, the display window F1 and the display window F2 according to the embodiment may be integrated, and the pass / fail judgment of the solidification material injection amount and the pass / fail of the chain cumulative movement distance may be performed in a single display window F16 by performing a composite (comprehensive) judgment and a pass / fail judgment by coloring. Specifically, for example, a "solidification material judgment" which is a pass / fail judgment of the solidification material injection amount is displayed in a display window F17 displayed at the top of the display window F16, and a "chain cumulative judgment" which is a pass / fail judgment of the chain cumulative movement distance is displayed in a display window F18 displayed adjacent to the display window F17. According to the illustration in FIG. 8, "x" is displayed in the solidification material judgment in the display window F17, "o" is displayed in the chain cumulative judgment in the display window F18, and the color display of the display window F16 which performs the comprehensive judgment is "70%". This is because the chain cumulative judgment has reached "100%" and is passed, but the solidification material judgment is "70%," so that the lower judgment (judgment of "70%") is reflected in the virtual division block. This allows the operator operating the backhoe 1 to check the pass / fail results of both parameters, the amount of solidification material injected and the cumulative chain travel distance, in a single display window F16 displayed on the monitor screen MD.
[0078] As described above, in this modified example, the pass / fail judgment is performed by comprehensively judging the construction record value of the solidification material injection amount and the construction record value of the cumulative chain movement distance. Therefore, the operator who operates the backhoe 1 can proceed with the improvement construction without checking the pass / fail judgment of each parameter displayed in the multiple display windows F1, F2 (see FIG. 3) as in the above embodiment, and the operator's labor (burden) can be reduced.
[0079] The present invention is not limited to the configuration exemplified in the above embodiment, and can be freely modified according to the specifications of the quality control system for ground improvement to be applied, within the scope that does not deviate from the spirit of the present invention.
[0080] For example, the display form of the monitor screen MD illustrated in the above embodiment is merely one example, and the layout and display format of each display window, mesh coarseness, etc. can be changed arbitrarily depending on the specifications of the quality control system for ground improvement to be applied.
[0081] Further, the positioning satellites DS include not only the GPS exemplified in the above embodiment, but also any other positioning satellites used for positioning, such as GLONASS, BeiDou, Galileo, Michibiki, and NAVIC. [Explanation of symbols]
[0082] 1...Backhoe (base machine) 2. Boom 3. Arm 4…Trencher (mixing and stirring head) 43…Drive chain 44...Hydraulic motor (hydraulic actuator) 45...Mixing impeller AN1...GNSS antenna (receiving antenna) AN2…Radio receiving antenna (receiving antenna) AS1: Angle sensor (measurement means) AS2: Angle sensor (measurement means) AS3: Angle sensor (measurement means) DS: Positioning satellite MD…Monitor screen (display means) PU…Arithmetic unit VM…Virtual division map VB…Virtual division block WM…Overall construction area WB: Entire construction area block Q: Center coordinates Tp…Predetermined time (judgment time)
Claims
1. A quality control system for ground improvement is provided for performing ground improvement work to increase the strength of original ground by excavating the original ground while mixing and stirring a solidification material using a ground improvement device equipped with a mixing and stirring head having mixing and stirring blades that move in a vertical direction via a chain based on the driving force of a hydraulic actuator at the tip of the boom and arm of a construction machine that functions as a base machine, the quality control system uses a global navigation satellite system to calculate the position coordinates of the mixing and stirring head in a global coordinate system, and uses the position coordinates to perform construction management of the ground improvement work using an overall construction section map of the planned construction area where the ground improvement work will be performed and a virtual division map into which the planned construction area is divided, The ground improvement device is A plurality of receiving antennas for receiving satellite signals transmitted from positioning satellites; A measuring means for measuring a horizontal distance from the base machine to the mixing and stirring head; A calculation device that calculates the planar position and penetration depth of the mixing and stirring head based on the position coordinates of the base machine calculated based on the satellite signal and the measurement results of the measuring means; a display means for displaying the planar position of the mixing and stirring head on the virtual division diagram in real time by a visually recognizable image; A recording means for recording the injection amount of the solidification material at the planar position of the mixing and stirring head and the cumulative movement distance of the chain as construction record values for each of the virtual division blocks divided in the virtual division diagram and the entire construction section block divided in the entire construction section diagram to a size equal to or smaller than the virtual division blocks; Equipped with The computing device includes: At the start of construction, the construction record value of the entire construction section block that overlaps with the center coordinates of the virtual division block where construction will start is reflected in the virtual division block where the center coordinates are located; In the virtual division block and the entire construction section block, the actual measurement values of the injection amount of the solidification material and the cumulative movement distance of the chain are added to the construction record value as a cumulative record value, The construction quality is judged by comparing the construction record values of the injection amount of the solidification material in the virtual division block and the cumulative movement distance of the chain with threshold values distributed in the virtual division block, which are calculated by dividing the design injection amount of the solidification material and the design cumulative movement distance of the chain by the number of the virtual division blocks, respectively, and the judgment result is displayed by coloring on the display means. A quality control system for ground improvement characterized by:
2. The quality control system for ground improvement according to claim 1, The computing device includes: The time when the mixing impeller mixes and mixes the raw ground to a good mixing state is calculated or recorded as a judgment time, When the planar position of the mixing and stirring head projected onto the virtual division diagram is located on the virtual division block for the judgment time or more, the construction record values recorded on the virtual division block within the range of the planar position are averaged. A quality control system for ground improvement characterized by:
3. The quality control system for ground improvement according to claim 2, The judgment time is a time at which the mixed state is judged to be good, which is calculated based on a designed cumulative moving distance of the chain. A quality control system for ground improvement characterized by:
4. A quality control system for ground improvement according to any one of claims 1 to 3, The calculation device performs a pass / fail judgment by comprehensively judging the construction record value of the injection amount of the solidification material and the construction record value of the cumulative movement distance of the chain. A quality control system for ground improvement characterized by:
Citation Information
Patent Citations
JP1975074293A
Control device of ground improvement machine
JP2013028923A
Ground improvement methods
JP7041435B1
JPP6835376B
JPP7041435B
